2 LEARNING OBJECTIVES Work with mutually exclusive alternatives based upon ROR analysis 1. Why Incremental Analysis? 2. Incremental Cash Flows 3. Interpretation 4. Incremental ROR by PW 5. Incremental ROR by AW 6. Multiple alternatives 6-2

3 Sct 6.1 Why Incremental Analysis is N Necessary Assume we have two or more mutually exclusive alternative Objective: Which, if any of the alternatives is preferred? Prior Chapters: Use the PW or AW approach This chapter: We apply the ROR approach Present Worth: Equal service lives must apply When using the ROR method to select from among alternatives one must always use the incremental cash flow approach. 6-3

4 Ranking Inconsistency For some problems, PW and ROR may rank the same problems differently. Why? PW assumes reinvestment at the MARR or discount rate. ROR assumes reinvestment at the i* or i rate Two different reinvestment rate assumptions apply 6-4

5 Review of Problem Types INDEPENDENT AND MUTUALLY EXCLUSIVE ALTERNATIVES INDEPENDENT - Selection of one alternative does not effect the selection of others. Example: select all projects with a ROR> 20% MUTUALLY EXCLUSIVE - Selection on one alternative precludes the selection of others. Example: select the project with the highest ROR. 6-5

6 Sct 6.2 ROR for Mutual Exclusive Projects Given Two or more alternatives Rank the investments based upon their initial time t = 0 investment requirements Rank from low to high Summarize the investments in a tabular format 6-6

7 Tabular Format t Alt. A Alt. B Lowest Highest 0 $ $ B - A 1 $ $ 2 $ $ Find the ROR of this investment which is (B A) N $ $ 6-7

8 Example Two Investments: A and B A costs $30,000 at time t = 0 B costs $50,000 at time t = 0 MARR = 10% Life is 4 years 6-8

9 Example: A and B For this problem, A is superior to B based on PW and on ROR! A is ranked first B is ranked second 6-9

10 Form the Difference (B A) For mutually exclusive alternatives One should focus on the differences between the alternatives Differences are illustrated best by forming what is called the incremental investment (B-A) 6-10

11 Incremental Investment A B (B-A) Lowest First Cost investment Next Highest first Cost investment = The Incremental investment Find the ROR of this investment The investment (B-A) measures the difference between investment B and investment A The decision maker will go with A at first. If the extra investment in moving from A to B is worth it, then the decision maker will go with B. If the extra investment is not worth it then B is rejected and one would stay with A 6-11

12 Example for Two Alternatives A and B Computed 18% shows that B has the lowest PW cost and would be preferred to A Note: No ROR exists these are pure cost type problems 6-12

13 Focus on the Incremental Cash Flow (B-A) -$50,000 15,000 15,000 50,000 15,000 15,000 Question? Is it worth spending an additional $50,000 in the automatic machine in order to receive the incremental savings shown to the left? Compute the ROR of the incremental cash flows The incremental cash flows have a mixture of (+) and (-) signs As such, an i* value may indeed exist 6 21,

14 Incremental ROR = % Using the Excel IRR function, we observe that the i* value for the incremental investment is 35.95%. This exceeds the firm's MARR, so the higher cost alternative is worth the incremental investment 6-14

15 NPV Plot of A and B A is equivalent to B at incremental ROR rate of 35.95% NPV(i%) NPV PLOT-INC. C.F Note: The two PW plots intersect at 35.95% Disc. Rates 6-15

16 i* (B-A) = % The incremental i* (B-A) is greater than the firm s discount rate of 18% Since i* (B-A) > MARR, accept the increment and go with Alternative B This is the same decision if PW at 18% is found B is clearly the winner! 6-16

17 Sct 6.3 Interpretation of Rate of return on the Extra Investment The i* incremental is the ROR of the additional or incremental investment required to move from one project to the next most costly project If the i* incremental value is < MARR the increment is not worth it. Go with the lower investment cash flow 6-17

18 Multiple Alternatives If Cost-Revenue Problem Calculate the computed i* s for each alternative in the set Discard those alternatives whose i* value is less than the MARR they would lose anyway! Remember: If the calculated rate of return earned on an incremental investment is MARR, the alternative associated with the higher investment is preferred 6-18

19 Independent Projects If dealing with independent projects, one does not compute incremental investments among the candidate projects Rule: Accept all projects whose calculated ROR > MARR and stay within any budget limitations 6-19

20 Observation About the i* (B-A) value Given two mutually exclusive alternatives, A and B. The i* (B-A) value also represents the interest rate at which the two alternatives are economically equivalent. 6-20

21 Sct 6.4 Rate of Return Evaluation Using PW: Incremental and Breakeven The PW approach based on the development in Chapter 5 for ME (mutually exclusive) alternatives is: Given multiple alternatives If unequal lives, either Apply the LCM of life approach Or, establish a common project life (study period) 6-21

22 PW Approach for ME Alternatives Order (rank) the alternatives by their initial investment cost at time t = 0 The smaller investment alternative is A. The next highest investment cost is called B Compute the incremental investment (B-A) and cash flows Calculate the PW at i% of the incremental cash flows. Usually i% = MARR 6-22

23 PW Approach Mutually Exclusive Case Decision Rule: If PW(MARR) of (B-A) is > 0; Else, accept the increment go with the higher investment cost alternative. reject the increment and go with the lower investment cost option 6-23

24 ROR Case for Unique i* (B-A) For ME alternatives, using the incremental ROR approach, the steps are: Determine incremental cash flows Examine the cash flows for sign changes and apply the cumulative cash flow (CCF) or Norstrom s test from Chapter 7 If a unique i* (B-A) is indicated, solve for it and compare it to MARR If i* (B-A) > MARR, accept the increment, else reject 6-24

25 Incremental ROR: Example year project (merger) New equipment is required Two vendors (A and B) MARR = 15% Which vendor should be selected? Cost /Service Problem 6-25

26 Setup: B vs. A Note: Cannot determine the i* for A or B since there are no + cash flows involved. PW at 15% of A is less than the PW at 15% of B. Based upon computed PW, A is the least costly alternative. Select A! 6-26

27 Conclusion to PW Analysis; Moving to ROR Analysis We could stop now, because the PW at 15% has signaled that A is the winner! Lowest PW cost To proceed with a ROR analysis, the incremental ROR must be determined on the incremental investment (B-A) 6-27

28 Incremental Cash Flow Focus on (B-A) cash flow series 6-28

29 Incr. Cash Flow Results The PW at 15% of incremental cash flow is negative. Result: Reject the increment reject B in favor of A i* (B-A) is less than the MARR of 18%. Reject increment and go with A! Consistent Decision! 6-29

30 The Breakeven ROR The incremental i* (B-A) is the interest rate at which the two alternatives are economically equivalent. This special interest rate is called: Breakeven Interest Rate or, Fisherian Intersection Rate 6-30

31 Breakeven Rate Illustrated For Example 8.3 the NPV Plot is: NPV PLOT-INC. C.F NPV(i%) i*(b-a) rate; Alternatives are identical at this rate Disc. Rates 6-31

32 Conclusions i* (B-A) = % Given: The MARR = 15% For MARR < 12.65% extra investment is justified. Go with B For MARR > 12.65%, the extra investment is not justified: Go with A If MARR = 12.65%, both options are economically equivalent. 6-32

33 Sct 6.5 Rate of return Evaluation Using AW ROR approach requires comparison over an equal-service life When the lives are equal or unequal set up the AW relationship for the cash flows of each alternative Then solve 0 = AW B AW A for the i* value 6-33

34 Sct 6.6 Incremental ROR Analysis of Multiple Mutually Exclusive Alternatives Given N mutually exclusive alternatives Using the incremental ROR method Select the one alternative that Requires the largest investment, and at the same time Indicates that the extra investment over another acceptable investment is justified 6-34

35 Ranking Rules - Ordering 1. Order the alternatives from smallest to largest initial investment 2. Compute the cash flows for each alternative (assume or create equal lives) 3. If the alternatives are revenue-cost alternatives do the following Next slide 6-35

36 Revenue-Cost Alternatives 4. Compute the i* value for all alternatives in the considered set. If any alternative has an i* < MARR drop it from further consideration The candidate set will be those alternatives with computed i* values > MARR. Call this the FEASIBLE set 6-36

37 Revenue-Cost Alternatives Approach - continued Calculate i* for the first alternative The first alternative is called the DEFENDER The second (next higher investment cost) alternative is called the CHALLENGER Compute the incremental cash flow as (Challenger Defender) 6-37

38 Revenue-Cost Approach - continued 4. Compute i* Challenger Defender If i* Challenger Defender > MARR drop the defender and the challenger wins the current round. 5. If i* Challenger Defender < MARR, drop the challenger and the defender moves on to the next comparison round 6-38

39 Revenue-Cost - continued At each round, a winner is determined Either the current Defender or the current Challenger The winner of a given round moves to the next round and becomes the current DEFENDER and is compared to the next challenger 6-39

40 Revenue-Cost - continued 6. This process continues until there are no more challengers remaining. The alternative that remains after all alternatives have been evaluated is the final winner. 6-40

41 Costs Only (Service) Problems ROR Approach Remember Cost problems do not have computed RoR s since there are more cost amounts that revenue amounts (salvage values may exist) Thus there are no feasible i* s for each alternative 6-41

42 Costs Only Problems - Rules Rank the alternatives according to their investment requirements (low to high) For the first round compare: Challenger Defender Cash Flow Compute i* Challenger Defender If i* Challenger Defender > MARR, Challenger wins; else Defender wins 6-42

43 Costs Only Problems -continued The current winner now becomes the defender for the next round. Compare the current defender to the next challenger and compute i* Challenger Defender The winner becomes the current champion and moves to the next round as the defender Repeat until all alternatives have been compared. 6-43

44 Sct 6.7 Spreadsheet Application PW, AW, and ROR Analysis all in one Use the E-solve software for a PW, AW or ROR Analysis Create your own spreadsheet from scratch and employ the built in financial functions. Formatting is most important 6-44

45 Chapter Summary PW and AW methods are preferred methods for evaluating alternatives ROR can be used, but care must be taken If ROR, must perform an incremental analysis Two at a time (paired comparison of alternatives) is required 6-45

Mutually Exclusive Choose at most one From the Set

Mutually Exclusive Choose at most one From the Set 1 Mutually Exclusive Choose at most one From the Set This lecture addresses an issue that is confusing to many users of the rate of return method. When choosing among mutually exclusive alternatives, never

More information

Overall ROR: 30,000(0.20) + 70,000(0.14) = 100,000(x) x = 15.8% Prepare a tabulation of cash flow for the alternatives shown below.

Overall ROR: 30,000(0.20) + 70,000(0.14) = 100,000(x) x = 15.8% Prepare a tabulation of cash flow for the alternatives shown below. Chapter 8, Problem 2. What is the overall rate of return on a $100,000 investment that returns 20% on the first $30,000 and 14% on the remaining $70,000? Chapter 8, Solution 2. Overall ROR: 30,000(0.20)

More information

i* = IRR i*? IRR more sign changes Passes: unique i* = IRR

i* = IRR i*? IRR more sign changes Passes: unique i* = IRR Decision Rules Single Alternative Based on Sign Changes of Cash Flow: Simple Investment i* = IRR Accept if i* > MARR Single Project start with zero, one sign change Non-Simple Investment i*? IRR Net Investment

More information

Engineering Economy. Lecture 8 Evaluating a Single Project IRR continued Payback Period. NE 364 Engineering Economy

Engineering Economy. Lecture 8 Evaluating a Single Project IRR continued Payback Period. NE 364 Engineering Economy Engineering Economy Lecture 8 Evaluating a Single Project IRR continued Payback Period Internal Rate of Return (IRR) The internal rate of return (IRR) method is the most widely used rate of return method

More information

IE463 Chapter 4. Objective: COMPARING INVESTMENT AND COST ALTERNATIVES

IE463 Chapter 4. Objective: COMPARING INVESTMENT AND COST ALTERNATIVES IE463 Chapter 4 COMPARING INVESTMENT AND COST ALTERNATIVES Objective: To learn how to properly apply the profitability measures described in Chapter 3 to select the best alternative out of a set of mutually

More information

Comparison and Selection among Alternatives Created By Eng.Maysa Gharaybeh

Comparison and Selection among Alternatives Created By Eng.Maysa Gharaybeh Comparison and Selection among Alternatives Created By Eng.Maysa Gharaybeh Quiz 1, 2, 7, 15,19, 20, 22, 26, 36, 40. The objective of chapter 6 is to evaluate correctly capital investment alternatives when

More information

Chapter 8. Rate of Return Analysis. Principles of Engineering Economic Analysis, 5th edition

Chapter 8. Rate of Return Analysis. Principles of Engineering Economic Analysis, 5th edition Chapter 8 Rate of Return Analysis Systematic Economic Analysis Technique 1. Identify the investment alternatives 2. Define the planning horizon 3. Specify the discount rate 4. Estimate the cash flows 5.

More information

SOLUTIONS TO SELECTED PROBLEMS. Student: You should work the problem completely before referring to the solution. CHAPTER 1

SOLUTIONS TO SELECTED PROBLEMS. Student: You should work the problem completely before referring to the solution. CHAPTER 1 SOLUTIONS TO SELECTED PROBLEMS Student: You should work the problem completely before referring to the solution. CHAPTER 1 Solutions included for problems 1, 4, 7, 10, 13, 16, 19, 22, 25, 28, 31, 34, 37,

More information

COMPARING ALTERNATIVES

COMPARING ALTERNATIVES CHAPTER 6 COMPARING FEASIBLE DESIGN Alternatives may be mutually exclusive (i.e., choice if one excludes the choice of any other alternative) because : The alternatives being considered may require different

More information

1.011Project Evaluation: Comparing Costs & Benefits

1.011Project Evaluation: Comparing Costs & Benefits 1.11Project Evaluation: Comparing Costs & Benefits Carl D. Martland Basic Question: Are the future benefits large enough to justify the costs of the project? Present, Future, and Annual Worth Internal

More information

SOLUTIONS TO SELECTED PROBLEMS. Student: You should work the problem completely before referring to the solution. CHAPTER 17

SOLUTIONS TO SELECTED PROBLEMS. Student: You should work the problem completely before referring to the solution. CHAPTER 17 SOLUTIONS TO SELECTED PROBLEMS Student: You should work the problem completely before referring to the solution. CHAPTER 17 Solutions included for all or part of problems: 4, 6, 9, 12, 15, 18, 21, 24,

More information

Chapter 7 Rate of Return Analysis

Chapter 7 Rate of Return Analysis Chapter 7 Rate of Return Analysis Rate of Return Methods for Finding ROR Internal Rate of Return (IRR) Criterion Incremental Analysis Mutually Exclusive Alternatives Why ROR measure is so popular? This

More information

An Interesting News Item

An Interesting News Item ENGM 401 & 620 X1 Fundamentals of Engineering Finance Fall 2010 Lecture 26: Other Analysis Techniques If you work just for money, you'll never make it, but if you love what you're doing and you always

More information

ECLT 5930/SEEM 5740: Engineering Economics Second Term

ECLT 5930/SEEM 5740: Engineering Economics Second Term ECLT 5930/SEEM 5740: Engineering Economics 2015 16 Second Term Master of Science in ECLT & SEEM Instructors: Dr. Anthony Man Cho So Department of Systems Engineering & Engineering Management The Chinese

More information

What Is a Project? How Do We Justify a Project? 1.011Project Evaluation: Comparing Costs & Benefits Carl D. Martland

What Is a Project? How Do We Justify a Project? 1.011Project Evaluation: Comparing Costs & Benefits Carl D. Martland MIT Civil Engineering 1.11 -- Project Evaluation Spring Term 23 1.11Project Evaluation: Comparing Costs & Benefits Carl D. Martland Basic Question: Are the future benefits large enough to justify the costs

More information

Nominal and Effective Interest Rates

Nominal and Effective Interest Rates Nominal and Effective Interest Rates Effective interest rates tell you how much interest accrues over some integer number of interest periods with the effects of compounding included. Nominal interest

More information

An Introduction to Capital Budgeting Methods

An Introduction to Capital Budgeting Methods An Introduction to Capital Budgeting Methods Econ 466 Spring, 2010 Chapters 9 and 10 Consider the following choice You have an opportunity to invest $20,000 in one of the following capital assets. You

More information

Chapter 13 Breakeven and Payback Analysis

Chapter 13 Breakeven and Payback Analysis Chapter 13 Breakeven and Payback Analysis by Ir Mohd Shihabudin Ismail 13-1 LEARNING OUTCOMES 1. Breakeven point one parameter 2. Breakeven point two alternatives 3. Payback period analysis 13-2 Introduction

More information

There are significant differences in the characteristics of private and public sector alternatives.

There are significant differences in the characteristics of private and public sector alternatives. Public Sector Projects Projects in private sector are owned by corporations, partnerships, and individuals and used by customers. Projects in public sector are owned, used and financed by citizens. Public

More information

Chapter 10 The Basics of Capital Budgeting: Evaluating Cash Flows ANSWERS TO SELECTED END-OF-CHAPTER QUESTIONS

Chapter 10 The Basics of Capital Budgeting: Evaluating Cash Flows ANSWERS TO SELECTED END-OF-CHAPTER QUESTIONS Chapter 10 The Basics of Capital Budgeting: Evaluating Cash Flows ANSWERS TO SELECTED END-OF-CHAPTER QUESTIONS 10-1 a. Capital budgeting is the whole process of analyzing projects and deciding whether

More information

Cost Benefit Analysis (CBA) Economic Analysis (EA)

Cost Benefit Analysis (CBA) Economic Analysis (EA) Cost Benefit Analysis (CBA) Economic Analysis (EA) This is an overview of the preliminary work that should be completed before launching into a full CBA to determine the net economic worth of a proposal

More information

TAX ECONOMIC ANALYSIS 1 Haery Sihombing. Learning Objectives

TAX ECONOMIC ANALYSIS 1 Haery Sihombing. Learning Objectives Ir. /IP Pensyarah Pelawat Fakulti Kejuruteraan Pembuatan Universiti Teknologi Malaysia Melaka 1. Terminology and Rates 2. Before and After-Tax Analysis 6 3. Taxes and Depreciation 4. Depreciation Recapture

More information

Chapter 9, Problem 3.

Chapter 9, Problem 3. Chapter 9, Problem 3. Identify each cash flow as a benefit, disbenefit, or cost. (a) $500,000 annual income from tourism created by a freshwater reservoir (b) $700,000 per year maintenance by container

More information

Benefit Cost Analysis and Public Sector Economics

Benefit Cost Analysis and Public Sector Economics 4 Ir. HaerySihombing MT. Pensyarah Pelawat Fakulti Kejuruteraan Pembuatan Universiti Teknologi Malaysia Melaka Benefit Cost Analysis and Public Sector Economics 1 INTRODUCTION Public Sector Economics Public

More information

Comparing Mutually Exclusive Alternatives

Comparing Mutually Exclusive Alternatives Comparing Mutually Exclusive Alternatives Comparing Mutually Exclusive Projects Mutually Exclusive Projects Alternative vs. Project Do-Nothing Alternative 2 Some Definitions Revenue Projects Projects whose

More information

ENG2000 Chapter 17 Evaluating and Comparing Projects: The IRR. ENG2000: R.I. Hornsey CM_2: 1

ENG2000 Chapter 17 Evaluating and Comparing Projects: The IRR. ENG2000: R.I. Hornsey CM_2: 1 ENG2000 Chapter 17 Evaluating and Comparing Projects: The IRR ENG2000: R.I. Hornsey CM_2: 1 Introduction This chapter introduces a second method for comparing between projects While the result of the process

More information

# 6. Comparing Alternatives

# 6. Comparing Alternatives IE 5441 1 # 6. Comparing Alternatives One of the main purposes of this course is to discuss how to make decisions in engineering economy. Let us first consider a single period case. Suppose that there

More information

Tax Homework. A B C Installed cost $10,000 $15,000 $20,000 Net Uniform annual before 3,000 6,000 10,000

Tax Homework. A B C Installed cost $10,000 $15,000 $20,000 Net Uniform annual before 3,000 6,000 10,000 Tax Homework 1. A firm is considering three mutually exclusive alternatives as part of a production improvement program. Management requires that you must select one. The alternatives are: A B C Installed

More information

Engineering Economics

Engineering Economics Engineering Economics Lecture 7 Er. Sushant Raj Giri B.E. (Industrial Engineering), MBA Lecturer Department of Industrial Engineering Contemporary Engineering Economics 3 rd Edition Chan S Park 1 Chapter

More information

INTERNAL RATE OF RETURN

INTERNAL RATE OF RETURN INTERNAL RATE OF RETURN Introduction You put money in a bank account and expect to get a return 1 percent You can think of investment/business/project in the same way Every investment/business/project

More information

Principles of Managerial Finance Solution Lawrence J. Gitman CHAPTER 10. Risk and Refinements In Capital Budgeting

Principles of Managerial Finance Solution Lawrence J. Gitman CHAPTER 10. Risk and Refinements In Capital Budgeting Principles of Managerial Finance Solution Lawrence J. Gitman CHAPTER 10 Risk and Refinements In Capital Budgeting INSTRUCTOR S RESOURCES Overview Chapters 8 and 9 developed the major decision-making aspects

More information

Chapter 7 Rate of Return Analysis

Chapter 7 Rate of Return Analysis Chapter 7 Rate of Return Analysis 1 Recall the $5,000 debt example in chapter 3. Each of the four plans were used to repay the amount of $5000. At the end of 5 years, the principal and interest payments

More information

Lecture Guide. Sample Pages Follow. for Timothy Gallagher s Financial Management 7e Principles and Practice

Lecture Guide. Sample Pages Follow. for Timothy Gallagher s Financial Management 7e Principles and Practice Lecture Guide for Timothy Gallagher s Financial Management 7e Principles and Practice 707 Slides Written by Tim Gallagher the textbook author Use as flash cards for terminology and concept review Also

More information

Other Analysis Techniques. Future Worth Analysis (FWA) Benefit-Cost Ratio Analysis (BCRA) Payback Period

Other Analysis Techniques. Future Worth Analysis (FWA) Benefit-Cost Ratio Analysis (BCRA) Payback Period Other Analysis Techniques Future Worth Analysis (FWA) Benefit-Cost Ratio Analysis (BCRA) Payback Period 1 Techniques for Cash Flow Analysis Present Worth Analysis Annual Cash Flow Analysis Rate of Return

More information

Chapter 12. b. Cost of Capital Rationing Constraint = NPV of rejected projects = $45 million

Chapter 12. b. Cost of Capital Rationing Constraint = NPV of rejected projects = $45 million Chapter 12 12-1 Project Investment NPV PI A $25 $10 0.40 B $30 $25 0.83 Accept C $40 $20 0.50 Accept D $10 $10 1.00 Accept E $15 $10 0.67 Accept F $60 $20 0.33 G $20 $10 0.50 Accept H $25 $20 0.80 Accept

More information

CAPITAL BUDGETING TECHNIQUES (CHAPTER 9)

CAPITAL BUDGETING TECHNIQUES (CHAPTER 9) CAPITAL BUDGETING TECHNIQUES (CHAPTER 9) Capital budgeting refers to the process used to make decisions concerning investments in the long-term assets of the firm. The general idea is that a firm s capital,

More information

The formula for the net present value is: 1. NPV. 2. NPV = CF 0 + CF 1 (1+ r) n + CF 2 (1+ r) n

The formula for the net present value is: 1. NPV. 2. NPV = CF 0 + CF 1 (1+ r) n + CF 2 (1+ r) n Lecture 6: Capital Budgeting 1 Capital budgeting refers to an investment into a long term asset. It must be noted that all investments have a cost and that investments should always have benefits such

More information

EGR 312 ENGINEERING ECONOMY PRACTICE FINAL EXAM

EGR 312 ENGINEERING ECONOMY PRACTICE FINAL EXAM EGR 312 ENGINEERING ECONOMY PRACTICE FINAL EXAM PART A: MULTIPLE CHOICE. Circle the one best answer for each question (5 points each.) 1. A piece of equipment that was purchased 2 years ago for $45,000

More information

Chapter 7 An Economic Appraisal II: NPV, AE, IRR Technique

Chapter 7 An Economic Appraisal II: NPV, AE, IRR Technique Chapter 7 An Economic Appraisal II: NPV, AE, IRR Technique Powerpoint Templates Page 1 Net Present Value Technique NPV=The Sum of The Present Values of All Cash Inflows The Sum of The Present Value of

More information

IE 343 Midterm Exam 2

IE 343 Midterm Exam 2 IE 343 Midterm Exam 2 Nov 16, 2011 Closed book, closed notes. 50 minutes Write your printed name in the spaces provided above on every page. Show all of your work in the spaces provided. Exam 2 has three

More information

Inflation Homework. 1. Life = 4 years

Inflation Homework. 1. Life = 4 years Inflation Homework 1. Life = 4 years 700 9001100 500 0 1 2 3 4-1500 You are to analyze the cash flow on the left with several assumptions regarding inflation. In all cases the general inflation rate is

More information

Chapter 4. Establishing the Planning Horizon & MARR. Principles of Engineering Economic Analysis, 5th edition

Chapter 4. Establishing the Planning Horizon & MARR. Principles of Engineering Economic Analysis, 5th edition Chapter 4 Establishing the Planning Horizon & MARR Systematic Economic Analysis Technique 1. Identify the investment alternatives 2. Define the planning horizon 3. Specify the discount rate 4. Estimate

More information

Software Economics. Introduction to Business Case Analysis. Session 2

Software Economics. Introduction to Business Case Analysis. Session 2 Software Economics Introduction to Business Case Analysis Session 2 Today Last Session we covered FV, PV and NPV We started with setting up the financials of a Business Case We talked about measurements

More information

Comparing Mutually Exclusive Alternatives

Comparing Mutually Exclusive Alternatives Comparing Mutually Exclusive Alternatives Lecture No. 18 Chapter 5 Contemporary Engineering Economics Copyright 2016 Comparing Mutually Exclusive Projects: Basic Terminologies Mutually Exclusive Projects

More information

MULTIPLE-CHOICE QUESTIONS Circle the correct answer on this test paper and record it on the computer answer sheet.

MULTIPLE-CHOICE QUESTIONS Circle the correct answer on this test paper and record it on the computer answer sheet. M I M E 3 1 0 E N G I N E E R I N G E C O N O M Y Class Test #2 Thursday, 23 March, 2006 90 minutes PRINT your family name / initial and record your student ID number in the spaces provided below. FAMILY

More information

CHAPTER 8 MAKING CAPITAL INVESTMENT DECISIONS

CHAPTER 8 MAKING CAPITAL INVESTMENT DECISIONS CHAPTER 8 MAKING CAPITAL INVESTMENT DECISIONS Answers to Concept Questions 1. In this context, an opportunity cost refers to the value of an asset or other input that will be used in a project. The relevant

More information

Capital Budgeting Decision Methods

Capital Budgeting Decision Methods Capital Budgeting Decision Methods 1 Learning Objectives The capital budgeting process. Calculation of payback, NPV, IRR, and MIRR for proposed projects. Capital rationing. Measurement of risk in capital

More information

IE 343 Midterm Exam. March 7 th Closed book, closed notes.

IE 343 Midterm Exam. March 7 th Closed book, closed notes. IE 343 Midterm Exam March 7 th 2013 Closed book, closed notes. Write your name in the spaces provided above. Write your name on each page as well, so that in the event the pages are separated, we can still

More information

Leland Blank, P. E. Texas A & M University American University of Sharjah, United Arab Emirates

Leland Blank, P. E. Texas A & M University American University of Sharjah, United Arab Emirates Eighth Edition ENGINEERING ECONOMY Leland Blank, P. E. Texas A & M University American University of Sharjah, United Arab Emirates Anthony Tarquin, P. E. University of Texas at El Paso Mc Graw Hill Education

More information

This is How Is Capital Budgeting Used to Make Decisions?, chapter 8 from the book Accounting for Managers (index.html) (v. 1.0).

This is How Is Capital Budgeting Used to Make Decisions?, chapter 8 from the book Accounting for Managers (index.html) (v. 1.0). This is How Is Capital Budgeting Used to Make Decisions?, chapter 8 from the book Accounting for Managers (index.html) (v. 1.0). This book is licensed under a Creative Commons by-nc-sa 3.0 (http://creativecommons.org/licenses/by-nc-sa/

More information

CHAPTER 6 MAKING CAPITAL INVESTMENT DECISIONS

CHAPTER 6 MAKING CAPITAL INVESTMENT DECISIONS CHAPTER 6 MAKING CAPITAL INVESTMENT DECISIONS Answers to Concepts Review and Critical Thinking Questions 1. In this context, an opportunity cost refers to the value of an asset or other input that will

More information

You have the opportunity to invest $10,000 now. Find the IRR if you receive $1,200 per year at the beginning of the year for 10 years.

You have the opportunity to invest $10,000 now. Find the IRR if you receive $1,200 per year at the beginning of the year for 10 years. CE 167 Midterm #1 Fall 2003 Prof. C.W. Ibbs Directions: Put your name on your bluebook. This exam is to be completed in a bluebook answers not recorded in a bluebook will not be graded. Place the exam

More information

The Basics of Capital Budgeting

The Basics of Capital Budgeting Chapter 11 The Basics of Capital Budgeting Should we build this plant? 11 1 What is capital budgeting? Analysis of potential additions to fixed assets. Long term decisions; involve large expenditures.

More information

Dr. Maddah ENMG 400 Engineering Economy 07/06/09. Chapter 5 Present Worth (Value) Analysis

Dr. Maddah ENMG 400 Engineering Economy 07/06/09. Chapter 5 Present Worth (Value) Analysis Dr. Maddah ENMG 400 Engineering Economy 07/06/09 Chapter 5 Present Worth (Value) Analysis Introduction Given a set of feasible alternatives, engineering economy attempts to identify the best (most viable)

More information

MENG 547 Energy Management & Utilization

MENG 547 Energy Management & Utilization MENG 547 Energy Management & Utilization Chapter 4 Economic Decisions for Energy Projects Prof. Dr. Ugur Atikol, cea Director of EMU Energy Research Centre The Need for Economic Analysis The decision on

More information

Lecture 5 Present-Worth Analysis

Lecture 5 Present-Worth Analysis Seg2510 Management Principles for Engineering Managers Lecture 5 Present-Worth Analysis Department of Systems Engineering and Engineering Management The Chinese University of Hong Kong 1 Part I Review

More information

What is it? Measure of from project. The Investment Rule: Accept projects with NPV and accept highest NPV first

What is it? Measure of from project. The Investment Rule: Accept projects with NPV and accept highest NPV first Consider a firm with two projects, A and B, each with the following cash flows and a 10 percent cost of capital: Project A Project B Year Cash Flows Cash Flows 0 -$100 -$150 1 $70 $100 2 $70 $100 What

More information

29/09/2010. Outline Module 4. Selection of Alternatives. Proposals for Investment Alternatives. Module 4: Present Worth Analysis

29/09/2010. Outline Module 4. Selection of Alternatives. Proposals for Investment Alternatives. Module 4: Present Worth Analysis Outline Module 4 Proposals for nvestment Alternatives Selection of Alternatives Future Worth Analysis Capitalized-cost calculation Module 4: Present Worth Analysis S-4251 konomi Teknik 4-2 S-4251 konomi

More information

Capital Budgeting: Decision Criteria

Capital Budgeting: Decision Criteria Consider a firm with two projects, A and B, each with the following cash flows and a 10 percent cost of capital: Project A Project B Year Cash Flows Cash Flows 0 -$100 -$150 1 $70 $100 2 $70 $100 What

More information

Chapter 9. Capital Budgeting Decision Models

Chapter 9. Capital Budgeting Decision Models Chapter 9 Capital Budgeting Decision Models Learning Objectives 1. Explain capital budgeting and differentiate between short-term and long-term budgeting decisions. 2. Explain the payback model and its

More information

CHAPTER 7: ENGINEERING ECONOMICS

CHAPTER 7: ENGINEERING ECONOMICS CHAPTER 7: ENGINEERING ECONOMICS The aim is to think about and understand the power of money on decision making BREAKEVEN ANALYSIS Breakeven point method deals with the effect of alternative rates of operation

More information

Chapter 7. Net Present Value and Other Investment Rules

Chapter 7. Net Present Value and Other Investment Rules Chapter 7 Net Present Value and Other Investment Rules Be able to compute payback and discounted payback and understand their shortcomings Understand accounting rates of return and their shortcomings Be

More information

FE Review Economics and Cash Flow

FE Review Economics and Cash Flow 4/4/16 Compound Interest Variables FE Review Economics and Cash Flow Andrew Pederson P = present single sum of money (single cash flow). F = future single sum of money (single cash flow). A = uniform series

More information

Economic Decision Making Using Fuzzy Numbers Shih-Ming Lee, Kuo-Lung Lin, Sushil Gupta. Florida International University Miami, Florida

Economic Decision Making Using Fuzzy Numbers Shih-Ming Lee, Kuo-Lung Lin, Sushil Gupta. Florida International University Miami, Florida Economic Decision Making Using Fuzzy Numbers Shih-Ming Lee, Kuo-Lung Lin, Sushil Gupta Florida International University Miami, Florida Abstract In engineering economic studies, single values are traditionally

More information

The NPV profile and IRR PITFALLS OF IRR. Years Cash flow Discount rate 10% NPV 472,27 IRR 11,6% NPV

The NPV profile and IRR PITFALLS OF IRR. Years Cash flow Discount rate 10% NPV 472,27 IRR 11,6% NPV PITFALLS OF IRR J.C. Neves, ISEG, 2018 23 The NPV profile and IRR Years 0 1 2 3 4 5 Cash flow -10000 2000 2500 1000 4000 5000 Discount rate 10% NPV 472,27 IRR 11,6% 5 000,00 NPV 4 000,00 3 000,00 2 000,00

More information

January 29. Annuities

January 29. Annuities January 29 Annuities An annuity is a repeating payment, typically of a fixed amount, over a period of time. An annuity is like a loan in reverse; rather than paying a loan company, a bank or investment

More information

The Economics of Innovation Procurement

The Economics of Innovation Procurement The Economics of Innovation Procurement 2nd SEREN3 Training for stakeholders on PCP/PPI in Secure Societies 30th of May 2017, Warsaw, Poland Dr. Anne Rainville Management Consultant, Vtrek Julianaplein

More information

PMBA 8135 Take Home Problem Set 3 Spring 2014

PMBA 8135 Take Home Problem Set 3 Spring 2014 PMBA 8135 Take Home Problem Set 3 Spring 2014 Directions: Determine or compute an answer for each question/problem on this problem set. After you have computed an answer for every question, enter your

More information

Introduction to Numerical Methods (Algorithm)

Introduction to Numerical Methods (Algorithm) Introduction to Numerical Methods (Algorithm) 1 2 Example: Find the internal rate of return (IRR) Consider an investor who pays CF 0 to buy a bond that will pay coupon interest CF 1 after one year and

More information

Project Evaluation. Carl D. Martland Senior Research Associate Dept. of Civil & Environmental Engineering

Project Evaluation. Carl D. Martland Senior Research Associate Dept. of Civil & Environmental Engineering Courtesy of Carl Martland. Used with permission. Project Evaluation Carl D. Martland Senior Research Associate Dept. of Civil & Environmental Engineering Outline Introduction (Lecture 1) Financial assessment

More information

CHAPTER 13 RISK, COST OF CAPITAL, AND CAPITAL BUDGETING

CHAPTER 13 RISK, COST OF CAPITAL, AND CAPITAL BUDGETING CHAPTER 13 RISK, COST OF CAPITAL, AND CAPITAL BUDGETING Answers to Concepts Review and Critical Thinking Questions 1. No. The cost of capital depends on the risk of the project, not the source of the money.

More information

Capital Budgeting, Part I

Capital Budgeting, Part I Capital Budgeting, Part I Lakehead University Fall 2004 Capital Budgeting Techniques 1. Net Present Value 2. The Payback Rule 3. The Average Accounting Return 4. The Internal Rate of Return 5. The Profitability

More information

Capital Budgeting, Part I

Capital Budgeting, Part I Capital Budgeting, Part I Lakehead University Fall 2004 Capital Budgeting Techniques 1. Net Present Value 2. The Payback Rule 3. The Average Accounting Return 4. The Internal Rate of Return 5. The Profitability

More information

Selection from Independent Projects Under Budget Limitation

Selection from Independent Projects Under Budget Limitation Basics In previous weeks, the alternatives have been mutually exclusive; only one could be selected. If the projects are not mutually exclusive; they are called independent projects. We learned the criteria

More information

University 18 Lessons Financial Management. Unit 2: Capital Budgeting Decisions

University 18 Lessons Financial Management. Unit 2: Capital Budgeting Decisions University 18 Lessons Financial Management Unit 2: Capital Budgeting Decisions Nature of Investment Decisions The investment decisions of a firm are generally known as the capital budgeting, or capital

More information

WHAT IS CAPITAL BUDGETING?

WHAT IS CAPITAL BUDGETING? WHAT IS CAPITAL BUDGETING? Capital budgeting is a required managerial tool. One duty of a financial manager is to choose investments with satisfactory cash flows and rates of return. Therefore, a financial

More information

Investment Decision Criteria. Principles Applied in This Chapter. Disney s Capital Budgeting Decision

Investment Decision Criteria. Principles Applied in This Chapter. Disney s Capital Budgeting Decision Investment Decision Criteria Chapter 11 1 Principles Applied in This Chapter Principle 1: Money Has a Time Value. Principle 2: There is a Risk-Return Tradeoff. Principle 3: Cash Flows Are the Source of

More information

Rules for Standard Offer Service Auction

Rules for Standard Offer Service Auction Charles River Associates and Market Design Inc August 11, 1997 Rules for Standard Offer Service Auction This document presents the rules for Eastern Utilities Associates auction for standard offer service.

More information

Chapter 7: Investment Decision Rules

Chapter 7: Investment Decision Rules Chapter 7: Investment Decision Rules -1 Chapter 7: Investment Decision Rules Note: Read the chapter then look at the following. Fundamental question: What criteria should firms use when deciding which

More information

Capital Budgeting Decisions

Capital Budgeting Decisions May 1-4, 2014 Capital Budgeting Decisions Today s Agenda n Capital Budgeting n Time Value of Money n Decision Making Example n Simple Return and Payback Methods Typical Capital Budgeting Decisions n Capital

More information

(Refer Slide Time: 2:56)

(Refer Slide Time: 2:56) Depreciation, Alternate Investment and Profitability Analysis. Professor Dr. Bikash Mohanty. Department of Chemical Engineering. Indian Institute of Technology, Roorkee. Lecture-5. Depreciation Sum of

More information

IE2140 Engineering Economy Tutorial 3 (Lab 1) Using Excel Financial Functions for Project Evaluation

IE2140 Engineering Economy Tutorial 3 (Lab 1) Using Excel Financial Functions for Project Evaluation IE2140 Engineering Economy Tutorial 3 (Lab 1) Using Excel Financial Functions for Project Evaluation 1. Objectives and Overview Solutions Guide by Hong Lanqing, Wang Xin and Mei Wenjie The objective of

More information

Transportation Economics and Decision Making. L e c t u r e - 3

Transportation Economics and Decision Making. L e c t u r e - 3 Transportation Economics and Decision Making L e c t u r e - 3 Arithmetic Gradient Series Amount increases by G each period A+2G A+(n-1)G A+3G A A+G This is equivalent to Arithmetic Gradient Series A A

More information

School of Engineering University of Guelph. ENGG*3240 Engineering Economics Course Description & Outline - Fall 2008

School of Engineering University of Guelph. ENGG*3240 Engineering Economics Course Description & Outline - Fall 2008 School of Engineering University of Guelph ENGG*3240 Engineering Economics Course Description & Outline - Fall 2008 CALENDAR DESCRIPTION Principle of project evaluation, analysis of capital and operating

More information

ENG2000 Chapter 16 Evaluating and Comparing Projects: The MARR. ENG2000: R.I. Hornsey CM: 1

ENG2000 Chapter 16 Evaluating and Comparing Projects: The MARR. ENG2000: R.I. Hornsey CM: 1 ENG2000 Chapter 16 Evaluating and Comparing Projects: The MARR ENG2000: R.I. Hornsey CM: 1 Overview So, we have seen that the act of investing is to sacrifice something of present value in the expectation

More information

Copyright Disclaimer under Section 107 of the Copyright Act 1976, allowance is made for "fair use" for purposes such as criticism, comment, news

Copyright Disclaimer under Section 107 of the Copyright Act 1976, allowance is made for fair use for purposes such as criticism, comment, news Copyright Disclaimer under Section 107 of the Copyright Act 1976, allowance is made for "fair use" for purposes such as criticism, comment, news reporting, teaching, scholarship, and research. Fair use

More information

Finance 303 Financial Management Review Notes for Final. Chapters 11&12

Finance 303 Financial Management Review Notes for Final. Chapters 11&12 Finance 303 Financial Management Review Notes for Final Chapters 11&12 Capital budgeting Project classifications Capital budgeting techniques (5 approaches, concepts and calculations) Cash flow estimation

More information

Software Economics. Introduction to Business Case Analysis. Session 2

Software Economics. Introduction to Business Case Analysis. Session 2 Software Economics Introduction to Business Case Analysis Session 2 Today Last Session we covered FV, PV and NPV We started with setting up the financials of a Business Case We talked about measurements

More information

Capital Budgeting Process and Techniques 93. Chapter 7: Capital Budgeting Process and Techniques

Capital Budgeting Process and Techniques 93. Chapter 7: Capital Budgeting Process and Techniques Capital Budgeting Process and Techniques 93 Answers to questions Chapter 7: Capital Budgeting Process and Techniques 7-. a. Type I error means rejecting a good project. Payback could lead to Type errors

More information

KING FAHAD UNIVERSITY OF PETROLEUM & MINERALS COLLEGE OF ENVIROMENTAL DESGIN CONSTRUCTION ENGINEERING & MANAGEMENT DEPARTMENT

KING FAHAD UNIVERSITY OF PETROLEUM & MINERALS COLLEGE OF ENVIROMENTAL DESGIN CONSTRUCTION ENGINEERING & MANAGEMENT DEPARTMENT KING FAHAD UNIVERSITY OF PETROLEUM & MINERALS COLLEGE OF ENVIROMENTAL DESGIN CONSTRUCTION ENGINEERING & MANAGEMENT DEPARTMENT Report on: Associated Problems with Life Cycle Costing As partial fulfillment

More information

MBF1223 Financial Management Prepared by Dr Khairul Anuar

MBF1223 Financial Management Prepared by Dr Khairul Anuar MBF1223 Financial Management Prepared by Dr Khairul Anuar L7 - Capital Budgeting Decision Models www.mba638.wordpress.com Learning Objectives 1. Explain capital budgeting and differentiate between short-term

More information

INVESTMENT CRITERIA. Net Present Value (NPV)

INVESTMENT CRITERIA. Net Present Value (NPV) 227 INVESTMENT CRITERIA Net Present Value (NPV) 228 What: NPV is a measure of how much value is created or added today by undertaking an investment (the difference between the investment s market value

More information

LO 1: Cash Flow. Cash Payback Technique. Equal Annual Cash Flows: Cost of Capital Investment / Net Annual Cash Flow = Cash Payback Period

LO 1: Cash Flow. Cash Payback Technique. Equal Annual Cash Flows: Cost of Capital Investment / Net Annual Cash Flow = Cash Payback Period Cash payback technique LO 1: Cash Flow Capital budgeting: The process of planning significant investments in projects that have long lives and affect more than one future period, such as the purchase of

More information

Chapter 7: Investment Decision Rules

Chapter 7: Investment Decision Rules Chapter 7: Investment Decision Rules-1 Chapter 7: Investment Decision Rules I. Introduction and Review of NPV A. Introduction Q: How decide which long-term investment opportunities to undertake? Key =>

More information

Bidding Decision Example

Bidding Decision Example Bidding Decision Example SUPERTREE EXAMPLE In this chapter, we demonstrate Supertree using the simple bidding problem portrayed by the decision tree in Figure 5.1. The situation: Your company is bidding

More information

Investment Decision Criteria. Principles Applied in This Chapter. Learning Objectives

Investment Decision Criteria. Principles Applied in This Chapter. Learning Objectives Investment Decision Criteria Chapter 11 1 Principles Applied in This Chapter Principle 1: Money Has a Time Value. Principle 2: There is a Risk-Return Tradeoff. Principle 3: Cash Flows Are the Source of

More information

J ohn D. S towe, CFA. CFA Institute Charlottesville, Virginia. J acques R. G agn é, CFA

J ohn D. S towe, CFA. CFA Institute Charlottesville, Virginia. J acques R. G agn é, CFA CHAPTER 2 CAPITAL BUDGETING J ohn D. S towe, CFA CFA Institute Charlottesville, Virginia J acques R. G agn é, CFA La Société de l assurance automobile du Québec Quebec City, Canada LEARNING OUTCOMES After

More information

Carefully read all directions given in a problem. Please show all work for all problems, and clearly label all formulas.

Carefully read all directions given in a problem. Please show all work for all problems, and clearly label all formulas. Carefully read all directions given in a problem. Please show all work for all problems, and clearly label all formulas. 1. You have been asked to make a decision regarding two alternatives. To make your

More information

AFM 271 Practice Problem Set #2 Spring 2005 Suggested Solutions

AFM 271 Practice Problem Set #2 Spring 2005 Suggested Solutions AFM 271 Practice Problem Set #2 Spring 2005 Suggested Solutions 1. Text Problems: 6.2 (a) Consider the following table: time cash flow cumulative cash flow 0 -$1,000,000 -$1,000,000 1 $150,000 -$850,000

More information

Study Session 11 Corporate Finance

Study Session 11 Corporate Finance Study Session 11 Corporate Finance ANALYSTNOTES.COM 1 A. An Overview of Financial Management a. Agency problem. An agency relationship arises when: The principal hires an agent to perform some services.

More information