2 Objectives of the training Understand the definition of project and project cycle management. Apply the Problem Tree Analysis as a pre-requisite to project design Understand and apply Logical Framework Approach. Use theses tools when drafing project proposals to EC grants.
3 Organising a party? How did you organise? What where the things that you consider?
4 Handout 1: what is a project? What are the commonalities in this list of definitions.
5 Handout 1: what is a project? According to all these definitions, A project has a beginning and an end. A project has limited resources. A project follows a planned, organized method to meet its objectives with specific goals of quality and performance. Every project is unique A project has a manager responsible for its outcomes.
6 Triple Constraints Triple Constraints: a. Reaching the predefined objectives and results b.within the timeframe targetted c. Completion of activitities within the estimated budget 1. Context 2. Budget Risk Quality 3. Time
7 When should we have a project? When there is a specific need identified When there is a problem When there is a situation that you want to change, etc.
8 Project Cycle Management is a methodology for the preparation, implementation and evaluation of projects based on the principles of the logical framework approach (LFA) describes management activities and decision-making procedures used during the life cycle of a project Key tasks Roles and responsibilities Key documents and decision options
9 Preparing Project Proposals Project Cycle Planning Monitoring & Evaluation Identification Implementation Formulation Financing
10 Preparing Project Proposals Planning Identification Formulation Financing Implementation Monitoring and Evaluation PROJECT CYCLE Analysis of situation at national, local and sectorial level Formulation of project idea and design of project Preparation of the project proposal Securing financial resources e.g. Award of the grant and co-funding Implementation of the activities stated on the project proposal Ongoing checks an d periodic review of project
11 Preparing Project Proposal STEPS TO FOLLOW: 1. Analyse the problem: Collect necessary information about the problem Tool: Problem tree Analysis / Stakeholder Analysis 2. Identify the project: Find the project idea that is feasible and addressing problem identified Tool: Objective tree Analysis 3. Logical Framework Formulation 4. Grant Application Form 5. Budget
12 Strategy Analysis Activity and Resource Scheduling Objective Analysis Problem analysis Stakeholder analysis Developing Logical Framework matrix Analysis Phase Planning Phase identifying and characterise potential stakeholders assess their capacity identifying key problems, constraints and opportunities determining cause-effect relationships developing solutions from the identified problems identifying an improved situation in the future identifying different strategies to achieve solutions selecting most appropriate strategy defining project structure testing logic and risks formulating measurable indicators of success determining the sequence and dependency of activities estimating their duration assigning responsibility from the Activity Schedule, developing input schedules and a budget
13 Problem Analysis Problem Analysis Purpose: to identify major problems and their main causal relationships. Output: problem tree with cause and effects
14 Problem Analysis Problem Analysis Steps in Undertaking Problem Tree 1. Identify the major problems that the project will address. 2. State problems in negative manner. 3. Group problems by similarity of concerns. 4. Develop the problem tree: a) Select a focal problem from the list and relate other problems to the focal problem. b) If the problem is a cause of the focal problem it is placed below the focal problem c) If the problem is an effect of the focal problem is goes above 14
15 Problem Analysis The completed problem tree provides a visual summary of the current negative situation. In various respects, problem analysis is the most critical stage of project design and guides other consecutive analyses.
16 Problem Tree and Problem Analysis MAIN PROBLEM EFFECT SUB-PROBLEM1 SUB-PROBLEM2 CAUSE UNDERLYING PROBLEMS 16
17 Problem Tree Sea Pollution High incidence of water borned diseases and illnesses, particularly among poor families and under 5s Sea water quality is deteriorating High levels of solid waste dumped into the sea Most households and hotels discharge wastewater directly into the sea Wastewater treated in plants does not meet environmental standards Polluters are not controlled Environment Protection Agency ineffective and closely aligned with industry intersts Population not aware of the danger of waste dumping No public information / educatiıon programs available Existing legal regulations are inadequate to prevent discharge of wastewater Pollution has been a low political priority 40% of households and 20% of businesses not connected to sewerage network Inadequate levels of capital investment and poor business planning within local government
18 Objective Analysis Objective Analysis clarifies the means-ends relationship between the desirable situation that would be attained and the solution for attaining it. This stage also requires an Objective Tree.
19 Objective Analysis How to Make the Objective Tree Step 1: Reformulate all negative situation of the problem tree into positive situations that are : Desirable Realistically achievable Step 2: Make sure that there is a means ends (results) relationship (if this is implemented then this will be achieved) The causes become the starting point for the objectives. The effects become the results of the objectives. Step 3: IF necessary: Revise statements Add new objectives if these seem to be relevant and necessary to achieve the objective at the next higher level Delete objectives which do not see suitable or necessary
20 Objective Tree and Objective Analysis MAIN OBJECTIVE GOALS SUB-OBJECTIVE1 SUB-OBJECTIVE2 MEANS 20
21 Objective Tree Sea Pollution Incidence of sea water borned diseases and illnesses is reduced, particularly among poor families and under 5s Sea water quality is improved The quantity of solid waste dumped into the sea is reduced No. of households and hotels discharging wastewater directly into the sea is reduced Wastewater treatment meets environmental standards Polluters are effectively controlled Environment Protection Agency is effective and more responsive to a broad range of stakeholder interests Population more aware of the danger of waste dumping Public information / education programs established New legal regulations are established which are effective in preventing direct discharge of wastewater Pollution management is given a higher political priority Increased % of households and businesses are connected to sewerage network Improved business planning within local government is established
22 Strategy Analysis Strategy analysis is a process in which specific project strategies are selected from among the objectives and means raised in Objectives Analysis, based upon selection criteria. comparison of different options to address a given situation
23 Strategy Analysis Step 1: Identify objectives you do not want to pursue (not desirable or not feasible); Step 2: Group objectives, to obtain possible strategies or components (clustering); Step 3: Assess which strategy/ies represent(s) an optimal strategy according to the agreed criteria; Step 4: Determine Overall Objective(s) and Project Purpose
24 Strategy Analysis Incidence of sea water borned diseases and illnesses is reduced, particularly among poor families and under 5s Sea water quality is improved OVERALL OBJECTIVE PURPOSE Polluters are effectively controlled The quantity of solid waste dumped into the sea is reduced Population more aware of the danger of waste dumping RESULTS ACTIVITIES No. of households and hotels discharging wastewater directly into the sea is reduced New legal regulations are established which are effective in preventing direct discharge of wastewater Wastewater treatment meets environmental standards Increased % of households and businesses are connected to sewerage network Environment Protection Agency is effective and more responsive to a broad range of stakeholder interests Public information / education programs established Pollution management is given a higher political priority New legal regulations are established which are effective in preventing direct discharge of wastewater OUT OF THE PROJECT STRATEGY CHOSEN
25 Stakeholder Analysis 1. Stakeholders: Individuals or institutions that may directly or indirectly, positively or negatively affect or be affected by a project or programme. 2. Beneficiaries: are those who benefit in whatever way from the implementation of the project. Target group(s): The group/entity who will be directly positively affected by the project at the Project Purpose level. Final beneficiaries: Those who benefit from the project in the long term at the level of the society or sector at large, e.g. children due to increased spending on health and education, consumers due to improved agricultural production / marketing. 3. Project partners: Those who implement the projects in-country (who are also stakeholders, and may be a target group ).
26 Stakeholder Analysis Questions to be Asked to Stakeholders Basic Characteristics Social characteristics Group status (formal / informal) Group structures (leadership/ effectiveness) The way they approach problems Interests and motivation Needs Interests (open and discreet) Expectations Approach to project Potential Strenghts Weaknesses Possible contribution
27 Logical Framework Approach Obligatory to submit in most of the EU Calls (mandatory for CSV and SchoolsVI) EU stresses the importance of this tool Should be considered as a starting point of the project design NOT just a form to fill in drafting should involve the all team and partners THE LOGFRAME SHOULD BE DRAFTED BEFORE THE APPLICATION FORM!!!
28 Logical Framework Approach Technique to set up a project involving the identification of problems, organise overall and specific objectives of your project define of results and related activities draft indicators to track progress track objective Lay down assumptions/risks for the success of the project LFA is a key management tool in each phase of the project cycle: from implementation to evaluation, representing a «master tool» for creating other tools (e.g. implementation and resource schedules, monitoring plan, etc.)
29 Logical Framework Matrix Intervention Logic Verifiable indicators Sources of verification Assumptions Overall objective Project purpose Results Activities means costs Pre-conditions
30 Intervention Logic: Levels of Objectives The long-term social and economic, sectoral or national program objectives to which the project contributes. The project s central objective: sustainable benefits to be delivered to target beneficiaries. It defines the project s success. The services to be provided by the project for which project managers can be held accountable What is going to be done to deliver the project s results OVERALL OBJECTIVE PROJECT PURPOSE RESULTS ACTIVITIES Ideal situation can only be realised in the long-run Can be reached as an outcome of the project. Should be specific, measurable, attainable, realistic and time and location bound. The direct / tangible results (goods and services) that the project delivers should measurable and attainable. The tasks that need to be carried out to deliver the planned results which also are bound by a timeframe and a budget by the use of resources 30
31 Logframe Matrix Hierarchy of Objectives IF adequate inputs/resources are provided, THEN activities can be undertaken; IF the activities are undertaken, THEN results can be produced; IF results are produced, THEN the purpose will be achieved; and IF the purpose is achieved, THEN this should contribute towards the overall objective
32 Attention!!! Logic of the logframe is established by drafting the proposal from top to bottom MOST COMMON MISTAKE IS TO START DESCRIBING ACTIVITIES FIRST Steps Should Be Followed As: Define the overall objective Define the purpose (specific objective) Expected Results Activities
33 Logframe Matrix General Sequence of Completion
34 Purpose of the Project (Specific Objective) BAD PRACTICE GOOD PRACTICE Purpose is sum of results: Water treatment is improved and levels of direct discharge into the river reduced Purpose is consequence of results: Improved quality of river water Results: 1.1 Direct discharge of waste-water into the river reduced 1.2 Waste water treatment standards improved and enforced 1.3 Awareness of environmental management responsibilities improved
35 Logframe - Assumptions Risks: All of the negative external factors which should be considered for the success of the project. Assumptions: All of the positively expressed external factors which affect or determine the success of the project. Pre-conditions: The conditions which should be overcome before the implementation of activities. 35
36 Assumptions / Risks Assumptions are external factors that have the potential to influence (or even determine) the success of a project, but lie outside the direct control of project managers Assumptions are risks, which can jeopardize the success of the Project and are worded positively, i.e. they describe circumstances required to achieve certain objectives
37 Assumptions / Risks Key points in setting Assumption Should be relevant and probable If an assumption is not important or almost certain: Do not include If an assumption is unlikely to occur: Killer assumption abandon project
38
39 Vertical Logic Intervention Logic Project context Objectively Verifiable Indicators Sources of Verification Overall Objective Assumptions Purpose Results Activities Means Cost Preconditions
40 Objectively Verifiable Indicators Objectively* Verifiable Indicators project s objectives in operationally measurable terms (quantity, quality, time, or QQT). An indicator is an observable change or event which provides evidence that something has happened or is happening. They are formulated in response of the questions: How would we know whether or not what has been planned is actually happening or happened? How do we verify success? *The meaning of Objectively Verifiable indicator is that the information collected should be the same if collected by different people.
41 Objectively Verifiable Indicators Indicators measure to verify to what extant the results are achieved. Specify how the achievement of an objective can be verified or demonstrated Provide a basis for Monitoring and Evaluation 3 Dimensions of Indicators Quantity SMART Quality Time S : Specific M A R T : Measurable : Achievable : Relevant : Time-bound
42 Indicators and Sources of Verification 42
43 Planning Stage A detailed activity schedule and budget need to be prepared following the logframe matrix process. Activity schedule and the budget play a crucial role in the preparation of the project proposal. Planning stage is when the activities and the budget are planned.
44 Strength Opportunities Context analysis Stakeholder analysis SWOT analysis Weaknesses Threats Problem analysis Project strategy Overall Objectives Purpose Objectively verifiable indicators The log frame matrix Sources of Verification Assumptions Objective analysis Strategy analysis Results Activities Means Cost PRE CONDITION Schedules Reports
45 Activity Scheduling Gantt Chart in the full application form (2.1.3) Identify logical sequence, expected duration and dependencies of activities Acts as basis for allocating management responsibility
46 Resource Planning Resource Planning and Budget Resource planning and budget preparation is a three-level process: 1. Resource planning and preparing a draft budget 2. Conducting market research 3. Finalizing budget preparation
47 Sustainability Sustainability An assessment of the likelihood of benefits produced by the project to continue to flow after external funding has ended, and with particular reference to: factors of ownership by beneficiaries policy support economic and financial factors socio-cultural aspects gender equality appropriate technology environmental aspects institutional and management capacity.
48 Monitoring Monitoring is a systematic management activity Actual progress is compared to planned so to identify remedial actions Takes place at all levels of management Uses both formal reporting & informal communication Focuses on resources, activities & results in the logframe
49 Monitoring Monitoring - Tools Logframe Matrix Provides the objectives and indicators (targets) and the sources of information to support the monitoring system Lists key assumptions which should be reviewed as a part of risk management Activity Schedule (Action Plan) Implementation progress can be assessed Resource and Budget Schedules (Budget of the action) Clear reference for financial monitoring Allows comparison between planned and actual utilisation
50 Evaluation Evaluation is an assessment of project success Assesses the relevance, efficiency, effectiveness, impact and sustainability of projects in relation to stated objectives Focuses more on results-to-purpose and purpose-to-overall objectives Checks the coherence of project planning Checks the influence of the important assumptions Is based on the guiding principles: impartiality, independence and credibility
51 Specific Instructions at the full application stage A quality logical framework matrix with SMART indicators and targets of the results Mechanisms and resources to monitor recommendation to budget HR for this purpose Realistic time planning maximum efficiency in the use of time Sustainability strategy (financial, social, environmental guarantee continuity of the project results after the EU funding ends Memorandum of Understanding among applicant and co-applicant(s) common values principles, tasks, duties and rights
52 GOOD LUCK!
Brief Introduction. To Completing the Logframe Matrix
Brief Introduction To Completing the Logframe Matrix Introduction Formulating a project plan and completing the logical framework matrix requires some understanding of the logical framework approach to
More informationBasic Introduction to Project Cycle. Management Using the. Logical Framework Approach
Basic Introduction to Project Cycle Management Using the Logical Framework Approach Developed and Presented by: Umhlaba Development Services Umhlaba Development Services Noswal Hall, Braamfontein, Johannesburg,
More informationJune 10 th, 2015 / Ankara, Turkey
L O G I C A L F R A M E W O R K A P P R O A C H June 10 th, 2015 / Ankara, Turkey ANALYSIS PHASE 1. Problem Analysis 2. Stakeholder Analysis 3. Objective Analysis 4. Strategy Analysis PLANNING PHASE 1.
More informationProject Cycle Management and How To Write A Good Proposal. Eng. Suhail and Ayman Sultan Palestine Polytechnic University Ramallah April
Project Cycle Management and How To Write A Good Proposal Eng. Suhail and Ayman Sultan Palestine Polytechnic University Ramallah April 9 2006 Project Cycle Management Programming phase: Analyzing the situation
More informationDevelopment Cooperation Development Education Partnership Fair. Writing a successful co financing application
Development Cooperation Development Education Partnership Fair Writing a successful co financing application 3 sessions to guide project preparation Session 1: Deciding on stakeholders and defining problems/issues.
More informationNEPAD/Spanish Fund for African Women s empowerment
NEPAD/Spanish Fund for African Women s empowerment Project Proposal Format Annex 0 1 P age Proposal Format Proposal Cover Page: PROPOSAL TO THE NEPAD- SPANISH FUND FOR AFRICAN WOMEN s EMPOWERMENT Organization
More informationPROJECT PROPOSAL WRITING (A Tool for Resource Mobilization and Effective Attainment of Organization Objectives) OJI OGBUREKE, PhD November 2011
PROJECT PROPOSAL WRITING (A Tool for Resource Mobilization and Effective Attainment of Organization Objectives) OJI OGBUREKE, PhD November 2011 OBJECTIVES OF THE PRESENTATION By the end of the presentation,
More informationProject Cycle Management (PCM) Guidebook
Project Cycle Management (PCM) Guidebook New Revised Version 2017 PCM Guidebook 1 LIST OF ABBREVIATIONS CEGSTAR Center for Effective Governance System and Territorial Arrangement Reform CPA Critical Path
More informationGood Practice when Preparing a Project Proposal. 15 February 2005
Good Practice when Preparing a Project Proposal II 15 February 2005 Before applying Familiarise yourself with the programmes Web site, FAQs, past projects Review open Call for Proposals and associated
More informationJKUAT RESEARCH GUIDELINES Format and Guidelines for Writing a Research Proposal ANNEX IV
36 JKUAT RESEARCH GUIDELINES Format and Guidelines for Writing a Research Proposal ANNEX IV 1.0 Cover Page The project document must bear the standard official cover page for JKUAToriginated research proposals.
More informationElements of the CYCLE OF OPERATIONS and Introduction to the Logical Framework approach
Elements of the CYCLE OF OPERATIONS and Introduction to the Logical Framework approach TAO training workshop "programminng and implementation of the 11th EDF for OCTs Unit DEVCO 06 Session A (9:45 11:15)
More information4. Outline of EIA for Development Assistance
4. Outline of EIA for Development Assistance 4.1 EIA and Development EIA has an important role to play resolving these environmental problems through its ability to contribute to environmentally sound
More informationCross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support
Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme 2003 2006 2005 Project Fiche for Programme Support 1. Basic Information 1.1 CRIS Number: BG 2005/017-455.01;04 1.2 1.2 Title:
More informationCompare the Earned Value Management with the Project Cycling Managememt
Compare the Earned Value Management with the Project Cycling Managememt Kornélia Gönczi West Hungarian University Faculty of Economics, Sopron Erzsébet utca 9, gonczi.kornelia@telekom.hu Abstract: Nowadays
More informationAppendix B: Glossary of Project Management Terms
Appendix B: Glossary of Project Management Terms Assumption - There may be external circumstances or events that must occur for the project to be successful (or that should happen to increase your chances
More informationEN 1 EN. Rural Development HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK. Guidance document. September 2006
Rural Development 2007-2013 HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK Guidance document September 2006 Directorate General for Agriculture and Rural Development EN 1 EN CONTENTS 1. A more
More informationLocal Economic Development. LGCP - Project Formulation Workshop
Local Economic Development LGCP - Project Formulation Workshop 1 Project Formulation Workshop 11 13 November Jacir Hotel Bethlehem Paul Munters and Firas Zaghal LGCP - Project Formulation Workshop 2 Day
More informationGuidance for Member States on Integrated Sustainable Urban Development (Article 7 ERDF Regulation)
EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Integrated Sustainable Urban Development (Article 7 ERDF Regulation) p10 addition of 3 bullet points for specific
More informationJKUAT RESEARCH GUIDELINES. Format and Guidelines for Writing a Research Proposal ANNEX IV
JKUAT RESEARCH GUIDELINES Format and Guidelines for Writing a Research Proposal ANNEX IV 1.0 Cover Page The project document must bear the standard official cover page for JKUAT-originated research proposals.
More informationProject management guidelines. November 2013
p r o j e c t m a n a g e m e n t g u i d e l i n e s N O V E M B E R 2 0 1 3 T e l e c o m m u n i c a t i o n D e v e l o p m e n t S e c t o r Project management guidelines November 2013 Please consider
More informationCOST BENEFIT ANALYSIS - A TOOL TO OPTIMIZE PROJECT CYCLE MANAGEMENT
COST BENEFIT ANALYSIS - A TOOL TO OPTIMIZE PROJECT CYCLE MANAGEMENT Delia GLIGOR Marius Ioan PANTEA West University of Timişoara, Faculty of Economics and Bussines Administration Valentin P. MUNTEANU West
More informationPROGRAMME MANUAL. Guide for applicants and project partners responding to the calls for proposals of the South-East Finland Russia CBC
PROGRAMME MANUAL Guide for applicants and project partners responding to the calls for proposals of the South-East Finland Russia CBC 2014-2020 Published by the Managing Authority Publication date 30 January
More information1.2 Title: Project Preparation and Support Facility (PPF)
FINAL VERSION 1. Basic information 1.1 CRIS Number: 2009/021-665 1.2 Title: Project Preparation and Support Facility (PPF) 1.3 ELARG Statistical code: 4.40 1.4 Location: Skopje Implementing arrangements:
More informationNCF Glossary 1. November 2017
NCF Glossary 1 November 2017 1 This glossary in developed specifically for NCF projects and thus the definitions only relate to NCF projects. Please note that the Glossary is subject to revisions by NDF.
More informationRisk Management and Assessment Overview Alistair Nairn
Risk Management and Assessment Overview Alistair Nairn Purpose of risk management To define what may happen in the future and to choose among alternatives is a question that lies at the heart of contemporary
More informationPROGRAMME MANUAL. Guide for applicants and project partners responding to the calls for proposals of the South-East Finland Russia CBC
PROGRAMME MANUAL Guide for applicants and project partners responding to the calls for proposals of the South-East Finland Russia CBC 2014-2020 HOW TO USE THIS MANUAL This Programme Manual is designed
More informationAPPENDIX 1. Transport for the North. Risk Management Strategy
APPENDIX 1 Transport for the North Risk Management Strategy Document Details Document Reference: Version: 1.4 Issue Date: 21 st March 2017 Review Date: 27 TH March 2017 Document Author: Haddy Njie TfN
More informationProject number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level.
` Standard Summary Project Fiche Project number: TR 0305.01 Twinning number: TR03-SPP-01 1. Basic Information 1.1 Title: SUPPORT TO THE STATE PLANNING ORGANIZATION GENERAL DIRECTORATE FOR REGIONAL DEVELOPMENT
More informationIPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV
IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV 1. Basic information 1.1 CRIS Number: 2009 / 021-650 1.2 Title: Preparation for IPA components
More informationFundamentals of Project Risk Management
Fundamentals of Project Risk Management Introduction Change is a reality of projects and their environment. Uncertainty and Risk are two elements of the changing environment and due to their impact on
More informationINTERNAL AUDIT DIVISION AUDIT REPORT 2013/053. Audit of the management of the ecosystem sub-programme in the United Nations Environment Programme
INTERNAL AUDIT DIVISION AUDIT REPORT 2013/053 Audit of the management of the ecosystem sub-programme in the United Nations Environment Programme Overall results relating to effective management of the
More informationSTRATEGIC PLANNING PROCESS (2017) 1.1 The Association s strategic planning framework consists of the preparation of the following documents;
1.0 INTRODUCTION STRATEGIC PLANNING PROCESS (2017) 1.1 The Association s strategic planning framework consists of the preparation of the following documents; Corporate Management Plan Departmental Service
More informationStandard Summary Project Fiche IPA centralised programmes Project Fiche: 18
Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18 1. Basic information 1.1. CRIS Number: 2010/022-154 1.2. Title: Technical Assistance and Project Preparation Facility (TA&PPF)
More informationMANAGERIAL ACCOUNTABILITY AND RISK MANAGEMENT
MANAGERIAL ACCOUNTABILITY AND RISK MANAGEMENT concept and practical implementation Discussion paper I Introduction The objective of this discussion paper is to explain the concept of managerial accountability
More informationREGULATIONS. COMMISSION REGULATION (EC) No 1147/2008. of 31 October 2008
22.11.2008 EN Official Journal of the European Union L 313/1 I (Acts adopted under the EC Treaty/Euratom Treaty whose publication is obligatory) REGULATIONS COMMISSION REGULATION (EC) No 1147/2008 of 31
More informationSummary Project Fiche
Summary Project Fiche 1. Basic Information 1.1. Désirée number 1.2. Title: Rehabilitation of Nicosia - Phase 2 1.3. Sector: Bi-communal 1 projects 1.4. Location: Cyprus / Nicosia 2. Objectives 2.1. Overall
More informationM_o_R (2011) Foundation EN exam prep questions
M_o_R (2011) Foundation EN exam prep questions 1. It is a responsibility of Senior Team: a) Ensures that appropriate governance and internal controls are in place b) Monitors and acts on escalated risks
More informationRISK MANAGEMENT FRAMEWORK
RISK MANAGEMENT FRAMEWORK 1. INTRODUCTION (Company) acknowledges that risk is inherent in its business. The Company s risk management framework is an important tool to guide the organisation towards achieving
More informationRisk Management Policy and Framework
Risk Management Policy and Framework Risk Management Policy Statement ALS recognises that the effective management of risks is a fundamental component of good corporate governance and is vital for the
More informationGuidelines for brief feasibility study
Guidelines for brief feasibility study 1. The executive summary This point shall provide a clear description of the activities which are planned to be implemented within the project. In case of more complex
More informationMarche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015
Marche Region 2014-2020 COMMITTENTE RDP for Marche Ex Ante Evaluation report Roma, June 2015 Executive summary EXECUTIVE SUMMARY Introduction The Ex Ante Evaluation (EAE) of the Rural Development Programme
More informationBraindumps.PRINCE2-Foundation.150.QA
Braindumps.PRINCE2-Foundation.150.QA Number: PRINCE2-Foundation Passing Score: 800 Time Limit: 120 min File Version: 29.1 http://www.gratisexam.com/ I was a little apprehensive at first about an online
More informationRisk Assessment Policy
Risk Assessment Policy Updated: April 2018 Date of next Review: April 2019 Policy Lead: Bursar Checked by: Middle Leadership Team 1. INTRODUCTION Beachborough School will have hazards which if not controlled
More information2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)
2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External
More informationCOHESION POLICY
COMMUNITY-LED LOCAL DEVELOPMENT COHESION POLICY 2014-2020 The European Commission adopted legislative proposals for cohesion policy for 2014-2020 in October 2011 This factsheet is one in a series highlighting
More informationLIST OF OPERATIONS OPERATIONAL PROGRAMME "ENVIRONMENT" , PRIORITY AXIS 6 TECHNICAL ASSISTANCE
LIST OF OPERATIONS OPERATIONAL PROGRAMME "ENVIRONMENT" 2014-2020, PRIORITY AXIS 6 TECHNICAL ASSISTANCE Beneficiary name Operation name Operation summary Operation start date and operation end date Total
More informationPRINCE2 Sample Papers
PRINCE2 Sample Papers The Official PRINCE2 Accreditor Sample Examination Papers Terms of use Please note that by downloading and/or using this document, you agree to comply with the terms of use outlined
More informationPROJECT MANAGEMENT DIPLOMA COURSE
PROJECT MANAGEMENT DIPLOMA COURSE UNIT THREE PROJECT PLANNING TUTOR TALK: The Learning Outcomes for this assignment are: Describe the following: o Planning parameters o Planning quality o Developing a
More informationL 347/174 Official Journal of the European Union
L 347/174 Official Journal of the European Union 20.12.2013 REGULATION (EU) No 1292/2013 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 December 2013 amending Regulation (EC) No 294/2008 establishing
More informationENERGY MANAGEMENT PLAN ENERGY MANAGEMENT POLICY: ERG-1
Our Commitment Effective energy management begins with the specific, visible expression of commitment by the senior authorities in the Municipality to making the reduction of energy consumption an organizational
More informationLIFE WRITERS WORKSHOP: CONCEPT NOTE
LIFE WRITERS WORKSHOP: CONCEPT NOTE VILNIUS MAY 11, 2018 DIEGO MATTIOLI WHAT S THE MORNING PROGRAMME 9.15 9.45 Project Planning how to select the right funding line for your idea Spotlight on LIFE priority
More informationGUIDE FOR FILLING IN THE APPLICATION FORM 4TH CALL. Central Baltic Programme Version 4.0 ( )
GUIDE FOR FILLING IN THE APPLICATION FORM 4TH CALL Central Baltic Programme 2014-2020 Version 4.0 (4.7.2018) Contents Introduction... 2 Small and regular projects... 2 The emonitoring System... 2 Important
More informationREPUBLIC OF CROATIA MINISTRY OF REGIONAL DEVELOPMENT AND EU FUNDS EVALUATION STRATEGY FOR EUROPEAN STRUCTURAL INSTRUMENTS
REPUBLIC OF CROATIA MINISTRY OF REGIONAL DEVELOPMENT AND EU FUNDS EVALUATION STRATEGY FOR EUROPEAN STRUCTURAL INSTRUMENTS March 2012 1 Table of contents GLOSSARY OF ABBREVIATIONS... 3 Introduction... 4
More informationHaving regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,
L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)
More informationPRINCE2-PRINCE2-Foundation.150q
PRINCE2-PRINCE2-Foundation.150q Number: PRINCE2-Foundation Passing Score: 800 Time Limit: 120 min File Version: 6.0 Exam PRINCE2-Foundation Version: 6.0 Exam A QUESTION 1 What process ensures focus on
More informationRisk Management Policy
DYNAMIC ARCHISTRUCTURES LIMITED Risk Management Policy DYNAMIC ARCHISTRUCTURES LIMITED Regd. Address: 409, Swaika Centre, 4A Pollock Street, Kolkata - 700001 (West Bengal) CONTENTS Sr. Particulars Page
More informationMONTENEGRO. Enhanced control and management of fisheries INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)
INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Enhanced control and management of fisheries Action summary The objective of the Action is to align the electronic data collection
More informationModule 4. College of Development Communication
Module 4 Follows a systematic process that involves: Determining the needs and problems, Planning Implementing Evaluating It entails ensuring that the resources needed for all project activities are available
More informationFinancial Monitoring of a Development Project by FMSF - A Concept Note
Financial Monitoring of a Development Project by FMSF - A Concept Note Section 1 About Monitoring 1.1 What is Monitoring? Monitoring is. To check that things are going as per plan. Monitoring is the systematic
More informationThe Results Measurement (ReM) framework methodology
The Results Measurement (ReM) framework methodology The ReM framework methodology European Investment Bank September 2017 1 Introduction EIB lending is results-driven. Outside the EU, we use the Results
More informationAnnual Implementation Report CITIZEN S SUMMARY
INTERREG V-A Italy Croatia 2014-2020 CCI 2014TC16RFCB042 Annual Implementation Report CITIZEN S SUMMARY Article 50(9) of Regulation (EU) No 1303/2013 Draft 2/2017 XX.06.2016 The INTERREG V A Cross-border
More informationANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures
EN ANNEX V Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures 1. Title/basic act/ CRIS number 2. Zone benefiting from the action/location CRIS number: 2018/41357
More informationRisk Management Framework
Risk Management Framework Anglican Church, Diocese of Perth November 2015 Final ( Table of Contents Introduction... 1 Risk Management Policy... 2 Purpose... 2 Policy... 2 Definitions (from AS/NZS ISO 31000:2009)...
More informationTABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities
IDP REVIEW PROCESS PLAN DEPARTMENT OF THE OFFICE OF THE MUNICIPAL MANAGER JULY 2009-JUNE2010 TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS Roles and responsibilities 2.1 Council
More informationPLANNING BUREAU SUMMARY. December 2009
PLANNING BUREAU EUROPEAN UNION REPUBLIC OF CYPRUS EVALUATION OF THE INDICATORS OF THE OPERATIONAL PROGRAMMES SUSTAINABLE DEVELOPMENT AND COMPETITIVENESS AND EMPLOYMENT, HUMAN CAPITAL AND SOCIAL COHESION
More informationUNDP Initiation Plan to programme the project preparation grant received from the GEF. (otherwise called GEF PPG)
UNDP Initiation Plan to programme the project preparation grant received from the GEF (otherwise called GEF PPG) effective for all PIFs approved as of GEF November work programme 2017 A. Background: The
More informationOfficial Journal of the European Union L 60/1 REGULATIONS
5.3.2008 Official Journal of the European Union L 60/1 I (Acts adopted under the EC Treaty/Euratom Treaty whose publication is obligatory) REGULATIONS COUNCIL REGULATION (EC) No 199/2008 of 25 February
More informationRecommendation of the Council on Good Practices for Public Environmental Expenditure Management
Recommendation of the Council on for Public Environmental Expenditure Management ENVIRONMENT 8 June 2006 - C(2006)84 THE COUNCIL, Having regard to Article 5 b) of the Convention on the Organisation for
More informationExecutive Board Annual Session Rome, May 2015 POLICY ISSUES ENTERPRISE RISK For approval MANAGEMENT POLICY WFP/EB.A/2015/5-B
Executive Board Annual Session Rome, 25 28 May 2015 POLICY ISSUES Agenda item 5 For approval ENTERPRISE RISK MANAGEMENT POLICY E Distribution: GENERAL WFP/EB.A/2015/5-B 10 April 2015 ORIGINAL: ENGLISH
More informationInformation Session on the Calls for Expression of Interest in the fields of municipal infrastructure and socio-economic support.
EUROPEAN COMMISSION Neighbourhood and Enlargement Negotiations A - STRATEGY AND TURKEY A.5 TURKEY Secretariat of the EU Facility for Refugees In Turkey Information Session on the Calls for Expression of
More informationStudies on macro-regional strategies
Studies on macro-regional strategies Main conclusions of the studies and analysis carried out by Interact, discussion of 2020+ 27 March 2017 Central European Initiative, Trieste, Italy @InteractEU Studies
More informationFRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES
GEF/C.8/4 GEF Council October 8-10, 1996 Agenda Item 6 FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES RECOMMENDED DRAFT COUNCIL DECISION The Council reviewed document
More informationENTERPRISE RISK MANAGEMENT POLICY FRAMEWORK
ANNEXURE A ENTERPRISE RISK MANAGEMENT POLICY FRAMEWORK CONTENTS 1. Enterprise Risk Management Policy Commitment 3 2. Introduction 4 3. Reporting requirements 5 3.1 Internal reporting processes for risk
More informationI Introduction 1. II Core Guiding Principles 2-3. III The APR Processes 3-9. Responsibilities of the Participating Countries 9-14
AFRICAN UNION GUIDELINES FOR COUNTRIES TO PREPARE FOR AND TO PARTICIPATE IN THE AFRICAN PEER REVIEW MECHANISM (APRM) Table of Contents I Introduction 1 II Core Guiding Principles 2-3 III The APR Processes
More informationCE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE
CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE ANNEX 1 1. IDTIFICATION Title/Number Support Services to the National Authorising Officer CRIS NO: FED/2009/021-496 Total cost Total: 315,800 (EC Contribution:
More informationKey elements to develop a National Strategic Plan for TB care and prevention
Key elements to develop a National Strategic Plan for TB care and prevention Dr Giuliano Gargioni, Dr Salah Ottmani Technical Support Coordination Global TB Programme, WHO, Geneva, Switzerland Workshop
More informationRe: Royal Commission into Misconduct in the Banking, Superannuation and Financial Services Industry
Re: Royal Commission into Misconduct in the Banking, Superannuation and Financial Services Industry Written Submissions of the Australian Prudential Regulation Authority (APRA) Round 2: Financial Advice
More informationMulti-country European Integration Facility
1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries
More informationAnnex 1: Conceptual Framework of the Swiss-Slovenian Cooperation Programme
non-official publication Modified Version of 14 June 2012 Annex 1: Conceptual Framework of the Swiss-Slovenian Cooperation Programme The Conceptual Framework is an integral part of the Framework Agreement
More informationGuidelines for the AF DSP call for proposals
Guidelines for the AF DSP call for proposals A stream of cooperation edited by the Managing Authority/Joint Secretariat Budapest, Hungary, 2018 Programme co-funded by the European Union Table of content
More informationPRINCE2 Sample Papers
PRINCE2 Sample Papers The Official PRINCE2 Accreditor Sample Examination Papers Terms of use Please note that by downloading and/or using this document, you agree to comply with the terms of use outlined
More informationInfo Session EU programs and funds Welcome!
Balkan Security Network Info Session EU programs and funds Welcome! Introduction... Boško Nektarijević BBA - Bachelor of Business Administration - Paris, France 99 MBA - Master of Business Administration
More informationEAF-Nansen Project (GCP/INT/003/NOR)
EAF-Nansen Project (GCP/INT/003/NOR) Title : Improving the Artisanal Fisheries Management of Liberia and Sierra Leone Funded: EAF-Nansen Total Contribution: USD 50,000 1 Countries: Duration: Liberia and
More informationReport of the Advisory Committee on Administrative and Budgetary Questions
United Nations General Assembly Distr.: General 3 November 2000 Original: English A/55/543 Fifty-fifth session Agenda item 116 Review of the efficiency of the administrative and financial functioning of
More informationTCP Facility COMPONENT DESCRIPTION
TCP Facility COMPONENT DESCRIPTION Title of the component: Provide assistance to the State Service for Food Safety of the Ministry of Agriculture of Armenia with risk assessment methodology and system
More informationMULTI-COUNTRY. Support to Western Balkans Infrastructure Investment Projects for 2014 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)
INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MULTI-COUNTRY Support to Western Balkans Infrastructure Investment Projects for 2014 Action Summary This Action will allow financing Technical
More informationIII. modus operandi of Tier 2
III. modus operandi of Tier 2 Objective, country and project eligibility 70 Budget and timing 71 Project preparation: formulation of proposals 71 Project appraisal 72 Project approval 73 Agreements and
More informationAN INTRODUCTION TO RISK CONSIDERATION
AN INTRODUCTION TO RISK CONSIDERATION Introduction This cookbook aims at recalling basic concepts and providing simple tools and possibilities of applying the "considering of risks and opportunities" in
More informationBOSNIA AND HERZEGOVINA
INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 BOSNIA AND HERZEGOVINA European Integration Facility Action Summary The Action is designed to provide support to institutions in Bosnia and Herzegovina
More informationEstablishment of a Self- Sustaining Environmental Investment Service in the East Asian Seas Region
Project Proposal: Establishment of a Self- Sustaining Environmental Investment Service in the East Asian Seas Region by the GEF/UNDP/IMO Regional Programme on Partnerships in Environmental management for
More informationCertificate IV in Project Management Practice
BSB41515 Certificate IV in Project Management Practice Day 1: Project Initiation Course structure 8-day program Attendance sheet Active participation Assessment portfolio Initiating projects Planning projects
More informationMulti-country European Integration Facility
1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries
More informationPRINCE2 Sample Papers
PRINCE2 Sample Papers The Official PRINCE2 Accreditor Sample Examination Papers Terms of use Please note that by downloading and/or using this document, you agree to comply with the terms of use outlined
More informationAEBR Position Paper THE FIFTH REPORT ON ECONOMIC, SOCIAL AND TERRITORIAL COHESION INVESTING IN EUROPE S FUTURE
Európai Határ Menti Régiók Szövetsége (EHMRS) AGEG c/o EUREGIO Enscheder Str. 362 D-48599 Gronau AEBR Position Paper ON THE FIFTH REPORT ON ECONOMIC, SOCIAL AND TERRITORIAL COHESION INVESTING IN EUROPE
More informationIP-CIS : CIS Project Management
Meltem Özturan www.mis.boun.edu.tr/ozturan/mis301 1 Project Management Tools and Techniques (PMTT) Feasibility Analysis Organizational Breakdown Structure Work Breakdown Structure Scheduling Earned Value
More informationPROHSP8 SQA Unit Code H8WH 04. Develop, implement and review reactive monitoring systems for health and safety. Overview
Develop, implement and review reactive monitoring systems for health Overview This standard is for people with a role which involves: 1 developing and implementing health reactive performance (loss event)
More informationEAN.UCC Project Management Framework Handbook. Issue Version 3.0
EAN.UCC Project Management Framework Handbook Issue Version 3.0 Document Information Document Summary Document Item Document Title (auto, from properties) File Name (auto) PMFH Issue Version 3 Template
More informationMonitoring and Evaluation of Budget Performance CPA John Kauta Partner, Ariska Associates March 31, 2017
Monitoring and Evaluation of Budget Performance CPA John Kauta Partner, Ariska Associates March 31, 2017 Outline Introduction Monitoring Budget Performance Evaluating Budget Performance Conclusion 2 Introduction
More informationFactsheet N 6 Project implementation: delivering project outputs, achieving project objectives and bringing about the desired change
Project implementation: delivering project outputs, achieving project objectives and bringing about the desired change Version No 13 of 23 November 2018 Table of contents I. GETTING STARTED: THE INITIATION
More informationA Project Management Guide for Researchers
A Project Management Guide for Researchers Prepared by: Research Grant and Contract Services January 2018 Copyright 2018 Memorial University of Newfoundland Table of Contents 1.0 Introduction... 4 2.0
More information