Richard Larson, PMP, CBAP, PMI-PBA President and Founder Watermark Learning. Enhanced 1 Performance. Enduring bapmtraining
|
|
- Opal Dorsey
- 5 years ago
- Views:
Transcription
1 Richard Larson, PMP, CBAP, PMI-PBA President and Founder Watermark Learning Enhanced 1 Performance. Enduring bapmtraining
2 Woman-owned business established in 1992, offering training and related services including certification preparation in: Business Analysis Project Management Agile/Scrum Business Process Management Business Relationship Management Leadership and Influencing Skills Courseware licensing Consulting and mentoring services Certificate programs through Auburn University
3 After this presentation you will be able to: Describe the essential components of an effective business case. Plan and create bullet-proof business cases. Avoid common pitfalls when recommending or justifying projects.
4 1 The Need for Effective Business Cases 2 Five Critical Things to Include 3 Pitfalls to Avoid
5 General Challenge: Projects not Meeting Business Needs Projects justified by solution Unclear scope Inappropriate approaches Scrapping of projects
6 The wrong way to justify projects
7 Why does this happen? For starters, market research shows that over 50 percent of For Ironically, funded starters, IT projects most market still companies use no formal ROI governance at all. research scrutinize $50 expense The vast The majority vast shows of business majority that cases of over 50 are seriously defective. percent reports business closer of cases funded than are IT seriously the Ironically, projects reasoning defective. most companies still behind use scrutinize no a formal $50 expense ROI reports $100,000 governance closer IT than investment. the at reasoning all. behind a $100,000 IT investment. Source: Making Technology Investments Profitable: ROI Road Map From Business Case to Value Realization, 2nd ed. by Jack M. Keen
8 DISCUSSION: What is missing from Business Cases in your organization? Discussion
9 Formal Definition: A document written for executive decision makers, assessing the present and future business value and risks related to a current investment opportunity. Source: Jack Keen book
10
11
12 DISCUSSION: Who should own a Business Case? Discussion a. Business Analyst b. PMO c. Project Manager d. Product Owner e. Sponsor f. Other
13 Who Produces/Uses a Business Case? Roles and Responsibilities R A C I Preparer/ Advisor Executive(s) deciding on projects SMEs, Financial Analysts, External organizations Interested Parties (e.g., Project Manager or other team members)
14 Business Advisor
15 Situation = Business Need/Rationale Includes both Problems and Opportunities Tip: Get Agreed-On Situation/Business Need before recommending anything Situation Statement Problem (or opportunity) of a Has the Effect of b With the Impact of c
16 Mortgage applications require on average 45 days to process, delaying their approval and final closing at an estimated cost of $100 per closed loan. Delays also cause 5% of loans to be abandoned, losing $10,000 revenue per loan, or $1.2 million per year.
17 Exercise: Which of these are valid Situation Statements? In order to process more records, we need to upgrade our database from Access to Oracle. No; this is a solution Our current development platform, Cold Fusion, has limited ability to add enhancements, resulting in delays of new releases which cost us $100,000 per year. Automating our registration system will reduce staff needed to process registrations, saving us $50,000 per year. Customers will also be happier because their registrations will be processed quicker. No; these are benefits of a solution Yes; Situation > Effect > Impact
18 A bullet-proof business case solves the right problem Use techniques like these to help you find and document the root causes Five Whys Pareto Charts Fishbone Diagrams Inter-relationship Diagrams Mind Maps Scatter Diagrams Process Diagrams
19 What is in a Solution Recommendation? The deliverables that must be produced to address the business need Needed enablers due to dependencies Impact on organization units and systems Risks, Assumptions, and Constraints
20 Root cause analysis Also need: Alternatives considered Feasibility Analysis Cost-Benefit Analysis Solution Situation Solution
21 Feasibility Analysis Determine Feasible Approach Preliminary cost-benefit analysis Often generates multiple approaches End-results should be rank-ordered
22 Factors for Feasible Solutions (TELOS * ) Factor Technology Feasibility Economic Feasibility Legal Feasibility Operational Feasibility Schedule Feasibility Questions to Ask Is the solution technically feasible? Will it integrate into what we have today? Does the solution seem affordable? Is it cost-justified enough for further study? Are we violating any laws with the solution? Is it ethical? How well does the solution solve the problem? How well does it match requirements? Will the solution accomplish what we need when we need it? * Adapted from Wikipedia listing for Feasibility Study
23 Benefit Identification Tangible benefits increase in sales or decrease in costs Intangible benefits improved customer satisfaction, heightened employee morale Cost Identification Easier to determine than benefits Tip: A business case team should spend no more than one-fourth of its cost and benefit research and analysis time on cost issues. * * From: Jack Keen book
24 Cost-Benefit Analysis Involves various financial tools to analyze outcomes, uncertainty, and tradeoffs Possible Financial tools: o Pay Back Period o Return on Investment o Weighted Average Cost of Capital Internal Rate of Return Average Rate of Return Discounted Cash Flow Net Present Value
25 Financial Tools - Basic Tool also known as Pay Back Period Break-Even Point Description Time needed to recover an investment, usually in months or years Example Cost Break-Even Point (1.64 Years) Benefits Year 0 Year 1 Year 2 Time Return on Investment ROI, ROR, Average Rate of Return Average of all net benefits divided by initial project cost 23.2% Average of 3 years projected net benefits ($324,000) divided by $1,250,000 initial cost
26 Financial Tools - Complex Tool also known as Internal Rate of Return IRR, ROR Net Present Value NPV Description Hypothetical annual yield of an investment. IRR is the projected rate of growth a given project is expected to bring. The value of a dollar today compared to the value of that same dollar in the future, taking inflation and returns into account. Example The IRR of a proposed project is 45% and current interest rates are at 5%, so the project would be a good investment. Excel can calculate this. $944,655, which means it is a great investment. Excel can calculate this. See
27 Speedy Mortgage. Inc. Procurement Analysis Worksheet - Sample Supporting Numbers for Financial Tools
28 Plan Implementation Approach High-level approach to obtaining the capabilities recommended Buy vs. Build Costs Assumptions Constraints Risks Phases/Iterations Implementation approach project plan
29 Measuring Benefits after solution delivery, such as: Costs saved Costs avoided Revenues increased Market share gains Increased customer satisfaction Benefits Tip: Recommend measures and methods to collect them in business case Measure and report benefits post-implementation
30 Business Metrics for evaluation Advisor Situation Statement Project Charter Project Plan Project Selected Data for Analysis Root-Case Analysis Deliverables Gap Analysis Cost-Benefit Analysis Risks & Assumptions
31 Avoid: 1. Leading with a solution - Treat every business case as a project focused on needs and remember the consultant's favorite question: What business problem are we solving? 2. Oder-Taking a solution request - Nail the situation statement before attempting to analyze its causes or drivers 3. Omitting key stakeholders Do your stakeholder analysis to ensure critical views are represented
32 Avoid: 4. The Feature Fallacy Focus on and stress business benefits more than features 5. Omitting cost-justification - For Costs, focus on the top 5 - For Benefits, assume the audience wants mostly tangible benefits, but will listen to intangibles 6. Leaving out total cost of ownership - Be sure to include it in your annual costs 7. Owning the solution or decision You may create a business case, but the business owns it
33 Avoid: 8. Presenting only one solution and no alternatives Rank-order them 9. Information overload - Assume the audience is impatient, and provide executive summaries up front, details in an Appendix 10. Ignoring the fear of change embrace stakeholders hearts not just their minds - to overcome it* * See HBR article for more on this
34 Now that we re done, you should be able to: Describe the essential components of an effective business case. Plan and create bullet-proof business cases. Avoid common pitfalls when recommending or justifying projects.
35 Visit our web site for valuable and free industry resources: Articles Webinars On-Demand Templates Bibliographies And more! Register or sign in here
36 Books: Making Technology Investments Profitable: ROI Road Map from Business Case to Value Realization, 2nd ed by Jack M. Keen The Influencing Formula: How to Become a Trusted Advisor and Influence Without Authority by Elizabeth Larson and Richard Larson Articles: Contact Us: Info@WatermarkLearning.com Find us on Like us on Facebook
Five-Day Schedule and Course Content
Five-Day Schedule and Course Content The following sequence is suggested to balance out the material over five sessions. Note that Chapter 10 is placed with Chapters 12 and 13 on Day 5. DAY 1 DAY 1 Course
More informationAchieve PMP Exam Success Five-Day Course Syllabus
Course Delivery Format: Traditional class room 5-day format, 35 hrs. Achieve PMP Exam Success Five-Day Course Syllabus Course Description: Achieve PMP Exam Success is a 35-hour PMP exam preparation course
More informationCertificate IV in Project Management Practice
BSB41515 Certificate IV in Project Management Practice Day 1: Project Initiation Course structure 8-day program Attendance sheet Active participation Assessment portfolio Initiating projects Planning projects
More informationProcess Optimization Level I (Introduction)
Process Optimization Level I (Introduction) 8 Hours A hands-on, interactive introduction to Business Process Optimization Focused on the most effective tools & concepts from the many process improvement
More informationCOPYRIGHTED MATERIAL. Index
Index Note to the reader: Throughout this index boldfaced page numbers indicate primary discussions of a topic. Italicized page numbers indicate illustrations. A A+ certification, 28 acceptance criteria
More informationPrincess Nora University Computer Science and Information Faculty Information Systems Department IS321
Princess Nora University Computer Science and Information Faculty Information Systems Department IS321 Chapter 5 Initiating & Planning Systems Development Projects 1 Learning Objectives Describe steps
More informationProject Integration Management
Project Integration Management The Key to Overall Project Success: Good Project Integration Management Project managers must coordinate all of the other knowledge areas throughout a project s life cycle.
More informationChapter 7: Project Cost Management. IT Project Management, Third Edition Chapter 7
Chapter 7: Project Cost Management 1 Learning Objectives Understand the importance of good project cost management Explain basic project cost management principles, concepts, and terms Describe how resource
More informationFeasibility Study Template. For Real Estate developments
Feasibility Study Template For Real Estate developments Mail: info@feasibility.pro Web: http://feasibility.pro/ What is a Feasibility Study? Feasibility analysis can mean different things to different
More informationPass PMP in 21 Days - ITTO Toolbox PROCESS MAP
PROCESS MAP 1 IntEgratIon Pass PMP in 21 Days - ITTO Toolbox InItIatIng PlannIng ExEcutIng MonItorIng & controlling closing Develop Project Charter Develop Project Management Plan Direct & Manage Project
More informationGEOTHERMAL PROJECT MANAGEMENT
Presented at SDG Short Course I on Exploration and Development of Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Nov. 10-31, 2016. Kenya Electricity
More informationSection II PROJECT MANAGEMENT METHODOLOGY GUIDELINES
Section II B PROJECT MANAGEMENT METHODOLOGY GUIDELINES Chapter 8 INTRODUCTION TO A METHODOLOGY Vision The vision of the Project Management Center of Excellence (PMCoE) organization is to achieve a world-class
More information1. A methodology provides a strategic-level plan for managing and controlling IT projects. a. True b. False True
Link full download of Test Bank for Information Technology Project Management 4th edition by Schwalbe https://digitalcontentmarket.org/download/test-bank-forinformation-technology-project-management-4th-edition-byschwalbe/
More informationProject Management and Scheduling
Question 1: What are the triple constraints of project management? Answer 1: The triple constraints deal with the time, cost, and scope of a project. Time is the duration between the project start and
More informationContent. 1. Project Initiating and Planning (PIP) Chapter 5 Initiating and Planning Systems Development Projects
Content Chapter 5 Initiating and Planning Systems Development Projects Steps of Project Initiation and Planning (PIP) process The need for and the contents of a Project Scope Statement and Baseline Project
More informationSoftware Economics. Introduction to Business Case Analysis. Session 3
Software Economics Introduction to Business Case Analysis Session 3 Recap How much profit will my investment give? What is the Risk of my Investment? When do I get benefit from my investment? Net Present
More informationTHE PMP EXAM PREP COURSE
THE PMP EXAM PREP COURSE Session 3 PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. www.falcontraining.co.nz Agenda 9:00 10:15 10:15 10:30 10:30 12:00 12:00 12:45 12:45
More informationPMP102 Fundamentals of Project Management
PMP102 Fundamentals of Project Management H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This course is designed for managers and staff,
More informationPMP (2018) PMBOK 6th Edition PMI. Project Management Professional (PMBOK 6th Edition)
PMI PMP (2018) PMBOK 6th Edition Project Management Professional (PMBOK 6th Edition) Download Full Version : https://killexams.com/pass4sure/exam-detail/pmi-001 QUESTION 903 Which process documents the
More informationUsing Real Options to Quantify Portfolio Value in Business Cases
Using Real Options to Quantify Portfolio Value in Business Cases George Bayer, MBA, PMP Cobec Consulting, Inc. www.cobec.com Agenda Contents - Introduction - Real Options in Investment Decisions - Capital
More informationPMI Long Island Chapter s Tools and Techniques Series PM101
PMI Long Island Chapter s Tools and Techniques Series PM101 Project Metrics & KPIs Agenda Overview Why Metrics and KPIs important Source of Metrics and KPIs Common PM Metrics and KPIs Other PM Metrics
More informationCost Benefit Analysis (CBA) Economic Analysis (EA)
Cost Benefit Analysis (CBA) Economic Analysis (EA) This is an overview of the preliminary work that should be completed before launching into a full CBA to determine the net economic worth of a proposal
More informationDr. Ebadati Kharazmi University
COMPUTER AIDED SOFTWARE ENGINEERING (CASE) Dr. Ebadati Kharazmi University PROJECT INITIATION Chapter 2 KEY IDEAS An opportunity to create business value from using information technology initiates a project.
More informationIP-CIS : CIS Project Management
Meltem Özturan www.mis.boun.edu.tr/ozturan/mis301 1 Project Management Tools and Techniques (PMTT) Feasibility Analysis Organizational Breakdown Structure Work Breakdown Structure Scheduling Earned Value
More informationIntroduction: MEASURING ROI IN E-GOVERNMENT. Pat O Donnell, Anexsys LLC. 08/12/02 FTA Conference Copyright 2002 Anexsys, LLC
Introduction: MEASURING ROI IN E-GOVERNMENT Pat O Donnell, Anexsys LLC 1 What we will cover: Establish need to measure ROI of e-government. Demonstrate proven methodologies for measuring e-government ROI.
More informationPMI - Dallas Chapter. Sample Questions. March 22, 2002
PMI - Dallas Chapter PMP Exam Sample Questions March 22, 2002 Disclaimer: These questions are intended for study purposes only. Success on these questions is not necessarily predictive of success on the
More informationMajor Projects Advisory Project Leadership Series
KPMG GLOBAL ENERGY INSTITUTE Major Projects Advisory Project Leadership Series February 7, 2013 Disclaimer The information contained herein is of a general nature and is not intended to address the circumstances
More informationProject Theft Management,
Project Theft Management, by applying best practises of Project Risk Management Philip Rosslee, BEng. PrEng. MBA PMP PMO Projects South Africa PMO Projects Group www.pmo-projects.co.za philip.rosslee@pmo-projects.com
More informationProject Management. A Practitioner s Guide. Steven M. Bragg
Project Management A Practitioner s Guide Steven M. Bragg Chapter 1 Overview of Project Management... 1 Learning Objectives... 1 Introduction... 1 Project Management Activities... 1 The Need for Project
More informationProject Management Certification. Multiple Choice Questions
Project Management Certification (PMP) Project Management Certification (PMP) Multiple Choice Questions QUESTION 1 In Project Cost Management, which input is exclusive to the Determine Budget process?
More informationKPIs & KEIs for Success
The Smart Manager Series (#3) KPIs & KEIs for Success Key principles & Survival Kit Tools October 2018 Smart Pharma Consulting Table of Contents 1. Introduction p. 2 2. Definitions p. 3 3. How to choose
More informationIT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps://
IT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps://www.certqueen.com Exam: PMI-002 Title : Certified Associate in Project Management (CAPM) Certification Version : DEMO 1 / 7 1.A
More informationCourse Outline. Project Finance Modelling Course 3 Days
Course Outline Project Finance Modelling Course 3 Days Overview This training course provides the opportunity for delegates to practise and improve their abilities in project finance modelling using Excel.
More informationTactics to Grow in 2016
Tactics to Grow in 2016 1 What is your definition of growth? Expansion Optimization Increasing in size Transition Maximizing returns and performance Moving to the next chapter 2 Why have a growth plan?
More informationIntroduction to Project Management. Modeling after NYS ITS
Introduction to Project Management Modeling after NYS ITS What is Project Management? Project management is the application of knowledge, skills, tools and techniques to project activities to meet project
More informationFAQ: Estimating, Budgeting, and Controlling
Question 1: Why do project managers need to create a budget? Answer 1: The budget is designed to tell how much the total project should cost and when these costs will occur. This information is beneficial
More informationITIL Practitioner Course 06 - Use Metrics & Measurement
ITIL Practitioner Course 06 - Use Metrics & Measurement Course Slide 1 Use Metrics & Measurement CSFs, KPIs & Improvement Analyze CSFs & KPIs in context Assessments Design a Report Slide 2 Learning Objectives
More informationEconomic and Technical Evaluations for Engineering and Maintenance Projects. Germany, Munich, relexa hotel München.
Training Course : Economic and Technical Evaluations for Engineering and Maintenance Projects Training Course For One Week In Germany, Munich, relexa hotel München Which Be Held As Under Details : Tel.
More informationKeeping Score: Best Practices for Risk Management Reporting
Keeping Score: Best Practices for Risk Management Reporting 1/4 Keeping Score: Best Practices for Risk Management Reporting John Schaefer Risk Management Information Systems (RMIS) are designed to capture,
More informationFor the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.
For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com
More informationDemystifying Dodd Frank s Impact on Corporate Hedging
Demystifying Dodd Frank s Impact on Corporate Hedging Overview Section 1: Dodd Frank on Swaps and the End User Section 2: How Companies Can prepare Section 3: What Tools are Available? 2 Section 1: End
More informationBrief course information Strategic planning and project selection Project integration management Project scope management
Brief course information Strategic planning and project selection Project integration management Project scope management Total Quality Project Management 2 This is an individual work. Each student prepares
More informationDevelopment Cooperation Development Education Partnership Fair. Writing a successful co financing application
Development Cooperation Development Education Partnership Fair Writing a successful co financing application 3 sessions to guide project preparation Session 1: Deciding on stakeholders and defining problems/issues.
More informationTopic 2: Define Key Inputs and Input-to-Output Logic
Mining Company Case Study: Introduction (continued) These outputs were selected for the model because NPV greater than zero is a key project acceptance hurdle and IRR is the discount rate at which an investment
More informationFM086: Financial Modelling
FM086: Financial Modelling FM086 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: Organizations cannot afford to make the wrong investments decisions because such decisions have a longterm
More informationFinal Preliminary Survey Report Audit of Budgeting and Forecasting. June 19, Office of Audit and Evaluation
2013-705 Audit of Budgeting and Forecasting June 19, 2014 Office of Audit and Evaluation TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND... 1 OBJECTIVE, SCOPE AND APPROACH... 3 RISK ASSESSMENT... 4 PRELIMINARY
More informationProject Integration Management
Project Integration Management Describe an overall framework for project integration management as it relates to the other PM knowledge areas and the project life cycle. Explain the strategic planning
More informationGFOA AWARD FOR BEST PRACTICES IN SCHOOL BUDGETING. Applicant and Judge's Guide
GFOA AWARD FOR BEST PRACTICES IN SCHOOL BUDGETING Applicant and Judge's Guide GFOA Award for Best Practices in School Budgeting Applicant and Judges Guide Introduction... 2 Definitions... 2 About the Award...
More informationKERN COMMUNITY COLLEGE DISTRICT BAKERSFIELD COLLEGE INDA B132 COURSE OUTLINE OF RECORD
Status: Final Last Revised: February 11, 2016 Proposal Type: New Course Start Term: Fall 2017 TOPS Code: 0935.00 CIP Code: 15.0406 (updated 6/1/16) KERN COMMUNITY COLLEGE DISTRICT BAKERSFIELD COLLEGE INDA
More informationCompany Name PRELIMINARY PROJECT SCOPE STATEMENT <PROJECT NAME> COMPANY NAME STREET ADDRESS CITY, STATE ZIP CODE DATE
Company Name PRELIMINARY PROJECT SCOPE STATEMENT COMPANY NAME STREET ADDRESS CITY, STATE ZIP CODE DATE TABLE OF CONTENTS PROJECT AND PRODUCT OBJECTIVES...2 PRODUCT OR SERVICE REQUIREMENTS
More informationReturn on Investment Metrics: An Army Perspective Presented by Noel Bishop
Return on Investment Metrics: An Army Perspective Presented by Noel Bishop Purpose To provide a Headquarters Department of the Army (HQDA) cost analyst s perspective on what Return on Investment (ROI )
More informationSoftware Economics. Metrics of Business Case Analysis Part 1
Software Economics Metrics of Business Case Analysis Part 1 Today Last Session we covered FV, PV and NPV We started with setting up the financials of a Business Case We talked about measurements to compare
More informationMany decisions in operations management involve large
SUPPLEMENT Financial Analysis J LEARNING GOALS After reading this supplement, you should be able to: 1. Explain the time value of money concept. 2. Demonstrate the use of the net present value, internal
More informationBusiness Plan ICO Consultancy
Business Plan ICO Consultancy By Shariq Hashmi CO-FOUNDER & PROJECT LEAD zuflo.io ZFL Exchange zuflo coin (ZFL) Copyright 2018 zuflo.io What is zuflo coin (ZFL) ZFL is a utility token that enables frictionless
More informationThe role of an actuary in a Policy Administration System implementation
The role of an actuary in a Policy Administration System implementation Abstract Benefits of a New Policy Administration System (PAS) Insurance is a service and knowledgebased business, which means that
More informationAccess to this webinar is for educational and informational purposes only. Consult a licensed broker or registered investment advisor before placing
Access to this webinar is for educational and informational purposes only. Consult a licensed broker or registered investment advisor before placing any trade. All securities and orders discussed are tracked
More informationNavigating the New Normal Enterprise Risk Management After e-risk Identification and Assessment
Navigating the New Normal Enterprise Risk Management After e-risk Identification and Assessment Agenda ERM After e-ria ERM Level Setting ERM Fundamentals So Now What? Next-Step Considerations Overview
More informationWhat you need to know about getting, using and keeping credit. A Guide to Credit* American Financial Services Association Education Foundation
A Guide to Credit* What you need to know about getting, American Financial Services Association Education Foundation www.afsaef.org www.gmacfs.com using and keeping credit *If you would like to receive
More informationBudgeting by Priorities Results Team Kickoff. January 3, 2014
Budgeting by Priorities Results Team Kickoff January 3, 2014 Aligning to the Strategic Plan What does it mean? Ability to identify how much money you spend by strategic plan priority. Ability to show that
More informationIntroduction to the Fund-Mapping Tool
Introduction to the Fund-Mapping Tool 2018 What is the Fund-Mapping Tool? The fund-mapping tool helps community and public agency leaders to make better investments in supports and services for children
More informationMR. MUHAMMAD AZEEM - PAKISTAN
HTTP://WWW.READYFOREX.COM MR. MUHAMMAD AZEEM - PAKISTAN How to become a successful trader? How to win in forex trading? What are the main steps and right way to follow in trading? What are the rules to
More informationMortgage Marketing Benchmarks Report
Mortgage Marketing Benchmarks Report 2017 Introduction How can I stay relevant to past clients to drive referrals and repeat business? That s a question successful loan officers ask themselves on a regular
More information7/25/2013. Presented by: Erike Young, MPPA, CSP, ARM. Chapter 2. Root Cause Analysis
Presented by: Erike Young, MPPA, CSP, ARM 1 Chapter 2 Root Cause Analysis 1 Introduction to Root Cause Analysis Root Cause The event or circumstance that directly leads to an occurrence Root Cause Analysis
More informationEnergy efficiency obligation schemes, monitoring impacts of eligible measures
Core Theme Series Report: Concerted Action Energy Efficiency Directive 8 Energy efficiency obligation schemes, monitoring impacts of eligible measures Gregor Thenius, Austrian Energy Agency, Austria July
More informationThe Art & Science of Budgeting. Poll # 1. Poll # 2 9/21/2010. What is the size of your organization? What is your role in your organization?
The Art & Science of Budgeting Steve Zimmerman Spectrum Nonprofit Services CALCASA September 14, 2010 Poll # 1 What is the size of your organization? A. Less than $500,000 B. Between $500,000 and $1 Million
More informationExaminer s report F9 Financial Management September 2017
Examiner s report F9 Financial Management September 2017 General comments The F9 Financial Management exam is offered in both computer-based (CBE) and paper-based (PBE) formats. The structure is the same
More informationBasic Financial Modelling in Excel
Basic Financial Modelling in Excel A Two Day Programme This course is presented in London on: 14-15 May 2018 This course can also be presented in-house for your company or via live on-line webinar The
More informationSoftware Economics. Introduction to Business Case Analysis. Session 2
Software Economics Introduction to Business Case Analysis Session 2 Today Last Session we covered FV, PV and NPV We started with setting up the financials of a Business Case We talked about measurements
More informationPRINCE2 - Business Case
Created/updated 05/11/17 PRINCE2 - Business Case Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Business Case Mind Map Project Name:
More informationProject Management CSC 310 Spring 2017 Howard Rosenthal
Project CSC 310 Spring 2017 Howard Rosenthal 1 No?ce This course is based on and includes material from the text: Effective Project - Traditional, Agile, Extreme 7TH Edition Authors: Robert K. Wysocki
More informationSustainable Approach to ROI for IT: What you may be missing in the bigger picture
1 8/1/200 Sustainable Approach to ROI for IT: What you may be missing in the bigger picture By David J. Dell LLC 2 8/1/200 What is Sustainability? The concept of sustainability was popularized in the 1980s.
More informationMajor City Goal Work Programs
Major City Goal Work Programs Staff Briefing January 29, 2013 1 Looking Back Challenges identified by staff at the project kick-off meeting on September 24, 2012 2 Challenges Things we ve achieved Establishing
More informationVendor: PMI. Exam Code: CA Exam Name: Certified Associate in Project Management. Version: Demo
Vendor: PMI Exam Code: CA0-001 Exam Name: Certified Associate in Project Management Version: Demo QUESTION: 1 On what is project baseline development established? A. Approved product requirements B. Estimated
More informationTHE CORPORATION OF THE CITY OF WINDSOR POLICY
THE CORPORATION OF THE CITY OF WINDSOR POLICY Service Area: Office of the Chief Administrative Officer Policy No.: CR252/2014 Department: Approval Date: October 6, 2014 Division: Corporate Initiatives
More informationRisk Management User Guide. Prepared By: Neville Turbit Version Feb /01/2009 Risk Management User Guide Page 1 of 36
Risk Management User Guide Prepared By: Neville Turbit Version 1.0 1 Feb 09 22/01/2009 Risk Management User Guide Page 1 of 36 Table of Contents Document Origin...2 Change History...2 Risk Guidelines...
More informationProject Management CTC-ITC 310 Spring 2018 Howard Rosenthal
Project Management CTC-ITC 310 Spring 2018 Howard Rosenthal 1 Notice This course is based on and includes material from the text: A User s Manual To the PMBOK Guide Authors: Cynthia Stackpole Snyder Publisher:
More informationProject Selection Risk
Project Selection Risk As explained above, the types of risk addressed by project planning and project execution are primarily cost risks, schedule risks, and risks related to achieving the deliverables
More informationAssociation for Project Management 2008
Contents List of tables vi List of figures vii Foreword ix Acknowledgements x 1. Introduction 1 2. Understanding and describing risks 4 3. Purposes of risk prioritisation 12 3.1 Prioritisation of risks
More informationChapter-8 Risk Management
Chapter-8 Risk Management 8.1 Concept of Risk Management Risk management is a proactive process that focuses on identifying risk events and developing strategies to respond and control risks. It is not
More informationGuide to Working with
Mutual of Omaha Insurance Company United of Omaha Life Insurance Company Companion Life Insurance Company Guide to Working with Headline Business Owners SUBHEAD 167456 Form No. For producer use only. Not
More informationFINANCE & ACCOUNTING FEASIBILITY STUDIES: PREPARATION, ANALYSIS AND EVALUATION NON-TECHNICAL & CERTIFIED TRAINING COURSE
FEASIBILITY STUDIES: PREPARATION, ANALYSIS AND EVALUATION FINANCE & ACCOUNTING NON-TECHNICAL & CERTIFIED TRAINING COURSE The Course Uses A Mix Of Interactive Techniques, Such As Brief Presentations By
More information1.011Project Evaluation: Comparing Costs & Benefits
1.11Project Evaluation: Comparing Costs & Benefits Carl D. Martland Basic Question: Are the future benefits large enough to justify the costs of the project? Present, Future, and Annual Worth Internal
More informationZacks Method for Trading: Home Study Course Workbook. Disclaimer. Disclaimer
Zacks Method for Trading: Home Study Course Workbook Disclaimer Disclaimer The performance calculations for the Research Wizard strategies were produced through the backtesting feature of the Research
More informationVersion 2.0- Project. Q: What is the current status of your project? A: Completed
Baker College, MI Project: Develop an institutional quality assurance framework to measure institutional effectiveness and drive continuous quality improvement efforts Version 2.0- Project What is the
More informationChapter 6 Rate of Return Analysis: Multiple Alternatives 6-1
Chapter 6 Rate of Return Analysis: Multiple Alternatives 6-1 LEARNING OBJECTIVES Work with mutually exclusive alternatives based upon ROR analysis 1. Why Incremental Analysis? 2. Incremental Cash Flows
More informationAppendix B: Glossary of Project Management Terms
Appendix B: Glossary of Project Management Terms Assumption - There may be external circumstances or events that must occur for the project to be successful (or that should happen to increase your chances
More informationCHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA
CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA Learning Objectives LO1 How to compute the net present value and why it is the best decision criterion. LO2 The payback rule and some of its shortcomings.
More informationDOWNLOAD PDF ANALYZING CAPITAL EXPENDITURES
Chapter 1 : Capital Expenditure (Capex) - Guide, Examples of Capital Investment The first step in a capital expenditure analysis is a factual evaluation of the current situation. It can be a simple presentation
More informationIndependently Assessed and Endorsed by NASBA, the official board that regulates accounting and financial education in the United States of America.
111 Independently Assessed and Endorsed by NASBA, the official board that regulates accounting and financial education in the United States of America. Program Overview Project managers play a key role
More information2010 ASPE-SDLC, Ravenflow & IIBA Business Analyst Salary Survey
ASPE SDLC Training 2010 ASPE-SDLC, Ravenflow & IIBA Business Analyst Salary Survey A WHITE PAPER PROVIDED BY ASPE-SDLC, RAVENFLOW & IIBA www.aspe-sdlc.com 877-800-5221 2010 ASPE-SDLC, Ravenflow & IIBA
More informationThe One Page Executive Dashboard
The One Page Executive Dashboard Tell them what they need to know then STOP! Laura Barnard, PMP Speaking, Training, Coaching, & Consulting PMO Strategies & IMPACT by Laura Nonprofit Service Founder & President,
More informationDUE DATE : 3pm Tuesday 16 March MATERIAL REQUIRED : ANSWER SHEET Refer to page 7
Page 1 of 7 ASSIGNMENT 1 st SEMESTER : FINANCIAL MANAGEMENT (FM) STUDY UNITS COVERED : MODULES 1-10 DUE DATE : 3pm Tuesday 16 March 2010 TOTAL MARKS : 100 MATERIAL REQUIRED : ANSWER SHEET Refer to page
More informationDiscussion Questions
Understanding the Financial Environment of Public Utility Firms Sanford V. Berg Joel F. Houston 1 Overview Our plan is to help facilitate a series of discussions related to utility finance. We will pose
More informationBest Practice Modelling for Project Finance
Best Practice Modelling for Project Finance Course overview This course is aimed at Project Finance professionals who would like to improve their Excel skills and expand their knowledge of Best Practice
More informationBasic Financial Modelling in Excel
Basic Financial Modelling in Excel A Two Day Programme This course is presented in London on: DATES TBD This course can also be presented in-house for your company or via live on-line webinar The Banking
More informationFinancial Analysis for Marketing Decisions
Chapter 4 Financial Analysis for Marketing Decisions Financial Analysis for Marketing Decisions In this chapter we address the third element of what marketing managers must understand: the financial implications
More informationACCIDENT INVESTIGATION
OBJECTIVE To determine what went wrong in the workplace that resulted in an accident, or near miss, so that effective corrective action can be taken to prevent reoccurrence. RESPONSIBILITIES The Restaurant
More informationSTART HERE. Small Business Retirement Plans. Prospecting Guide to. American National Insurance Company
American National Insurance Company START HERE Prospecting Guide to Small Business Retirement Plans 1 Getting Started Every business owner needs a plan for retirement. 2 WHY? They work hard to make their
More informationOffice of Audit and Evaluation. Audit of Major Capital Project Management
Office of Audit and Evaluation Audit of Major Capital Project Management August 2018 TABLE OF CONTENTS EXECUTIVE SUMMARY AND CONCLUSION...I 1.0 INTRODUCTION... 1 2.0 BACKGROUND AND CONTEXT... 1 3.0 AUDIT
More informationFrequently Asked Questions
Frequently Asked Questions Contents How does short-term small dollar lending help my customers and communities?... 3 What is a digital lending platform?... 3 What is Q-Cash and Q-Cash Plus? Do we offer
More information