1 Marin County Flood Control & Water Conservation District Zone No. 3 Advisory Board Meeting May 26, :30 8:30 pm Mill Valley City Hall Council s Chambers

2 PG&E Utilities at Bothin Marsh

3 PG&E Utilities at Bothin Marsh

4 PG&E Utilities at Bothin Marsh

5 Ryan Creek Hydraulics Study o Need emerged during study of Arroyo Corte del Presidio watershed o Cost: $39,000 o Expand ACMDP model o Evaluate flooding in adjoining Ryan Creek watershed o Recommend facility operation and improvements

6 Seminary Drive Pump Station o Design near completion o Close to finalizing easement o Construction ready this summer o Construction either 2010 or 2011 o Revised cost estimate $1,500,000

7 Goal Develop mapping standards, identify data gaps, and obtain new data Completed Zone 4 Strawberry Alto West Ryan Creek Current Tam Valley Planned Almonte Reed Creek Marin City Storm Drain Mapping

8 Storm Drain Mapping Catch Basin Channel Upstream Pipe Downstream Pipe Manhole Stream

9 Storm Drain Mapping

10 Watershed Program Framework for integrating flood protection, creek and wetland restoration, fish passage, and water quality improvements Existing conditions reports and website Committees established Political Action Technical Advisory Operations and Finance Committee meetings

11 Boyle Park Restoration $370,000 EPA grant Improve water quality Study/design 2010 Construction 2011

12 Master Plan Develop recommendations for watershed improvements Scope of work developed though Watsershed Program Consultant to complete Master Plan and provide report

13 Maintenance Activities Update o Sediment Removal Middle reach Coyote Creek Enterprise Concourse o Army Corps Continuing Eligibility Inspections o City of Mill Valley Vegetation Maintenance Agreement o Pump Station Maintenance

14 Continuing Eligibility Inspections Before o Annual inspection (April 15 September 15) of federal projects constructed by the U.S. Army Corps of Engineers (Corps). After o Inspection conducted by Corps staff to determine the existing condition and rate according to specific criteria. o Requires that the District, as project sponsor, perform regular maintenance which meet criteria. o Failure to meet criteria could affect eligibility for rehabilitation aid o Periodic inspections are conducted every five year (beginning 2009) and evaluate hydraulics, hydrology, and project performance.

15 Sediment Removal Coyote Creek Middle Reach

16 Enterprise Concourse Sediment Removal Looking Upstream Towards Crossing Pre-removal (2008) Looking Upstream Towards Crossing Post-removal (2008)

17 City of Mill Valley Vegetation Maintenance Agreement

18 Fire Fuel Reduction Mowing

19 Pump Station Maintenance Crest Marin Pump Station o Planned maintenance on pump #1 (2010) Ryan Creek Pump Station o Performed maintenance on pump #1 (2009) o Planned maintenance on pump #2 (2010) Cardinal Pump Station o Planned maintenance on pump #1 (2010) Shoreline Pump Station o Performed maintenance on pump #2 (2009)

20 FY Budget Report FCZ #3 Mill Valley Fund Budget Summary FY FY FY Account Description Budget Projected Budget Fund Beginning Balance $4,293,775 $4,496,722 $2,961,640 Expenses Salaries and Benefits $662,000 $625,142 $812,986 Service and Supplies $1,527,690 $2,330,340 $510,900 Capital Assets $5,000 $8,000 $5,000 Total Expenditures $2,194,690 $2,963,482 $1,328,886 Revenue Taxes $1,324,700 $1,370,400 $1,370,400 Revenues From Use of Money and Property $120,000 $50,000 $30,000 Intergovernmental Revenues $5,000 $5,000 $5,000 Miscellaneous Revenues $3,000 $3,000 $3,000 Total Revenue $1,452,700 $1,428,400 $1,408,400 Fund Ending Balance $3,551,785 $2,961,640 $3,041,154 Major "Services & Supplies" Expenditures Professional Services Watershed Stewardship Plan $240,000 $240,000 $0 Mill Valley Creek Maintenance MOU $35,000 $35,000 $35,000 Seminary Drive Pump Station, CM $30,000 $40,000 $0 Coyote Creek Middle Reach Dredging $50,000 $0 $50,000 Ryan Creek H&H Study $0 $40,000 $0 Boyle Park Restoration $0 $0 $10,000 Miscellaneous Studies $80,000 $135,000 $80,000 Total $435,000 $490,000 $175,000 Construction Seminary Drive $800,000 $1,500,000 $0 Boyle Park Restoration $0 $0 $0 Total $800,000 $1,500,000 $0 Maintenance & Repair Services - Equipment Pump Repair Service $57,300 $56,600 $75,000 SCADA $30,000 $0 $45,000 Miscellaneous 21,500 $103,400 26,500 Total $108,800 $160,000 $146,500 Maintenance & Repair Services - Land & Buildings MCC (Marin Conservation Corps) $77,000 $30,000 $77,000 Miscellaneous 42,390 $81,440 43,500 Total $119,390 $111,440 $120,500 Miscellaneous Services & Supplies $64,500 $68,900 $68,900

21 Zone 3 Budget FY $3,500,000 $3,000,000 $2,961,640 $3,041,154 $2,500,000 $2,000,000 $1,500,000 $1,328,886 $1,408,400 $1,000,000 $500,000 $- Ending Balance FY09-10 Expenses FY10-11 Revenues FY10-11 Ending Balance FY10-11

22 Zone 3 Budget FY Total Revenue by Source $3,000 $5,000 $30,000 Taxes $1,370,400 Revenues From Use of Money and Property Intergovernmental Revenues Miscellaneous Revenues

23 Zone 3 Budget FY Expenditures $5,000 $510,900 $812,986 Salaries Services & Supplies Capital Assets

24 Zone 3 Budget FY Services & Supplies $68,900 $0 $175,000 Professional Services Maintenance & Repair Construction Other $267,000

Marin County Flood Control and Water Conservation District FLOOD CONTROL ZONE 5 ADVISORY BOARD MAY 15, 2014 STAFF REPORT

Marin County Flood Control and Water Conservation District FLOOD CONTROL ZONE 5 ADVISORY BOARD MAY 15, 2014 STAFF REPORT FLOOD CONTROL ZONE 5 ADVISORY BOARD MAY 15, 2014 STAFF REPORT Item 1. Approval of Meeting Minutes for February 10, 2014 Recommended Action: Approve minutes. Item 2. Open Time for Items not on the Agenda

More information

Marin County Flood Control and Water Conservation District

Marin County Flood Control and Water Conservation District Marin County Flood Control and Water Conservation District FLOOD CONTROL ZONE 3 ADVISORY BOARD MEETING MARCH 17, 2016 STAFF REPORT Item 1. Election of Chairperson and Vice-Chairperson Article VI of the

More information

Gallinas Watershed Program

Gallinas Watershed Program C O M M U N I T Y M E E T I N G April 5, 2016 Tonight s Agenda S C H E D U L E O F P R E S E N T A T I O N S Presentation: Gallinas Watershed Program Overview Questions and Answers Presentation: Upper

More information

REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES

REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES SEPTEMBER 2018 Submit proposal to: Tony Williams, Principal Civil Engineer Marin County Flood Control & Water Conservation

More information

King County Flood Control District 2015 Work Program

King County Flood Control District 2015 Work Program Attachment A 2015 Work Plan 10-24-14 King County Flood Control District 2015 Work Program The District work program is comprised of three categories: district oversight and policy development, operations,

More information

Gallinas Watershed Program

Gallinas Watershed Program S A N R A F A E L C I T Y C O U N C I L May 2, 2016 Tonight s Agenda G A L L I N A S W A T E R S H E D P R O G R A M What is the Watershed Program? Gallinas Watershed Products Community Involvement More

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

FIVE YEAR CIP SUMMARY

FIVE YEAR CIP SUMMARY RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 7 FISCAL YEARS 2018-19 THROUGH 2022-23 Project Number Stg No. Project Title

More information

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial

More information

NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter

NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter Agenda Date: 6/7/2016 Agenda Placement: 8A Set Time: 1:30 PM PUBLIC HEARING Estimated Report Time: 20 Minutes NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter TO: FROM: Board

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

MVMCC CAPITAL IMPROVEMENT PROGRAM (CIP) UPDATE AND ADOPTING A RESOLUTION APPROVING A MVMCC CAPITAL BUDGET ALLOCATION AMENDMENT

MVMCC CAPITAL IMPROVEMENT PROGRAM (CIP) UPDATE AND ADOPTING A RESOLUTION APPROVING A MVMCC CAPITAL BUDGET ALLOCATION AMENDMENT STAFF REPORT MEETING DATE: October 20, 2015 TO: FROM: City Council Cathy Capriola, Assistant City Manager Matt Greenberg, Park General Manager Tony Williams, Senior Civil Engineer 922 Machin Avenue Novato,

More information

Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain management plans and flood forecast inundation maps

Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain management plans and flood forecast inundation maps Presentation to USACE 2012 Flood Risk Management and Silver Jackets Joint Workshop, Harrisburg, Pennsylvania Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain

More information

Attachment B. King County Flood Control Zone District Work Program

Attachment B. King County Flood Control Zone District Work Program Attachment B King County Flood Control Zone District Work Program The King County Flood Control Zone District work program is comprised of two major categories: Programmatic Work Program o Flood Preparedness,

More information

Attachment A 09 Final Budget Adjustments Summary-All Depts ( )

Attachment A 09 Final Budget Adjustments Summary-All Depts ( ) Board of Supervisors 0 0 0 This adjustment moves the cost of the LAN support position from General Services to the CEO and allocates the cost through an intra-fund transfer. Cost being shifted equals $34,773.

More information

RESOLUTION - APPROVING FINAL FISCAL YEAR BUDGET

RESOLUTION - APPROVING FINAL FISCAL YEAR BUDGET ITEM 12 TO: FROM: SUBJECT: Sacramento Area Flood Control Agency Board of Directors Richard M. Johnson, Executive Director (916) 874-7606 RESOLUTION - APPROVING FINAL FISCAL YEAR 2015-16 BUDGET OVERVIEW:

More information

RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT AGENDA

RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT AGENDA 146054 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Budget Work Session Zone 5 Wednesday, April 16, 2014 AGENDA Call to Order... Chairperson Tom Linton Introductions Purpose of Meeting...

More information

The Breadth of the Planning Portfolio

The Breadth of the Planning Portfolio The Breadth of the Planning Portfolio Travis Creel, Planner, Regional Planning and Environmental Division South, MVD Eric Halpin, Special Assistant for Dam and Levee Safety, HQUSACE Lisa Kiefel, PCoP,

More information

RECOMMENDATION: Staff recommends the Board adopt Resolution No approving SAFCA s Fiscal Year Final Budget.

RECOMMENDATION: Staff recommends the Board adopt Resolution No approving SAFCA s Fiscal Year Final Budget. ITEM 5 Agenda of August 18, 2016 TO: FROM: SUBJECT: Sacramento Area Flood Control Agency Board of Directors Jason D. Campbell, Deputy Executive Director (916) 874-7606 APPROVING FINAL FISCAL YEAR 2016-17

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

Presented by: Connie Perkins, PE, CFM April 20, 2016

Presented by: Connie Perkins, PE, CFM April 20, 2016 Presented by: Connie Perkins, PE, CFM April 20, 2016 City of Sacramento s Flood History Need for a Comprehensive Flood Management Plan (CFMP) Overview of Sacramento s CFMP 2016 Next Steps Sacramento

More information

AGENDA DATE: June 21, 2017 ITEM NO: 13. Zone 7 adopted its first two-year budget for fiscal years FY in June of 2016.

AGENDA DATE: June 21, 2017 ITEM NO: 13. Zone 7 adopted its first two-year budget for fiscal years FY in June of 2016. ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT, ZONE 7 100 NORTH CANYONS PARKWAY, LIVERMORE, CA 94551 PHONE (925) 454-5000 FAX (925) 454-5727 ORIGINATING DIVISION: ADMINISTRATIVE SERVICES

More information

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach i City of Centerville s Table of Contents Minimum Control Measure 1. Public Education and Outreach Best Management Practice Page 1-1: Outreach Publications...1 1-2: 30-day Public Notice for Annual Storm

More information

UPDATE ON DALLAS FLOODWAY

UPDATE ON DALLAS FLOODWAY UPDATE ON DALLAS FLOODWAY ENVIRONMENTAL IMPACT STATEMENT [ EIS ] Transportation and Trinity River Project Committee Rob Newman Director, Trinity River Corridor Project, Fort Worth District 28 April 2014

More information

Stormwater Management Utility Fee Reduction Credit Application

Stormwater Management Utility Fee Reduction Credit Application Stormwater Management Utility City of Dubuque, IA Winter 2003 Stormwater Management Utility Stormwater Management Utility Introduction The City of Dubuque established a Stormwater Management Utility on

More information

Budget. One. Time Cost. Total

Budget. One. Time Cost. Total Service Enhancements General Fund Town of Los Altos Hills 2018 20 Budget Attachment 2 - Budget Service Enhancements/New Requests CIP and Capital Funds Town wide 15,072,124 (1,364,236) 13,707,888 932,967

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

STORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office 1294 Chestnut Street, Clarkston 5:30-7:30 p.m.

STORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office 1294 Chestnut Street, Clarkston 5:30-7:30 p.m. County of Asotin Regional Stormwater Program P.O. Box 160 135 2 nd Street Asotin, WA 99402 509-243-2071 Fax 509-243-2003 STORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office

More information

Carroll County Maryland. Community Investment Plan Request Fiscal Years

Carroll County Maryland. Community Investment Plan Request Fiscal Years Carroll County Maryland Community Investment Plan Request Fiscal Years 2019-2024 PRODUCED BY The Department of Management and Budget Ted Zaleski... Director Deborah Effingham... Chief, Bureau of Budget

More information

JANUARY 13, ILL. ADM. CODE CH. I, SEC TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER h: WATER RESOURCES

JANUARY 13, ILL. ADM. CODE CH. I, SEC TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER h: WATER RESOURCES TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER h: WATER RESOURCES PART 3702 CONSTRUCTION AND MAINTENANCE OF DAMS Section Page No. 3702.10 Purpose 2 3702.20 Definitions 3 3702.30

More information

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C .t DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 REPLY TO A TTENTION OF: CECW-PE (l0-1-7a) 1 3 OCT 199B SUBJECT: Tampa Harbor, Big Bend Channel, Florida THE SECRETARY

More information

Flood Plain Management Annual Progress Report September 2014

Flood Plain Management Annual Progress Report September 2014 Flood Plain Management Annual Progress Report September 2014 Flood Plains in the City of Santa Cruz The City of Santa Cruz flood plains encompass the low-lying areas along the San Lorenzo River through

More information

RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT AGENDA

RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT AGENDA 146054 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Budget Work Session Zone 7 Tuesday, April 15, 2014 AGENDA Call to Order... Chairperson Steven Beswick Introductions Purpose of Meeting...

More information

SCW IMC Report - Year 3 Page 1 of 22

SCW IMC Report - Year 3 Page 1 of 22 Page 1 of 22 While the SCW Anderson Dam Project's Key Performance Indicator to provide funding remains the same, recent geotechnical and geologic investigation results have necessitated more extensive

More information

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS TABLE OF CONTENTS ENTERPRISE FUNDS Storm Drainage Fund... 121-124 Off Street Parking Fund... 125-126 Airport Fund... 127-131 Water Service Fund... 132-145 STORM DRAINAGE FUND CURRENT OPERATIONS This fund

More information

Accountant s Compilation Report

Accountant s Compilation Report CliftonLarsonAllen LLP CLAconnect.com Accountant s Compilation Report Board of Directors Cherry Creek Basin Water Quality Authority Arapahoe and Douglas Counties, Colorado Management is responsible for

More information

National Flood Risk Management Program

National Flood Risk Management Program National Flood Risk Management Program US Army Corps of Engineers Floodplain Managers Association Sacramento, California July 29, 2010 Judy Soutiere Institute for Water Resources A Shared Responsibility

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) Fax: (415)

SAUSALITO-MARIN CITY SANITARY DISTRICT 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) Fax: (415) 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) 332-0244 Fax: (415) 332-0453 Budget FY 2017/18 Adopted by Board on June 5, 2017 BUDGET EXECUTIVE SUMMARY FISCAL YEAR 2017/18 DISTRICT OVERVIEW The Sausalito-Marin

More information

Chicopee River CSO Project Springfield Water & Sewer Commission. APWA Congress September 9, CSO Control Plan. CSO Control

Chicopee River CSO Project Springfield Water & Sewer Commission. APWA Congress September 9, CSO Control Plan. CSO Control Chicopee River CSO Project Springfield Water & Sewer Commission APWA Congress September 9, 2007 CSO Control Plan Typical Approach Different Thinking on Controlling Costs Case Example Springfield MA CSO

More information

ACTIONS BOARD OF DIRECTORS BUDGET ADOPTION APRIL 14, :00 P.M. LINCOLN CENTER HEARING ROOM

ACTIONS BOARD OF DIRECTORS BUDGET ADOPTION APRIL 14, :00 P.M. LINCOLN CENTER HEARING ROOM ACTIONS BOARD OF DIRECTORS BUDGET ADOPTION 7:00 P.M. LINCOLN CENTER HEARING ROOM PRESENT: ALSO: Mayor Spadaccini, Deputy Mayor Peak, Secretary Pelletier, Directors Tweedie, Beckman, Zingler, O Neill, Kissmann,

More information

Water Resources Engineering Division Public Works City of Colorado Springs

Water Resources Engineering Division Public Works City of Colorado Springs Water Resources Engineering Division Public Works City of Colorado Springs Richard Mulledy, P.E. Division Manager City of Colorado Springs/Pueblo County IGA City of Colorado Springs/Pueblo County IGA $460

More information

A. All Responses to Request for Statements shall be sent to:

A. All Responses to Request for Statements shall be sent to: CITY OF FEDERAL WAY REQUEST FOR STATEMENT OF QUALIFICATIONS ARCHITECTURAL AND ENGINEERING SERVICES Surface Water Management ( SWM ) Comprehensive Plan Capital Improvements Program Update and Rate Study

More information

Corte Madera Sales Tax Community Forum- Measure F

Corte Madera Sales Tax Community Forum- Measure F Corte Madera Sales Tax Community Forum- Measure F APRIL 4, 2018 PRESENTED BY: TODD CUSIMANO, TOWN MANAGER PETER BROWN, PUBLIC WORKS DIRECTOR MEETING OVERVIEW 1) Meeting Purpose Provide Background, Transparency

More information

CITY OF NORTH RIDGEVILLE STORMWATER UTILITY

CITY OF NORTH RIDGEVILLE STORMWATER UTILITY CITY OF NORTH RIDGEVILLE STORMWATER UTILITY NON-RESIDENTIAL CREDIT MANUAL January 2019 City of North Ridgeville, 7307 Avon Belden Road, North Ridgeville, Ohio 44039 www.nridgeville.org, 440-353-0819 (office),

More information

Actual TOTAL $ 2,793,103 $ 3,115,212 $ 3,206,457 $ 3,296,810

Actual TOTAL $ 2,793,103 $ 3,115,212 $ 3,206,457 $ 3,296,810 REVENUE AND EXPENDITURE SUMMARY ITEM Revenues, Other Sources, and Fund Balance Sales/Charges for Services $ 2,773,135 $ 3,077,010 $ 3,191,580 $ 3,288,810 Miscellaneous Income 9,538 8,000 8,416 8,000 Investment

More information

REQUEST FOR PROPOSAL Engineering Survey/Design Services Loecy Pond Dam Modification or Rehabilitation August 27, 2018

REQUEST FOR PROPOSAL Engineering Survey/Design Services Loecy Pond Dam Modification or Rehabilitation August 27, 2018 REQUEST FOR PROPOSAL Engineering Survey/Design Services Loecy Pond Dam Modification or Rehabilitation August 27, 2018 I. INTRODUCTION Chagrin River Watershed Partners, Inc. (CRWP), located at 38238 Glenn

More information

Appendix A. Plan Formulation. Puyallup River Basin Flood Risk Management Feasibility Study

Appendix A. Plan Formulation. Puyallup River Basin Flood Risk Management Feasibility Study Appendix A Plan Formulation Puyallup River Basin Flood Risk Management Feasibility Study Department of the Army Seattle District, US Army Corps of Engineers March 2016 This page intentionally left blank

More information

Passaic River Basin Flood Advisory Commission Report/Status of Recommendations. October 2014 Update

Passaic River Basin Flood Advisory Commission Report/Status of Recommendations. October 2014 Update Passaic River Basin Flood Advisory Commission Report/Status of Recommendations October 2014 Update Passaic River Basin Flood Advisory Commission April 2010: By Executive Order, Governor Christie created

More information

Utility Board. Agenda topics. For Meeting of June 12, :00 PM to 9:00 PM City Council Chambers, City Hall

Utility Board. Agenda topics. For Meeting of June 12, :00 PM to 9:00 PM City Council Chambers, City Hall Utility Board For Meeting of June 12, 2012 7:00 PM to 9:00 PM City Council Chambers, City Hall Board Members: Council Liaison: Staff: David Laub, Chairman, Benjamin Levie, Vice Chairman, Suresh Malhotra,

More information

DRAFT. Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects

DRAFT. Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects DRAFT Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects February 27, 2019 Purpose This document provides the draft documentation for the Harris County Flood Control

More information

GOAL 1: Protect coastal resources and human life and limit public expenditures in areas that are subject to destruction by natural disasters..

GOAL 1: Protect coastal resources and human life and limit public expenditures in areas that are subject to destruction by natural disasters.. GOALS, OBJECTIVES, AND POLICIES GOAL 1: Protect coastal resources and human life and limit public expenditures in areas that are subject to destruction by natural disasters.. OBJECTIVE 1.1: The City will

More information

United States Department of the Interior

United States Department of the Interior United States Department of the Interior IN «CPLY utrt* TO NATIONAL PARK SERVICE P.O. BOX 37 127 WASHINGTON, D.C 20013-7127 ENVIRONMENTAL QUALITY DIVISION EIS/RELATED DOCUMENT REVIEW ER-97/0135 ENVIRONMENTAL

More information

[Letter to be printed on official Levee Sponsor letterhead]

[Letter to be printed on official Levee Sponsor letterhead] [Letter to be printed on official Levee Sponsor letterhead] [Date] COL Joel R. Cross, Commander US Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901 RE: [Levee Sponsor

More information

City of Madison 2018 Capital Improvement Plan Agency Request Summary

City of Madison 2018 Capital Improvement Plan Agency Request Summary City of Madison 2018 Capital Improvement Plan Agency Request Summary Agency : Agency Request by Project (All Funds) Project 2230 Broadway ## Citywide Flood Mitigation 350,000 875,000 550,000 575,000 675,000

More information

Overview. Highland Creek Wastewater Treatment Plant. R.C. Harris Water Treatment Plant

Overview. Highland Creek Wastewater Treatment Plant. R.C. Harris Water Treatment Plant Presentation to Budget Committee October 19, 2009 2010 Operating Budget 2010-20192019 Capital Budget 1 Overview Serves 3.1 million residents and businesses in Toronto, and portions of York and Peel Over

More information

F U L L R E S E RV E S T U DY R E P O RT

F U L L R E S E RV E S T U DY R E P O RT Office: (888) 927-7865 Fax: (813) 200-8448 Contact@customreserves.com 5470 E Busch Blvd., Unit 171 Tampa, FL 33617 Hawks Point Community Development District F U L L R E S E RV E S T U DY R E P O RT For

More information

FURTHER TO EXECUTIVE COMMITTEE MEETING #13/11 To be held on Friday, February 3, 2012

FURTHER TO EXECUTIVE COMMITTEE MEETING #13/11 To be held on Friday, February 3, 2012 FURTHER TO EXECUTIVE COMMITTEE MEETING #13/11 To be held on Friday, February 3, 2012 FURTHER TO: Pages EX6. CORRESPONDENCE EX6.1 A letter dated January 11, 2012 from Mr. David de Launay, Assistant Deputy

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY 2 IA 2 Flood THIS PAGE LEFT BLANK INTENTIONALLY 1 Purpose The purpose of this annex is to provide a framework of coordination among agencies to help ensure the safety of life and property during a flood

More information

Section 19: Basin-Wide Mitigation Action Plans

Section 19: Basin-Wide Mitigation Action Plans Section 19: Basin-Wide Mitigation Action Plans Contents Introduction...19-1 Texas Colorado River Floodplain Coalition Mitigation Actions...19-2 Mitigation Actions...19-9 Introduction This Mitigation Plan,

More information

FY 16 - FY 18 Capital Fund Revenues

FY 16 - FY 18 Capital Fund Revenues FY 16 - FY 18 Capital Fund Revenues Fiscal Year $ Change 2016 2017 2018 FY 17 to Revenue Source Budget Budget Budget FY 18 Local Transfer from General Fund $3,136,950 $2,977,556 $6,087,130 $3,109,574 Local

More information

Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary

Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary 1. Introduction Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary Kankakee County is subject to natural hazards that threaten life, safety, health, and welfare and cause extensive

More information

THE BOARD OF SUPERVISORS OF THE COUNTY OF MARIN ORDAINS AS FOLLOWS:

THE BOARD OF SUPERVISORS OF THE COUNTY OF MARIN ORDAINS AS FOLLOWS: ORDINANCE NO.3586 AN ORDINANCE OF THE COUNTY OF MARIN, STATE OF CALIFORNIA, IMPOSING A ONE-QUARTER OF ONE PERCENT RETAIL TRANSACTIONS AND USE TAX TO BE ADMINISTERED BY THE STATE BOARD OF EQUALIZATION FOR

More information

Capital Improvement Program

Capital Improvement Program Capital Improvement Program May 14, 2015 KEN KNATZ, P.E. PRINCIPAL CIVIL ENGINEER FY 2015 Current CIP Status Maintenance Projects, $13.9M CIP Projects, $30.5M Total FY 2015 CIP: $44.4 M 2 Courtney s Sand

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

San Mateo County Resource Conservation District FY 2012 Financial Budget

San Mateo County Resource Conservation District FY 2012 Financial Budget San Mateo County Resource Conservation District FY 2012 Financial Budget REVENUE Grant-funded Projects Biochar Field Trials $ 28,383 Fitzgerald Pollution Reduction $ 77,280 Integrated Watershed Restoration

More information

2011 MT Floods Damages and Recovery Options

2011 MT Floods Damages and Recovery Options MONTANA 2011 MT Floods Damages and Recovery Options Damage Estimates Public Works: Between $57.5 million Individual: id Housing Assistance $4,442,194 Small Business Assistance $1,634,100 Other Needs

More information

PUBLIC FACILITIES ELEMENT

PUBLIC FACILITIES ELEMENT PUBLIC FACILITIES ELEMENT E l C e n t r o G e n e r a l P l a n This Implementation Program provides actions to implement the adopted policies and plans identified in the Public Facilities Element. The

More information

GENERAL PLAN AMENDMENT # FLOOD HAZARDS

GENERAL PLAN AMENDMENT # FLOOD HAZARDS GENERAL PLAN AMENDMENT #2011-03 FLOOD HAZARDS The following text that appears on pages HS 3-4 of the Health and Safety Element in the Yolo 2030 Countywide General Plan has been amended. New language is

More information

Mill Creek Floodplain Proposed Bylaw Frequently Asked Questions

Mill Creek Floodplain Proposed Bylaw Frequently Asked Questions Mill Creek Floodplain Proposed Bylaw Frequently Asked Questions Q: What is a Floodplain Bylaw? A: A Floodplain Bylaw is a flood hazard management tool to ensure future land use will be planned and buildings

More information

PROPOSITION O PROJECT BUDGET REDUCTIONS AND SAVINGS

PROPOSITION O PROJECT BUDGET REDUCTIONS AND SAVINGS Attachment A FORM GEN. 100 (Rev. 11-02) CITY OF LOS ANGELES INTERDEPARTMENTAL CORRESPONDENCE Date; To: From: October 28, 2015 Proposition O Administrative Oversight Committee V.^1 O, J Kendrick K. Okuda,

More information

Chapter 5 Floodplain Management

Chapter 5 Floodplain Management Chapter 5 Floodplain Management Contents 1.0 Introduction... 1 2.0 Floodplain Management and Regulation... 1 2.1 City Code... 1 2.2 Floodplain Management... 1 2.3 Level of Flood Protection... 2 2.3.1 Standard

More information

FY 2015 Operating and Capital Budget Union County, NC

FY 2015 Operating and Capital Budget Union County, NC 1 County Services Public Hearing Tonight s Meeting Public Hearing Concerning the Proposed FY 2015 Operating and Capital Budget for County Services Including the proposed County Ad Valorem Tax Rate of 30.64

More information

MAINTENANCE DEPARTMENT

MAINTENANCE DEPARTMENT MAINTENANCE DEPARTMENT E-78 City of Mercer Island 2007-2008 Budget Department: Maintenance The Maintenance Department consists of the following functions: 1) administration, 2) capital projects engineering,

More information

ENBRIDGE ENERGY LIMITED PARTNERSHIP SPECIAL USE PERMIT

ENBRIDGE ENERGY LIMITED PARTNERSHIP SPECIAL USE PERMIT Page 1 of 6 Chequamegon- Nicolet National Forest ENBRIDGE ENERGY LIMITED PARTNERSHIP SPECIAL USE PERMIT Fact Sheet July 5, 2017 Situation: Enbridge Energy Limited Partnership (Enbridge) has requested to

More information

City of San Mateo Flood Zone Update. North Shoreview Neighborhood Meeting June 18, 2014

City of San Mateo Flood Zone Update. North Shoreview Neighborhood Meeting June 18, 2014 City of San Mateo Flood Zone Update North Shoreview Neighborhood Meeting June 18, 2014 Introductions Open Statement - Council Member Goethals Technical Presentation City Staff Closing Comments - Council

More information

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ As Introduced Annual Budget FY 2017

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ As Introduced Annual Budget FY 2017 General Fund - Governmental Fund Income 4010 Local Sources 4100 Real Estate Taxes 4152 Admission & Amusement Tax 4153 Hotel Tax 4159 Operating Property Tax 4120 Penalties & Interest 4221 Liquor License

More information

Mountain House Debt. A Synopsis of How Mountain House Is Financed

Mountain House Debt. A Synopsis of How Mountain House Is Financed Mountain House Debt A Synopsis of How Mountain House Is Financed Source of Debt California works under the premise that development pays for itself and does not impose a burden on existing residents. Several

More information

SECTION 9: MAPS AND DATA

SECTION 9: MAPS AND DATA SECTION 9: MAPS AND DATA Contents 9.1. NFIP Maps and Data... 9-2 9.1.1. Adopting and enforcing NFIP floodplain maps and data... 9-2 9.1.2. Adopting and enforcing more restrictive data... 9-2 9.1.3. Annexations...

More information

Waterway Improvement Class Project Title Page Appendix

Waterway Improvement Class Project Title Page Appendix Project Title Page Appendix Waterway Improvement Class Project Title Page Appendix Aurora Hills SD Rehb 252 2-252 Beacrane Road Bog Rehab 266 2-266 Bodkin/Main 276 2-276 Brady Cove Dredging 305 2-305 Broadneck

More information

HOW PLANNING FOR SEA LEVEL RISE CREATES FLOOD INSURANCE REDUCTIONS: THE GEORGIA CONTEXT. Hunter Jones 1 I. INTRODUCTION

HOW PLANNING FOR SEA LEVEL RISE CREATES FLOOD INSURANCE REDUCTIONS: THE GEORGIA CONTEXT. Hunter Jones 1 I. INTRODUCTION HOW PLANNING FOR SEA LEVEL RISE CREATES FLOOD INSURANCE REDUCTIONS: THE GEORGIA CONTEXT Hunter Jones 1 I. INTRODUCTION Flood insurance rates are rising for homeowners. One way local governments can create

More information

Financial Summaries FINANCIAL OVERVIEW. 2014/2015 Operating and Capital Budget 4-1

Financial Summaries FINANCIAL OVERVIEW. 2014/2015 Operating and Capital Budget 4-1 FINANCIAL OVERVIEW 2014/2015 Operating and Capital Budget 4-1 Financial Overview The accounts of the District are organized on the basis of fund types and account groups. Each fund is an independent accounting

More information

HOUSE SPONSORSHIP. Bill Summary

HOUSE SPONSORSHIP. Bill Summary Second Regular Session Seventieth General Assembly STATE OF COLORADO REENGROSSED This Version Includes All Amendments Adopted in the House of Introduction LLS NO. 1-.0 Thomas Morris x1 SENATE BILL 1- SENATE

More information

9:00 A.M. June 19, 2007

9:00 A.M. June 19, 2007 04'7 1 PROCEEDINGS OF THE BOARD OF DIRECTORS COUNTY OF SANTA CRUZ FLOOD CONTROL AND WATER CONSERVATION DISTRICT, ZONE 5 MEETING Governmental Center Building 701 Ocean Street, Room 525, Santa Cruz, CA A-

More information

Peer Review Plan. Bastrop Interim Feasibility Study. Lower Colorado River Basin, Texas

Peer Review Plan. Bastrop Interim Feasibility Study. Lower Colorado River Basin, Texas U.S. Army Corps of Engineers Fort Worth District Peer Review Plan Bastrop Interim Feasibility Study Lower Colorado River Basin, Texas September 28, 2007 PEER REVIEW PLAN BASTROP INTERIM FEASIBILITY STUDY

More information

West Linn s Waterfront Public Engagement Plan

West Linn s Waterfront Public Engagement Plan Introduction The City of West Linn is preparing to Master Plan the Willamette River waterfront area located generally south of I-205 and between the Willamette Neighborhood on the west and the Arch Bridge

More information

Completed Projects 17/18

Completed Projects 17/18 Slide 1 Completed Projects 17/18 Major projects - Collections Department 2017 Collection System Rehabilitation Slide 2 NapaSan Board of Directors Meeting May 16, 2018 Completed Projects 17/18 Major projects

More information

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...

More information

FLOOD HAZARD AND RISK MANAGEMENT UTILIZING HYDRAULIC MODELING AND GIS TECHNOLOGIES IN URBAN ENVIRONMENT

FLOOD HAZARD AND RISK MANAGEMENT UTILIZING HYDRAULIC MODELING AND GIS TECHNOLOGIES IN URBAN ENVIRONMENT Proceedings of the 14 th International Conference on Environmental Science and Technology Rhodes, Greece, 3-5 September 2015 FLOOD HAZARD AND RISK MANAGEMENT UTILIZING HYDRAULIC MODELING AND GIS TECHNOLOGIES

More information

VILLAGE OF LIBERTYVILLE SPECIAL MEETING. Tuesday, March 6, 2018 Village Hall 118 W. Cook Avenue Libertyville, IL :00 p.m.

VILLAGE OF LIBERTYVILLE SPECIAL MEETING. Tuesday, March 6, 2018 Village Hall 118 W. Cook Avenue Libertyville, IL :00 p.m. VILLAGE OF LIBERTYVILLE SPECIAL MEETING Tuesday, March 6, 2018 Village Hall 118 W. Cook Avenue Libertyville, IL 60048 6:00 p.m. 1) Roll Call 2) Continued Discussion of Draft 2018/2019 Budget 3) Executive

More information

S 2909 S T A T E O F R H O D E I S L A N D

S 2909 S T A T E O F R H O D E I S L A N D ======== LC00 ======== 01 -- S 0 S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO CAPITAL DEVELOPMENT PROGRAM -- 01 BOND REFERENDA Introduced By: Senators

More information

Finance Committee Meeting

Finance Committee Meeting Finance Committee Meeting FY16 Strategic Business and Operating Plan and Preliminary Budget Review April 8, 2015 Finance Committee Meeting FY16 Strategic Business Operating Plan and Preliminary Budget

More information

NATIONAL WETLAND MITIGATION BANKING STUDY Model Banking Instrument

NATIONAL WETLAND MITIGATION BANKING STUDY Model Banking Instrument NATIONAL WETLAND MITIGATION BANKING STUDY Model Banking Instrument Institute for Water Resources Water Resources Support Center U.S. Army Corps of Engineers Alexandria, Virginia 22315 May 1996 IWR Technical

More information

2019 ANNUAL BUDGET SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES

2019 ANNUAL BUDGET SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES 2019 ANNUAL BUDGET SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES SEWER S E W E R STORM WATER S T O R M LIGHTING L I G H T S WATER W A T E R Serving Our Community and Protecting Our Environment FY2019 PUBLIC

More information

City of Des Moines. Budget Workshop. December 7, 2015

City of Des Moines. Budget Workshop. December 7, 2015 City of Des Moines Budget Workshop December 7, 2015 Today s Agenda SSMID Review Sanitary and Storm Sewer 2 Self-Supported Municipal Improvement Districts 3 Operation and Terms Each SSMID has a separate

More information

Interagency Regulatory Guide

Interagency Regulatory Guide Interagency Regulatory Guide Advance Permittee-Responsible Mitigation U.S. Army Corps of Engineers Washington State Department of Ecology Washington State Department of Fish and Wildlife US Army Corps

More information

In-Lieu Fee Program Instrument Outline For Proposed In-Lieu Fee Programs in the States of Kansas and Missouri

In-Lieu Fee Program Instrument Outline For Proposed In-Lieu Fee Programs in the States of Kansas and Missouri In-Lieu Fee Program Instrument Outline For Proposed In-Lieu Fee Programs in the States of Kansas and Missouri The U.S. Army Corps of Engineers (Corps) and U.S. Environmental Protection Agency joint regulation

More information

Testimony of the National Association of Flood And Stormwater Management Agencies. Water Resources Development Act of 2012

Testimony of the National Association of Flood And Stormwater Management Agencies. Water Resources Development Act of 2012 National Association of Flood & Stormwater Management Agencies 1333 H Street, NW, 10th Floor West Tower, Washington, DC 20005 Phone: 202-289-8625 www.nafsma.org Testimony of the National Association of

More information

Mitigation Banking Factsheet

Mitigation Banking Factsheet EXHIBIT 57 Page 1 of 5 Wetlands You are here: EPA Home Office of Water Wetlands, Oceans, and Watersheds Wetlands Wetlands Fact Sheet Mitigation Banking Mitigation Banking Factsheet Compensating for Impacts

More information

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers, New York District New Jersey Department of Environmental Protection 11 &

More information

Through: Finance, Legal, and Administration Committee (3/11/15) Chief Financial Officer/Assistant General Manager

Through: Finance, Legal, and Administration Committee (3/11/15) Chief Financial Officer/Assistant General Manager Date: To: The Honorable Board of Directors Through: Finance, Legal, and Administration Committee (3/11/15) From: Submitted by: P. Joseph Grindstaff General Manager Christina Valencia Chief Financial Officer/Assistant

More information