SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR AUGUST 20, 2015
|
|
- Daniela Garrison
- 5 years ago
- Views:
Transcription
1 ITEM 1 TO: FROM: Board of Directors Sacramento Area Flood Control Agency Richard M. Johnson, Executive Director (916) SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR AUGUST 20, 2015 SAFCA Intent to Serve as Local Sponsor for GRR and Plan to Accomplish Financial Assurances One of the actions the Board is requested to take today is to approve a resolution which indicates SAFCA s intent to serve as the local sponsor for the project described in the American River Watershed Common Features General Reevaluation Report (GRR). As the local sponsor, one of the assurances SAFCA will be making today is to provide the local share of the total project costs for the GRR project elements once it is authorized by Congress. The cost of the recommended plan in the GRR is approximately $1.5 billion. This is significantly higher than what was assumed to be required for this work in the Final Engineer s Report for the Consolidated Capital Assessment District (CCAD) in The GRR recommended plan reflects numerous changes that have occurred since 2007 as highlighted below: New urban levee standards to address underseepage - the same standard that required the expanded work in Natomas and along the American River is now being applied to the remainder of the system; Significantly higher standards for bank, channel and levee erosion protection; Requirements to address levee encroachments, access and vegetation; Natomas levee raising removed from GRR resulting in loss of Federal credits; and Higher non-federal cost share than anticipated. In addition, the LERRD s (Land, Easements, Rights-Of-Way, Relocations and Disposal Areas) requirements for the non-federal sponsors have increased. In order to support SAFCA s agreement to be the local sponsor and provide the local cost share, the Board will be requested today to take an action to start the CEQA process to prepare an
2 Page 2 Environmental Impact Report (EIR) to form a new assessment district. The new Consolidated Capital Assessment District 2 (CCAD2) would replace the existing CCAD. While the new CCAD2 would be formed in 2016, its assessments would not be levied until the budget year. New CCAD2 bonds would not be issued until fall of 2017 when the existing CCAD bonds can be refunded without penalty. In order to continue advancing projects until the fall of 2017, the following actions will take place: Subordinate CCAD bonds will be issued in October 2015; An agreement will be executed to sell Bond Anticipation Notes (BAN s) to the City of Sacramento when SAFCA needs cash. (Similar to previous arrangements); Remaining available funds will be utilized, as needed: o Development Impact Fee account; o North Area Local Project account; o Operations and Maintenance Assessment District account; and o State reimbursement. Staff will continue to work with the Finance Committee as the details of the process are developed. Levee Accreditation Project Request for Qualifications SAFCA will be issuing a Request for Qualifications (RFQ) regarding construction management services for the upcoming Levee Accreditation Project. After the firms have been evaluated, staff s recommendation will be brought to the Board to select a firm. American River Watershed Folsom Dam Modifications - Joint Federal Project Photographs Work continues to progress on the construction of the new dam and auxiliary spillway at Folsom Dam. The following are some photographs from the USACE, which show the progress. For orientation purposes, the following rendering shows where the photos are taken from in the project area.
3 Page 3
4 Upstream Approach Channel
5 Page 5 New Dam (Upstream View)
6 Page 6 Downstream Chute
7 Page 7 Stepped Chute
8 Page 8 Stilling Basin
SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR JANUARY 19, 2017 WATER INFRASTRUCTURE IMPROVEMENTS FOR THE NATION (WIIN) ACT
ITEM 2 Agenda of January 19, 2017 TO: FROM: Board of Directors Sacramento Area Flood Control Agency Richard M. Johnson, Executive Director (916) 874-7606 SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR JANUARY
More informationRECOMMENDATION: Staff recommends the Board adopt Resolution No approving SAFCA s Fiscal Year Final Budget.
ITEM 5 Agenda of August 18, 2016 TO: FROM: SUBJECT: Sacramento Area Flood Control Agency Board of Directors Jason D. Campbell, Deputy Executive Director (916) 874-7606 APPROVING FINAL FISCAL YEAR 2016-17
More informationRESOLUTION - APPROVING FINAL FISCAL YEAR BUDGET
ITEM 12 TO: FROM: SUBJECT: Sacramento Area Flood Control Agency Board of Directors Richard M. Johnson, Executive Director (916) 874-7606 RESOLUTION - APPROVING FINAL FISCAL YEAR 2015-16 BUDGET OVERVIEW:
More informationPresented by: Connie Perkins, PE, CFM April 20, 2016
Presented by: Connie Perkins, PE, CFM April 20, 2016 City of Sacramento s Flood History Need for a Comprehensive Flood Management Plan (CFMP) Overview of Sacramento s CFMP 2016 Next Steps Sacramento
More informationDevelopment Fee Program: Comparative risk analysis
Development Fee Program: Comparative risk analysis January 2008 Sacramento Area Flood Control Agency David Ford Consulting Engineers, Inc. 2015 J Street, Suite 200 Sacramento, CA 95811 Ph. 916.447.8779
More informationAPPENDIX E ECONOMICS
APPENDIX E ECONOMICS American River Watershed Common Features General Reevaluation Report Draft Economics Appendix E February 2015 Cover Photos courtesy of the Sacramento District: Sacramento Weir during
More informationSACRAMENTO AREA FLOOD CONTROL AGENCY. For the Fiscal Year Ended June 30, 2013
Independent Auditors Reports, Management's Discussion and Analysis, Basic Financial Statements, Required Supplementary Information, Supplemental Information and Other Reports For the Fiscal Year Ended
More informationSACRAMENTO AREA FLOOD CONTROL AGENCY. For the Fiscal Year Ended June 30, 2015
Independent Auditors Reports, Management's Discussion and Analysis, Basic Financial Statements, Required Supplementary Information and Other Reports For the Fiscal Year Ended June 30, 2015 For the Fiscal
More informationU.S. Army Corp of Engineers
U.S. Army Corp of Engineers PL 84-99 Levee Inspections and Levee Certification Hank DeHaan Rock Island District March 9, 2011 US Army Corps of Engineers U.S. Army Corps of Engineers Flood Damage Reduction
More informationSACOG Board of Directors
SACOG Board of Directors Item #12-3-14 Action March 8, 2012 Federal Flood Policy Issues Issue: A lack of funding and several regulatory and legislative issues at the federal level related to flood protection.
More informationFinancing Requirements Schedule- FY Final Budget Sacramento Area Flood Control Agency Operations & Maintenance District No.
Financing Requirements Schedule- FY 2016-17 Budget Operations & Maintenance District No. 1 - Fund 325A FY 2016-17 Appropriations By Object of Expenditure Proposed * 10 - SALARIES AND EMPLOYEE BENEFITS
More informationDEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C
.t DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 REPLY TO A TTENTION OF: CECW-PE (l0-1-7a) 1 3 OCT 199B SUBJECT: Tampa Harbor, Big Bend Channel, Florida THE SECRETARY
More informationDEPARTMENT OF THE ARMY U. S. Army Corps of Engineers CECW-CP Washington, DC APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS
ER-1105-2-100 DEPARTMENT OF THE ARMY U. S. Army Corps of Engineers CECW-CP Washington, DC 20314-1000 Regulation 31 January 2007 ER 1105-2-100 APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS
More informationA Review of Our Legacy System, History of Neglect, Current Issues, and the Path Forward for Levee Safety
4 th NACGEA GEOTECHNICAL WORKSHOP January 29, 2010 A Review of Our Legacy System, History of Neglect, Current Issues, and the Path Forward for Levee Safety Presented by: Leslie F. Harder, Jr., Phd, PE,
More informationThe Breadth of the Planning Portfolio
The Breadth of the Planning Portfolio Travis Creel, Planner, Regional Planning and Environmental Division South, MVD Eric Halpin, Special Assistant for Dam and Levee Safety, HQUSACE Lisa Kiefel, PCoP,
More informationPublic Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study
Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers, New York District New Jersey Department of Environmental Protection 11 &
More informationPassaic River Flood Risk Management Projects
Passaic River Flood Risk Management Projects EPA Lower Passaic River Community Advisory Group Tom Shea, PMP Project Manager 12 March 2015 US Army Corps of Engineers Passaic River Main Stem Project Studies
More informationREAL ESTATE A GUIDE FOR PROJECT PARTNERS
REAL ESTATE A GUIDE FOR PROJECT PARTNERS WHO PAYS, AND WHERE DOES THE MONEY COME FROM? Corps and Sponsor Roles in Sharing and Financing Project Costs INTRODUCTION The Water Resources Development Act of
More informationExisting Manhattan Levee
Tuttle Creek Dam and Lake Existing Conditions General location of existing project, Tuttle Creek Lake, and unprotected areas of the City of Manhattan examined in this study. Approximate Unprotected Northern
More informationNational Flood Policy Challenges Levees: The Double-edged Sword
National Flood Policy Challenges Levees: The Double-edged Sword ASFPM White Paper This is a position paper prepared by the Association of State Floodplain Managers, (ASFPM), a non-profit professional organization
More informationKing County Flood Control District 2015 Work Program
Attachment A 2015 Work Plan 10-24-14 King County Flood Control District 2015 Work Program The District work program is comprised of three categories: district oversight and policy development, operations,
More informationAction Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain management plans and flood forecast inundation maps
Presentation to USACE 2012 Flood Risk Management and Silver Jackets Joint Workshop, Harrisburg, Pennsylvania Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain
More informationCommunity Development Department
Community Development Department Ryan DeVore, Interim Director of Community Development Scot Mende, Principal Planner Bill Busath, Interim Director of Utilities Connie Perkins, Senior Engineer, Floodplain
More informationKing County Flood Control District Flood Risk Reduction Work Program and Accomplishments
King County Flood Control District Flood Risk Reduction Work Program and Accomplishments Brian Murray Water and Land Resources Division April 26, 2016 Department of Natural Resources and Parks Water and
More informationSUBJECT: LAND USE PLANNING POLICY WITHIN THE 100 YEAR FLOODPLAIN (REPORT #2)
DEPARTMENT OF PLANNING AND DEVELOPMENT City Council Sacramento, California Honorable Members in Session: CITY OF SACRAMENTO CALIFORNIA August 20, 1993 1231 1 STREET ROOM 200 SACRAMENTO, CA 95814-2998 ENVIRONMENTAL
More informationSutter Butte Flood Control Agency
Sutter Butte Flood Control Agency Sutter and Butte Counties, California Basic Financial Statements and Independent Auditors Reports For the year ended June 30, 2017 Table of Contents Page FINANCIAL SECTION
More informationDAEN SUBJECT: South San Francisco Bay Shoreline, Santa Clara County, California
opportunities would be significant with the restoration of the tidal marsh areas. Recreational features in the recommended plan include two pedestrian bridges, viewing platforms, and benches. The new levees
More informationMinimum Standards For USACE Evaluation of Levee Systems For the National Flood Insurance Program
Minimum Standards For USACE Evaluation of Levee Systems For the National Flood Insurance Program Christopher N. Dunn, P.E., Director Hydrologic Engineering Center ASCE Water Resource Group 20 October,
More informationCOMPREHENSIVE ANNUAL FINANCIAL REPORT
WEST SACRAMENTO AREA FLOOD CONTROL AGENCY WEST SACRAMENTO, CALIFORNIA COMPREHENSIVE ANNUAL FINANCIAL REPORT Jelaina Rosalejos, 5 th Grade FOR THE FISCAL YEAR ENDED JUNE 30, 2015 WEST SACRAMENTO AREA FLOOD
More informationAbstract. An assessment of the benefits of DWR s levee inspection program in California s Central Valley
An assessment of the benefits of DWR s levee inspection program in California s Central Valley At left: Crew members place sandbags during flood fighting effors (DWR). By David Ford, PhD, PE, D.WRE; Joanna
More informationDAEN SUBJECT: Little Colorado River at Winslow, Arizona, Flood Risk Management Project
per year. In addition to the above, the Navajo County Flood Control District would be fully responsible for performing the investigation, cleanup, and response of hazardous materials on the project sites.
More informationUPPER SUSQUEHANNA RIVER BASIN FLOOD RISK MANAGEMENT FEASIBILITY STUDY
UPPER SUSQUEHANNA RIVER BASIN FLOOD RISK MANAGEMENT 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 FEASIBILITY STUDY 110 135 120 252 174.59 112 92 56
More informationDEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS
DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON. D.C. 20314'1000 REPLY TO ATTENTION OF: CECW-PE (l0-1-7a) THE SECFETARY OF THE ARMY 1. I submit for transmission to Congress my report
More informationNational Flood Risk Management Program
National Flood Risk Management Program US Army Corps of Engineers Floodplain Managers Association Sacramento, California July 29, 2010 Judy Soutiere Institute for Water Resources A Shared Responsibility
More informationSUBJECT: Amite River and Tributaries, Louisiana, East Baton Rouge Parish Watershed
DEPARTMENi OF THE ARMY OFFICE OF 'rhe CHIEF OF ENGINEERS WASHINGTON. D.C. 20314-1000 REPLY TO AT1'~NTIQN OF: (lo-1-7a) THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report on East
More information2018 WASHOE COUNTY BALLOT QUESTION WC 1
2018 WASHOE COUNTY BALLOT QUESTION WC 1 Shall Washoe County be authorized to levy an additional property tax rate for the purpose of paying for the cost of designing, acquiring, constructing, improving
More information' New Orleans District. Lake Pontchartrain, Louisiana, and Vicinity (Hurricane Protection) Lower Mississippi Valley Division '---..
'---.. APPROPRIATION TITLE: PROJECT: ltzj'i "-.' "------- Construction General - Local Protection (Flood Control) (Continuing) LOCATION: The project is located in St. Charles, Jefferson, Orleans, St. Bernard,
More informationDEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C AUG 2339
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C. 20314-1000 8 1 AUG 2339 CECW-PC MEMORANDUM FOR COMMANDERS, MAJOR SUBORDINATE COMMANDS SUBJECT: Implementation Guidance
More informationYUNG-HSIN SUN Ph.D., P.E., D.WRE
YUNG-HSIN SUN Ph.D., P.E., D.WRE Corresponding roles and responsibilities depend on levee ownerships, agreements, and interests Local Maintaining Agencies State s role is increasing and its jurisdiction
More informationSUTTER BUTTE FLOOD CONTROL AGENCY
SUTTER BUTTE FLOOD CONTROL AGENCY ANNUAL FINANCIAL REPORT For the Fiscal Year Ended SUTTER BUTTE FLOOD CONTROL AGENCY FINANCIAL STATEMENTS JUNE 30, 2016 TABLE OF CONTENTS FINANCIAL SECTION Independent
More informationCOUNTY OF SACRAMENTO CALIFORNIA
COUNTY OF SACRAMENTO CALIFORNIA Control No.: 2002-0105 Type: GPB A D D E N D U M # 4 For the Agenda of: July 20, 2010 Agenda Item No. 4 TO: FROM: BOARD OF SUPERVISORS PLANNING AND COMMUNITY DEVELOPMENT
More informationItem No. 1 Public Comments on Non-Agenda Items: There were no comments on non-agenda items from members of the public.
June 10, 2016 Sacramento, California The Board of Trustees of the American River Flood Control District met in regular session in its office at 185 Commerce Circle, Sacramento, CA at 11:00 a.m. on Friday,
More informationDAEN SUBJECT: Lower San Joaquin River Feasibility Study Report, California
1.33 miles of new setback levee along the Delta Front to eliminate the eastern portions of the Fourteenmile Slough levee in North Stockton. 0.59 miles of height improvements between 1.8 and 2.7 feet on
More informationDEPARTMENT OF THE ARMY. u.s. ARMY CORPS OF ENGINEERS WASHINGTON, D.C
DEPARTMENT OF THE ARMY u.s. ARMY CORPS OF ENGINEERS WASHINGTON, D.C. 20314-1000 REPLY TO ATTENTION OF: NOV 1 7 2008 CECW-PB MEMORANDUM FOR SEE DISTRIBUTION SUBJECT: Clarification Guidance on the Policy
More informationREQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES
REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES SEPTEMBER 2018 Submit proposal to: Tony Williams, Principal Civil Engineer Marin County Flood Control & Water Conservation
More informationDistribution Restriction Statement Approved for public release; distribution is unlimited.
CECW-PA Engineer Regulation 1165-2-122 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Water Resource Policies and Authorities STUDIES OF HARBOR OR INLAND HARBOR PROJECTS
More informationFIVE YEAR CIP SUMMARY
RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 7 FISCAL YEARS 2018-19 THROUGH 2022-23 Project Number Stg No. Project Title
More informationUPPER BRUSHY CREEK WATER CONTROL AND IMPROVEMENT DISTRICT 2016 ANNUAL REPORT
UPPER BRUSHY CREEK WATER CONTROL AND IMPROVEMENT DISTRICT 2016 Prepared by Ruth Haberman The mission of the Upper Brushy Creek Water Control and Improvement District is to maintain and improve flood control
More informationCONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination
Date: 8 May 2013 Division: Great Lakes and Ohio River Division District: Nashville District CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination 1. Project: Cumberland River, Metropolitan
More informationGENERAL PLAN AMENDMENT # FLOOD HAZARDS
GENERAL PLAN AMENDMENT #2011-03 FLOOD HAZARDS The following text that appears on pages HS 3-4 of the Health and Safety Element in the Yolo 2030 Countywide General Plan has been amended. New language is
More informationFlood Insurance and Levees
Flood Insurance and Levees NFIP Requirements are found in 44 (CFR) Section 65.10 General Requirements 65.10(a) Design Criteria 65.10(b) Operation Plans and Criteria 65.10(c) Maintenance Plans and Criteria
More informationPassaic River Basin Flood Advisory Commission Report/Status of Recommendations. October 2014 Update
Passaic River Basin Flood Advisory Commission Report/Status of Recommendations October 2014 Update Passaic River Basin Flood Advisory Commission April 2010: By Executive Order, Governor Christie created
More informationFREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality
FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial
More informationInterim Policy for Determining Eligibility Status of Flood Risk Management Projects for the Rehabilitation Program Pursuant to Public Law (PL) 84-99
Interim Policy for Determining Eligibility Status of Flood Risk Management Projects for the Rehabilitation Program Pursuant to Public Law (PL) 84-99 March 24, 2014 US Army Corps of Engineers Purpose of
More informationFINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT ADDENDUM
FINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT BREVARD COUNTY, FLORIDA HURRICANE AND STORM DAMAGE REDUCTION PROJECT MARCH 2014 U.S. Army Corps of Engineers
More informationDECISION DOCUMENT REVIEW PLAN USING THE NATIONAL PROGRAMMATIC REVIEW PLAN MODEL
DECISION DOCUMENT REVIEW PLAN USING THE NATIONAL PROGRAMMATIC REVIEW PLAN MODEL For Section 506, Water Resources Development Act of 2000, as Amended Great Lakes Fishery and Ecosystem Restoration (GLFER)
More informationREQUEST FOR PROPOSAL Engineering Survey/Design Services Loecy Pond Dam Modification or Rehabilitation August 27, 2018
REQUEST FOR PROPOSAL Engineering Survey/Design Services Loecy Pond Dam Modification or Rehabilitation August 27, 2018 I. INTRODUCTION Chagrin River Watershed Partners, Inc. (CRWP), located at 38238 Glenn
More informationBusiness Plan Summary
Owner: 2012-2016 Business Plan Summary Program Environmental Services Service grouping Conservation Authority Service Type Public Service Ian Wilcox, General Manager/Secretary-Treasurer, Upper Thames River
More informationJANUARY 13, ILL. ADM. CODE CH. I, SEC TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER h: WATER RESOURCES
TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER h: WATER RESOURCES PART 3702 CONSTRUCTION AND MAINTENANCE OF DAMS Section Page No. 3702.10 Purpose 2 3702.20 Definitions 3 3702.30
More informationDAM SAFETY REMEDIATION LETTER REPORT
REVIEW PLAN DAM SAFETY REMEDIATION LETTER REPORT SUCCESS DAM, CALIFORNIA DAM SAFETY ASSURANCE PROGRAM SACRAMENTO DISTRICT July 6, 2010 ii REVIEW PLAN DAM SAFETY MODIFICATION REPORT SUCCESS DAM, CALIFORNIA
More informationAppendix A. Plan Formulation. Puyallup River Basin Flood Risk Management Feasibility Study
Appendix A Plan Formulation Puyallup River Basin Flood Risk Management Feasibility Study Department of the Army Seattle District, US Army Corps of Engineers March 2016 This page intentionally left blank
More informationMarin County Flood Control & Water Conservation District. Zone No. 3 Advisory Board Meeting
Marin County Flood Control & Water Conservation District Zone No. 3 Advisory Board Meeting May 26, 2010 6:30 8:30 pm Mill Valley City Hall Council s Chambers PG&E Utilities at Bothin Marsh PG&E Utilities
More informationThis survey is expected to take approximately 20 minutes and must be completed in one session.
State Flood Assessment Survey 1 Introduction Thank you for your willingness to participate in this online survey as part of the State Flood Assessment effort. This first step toward developing comprehensive
More informationAPPENDIX K Drainage Study
APPENDIX K Drainage Study Storm Drainage Study For Project 65 Sacramento, California Prepared for: Capital Station 65, LLC Prepared by: Nolte Associates, Inc. 2495 Natomas Park Drive, Fourth Floor Sacramento,
More informationTo Whom It May Concern: Terra Yaney Administrative Analyst
January 18, 2019 RE: Request for Proposal for Benefit Assessment District Administration Services To Whom It May Concern: The Sutter Butte Flood Control Agency (SBFCA) is hereby soliciting proposals from
More informationThis survey is expected to take approximately 20 minutes and must be completed in one session.
Introduction Thank you for your willingness to participate in this online survey as part of the State Flood Assessment effort. This first step toward developing comprehensive flood planning for Texas does
More informationProposed Report 1 DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC
Proposed Report 1 REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC 20310-2600 DAEN THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my
More informationJustification for Floodplain Regulatory Standards in Illinois
Justification for Floodplain Regulatory Standards in Illinois Office of Water Resources Issue Paper April, 2015 Proactive Illinois floodplain and floodway regulatory standards have prevented billions of
More informationSWIF TO THE RESCUE. Patty Robinson Ike Pace, PE WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY
SWIF TO THE RESCUE Patty Robinson Ike Pace, PE WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY AGENDA USACE Programs PL 84 99 (Rehabilitation & Inspection Program, RIP) Levee Safety Program (Routine,
More information4 Incl as. Walton/ea/583: TC HiL PD-( (aftel dispatch; L.'1VPD-G 15 August Lake Pontchartrain, LA, and Vicinity Hurricane Protection Project
Walton/ea/583: L.'1VPD-G 15 August 1984 SUBJECT: Lake Pontchartrain, LA, and Vicinity Hurricane Protection Project CDR USACE (DAEN-CWP-G) l.otash DC 20314 TC HiL PD-( (aftel dispatch; Hollau< PD-I Gardne]
More informationDamages caused by Flash Floods
Damages caused by Flash Floods Damages caused as a result of flash flood are enormous both on human lives and loss of property. It is reported that flood disasters account for about a third of all natural
More information/q4;t: Lake Pontchartrain, Louisiana, aud Vicinity (Hurricane Protection) ~ Lower Mississippi Valley Division. New Orleans District 18 March 1996 /"~
"" /"~ ~\ /q4;t: APP~OPRIATION TITLE: PROJECT: Construction, General - Local Protection (Flood Control) Lake Pontchartrain, Louisiana, and Vicinity (Hurricane Protection) (Continuing) LOCATION: The project
More informationHAZARD DESCRIPTION... 1 LOCATION... 2 EXTENT... 4 HISTORICAL OCCURRENCES... 6 PROBABILITY OF FUTURE EVENTS... 6 VULNERABILITY AND IMPACT...
DAM FAILURE HAZARD DESCRIPTION... 1 LOCATION... 2 EXTENT... 4 HISTORICAL OCCURRENCES... 6 PROBABILITY OF FUTURE EVENTS... 6 VULNERABILITY AND IMPACT... 6 Hazard Description Dams are water storage, control
More informationLower Mississippi Valley Division New Orleans District Lake Pontchartrain. Louisiana. and Vicinity (Hurricane Protection)
~ u u (17'b '-../' LP.JS APPROPRIATION TITLE: Construction General - Local Protection (Flood Control) PROJECT: Lake Pontchartrain. Louisiana. and (Continuing) LOCATION: The project is located in St. Charles.
More informationAPPENDIX D. Economic And Social Considerations TABLE OF CONTENTS
APPENDIX D Economic And Social Considerations TABLE OF CONTENTS Paragraph Page D- D-1. Background...1 D-2. Other Direct Benefits.1 D-3. NED Cost Evaluation Procedures.3 D-4. Planning Special Topics and
More informationVocabulary of Flood Risk Management Terms
USACE INSTITUTE FOR WATER RESOURCES Vocabulary of Flood Risk Management Terms Appendix A Leonard Shabman, Paul Scodari, Douglas Woolley, and Carolyn Kousky May 2014 2014-R-02 This is an appendix to: L.
More informationFirst American Title Company
CLTA Preliminary Report Form Order Number: 5102-3889428 (Rev. 11/06) Page Number: 1 Updated Company 415 Century Park Drive Yuba City, CA 95991 Escrow Officer: Ginger Harris Phone: (530)673-5527 Fax No.:
More informationUSACE Levee Screening Tool Understanding the Classification
USACE Levee Screening Tool Understanding the Classification Richard J. Varuso, Ph.D., P.E. Deputy Chief, Geotechnical Branch Levee Safety Program Manager USACE - New Orleans District 17 Nov 2011 US Army
More information77th OREGON LEGISLATIVE ASSEMBLY Regular Session. Enrolled. House Bill 2800 CHAPTER... AN ACT
77th OREGON LEGISLATIVE ASSEMBLY--2013 Regular Session Enrolled House Bill 2800 Sponsored by Representatives READ, BENTZ, Senators BEYER, STARR CHAPTER... AN ACT Relating to the Interstate 5 bridge replacement
More informationCounty of Yolo PLANNING AND PUBLIC WORKS DEPARTMENT. PLANNING COMMISSION STAFF REPORT April 14, 2011
County of Yolo PLANNING AND PUBLIC WORKS DEPARTMENT John Bencomo DIRECTOR 292 West Beamer Street Woodland, CA 95695-2598 (530) 666-8775 FAX (530) 666-8728 www.yolocounty.org PLANNING COMMISSION STAFF REPORT
More informationAppendix D Rural LMA Work Group Topic Papers
Appendix D Appendix D Rural LMA Work Group Topic Papers Lower San Joaquin River and Delta South Regional Flood Management Plan November 2014 Appendix D --Page initially blank-- Lower San Joaquin River
More informationA Little Less Conversation a Little More ACTION! Louie Greenwell, GISP, CFM T&M Associates Carey Johnson KY Division of Water
A Little Less Conversation a Little More ACTION! Louie Greenwell, GISP, CFM T&M Associates Carey Johnson KY Division of Water Topics Covered It s all about ACTION! Kentucky s plan for delivering actions
More informationPublic Notice. Number: CESWF-12-MITB Activity: Fort Worth District Mitigation Banks Date: June 27, 2016
Public Notice Number: CESWF-12-MITB Activity: Fort Worth District Mitigation Banks Date: June 27, 2016 Purpose The purpose of this Public Notice is to inform you of mitigation banking guidelines being
More informationSituation: the need for non-structural flood risk reduction measures
Evaluating benefits of non-structural measures in flood risk management feasibility studies At left: Example of a house on an open foundation Source Asheville, NC (undated) By Steve Cowdin, CFM; Natalie
More informationUPDATE ON DALLAS FLOODWAY
UPDATE ON DALLAS FLOODWAY ENVIRONMENTAL IMPACT STATEMENT [ EIS ] Transportation and Trinity River Project Committee Rob Newman Director, Trinity River Corridor Project, Fort Worth District 28 April 2014
More informationPARTNERSHIPS AND INCENTIVES
PARTNERSHIPS AND INCENTIVES Flood damage is a direct consequence of floodplain investment activities, both public and private. Those who occupy and use the floodplain should be responsible for the consequences
More informationLincoln Draw City of Hays, Kansas. Feasibility Report and Environmental Assessment Review Plan
City of Feasibility Report and Environmental Assessment Review Plan Continuing Authorities Program Section 205 of the Flood Control Act of 1948 Northwestern Division Kansas City District P2 Project Number:
More informationATR REVIEW PLAN USING THE NWD ATR REVIEW PLAN TEMPLATE
ATR REVIEW PLAN USING THE NWD ATR REVIEW PLAN TEMPLATE Project Name: Project Location: Kanopolis Dam, KS Project P2 Number: 351875 Project Manager or POC Name: Chance Bitner NWD Original Approval Date:
More informationSPILLWAY ADEQUACY ANALYSIS ROUGH RIVER LAKE LOUISVILLE DISTRICT
SPILLWAY ADEQUACY ANALYSIS OF ROUGH RIVER LAKE LOUISVILLE DISTRICT RICHARD PRUITT (502) 315-6380 Louisville District COE richard.l.pruitt@lrl02.usace.army.mil Spillway ROUGH RIVER LAKE PERTINENT DATA Construction
More informationLETTER REPORT BAYOU SORREL LOCK REPLACEMENT, LOUISIANA POST AUTHORIZATION CHANGE STUDY
LETTER REPORT BAYOU SORREL LOCK REPLACEMENT, LOUISIANA POST AUTHORIZATION CHANGE STUDY September 2013 SEPTEMBER 2013 LETTER REPORT BAYOU SORREL LOCK REPLACEMENT, LOUISIANA POST AUTHORIZATION CHANGE STUDY
More informationThird Appropriation Funding Recommendation
Third Appropriation Funding Recommendation Context: It is currently anticipated but not confirmed that the State of Louisiana will receive an additional 51,435,000 allocation from the Department of Housing
More informationDECISION DOCUMENT REVIEW PLAN Consistent with the National Programmatic Review Plan Model
Continuing Authorities Program Section 14, Flood Control Act of 1946, as amended Emergency Streambank and Shoreline Protection Projects DECISION DOCUMENT REVIEW PLAN Consistent with the National Programmatic
More informationARTICLE 5 RELATING TO CAPITAL DEVELOPMENT PROGRAM. SECTION 1. Proposition to be submitted to the people. -- At the general election to be
======= art.00//00//00//00/ ======= ARTICLE 0 0 0 SECTION. Proposition to be submitted to the people. -- At the general election to be held on the Tuesday next after the first Monday in November 0, there
More informationPROJECT REVIEW PLAN INDEPENDENT TECHNICAL REVIEW AND EXTERNAL PEER REVIEW
PROJECT REVIEW PLAN INDEPENDENT TECHNICAL REVIEW AND EXTERNAL PEER REVIEW WHITE OAK BAYOU FEDERAL FLOOD CONTROL PROJECT HARRIS COUNTY, TEXAS HARRIS COUNTY FLOOD CONTOL DISTRICT/GALVESTON DISTRICT-USACE
More informationRisk Assessment Framework. Levee Ready Columbia
Risk Assessment Framework Levee Ready Columbia November 23, 2015 Today s Discussion Level of Protection Levees and Risk Tolerable Risk Guidelines Applying Tolerable Risk Guidelines Levees and Level of
More informationFLOODPLAIN MANAGEMENT: A PRESENT AND A 21st CENTURY IMPERATIVE. Gerald E. Galloway, Jr. United States Military Academy
FLOODPLAIN MANAGEMENT: A PRESENT AND A 21st CENTURY IMPERATIVE Gerald E. Galloway, Jr. United States Military Academy Introduction The principal rivers of the United States and their tributaries have played
More informationFinance and Insurance Committee Item 6a January 7, 2019
Finance and Insurance Committee Item 6a January 7, 2019 Section I: Brief History Section II: Physical Features Section III: Statutory Authorities Section IV: Contractual Terms Section V: Significant Legal
More informationProject Planning with the U.S. Army Corps of Engineers
US Army Corps of Engineers PLANNING SMART BUILDING STRONG Project Planning with the U.S. Army Corps of Engineers Tim Kuhn Project Manager Portland District 1 February 2016 Introduction Levee Ready Columbia
More informationMarin County Flood Control and Water Conservation District FLOOD CONTROL ZONE 5 ADVISORY BOARD MAY 15, 2014 STAFF REPORT
FLOOD CONTROL ZONE 5 ADVISORY BOARD MAY 15, 2014 STAFF REPORT Item 1. Approval of Meeting Minutes for February 10, 2014 Recommended Action: Approve minutes. Item 2. Open Time for Items not on the Agenda
More informationUSACE Levee Safety Program Update
USACE Levee Safety Program Update Eric Halpin, PE Acting Administrator National Levee Safety Program November, 2 2015 US Army Corps of Engineers The Continuing Levee Challenge The nation has thousands
More information