1 US Army Corps of Engineers General Program Overview & Impacts of Issues on Project Regulation Charles Pearre, PE Program Manager,, Emeritus June 2011 US Army Corps of Engineers BUILDING STRONG

2 Defined Dam safety is the art and science of ensuring the integrity and viability of dams such that they do not present unacceptable risks to the public, property, and the environment. It requires the collective application of engineering principles and experience, and a philosophy of risk management that recognizes that a dam is a structure whose safe function is not explicitly determined by its original design and construction. It also includes all actions taken to identify or predict deficiencies and consequences related to failure, and to document, publicize, and reduce, eliminate, or remediate to the extent reasonably possible, any unacceptable risks Federal Guidelines for, Glossary of Terms (FEMA 148), April

3 Transition to a Risk Informed Program Moving from a solely standards based approach to a dam safety portfolio risk management approach. Standards based or essential guidelines approach is included in the risk informed approach. One element of a risk informed decision is compliance with tolerable risk guidelines Other non-quantitative factors will influence risk management decisions. 3

4 Risk Framework 4

5 Guiding Principles Portfolio Risk Management Life safety is paramount. Do No Harm Risk-informed corporate approach. Urgency of dam safety actions. Risk communication. Prioritization of studies and investigations. Formulation and prioritization of risk management measures. Level of detail of risk assessments. Routine dam safety activities. Risk Reporting 5

6 USACE Portfolio Management Reassess Risk & Revise DSAC Implement Risk Reduction Measures Modification Study Yes Monitoring, Instrumentation, and Evaluation Classification (DSAC) DSAC I, II, III,, & IV Dam safety issue Identified that requires further evaluation? Yes IRRM Issue Evaluation Study Remedial Action Justified? Training NO No NO All Dams Routine O&M Routine/Annual Inspections Periodic Inspections Periodic Assessment Incident or inspection finding triggers DSAC review? YES Outside Loop: Routine Activities Inside Loop: Non-Routine Activities Centrally Managed Processes: Queues Priorities Classifications Policy Decentrally Executed Processes: IRRMs Routine Activities Implementation of Risk Reduction Measures Jointly Executed: Risk Assessments IES & DSM Studies

7 Routine Activities Reassess Risk & Revise DSAC Implement Risk Reduction Measures Modification Study Yes Monitoring, Instrumentation, and Evaluation Classification (DSAC) DSAC I, II, III,, & IV Dam safety issue Identified that requires further evaluation? Yes IRRM (DSAC I, II, III Only) Issue Evaluation Study Remedial Action Justified? Training NO No NO All Dams Routine O&M Routine/Annual Inspections Periodic Inspections Periodic Assessment Incident or inspection finding triggers DSAC review? YES Monitoring, Instrumentation, and Evaluation Routine O&M Routine/Annual Inspections Periodic Inspection (5 years) Periodic Assessments(10 years) Training & Emergency Exercises Emergency Action Plans Budgeting ( Program and Maintenance)

8 Non- Routine Activities Classification (DSAC) DSAC I, II, III,, & IV All Dams Interim Risk Reduction Measures Reassess Risk & Revise DSAC Dam safety issue Identified that requires further evaluation? No Routine O&M Issue Evaluation Study Implement Risk Reduction Measures Modification Study Yes Yes IRRM (DSAC I, II, III Only) Issue Evaluation Study Remedial Action Justified? NO Routine/Annual Inspections Periodic Inspections Periodic Assessment YES Modification Study Implement permanent risk reduction measures Re-assess risk & review DSAC Monitoring, Instrumentation, and Evaluation Training NO Incident or inspection finding triggers DSAC review?

9 Action Classification I URGENT AND COMPELLING (Unsafe) Action Class General Description II URGENT (Unsafe or Potentially Unsafe) III HIGH PRIORITY (Conditionally Unsafe) IV PRIORITY (Marginally Safe) USACE Action Classification Table* Characteristics of this class CRITICALLY NEAR FAILURE Progression toward failure is confirmed to be taking place under normal operations. Almost certain to fail under normal operations from immediately to within a few years without intervention. OR EXTREMELY HIGH RISK Combination of life or economic consequences with probability of failure is extremely high. FAILURE INITIATION FORESEEN For confirmed (unsafe) and unconfirmed (potentially unsafe) dam safety issues, failure could begin during normal operations or be initiated as the consequence of an event. The likelihood of failure from one of these occurrences, prior to remediation, is too high to assure public safety. OR VERY HIGH RISK The combination of life or economic consequences with probability of failure is very high. Urgency & Risk Description SIGNIFICANTLY INADEQUATE OR MODERATE TO HIGH RISK For confirmed and unconfirmed dam safety issues, the combination of life, economic, or environmental consequences with probability of failure is moderate to high. INADEQUATE WITH LOW RISK For confirmed and unconfirmed dam safety issues, the combination of life, economic, or environmental consequences with probability of failure is low and may not meet all essential USACE guidelines. Actions for dams in this class Take immediate action to avoid failure. Validate classification through an external peer review for dams with life loss concerns. Implement interim risk reduction measures, including operational restrictions, ensure that emergency action plan is current, and functionally tested for initiating event. Conduct heightened monitoring and evaluation. Expedite investigations to support justification for remediation using all resources and funding necessary. Initiate intensive management and situation reports. Implement interim risk reduction measures, including operational restrictions as justified, and ensure that emergency action plan is current, and functionally tested for initiating event. Conduct heightened monitoring and evaluation. Expedite confirmation of classification. Give very high priority for investigations to support justification for remediation. Actions Required Description Implement interim risk reduction measures, including operational restrictions as justified, ensure that emergency action plan is current, and functionally tested for initiating event. Conduct heightened monitoring and evaluation. Prioritize for investigations to support justification for remediation considering consequences and other factors. Conduct elevated monitoring and evaluation. Give normal priority to investigations to validate classification, but no plan for risk reduction measures at this time. V (Adequately Safe) ADEQUATELY SAFE Dam is considered adequately safe, meeting all essential USACE guidelines with no unconfirmed dam safety issues, AND RESIDUAL RISK IS CONSIDERED TOLERABLE. Continue routine dam safety activities, normal operation, and maintenance. * At any time for specific events a dam, from any action class, can become an emergency requiring activation of the emergency plan

10 USACE Investment Plan Multi- Billion Dollar Investment to Repair over 300 Structures Includes all Moderate to Extremely High Risk Structures Time to Complete Investment -18 to 55 years depending on annual funding levels Population at Risk: +15 Million Avoids $236 Billion in Direct Damages

11 Prioritize Investment By Risk DSAC I DSAC III DSAC II

12 Interim Risk Reduction Measures (IRRMs) Classification (DSAC) DSAC I, II, III,, & IV All Dams Reassess Risk & Revise DSAC Implement Risk Reduction Measures Modification Study Yes Dam safety issue Identified that requires further evaluation? Yes IRRM (DSAC I, II, III Only) Issue Evaluation Study Remedial Action Justified? No NO Routine O&M Routine/Annual Inspections Periodic Inspections Periodic Assessment YES While the study, design, and construction of longterm solutions are pursued, IRRM are the most responsible way to manage the risk to public safety. Monitoring, Instrumentation, and Evaluation Training NO Incident or inspection finding triggers DSAC review?

13 Principles for Implementing IRRM at High Risk Dams The IRRM Plan sets the sideboards for decision making, decision points, and actions required. General public safety responsibility informs all of our statutory responsibilities. It is after public safety guidelines are met that other purposes and objectives will be considered. Decisions should be risk-informed, not risk-based. We manage risks of flood waters, we do not control them. Advanced planning and execution of mitigating measures is far more effective with planned, controlled release of the pool than with the case of unplanned, uncontrolled release resulting from failure of the project. 13

14 Non-Structural IRRM Examples Reservoir pool restrictions / operational changes Stockpile materials Improve/increase inspection and monitoring Pre-placed emergency contracts Establish pool levels for increased surveillance Update Emergency Action Plans Emergency exercises and coordination with stakeholders (includes communication) Warning systems Preventative Maintenance

15 Structural IRRM Examples Improve seepage collection system Install shallow cut-off trench Fill voids in embankment or foundation Grout/Seal conduit joints Grout curtain Downstream stability berm and/or inverted filter.

16 Issue Evaluation Studies Classification (DSAC) DSAC I, II, III,, & IV All Dams IES The study findings Reassess Risk & Revise DSAC Dam safety issue Identified that requires further evaluation? No Routine O&M YES determine the nature of the dam safety issue, Implement Risk Reduction Measures Yes IRRM (DSAC I, II, III Only) NO Routine/Annual Inspections the degree of urgency for action Modification Study Yes Issue Evaluation Study Remedial Action Justified? Periodic Inspections Periodic Assessment Report presents risk documentation justification for conducting a Modification Study Monitoring, Instrumentation, and Evaluation Training NO Incident or inspection finding triggers DSAC review?

17 Modification Studies Classification (DSAC) DSAC I, II, III,, & IV All Dams DSM Reports Reassess Risk & Revise DSAC Implement Risk Reduction Measures Modification Study Dam safety issue Identified that requires further evaluation? Yes IRRM (DSAC I, II, III Only) Issue Evaluation Study No NO Routine O&M Routine/Annual Inspections Periodic Inspections YES Decision documents to obtain approval to implement permanent risk reduction measures DSM Report replaces: Yes Remedial Action Justified? Periodic Assessment Major Rehabilitation Evaluation Reports Monitoring, Instrumentation, and Evaluation Training NO Incident or inspection finding triggers DSAC review? Assurance Evaluation Reports

18 Potential Impacts on Projects Short term impacts due to IRRM, i.e. pool restrictions Hydropower Water supply Navigation Flood Damage Reduction Recreation Planning for reallocation to Municipal & Industrial water supply Sponsor incurs costs related to dam safety and related RR&R actions Increases long term ability to operate as authorized

19 Reallocation Policy EC , Water Supply Storage and Risk Reduction Measures for Dam Safety, 15 March DSAC I, II, and III Projects A reallocation that would require raising the conservation pool is not permitted while a project is classified DSAC I, II or III. DSAC IV Projects: Recommendations for reallocations that would require raising the conservation pool will be considered by Headquarters USACE on a caseby-case basis. Reallocation reports that recommend pool raises must include a review of the Potential Failure Mode Analysis (PFMA) for the dam and an analysis of the effect of a higher pool elevation on the probable failure due to seismic or hydrologic conditions. Cost Sharing The non-federal entity will be required to share in the costs of IRRM and other remediation.

20 Cost Sharing Section 1203, WRDA 1986 Hydrologic and Seismic Deficiencies Major Rehabilitation or Operations and Maintenance: Older (pre-1986) agreements may allow for amortization Current model water storage agreement terms Seepage and Stability Deficiencies

21 Communication USACE will maintain public trust through effective, transparent, and continuous communication and stakeholder involvement. Public Meetings News Releases Agency Web Sites Hot Topics button at Facebook, Twitter, YouTube, etc. Updating Specific Stakeholders Water Supply Navigation Recreation Hydropower Emergency Management Preparedness Exercises Downstream Notification Chain You are always welcome to call the Public Affairs Office.

22 Modifications Some modifications can adversely effect water supply infrastructure Cut off wall Changes to outlet conduit Cost sharing of modifications Prorated by project purposes Seepage/Stability modifications Full cost sharing by purpose Section 1203 (Seismic & Hydraulic) 15% of standard cost sharing Slide 22

23 EC Restrictions Total number of Dams = 652 Includes saddle dams and levees around upstream towns and villages Number of Projects = 557 Dams authorized and constructed Corps O&M Number of DSAC I, II, & III Dams = 288 Dams/Projects available for water supply studies = 269 (48% of Projects) Dry Dams = 62 Less Than 100 acre feet of normal storage Navigation Dams = 138 Slide 23

24 Summary Observations of Dam Safety Program Geotechnical Issues Dominate Portfolio DSAC ratings can change with events, study, or remediation DSAC IV is a combination of low consequences and low risk Balancing Water Supply with other purposes is important Slide 24

25 Questions? Please continue to keep dam safety in mind New Delhi Dam Failure in Iowa (non-fed) July 2010

ENGINEERING AND CONSTRUCTION BULLETIN

ENGINEERING AND CONSTRUCTION BULLETIN ENGINEERING AND CONSTRUCTION BULLETIN No. 2016-8 Issuing Office: CECW-CE Issued: 22 Feb 16 Expires: 22 Feb 18 SUBJECT: Interim Risk Reduction Measures (IRRMs) for Levee Safety CATEGORY: Directive and Policy

More information

USACE Levee Screening Tool Understanding the Classification

USACE Levee Screening Tool Understanding the Classification USACE Levee Screening Tool Understanding the Classification Richard J. Varuso, Ph.D., P.E. Deputy Chief, Geotechnical Branch Levee Safety Program Manager USACE - New Orleans District 17 Nov 2011 US Army

More information

RISK MANAGEMENT GUIDELINES, PRIORITIZATION, AND PROCESS

RISK MANAGEMENT GUIDELINES, PRIORITIZATION, AND PROCESS RISK MANAGEMENT GUIDELINES, PRIORITIZATION, AND PROCESS Modified Extract of a Presentation by Nate Snorteland, P.E. Director, USACE Risk Management Center Presenter Bruce Rogers, P.G. USACE Philadelphia

More information

DAM SAFETY RISK MANAGEMENT FOR HYDROELECTRIC PROJECTS

DAM SAFETY RISK MANAGEMENT FOR HYDROELECTRIC PROJECTS DAM SAFETY RISK MANAGEMENT FOR HYDROELECTRIC PROJECTS DAVID S. BOWLES Professor and Director Institute for Dam Safety Risk Management Utah State University Logan, Utah, U.S.A. Managing Principal RAC Engineers

More information

USACE Levee Screening Tool application guide and user s manual: Levee Safety Action Classification (LSAC)

USACE Levee Screening Tool application guide and user s manual: Levee Safety Action Classification (LSAC) USACE Levee Screening Tool application guide and user s manual: Levee Safety Action Classification (LSAC) (Attachment 1 to the USACE LST application guide with user s manual) Chapter 14 Attachment 1. Levee

More information

USACE Levee Safety Program Update

USACE Levee Safety Program Update USACE Levee Safety Program Update Eric Halpin, PE Acting Administrator National Levee Safety Program November, 2 2015 US Army Corps of Engineers The Continuing Levee Challenge The nation has thousands

More information

Levee Safety The Middle Age Of Levee Safety Development

Levee Safety The Middle Age Of Levee Safety Development Levee Safety The Middle Age Of Levee Safety Development HDR Showcase Panel Discussion June 22, 2016 Living the Current Changing Regulatory Climate by Roger Less, PE, CFM Overview of Section 408 Permit

More information

Risk-Based Project Management Approach for Large- Scale Civil Engineering Projects

Risk-Based Project Management Approach for Large- Scale Civil Engineering Projects Risk-Based Project Management Approach for Large- Scale Civil Engineering Projects Alex Bredikhin, P.E., Risk Manager - Megaprojects, U.S. Army Corps of Engineers, Pittsburgh District 1000 Liberty Ave.,

More information

USACE Rehabilitation and Inspection Program (RIP)

USACE Rehabilitation and Inspection Program (RIP) USACE Rehabilitation and Inspection Program (RIP) Lance Helwig, P.E. Chief, Engineering and Construction Division Jason McBain Levee Safety Program Manager Portland District November 14, 2014 US Army Corps

More information

SWIF TO THE RESCUE. Patty Robinson Ike Pace, PE WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY

SWIF TO THE RESCUE. Patty Robinson Ike Pace, PE WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY SWIF TO THE RESCUE Patty Robinson Ike Pace, PE WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY AGENDA USACE Programs PL 84 99 (Rehabilitation & Inspection Program, RIP) Levee Safety Program (Routine,

More information

HAZARD DESCRIPTION... 1 LOCATION... 2 EXTENT... 4 HISTORICAL OCCURRENCES... 6 PROBABILITY OF FUTURE EVENTS... 6 VULNERABILITY AND IMPACT...

HAZARD DESCRIPTION... 1 LOCATION... 2 EXTENT... 4 HISTORICAL OCCURRENCES... 6 PROBABILITY OF FUTURE EVENTS... 6 VULNERABILITY AND IMPACT... DAM FAILURE HAZARD DESCRIPTION... 1 LOCATION... 2 EXTENT... 4 HISTORICAL OCCURRENCES... 6 PROBABILITY OF FUTURE EVENTS... 6 VULNERABILITY AND IMPACT... 6 Hazard Description Dams are water storage, control

More information

CONGRESSIONAL DISTRICT: IN 03

CONGRESSIONAL DISTRICT: IN 03 CONGRESSIONAL DISTRICT: IN 03 80 Steuben Lagrange Angola 69 Kendallville DeKalb Noble Garrett Auburn Kosciusko Warsaw Dam Safety Program (All COE Indiana Dams) Columbia City Allen Whitley Fort Wayne New

More information

MVD 2012 Flood Season Preparedness

MVD 2012 Flood Season Preparedness MVD 2012 Flood Season Preparedness Regional Workshop Identifying, Managing, and Communicating Risk 23 February US Army Corps of Engineers MVD 2012 Flood Season Preparation Scope: Move forward with priority

More information

Regulatory Framework for Dam Safety

Regulatory Framework for Dam Safety Regulatory Framework for Dam Safety Preliminary Results of the WB Global Dam Safety Legal & Institutional Framework Study Satoru Ueda, Lead Dam Specialist Sofia Grand Hotel, September 19, 2017 www.worldbank.org/water

More information

[Letter to be printed on official Levee Sponsor letterhead]

[Letter to be printed on official Levee Sponsor letterhead] [Letter to be printed on official Levee Sponsor letterhead] [Date] COL Joel R. Cross, Commander US Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901 RE: [Levee Sponsor

More information

Vocabulary of Flood Risk Management Terms

Vocabulary of Flood Risk Management Terms USACE INSTITUTE FOR WATER RESOURCES Vocabulary of Flood Risk Management Terms Appendix A Leonard Shabman, Paul Scodari, Douglas Woolley, and Carolyn Kousky May 2014 2014-R-02 This is an appendix to: L.

More information

Northwest Flood Fight Workshops

Northwest Flood Fight Workshops Northwest Flood Fight Workshops September 24, 2014 IWR Webinar D. Leslie Miller, P.E. (Les) Flood Preparedness Program Manager US Army Corps of Engineers, Portland District US Army Corps of Engineers Welcome

More information

SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR JANUARY 19, 2017 WATER INFRASTRUCTURE IMPROVEMENTS FOR THE NATION (WIIN) ACT

SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR JANUARY 19, 2017 WATER INFRASTRUCTURE IMPROVEMENTS FOR THE NATION (WIIN) ACT ITEM 2 Agenda of January 19, 2017 TO: FROM: Board of Directors Sacramento Area Flood Control Agency Richard M. Johnson, Executive Director (916) 874-7606 SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR JANUARY

More information

Meeting the Nation s Levee Challenges

Meeting the Nation s Levee Challenges ASDSO USACE/FEMA Levee Discussion Meeting the Nation s Levee Challenges November 2015 Presenters: Richard Varuso, USACE Michael Bishop, FEMA 1 This Session s Objective KNOWLEDGE - Provide you with insight

More information

Improving Flood Hazard Identification & Flood Risk Communication: Lessons Learned from Dam Failures in South Carolina

Improving Flood Hazard Identification & Flood Risk Communication: Lessons Learned from Dam Failures in South Carolina Improving Flood Hazard Identification & Flood Risk Communication: Lessons Learned from Dam Failures in South Carolina Katy Goolsby-Brown June 23, 2016 1 Dam Failure Incidents in South Carolina SC Dam Failures

More information

DAEN SUBJECT: Little Colorado River at Winslow, Arizona, Flood Risk Management Project

DAEN SUBJECT: Little Colorado River at Winslow, Arizona, Flood Risk Management Project per year. In addition to the above, the Navajo County Flood Control District would be fully responsible for performing the investigation, cleanup, and response of hazardous materials on the project sites.

More information

JANUARY 13, ILL. ADM. CODE CH. I, SEC TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER h: WATER RESOURCES

JANUARY 13, ILL. ADM. CODE CH. I, SEC TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER h: WATER RESOURCES TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER h: WATER RESOURCES PART 3702 CONSTRUCTION AND MAINTENANCE OF DAMS Section Page No. 3702.10 Purpose 2 3702.20 Definitions 3 3702.30

More information

SEQWATER PORTFOLIO RISK ASSESSMENT AND MANAGEMENT

SEQWATER PORTFOLIO RISK ASSESSMENT AND MANAGEMENT SEQWATER PORTFOLIO RISK ASSESSMENT AND MANAGEMENT BARTON MAHER PRINCIPAL STORAGE PLANNING SEQWATER AUSTRALIA THE WHOLE POINT OF RISK ASSESSMENT SEQWATER DOWN UNDER WHERE WE OPERATE One of Australia s largest

More information

U.S. Army Corp of Engineers

U.S. Army Corp of Engineers U.S. Army Corp of Engineers PL 84-99 Levee Inspections and Levee Certification Hank DeHaan Rock Island District March 9, 2011 US Army Corps of Engineers U.S. Army Corps of Engineers Flood Damage Reduction

More information

Passaic River Basin Flood Advisory Commission Report/Status of Recommendations. October 2014 Update

Passaic River Basin Flood Advisory Commission Report/Status of Recommendations. October 2014 Update Passaic River Basin Flood Advisory Commission Report/Status of Recommendations October 2014 Update Passaic River Basin Flood Advisory Commission April 2010: By Executive Order, Governor Christie created

More information

A Review of Our Legacy System, History of Neglect, Current Issues, and the Path Forward for Levee Safety

A Review of Our Legacy System, History of Neglect, Current Issues, and the Path Forward for Levee Safety 4 th NACGEA GEOTECHNICAL WORKSHOP January 29, 2010 A Review of Our Legacy System, History of Neglect, Current Issues, and the Path Forward for Levee Safety Presented by: Leslie F. Harder, Jr., Phd, PE,

More information

DAM SAFETY REMEDIATION LETTER REPORT

DAM SAFETY REMEDIATION LETTER REPORT REVIEW PLAN DAM SAFETY REMEDIATION LETTER REPORT SUCCESS DAM, CALIFORNIA DAM SAFETY ASSURANCE PROGRAM SACRAMENTO DISTRICT July 6, 2010 ii REVIEW PLAN DAM SAFETY MODIFICATION REPORT SUCCESS DAM, CALIFORNIA

More information

Living with levees: using tolerable risk guidelines in California

Living with levees: using tolerable risk guidelines in California Living with levees: using tolerable risk guidelines in California Jessica Ludy, CFM. Arcadis-U.S. Inc. Larry Roth, G.E., P.E., Arcadis-US, Inc. Dustin Jones, P.E., Delta Stewardship Council 1 Hoogwater

More information

PROJECT REVIEW PLAN INDEPENDENT TECHNICAL REVIEW AND EXTERNAL PEER REVIEW

PROJECT REVIEW PLAN INDEPENDENT TECHNICAL REVIEW AND EXTERNAL PEER REVIEW PROJECT REVIEW PLAN INDEPENDENT TECHNICAL REVIEW AND EXTERNAL PEER REVIEW WHITE OAK BAYOU FEDERAL FLOOD CONTROL PROJECT HARRIS COUNTY, TEXAS HARRIS COUNTY FLOOD CONTOL DISTRICT/GALVESTON DISTRICT-USACE

More information

Fighting the Flood: Current Political, Regulatory and Financial Challenges

Fighting the Flood: Current Political, Regulatory and Financial Challenges Fighting the Flood: Current Political, Regulatory and Financial Challenges for Levee Owners Kansas City, Missouri January 23, 2013 Emerging Policy, Programs and Tools for the Management of Levee Systems

More information

Update to the PL Rehabilitation Program

Update to the PL Rehabilitation Program Update to the PL 84-99 Rehabilitation Program Richard J. Varuso, Ph.D., P.E. Senior Program Manager Risk Management Center New Orleans November 2, 2015 US Army Corps of Engineers PL 84-99 The USACE Emergency

More information

Flood Protection Structure Accreditation Task Force: Final Report

Flood Protection Structure Accreditation Task Force: Final Report Flood Protection Structure Accreditation Task Force: Final Report November 2013 Message from the Administrator and the Assistant Secretary of the Army (Civil Works) The United States Army Corps of Engineers

More information

RESOLUTION - APPROVING FINAL FISCAL YEAR BUDGET

RESOLUTION - APPROVING FINAL FISCAL YEAR BUDGET ITEM 12 TO: FROM: SUBJECT: Sacramento Area Flood Control Agency Board of Directors Richard M. Johnson, Executive Director (916) 874-7606 RESOLUTION - APPROVING FINAL FISCAL YEAR 2015-16 BUDGET OVERVIEW:

More information

Joint Recommendations on Levee Policy. Association of State Floodplain Managers. National Association of Flood and Stormwater Management Agencies

Joint Recommendations on Levee Policy. Association of State Floodplain Managers. National Association of Flood and Stormwater Management Agencies Joint Recommendations on Levee Policy developed by the Association of State Floodplain Managers and the National Association of Flood and Stormwater Management Agencies from discussions at the Flood Risk

More information

National Flood Risk Management Program

National Flood Risk Management Program National Flood Risk Management Program US Army Corps of Engineers Floodplain Managers Association Sacramento, California July 29, 2010 Judy Soutiere Institute for Water Resources A Shared Responsibility

More information

Dredged Material Management Plans (DMMPs)

Dredged Material Management Plans (DMMPs) Dredged Material Management Plans (DMMPs) Theodore A. Brown, P.E. SES Chief, Planning and Policy Division Headquarters, USACE 12 February 2014 Planning- Construction- Operations & Maintenance Current Guidance

More information

Improving Coordinated Flood Preparedness and Response

Improving Coordinated Flood Preparedness and Response Improving Coordinated Flood Preparedness and Response Illinois Silver Jackets Hank DeHaan Rock Island and Saint Louis Districts October 2011 US Army Corps of Engineers Illinois Silver Jackets Program Illinois

More information

CONGRESSIONAL DISTRICT: KY 03

CONGRESSIONAL DISTRICT: KY 03 CONGRESSIONAL DISTRICT: KY 03 3 Metro Louisville Flood Risk Management Reconstruction Study Louisville VAMC Location Map McAlpine 71 265 Portland Wharf Park (CAP Section 14) 264 264 64 Lower Salt River

More information

DAM SAFETY MODIFICATION REPORT

DAM SAFETY MODIFICATION REPORT REVIEW PLAN DAM SAFETY MODIFICATION REPORT MARTIS CREEK DAM, CALIFORNIA DAM SAFETY ASSURANCE PROGRAM SACRAMENTO DISTRICT July 7, 2010 ii REVIEW PLAN DAM SAFETY MODIFICATION REPORT MARTIS CREEK DAM, CALIFORNIA

More information

Requirements for Mapping Levees Complying with Section of the NFIP Regulations

Requirements for Mapping Levees Complying with Section of the NFIP Regulations FACT SHEET Requirements for Mapping Levees Complying with Section 65.10 of the NFIP Regulations As part of a mapping project, it is the levee owner s or community s responsibility to provide data and documentation

More information

Testimony of the Association of State Dam Safety Officials to the Environment and Public Works Committee U.S. Senate March 1, 2017

Testimony of the Association of State Dam Safety Officials to the Environment and Public Works Committee U.S. Senate March 1, 2017 Association of State Dam Safety Officials 239 S. Limestone St. Lexington, Kentucky 40508 Phone: (859) 550-2788 lspragens@damsafety.org www.damsafety.org Testimony of the Association of State Dam Safety

More information

Future Directions for Civil Works Project Delivery and Partnership

Future Directions for Civil Works Project Delivery and Partnership Future Directions for Civil Works Project Delivery and Partnership Becky Moyer Chief, Planning & Policy Southwestern Division 3 March 2016 US Army Corps of Engineers Future of the Texas Coast Shared Visioning

More information

Delaware River Basin Commission s Role in Flood Loss Reduction Efforts

Delaware River Basin Commission s Role in Flood Loss Reduction Efforts Delaware River Basin Commission s Role in Flood Loss Reduction Efforts There is a strong need to reduce flood vulnerability and damages in the Delaware River Basin. This paper presents the ongoing role

More information

Analysis Item 37: Water Resources Department High-hazard Dams

Analysis Item 37: Water Resources Department High-hazard Dams Analysis Item 37: Water Resources Department High-hazard Dams Analysts: Amanda Beitel and Matt Stayner Request: Acknowledge receipt of a report on publicly owned high-hazard dams in Oregon that have unsatisfactory

More information

SMART Planning Utilizing Risk Assessment Methodologies for Public Safety and Flood Risk Management

SMART Planning Utilizing Risk Assessment Methodologies for Public Safety and Flood Risk Management SMART Planning Utilizing Risk Assessment Methodologies for Public Safety and Flood Risk Management Brian Harper USACE, Institute for Water Resources Jason Needham Risk Management Center US Army Corps of

More information

The City of El Paso APPENDIX D DAM RISK INVENTORY ASSESSMENT

The City of El Paso APPENDIX D DAM RISK INVENTORY ASSESSMENT APPENDIX D DAM RISK INVENTORY ASSESSMENT March 2009 Appendix D - Dam Risk Inventory Assessment Section Table of Contents Page D.1.0 DAM RISK INVENTORY ASSESSMENT... 1 D.1.1 Methodology... 1 D.1.2 Dam

More information

Executive Board Annual Session Rome, May 2015 POLICY ISSUES ENTERPRISE RISK For approval MANAGEMENT POLICY WFP/EB.A/2015/5-B

Executive Board Annual Session Rome, May 2015 POLICY ISSUES ENTERPRISE RISK For approval MANAGEMENT POLICY WFP/EB.A/2015/5-B Executive Board Annual Session Rome, 25 28 May 2015 POLICY ISSUES Agenda item 5 For approval ENTERPRISE RISK MANAGEMENT POLICY E Distribution: GENERAL WFP/EB.A/2015/5-B 10 April 2015 ORIGINAL: ENGLISH

More information

Risk Assessment Framework. Levee Ready Columbia

Risk Assessment Framework. Levee Ready Columbia Risk Assessment Framework Levee Ready Columbia November 23, 2015 Today s Discussion Level of Protection Levees and Risk Tolerable Risk Guidelines Applying Tolerable Risk Guidelines Levees and Level of

More information

Interim Policy for Determining Eligibility Status of Flood Risk Management Projects for the Rehabilitation Program Pursuant to Public Law (PL) 84-99

Interim Policy for Determining Eligibility Status of Flood Risk Management Projects for the Rehabilitation Program Pursuant to Public Law (PL) 84-99 Interim Policy for Determining Eligibility Status of Flood Risk Management Projects for the Rehabilitation Program Pursuant to Public Law (PL) 84-99 March 24, 2014 US Army Corps of Engineers Purpose of

More information

Sustaining the Civil Works Program

Sustaining the Civil Works Program Sustaining the Civil Works Program Presentation to Planning Community of Practice Meeting Steven L. Stockton, P.E. Director of Civil Works 2 June 2015 US Army Corps of Engineers 1 A society grows great

More information

BRITISH COLUMBIA DAM SAFETY REGULATION 44/2000

BRITISH COLUMBIA DAM SAFETY REGULATION 44/2000 PDF Version [Printer friendly ideal for printing entire document] BRITISH COLUMBIA DAM SAFETY REGULATION 44/2000 Published by Important: Quickscribe offers a convenient and economical updating service

More information

Britannia Village Flood Control Project

Britannia Village Flood Control Project Britannia Village Flood Control Project Summary of Background Information February 2011 Contents 1) Flood Risks in the Village 2) Alternative Flood Risk Management Approaches Status Quo The Proposed Remedial

More information

Project Planning with the U.S. Army Corps of Engineers

Project Planning with the U.S. Army Corps of Engineers US Army Corps of Engineers PLANNING SMART BUILDING STRONG Project Planning with the U.S. Army Corps of Engineers Tim Kuhn Project Manager Portland District 1 February 2016 Introduction Levee Ready Columbia

More information

UPDATE ON DALLAS FLOODWAY

UPDATE ON DALLAS FLOODWAY UPDATE ON DALLAS FLOODWAY ENVIRONMENTAL IMPACT STATEMENT [ EIS ] Transportation and Trinity River Project Committee Rob Newman Director, Trinity River Corridor Project, Fort Worth District 28 April 2014

More information

Minimum Standards For USACE Evaluation of Levee Systems For the National Flood Insurance Program

Minimum Standards For USACE Evaluation of Levee Systems For the National Flood Insurance Program Minimum Standards For USACE Evaluation of Levee Systems For the National Flood Insurance Program Christopher N. Dunn, P.E., Director Hydrologic Engineering Center ASCE Water Resource Group 20 October,

More information

DAEN SUBJECT: Lower San Joaquin River Feasibility Study Report, California

DAEN SUBJECT: Lower San Joaquin River Feasibility Study Report, California 1.33 miles of new setback levee along the Delta Front to eliminate the eastern portions of the Fourteenmile Slough levee in North Stockton. 0.59 miles of height improvements between 1.8 and 2.7 feet on

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment Strategic Flood Risk Assessment Draft Claremorris Local Area Plan 2012 2018 Prepared by Forward Planning Section Mayo County Council 1 Table of Contents Section 1: Overview of the Guidelines... 4 1.1 Introduction...

More information

CONGRESSIONAL DISTRICT: IN 03

CONGRESSIONAL DISTRICT: IN 03 CONGRESSIONAL DISTRICT: IN 03 80 Steuben Lagrange Angola 69 Kendallville DeKalb Noble Garrett Auburn Kosciusko Warsaw Dam Safety Program (All COE Indiana Dams) Columbia City Allen Whitley Fort Wayne Olmsted

More information

Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option

Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option October 16, 2012 Q1. Why has the position on a ring-levee changed? The feasibility study recommended buy-outs for areas with staging

More information

FILE: and EFFECTIVE DATE: September 1, 2009 AMENDMENT NO: 3 (December 1, 2013)

FILE: and EFFECTIVE DATE: September 1, 2009 AMENDMENT NO: 3 (December 1, 2013) APPROVED AMENDMENTS: Effective date Briefing Note /Approval September 1, 2009 BN 109249 July 20, 2009 Summary of Changes: Changes made are as a result of updating water policies. The draft 2006 policy

More information

Corps Water Management System (CWMS)

Corps Water Management System (CWMS) Corps Water Management System (CWMS) Real-Time Decision Support Modeling & Mapping Inter-Agency Flood Risk Characterization Workshop Christopher N. Dunn, P.E., D. WRE, Director Hydrologic Engineering Center

More information

DEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-CP Washington, DC Circular No July 2014

DEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-CP Washington, DC Circular No July 2014 DEPARTMENT OF THE ARMY EC 1165-2-216 US Army Corps of Engineers CECW-CP Washington, DC 20314-1000 Circular No. 1165-2-216 31 July 2014 EXPIRES 31 July 2016 Water Resource Policies and Authorities POLICY

More information

Memorandum. August5, 2016 CITY OF DALLAS

Memorandum. August5, 2016 CITY OF DALLAS Memorandum DATE August5, 2016 CITY OF DALLAS TO The Honorable Members of the Transportation and Trinity River Project Committee: Lee M. Kleinman (Chair), Deputy Mayor Pro Tern Erik Wilson (Vice-Chair),

More information

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...

More information

Position Statement on a 2018 Water Resources Development Act (WRDA)

Position Statement on a 2018 Water Resources Development Act (WRDA) Position Statement on a 2018 Water Resources Development Act (WRDA) In order to maintain the safety and resilience of our nation s coastlines, Congress must continue a twoyear cycle for passing Water Resource

More information

CAPTIVA ISLAND EMERGENCY MAINTENANCE PLAN. December, 1998

CAPTIVA ISLAND EMERGENCY MAINTENANCE PLAN. December, 1998 CAPTIVA ISLAND EMERGENCY MAINTENANCE PLAN December, 1998 Contents Introduction... 4 Purpose... 4 Initial Restoration and Renourishment Design... 4 Emergency Maintenance Criteria... 5 Storm Damage and Response...

More information

Upper Joachim Creek Public Survey on Potential Flood Risk Reduction

Upper Joachim Creek Public Survey on Potential Flood Risk Reduction Upper Joachim Creek Public Survey on Potential Flood Risk Reduction This survey is intended to help the interagency planning committee to receive public feedback on specific flood risk reduction techniques,

More information

2009 Ohio Infrastructure Report Card Dams Fact Sheet Grade: C

2009 Ohio Infrastructure Report Card Dams Fact Sheet Grade: C American Society of Civil Engineers Ohio Council of Local Sections May, 2009 Dams Fact Sheet Grade: C There are more than 2,600 dams in the State of Ohio. The Ohio Department of Natural Resources, Division

More information

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers, New York District New Jersey Department of Environmental Protection 11 &

More information

REAL ESTATE A GUIDE FOR PROJECT PARTNERS

REAL ESTATE A GUIDE FOR PROJECT PARTNERS REAL ESTATE A GUIDE FOR PROJECT PARTNERS WHO PAYS, AND WHERE DOES THE MONEY COME FROM? Corps and Sponsor Roles in Sharing and Financing Project Costs INTRODUCTION The Water Resources Development Act of

More information

Flood Risk Management and Columbia River Treaty Review

Flood Risk Management and Columbia River Treaty Review Flood Risk Management and Columbia River Treaty 2014 2024 Review Lower Columbia River Estuary Partnership 2013 Science to Policy Summit: The Columbia River Treaty May 10, 2013 Matt Rea Treaty Review Program

More information

CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination

CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination Date: 8 May 2013 Division: Great Lakes and Ohio River Division District: Nashville District CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination 1. Project: Cumberland River, Metropolitan

More information

RESERVOIR LEGISLATION IN WALES

RESERVOIR LEGISLATION IN WALES RESERVOIR LEGISLATION IN WALES BASIC LEGAL FRAMEWORK The United Kingdom comprises four regional administrations, England, Wales, Scotland and Northern Ireland. Reservoirs in England and Wales are regulated

More information

EXCELLENCE INNOVATION SERVICE VALUE

EXCELLENCE INNOVATION SERVICE VALUE Incorporation of Geotechnical Elements as an Asset Class within Transportation Asset Management and Development of Risk Based and Life Cycle Cost Performance Strategies by Mark Vessely, P.E. Shannon &

More information

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C AUG 2339

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C AUG 2339 DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C. 20314-1000 8 1 AUG 2339 CECW-PC MEMORANDUM FOR COMMANDERS, MAJOR SUBORDINATE COMMANDS SUBJECT: Implementation Guidance

More information

Non Regulatory Risk MAP Products Flood Depth and Probability Grids

Non Regulatory Risk MAP Products Flood Depth and Probability Grids Non Regulatory Risk MAP Products Flood Depth and Probability Grids Virginia Floodplain Management Association 2015 Floodplain Management Workshop October 29th, 2015 Nabil Ghalayini, P.E., PMP, D.WRE, CFM

More information

Executive Summary Levee Engineering Assessments September 26, 2014

Executive Summary Levee Engineering Assessments September 26, 2014 Executive Summary s September 26, 2014 Purpose Multnomah County Drainage District (MCDD), the agency responsible for managing the Columbia Corridor levee system, received notification that in August of

More information

REVIEW PLAN. Whittier Narrows Dam, Los Angeles, California Dam Safety Modification Study. Los Angeles District

REVIEW PLAN. Whittier Narrows Dam, Los Angeles, California Dam Safety Modification Study. Los Angeles District REVIEW PLAN Whittier Narrows Dam, Los Angeles, California Dam Safety Modification Study Los Angeles District MSC Approval Date: 05 April 2013 Last Revision Date: None REVIEW PLAN Whittier Narrows Dam,

More information

The Need to Address the True Cost of Long-Term Operations, Maintenance, Repair, Rehabilitation, and Replacement (OMRR&R) of the Flood System

The Need to Address the True Cost of Long-Term Operations, Maintenance, Repair, Rehabilitation, and Replacement (OMRR&R) of the Flood System The Need to Address the True Cost of Long-Term Operations, Maintenance, Repair, Rehabilitation, and Replacement (OMRR&R) of the Flood System September 8, 2016 Presented by: Christopher Williams, PE Department

More information

A White Paper - Flood Risk and Concepts for a National Flood Risk Classification System

A White Paper - Flood Risk and Concepts for a National Flood Risk Classification System A White Paper - Flood and Concepts for a National Flood Classification System By Darryl W. Davis, P.E. and Dale F. Munger, P.E. USACE Dam and Levee Safety Policy and Procedures Teams 1. Preface: This paper

More information

ASFPM RECOMMENDED TASK FORCE ACTIONS

ASFPM RECOMMENDED TASK FORCE ACTIONS Association of State Floodplain Managers, Inc. 2809 Fish Hatchery Road, Suite 204, Madison, WI 53713 Phone: 608-274-0123 Fax: 608-274-0696 Website: www.floods.org Email: asfpm@floods.org Federal Interagency

More information

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial

More information

Frequently Asked Questions: Civil Works Budget Development Transformation (Watershed / System-Based Budget Development)

Frequently Asked Questions: Civil Works Budget Development Transformation (Watershed / System-Based Budget Development) U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG What is Civil Works budget development transformation? Civil Works budget development transformation seeks to: 1) improve the justification and defense of budget

More information

SOUTH CENTRAL REGION MULTI-JURISDICTION HAZARD MITIGATION PLAN. Advisory Committee Meeting September 12, 2012

SOUTH CENTRAL REGION MULTI-JURISDICTION HAZARD MITIGATION PLAN. Advisory Committee Meeting September 12, 2012 SOUTH CENTRAL REGION MULTI-JURISDICTION HAZARD MITIGATION PLAN Advisory Committee Meeting September 12, 2012 AGENDA FOR TODAY Purpose of Meeting Engage All Advisory Committee Members Distribute Project

More information

Development Fee Program: Comparative risk analysis

Development Fee Program: Comparative risk analysis Development Fee Program: Comparative risk analysis January 2008 Sacramento Area Flood Control Agency David Ford Consulting Engineers, Inc. 2015 J Street, Suite 200 Sacramento, CA 95811 Ph. 916.447.8779

More information

Floodplain Management Plan

Floodplain Management Plan Floodplain Management Plan CITY OF FORT WORTH TFMA 2016 Spring Conference March 10, 2016 Agenda 1. Fort Worth Higher Standards (NFIP & CRS) 2. Floodplain Management Plan Overview and Results 3. Project

More information

LIFE SAFETY HAZARD INDICATOR

LIFE SAFETY HAZARD INDICATOR LIFE SAFETY HAZARD INDICATOR Background The Life Safety Hazard Indicator (LSHI) is a value that represents the relative potential loss of life for a specific flood scenario. The LSHI is a screening level

More information

Upper Mississippi River Basin Association

Upper Mississippi River Basin Association Upper Mississippi River Basin Association ILLINOIS, IOWA, MINNESOTA, MISSOURI, WISCONSIN The Honorable Mitchell McConnell The Honorable Kevin McCarthy The Honorable Harry Reid The Honorable Nancy Pelosi

More information

DES MOINES CITY OF TWO RIVERS. Flooding Risk & Impact to Development

DES MOINES CITY OF TWO RIVERS. Flooding Risk & Impact to Development DES MOINES CITY OF TWO RIVERS Flooding Risk & Impact to Development River System Des Moines Flood Protection Des Moines Flood Protection cont. Infrastructure Over 24 miles of levees 21stormwater pump stations

More information

DRAFT DRAFT. Project Implementation Plan Southwestern Illinois Flood Prevention Initiative. June 13, 2011

DRAFT DRAFT. Project Implementation Plan Southwestern Illinois Flood Prevention Initiative. June 13, 2011 DRAFT Project Implementation Plan Southwestern Illinois Flood Prevention Initiative June 13, 2011 DRAFT ii Project Implementation Plan Table of Contents I. Introduction...1 II. Background...3 III. Preliminary

More information

Texoma/Missouri River SAME Regional Implementation of ARRA

Texoma/Missouri River SAME Regional Implementation of ARRA Texoma/Missouri River SAME Regional Implementation of ARRA Raymond Russo, P.E. Chief, Civil Works Integration Division Southwestern Division September 3, 2009 US Army Corps of Engineers USACE Recovery

More information

USACE Planning 101 Planning Basics for Partners

USACE Planning 101 Planning Basics for Partners USACE Planning 101 Planning Basics for Partners Bret Walters (901-544-0777) bret.l.walters@usace.army.mil Conservation Partnering Conference Memphis, TN November 2011 US Army Corps of Engineers Topics

More information

Peer Review Plan. Bastrop Interim Feasibility Study. Lower Colorado River Basin, Texas

Peer Review Plan. Bastrop Interim Feasibility Study. Lower Colorado River Basin, Texas U.S. Army Corps of Engineers Fort Worth District Peer Review Plan Bastrop Interim Feasibility Study Lower Colorado River Basin, Texas September 28, 2007 PEER REVIEW PLAN BASTROP INTERIM FEASIBILITY STUDY

More information

FERC DAM SAFETY PROGRAM

FERC DAM SAFETY PROGRAM National Hydropower Association Southwest Regional Meeting August 27, 2009 Denver, CO FERC DAM SAFETY PROGRAM FERC Presenter David Capka, PE Supervisor-Dam Safety Engineering Washington Office FERC UPDATE

More information

DAMS BACKGROUND. Page 1 of 7

DAMS BACKGROUND. Page 1 of 7 DAMS C- There are a total of 3,358 state-regulated dams in Pennsylvania, including 768 high hazard potential dams (23 percent); 297 significant hazard potential dams (9 percent); and 2,293 low hazard potential

More information

Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain management plans and flood forecast inundation maps

Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain management plans and flood forecast inundation maps Presentation to USACE 2012 Flood Risk Management and Silver Jackets Joint Workshop, Harrisburg, Pennsylvania Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain

More information

GAFM Showcase: Multiple Agencies Combating Georgia s Flood Risk Together: Proven Results Gained by Strong Partnerships

GAFM Showcase: Multiple Agencies Combating Georgia s Flood Risk Together: Proven Results Gained by Strong Partnerships National Flood Insurance Program Participation GAFM Showcase: Multiple Agencies Combating Georgia s Flood Risk Together: Proven Results Gained by Strong Partnerships Moderator: Jill Bazinet, PE, CFM GAFM

More information

Security Risk Management

Security Risk Management Security Risk Management Related Chapters Chapter 53: Risk Management Also Chapter 32 Security Metrics: An Introduction and Literature Review Chapter 62 Assessments and Audits 2 Definition of Risk According

More information

Proposed Report 1 DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC

Proposed Report 1 DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC Proposed Report 1 REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC 20310-2600 DAEN THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my

More information

IMPLEMENTATION DOCUMENT REVIEW PLAN

IMPLEMENTATION DOCUMENT REVIEW PLAN IMPLEMENTATION DOCUMENT REVIEW PLAN Ohio River Shoreline, Paducah, KY (Paducah, KY LFPP) Reconstruction Project Louisville District MSC Approval Date: 15 January 2013 Last Revision Date: None IMPLEMENTATION