1 USACE Planning 101 Planning Basics for Partners Bret Walters ( ) Conservation Partnering Conference Memphis, TN November 2011 US Army Corps of Engineers
2 Topics of Discussion Corps Organization Corps Mission Areas Corps Programs Planning Process Cost-Share Agreements Reports Post Construction Commitments
3 USACE Organizational Structure ASA (CW) Washington, DC Corps HQ Washington, DC Divisions: 8 C/W Regions: 4 Regional Offices Districts: 38 Civil Works District Offices District Deputy For Programs & Project Management District Corporate Board Project Delivery Team Project Sponsor Project Manager Planning Engineering Real Estate Construction Operations Counsel
4 Flood Risk Management Navigation Civil Works Mission Areas Inland & Deep Draft Ecosystem Restoration Other Missions Hydropower Storm Damage Reduction Water Quality/Supply Recreation
5 Larger Projects Primary Programs General Investigations to Construction General Smaller Projects Continuing Authorities Program CAP Planning Assistance to States PAS Floodplain Management Services FPMS Technical Services such as Base Flood Elevations and Geographic Information Systems Environmental Infrastructure Section 219 Water and Wastewater Infrastructure Interagency Intergovernmental Support IIS
6 It Takes Two to Tango Authorization Appropriation
7 GI/CG Projects Advantages Ability to adequately implement large scale, complex projects Federal Funding Often take advantage of interagency cooperation and expertise Projects completed to Federal standard Disadvantages Cumbersome process not ideally suited to small scale projects Use of funds constrained by Congressional authorization Maintaining federal standard may increase total project costs 8-10 year timeframe
8 CAP/Smaller Project Programs Advantages Better suited to small to medium sized projects Fast-track project implementation Do not require new Congressional authorization Funding Available from national allotment Disadvantages Program limits prohibit implementation of large scale projects Great demand for assistance within limited budget
9 Planning Process (For water resource Projects) There is a Federal planning process Codified in 1983 in the Principals and Guidelines (Reagan) Applies to Corps and other Federal Agencies Establishes national priorities and criteria Non-Federal Cost-Share Requirements (1986) Cost-Share Percentages depend on the program
10 4-Phase Planning Process & Cost-Share Agreements Reconnaissance Phase - No Cost-Share or Agreement - (Reconnaissance Report) Feasibility Phase - Feasibility Cost Share Agreement (FCSA) (Feasibility Report) Pre-construction Engineering and Design Phase - Design Agreement (DA) (Design) Construction Phase - Project Partnership Agreement (PPA) (Completed Project)
11 Planning Process (Quantifying Benefits) Four Accounts to Quantify Improvements National Economic Development Environmental Quality Regional Economic Development Other Social Effects
12 What is the problem? How can it be solved? Planning Process What are the advantages and disadvantages of solutions? What is the best solution? Feedback
13 BUILDING STRONG
14 Step 1 Specify Problems and Opportunities Problems (negative)/opportunities (positive) Define Objectives (what you are working towards) These bridge from problems to plans Identify Constraints Objectives guide data inventory, data collection, forecasting, and evaluation of effects
15 Step 2 Inventory and Forecast Collect relevant data to for alternative evaluation Four conditions: Historic Existing future with project future without project A good future without project condition is essential to a good decision
16 Step 3 Formulate Alternative Plans No Action is always the baseline All plans must be better than No Action Management Measure - feature or activity at a site Alternative Plan - one or more management measures combined into self-sufficient plan Alternative plans must address one or more of the planning objectives
17 Screen out alternatives that fail to meet most objectives early Looking at remaining plans: Based on their merits Forecast with project and without project conditions Compare with and without conditions effects Describe effects Step 4 Evaluation Benefit-Cost analysis (including non-economic benefits)
18 Step 5 Comparison Contrasting the merits among plans Describe cost differences Describe trade-offs Compare effects
19 Formulation Criteria Formulation criteria are used to determine when adequate iterations have been accomplished Effectiveness Efficiency Completeness Acceptability
20 Comparison Example Item Alternative 1 Alternative 2 Alternative 3 Cost $ $$$ $ Benefits $$ $$ $$$ Ecosystem + Habitat ++ Habitat - Habitat Other Comparison Congress Likes Public Accept Opposition
21 Step 6 Selection Decision makers can disagree on what is most important. Different selection criteria will lead to different decisions. Corps makes recommendations but Congress/President make the decision.
22 After Construction: (Sponsor Commitments) Once construction is complete, the project is accepted and transferred to the local sponsor for OMRR&R (operations, maintenance, repair, replacement, and rehabilitation) 100% non-federal (Excluding Navigation) O&M manual and PPA provide the guidelines as to responsibilities and procedures required of the local sponsor after construction
23 Questions?
DEPARTMENT OF THE ARMY U. S. Army Corps of Engineers CECW-CP Washington, DC APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS
ER-1105-2-100 DEPARTMENT OF THE ARMY U. S. Army Corps of Engineers CECW-CP Washington, DC 20314-1000 Regulation 31 January 2007 ER 1105-2-100 APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS
More informationFuture Directions for Civil Works Project Delivery and Partnership
Future Directions for Civil Works Project Delivery and Partnership Becky Moyer Chief, Planning & Policy Southwestern Division 3 March 2016 US Army Corps of Engineers Future of the Texas Coast Shared Visioning
More informationASBPA PARTNERING COMMITTEE S GUIDANCE ON INCORPORATING SURFING CONCERNS INTO PLANNING AND DESIGN OF FEDERAL SHORE PROTECTION AND NAVIGATION PROJECTS
ASBPA PARTNERING COMMITTEE S GUIDANCE ON INCORPORATING SURFING CONCERNS INTO PLANNING AND DESIGN OF FEDERAL SHORE PROTECTION AND NAVIGATION PROJECTS PURPOSE This document is intended to succinctly outline
More informationFrequently Asked Questions: Civil Works Budget Development Transformation (Watershed / System-Based Budget Development)
U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG What is Civil Works budget development transformation? Civil Works budget development transformation seeks to: 1) improve the justification and defense of budget
More informationTestimony of the National Association of Flood And Stormwater Management Agencies. Water Resources Development Act of 2012
National Association of Flood & Stormwater Management Agencies 1333 H Street, NW, 10th Floor West Tower, Washington, DC 20005 Phone: 202-289-8625 www.nafsma.org Testimony of the National Association of
More informationAPPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS
ER-1105-2-100 Appendix F, Revised xx August 2018 APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS Paragraph Page SECTION I - PROGRAM OVERVIEW Purpose and Applicability.. F-1 F-1 References..
More informationORBCRE Symposium & ORBA Summit
ORBCRE Symposium & ORBA Summit USACE Priorities, Programs & Projects Mike Saffran LRD Risk Analysis Coordinator October 18, 2018 The views, opinions and findings contained in this report are those of the
More informationProject Planning with the U.S. Army Corps of Engineers
US Army Corps of Engineers PLANNING SMART BUILDING STRONG Project Planning with the U.S. Army Corps of Engineers Tim Kuhn Project Manager Portland District 1 February 2016 Introduction Levee Ready Columbia
More informationDredged Material Management Plans (DMMPs)
Dredged Material Management Plans (DMMPs) Theodore A. Brown, P.E. SES Chief, Planning and Policy Division Headquarters, USACE 12 February 2014 Planning- Construction- Operations & Maintenance Current Guidance
More informationThe Breadth of the Planning Portfolio
The Breadth of the Planning Portfolio Travis Creel, Planner, Regional Planning and Environmental Division South, MVD Eric Halpin, Special Assistant for Dam and Levee Safety, HQUSACE Lisa Kiefel, PCoP,
More informationEC Civil Works Review Policy
EC 1165-2-209 Civil Works Review Policy Wilbert V. Paynes Director, Deep Draft Navigation Planning Center of Expertise Chief, Planning and Policy American Association of Port Authorities 27 January 2010
More informationNorfolk Flood Risk Management Study
Old Dominion University ODU Digital Commons May 18, 2016: The Economic Impacts of Sea-Level Rise in Hampton Roads Hampton Roads Intergovernmental Pilot Project: Meetings 5-18-2016 Norfolk Flood Risk Management
More informationSECTION Watershed Informed Approach to FY 2016 Budget Development
SECTION 2 This section provides information and guidance regarding three new initiatives by the Civil Works Integration within USACE to make the budget formulation more streamlined, our investments more
More informationREAL ESTATE A GUIDE FOR PROJECT PARTNERS
REAL ESTATE A GUIDE FOR PROJECT PARTNERS WHO PAYS, AND WHERE DOES THE MONEY COME FROM? Corps and Sponsor Roles in Sharing and Financing Project Costs INTRODUCTION The Water Resources Development Act of
More informationUpper Mississippi River Basin Association
Upper Mississippi River Basin Association ILLINOIS, IOWA, MINNESOTA, MISSOURI, WISCONSIN The Honorable Mitchell McConnell The Honorable Kevin McCarthy The Honorable Harry Reid The Honorable Nancy Pelosi
More informationUSACE Infrastructure Strategy: UIS Overview and P3 Review
USACE Infrastructure Strategy: UIS Overview and P3 Review Edward E. Belk, Jr P.E. Chief, Operations and Regulatory Division Directorate of Civil Works Headquarters, US Army Corps of Engineers Washington,
More informationDEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers CECW-I Washington, D.C Circular No May 2011
DEPARTMENT OF THE ARMY EC 11-2-201 U.S. Army Corps of Engineers CECW-I Washington, D.C. 20314-1000 Circular No. 11-2-201 31 May 2011 EXPIRES 30 SEPTEMBER 2011 Programs Management EXECUTION OF THE ANNUAL
More informationUS Army Corps of Engineers PAYING FOR PROJECTS. Kim Smith Office of Water Project Review Planning and Policy Division HQUSACE
PAYING FOR PROJECTS Kim Smith Office of Water Project Review Planning and Policy Division HQUSACE DISCUSSION TOPICS - In-Kind Contributions Provisions of Section 221, as amended by Section 2003 - Section
More informationFinal Draft Feasibility Study And Environmental Assessment APPENDIX F MODEL PROJECT COOPERATION AGREEMENT. November 2008
Final Draft Feasibility Study And Environmental Assessment Prepared by: EMH&T, Inc. 5500 New Albany Road, Columbus, OH 43054 Tel: (614) 775-4500 Fax: (614) 775-4800 Prepared for: Prime Engineering & Architecture,
More informationCONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination
Date: 8 May 2013 Division: Great Lakes and Ohio River Division District: Nashville District CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination 1. Project: Cumberland River, Metropolitan
More informationREVIEW PLAN USING THE NWD MODEL REVIEW PLAN
REVIEW PLAN USING THE NWD MODEL REVIEW PLAN for Continuing Authorities Program Section 103, 205 and projects directed by guidance to use CAP procedures Alki Seawall Erosion Control Project Seattle, WA
More informationDEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-CP Washington, DC Circular No July 2014
DEPARTMENT OF THE ARMY EC 1165-2-216 US Army Corps of Engineers CECW-CP Washington, DC 20314-1000 Circular No. 1165-2-216 31 July 2014 EXPIRES 31 July 2016 Water Resource Policies and Authorities POLICY
More informationFeasibility to Closeout, the Corps Planning Process September 27, 2016
Feasibility to Closeout, the Corps Planning Process September 27, 2016 Marshall Plumley MVP @ MVR Chief, Rock Island Plan Formulation Section Mississippi Valley Rock Island District (MVR) Mississippi Valley
More informationCONTINUING AUTHORITIES PROGRAM REGIONAL PROGRAMMATIC REVIEW PLAN FOR DECISION DOCUMENTS
South Atlantic Division CONTINUING AUTHORITIES PROGRAM REGIONAL PROGRAMMATIC REVIEW PLAN FOR DECISION DOCUMENTS US Army Corps of Engineers April 2015 1. Overview. This document serves as the South Atlantic
More informationDAEN SUBJECT: South San Francisco Bay Shoreline, Santa Clara County, California
opportunities would be significant with the restoration of the tidal marsh areas. Recreational features in the recommended plan include two pedestrian bridges, viewing platforms, and benches. The new levees
More informationFINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT ADDENDUM
FINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT BREVARD COUNTY, FLORIDA HURRICANE AND STORM DAMAGE REDUCTION PROJECT MARCH 2014 U.S. Army Corps of Engineers
More informationSUBJECT: Flagler County, Florida, Hurricane and Storm Damage Reduction Project
DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC 20310-2600 REPLY TO ATTENTION OF DAEN B3 DEC 2014 THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report
More informationNAFSMA Annual Meeting July 10, 2018
NAFSMA Annual Meeting July 10, 2018 Levees and Flood Protection Karin Jacoby,. P.E., Esq. Husch Blackwell LLP Overview President s proposal for reforming USACE-CW Owner/operators: Less help more burdens
More informationFederal Discount Rate for Fiscal Year 2018
Federal Discount Rate for Fiscal Year 2018 Project Evaluation and Formulation Rate (Discount Rate): FY 2018 2.750 % The Principles and Guidelines states: "Discounting is to be used to convert future monetary
More informationDEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers 441 G Street, NW CECW-I Washington, D.C
DEPARTMENT OF THE ARMY EC 11-2-211 U.S. Army Corps of Engineers 441 G Street, NW CECW-I Washington, D.C. 20314-1000 Circular No. 11-2-211 29 April 2016 EXPIRES 30 SEPTEMBER 2016 Programs Management EXECUTION
More informationFLOODPLAIN MANAGEMENT: A PRESENT AND A 21st CENTURY IMPERATIVE. Gerald E. Galloway, Jr. United States Military Academy
FLOODPLAIN MANAGEMENT: A PRESENT AND A 21st CENTURY IMPERATIVE Gerald E. Galloway, Jr. United States Military Academy Introduction The principal rivers of the United States and their tributaries have played
More informationPublic Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study
Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers, New York District New Jersey Department of Environmental Protection 11 &
More informationWater Supply Workshop Savannah, Georgia 31 May 2 June 2011 Funding of Water Supply Reallocation Studies
Water Supply Workshop Savannah, Georgia 31 May 2 June 2011 Funding of Water Supply Reallocation Studies Ted Hillyer Water Supply Business Line Manager Institute for Water Resources US Army Corps of Engineers
More informationEmerging Policy. Post Marks from the Bleeding Edge. Dennis Duke
Emerging Policy Post Marks from the Bleeding Edge Dennis Duke Why Postmarks? Highlights of some key policy issues, not in-depth discussion. Why Bleeding Edge? Many current restoration policies were developed
More informationApril 3, 4, & 5, 2017 Pittsburgh, Butler, Erie Western PA
April 3, 4, & 5, 2017 Pittsburgh, Butler, Erie Western PA 2 Hazard Mitigation is: any cost-effective action taken to eliminate or reduce the long term risk to life and property from natural and technological
More informationDRAFT REVIEW PLAN SABINE PASS TO GALVESTON BAY, TEXAS FEASIBILITY STUDY. U.S. Army Corps of Engineers Galveston District
DRAFT REVIEW PLAN SABINE PASS TO GALVESTON BAY, TEXAS FEASIBILITY STUDY U.S. Army Corps of Engineers Galveston District MSC Approval Date: Pending Last Revision Date: November, 2012 DRAFT REVIEW PLAN Sabine
More informationDAEN SUBJECT: Little Colorado River at Winslow, Arizona, Flood Risk Management Project
per year. In addition to the above, the Navajo County Flood Control District would be fully responsible for performing the investigation, cleanup, and response of hazardous materials on the project sites.
More informationWestern Dredging Association Eastern Chapter Annual Meeting Infrastructure Strategy Overview and P3/P4 Review
Western Dredging Association Eastern Chapter Annual Meeting Infrastructure Strategy Overview and P3/P4 Review Edward J Hecker Senior Policy Advisor Institute for Water Resources US Army Corps of Engineers
More informationPeer Review Plan. Bastrop Interim Feasibility Study. Lower Colorado River Basin, Texas
U.S. Army Corps of Engineers Fort Worth District Peer Review Plan Bastrop Interim Feasibility Study Lower Colorado River Basin, Texas September 28, 2007 PEER REVIEW PLAN BASTROP INTERIM FEASIBILITY STUDY
More informationNational Flood Risk Management Program
National Flood Risk Management Program US Army Corps of Engineers Floodplain Managers Association Sacramento, California July 29, 2010 Judy Soutiere Institute for Water Resources A Shared Responsibility
More informationDECISION DOCUMENT REVIEW PLAN Consistent with the National Programmatic Review Plan Model
Continuing Authorities Program Section 14, Flood Control Act of 1946, as amended Emergency Streambank and Shoreline Protection Projects DECISION DOCUMENT REVIEW PLAN Consistent with the National Programmatic
More informationPosition Statement on a 2018 Water Resources Development Act (WRDA)
Position Statement on a 2018 Water Resources Development Act (WRDA) In order to maintain the safety and resilience of our nation s coastlines, Congress must continue a twoyear cycle for passing Water Resource
More informationREVIEW PLAN. Cedar Bayou, Texas Dredged Material Management Plan
REVIEW PLAN Cedar Bayou, Texas Dredged Material Management Plan Galveston District MSC Approval Date: 16 November 2012 Last Revision Date: none REVIEW PLAN Cedar Bayou, Texas Dredged Material Management
More informationRisk-Based Project Management Approach for Large- Scale Civil Engineering Projects
Risk-Based Project Management Approach for Large- Scale Civil Engineering Projects Alex Bredikhin, P.E., Risk Manager - Megaprojects, U.S. Army Corps of Engineers, Pittsburgh District 1000 Liberty Ave.,
More informationU.S. Updates: Climate Change, Maintenance and Investigations
U.S. Updates: Climate Change, Monitoring, Assessment, Maintenance and Investigations Edward d J. Hecker Chief, Office of Homeland Security and Provost Marshal, Directorate of Civil Works June 15, 2010
More informationSustaining the Civil Works Program
Sustaining the Civil Works Program Presentation to Planning Community of Practice Meeting Steven L. Stockton, P.E. Director of Civil Works 2 June 2015 US Army Corps of Engineers 1 A society grows great
More informationDEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C AUG 2339
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C. 20314-1000 8 1 AUG 2339 CECW-PC MEMORANDUM FOR COMMANDERS, MAJOR SUBORDINATE COMMANDS SUBJECT: Implementation Guidance
More informationREVIEW PLAN. Panama City Harbor Improvements to Bay Harbor Channel. Limited Reevaluation Report (LRR) with Integrated
REVIEW PLAN Panama City Harbor Improvements to Bay Harbor Channel Limited Reevaluation Report (LRR) with Integrated Environmental Assessment, Panama City, Florida P2: 395107 Mobile District April 2016
More informationDEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C
.t DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 REPLY TO A TTENTION OF: CECW-PE (l0-1-7a) 1 3 OCT 199B SUBJECT: Tampa Harbor, Big Bend Channel, Florida THE SECRETARY
More informationProposed Report 1 DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC
Proposed Report 1 REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC 20310-2600 DAEN THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my
More informationBuilding the Planning Portfolio
Building the Planning Portfolio Amy Sharp, ASA(CW) Lisa Kiefel, PCoP, HQUSACE 2015 National Planning Community of Practice Training June 2, 2015 US Army Corps of Engineers Objectives Understand the Program
More informationJanuary 30, HQ, U.S. Army Corps of Engineers ATTN: EO13690/CECW-HS/3G G Street N.W. Washington, DC Re: Docket COE
January 30, 2017 HQ, U.S. Army Corps of Engineers ATTN: EO13690/CECW-HS/3G68 441 G Street N.W. Washington, DC 20314-1000 Re: Docket COE-2016-0018 Dear Sir or Madam: Thank you for the opportunity to submit
More informationDEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers CECW-I Washington, D.C
DEPARTMENT OF THE ARMY EC 5-2-01 U.S. Army Corps of Engineers CECW-I Washington, D.C. 20314-1000 Circular No. 5-2-01 31 March 2016 EXPIRES 30 MARCH 2018 Management EXECUTION OF CHANGE CONTROL BOARDS 1.
More informationNorth Atlantic Coast Comprehensive Study: Resilient Adaption to Increasing Risk
North Atlantic Coast Comprehensive Study: Resilient Adaption to Increasing Risk U.S. Army Corps of Engineers Coastal Storm Risk Management Planning Center of Expertise Amy M. Guise, USACE 21 November 2013
More informationSUBJECT: Amite River and Tributaries, Louisiana, East Baton Rouge Parish Watershed
DEPARTMENi OF THE ARMY OFFICE OF 'rhe CHIEF OF ENGINEERS WASHINGTON. D.C. 20314-1000 REPLY TO AT1'~NTIQN OF: (lo-1-7a) THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report on East
More informationDEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C
DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20310-2600 REPLY TO ATTENTION OF CECW-P (1105-2-10a) 0 2 JUN 2003 THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress
More informationUSACE Policy Guidance on Contributed Funds and Section 408
USACE Policy Guidance on Contributed Funds and Section 408 Jessica Burton Evans Navigation Program Manager Presentation to California Marine Affairs & Navigation Conference (CMANC) 16 January 2014 Redondo
More informationJoint Recommendations on Levee Policy. Association of State Floodplain Managers. National Association of Flood and Stormwater Management Agencies
Joint Recommendations on Levee Policy developed by the Association of State Floodplain Managers and the National Association of Flood and Stormwater Management Agencies from discussions at the Flood Risk
More informationTexoma/Missouri River SAME Regional Implementation of ARRA
Texoma/Missouri River SAME Regional Implementation of ARRA Raymond Russo, P.E. Chief, Civil Works Integration Division Southwestern Division September 3, 2009 US Army Corps of Engineers USACE Recovery
More informationASCE Federal Project BCR and Scoring Information Paper 27 April 2018
ASCE Federal Project BCR and Scoring Information Paper 27 April 2018 This paper provides basic information about the Federal project planning process and associated Benefit Cost Ratio (BCR) calculations,
More informationHighlights from the Congressional Research Service Report Inland Waterways: Recent Proposals and Issues For Congress (October 18, 2013)
Highlights from the Congressional Research Service Report Inland Waterways: Recent Proposals and Issues For Congress (October 18, 2013) Prepared by Melissa Welch-Ross, Study Director National Research
More informationUSACE Navigation FY 2014 Workplan and FY 2015 Budget
USACE Navigation FY 2014 Workplan and FY 2015 Budget For American Association of Port Authorities Webinar Jeffrey A. McKee Chief, Navigation Branch US Army Corps of Engineers April 22, 2014 US Army Corps
More informationFlood Risk Management and Columbia River Treaty Review
Flood Risk Management and Columbia River Treaty 2014 2024 Review Lower Columbia River Estuary Partnership 2013 Science to Policy Summit: The Columbia River Treaty May 10, 2013 Matt Rea Treaty Review Program
More informationDEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers CECW-IP Washington, D. C
DEPARTMENT OF THE ARMY EC 11-2-216 U.S. Army Corps of Engineers CECW-IP Washington, D. C. 20314-1000 Circular No. 11-2-216 EXPIRES 31 March 2019 Army Programs CIVIL WORKS DIRECT PROGRAM DEVELOPMENT POLICY
More informationInland Waterways Trust Fund
Inland Waterways Trust Fund Presented at the 78th Annual PNWA Mission to Washington, DC March 6 th, 2012 Jorge Romero Copyright 2012 by K&L Gates LLP. All rights reserved. K&L Gates Maritime Group One
More informationUPPER SUSQUEHANNA RIVER BASIN FLOOD RISK MANAGEMENT FEASIBILITY STUDY
UPPER SUSQUEHANNA RIVER BASIN FLOOD RISK MANAGEMENT 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 FEASIBILITY STUDY 110 135 120 252 174.59 112 92 56
More informationDuPage County East Branch DuPage River Resiliency Project. Benefit Cost Analysis
DuPage County East Branch DuPage River Resiliency Project Benefit Cost Analysis 1.0 Benefit Cost Analysis Preparation The BCA for this proposal was a collaborative effort between DuPage County, V3 engineering
More informationU.S. Army Corps of Engineers Navigation Program Update
U.S. Army Corps of Engineers Navigation Program Update For Waterways Council, Inc. Jeffrey A. McKee Chief, Navigation Branch US Army Corps of Engineers March 14, 2016 US Army Corps of Engineers 1 Corps
More informationFrequently Asked Questions
The National Committee on Levee Safety Frequently Asked Questions The Context: Current State of Levees and Public Safety 1. What problem is the National Committee on Levee Safety trying to address? We
More informationPROJECT REVIEW PLAN MOORING BASIN MODIFICATIONS GULF INTRACOASTAL WATERWAY, TEXAS OPERATIONS AND MAINTENANCE DISCRETIONARY AUTHORITY DECISION DOCUMENT
PROJECT REVIEW PLAN MOORING BASIN MODIFICATIONS GULF INTRACOASTAL WATERWAY, TEXAS OPERATIONS AND MAINTENANCE DISCRETIONARY AUTHORITY DECISION DOCUMENT U.S. Army Corps of Engineers Galveston District MSC
More informationFlood Plain Management Services (FPMS) Program
Flood Plain Management Services (FPMS) Program 2016 Winter Stakeholder Partnering Forum March 2016 Mario Beddingfield, P.E., CFM Hydraulic Engineer/FPMS Program Manager H&H/Water Control Branch U.S. Army
More informationDEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers CECW-I Washington, D.C Circular No March 2014
DEPARTMENT OF THE ARMY EC 11-2-207 U.S. Army Corps of Engineers CECW-I Washington, D.C. 20314-1000 Circular No. 11-2-207 31 March 2014 EXPIRES 30 SEPTEMBER 2014 Programs Management EXECUTION OF THE ANNUAL
More informationMeeting the Nation s Levee Challenges
ASDSO USACE/FEMA Levee Discussion Meeting the Nation s Levee Challenges November 2015 Presenters: Richard Varuso, USACE Michael Bishop, FEMA 1 This Session s Objective KNOWLEDGE - Provide you with insight
More informationREVIEW PLAN KEŌPŪ-HIENALOLI STREAMS FLOOD RISK MANAGEMENT PROJECT ISLAND OF HAWAI I, HAWAI I. Feasibility Study
KEŌPŪ-HIENALOLI STREAMS FLOOD RISK MANAGEMENT PROJECT ISLAND OF HAWAI I, HAWAI I Feasibility Study Continuing Authorities Program (CAP) Section 205 of the Flood Control Act of 1948 Public Law 80-858 U.S.
More informationDEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH ST, SW, ROOM 10M15 ATLANTA, GEORGIA
DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH ST, SW, ROOM 10M15 ATLANTA, GEORGIA 30303-3490 REPLY TO ATTENTION OF: CESAD-PDP : 1 SEP 2012 MEMORANDUM FOR Commander,
More informationMaking the NFIP Work for Taxpayers and Policy Holders: Reducing Flood Losses and NFIP Premiums through Mitigation
Making the NFIP Work for Taxpayers and Policy Holders: Reducing Flood Losses and NFIP Premiums through Mitigation January 27, 2017 This paper was developed in conjunction with C. Scott Canady, owner and
More informationLevees: PL84-99 and the NFIP
Levees: PL84-99 and the NFIP Tony D. Krause, P.E., CFM Flood Risk and Floodplain Management Omaha District US Army Corps of Engineers Objectives and Overview Objectives: Identify overlaps between Federal
More informationDEPARTMENT OF TH E ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC MAY
DEPARTMENT OF TH E ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC 20314-1000 MAY 11 2018 The Honorable Bill Shuster Chairman, Committee on Transportation and Infrastructure United States
More informationSUMMARY OF RECENT USACE PLANNING POLICY UPDATES: SEPTEMBER MARCH 2019
SUMMARY OF RECENT USACE PLANNING POLICY UPDATES: SEPTEMBER 2018 - MARCH 2019 SUMMARY OF RECENT USACE PLANNING POLICY UPDATES: SEPTEMBER 2018 - MARCH 2019 2 USACE policy and guidance continues to evolve
More informationLevee Safety The Middle Age Of Levee Safety Development
Levee Safety The Middle Age Of Levee Safety Development HDR Showcase Panel Discussion June 22, 2016 Living the Current Changing Regulatory Climate by Roger Less, PE, CFM Overview of Section 408 Permit
More informationWRRDA 2014 Capital Investment Strategy Update
WRRDA 2014 Capital Investment Strategy Update Jeanine Hoey, PE, PMP Chief, Programs and Project Management Pittsburgh District, US Army Corps of Engineers Jeanine.Hoey@usace.army.mil PH: 412-395-7289 14
More informationDEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C. 20314 1000 CECW-I MAR 1 1 2008 MEMORANDUM FOR Commanders, Major Subordinate Commands, Districts, and Separate Field
More informationPRESQUE ISLE ERIE, PENNSYLVANIA CG CAP SECTION 204 REGIONAL SEDIMENT MANAGEMENT BENEFICIAL USE OF DREDGED MATERIAL. Project No.
DECISION DOCUMENT REVIEW PLAN USING THE PROGRAMMATIC REVIEW PLAN MODEL for Continuing Authorities Program Section 14, 107, 111, 204, 206, 208 and 1135 Projects PRESQUE ISLE ERIE, PENNSYLVANIA CG CAP SECTION
More informationTOOKANY CREEK CHELTENHAM TOWNSHIP, MONTGOMERY COUNTY, PENNSYLVANIA SECTION 205, FLOOD DAMAGE REDUCTION PROJECT MANAGEMENT PLAN
TOOKANY CREEK CHELTENHAM TOWNSHIP, MONTGOMERY COUNTY, PENNSYLVANIA SECTION 205, FLOOD DAMAGE REDUCTION PROJECT MANAGEMENT PLAN Philadelphia District North Atlantic Division April 2012 UPDATED: July 26,
More informationDEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers CECW-IP Washington, D. C
DEPARTMENT OF THE ARMY EC 11-2-214 U.S. Army Corps of Engineers CECW-IP Washington, D. C. 20314-1000 Circular No. 11-2-214 31 March 2017 EXPIRES 31 March 2018 Army Programs U.S. ARMY CORPS OF ENGINEERS
More informationFLOODPLAINS AND FLOOD RISK
FLOODPLAINS AND FLOOD RISK A brief overview of changing management responsibilities The following article was originally published in The Water Report and is used with permission. Andrea Clark, of Downey
More informationGreat Lakes Navigation System Five-Year Development Plan. Great Lakes System
Great Lakes Navigation System Five-Year Development Plan Great Lakes System Great Lakes and Ohio River Division FY07 FY12 December 2006 Executive Summary Purpose of the Five Year Development Plan The Five
More informationREVIEW PLAN. For. Missouri River Bed Degradation Feasibility Study PN Kansas City District. February 11, 2013 (Supersedes all previous drafts)
REVIEW PLAN For Missouri River Bed Degradation Feasibility Study PN 146254 Kansas City District February 11, 2013 (Supersedes all previous drafts) Page 1 REVIEW PLAN Missouri River Bed Degradation Feasibility
More informationPROJECT REVIEW PLAN INDEPENDENT TECHNICAL REVIEW AND EXTERNAL PEER REVIEW
PROJECT REVIEW PLAN INDEPENDENT TECHNICAL REVIEW AND EXTERNAL PEER REVIEW WHITE OAK BAYOU FEDERAL FLOOD CONTROL PROJECT HARRIS COUNTY, TEXAS HARRIS COUNTY FLOOD CONTOL DISTRICT/GALVESTON DISTRICT-USACE
More informationDiscount Rates in the Economic Evaluation of U.S. Army Corps of Engineers Projects
Discount Rates in the Economic Evaluation of U.S. Army Corps of Engineers Projects name redacted Specialist in Natural Resources Policy name redacted Analyst in Natural Resources Policy August 15, 2016
More informationFOR - ARRA Financial and Operational Review Report Investigations
Program Description 96-3133 Investigations This appropriation funds studies to determine the need, engineering feasibility, and economic and environmental return to the Nation of potential solutions to
More informationDear Speaker Ryan, Leader McConnell, Leader Pelosi, and Leader Schumer:
April 13, 2018 The Honorable Paul D. Ryan Speaker U.S. House of Representatives H-232, Capitol Building Washington, DC 20515 The Honorable Mitch McConnell Majority Leader U.S. Senate S-230 Capitol Building
More informationFighting the Flood: Current Political, Regulatory and Financial Challenges
Fighting the Flood: Current Political, Regulatory and Financial Challenges for Levee Owners Kansas City, Missouri January 23, 2013 Emerging Policy, Programs and Tools for the Management of Levee Systems
More informationDETAILED PROJECT REPORT/ENVIRONMENTAL ASSESSMENT Little Manistee River Sea Lamprey Barrier, Manistee County, Michigan Section 506.
DECISION DOCUMENT REVIEW PLAN USING THE REGIONAL REVIEW PLAN MODEL for Great Lakes Fisheries and Ecosystem Restoration (GLFER) Program Section 506, Water Resources Development Act of 2000, as Amended DETAILED
More informationS. ll IN THE SENATE OF THE UNITED STATES A BILL
TH CONGRESS ST SESSION S. ll To provide for the conservation and development of water and related resources, to authorize the Secretary of the Army to construct various projects for improvements to rivers
More informationRegional Division Directors Regions I - X. Doug Bellomo, P.E. Director, Risk Analysis Division
August 18, 2010 U.S. Department of Homeland Security 500 C Street SW Washington, DC 20472 FEMA MEMORANDUM FOR: Regional Division Directors Regions I - X FROM: SUBJECT: EFFECTIVE DATE: Doug Bellomo, P.E.
More informationECONOMIC AND ENVIRONMENTAL PRINCIPLES AND GUIDELINES FOR WATER AND RELATED LAND RESOURCES IMPLEMENTATION STUDIES
ECONOMIC AND ENVIRONMENTAL PRINCIPLES AND GUIDELINES FOR WATER AND RELATED LAND RESOURCES IMPLEMENTATION STUDIES March 10, 1983 This page is intentionally blank. ii Foreword These Economic and Environmental
More informationDRAFT. Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects
DRAFT Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects February 27, 2019 Purpose This document provides the draft documentation for the Harris County Flood Control
More informationUS Army Corps of Engineers Dam Safety
US Army Corps of Engineers General Program Overview & Impacts of Issues on Project Regulation Charles Pearre, PE Program Manager,, Emeritus June 2011 US Army Corps of Engineers BUILDING STRONG Defined
More informationDECISION DOCUMENT REVIEW PLAN USING THE NATIONAL PROGRAMMATIC REVIEW PLAN MODEL
DECISION DOCUMENT REVIEW PLAN USING THE NATIONAL PROGRAMMATIC REVIEW PLAN MODEL for Continuing Authorities Program Section 14, 107, 111, 204, 206, 208 and 1135 Projects Archer Highway Twin Bridges, Madison
More information