1 Comparing Mutually Exclusive Alternatives Comparing Mutually Exclusive Projects Mutually Exclusive Projects Alternative vs. Project Do-Nothing Alternative 2 Some Definitions Revenue Projects Projects whose revenues depend on the choice of alternatives Service Projects Projects whose revenues do not depend on the choice of alternative Analysis Period The time span over which the economic effects of an investment will be evaluated (study period or planning horizon). 3 Presented by: Dr. Magdy Akladios 1
2 Two situations: 1. Useful lives are the same for all alternatives and equal to the study period 2. Useful lives are different among the alternatives and at least one does not match the study period 4 Comparing Mutually Exclusive Projects Principle: Projects must be compared over an equal time span. Rule of Thumb: If the required service period is given, the analysis period should be the same as the required service period. 5 First, comparing alternatives w/useful lives = study period Chapter 5 - Part II Presented by: Dr. Magdy Akladios 2
3 Comparing MEAs Beginning Planning Horizon End Project A Project B 7 Case 1: Analysis Period Equals Project Lives Compute the PW for each project over its life 0 $450 $ $500 $1,400 0 $2,075 $2, $1,000 A PW (10%) = $283 A PW (10%) = $579 B $4,000 Select B B 8 Example Alternatives A and B are 2 mutually exclusive projects as shown below: A B Capital investment: $60,000 $73,000 Annual Revenues: $22,000 $26,225 Project life = 4 years MARR = 10% Which project should you invest in? 11 Presented by: Dr. Magdy Akladios 3
4 Solution PW(10%) A = -$60,000 + $22,000(P/A, 10%, N=4) = $9,738 PW(10%) B = -$73,000 + $26,225(P/A, 10%, N=4) = $10,131 Select alternative B since PW B > PW A Can also solve for the difference between the 2 alternatives, PW B-A (Alt B Alt A) = $ Example of a Cost Alternative Alternatives C and D are 2 mutually exclusive cost alternatives as shown below: EOY C D 0 -$380,000 -$415, $38,100 -$27, $39,100 -$27, $40,100 -$27,400 Salvage value $0 $26,000 MARR = 10% Which cost alternative should you adopt? 13 Solution: PW(10%) C = -$380,000 - $38,100(P/F, 10%, N=1) - $39,100(P/F, 10%, N=2) - $40,100(P/F, 10%, N=3) = -$477,077 PW(10%) D = -$415,000 - $27,400(P/A, 10%, N=3) + $26,000(P/F, 10%, N=3) = -$463,607 Select alternative D since PW D > PW C Can also solve for the difference. 14 Presented by: Dr. Magdy Akladios 4
5 Example Alternatives A, B, and C are 3 mutually exclusive projects as shown below: A B C Capital investment: $390,000 $920,000 $660,000 Annual Revenues: $69,000 $167,000 $133,500 Project life = 10 years MARR = 10% Which project should you invest in? 15 Solution (PW method) PW(10%) A = -$390,000 + $69,000(P/A, 10%, N=10) = $33,977 PW(10%) B = -$920,000 + $167,000(P/A, 10%, N=10) = $106,148 PW(10%) C = -$660,000 + $133,500(P/A, 10%, N=10) = $160,304 Therefore, we select alternative C w/the highest PW. 16 Solution (FW method) FW(10%) A = -$390,000(F/P, 10%, N=10) + $69,000(F/A, 10%, N=10) = $88,138 FW(10%) B = -$920,000(F/P, 10%, N=10) + $167,000(F/A, 10%, N=10) = $275,342 FW(10%) C = -$660,000(F/P, 10%, N=10) + $133,500(F/A, 10%, N=10) = $415,801 Therefore, we select alternative C w/the highest FW. 17 Presented by: Dr. Magdy Akladios 5
6 Can also solve using the Incremental Method Sort the projects in ascending order of initial investment A C B Capital investment: $390,000 $660,000 $920,000 Annual Revenues: $69,000 $133,500 $167, Start your Iterations A C (C-A) Capital investment: $390,000 $660,000 $270,000 Annual Revenues: $69,000 $133,500 $64,500 PW(10%) (C-A) = -$270,000 + $64,500(P/A, 10%, N=10) PW(10%) (C-A) = a positive amount, therefore, C is higher than A, then you should drop A, keep C, etc. 19 Second, useful lives are different among the alternatives Presented by: Dr. Magdy Akladios 6
7 Comparing MEAs Beginning End Planning Horizon Project A Project B 21 Case 2: Analysis Period Shorter than Project Lives Estimate the Salvage value at the end of the required service period. Compute the PW for each project over the required service period 22 Useful Life(s) > Study Period Truncate the alternative at the end of the study period using an estimated market value. This method assumes disposable assets will be sold at the end of the study period at that value 24 Presented by: Dr. Magdy Akladios 7
8 IMPUTED MARKET VALUE TECHNIQUE When current marketplace data is unavailable for an asset, it is sometimes necessary to estimate the market value of an asset Referred to as an imputed or implied market value Estimating is based on logical assumptions about the remaining life for the asset: MV T = [PW at the end of year T of remaining capital recovery amounts] + [PW at EOY T of original market value (salvage) at the end of useful life] T < useful life PW is Present worth at i = MARR 25 Example Your firm is purchasing a pump ($47,600). The pump has a useful life of 9 years. Salvage value = $5,000. Use the imputed market value technique to estimate the market value of this pump at the end of year 5. MARR = 20% 26 MV 5 = PW at EOY 5 of remaining CR amounts + PW at EOY 5 of salvage value at EOY 9 MV 5 = $? F 9 = $5, P 0 = $47, Presented by: Dr. Magdy Akladios 8
9 Solution (Part I) PW at the end of year 5 of remaining CR amounts: PW(20%) CR = [$47,600 (A/P, 20%, 9) - $5,000 (A/F, 20%, 9)] X (P/A, 20%, 4) PW(20%) CR = $29,949 MV 5 = $? F 9 = $5, P 0 = $47, Solution (Part II) PW at the end of year 5 of original market value at the end of useful life: PW(20%) Salvage = $5,000 (P/F, 20%, 4) PW(20%) Salvage = $2,412 MV 5 = $? F 9 = $5, P 0 = $47, Final Solution MV 5 = PW CR + PW Salvage MV 5 = $29,949 + $2,412 MV 5 = $32, Presented by: Dr. Magdy Akladios 9
10 Example: Investment: $10 K $15 K Annuity: $3 K $5 K Salvage $4 K $7 K Project life 7 yrs 9 yrs Study period = 5 years, MARR = 10% Which project should you invest in? A B 31 Solution: CR A = I (A/P, i, 7) - S (A/F, i, 7) CR A = 10k ( ) - 4k (0.1054) = $1, CR B = I (A/P, i, 9) - S (A/F, i, 9) CR B = 15K ( ) - 7k (0.0736) = $2, MV A = CR (P/A, i, 2) + S (P/F, i, 2) MV A = 1, (1.7355) + 4K (0.8264) = $6, MV B = CR (P/A, i, 4) + S (P/F, i, 4) MV B = 2, (3.1699) + 7K ( = $11, NPW A = -10K + 3K (P/A, i, 5) + 6, (P/F, i, 5) = $5, NPW B = -15K + 5K (P/A, i, 5) + 11,402.29(P/F,i, 5) = $11, Therefore, select B 32 Analysis Period Longer than Project Lives Presented by: Dr. Magdy Akladios 10
11 Case 3: Analysis Period Longer than Project Lives Come up with replacement projects that match or exceed the required service period. Compute the PW for each project over the required service period. 34 Useful Life(s) < Study Period a. Cost alternatives -- each cost alternative must provide same level of service as study period: 1) contract for service or lease equipment for remaining time; 2) repeat part of useful life of original alternative until study period ends b. investment alternatives -- assume all cash flows reinvested in other opportunities at MARR to end of study period 35 Example Use the co-terminated assumption to select one of the following MEA s: A B I -$3,500 -$5,000 Annual Rev. 1,255 1,480 Useful Lives 4 yrs 6 yrs Salvage values = $0 MARR = 10%/year Planning Horizon = 6 years 36 Presented by: Dr. Magdy Akladios 11
12 Solution: FW A for the useful life of the project (Yr 4): FW A:Useful = -$3,500 (F/P, 10%, 4) + $1,255 (F/A, 10%, 4) FW A:Useful = -$3,500 (1.4641) + $1,255 (4.641) FW A:Useful = $700 Then, reinvest this cash flow at the MARR for the remainder of the study period (2 yrs till Yr 6): FW A = FW A:Useful (F/P, 10%, 2) FW A = $700 (1.21) FW A = $847 FW A:Useful FW A Solution: FW B for the useful life of the project (Yr 6): FW B = -$5,000 (F/P, 10%, 6) + $1,480 (F/A, 10%, 6) FW B = -$5,000 (1.7716)+ $1,480 (7.7156) FW B1 = $2,561 FW B Comparison for Service Projects When the Required Service Period is Longer than the Individual Project Life PW(15%) $34,359 Model A PW(15%) $31,031 Model B. 39 Presented by: Dr. Magdy Akladios 12
13 Example: Analysis Period Coincides with Longest Project Life Revenue Projects PW(15%) $2,208,470 Drill PW(15%) $2,180,210 Lease 40 Case 4: Analysis Period Is Not Specified Come up with replacement projects that serve out the least common multiple period. Compute the PW for each project over the required service period. 41 REPEATABILITY ASSUMPTION The study period: Is either indefinitely long, or, Equal to a common multiple of the lives of the alternatives. The economic consequences that are estimated to happen in an alternative s initial useful life span will be repeated in all succeeding life spans 42 Presented by: Dr. Magdy Akladios 13
14 Example: Analysis Period is Not Specified: Lowest Common Multiple Method PW(15%) Model A $53,657 PW(15%) Model B $48, Example Use the repeatability assumption to select one of the following MEA s: A B I -$3,500 -$5,000 Annual Rev. 1,255 1,480 Useful Lives 4 yrs 6 yrs Salvage values = $0 MARR = 10%/year 44 Solution The least common multiple of the useful lives = 12 yrs Therefore, repeat A three times, repeat B twice. To solve this problem, find the PW of each alternative, then repeat it as many times as necessary. 45 Presented by: Dr. Magdy Akladios 14
15 Solution: PW A1 for the first term: PW A1 = -$3,500 + $1,255 (P/A, 10%, 4) PW A1 = -$3,500 + $1,255 (3.1699) PW A1 = $ Then, repeat PW A 3 times: PW A = PW A1 + PW A2 (P/F, 10%, 4) + PW A3 (P/F, 10%, 8) PW A = $ $ (P/F, 10%, 4) + $ (P/F, 10%, 8) PW A = $ $ (0.6833) + $ (0.4665) = $1,028 PW A1 PW A2 PW A Solution: PW B1 for the first term: PW B1 = -$5,000 + $1,480 (P/A, 10%, 6) PW B1 = -$5,000 + $1,480 (4.3553) PW B1 = $1, Then, repeat PW B 2 times: PW B = PW B1 + PW B2 (P/F, 10%, 6) PW B = $1, $1, (P/F, 10%, 6) PW B = $1, $1, (0.5645) = $2,262 PW B1 PW B An alternative Solution: Use the AW method to solve the previous problem AW A = PW A (A/P, 10%, 12) AW A = $1,028 (0.1468) = $ Or, by calculation: AW A1 for the first term: AW A1 = -$3,500 (A/P, 10%, 4) + $1,255 AW A1 = -$3,500 (0.3155) + $1,255 AW A1 = $ Then, repeat AW A 3 times: AW A =AW A1 = AW A2 = AW A3 = $ Presented by: Dr. Magdy Akladios 15
16 An alternative Solution: Use the AW method to solve the previous problem AW B = PW B (A/P, 10%, 12) AW B = $2,262 (0.1468) = $ Or, by calculation: AW B1 for the first term: AW B1 = -$5,000 (A/P, 10%, 6) + $1,480 AW B1 = -$5,000 (0.2296) + $1,480 AW A1 = $332 Then, repeat AW B 3 times: AW B =AW B1 = AW B2 = $ Summary Present worth is an equivalence method of analysis in which a project s cash flows are discounted to a lump sum amount at present time. MARR is the interest rate at which a firm can always earn or borrow money. MARR is generally dictated by management and is the rate at which NPW analysis should be conducted. Two measures of investment, the Net Future Worth and the capitalized Equivalent Worth, are variations to the NPW criterion. The term mutually exclusive means that, when one of several alternatives that meet the same need is selected, the others will be rejected. 50 Continue Summary Revenue projects are those for which the income generated depends on the choice of project. Service projects are those for which income remains the same, regardless of which project is selected. The analysis period (study period) is the time span over which the economic effects of an investment will be evaluated. The required service period is the time span over which the service of an equipment (or investment) will be needed. The analysis period should be chosen to cover the required service period. When not specified by management or company policy, the analysis period to use in a comparison of mutually exclusive projects may be chosen by an individual analyst. 51 Presented by: Dr. Magdy Akladios 16
IE463 Chapter 4. Objective: COMPARING INVESTMENT AND COST ALTERNATIVES
IE463 Chapter 4 COMPARING INVESTMENT AND COST ALTERNATIVES Objective: To learn how to properly apply the profitability measures described in Chapter 3 to select the best alternative out of a set of mutually
More informationComparing Mutually Exclusive Alternatives
Comparing Mutually Exclusive Alternatives Lecture No. 18 Chapter 5 Contemporary Engineering Economics Copyright 2016 Comparing Mutually Exclusive Projects: Basic Terminologies Mutually Exclusive Projects
More informationCOMPARING ALTERNATIVES
CHAPTER 6 COMPARING FEASIBLE DESIGN Alternatives may be mutually exclusive (i.e., choice if one excludes the choice of any other alternative) because : The alternatives being considered may require different
More informationComparison and Selection among Alternatives Created By Eng.Maysa Gharaybeh
Comparison and Selection among Alternatives Created By Eng.Maysa Gharaybeh Quiz 1, 2, 7, 15,19, 20, 22, 26, 36, 40. The objective of chapter 6 is to evaluate correctly capital investment alternatives when
More information# 6. Comparing Alternatives
IE 5441 1 # 6. Comparing Alternatives One of the main purposes of this course is to discuss how to make decisions in engineering economy. Let us first consider a single period case. Suppose that there
More informationIE 343 Section 1 Engineering Economy Exam 2 Review Problems Solutions Instructor: Tian Ni March 30, 2012
IE 343 Section 1 Engineering Economy Exam 2 Review Problems Solutions Instructor: Tian Ni March 30, 2012 1. A firm is considering investing in a machine that has an initial cost of $36,000. For a period
More informationINTERNAL RATE OF RETURN
INTERNAL RATE OF RETURN Introduction You put money in a bank account and expect to get a return 1 percent You can think of investment/business/project in the same way Every investment/business/project
More informationIE463 Chapter 3. Objective: INVESTMENT APPRAISAL (Applications of Money-Time Relationships)
IE463 Chapter 3 IVESTMET APPRAISAL (Applications of Money-Time Relationships) Objective: To evaluate the economic profitability and liquidity of a single proposed investment project. CHAPTER 4 2 1 Equivalent
More informationi* = IRR i*? IRR more sign changes Passes: unique i* = IRR
Decision Rules Single Alternative Based on Sign Changes of Cash Flow: Simple Investment i* = IRR Accept if i* > MARR Single Project start with zero, one sign change Non-Simple Investment i*? IRR Net Investment
More informationChapter 5 Present Worth Analysis
Chapter 5 Present Worth Analysis 1. Net Present Worth (NPW) Analysis NPW is a comparison of alternatives by determining at year 0 (i.e., the present time). At least one of the following three situations
More informationECONOMIC ANALYSIS AND LIFE CYCLE COSTING SECTION I
ECONOMIC ANALYSIS AND LIFE CYCLE COSTING SECTION I ECONOMIC ANALYSIS AND LIFE CYCLE COSTING Engineering Economy and Economics 1. Several questions on basic economics. 2. Several problems on simple engineering
More informationSTRAIGHT-LINE (SL) METHOD
STRAIGHT-LINE (SL) METHOD A constant amount is depreciated each year over the asset's life. N = depreciable life of the asset in years. d k = annual depreciation deduction in year k d k = (B - SV N ) /
More informationCHAPTER 7: ENGINEERING ECONOMICS
CHAPTER 7: ENGINEERING ECONOMICS The aim is to think about and understand the power of money on decision making BREAKEVEN ANALYSIS Breakeven point method deals with the effect of alternative rates of operation
More informationSelection from Independent Projects Under Budget Limitation
Basics In previous weeks, the alternatives have been mutually exclusive; only one could be selected. If the projects are not mutually exclusive; they are called independent projects. We learned the criteria
More informationIE 343 Midterm Exam 2
IE 343 Midterm Exam 2 April 6, 2012 Version A Closed book, closed notes. 50 minutes Write your printed name in the spaces provided above on every page. Show all of your work in the spaces provided. Interest
More informationME 353 ENGINEERING ECONOMICS
ME 353 ENGINEERING ECONOMICS Final Exam Sample Scoring gives priority to the correct formulas. Numerical answers without the correct formulas for justification receive no credit. Decisions without numerical
More informationOther Analysis Techniques. Future Worth Analysis (FWA) Benefit-Cost Ratio Analysis (BCRA) Payback Period
Other Analysis Techniques Future Worth Analysis (FWA) Benefit-Cost Ratio Analysis (BCRA) Payback Period 1 Techniques for Cash Flow Analysis Present Worth Analysis Annual Cash Flow Analysis Rate of Return
More informationIE463 Chapter 5. Depreciation. Depreciable Property. Basic Terminology STRAIGHT-LINE (SL) METHOD DEPRECIATION AND INCOME TAXES
Depreciation IE463 Chapter 5 DEPRECIATION AND INCOME TAXES Depreciation is the decrease in the value of physical properties with passage of time Because, depreciation is a non-cash cost that affects income
More informationIntroduction to Engineering Economic Analysis DR. AHMED ELYAMANY
Introduction to Engineering Economic Analysis DR. AHMED ELYAMANY Topics ointroduction to engineering economic analysis otime value of money othe principle of interest, osimple interest rates ocompounding
More informationIE 343 Midterm Exam 2
IE 343 Midterm Exam 2 Nov 16, 2011 Closed book, closed notes. 50 minutes Write your printed name in the spaces provided above on every page. Show all of your work in the spaces provided. Exam 2 has three
More informationChapter 8. Rate of Return Analysis. Principles of Engineering Economic Analysis, 5th edition
Chapter 8 Rate of Return Analysis Systematic Economic Analysis Technique 1. Identify the investment alternatives 2. Define the planning horizon 3. Specify the discount rate 4. Estimate the cash flows 5.
More informationIE463 Chapter 5 DEPRECIATION AND INCOME TAXES
IE6 Chapter 5 DEPRECIATION AND INCOME TAXES Depreciation Depreciation is the decrease in the value of physical properties with passage of time Because, depreciation is a non-cash cost that affects income
More informationTax Homework. A B C Installed cost $10,000 $15,000 $20,000 Net Uniform annual before 3,000 6,000 10,000
Tax Homework 1. A firm is considering three mutually exclusive alternatives as part of a production improvement program. Management requires that you must select one. The alternatives are: A B C Installed
More informationChapter 4. Establishing the Planning Horizon & MARR. Principles of Engineering Economic Analysis, 5th edition
Chapter 4 Establishing the Planning Horizon & MARR Systematic Economic Analysis Technique 1. Identify the investment alternatives 2. Define the planning horizon 3. Specify the discount rate 4. Estimate
More informationSOLUTIONS TO SELECTED PROBLEMS. Student: You should work the problem completely before referring to the solution. CHAPTER 1
SOLUTIONS TO SELECTED PROBLEMS Student: You should work the problem completely before referring to the solution. CHAPTER 1 Solutions included for problems 1, 4, 7, 10, 13, 16, 19, 22, 25, 28, 31, 34, 37,
More information29/09/2010. Outline Module 4. Selection of Alternatives. Proposals for Investment Alternatives. Module 4: Present Worth Analysis
Outline Module 4 Proposals for nvestment Alternatives Selection of Alternatives Future Worth Analysis Capitalized-cost calculation Module 4: Present Worth Analysis S-4251 konomi Teknik 4-2 S-4251 konomi
More informationChapter 7 Rate of Return Analysis
Chapter 7 Rate of Return Analysis 1 Recall the $5,000 debt example in chapter 3. Each of the four plans were used to repay the amount of $5000. At the end of 5 years, the principal and interest payments
More informationPresent Worth Analysis
Present Worth Analysis Net Present Worth of initial and future cash flows can be used to select among alternative projects It is important to understand what Net Present Worth means, especially when the
More informationIE 343 Midterm Exam. March 7 th Closed book, closed notes.
IE 343 Midterm Exam March 7 th 2013 Closed book, closed notes. Write your name in the spaces provided above. Write your name on each page as well, so that in the event the pages are separated, we can still
More informationInflation Homework. 1. Life = 4 years
Inflation Homework 1. Life = 4 years 700 9001100 500 0 1 2 3 4-1500 You are to analyze the cash flow on the left with several assumptions regarding inflation. In all cases the general inflation rate is
More informationLecture 5 Effects of Inflation
Lecture 5 Effects of Inflation Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin 14-1 LEARNING OUTCOMES 1. Understand inflation 2. Calculate PW of cash flows with
More informationECLT 5930/SEEM 5740: Engineering Economics Second Term
ECLT 5930/SEEM 5740: Engineering Economics 2015 16 Second Term Master of Science in ECLT & SEEM Instructors: Dr. Anthony Man Cho So Department of Systems Engineering & Engineering Management The Chinese
More informationDepartment of Humanities. Sub: Engineering Economics and Costing (BHU1302) (4-0-0) Syllabus
Department of Humanities Sub: Engineering Economics and Costing (BHU1302) (4-0-0) Syllabus Module I (10 Hours) Time value of money : Simple and compound interest, Time value equivalence, Compound interest
More informationDr. Maddah ENMG 400 Engineering Economy 07/06/09. Chapter 5 Present Worth (Value) Analysis
Dr. Maddah ENMG 400 Engineering Economy 07/06/09 Chapter 5 Present Worth (Value) Analysis Introduction Given a set of feasible alternatives, engineering economy attempts to identify the best (most viable)
More informationChapter 9, Problem 3.
Chapter 9, Problem 3. Identify each cash flow as a benefit, disbenefit, or cost. (a) $500,000 annual income from tourism created by a freshwater reservoir (b) $700,000 per year maintenance by container
More informationDiscounted Cash Flow Analysis
Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright 2016 Net Present Worth Measure Principle: Compute the equivalent net surplus at n = 0 for a given interest
More informationChapter 15 Inflation
Chapter 15 Inflation 15-1 The first sewage treatment plant for Athens, Georgia cost about $2 million in 1964. The utilized capacity of the plant was 5 million gallons/day (mgd). Using the commonly accepted
More informationNominal and Effective Interest Rates
Nominal and Effective Interest Rates Effective interest rates tell you how much interest accrues over some integer number of interest periods with the effects of compounding included. Nominal interest
More informationChapter 6 Rate of Return Analysis: Multiple Alternatives 6-1
Chapter 6 Rate of Return Analysis: Multiple Alternatives 6-1 LEARNING OBJECTIVES Work with mutually exclusive alternatives based upon ROR analysis 1. Why Incremental Analysis? 2. Incremental Cash Flows
More informationTechniques for Cash Flow Analysis
Techniques for Cash Flow Analysis Present Worth Analysis Chapter 5 Annual Cash Flow Analysis Chapter 6 Rate of Return Analysis Chapter 7 Incremental Analysis Other Techniques: Future Worth Analysis Benefit-Cost
More informationOverall ROR: 30,000(0.20) + 70,000(0.14) = 100,000(x) x = 15.8% Prepare a tabulation of cash flow for the alternatives shown below.
Chapter 8, Problem 2. What is the overall rate of return on a $100,000 investment that returns 20% on the first $30,000 and 14% on the remaining $70,000? Chapter 8, Solution 2. Overall ROR: 30,000(0.20)
More informationMultiple Choice: 5 points each
Carefully read each problem before answering. Please write clearly, and show and label all factors used in any problem requiring mathematical calculations. SHOW ALL WORK. Multiple Choice: 5 points each
More informationME 353 ENGINEERING ECONOMICS Sample Second Midterm Exam
ME 353 ENGINEERING ECONOMICS Sample Second Midterm Exam Scoring gives priority to the correct formulation. Numerical answers without the correct formulas for justification receive no credit. Decisions
More informationEngineering Economics
Economic Analysis Methods Engineering Economics Day 3: Rate of Return Analysis Three commonly used economic analysis methods are 1. Present Worth Analysis 2. Annual Worth Analysis 3. www.engr.sjsu.edu/bjfurman/courses/me195/presentations/engeconpatel3nov4.ppt
More informationThere are significant differences in the characteristics of private and public sector alternatives.
Public Sector Projects Projects in private sector are owned by corporations, partnerships, and individuals and used by customers. Projects in public sector are owned, used and financed by citizens. Public
More information7 - Engineering Economic Analysis
Construction Project Management (CE 110401346) 7 - Engineering Economic Analysis Dr. Khaled Hyari Department of Civil Engineering Hashemite University Introduction Is any individual project worthwhile?
More informationChapter 13 Breakeven and Payback Analysis
Chapter 13 Breakeven and Payback Analysis by Ir Mohd Shihabudin Ismail 13-1 LEARNING OUTCOMES 1. Breakeven point one parameter 2. Breakeven point two alternatives 3. Payback period analysis 13-2 Introduction
More informationSOLUTIONS TO SELECTED PROBLEMS. Student: You should work the problem completely before referring to the solution. CHAPTER 17
SOLUTIONS TO SELECTED PROBLEMS Student: You should work the problem completely before referring to the solution. CHAPTER 17 Solutions included for all or part of problems: 4, 6, 9, 12, 15, 18, 21, 24,
More informationLecture 5 Present-Worth Analysis
Seg2510 Management Principles for Engineering Managers Lecture 5 Present-Worth Analysis Department of Systems Engineering and Engineering Management The Chinese University of Hong Kong 1 Part I Review
More informationSchool of Engineering University of Guelph. ENGG*3240 Engineering Economics Course Description & Outline - Fall 2008
School of Engineering University of Guelph ENGG*3240 Engineering Economics Course Description & Outline - Fall 2008 CALENDAR DESCRIPTION Principle of project evaluation, analysis of capital and operating
More informationChapter 7 Rate of Return Analysis
Chapter 7 Rate of Return Analysis Rate of Return Methods for Finding ROR Internal Rate of Return (IRR) Criterion Incremental Analysis Mutually Exclusive Alternatives Why ROR measure is so popular? This
More informationEngineering Economics
Engineering Economics Lecture 6 Er. Sushant Raj Giri B.E. (Industrial Engineering), MBA Lecturer Department of Industrial Engineering Contemporary Engineering Economics 3 rd Edition Chan S Park 1 Chapter
More information8: Economic Criteria
8.1 Economic Criteria Capital Budgeting 1 8: Economic Criteria The preceding chapters show how to discount and compound a variety of different types of cash flows. This chapter explains the use of those
More informationOutline of Review Topics
Outline of Review Topics Cash flow and equivalence Depreciation Special topics Comparison of alternatives Ethics Method of review Brief review of topic Problems 1 Cash Flow and Equivalence Cash flow Diagrams
More informationIE463 Chapter 2. Objective. Time Value of Money (Money- Time Relationships)
IE463 Chapter 2 Time Value of Money (Money- Time Relationships) Objective Given a cash flow (or series of cash flows) occurring at some point in time, the objective is to find its equivalent value at another
More informationChapter 14: Effects of Inflation
Chapter 14: Effects of Inflation Session 25, 26 Dr Abdelaziz Berrado 1 Topics to Be Covered in Today s Lecture Section14.1: Impacts of Inflation; Section14.2: Present Worth with Inflation; Section14.3:
More informationChapter 2. Time Value of Money (TVOM) Principles of Engineering Economic Analysis, 5th edition
Chapter 2 Time Value of Money (TVOM) Cash Flow Diagrams $5,000 $5,000 $5,000 ( + ) 0 1 2 3 4 5 ( - ) Time $2,000 $3,000 $4,000 Example 2.1: Cash Flow Profiles for Two Investment Alternatives (EOY) CF(A)
More informationwhich considers any inflationary effects in the cash flows.
Note 1: Unless otherwise stated, all cash flows given in the problems represent aftertax cash flows in actual dollars. The MARR also represents a market interest rate, which considers any inflationary
More informationTaxation TYPES OF TAXES TYPES OF TAXES. 1. Income taxes: 2. Property taxes: By: Magdy Akladios, PhD, PE, CSP, CPE, CSHM
Taxation By: Magdy Akladios, PhD, PE, CSP, CPE, CSHM TYPES OF TAXES 1. Income taxes: Assessed as a function of gross revenues minus allowable deductions Levied at federal, most state, and some municipal
More informationPrinciples of Financial Feasibility ARCH 738: REAL ESTATE PROJECT MANAGEMENT. Morgan State University
Principles of Financial Feasibility ARCH 738: REAL ESTATE PROJECT MANAGEMENT Morgan State University Jason E. Charalambides, PhD, MASCE, AIA, ENV_SP (This material has been prepared for educational purposes)
More informationCE 231 ENGINEERING ECONOMY PROBLEM SET 1
CE 231 ENGINEERING ECONOMY PROBLEM SET 1 PROBLEM 1 The following two cash-flow operations are said to be present equivalent at 10 % interest rate compounded annually. Find X that satisfies the equivalence.
More informationCarefully read all directions given in a problem. Please show all work for all problems, and clearly label all formulas.
Carefully read all directions given in a problem. Please show all work for all problems, and clearly label all formulas. 1. You have been asked to make a decision regarding two alternatives. To make your
More informationSTR 402: Quantity Surveying & Cost Control of Construction Projects
Time Value of Money Depreciation Accounting Techniques STR 402: Quantity Surveying & Cost Control of Construction Projects Dr. Ahmed Saad Eldin Eldieb Time Value of Money Money has a time value. The value
More informationYou have the opportunity to invest $10,000 now. Find the IRR if you receive $1,200 per year at the beginning of the year for 10 years.
CE 167 Midterm #1 Fall 2003 Prof. C.W. Ibbs Directions: Put your name on your bluebook. This exam is to be completed in a bluebook answers not recorded in a bluebook will not be graded. Place the exam
More informationWhat is Value? Engineering Economics: Session 2. Page 1
Engineering Economics: Session 2 Engineering Economic Analysis: Slide 26 What is Value? Engineering Economic Analysis: Slide 27 Page 1 Review: Cash Flow Equivalence Type otation Formula Excel Single Uniform
More informationEngineering Economics, ENGR 610 Final Exam (35%)
Engineering Economics, ENGR 610 Final Exam (35%) Name: Instructor: Mutlu Ozer, Fall 2011 CF Diagrams are required. Without CF diagram solutions would not be accepted!!! ------------------------------------------------------------------------------------------------------------------------------------------------------------------
More informationENG2000 Chapter 16 Evaluating and Comparing Projects: The MARR. ENG2000: R.I. Hornsey CM: 1
ENG2000 Chapter 16 Evaluating and Comparing Projects: The MARR ENG2000: R.I. Hornsey CM: 1 Overview So, we have seen that the act of investing is to sacrifice something of present value in the expectation
More informationTAX ECONOMIC ANALYSIS 1 Haery Sihombing. Learning Objectives
Ir. /IP Pensyarah Pelawat Fakulti Kejuruteraan Pembuatan Universiti Teknologi Malaysia Melaka 1. Terminology and Rates 2. Before and After-Tax Analysis 6 3. Taxes and Depreciation 4. Depreciation Recapture
More informationChapter One. Definition and Basic terms and terminology of engineering economy
Chapter One Definition and Basic terms and terminology of engineering economy 1. Introduction: The need for engineering economy is primarily motivated by the work that engineers do in performing analysis,
More informationLeland Blank, P. E. Texas A & M University American University of Sharjah, United Arab Emirates
Eighth Edition ENGINEERING ECONOMY Leland Blank, P. E. Texas A & M University American University of Sharjah, United Arab Emirates Anthony Tarquin, P. E. University of Texas at El Paso Mc Graw Hill Education
More informationA Brief Guide to Engineering Management Financial Calculations in ENGM 401 & ENGM 620 Section X1 Fall 2010
A Brief Guide to Engineering Management Financial Calculations in ENGM 401 & ENGM 620 Section X1 Fall 2010 MG Lipsett last updated October 21, 2010 Introduction This document provides concise explanations
More informationCE 231 ENGINEERING ECONOMY PROBLEM SET 5
CE 231 ENGINEERING ECONOMY PROBLEM SET 5 PROBLEM 1 Considering the great tourism potential in Antalya, the government is thinking about the construction of a second airport at a place located outside the
More informationEngineering Economics
Engineering Economics Lecture 7 Er. Sushant Raj Giri B.E. (Industrial Engineering), MBA Lecturer Department of Industrial Engineering Contemporary Engineering Economics 3 rd Edition Chan S Park 1 Chapter
More informationFE Review Economics and Cash Flow
4/4/16 Compound Interest Variables FE Review Economics and Cash Flow Andrew Pederson P = present single sum of money (single cash flow). F = future single sum of money (single cash flow). A = uniform series
More informationENGM 310 Engineering Economy Lecture Notes (MJ Zuo) Page 1 of 36. Introduction
ENGM 310 Engineering Economy Lecture Notes (MJ Zuo) Page 1 of 36 Introduction 1. Syllabus distributed: Dates of assignments, mid-terms, and final exams specified. (a) Let me know in writing about possible
More informationA Brief Guide to Engineering Management Financial Calculations in ENGM 401 Section B1 Winter 2009
A Brief Guide to Engineering Management Financial Calculations in ENGM 401 Section B1 Winter 2009 MG Lipsett 2008 last updated December 8, 2008 Introduction This document provides concise explanations
More informationIE2140 Engineering Economy Tutorial 3 (Lab 1) Using Excel Financial Functions for Project Evaluation
IE2140 Engineering Economy Tutorial 3 (Lab 1) Using Excel Financial Functions for Project Evaluation 1. Objectives and Overview Solutions Guide by Hong Lanqing, Wang Xin and Mei Wenjie The objective of
More information2. Basic Concepts In Project Appraisal [DoF Ch. 4; FP Ch. 3, 4, 5]
R.E.Marks 2003 Lecture 3-1 2. Basic Concepts In Project Appraisal [DoF Ch. 4; FP Ch. 3, 4, 5] 1. Which Investment Criterion? 2. Investment Decision Criteria 3. Net Present Value Annual User Charge / Value
More informationEngineering Economy Chapter 4 More Interest Formulas
Engineering Economy Chapter 4 More Interest Formulas 1. Uniform Series Factors Used to Move Money Find F, Given A (i.e., F/A) Find A, Given F (i.e., A/F) Find P, Given A (i.e., P/A) Find A, Given P (i.e.,
More information1.011Project Evaluation: Comparing Costs & Benefits
1.11Project Evaluation: Comparing Costs & Benefits Carl D. Martland Basic Question: Are the future benefits large enough to justify the costs of the project? Present, Future, and Annual Worth Internal
More informationTime Value of Money and Economic Equivalence
Time Value of Money and Economic Equivalence Lecture No.4 Chapter 3 Third Canadian Edition Copyright 2012 Chapter Opening Story Take a Lump Sum or Annual Installments q q q Millionaire Life is a lottery
More information2/22/2017. Engineering Economics Knowledge. Engineering Economics FE REVIEW COURSE SPRING /22/2017
FE REVIEW COURSE SPRING 2017 Engineering Economics Paige Harris 2/22/2017 Engineering Economics Knowledge 4 6 problems Discounted cash flow Equivalence, PW, equivalent annual worth, FW, rate of return
More informationEGR 312 ENGINEERING ECONOMY PRACTICE FINAL EXAM
EGR 312 ENGINEERING ECONOMY PRACTICE FINAL EXAM PART A: MULTIPLE CHOICE. Circle the one best answer for each question (5 points each.) 1. A piece of equipment that was purchased 2 years ago for $45,000
More information3: Balance Equations 3.1 Accounts with Constant Interest Rates. Terms. Example. Simple Interest
3: Balance Equations 3.1 Accounts with Constant Interest Rates Example Two different accounts 1% per year: earn 1% each year on dollars at beginning of year 1% per month: earn 1% each month on dollars
More information3: Balance Equations
3.1 Balance Equations Accounts with Constant Interest Rates 15 3: Balance Equations Investments typically consist of giving up something today in the hope of greater benefits in the future, resulting in
More informationENG2000 Chapter 17 Evaluating and Comparing Projects: The IRR. ENG2000: R.I. Hornsey CM_2: 1
ENG2000 Chapter 17 Evaluating and Comparing Projects: The IRR ENG2000: R.I. Hornsey CM_2: 1 Introduction This chapter introduces a second method for comparing between projects While the result of the process
More informationEconomic Decision Making Using Fuzzy Numbers Shih-Ming Lee, Kuo-Lung Lin, Sushil Gupta. Florida International University Miami, Florida
Economic Decision Making Using Fuzzy Numbers Shih-Ming Lee, Kuo-Lung Lin, Sushil Gupta Florida International University Miami, Florida Abstract In engineering economic studies, single values are traditionally
More informationChapter 2. Time Value of Money (TVOM) Principles of Engineering Economic Analysis, 5th edition
Chapter 2 Time Value of Money (TVOM) Cash Flow Diagrams (EOY) Example 2.1 Cash Flow Profiles for Two Investment Alternatives End of Year (EOY) CF(A) CF(B) CF(B-A) 0 -$100,000 -$100,000 $0 1 $10,000 $50,000
More information22.812J Nuclear Energy Economics and Policy Analysis S 04. Classnote: The Time Value of Money
22.812J uclear Energy Economics and Policy Analysis S 04 Classnote: The Time Value of Money 1. Motivating Example To motivate the discussion, we consider a homeowner faced with a decision whether to install
More informationEngineering Economic Analysis 13E Supplement for Tax Cuts and Jobs Act p. 1. Determine the depreciation schedule with 100% bonus depreciation.
Engineering Economic Analysis 13E Supplement for Tax Cuts and Jobs Act p. 1 EEA13 SUPPLEMENT FOR TAX CUTS AND JOBS ACT The Tax Cuts and Jobs Act, approved in December 2017, made significant changes in
More informationCHAPTER 6 MAKING CAPITAL INVESTMENT DECISIONS
CHAPTER 6 MAKING CAPITAL INVESTMENT DECISIONS Answers to Concepts Review and Critical Thinking Questions 1. In this context, an opportunity cost refers to the value of an asset or other input that will
More informationIE 343 Midterm Exam 1
IE 343 Midterm Exam 1 Feb 17, 2012 Version A Closed book, closed notes. Write your printed name in the spaces provided above on every page. Show all of your work in the spaces provided. Interest rate tables
More informationLESSON 2 INTEREST FORMULAS AND THEIR APPLICATIONS. Overview of Interest Formulas and Their Applications. Symbols Used in Engineering Economy
Lesson Two: Interest Formulas and Their Applications from Understanding Engineering Economy: A Practical Approach LESSON 2 INTEREST FORMULAS AND THEIR APPLICATIONS Overview of Interest Formulas and Their
More informationAn Interesting News Item
ENGM 401 & 620 X1 Fundamentals of Engineering Finance Fall 2010 Lecture 26: Other Analysis Techniques If you work just for money, you'll never make it, but if you love what you're doing and you always
More informationENSC 201 Assignment 5, Model Answers
ENSC 201 Assignment 5, Model Answers 5.1 Gerry likes driving small cars, and buys nearly identical ones whenever the old one needs replacing. He typically trades in his old car for a new one costing about
More informationTIME VALUE OF MONEY. Lecture Notes Week 4. Dr Wan Ahmad Wan Omar
TIME VALUE OF MONEY Lecture Notes Week 4 Dr Wan Ahmad Wan Omar Lecture Notes Week 4 4. The Time Value of Money The notion on time value of money is based on the idea that money available at the present
More informationHomework 4. Public Projects. (a) Using the benefit cost ratio, which system should be selected?
Homework 4. Public Projects 1. A city government is considering two types of town-dump sanitary systems, Design A requires an initial outlay of $400,000, with annual operating and maintenance costs of
More informationMutually Exclusive Choose at most one From the Set
1 Mutually Exclusive Choose at most one From the Set This lecture addresses an issue that is confusing to many users of the rate of return method. When choosing among mutually exclusive alternatives, never
More informationMGT201 Lecture No. 11
MGT201 Lecture No. 11 Learning Objectives: In this lecture, we will discuss some special areas of capital budgeting in which the calculation of NPV & IRR is a bit more difficult. These concepts will be
More informationPrinciples of Energy Conversion Part 4. Introduction to Energy Economics
Principles of Energy Conversion Part 4. Introduction to Energy Economics January 23, 2018 7 Energy Economics 3 7.1 Energy Costs...................................... 3 7.2 Time Value of Money.................................