1 Question 1: What are the triple constraints of project management? Answer 1: The triple constraints deal with the time, cost, and scope of a project. Time is the duration between the project start and the expected completion of all results or deliverables. Cost deals with the expenditure or consumption of resources. Scope outlines what the specifications of the acceptable project deliverables will be (Project Management Institute, 2013). Common theory states that if one of the constraints is altered, it may have an effect on either or both of the other constraints. For example, if the project schedule or the time is extended, this may affect the project budget or cost. Question 2: Who determines what the project constraints will be? Answer 2: The constraints are usually worked out between the project sponsor and the end user or client. Normally, there are meetings set during the project initiation process where the project feasibility and needs assessment are decided. At this point, a preliminary scope statement is produced and a rough schedule and budget may be set. Throughout the duration of the project, any project stakeholder can make suggestions for changes to the project's constraints by submitting a change request document to the project manager. The project manager will then examine the request and possibly request a meeting with key members of the project to determine whether to incorporate the changes. Question 3: What is the difference between a project and a product? Answer 3: A project is a unique undertaking that has a specific start and end: It will usually have a finite budget and limited resources (Project Management Institute, 2013). 1

2 A product is the end result of a series of activities that accept input and are manipulated and delivered as output. A product may be the end result of a project's efforts but is usually associated with ongoing production operations. Question 4: What are the benefits of using project management techniques? Answer 4: In The Case for Project and Portfolio Management: Best Practices for Missouri State Agencies (n.d.), the Missouri Office of Administration says of project management: Private industry experts estimate that about 40% to 75% of all IT projects end in failure, abandoned in one way or another. In many cases, the blame can be laid at the managers' feet, through their failure to plan, monitor, and account for progress on the project. Project management techniques give you the tools needed to plan, monitor, and control all aspects of a project, thus giving you the best possible chance for successfully completing your project to the satisfaction of the project's sponsor and client. Question 5: How do project managers get picked to do their jobs? Answer 5: According to PSA Project Management Online, two thirds of project managers are selected for their projects without regard to their level of competence. "It is not surprising that 58% of the surveyed project managers agreed that their projects rarely meet time and cost targets" (2002). If you want to get involved in project management at your organization, it is strongly suggested that you first take several training programs and then inform your supervisor (and any other employees who may be responsible for selecting project managers) of your qualifications. Question 6: What are the skills needed to become a successful project manager? 2

3 Answer 6: According to the PMBOK Guide, successful project managers will have multiple areas of expertise. These include the following (Project Management Institute, 2013): A thorough understanding of the PMBOK Guide The ability to apply project management principles General management knowledge and skills Interpersonal skills Many individuals elect to study for and pass the rigorous Project Management Institute's (PMI) exam for a Project Management Professional (PMP) Certification. This test consists of 200 questions drawn from the PMBOK Guide. General management knowledge can come from both studying management principles in school and from working on the job. The interpersonal skills that the project manager will be expected to have include the ability to communicate effectively, solve problems through leadership and negotiation, and motivate people over whom they may have no authority. Question 7: Why are projects split into distinct phases? Answer 7: Projects are usually split into distinct phases for control over the project and the allocation of resources. During the execution of any particular phase, if some event happens that results in the project plan needing rework, the project manager can halt progress and cycle back to a previous phase. If it turns out that the project is experiencing something that will definitely result in project failure, it is easier to make a termination decision at the conclusion of a phase instead of proceeding forward. 3

4 Question 8: Why is it so important to conduct a project after-action review? Answer 8: During the management of a project, there are many hard-won lessons that have been learned by the project manager and project team, such as which vendor provides the most reliable supplies, how to juggle competing requirements for limited resources, and why project plans must be constantly updated. These lessons have expended company resources in the form of money and time while being learned. If they are not documented, those resources are wasted. It may be quite some time before the project team or company tries a project of a similar type. If the lessons learned are made available through some form of archive, the next team to take on a project can read the documents and learn from its predecessors instead of completely starting over. This will not only save significant money but keep the level of stress and anxiety down as well. To capture and document the lessons learned, it is suggested that the project manager hold an after-action review meeting. During this meeting, the team should concentrate on process and personal improvement without spending any time pointing fingers or accessing blame. Upon completion of the review process, all documents, including the final version of the project plan, should be archived for future project teams. Question 9: Where is the majority of a project manager's time spent? Answer 9: This will greatly depend on the individual project, the project manager, and the areas chosen for focus. Many project managers come from a technical background, and they feel comfortable writing software code or piecing equipment together: This may be at the sacrifice of other more important areas of the project management process. The project manager must also track the project's progress to ensure that the project is staying on schedule and, at the same time, watch the project's cash flow to ensure that the project does not go over budget. In very large projects, there may be a team of project helpers who are assigned these various tasks. In that case, the project manager may spend 4

5 most of the time ensuring that individual workers have the resources they need and are producing output based on the project's scope statement. The larger the project, the more time the project manager will also spend communicating with all of the different people interested on the project's outcomes. Question 10: How do you know if the project was a success? Answer 10: First and foremost, during the initiation and planning phases of the project, the project manager, sponsor, and end client should develop a document that outlines just what the project deliverables will be. This document should go into quite some detail to spell out specifically the scope of the project. Scope outlines what the specifications of the acceptable project deliverables will be (Project Management Institute, 2013). A second document will determine what the duration of the project will be. This is the schedule that shows how long the project should take to be complete and what activities need to be accomplished at set intervals. Third is the project's budget. This lays out how much money should be spent, where it is to be spent, and when. If each of these documents is adhered to and the client is satisfied and accepts the final output, the project should be considered a success. References Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK Guide), Fifth Edition, Project Management Institute, Inc PSA Project Management Online. (2002). The accidental project manager. Retrieved from The case for project and portfolio management: Best practices for Missouri state agencies. (n.d.). Retrieved from Missouri Office of Administration Web site: PM-WP Short.doc 5

IT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps://

IT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps:// IT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps://www.certqueen.com Exam: PMI-002 Title : Certified Associate in Project Management (CAPM) Certification Version : DEMO 1 / 7 1.A

More information

PMP (2018) PMBOK 6th Edition PMI. Project Management Professional (PMBOK 6th Edition)

PMP (2018) PMBOK 6th Edition PMI. Project Management Professional (PMBOK 6th Edition) PMI PMP (2018) PMBOK 6th Edition Project Management Professional (PMBOK 6th Edition) Download Full Version : https://killexams.com/pass4sure/exam-detail/pmi-001 QUESTION 903 Which process documents the

More information

PMI PMI-SP. PMI Scheduling Professional. Download Full Version :

PMI PMI-SP. PMI Scheduling Professional. Download Full Version : PMI PMI-SP PMI Scheduling Professional Download Full Version : http://killexams.com/pass4sure/exam-detail/pmi-sp QUESTION: 311 A company hires a scheduler for one of its projects. What skills should he

More information

Best Practices in Project Risk Management. Presented by: Jeff Miller, PMP - Director of Project Management Interstates Control Systems, Inc.

Best Practices in Project Risk Management. Presented by: Jeff Miller, PMP - Director of Project Management Interstates Control Systems, Inc. Best Practices in Project Risk Management Presented by: Jeff Miller, PMP - Director of Project Management Interstates Control Systems, Inc. What is Project Risk Management? PMBOK Definition of Project

More information

Risk Management Plan for the <Project Name> Prepared by: Title: Address: Phone: Last revised:

Risk Management Plan for the <Project Name> Prepared by: Title: Address: Phone:   Last revised: for the Prepared by: Title: Address: Phone: E-mail: Last revised: Document Information Project Name: Prepared By: Title: Reviewed By: Document Version No: Document Version Date: Review Date:

More information

Key Aspects for Managing a Project

Key Aspects for Managing a Project Key Aspects for Managing a Project What is a Project? Definition: A project is a temporary endeavor undertaken to create a unique product, service or result. The temporary nature of projects indicates

More information

PROJECT MANAGEMENT BODY OF KNOWLEDGE

PROJECT MANAGEMENT BODY OF KNOWLEDGE A Guide to the PROJECT MANAGEMENT BODY OF KNOWLEDGE (PMBOK GUIDE ) Sixth edition Chapter 7 Project Cost Management PMBOK is a registered mark of the Project Management Institute, Inc Slide # 1 3FOLD Education

More information

PMP Exam Prep Coaching Program

PMP Exam Prep Coaching Program PMP Exam Prep Coaching Program Project Part 1 Presented by Vinai Prakash, PMP 1 Project Plan Estimate s Determine Budget 2 Vinai Prakash, PMCHAMP.COM 1 Process of monitoring the status of the project to

More information

Achieve PMP Exam Success Five-Day Course Syllabus

Achieve PMP Exam Success Five-Day Course Syllabus Course Delivery Format: Traditional class room 5-day format, 35 hrs. Achieve PMP Exam Success Five-Day Course Syllabus Course Description: Achieve PMP Exam Success is a 35-hour PMP exam preparation course

More information

COPYRIGHTED MATERIAL. Index

COPYRIGHTED MATERIAL. Index Index Note to the reader: Throughout this index boldfaced page numbers indicate primary discussions of a topic. Italicized page numbers indicate illustrations. A A+ certification, 28 acceptance criteria

More information

Managing Project Risk DHY

Managing Project Risk DHY Managing Project Risk DHY01 0407 Copyright ESI International April 2007 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or

More information

THE PMP EXAM PREP COURSE

THE PMP EXAM PREP COURSE THE PMP EXAM PREP COURSE Session 3 PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. www.falcontraining.co.nz Agenda 9:00 10:15 10:15 10:30 10:30 12:00 12:00 12:45 12:45

More information

PROJECT COST MANAGEMENT

PROJECT COST MANAGEMENT PROJECT COST MANAGEMENT For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, PMP, PMI-RMP

More information

Introduction to Project Management. Modeling after NYS ITS

Introduction to Project Management. Modeling after NYS ITS Introduction to Project Management Modeling after NYS ITS What is Project Management? Project management is the application of knowledge, skills, tools and techniques to project activities to meet project

More information

Five-Day Schedule and Course Content

Five-Day Schedule and Course Content Five-Day Schedule and Course Content The following sequence is suggested to balance out the material over five sessions. Note that Chapter 10 is placed with Chapters 12 and 13 on Day 5. DAY 1 DAY 1 Course

More information

Unit 3 Research Project. Eddie S. Jackson. Kaplan University. IT511: Information Systems Project Management

Unit 3 Research Project. Eddie S. Jackson. Kaplan University. IT511: Information Systems Project Management Running head: UNIT 3 RESEARCH PROJECT 1 Unit 3 Research Project Eddie S. Jackson Kaplan University IT511: Information Systems Project Management 04/06/2014 UNIT 3 RESEARCH PROJECT 2 Unit 3 Research Project

More information

Appendix B: Glossary of Project Management Terms

Appendix B: Glossary of Project Management Terms Appendix B: Glossary of Project Management Terms Assumption - There may be external circumstances or events that must occur for the project to be successful (or that should happen to increase your chances

More information

Project Management CSC 310 Spring 2017 Howard Rosenthal

Project Management CSC 310 Spring 2017 Howard Rosenthal Project CSC 310 Spring 2017 Howard Rosenthal 1 No?ce This course is based on and includes material from the text: Effective Project - Traditional, Agile, Extreme 7TH Edition Authors: Robert K. Wysocki

More information

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com

More information

SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME END SEMESTER EXAMINATION JULY 2016

SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME END SEMESTER EXAMINATION JULY 2016 All Rights Reserved No. of Pages - 10 No of Questions - 06 SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME END SEMESTER EXAMINATION JULY 2016 MGT 30725 Project

More information

EAN.UCC Project Management Framework Handbook. Issue Version 3.0

EAN.UCC Project Management Framework Handbook. Issue Version 3.0 EAN.UCC Project Management Framework Handbook Issue Version 3.0 Document Information Document Summary Document Item Document Title (auto, from properties) File Name (auto) PMFH Issue Version 3 Template

More information

A Layman s Guide to Earned Value

A Layman s Guide to Earned Value A Layman s Guide to Earned Value A TenStep White Paper Contact us at info@tenstep.com TenStep, Inc. 2363 St. Davids Square Kennesaw, GA. 30152 877.536.8434 770.795.9097 If you are a project manager, you

More information

GEOTHERMAL PROJECT MANAGEMENT

GEOTHERMAL PROJECT MANAGEMENT Presented at SDG Short Course I on Exploration and Development of Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Nov. 10-31, 2016. Kenya Electricity

More information

LCS International, Inc. PMP Review. Chapter 5 Developing Project Budgets. Presented by David J. Lanners, MBA, PMP

LCS International, Inc. PMP Review. Chapter 5 Developing Project Budgets. Presented by David J. Lanners, MBA, PMP PMP Review Chapter 5 Developing Project Budgets Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy of the Sybex PMP Study

More information

Risk Management Made Easy 1, 2

Risk Management Made Easy 1, 2 1, 2 By Susan Parente ABSTRACT Many people know and understand risk management but are struggling to integrate it into their project management processes. How can you seamlessly incorporate project risk

More information

PMP EXAMINATION PREP CHAPTER 11 RISK MANAGEMENT. PMP Exam Prep

PMP EXAMINATION PREP CHAPTER 11 RISK MANAGEMENT. PMP Exam Prep PMP EXAMINATION PREP CHAPTER 11 RISK MANAGEMENT PMP Exam Prep RISK MANAGEMENT Page 441 Communications Management Process : Contains 7 of the 49 total processes Plan Risk Management Identify Risks Perform

More information

KERN COMMUNITY COLLEGE DISTRICT BAKERSFIELD COLLEGE INDA B132 COURSE OUTLINE OF RECORD

KERN COMMUNITY COLLEGE DISTRICT BAKERSFIELD COLLEGE INDA B132 COURSE OUTLINE OF RECORD Status: Final Last Revised: February 11, 2016 Proposal Type: New Course Start Term: Fall 2017 TOPS Code: 0935.00 CIP Code: 15.0406 (updated 6/1/16) KERN COMMUNITY COLLEGE DISTRICT BAKERSFIELD COLLEGE INDA

More information

PM TUTORIAL. Notes On Project Requirements

PM TUTORIAL. Notes On Project Requirements PM TUTORIAL Notes On Project Requirements Requirements are the first and most important thing to define on any project, spend real time making sure your requirements are adequate before any significant

More information

Work Breakdown Structure. Managing an Efficient Construction Workflow

Work Breakdown Structure. Managing an Efficient Construction Workflow Work Breakdown Structure Managing an Efficient Construction Workflow Managing an Efficient Construction Workflow The purpose of this whitepaper is to define an operational process that creates an efficient

More information

THE CORPORATION OF THE CITY OF WINDSOR POLICY

THE CORPORATION OF THE CITY OF WINDSOR POLICY THE CORPORATION OF THE CITY OF WINDSOR POLICY Service Area: Office of the Chief Administrative Officer Policy No.: CR252/2014 Department: Approval Date: October 6, 2014 Division: Corporate Initiatives

More information

Project planning and creating a WBS

Project planning and creating a WBS 37E01500 Project Management and Consulting Practice Project planning and creating a WBS Matti Rossi Lecture 3, Tue 28.2.2017 Learning objectives Describe the project time management planning tasks, and

More information

PMI - Dallas Chapter. Sample Questions. March 22, 2002

PMI - Dallas Chapter. Sample Questions. March 22, 2002 PMI - Dallas Chapter PMP Exam Sample Questions March 22, 2002 Disclaimer: These questions are intended for study purposes only. Success on these questions is not necessarily predictive of success on the

More information

Risk Management Made Easy. I. S. Parente 1

Risk Management Made Easy. I. S. Parente 1 Risk Management Made Easy I. S. Parente 1 1 Susan Parente, MS Engineering Management, PMP, CISSP, PMI-RMP, PMI-ACP, CSM, CSPO, PSM I, ITIL, RESILIA, CRISC, MS Eng. Mgmt.; S3 Technologies, LLC, Principal

More information

Project Management Professional (PMP) Exam Prep Course 06 - Project Time Management

Project Management Professional (PMP) Exam Prep Course 06 - Project Time Management Project Management Professional (PMP) Exam Prep Course 06 - Project Time Management Slide 1 Looking Glass Development, LLC (303) 663-5402 / (888) 338-7447 4610 S. Ulster St. #150 Denver, CO 80237 information@lookingglassdev.com

More information

1890 Project Management

1890 Project Management 1890 Project Management Presenters: 101 Lois Burg, Office of Sponsored Programs (OSP) Craig Warner, College of Agriculture and Human Sciences (CAHS) 02 TOPICS OF DISCUSSION Techniques for 1. Program Management

More information

Project & Construction Management (PCM) Manage project goals, costs, decisions, and risks right from Day 1

Project & Construction Management (PCM) Manage project goals, costs, decisions, and risks right from Day 1 (PCM) Manage project goals, costs, decisions, and risks right from Day 1 plan early and confirm often DEFINE GOALS PREPARE A PLAN MEASURE RESULTS (PCM) proven results Plan early and continuously monitor

More information

The Four Pillars of project management

The Four Pillars of project management The Four Pillars of project management Background This article is intended to give a round up of key practical project management practices to the novice as well as to the experienced. About 90% of this

More information

Your Free Guide to our PMP & CAPM Preparation Course Certified Associate in Project Management (CAPM) Edition

Your Free Guide to our PMP & CAPM Preparation Course Certified Associate in Project Management (CAPM) Edition Your Free Guide to our PMP & CAPM Preparation Course Certified Associate in Project Management (CAPM) Edition PMI s Project Management Professional Your Free Guide to Our PMP Preparation Course Part 1:

More information

MEASURING UP. Best practices in benchmarking 403(b) plans

MEASURING UP. Best practices in benchmarking 403(b) plans MEASURING UP Best practices in benchmarking 403(b) plans Retirement plan oversight is a challenging task for any plan sponsor. For 403(b) plan sponsors, many of whom use multiple vendors, the responsibility

More information

KEY GUIDE. The key stages of financial planning

KEY GUIDE. The key stages of financial planning KEY GUIDE The key stages of financial planning What can financial planning do for you? Financial planning has witnessed significant change, so it is not surprising that most people are unclear about what

More information

FAQ: Estimating, Budgeting, and Controlling

FAQ: Estimating, Budgeting, and Controlling Question 1: Why do project managers need to create a budget? Answer 1: The budget is designed to tell how much the total project should cost and when these costs will occur. This information is beneficial

More information

Project Initiation, Planning, Executing, Monitoring and Controlling Process Groups (Workshops 1, 2, 3 & 4) Certified Program

Project Initiation, Planning, Executing, Monitoring and Controlling Process Groups (Workshops 1, 2, 3 & 4) Certified Program 438 Project Initiation, Planning, Executing, Monitoring and Controlling Process Groups (Workshops 1, 2, 3 & 4) Certified Program 3 19 October 2010, Kuwait Program Objectives: The Project Management Body

More information

Richard Larson, PMP, CBAP, PMI-PBA President and Founder Watermark Learning. Enhanced 1 Performance. Enduring bapmtraining

Richard Larson, PMP, CBAP, PMI-PBA President and Founder Watermark Learning. Enhanced 1 Performance. Enduring bapmtraining Richard Larson, PMP, CBAP, PMI-PBA President and Founder Watermark Learning Enhanced 1 Performance. Enduring Results. @Rich_Larson bapmtraining Woman-owned business established in 1992, offering training

More information

0470_022817_03_chap01.fm Page 11 Wednesday, September 8, :29 PM. Part I The basics of project risk management

0470_022817_03_chap01.fm Page 11 Wednesday, September 8, :29 PM. Part I The basics of project risk management 0470_022817_03_chap01.fm Page 11 Wednesday, September 8, 2004 3:29 PM Part I The basics of project risk management 0470_022817_03_chap01.fm Page 12 Wednesday, September 8, 2004 3:29 PM 0470_022817_03_chap01.fm

More information

A Project Management Guide for Researchers

A Project Management Guide for Researchers A Project Management Guide for Researchers Prepared by: Research Grant and Contract Services January 2018 Copyright 2018 Memorial University of Newfoundland Table of Contents 1.0 Introduction... 4 2.0

More information

Project Management CTC-ITC 310 Spring 2018 Howard Rosenthal

Project Management CTC-ITC 310 Spring 2018 Howard Rosenthal Project Management CTC-ITC 310 Spring 2018 Howard Rosenthal 1 Notice This course is based on and includes material from the text: A User s Manual To the PMBOK Guide Authors: Cynthia Stackpole Snyder Publisher:

More information

Earned Value Management - EVM

Earned Value Management - EVM Earned Value Management (EVM) technique used to track the Progress and Status of a Project & Forecast the likely future performance of the Project. Earned Value Management (EVM) technique integrates the

More information

PRINCE2 Practitioner Online

PRINCE2 Practitioner Online What you will learn At the end of this course the delegate will be prepared for the PRINCE2 practitioner exam. The purpose of the Practitioner qualification is to confirm whether the candidate has achieved

More information

TAC 216 Companion Guide

TAC 216 Companion Guide IT Project Management Best Practices The Texas A&M University System Version 2018 Last Revised 09/01/2017 Page 1 of 31 Table of Contents Introduction... 4 The A&M System s Approach to Help Members Achieve

More information

The Evolution of Risk Management and The Risk Management Process

The Evolution of Risk Management and The Risk Management Process The Evolution of Risk Management and The Risk Management Process The Evolution of Analytical Risk-Management Tools 1938 Bond Duration 1952 Markowitz mean-variance framework 1963 Sharpe s capital asset

More information

Lesson 7 The Project Budget

Lesson 7 The Project Budget MBA, Msc, Bsc, PMP, CSM, PMI-ACP Indike Manthilake MBA, Msc, Bsc, CSM, PMI-ACP indikem@unitedmotors.lk.com Lesson 7 The Project Budget Agenda Estimate Costs and income Creating a Preliminary Budget Budget

More information

Section II PROJECT MANAGEMENT METHODOLOGY GUIDELINES

Section II PROJECT MANAGEMENT METHODOLOGY GUIDELINES Section II B PROJECT MANAGEMENT METHODOLOGY GUIDELINES Chapter 8 INTRODUCTION TO A METHODOLOGY Vision The vision of the Project Management Center of Excellence (PMCoE) organization is to achieve a world-class

More information

PMP Exam Preparation Workshop Chapter 7 Project Cost Management

PMP Exam Preparation Workshop Chapter 7 Project Cost Management PMP Exam Preparation Workshop Chapter 7 Project Cost Management 1 Learning Objectives By the end of this session, you should understand: Importance of cost management for the success of a project Cost

More information

Series on Advances in Project Management. Managing Risk in Projects: What s New?

Series on Advances in Project Management. Managing Risk in Projects: What s New? PM WORLD TODAY MONTHLY COLUMN FEBRUARY 2010 Series on Advances in Project Management Editor s note: This series on Advances in Project Management was launched with a Guest Editorial by Professor Darren

More information

Meaningful, Coherent and Well Positioned Assurance. December 2014

Meaningful, Coherent and Well Positioned Assurance. December 2014 Meaningful, Coherent and Well Positioned Assurance December 2014 1 Contents Page What is the exam question? 3 Assurance: What is it? 4 What is good practice? 5 Assurance in an Accounting Officer context

More information

Application of Earned Value Management (EVM) for Effective Project Control

Application of Earned Value Management (EVM) for Effective Project Control Application of Earned Value Management (EVM) for Effective Project Control Course No: B02-012 Credit: 2 PDH Boris Shvartsberg, Ph.D., P.E., P.M.P. Continuing Education and Development, Inc. 9 Greyridge

More information

2. Which of the following is a common characteristic of most project life cycle descriptions?

2. Which of the following is a common characteristic of most project life cycle descriptions? INTEGRATION MANAGEMENT 1. The review of key deliverables and project performance at the conclusion of a project phase is called: A. phase exit B. kill point C. stage gate D. a and c E. All above 2. Which

More information

Process Optimization Level I (Introduction)

Process Optimization Level I (Introduction) Process Optimization Level I (Introduction) 8 Hours A hands-on, interactive introduction to Business Process Optimization Focused on the most effective tools & concepts from the many process improvement

More information

The One Page Executive Dashboard

The One Page Executive Dashboard The One Page Executive Dashboard Tell them what they need to know then STOP! Laura Barnard, PMP Speaking, Training, Coaching, & Consulting PMO Strategies & IMPACT by Laura Nonprofit Service Founder & President,

More information

Accounting for Management: Concepts & Tools v.2.0- Course Transcript Presented by: TeachUcomp, Inc.

Accounting for Management: Concepts & Tools v.2.0- Course Transcript Presented by: TeachUcomp, Inc. Accounting for Management: Concepts & Tools v.2.0- Course Transcript Presented by: TeachUcomp, Inc. Course Introduction Welcome to Accounting for Management: Concepts and Tools, a presentation of TeachUcomp,

More information

Professional Development Seminar Series

Professional Development Seminar Series Professional Development Seminar Series Feb, 2019 2019. All rights reserved. online@3foldtraining.com. www.pmexamstudy.com. www.3foldtraining.com. PMP Exam Review Agenda Introduction to Definition Context

More information

REQUEST FOR PROPOSAL FOR. Full Cost Allocation Plan and Citywide User Fee and Rate Study. Finance Department CITY OF HUNTINGTON BEACH

REQUEST FOR PROPOSAL FOR. Full Cost Allocation Plan and Citywide User Fee and Rate Study. Finance Department CITY OF HUNTINGTON BEACH REQUEST FOR PROPOSAL FOR Full Cost Allocation Plan and Citywide User Fee and Rate Study Finance Department CITY OF HUNTINGTON BEACH Released on October 17, 2007 Full Cost Allocation Plan and Citywide User

More information

Project Management Professional (PMP) Exam Prep Course 11 - Project Risk Management

Project Management Professional (PMP) Exam Prep Course 11 - Project Risk Management Project Management Professional (PMP) Exam Prep Course 11 - Project Slide 1 Project Looking Glass Development, LLC (303) 663-5402 / (888) 338-7447 4610 S. Ulster St. #150 Denver, CO 80237 information@lookingglassdev.com

More information

Project Management Institute. Government Extension to the PMBOK Guide Third Edition

Project Management Institute. Government Extension to the PMBOK Guide Third Edition Project Management Institute Government Extension to the PMBOK Guide Third Edition Government Extension to the PMBOK Guide Third Edition ISBN 13: 978-1-930699-91-5 ISBN 10: 1-930699-91-3 Published by:

More information

Self-Assessment Questions for Module 07 Project Cost Management

Self-Assessment Questions for Module 07 Project Cost Management Self-Assessment Questions for Module 07 Project Cost Management Question 1: Which of the following regarding Analogous Estimating and Parametric Estimating is incorrect? A.) Parametric Estimating uses

More information

PMP. Preparation Training. Cost Management. Your key in Successful Project Management. Cost Management Processes. Chapter 7 6/7/2005

PMP. Preparation Training. Cost Management. Your key in Successful Project Management. Cost Management Processes. Chapter 7 6/7/2005 PMP Preparation Training Your key in Successful Project Management Akram Al-Najjar, PMP Cost Management Processes Chapter 7 Cost Management Slide 2 1 AGENDA What is Cost Management? Cost Management Processes

More information

CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon

CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon Abstract- Project Cost Management includes the processes involved in planning, estimating, budgeting,

More information

International Project Management. prof.dr MILOŠ D. MILOVANČEVIĆ

International Project Management. prof.dr MILOŠ D. MILOVANČEVIĆ International Project Management prof.dr MILOŠ D. MILOVANČEVIĆ Project time management Project cost management Time in project management process Time is a valuable resource. It is also the scarcest. Time

More information

NEST s research into retirement decisions

NEST s research into retirement decisions 5 NEST s research into retirement decisions NEST Corporation NEST carries out a wide variety of research projects to better understand the decisions that members of our target group make, and the factors

More information

Project Management for EPC Contracts Presented by: Dr. Jamal F. AlBahar, PMP, VMA Registered Arbitrator; Member: PMI, CMAA, AACE, AAA, PMA, CSI, SAVE

Project Management for EPC Contracts Presented by: Dr. Jamal F. AlBahar, PMP, VMA Registered Arbitrator; Member: PMI, CMAA, AACE, AAA, PMA, CSI, SAVE Project Management for EPC Contracts Presented by: Dr. Jamal F. AlBahar, PMP, VMA Registered Arbitrator; Member: PMI, CMAA, AACE, AAA, PMA, CSI, SAVE INTRODUCTION: Project Management for Engineering and

More information

PMI - Dallas Chapter. PMP Exam Sample Questions

PMI - Dallas Chapter. PMP Exam Sample Questions PMI - Dallas Chapter PMP Exam Sample Questions June 4, 1999 Disclaimer: These questions are intended for study purposes only. Success on these questions is not necessarily predictive of success on the

More information

Braindumps.PRINCE2-Foundation.150.QA

Braindumps.PRINCE2-Foundation.150.QA Braindumps.PRINCE2-Foundation.150.QA Number: PRINCE2-Foundation Passing Score: 800 Time Limit: 120 min File Version: 29.1 http://www.gratisexam.com/ I was a little apprehensive at first about an online

More information

Preferred Portfolio Services SM. managed portfolios. striking the right balance.

Preferred Portfolio Services SM. managed portfolios. striking the right balance. Preferred Portfolio Services SM select managed portfolios. striking the right balance. 2 3 Striking the Right Balance Devoting the appropriate amount of time and energy to each of life s priorities is

More information

Project Theft Management,

Project Theft Management, Project Theft Management, by applying best practises of Project Risk Management Philip Rosslee, BEng. PrEng. MBA PMP PMO Projects South Africa PMO Projects Group www.pmo-projects.co.za philip.rosslee@pmo-projects.com

More information

An Earned Value Tutorial

An Earned Value Tutorial 500 Thoreau Street Concord, MA 01742 USA +978.369.9009 info@newleafpm.com When you are ready to earn your PDUS: Please return to www.newleafpm.com Click on the White Papers tab. Select White Paper Power

More information

Overview of Legal Project Management

Overview of Legal Project Management Overview of Legal Project Management Scope - Determining the goals and deliverables for the project Conduct of Legal Matter Carrying out the project within the established parameters, making adjustments

More information

Stock Market Investor

Stock Market Investor 017 648 2029 6767 www.stockmarketinvestor.co.za Stock Market Investor is your leading stock market charting software, specifically developed for both seasoned as well as first-time investors. This programme

More information

JAYARAM COLLEGE OF ENGINEERING AND TECHNOLOGY DEPARTMENT OF INFORMATION TECHNOLOGY

JAYARAM COLLEGE OF ENGINEERING AND TECHNOLOGY DEPARTMENT OF INFORMATION TECHNOLOGY JAYARAM COLLEGE OF ENGINEERING AND TECHNOLOGY DEPARTMENT OF INFORMATION TECHNOLOGY Two Mark Question for Student s Reference 1. Define software project management. Software Project Management has key ideas

More information

CHAPTER 17 INVESTMENT MANAGEMENT. by Alistair Byrne, PhD, CFA

CHAPTER 17 INVESTMENT MANAGEMENT. by Alistair Byrne, PhD, CFA CHAPTER 17 INVESTMENT MANAGEMENT by Alistair Byrne, PhD, CFA LEARNING OUTCOMES After completing this chapter, you should be able to do the following: a Describe systematic risk and specific risk; b Describe

More information

Lecture 16: Estimating Parameters (Confidence Interval Estimates of the Mean)

Lecture 16: Estimating Parameters (Confidence Interval Estimates of the Mean) Statistics 16_est_parameters.pdf Michael Hallstone, Ph.D. hallston@hawaii.edu Lecture 16: Estimating Parameters (Confidence Interval Estimates of the Mean) Some Common Sense Assumptions for Interval Estimates

More information

Role of the Pricing/Reserving Actuary in a Non-Life Company. From a Management Point of View

Role of the Pricing/Reserving Actuary in a Non-Life Company. From a Management Point of View Role of the Pricing/Reserving Actuary in a Non-Life Company From a Management Point of View Mr. Augusto P. Hidalgo President and CEO National Reinsurance Corporation of the Philippines November 12, 2015

More information

FREQUENTLY ASKED QUESTIONS RE: ADDITIONAL CLIENT DATA REQUIREMENTS

FREQUENTLY ASKED QUESTIONS RE: ADDITIONAL CLIENT DATA REQUIREMENTS New FINRA Rules 2090 and 2111 - Know Your Customer ( KYC ) and Suitability FREQUENTLY ASKED QUESTIONS RE: ADDITIONAL CLIENT DATA REQUIREMENTS You may choose to simply page down through all of the Questions

More information

2) What is algorithm?

2) What is algorithm? 2) What is algorithm? Step by step procedure designed to perform an operation, and which (like a map or flowchart) will lead to the sought result if followed correctly. Algorithms have a definite beginning

More information

Child Welfare Digital Services Project. Cost Management Plan

Child Welfare Digital Services Project. Cost Management Plan Child Welfare Digital Services Project Cost Management Plan January 2017 CWDS Cost Management Plan January 2017 Revision History Revision / Version # Date of Release Author Summary of Changes V 1.0 4/22/14

More information

PROJECT MANAGEMENT DIPLOMA COURSE

PROJECT MANAGEMENT DIPLOMA COURSE PROJECT MANAGEMENT DIPLOMA COURSE UNIT FOUR PROJECT IMPLEMENTATION TUTOR TALK: The Learning Outcomes for this assignment are: Evaluate how a project is prepared for implementation. Analyse the following

More information

Project Management. Joycelyn M. Ray HCC Insurance Holdings SCCE- Chicago 9/08

Project Management. Joycelyn M. Ray HCC Insurance Holdings SCCE- Chicago 9/08 Project Management Joycelyn M. Ray HCC Insurance Holdings SCCE- Chicago 9/08 Society of Corporate Compliance and Ethics 6500 Barrie Road, Suite 250, Minneapolis, MN 55435, United States www.corporatecompliance.org

More information

MS Project 2007 Page 1 of 18

MS Project 2007 Page 1 of 18 MS Project 2007 Page 1 of 18 PROJECT MANAGEMENT (PM):- There are powerful environment forces contributed to the rapid expansion of the projects and project management approaches to the business problems

More information

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS Incorporating amendments by Scottish Futures Trust (Proposals for Decision Points 2 5 Only) Executive summary... 1 Section 1: Introduction

More information

INVESTIGATIONS & ENFORCEMENT CAREER OPPORTUNITIES Job Descriptions. Chief Manager, Investigations (1 position) Grade: 7

INVESTIGATIONS & ENFORCEMENT CAREER OPPORTUNITIES Job Descriptions. Chief Manager, Investigations (1 position) Grade: 7 INVESTIGATIONS & ENFORCEMENT CAREER OPPORTUNITIES Job Descriptions Job Title: Chief Manager, Investigations (1 position) Grade: 7 Organization: Department: Division: Kenya Revenue Authority Investigations

More information

Risk Management User Guide. Prepared By: Neville Turbit Version Feb /01/2009 Risk Management User Guide Page 1 of 36

Risk Management User Guide. Prepared By: Neville Turbit Version Feb /01/2009 Risk Management User Guide Page 1 of 36 Risk Management User Guide Prepared By: Neville Turbit Version 1.0 1 Feb 09 22/01/2009 Risk Management User Guide Page 1 of 36 Table of Contents Document Origin...2 Change History...2 Risk Guidelines...

More information

DIRECTIVE SUR LA GESTION DES PROJETS MAJEURS D INFRASTRUCTURE PUBLIQUE

DIRECTIVE SUR LA GESTION DES PROJETS MAJEURS D INFRASTRUCTURE PUBLIQUE Notice to reader on accessibility: This document complies with the SGQRI 008-02 standard of the Gouvernement du Québec in order to be accessible to every individual whether or not they have a disability.

More information

PROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI

PROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI PROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI Objectives of the training Understand the definition of project and

More information

Weber State University Information Technology Division. Policy Guide

Weber State University Information Technology Division. Policy Guide Weber State University Information Technology Division Policy Guide Updated: April 25, 2012 Table of Contents Using This Guide... 4 What is Policy?... 4 Why is Policy Created?... 4 University Policy vs.

More information

Re: Pre-consultation comments on draft ICP revisions 4, 5, 7 and 8

Re: Pre-consultation comments on draft ICP revisions 4, 5, 7 and 8 May 12, 2015 International Association of Insurance Supervisors CH-4002 Basel Switzerland Via email to nina.moss@bis.org Re: Pre-consultation comments on draft ICP revisions 4, 5, 7 and 8 To Whom It May

More information

Q2.1 Please rate how strongly you agree or disagree with the following statements about the use of time in your school.

Q2.1 Please rate how strongly you agree or disagree with the following statements about the use of time in your school. Report for TELL Oregon 2018 54.18% responded 90.60% responded 58.44% responded 90.91% responded Time Q2.1 Please rate how strongly you agree or disagree with the following statements about the use of time

More information

INSE 6230 Total Quality Project Management Winter 2018 Quiz I. Max : 70 points. This is a closed book exam. Answer all the questions in the booklet.

INSE 6230 Total Quality Project Management Winter 2018 Quiz I. Max : 70 points. This is a closed book exam. Answer all the questions in the booklet. . Surname, given names: Student Number: INSE 6230 Total Quality Project Management Winter 2018 Quiz I. Max : 70 points This is a closed book exam. Answer all the questions in the booklet. Ensure that your

More information

What is Project Management? *

What is Project Management? * OpenStax-CNX module: m31508 1 What is Project Management? * Merrie Barron, PMP, CSM Andrew R. Barron This work is produced by OpenStax-CNX and licensed under the Creative Commons Attribution License 3.0

More information

Binary Options Trading Strategies How to Become a Successful Trader?

Binary Options Trading Strategies How to Become a Successful Trader? Binary Options Trading Strategies or How to Become a Successful Trader? Brought to You by: 1. Successful Binary Options Trading Strategy Successful binary options traders approach the market with three

More information

REQUEST FOR QUOTATIONS FOR DOCUMENT SCANNING AN STORAGE SERVICES FOR THE CUYAHOGA COUNTY BOARD OF HEALTH

REQUEST FOR QUOTATIONS FOR DOCUMENT SCANNING AN STORAGE SERVICES FOR THE CUYAHOGA COUNTY BOARD OF HEALTH REQUEST FOR QUOTATIONS FOR DOCUMENT SCANNING AN STORAGE SERVICES FOR THE CUYAHOGA COUNTY BOARD OF HEALTH Background The Cuyahoga County Board of Health (CCBH) seeks a qualified contractor to provide assistance

More information

Life Application Process

Life Application Process General Discussion About Case With Marketer Preliminary Underwriting Preliminary Illustration(s) Meet With Client Informal/Trial Application APPLICATION Formal Application Obtain FIG HIPAA and Preliminary

More information