1 PMI Long Island Chapter s Tools and Techniques Series PM101 Project Metrics & KPIs

2 Agenda Overview Why Metrics and KPIs important Source of Metrics and KPIs Common PM Metrics and KPIs Other PM Metrics and KPIs Metric & KPI Considerations Source of Metrics and KPIs Planning and Reporting Pitfalls of Metrics and KPIs Status Report Examples

3 Overview Definition: Metric: Something that can be measured and reported with a meaningful value. KPI: (Key Performance Indicator) A metric that indicates how well something is performing. Forecast of how the project is expected to perform. Also referred to as a leading indicator. Metrics focus on what is completed and KPIs focus on predictions Benefits: Benefits to the project Indicates if the project is on time and in budget Identifies risks and issues Measures if project deliverables meet requirements Benefits to the organization Confidence that investment is delivering expected strategic value Confidence that the investment will be realized when required to meet strategic goal Benefits to the end product Meets or exceeds customers expectation in utility, quality, and value.

4 Overview Presentation Considerations: We include example charts and graphs to consider for your reports Some metrics and KPIs are common to our profession focus is on PM and PMBOK metrics and KPIs It is not possible to cover all metrics and KPIs our goal is to get you to think about what is important to you and your project. Presentation Goals: Appreciate the importance of metrics and KPIs Understand that there is no one size fits all approach to many metrics and KPIs but there are common measures to our profession Use and / or enhance your use of metrics and KPIs to help the success of your projects.

5 Why Metrics and KPIs important As stated by Harold Kerzner: If you cannot offer a stakeholder something that can be measured, then how can you promise that their expectations will be met? Good metrics lead to proactive project management rather than reactive project management.

6 Source of Metrics & KPI PMBOK Project Charter, Business Case, SOW, Contracts Program Manager / Sponsor Organizational Process Assets Interview and / or brainstorm key stakeholders Critical Success Factors (CSFs) Note: Executive Stakeholders and project teams have different needs.

7 Common PM Metrics and KPIs Metrics Earned Value Management (EVM) Cost Variance (CV) Scheduled Variance (SV) Quality Metrics Defects or Percent / Rate of Defects Conformance to requirements (QC) Conformance to Process (QA) Fit for purpose KPIs Earned Value Management (EVM) Estimate at Completion (EAC) Estimate to Completion (ETC) Financial Return on Investment (ROI) Payback Period Almost any metric can be used to trend progress which can help forecast end result and plan actions. Close Customer Satisfaction Value Employee moral.

8 Other PM Metrics and KPIs Earned Value Management (EVM) Tailored to manage subprojects or portion of the project Quality Metrics Fit for purpose / Quality Function Deployment (QFD) using Voice of the Customer (VOC) Business Case Updated ROI, Payback period, etc Updated and validated during the project and at phase gates (kill points) Close Value Employee retention Communications Frequency Attendance.

9 Metrics & KPIs Considerations Subjective vs. Objective Quantitative vs. Qualitative Reliable vs. Unreliable (Verifiable and source) Valid vs. Invalid (Correct data for measure).

10 Pitfalls of Metrics and KPIs Too many may result in micro management Too little may result in loss of control Too many may result in more time managing metrics vs. the project Metrics, by themselves, do not tell the entire story Consider post deployment Programs or Organizational Change Management should continue with measurements & actions.

11 Planning & Reporting Metrics and KPIs must be defined in the project plan The Plan must define the measurement The source of input to the measurement must be clearly defined Stakeholders should review and approve the metrics and KPIs People who are the subject of the measure People who need to know the performance The Plan must define the when, where, and how measures are reported Each project phase may have new measures and some that are no longer important Review with each phase planning process Make sure all measures have documented importance.

12 Pitfalls of Metrics and KPIs Not periodically reviewing and selecting meaningful metric and KPIs throughout the project Not reviewing and updating when stakeholders change Not reviewing or getting stakeholder buy in.

13 Metrics & KPIs Examples

14 Example 1 Health Indicators Key Project Health Indicators Prior Current Next Scope Y G G Schedule Y Y y Cost G G G Complexity G G G Risk G Y Y Quality G R G Total Project Health Y Y Y Key Project Health Indicators Scope Prior Current Next Schedule (SPI) Cost (CPI) Complexity Risk Quality (Defect Rate) 3% 11% 2% Total Project Health Key Project Health Indicator Definitions Scope Documented and Approved Green Not documented or not approved Yellow Changes proposed and likely to be approved Yellow No agreement and likely to impact project Red Schedule SPI is 0.95 or greater Green SPI is 0.90 to 0.94 Yellow SPI is less than 0.90 Red Cost CPI is 0.95 or greater Green CPI is 0.90 to 0.94 Yellow CPI is less than 0.90 Red

15 Example 2 EVM

16 Example 3 Agile

17 References Kerzner, H. (2011). Project Management Metrics, KPIs, and Dashboards. Hoboken, NJ: John Wiley & Sons, Inc. Meredith, J.R. and Mantel, S.J. (2009). Project Management A Managerial Approach (7th Ed.). Hoboken, NJ: Wiley and Sons, Inc. PMI Today May 2014 A supplement to PM Network Project Management Institute (2013). A guide to the project management body of knowledge (PMBOK) (5th ed.). Newtown Square, PA: Project Management Institute.

18 Discussions, your experience, and Questions?

FAQ: Estimating, Budgeting, and Controlling

FAQ: Estimating, Budgeting, and Controlling Question 1: Why do project managers need to create a budget? Answer 1: The budget is designed to tell how much the total project should cost and when these costs will occur. This information is beneficial

More information

THE PMP EXAM PREP COURSE

THE PMP EXAM PREP COURSE THE PMP EXAM PREP COURSE Session 3 PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. www.falcontraining.co.nz Agenda 9:00 10:15 10:15 10:30 10:30 12:00 12:00 12:45 12:45

More information

Five-Day Schedule and Course Content

Five-Day Schedule and Course Content Five-Day Schedule and Course Content The following sequence is suggested to balance out the material over five sessions. Note that Chapter 10 is placed with Chapters 12 and 13 on Day 5. DAY 1 DAY 1 Course

More information

Achieve PMP Exam Success Five-Day Course Syllabus

Achieve PMP Exam Success Five-Day Course Syllabus Course Delivery Format: Traditional class room 5-day format, 35 hrs. Achieve PMP Exam Success Five-Day Course Syllabus Course Description: Achieve PMP Exam Success is a 35-hour PMP exam preparation course

More information

Key Aspects for Managing a Project

Key Aspects for Managing a Project Key Aspects for Managing a Project What is a Project? Definition: A project is a temporary endeavor undertaken to create a unique product, service or result. The temporary nature of projects indicates

More information

CS 413 Software Project Management LECTURE 9 COST MANAGEMENT FOR SOFTWARE PROJECT III

CS 413 Software Project Management LECTURE 9 COST MANAGEMENT FOR SOFTWARE PROJECT III LECTURE 9 COST MANAGEMENT FOR SOFTWARE PROJECT III Earned Value Management Earned value management (EVM) is a way of measuring your performance (and the performance of your project team) at any given date

More information

James A. Wrisley, President 9070 Lakes Blvd. West Palm Beach FL (561)

James A. Wrisley, President 9070 Lakes Blvd. West Palm Beach FL (561) Earned Value Management Results in Early Visibility and Management Opportunities March 21, 2007 James A. Wrisley, President 9070 Lakes Blvd. West Palm Beach FL 33412 (561) 694-1646 E-mail: wrisley@pmassoc.com

More information

Pass PMP in 21 Days - ITTO Toolbox PROCESS MAP

Pass PMP in 21 Days - ITTO Toolbox PROCESS MAP PROCESS MAP 1 IntEgratIon Pass PMP in 21 Days - ITTO Toolbox InItIatIng PlannIng ExEcutIng MonItorIng & controlling closing Develop Project Charter Develop Project Management Plan Direct & Manage Project

More information

Project Management CSC 310 Spring 2017 Howard Rosenthal

Project Management CSC 310 Spring 2017 Howard Rosenthal Project CSC 310 Spring 2017 Howard Rosenthal 1 No?ce This course is based on and includes material from the text: Effective Project - Traditional, Agile, Extreme 7TH Edition Authors: Robert K. Wysocki

More information

PROJECT COST MANAGEMENT

PROJECT COST MANAGEMENT PROJECT COST MANAGEMENT For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, PMP, PMI-RMP

More information

NOVEMBER 9, An overview of the core elements of the Earned Value Management technique. Presenter:

NOVEMBER 9, An overview of the core elements of the Earned Value Management technique. Presenter: NOVEMBER 9, 2009 An overview of the core elements of the Earned Value Management technique Presenter: G M Jim Anderson, PMP 1 Goal of the Presentation A presentation ti on earned value that t allows PM

More information

Earned Value Formulae

Earned Value Formulae Earned Value Formulae This White Paper focuses on the basic values and formulae used in Earned Value calculations. Additional EV resources are available from https://mosaicprojects.com.au/pmki-sch.php

More information

PMP. Preparation Training. Cost Management. Your key in Successful Project Management. Cost Management Processes. Chapter 7 6/7/2005

PMP. Preparation Training. Cost Management. Your key in Successful Project Management. Cost Management Processes. Chapter 7 6/7/2005 PMP Preparation Training Your key in Successful Project Management Akram Al-Najjar, PMP Cost Management Processes Chapter 7 Cost Management Slide 2 1 AGENDA What is Cost Management? Cost Management Processes

More information

Introduction to Project Management. Modeling after NYS ITS

Introduction to Project Management. Modeling after NYS ITS Introduction to Project Management Modeling after NYS ITS What is Project Management? Project management is the application of knowledge, skills, tools and techniques to project activities to meet project

More information

IT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps://

IT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps:// IT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps://www.certqueen.com Exam: PMI-002 Title : Certified Associate in Project Management (CAPM) Certification Version : DEMO 1 / 7 1.A

More information

PMP (2018) PMBOK 6th Edition PMI. Project Management Professional (PMBOK 6th Edition)

PMP (2018) PMBOK 6th Edition PMI. Project Management Professional (PMBOK 6th Edition) PMI PMP (2018) PMBOK 6th Edition Project Management Professional (PMBOK 6th Edition) Download Full Version : https://killexams.com/pass4sure/exam-detail/pmi-001 QUESTION 903 Which process documents the

More information

Critical Path and Earned Value Management

Critical Path and Earned Value Management Critical Path and Earned Value Management Two elegantly simple metrics, both rich with meaning, have been part of project management since the very beginning of the profession: 1. Critical Path Method

More information

Cumulative trends Problems and issues since last report

Cumulative trends Problems and issues since last report Project Progress Report Format Progress since last report Current status of project 1. Schedule 2. Cost 3. Scope Cumulative trends Problems and issues since last report 1. Actions and resolution of earlier

More information

PMP Exam Prep Coaching Program

PMP Exam Prep Coaching Program PMP Exam Prep Coaching Program Project Part 1 Presented by Vinai Prakash, PMP 1 Project Plan Estimate s Determine Budget 2 Vinai Prakash, PMCHAMP.COM 1 Process of monitoring the status of the project to

More information

Project Theft Management,

Project Theft Management, Project Theft Management, by applying best practises of Project Risk Management Philip Rosslee, BEng. PrEng. MBA PMP PMO Projects South Africa PMO Projects Group www.pmo-projects.co.za philip.rosslee@pmo-projects.com

More information

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com

More information

Process Optimization Level I (Introduction)

Process Optimization Level I (Introduction) Process Optimization Level I (Introduction) 8 Hours A hands-on, interactive introduction to Business Process Optimization Focused on the most effective tools & concepts from the many process improvement

More information

An Automated Framework for the Integration between EVM and Risk Management

An Automated Framework for the Integration between EVM and Risk Management Journal of Information Systems Engineering & Management, 2018, 3(1), 03 ISSN: 2468-4376 An Automated Framework for the Integration between EVM and Risk Management Anabela Tereso 1 *, Pedro Ribeiro 1, Manuel

More information

Earned Value Management - EVM

Earned Value Management - EVM Earned Value Management (EVM) technique used to track the Progress and Status of a Project & Forecast the likely future performance of the Project. Earned Value Management (EVM) technique integrates the

More information

MEASURING THE STRATEGIC VALUE OF PROJECT MANAGEMENT

MEASURING THE STRATEGIC VALUE OF PROJECT MANAGEMENT MEASURING THE STRATEGIC VALUE OF PROJECT MANAGEMENT Prof. C. William Ibbs* and Justin Reginato Deparment of Civil and Environmental Engineering University of California Berkeley, CA 94720 USA * E-mail:

More information

Application of Data Mining Tools to Predicate Completion Time of a Project

Application of Data Mining Tools to Predicate Completion Time of a Project Application of Data Mining Tools to Predicate Completion Time of a Project Seyed Hossein Iranmanesh, and Zahra Mokhtari Abstract Estimation time and cost of work completion in a project and follow up them

More information

Value And Earned Schedule Management

Value And Earned Schedule Management EVM World 2013 Conference IPMC 2013 Title: An Analytical Utility For Earned Value And Earned Schedule Management Gary L. Richardson and Saranya Lakshmikanthan May 29, 2013 The popular technical literature

More information

Self-Assessment Questions for Module 07 Project Cost Management

Self-Assessment Questions for Module 07 Project Cost Management Self-Assessment Questions for Module 07 Project Cost Management Question 1: Which of the following regarding Analogous Estimating and Parametric Estimating is incorrect? A.) Parametric Estimating uses

More information

Abstract. Value. Baselining a Project

Abstract. Value. Baselining a Project Earning Function Points in Software Projects Robert J. Muller, Chief Information Officer ValueStar, Inc. 1120A Ballena Blvd. Alameda, CA 94501-3682 Phone: (510) 814-7191 E-mail bmuller@valuestar.com Abstract

More information

Earned Value Management. Danielle Kellogg. Hodges University

Earned Value Management. Danielle Kellogg. Hodges University Earned Value Management 1 EARNED VALUE MANAGEMENT Earned Value Management Danielle Kellogg Hodges University Earned Value Management 2 Abstract Earned Value Management has been used with enterprise-level

More information

Vendor: PMI. Exam Code: CA Exam Name: Certified Associate in Project Management. Version: Demo

Vendor: PMI. Exam Code: CA Exam Name: Certified Associate in Project Management. Version: Demo Vendor: PMI Exam Code: CA0-001 Exam Name: Certified Associate in Project Management Version: Demo QUESTION: 1 On what is project baseline development established? A. Approved product requirements B. Estimated

More information

The Mystery of Earned Value - An Oil & Gas Owner s Perspective

The Mystery of Earned Value - An Oil & Gas Owner s Perspective The Mystery of Earned Value - An Oil & Gas Owner s Perspective 15 June 2011 William Harroun Head of Programme Controls, BG Group What we are going to cover Cost and progress reporting before --- Earned

More information

A Practical Way To Learn About EVM. ***The Deck Project***

A Practical Way To Learn About EVM. ***The Deck Project*** A Practical Way To Learn About EVM ***The Deck Project*** Back to the Baseline 2 The Deck Project The product of this project is a new second-story deck in the backyard. This new deck will replace an existing

More information

How to Mitigate Risk in a Portfolio of Contracts

How to Mitigate Risk in a Portfolio of Contracts How to Mitigate Risk in a Portfolio of Contracts BY dr. mark d antonio Organizational management must use the resources they are entrusted with in the most judicious manner possible. An organization must

More information

CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon

CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon Abstract- Project Cost Management includes the processes involved in planning, estimating, budgeting,

More information

NEW HORIZONS ONLINE LIVE. Project Management Professional (PMP ) PMBOK Guide 6th Edition DAY 4

NEW HORIZONS ONLINE LIVE. Project Management Professional (PMP ) PMBOK Guide 6th Edition DAY 4 NEW HORIZONS ONLINE LIVE Project Management Professional (PMP ) PMBOK Guide 6th Edition DAY 4 2 3 4 5 6 Other PMP Topics Cost Ranges Rough Order of Magnitude (ROM) (often done in the initiating process

More information

4/14/2017. Unit 7 Slide Lectures of 19/20/21 April 2017 PROJECT PROGRESS AND PROJECT PERFORMANCE ASSESSMENT (CH. 13)

4/14/2017. Unit 7 Slide Lectures of 19/20/21 April 2017 PROJECT PROGRESS AND PROJECT PERFORMANCE ASSESSMENT (CH. 13) PROJECT AND COMMUNICATION MANAGEMENT Academic Year 2016/2017 PROJECT PROGRESS AND PROJECT PERFORMANCE ASSESSMENT (CH. 13) Unit 7 Slide 7.2.1 Lectures of 19/20/21 April 2017 Structure of a Project Monitoring

More information

DEFENSE ACQUISITION UNIVERSITY EMPLOYEE SELF-ASSESSMENT. Outcomes and Enablers

DEFENSE ACQUISITION UNIVERSITY EMPLOYEE SELF-ASSESSMENT. Outcomes and Enablers 1 Recognize key concepts about Earned Value as an integrated program management tool that integrates cost, schedule, and technical performance Recognize that Earned Value is a management tool that program

More information

THE VALUE OF EARNED VALUE MANAGEMENT

THE VALUE OF EARNED VALUE MANAGEMENT THE VALUE OF EARNED VALUE MANAGEMENT PMI Pittsburgh Chapter Meeting February 8, 2001 Marilyn McCauley McManagement Group 703-455-0602 703-455-0598 (f) McMgtGrp@aol.com AGENDA Twelve Reasons Why Programs

More information

Project Management CTC-ITC 310 Spring 2018 Howard Rosenthal

Project Management CTC-ITC 310 Spring 2018 Howard Rosenthal Project Management CTC-ITC 310 Spring 2018 Howard Rosenthal 1 Notice This course is based on and includes material from the text: A User s Manual To the PMBOK Guide Authors: Cynthia Stackpole Snyder Publisher:

More information

Performance measurement

Performance measurement MGT/437 Project Management Session #4 Managing Projects to Achieve Optimal Results University of Phoenix, San José Learning Center 07/06/2004 Brian Smithson 07/06/2004 MGT/437 #4 -- Brian Smithson 1 Agenda

More information

Best Practices in Project Risk Management. Presented by: Jeff Miller, PMP - Director of Project Management Interstates Control Systems, Inc.

Best Practices in Project Risk Management. Presented by: Jeff Miller, PMP - Director of Project Management Interstates Control Systems, Inc. Best Practices in Project Risk Management Presented by: Jeff Miller, PMP - Director of Project Management Interstates Control Systems, Inc. What is Project Risk Management? PMBOK Definition of Project

More information

Managing Project Risk DHY

Managing Project Risk DHY Managing Project Risk DHY01 0407 Copyright ESI International April 2007 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or

More information

PROJECT MANAGEMENT BODY OF KNOWLEDGE

PROJECT MANAGEMENT BODY OF KNOWLEDGE A Guide to the PROJECT MANAGEMENT BODY OF KNOWLEDGE (PMBOK GUIDE ) Sixth edition Chapter 7 Project Cost Management PMBOK is a registered mark of the Project Management Institute, Inc Slide # 1 3FOLD Education

More information

CPM (College of Performance Management) Meetings have focused on this topic in the last year

CPM (College of Performance Management) Meetings have focused on this topic in the last year June 13, 2016 1 PMI - (PMI-ACP Exam tests using EVM with Agile) PMI: EVM should be used on all projects, in all industries, no matter how simple or complex Federal Government is asking for the two approaches

More information

PMP Exam Preparation Course. Madras Management Training W.L.L All Rights Reserved

PMP Exam Preparation Course. Madras Management Training W.L.L All Rights Reserved Project Cost Management 1 Project Cost Management Processes 1. Estimate Costs 2. Determine Budget 3. Control Costs In some projects, especially with smaller scope, cost estimation and cost budgeting are

More information

A Case for Project Revenue Management. Peter Varani PMP

A Case for Project Revenue Management. Peter Varani PMP A Case for Project Revenue Management Peter Varani PMP A Case for Project Revenue Management PMBOK GUIDE (4 th edition) Cost 845 Revenue 3 Unisys Annual Report (2008) Cost 174 Revenue 152 2 Balanced Approach

More information

The Four Pillars of project management

The Four Pillars of project management The Four Pillars of project management Background This article is intended to give a round up of key practical project management practices to the novice as well as to the experienced. About 90% of this

More information

COPYRIGHTED MATERIAL. Index

COPYRIGHTED MATERIAL. Index Index Note to the reader: Throughout this index boldfaced page numbers indicate primary discussions of a topic. Italicized page numbers indicate illustrations. A A+ certification, 28 acceptance criteria

More information

ANALYZE THIS! EARNED VALUE MANAGEMENT CONCEPTS AND ADVANCED FORECASTING?

ANALYZE THIS! EARNED VALUE MANAGEMENT CONCEPTS AND ADVANCED FORECASTING? ANALYZE THIS! EARNED VALUE MANAGEMENT CONCEPTS AND ADVANCED FORECASTING? KANSAS CITY CHAPTER PMI PROFESSIONAL DEVELOPMENT DAYS SEPTEMBER 2012 Glenn Meyer (c) Glenn Meyer, except as noted. 10 Sep 2012 1

More information

Earned Value Management

Earned Value Management Earned Value Management Reading the Roadmap to Project Success (or, Are We There Yet?) Steve Margolis, PMP, CISSP smargolis@us.ibm.com September 5, 2018 Overview EVM Background EVM Basics and Standards

More information

Project Management -- Monitoring the progress

Project Management -- Monitoring the progress Project Management -- Monitoring the progress Dr. Tai-Yue Wang Department of Industrial and Information Management National Cheng Kung University Tainan, TAIWAN, ROC 1 Where We Are Now 2 Structure of a

More information

Roberta Tomasini Defense Acquisition University DSN

Roberta Tomasini Defense Acquisition University DSN $ ACWP C Program at a Glance BCWS C Total Allocated Budget Management Reserve Raleigh Distribution PMB BCWP C Over Budget P R O J E C T E D S L I P P A G E EAC Earned Value and the Acquisition Program

More information

Quick Reference Card PPM Pro Project Data Field Dictionary

Quick Reference Card PPM Pro Project Data Field Dictionary Actual Completion Date This is the date the project actual completed. When this date is entered the project Status should be moved to Completed. This field is used in the standard Project metric reports.

More information

Components of a Project Portfolio Management Process: Part Two Managing the Pipeline

Components of a Project Portfolio Management Process: Part Two Managing the Pipeline Components of a Project Portfolio Management Process: Part Two Managing the Pipeline We started our coverage of Project Portfolio Management with two papers: Project Portfolio Management is not just Enterprise

More information

I ll tell you a bit about Earned Value Management, how you do it, and why the big client wants everyone to use it. Then I m going to spend most of

I ll tell you a bit about Earned Value Management, how you do it, and why the big client wants everyone to use it. Then I m going to spend most of 1 I ll tell you a bit about Earned Value Management, how you do it, and why the big client wants everyone to use it. Then I m going to spend most of the time telling you the ways things go wrong in it.

More information

An Earned Value Tutorial

An Earned Value Tutorial 500 Thoreau Street Concord, MA 01742 USA +978.369.9009 info@newleafpm.com When you are ready to earn your PDUS: Please return to www.newleafpm.com Click on the White Papers tab. Select White Paper Power

More information

TAC 216 Companion Guide

TAC 216 Companion Guide IT Project Management Best Practices The Texas A&M University System Version 2018 Last Revised 09/01/2017 Page 1 of 31 Table of Contents Introduction... 4 The A&M System s Approach to Help Members Achieve

More information

Workshop II Project Management

Workshop II Project Management Workshop II Project Management UNITAR-HIROSHIMA FELLOWSHIP FOR AFGHANISTAN 2007 Introduction to Project Management 15 17 August 2007, Dehradun, India Presented by: Dr. Jobaid Kabir Fellowshop Program 2007

More information

The Impact of Project Type on Risk Timing and Frequency

The Impact of Project Type on Risk Timing and Frequency 1831 The Impact of Project Type on Risk Timing and Frequency Anthony J. PERRENOUD 1, Kenneth T. SULLIVAN 2, and Kristen C. HURTADO 3 1 School of Sustainable Engineering and the Built Environment, Arizona

More information

Lesson 7 The Project Budget

Lesson 7 The Project Budget MBA, Msc, Bsc, PMP, CSM, PMI-ACP Indike Manthilake MBA, Msc, Bsc, CSM, PMI-ACP indikem@unitedmotors.lk.com Lesson 7 The Project Budget Agenda Estimate Costs and income Creating a Preliminary Budget Budget

More information

ievm (INTEGRATED EARNED VALUE MANAGEMENT) AN APPROACH FOR INTEGRATING QUALITY WITH TRADITIONAL EVM FOR EFFECTIVE PROGRAM AND PROJECT MANAGEMENT

ievm (INTEGRATED EARNED VALUE MANAGEMENT) AN APPROACH FOR INTEGRATING QUALITY WITH TRADITIONAL EVM FOR EFFECTIVE PROGRAM AND PROJECT MANAGEMENT ievm (INTEGRATED EARNED VALUE MANAGEMENT) AN APPROACH FOR INTEGRATING QUALITY WITH TRADITIONAL EVM FOR EFFECTIVE PROGRAM AND PROJECT MANAGEMENT Vanshika T Department of Information Technology Barkatullah

More information

[Project Name] Monthly Performance Report for mmm/yyyy. [Sub-Project, phase, etc.] [Company] [Company Address] Marc Arnecke, PMP

[Project Name] Monthly Performance Report for mmm/yyyy. [Sub-Project, phase, etc.] [Company] [Company Address] Marc Arnecke, PMP This template is downloaded from project-management.magt.biz [Company] [Company Address] Tel: Fax: [Company Phone] [Company Fax] [Company E-mail] May 19, 2015 [Ref. number] Marc Arnecke, PMP [Sub-Project,

More information

Thomas Carlos Consulting. Simple Earned Value Management

Thomas Carlos Consulting. Simple Earned Value Management Thomas Carlos Consulting Simple Earned Value Management Financial analysis that goes one step beyond Budget versus Actual Presented by Tom Carlos, PMP September 11, 2008 Thomas Carlos Consulting, Roseville,

More information

Earned Value Management Guide

Earned Value Management Guide 1 Earned Value Management Guide Earned Value Management (EVM) is a project management technique that objectively tracks physical accomplishment of work. More elaborately: EVM is used to track the progress

More information

PROJECT BY PROJECT MANAGEMENT T OOLS

PROJECT BY PROJECT MANAGEMENT T OOLS Earned Schedule Tejas Sura Joint M.D., Conart Engineers Limited V.P.-President President PMI Mumbai Chapter We are here to know HOW TO GUIDE OUR PROJECT BY PROJECT MANAGEMENT TOOLS Project Monitoring Monitoring

More information

The Value of EVM. Earned Value Management

The Value of EVM. Earned Value Management The Value of EVM Earned Value Management Good decisions are based on knowledge and not on numbers. - Plato What is EVM? A project management technique for measuring project performance and progress, in

More information

Risk Management Made Easy. I. S. Parente 1

Risk Management Made Easy. I. S. Parente 1 Risk Management Made Easy I. S. Parente 1 1 Susan Parente, MS Engineering Management, PMP, CISSP, PMI-RMP, PMI-ACP, CSM, CSPO, PSM I, ITIL, RESILIA, CRISC, MS Eng. Mgmt.; S3 Technologies, LLC, Principal

More information

RISK MANAGEMENT: I SURVIVED WITHOUT IT BUT NOW I CANT LIVE WITHOUT IT.

RISK MANAGEMENT: I SURVIVED WITHOUT IT BUT NOW I CANT LIVE WITHOUT IT. Can Stock Photo Inc. / iqoncept PMINEO 23 May 2013 Presented By Michael Garner MBA, PMP, PMI-RMP RISK MANAGEMENT: I SURVIVED WITHOUT IT BUT NOW I CANT LIVE WITHOUT IT. PROJECT OVERVIEW Charter: Create

More information

Software Process and Management

Software Process and Management Software Process and Management Gu Qing Nanjing University 2006-2-28 1 Chapter 5. Project Tracking Project Tracking and Control Progress Management Project Termination 2 1. Project Tracking and Control

More information

PRINCE2 - Business Case

PRINCE2 - Business Case Created/updated 05/11/17 PRINCE2 - Business Case Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Business Case Mind Map Project Name:

More information

PMP Exam Preparation Workshop Chapter 7 Project Cost Management

PMP Exam Preparation Workshop Chapter 7 Project Cost Management PMP Exam Preparation Workshop Chapter 7 Project Cost Management 1 Learning Objectives By the end of this session, you should understand: Importance of cost management for the success of a project Cost

More information

Project Management Certification. Multiple Choice Questions

Project Management Certification. Multiple Choice Questions Project Management Certification (PMP) Project Management Certification (PMP) Multiple Choice Questions QUESTION 1 In Project Cost Management, which input is exclusive to the Determine Budget process?

More information

Risk Management Plan for the <Project Name> Prepared by: Title: Address: Phone: Last revised:

Risk Management Plan for the <Project Name> Prepared by: Title: Address: Phone:   Last revised: for the Prepared by: Title: Address: Phone: E-mail: Last revised: Document Information Project Name: Prepared By: Title: Reviewed By: Document Version No: Document Version Date: Review Date:

More information

EVMi 101: EARNED VALUE MANAGEMENT FUNDAMENTALS

EVMi 101: EARNED VALUE MANAGEMENT FUNDAMENTALS EVMI - BUILDING & EDUCATING PROJECT STAFF MEMBERS WHO EXECUTE AND DELIVER PROJECTS & PROGRAMS SUCCESSFULLY ACROSS ALL INDUSTRIES EVMi 101: EARNED VALUE MANAGEMENT FUNDAMENTALS COURSE HIGHLIGHTS EVMI 101:

More information

Earned Value Project Management. Amber L. Romero, CPM, P.M.P., Policy Analyst Sandia National Laboratories 505/ ;

Earned Value Project Management. Amber L. Romero, CPM, P.M.P., Policy Analyst Sandia National Laboratories 505/ ; Dollars $M Earned Value Project Management Amber L. Romero, CPM, P.M.P., Policy Analyst Sandia National Laboratories 505/284-0634; allewis@sandia.gov 95 th ISM Annual International Supply Management Conference,

More information

Be Prepared: Non-Profit Charter School Financial Statements are Changing

Be Prepared: Non-Profit Charter School Financial Statements are Changing Be Prepared: Non-Profit Charter School Financial Statements are Changing Marlen Gomez, CPA Franci Sassin Derrick DeBruyne, CPA, CFE California Charter Schools Conference 2017 AGENDA Introduction How are

More information

How to Improve the Value of Your Bank

How to Improve the Value of Your Bank How to Improve the Value of Your Bank Philip K. Smith, President Gerrish Smith Tuck, Consultants and Attorneys Independent Bankers of Colorado 44 th Annual Convention September 20-22, 2017 Increase earnings

More information

Richard Larson, PMP, CBAP, PMI-PBA President and Founder Watermark Learning. Enhanced 1 Performance. Enduring bapmtraining

Richard Larson, PMP, CBAP, PMI-PBA President and Founder Watermark Learning. Enhanced 1 Performance. Enduring bapmtraining Richard Larson, PMP, CBAP, PMI-PBA President and Founder Watermark Learning Enhanced 1 Performance. Enduring Results. @Rich_Larson bapmtraining Woman-owned business established in 1992, offering training

More information

Strategic Planning, Forecasting & Budgeting

Strategic Planning, Forecasting & Budgeting Strategic Planning, Forecasting & Budgeting Overview Many organisations use budgeting and forecasting as a means of providing and updating tactical operating plans and controlling costs; but world class

More information

Control Charts. A control chart consists of:

Control Charts. A control chart consists of: Control Charts The control chart is a graph that represents the variability of a process variable over time. Control charts are used to determine whether a process is in a state of statistical control,

More information

Analysis of Estimate at Completion of a Project's duration to improve Earned Value Management System 1 N.Vignesh

Analysis of Estimate at Completion of a Project's duration to improve Earned Value Management System 1 N.Vignesh Analysis of Estimate at Completion of a Project's duration to improve Earned Value Management System 1 N.Vignesh 2 S.Sowmya 1. Research Associate, Indian Institute of Management Ahmedabad, 2. SDE, ACS

More information

Managing Customer Expectations. Dean P. Mallory 23 Oct 2018

Managing Customer Expectations. Dean P. Mallory 23 Oct 2018 Managing Customer Expectations Dean P. Mallory 23 Oct 2018 But we didn t call it Project Management Consolidate mainframe computer operations Ft Bragg, Pope AFB Air Show and Open House Commander s Conference

More information

Jefferson Science Associates, LLC. 900 Glossary. Project Control System Manual Revision 7

Jefferson Science Associates, LLC. 900 Glossary. Project Control System Manual Revision 7 Jefferson Science Associates, LLC 900 Glossary Project Control System Manual Revision 7 900 Glossary Actual Cost of Work Performed (ACWP) The direct costs incurred in accomplishing the project work activities,

More information

A Layman s Guide to Earned Value

A Layman s Guide to Earned Value A Layman s Guide to Earned Value A TenStep White Paper Contact us at info@tenstep.com TenStep, Inc. 2363 St. Davids Square Kennesaw, GA. 30152 877.536.8434 770.795.9097 If you are a project manager, you

More information

Risk Management Made Easy 1, 2

Risk Management Made Easy 1, 2 1, 2 By Susan Parente ABSTRACT Many people know and understand risk management but are struggling to integrate it into their project management processes. How can you seamlessly incorporate project risk

More information

SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME END SEMESTER EXAMINATION JULY 2016

SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME END SEMESTER EXAMINATION JULY 2016 All Rights Reserved No. of Pages - 10 No of Questions - 06 SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME END SEMESTER EXAMINATION JULY 2016 MGT 30725 Project

More information

From Suspicion to Invaluable Transition of Two Project Managers

From Suspicion to Invaluable Transition of Two Project Managers From Suspicion to Invaluable Transition of Two Project Managers June 2010 Shilpi Kumar & Sunita Raman Agenda Unisys and HOLMES 2 Nature of Projects and Roles Why EVA? How? EVA in Development Projects Transition

More information

Chapter-8 Risk Management

Chapter-8 Risk Management Chapter-8 Risk Management 8.1 Concept of Risk Management Risk management is a proactive process that focuses on identifying risk events and developing strategies to respond and control risks. It is not

More information

Project Management Institute. Government Extension to the PMBOK Guide Third Edition

Project Management Institute. Government Extension to the PMBOK Guide Third Edition Project Management Institute Government Extension to the PMBOK Guide Third Edition Government Extension to the PMBOK Guide Third Edition ISBN 13: 978-1-930699-91-5 ISBN 10: 1-930699-91-3 Published by:

More information

Agenda. - Why have metrics related to O2C. - What can impact O2C metrics. - What questions should you consider before starting? - KPIs to consider

Agenda. - Why have metrics related to O2C. - What can impact O2C metrics. - What questions should you consider before starting? - KPIs to consider Agenda - Why have metrics related to O2C - What can impact O2C metrics - What questions should you consider before starting? - KPIs to consider The Accounts Receivable and Order-to-Cash Expo Conference

More information

Schedule Analysis and Predictive Techniques Using Earned Schedule. 16 th IPM Conference Tysons Corner, Virginia

Schedule Analysis and Predictive Techniques Using Earned Schedule. 16 th IPM Conference Tysons Corner, Virginia Schedule Analysis and Predictive Techniques Using Earned Schedule 16 th IPM Conference Tysons Corner, Virginia 17 th November 2004 Walt Lipke OC-ALC/MAS Tinker AFB OK walter.lipke@tinker.af.mil 405-736-3341

More information

Keeping Score: Best Practices for Risk Management Reporting

Keeping Score: Best Practices for Risk Management Reporting Keeping Score: Best Practices for Risk Management Reporting 1/4 Keeping Score: Best Practices for Risk Management Reporting John Schaefer Risk Management Information Systems (RMIS) are designed to capture,

More information

INSE 6230 Total Quality Project Management

INSE 6230 Total Quality Project Management Lecture 5 Project Cost Management Project cost management introduction Estimating costs Budget Earned Value Management (EVM) EVM projections 2 IT projects have a poor track record for meeting budget goals

More information

We are IntechOpen, the world s leading publisher of Open Access books Built by scientists, for scientists. International authors and editors

We are IntechOpen, the world s leading publisher of Open Access books Built by scientists, for scientists. International authors and editors We are IntechOpen, the world s leading publisher of Open Access books Built by scientists, for scientists 3,350 108,000 1.7 M Open access books available International authors and editors Downloads Our

More information

europe GENEVA 2009 Haute école de gestion de Genève Geneva School of Business Administration EVA Europe 2009 was jointly organised by Gold Sponsors

europe GENEVA 2009 Haute école de gestion de Genève Geneva School of Business Administration EVA Europe 2009 was jointly organised by Gold Sponsors eva europe GENEVA 2009 2009, CERN, HEG, Authors - This material is provided courtesy of EVA Europe 2009, the European organisation for nuclear research(cern), the Geneva School of Business administration

More information

Carlos Consulting Group

Carlos Consulting Group Carlos Consulting Group Earned Value Management Building A Playhouse Financial analysis that goes one step beyond Budget versus Actual Presented by Tom Carlos, PMP June 20, 2007 Carlos Consulting Group

More information

1/7/2015. Sharif University of Technology. Session#12. Instructor. Class time. Course evaluation. International Campus Kish

1/7/2015. Sharif University of Technology. Session#12. Instructor. Class time. Course evaluation. International Campus Kish International Campus Kish Sharif University of Technology Session#12 Instructor Omid Fatahi Valilai, Ph.D. Industrial Engineering Department, Sharif University of Technology Email: Fvalilai@Sharif.edu,

More information

THE ART OF ASKING THE RIGHT QUESTIONS

THE ART OF ASKING THE RIGHT QUESTIONS SCHOOL BOARD GOVERNANCE THE ART OF ASKING THE RIGHT QUESTIONS Candace L. Sorensen OVERVIEW ABCs of Board Work Key Performance Indicators Dashboards that Tell the Story Q&A Governance is not about budget

More information

Product Portfolio Management

Product Portfolio Management 1 Portfolio Management Andrew Reback Group Manager, Intuit QuickBooks Industry-Specific Solutions Silicon Valley Management Association Presentation 9 July 200 All Contents Copyright 200 by Andrew Reback

More information