CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

Size: px
Start display at page:

Download "CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE"

Transcription

1 CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE ANNEX 1 1. IDTIFICATION Title/Number Support Services to the National Authorising Officer CRIS NO: FED/2009/ Total cost Total: 315,800 (EC Contribution: 225,000; Beneficiary: 90,800) - A envelope 10 th EDF Aid method / Method of implementation Project approach, Partially decentralised management DAC-code Sector Economic and Development Policy/Planning 2. RATIONALE 2.1. Sector context The programme of Support to the National Authorising Officer places new emphasis on the following: (i) Project Formulation, (ii) Programme Coordination, (iii) Procurement, (iv) Programme Monitoring and Implementation, (v) Monitoring and implementation of the National Adaptation Strategy (NAS). St. Kitts and Nevis has never had a physically separate NAO s Office. EC funded programmes are managed in an integrated, centrally located projects section of the national planning facility located in the Ministry of Finance & Sustainable Development (MoFSD). The closure of the sugar industry and the consequent development of Accompanying Measures for Sugar Protocol countries (AMSP) to assist with post-sugar adaptation have resulted in a significant increase in the resources allocated to St. Kitts & Nevis and consequently the workload of the Project Coordination Unit (PCU). It has therefore been recognized that more support to the Unit is necessary to deal with management of several EDF financed projects, the implementation of the NAS which is the basis of current and future budget support a new aid modality for St. Kitts, and accompanying technical assistance programmes financed under the Sugar facility. The PCU is therefore seeking to establish a dedicated NAO's Office which will be linked to the existing project office so that it benefits from the existing experience but with its own staff to work on issues emanating from the partnership between St. Kitts and Nevis and the European Commission Lessons learnt The Project Coordination Unit has not been a beneficiary of any direct project support in the past, other than some assistance for training and attendance at conferences and seminars under the ongoing TCF for general project staff. These are the same officers covering some of the activities of the NAO office and therefore the office has experienced difficulties previously in implementing the National Indicative Programme due to inadequate capacity. Therefore it is desirable to create a dedicated NAO's Office which can concentrate on EC cooperation alone. Experience has shown that further assistance is required in several areas: policy development, sectoral planning, project management, improved coordination and visibility, reporting and monitoring, training and additional staff. It has also been demonstrated that there needs to be enough focus on achieving a clear vision and understanding of project implementation in the Financing Agreement, and in response there is also a need for Government implementation and planning capacity building prior to project start-up. Evidently there is a need to focus more on strengthening the institutions managing and implementing programme activities. The presence of sufficient staff and strengthened management and planning capacity for an enhanced institutional framework should take centre stage in future EC cooperation. The activities proposed for implementation of the Support Services to the NAO also draw on a number of important lessons from the implementation of previous EU

2 CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE development cooperation programmes within the country. It also draws on a number of lessons learned from various reports Complementary actions The proposed project is an important means of supporting the adjustment process of SKN to the new market conditions affecting sugar. The project is consistent with the NAS which addresses the GoSKN response to economic/fiscal and structural issues and maps out economic diversification programmes and activities related to non-sugar agricultural diversification, social protection, poverty reduction and environmental challenges raised by the EU sugar reforms. The NAS constitutes the overall development strategy of the GoSKN. The proposed programme is consistent with the country s 2006 sugar allocation ( 2.85 million) which supports the strengthening of Government planning and coordination mechanisms and the establishment of the institutional framework for managing the adaptation process, as well as with the 2007 sugar allocation via a general budget support programme for 10.5 million which has a technical assistance component aimed at developing institutional capacity within the public sector as well as development of strategic policies. Most of the A- allocation for the 9 th EDF NIP is allocated to the focal sector Human Resources Development, with emphasis on skills development in the area of information technology. The focal sector proposed for the 10 th EDF is Safety and Security with special attention to capacity building, training, and provision of scholarship programmes for police and other security staff. It is the differentiation of these complementary modalities as well as the increase in workload that now makes earmarked resources for the NAO necessary. These approaches are all supported both by the European Consensus and the Paris Declaration on Aid Effectiveness where it is acknowledged that aid effectiveness may require different but complementary modalities. The 10 th EDF CSP allocates 5% of the total to support for the NAO Donor coordination The EC is the only donor with significant grant funds for a major bilateral aid programme in SKN. Project activities will be integrated with ongoing projects under the 9 th EDF and the 2006, 2007 and 2008 sugar allocation programmes where appropriate. There are only two development financial institutions present in SKN which are the World Bank and the Caribbean Development Bank (CDB) with which the EC collaborates closely through an alignment with its policy based assistance under the general budget support programme for the 2007 AAP. In addition, the programme will seek to complement the activities of other donors such as CIDA and programmes like CARTAC that are engaged in the implementation of a series of public finance management reforms in SKN. 3. DESCRIPTION 3.1. Objectives The overall objective of this programme is to ensure the efficient and optimal utilization of EU development assistance in support of national development goals and objectives. The programme's purpose is to foster more efficient and effective planning, utilization, monitoring and implementation of EU development assistance and co-operation in St. Kitts & Nevis through support to the operations of the National Authorising Officer. The detailed planning of the project will be subject to an Institutional Assessment of the relevant units assisting the NAO to be undertaken before the first Programme Estimate is prepared. The assessment will review organisational structures, working methods, allocated tasks, coordination and communication patterns, budget 1 Report of the 7 th Meeting of the ACP National and Regional Authorizing Officers, Brussels 10 th -12 May 2003; Brussels Declaration on the timely and effective implementation of the EDF :(NAOs/RAOs meeting 10 th to 12 th May 2003); Europe Aid: Working Paper; orientation note on the reinforcement of the National Authorizing Officer System; Report on the Caribbean Regional Workshop for ACP National and Regional Authorizing Officers, Non-State Actors and EC Heads of Delegation held in Suriname March 2004; European Development Fund Support Services Unit Mid-Term Evaluation Report December AGRER Belgium.

3 CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE allocations et cetera taking into consideration the present structure and needs and consider the future needs due to the shift towards general budget support. The findings will provide the basis for further competence development/training and/or institutional and organisational improvements Expected results and main activities Results The set of results necessary to achieve the project purpose comprises: 1. A more coordinated and operationally strengthened structure with clear lines of reporting and mechanisms for cross-ministerial sectoral planning and coordination of the transition and development programming which supports the overall implementation of the NAS and coordination with donors; 2. Improved planning, reporting, monitoring and accounting of the use of EU funds and in particular the delivery of budget support programmes; 3. Better visibility of EU development assistance to St. Kitts and Nevis. Activities The following activities will be undertaken in support of the results: In fulfilment of Results Area 1: a) Establishment of a dedicated NAO's Office. b) Annual country portfolio reviews, donor coordination meetings and annual budget support reviews with the EC and other donors; establishment and support to donor-coordination forums on public finance management and macro-economic reforms. In fulfilment of Results Area 2: c) Participation in Conferences and Workshops by staff in the NAO s Office & line ministries, allowing them to participate effectively in skills and knowledge transfers and to facilitate networking. d) Training for staff working in the NAO s Office is necessary for their general professional development as well as to assist them in keeping abreast with all the relevant EU policies, processes and procedures. e) Administrative support is integral to any project management based institutional structure through providing supplies and equipment and covering some operating costs to enable the office to function efficiently. In fulfilment of Results Area 3: f) Publication of EU development cooperation initiatives with SKN Risks and assumptions The programmes assume the following: At the level of the activities that there will be the availability of suitable, dedicated and motivated staff and appropriate information materials and equipment, mobilised in a timely manner; At the level of the results that external factors do not overcome the efforts of the NAO in relation to project implementation or slippages in implementation of sound macro-economic policies that could affect the overall macroeconomic climate and general budget support programmes under the AMSP;

4 CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE At the level of the project purpose that a continuity of development co-operation is ensured from the EU; Economic and social partners will fulfil their obligations and responsibilities; The Government remains committed to fully implement the NAS in a timely manner in spite of capacity constraints in sector/line ministries, & these ministries are committed to working in a coherent and coordinated manner with the MoFSD; Availability of relevant technical assistance and consultancy services and retention of the staff in the NAO s Office; Timely availability and disbursement of funds under this programme; Natural/man-made disasters will have manageable consequences. Through carefully established monitoring and reporting systems, the NAO will have the opportunity to supervise the Support Services to the NAO output on a continuing basis. Thus, the NAO will be able to apply any changes regarding the management and operation of the Office should the need arise. The risks are that the above mentioned assumptions are not fulfilled Crosscutting Issues The project will also seek to train and inform the staff of the NAO s Office & line ministries on cross-cutting issues pertinent to St. Kitts & Nevis, which should be addressed in the Project Cycle Management of European Union Aid. These issues should include Environmental Assessment, Guidelines on Good Governance, Gender Equality and Disability Stakeholders The enhancement in support to the NAO s Office will facilitate the efficient delivery of EC funded programmes to some of the most vulnerable groups in the society. In the case of the Sugar Facility funded programmes, direct key stakeholders include the ex sugar workers and their families as well as other vulnerable groups. The wider community including workers in key service industries in the economy such as tourism and ICT will also benefit from the economy wide transformation that is the planned outcome of the Adaptation Strategy. Other key stakeholders include the officers and staff of the MoFSD and ultimately the whole of the public sector. Investments in human resources and institutional development efforts will enhance Government capacity to plan and manage the ongoing adaptation process, and to achieve macro-economic stability and transparent public finance management systems conducive to receiving budget support as the main EC aid modality for the implementation of programmes under the sugar facility and potentially under the 10 th EDF. 4. IMPLEMTATION ISSUES 4.1. Method of implementation The project will be implemented under partially decentralised management through the signature of a financing agreement with the Government of St. Kitts & Nevis. Technical assistance will be recruited under the framework contract procedure. Implementation of the other activities is under a Programme Estimate with the Ministry of Finance and Sustainable Development. The National Authorising Officer will be the Contracting Authority. Imprest administrators and accounting officers will be assigned. Day to day management and implementation of the project will be located in the existing structure with the Planning Unit of the MoFSD. The existing institutional structure and management system will be reviewed during the formulation of the Financing Proposal. Responsibility for the overall management and the coordination of tender procedures and contracting will rest with the NAO's office. The Commission controls ex ante all the procurement contracts except for procurement contracts under Programme Estimates where the Commission controls ex ante procurement

5 CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE contracts > EUR and ex post procurement contracts EUR. All grant contracts, whether being under Programme Estimates or not, are subject to ex ante controls. Any programme estimates under this project will take the form of direct decentralised operation. Through the programme estimates, payments are decentralised for operating costs and contracts up to the ceilings indicated in the table below: The Authorising Officer ensures that, by using the model of financing agreement for decentralised management, the segregation of duties between the authorising officer and the accounting officer or of the equivalent functions within the delegated entity will be effective, so that the decentralisation of the payments can be carried out for contracts up to the ceilings specified below. Works Supplies Services Grants < EUR EUR < EUR EUR 4.2. Procurement and programme estimates All contracts implementing the action must be awarded and implemented in accordance with the procedures and standard documents laid down and published by the Commission for the implementation of external operations, in force at the time of the launch of the procedure in question. Participation in the award of contracts for the present action shall be open to all natural and legal persons covered by the EDF. Extensions of this participation to other natural or legal persons by the concerned authorising officer shall be subject to the conditions provided for in article 20 of Annex IV of the Cotonou Agreement. All programme estimates must respect the procedures and standard documents laid down by the Commission, in force at the time of the adoption of the programme estimates in question Budget and calendar The estimated project operational implementation phase is 48 months, followed by a 24 months closure period. The budget will be programmed from 10 th EDF Funding, allocated to Support Services to the National Authorising Officer as follows: Budget Item Budget (Euro) Government Contribution (Euro) Total (Euro) Activity 1: Staffing of NAO Office these activities will be implemented through programme estimates 95,000 55, ,800 Activity 2: Training, Conferences and Workshops - these activities will be implemented through programme estimates Activity 3: Administrative Support (facilities, equipment, and operating costs) -these activities will be implemented through programme estimates 48,000 48,000 50,000 10,000 60,000

6 CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE Audits 10,000 10,000 Monitoring and Evaluation 15,000 15,000 Contingencies 7,000 7,000 Office Rental 25,000 25,000 Total 225,000 90, , Performance monitoring Overall monitoring of the programme will be assured by the NAO in St. Kitts & Nevis and the Delegation of the European Commission in Barbados and the Eastern Caribbean. External consultants may be recruited to support the process Evaluation and audit An evaluation of the support to the NAO will be conducted at the end of the programme. A provision for Audit is included in the Budget of this Financing Agreement. In addition, the Chief Authorising Officer can use this provision to organise an independent audit of expenditure under this agreement. Audit and evaluation contracts and framework contracts are always conducted by the Commission acting for and on behalf of the ACP country concerned Communication and visibility The Support Services to the NAO will ensure that proper visibility is provided for the EU interventions for this agreement and other agreements implemented with EU funding in St. Kitts in accordance with existing visibility guidelines: [ This includes ensuring that reference to the EU contribution shall be made on each official document and report elaborated with EU support, to provide appropriate support to and encourage PR activities as well as ensuring that every work site/building funded with EU funds is officially recognised by an appropriate sign.

7 CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE AIDCO/ (2008) D/NNN

8 CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE ANNEX 2 1. IDTIFICATION Title/Number Total cost Aid method / Method of implementation Technical Cooperation Facility and Support to Non-State Actors CRIS: FED/2009/ EC contribution: 450,000 (10% of Indicative Programme) EDF 10 A envelope Project approach partially decentralised management. DAC-code Sector Economic and Development Policy/Planning 2. RATIONALE 2.1. Sector context The present intervention will support the planning and implementation of policies and strategies in all sectors supported by the various instruments of EU cooperation, including in particular the education sector (focal sector for the 9 th EDF) and the area of safety and security (focal sector for the 10 th EDF), as well as the areas supported under the AMSP Lessons learnt The former Technical Cooperation Facility from the 9th EDF ( ) has supported the European Commission cooperation programme in St Kitts and Nevis in various activities including the sugar facility. It has also allowed participation in seminars and trainings that have improved the understanding of the EU cooperation policies among key actors. Experience has shown that in general, the need for Technical Assistance (TA) was underestimated, while the other components were overestimated. The TA allocation has therefore been increased Complementary actions There is no ongoing EC action which would be complementary to the present one. In the future, St Kitts and Nevis will also benefit from more specific support to the NAO's office, which will address similar problems, but will only focus on the NAO's office. 1

9 CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE 2.4. Donor coordination Through the allocation for training and for conferences and seminars, the project will contribute to improved coordination with other donors in particular in the focal sector. However, as there are very few other donors active in St Kitts and Nevis, donor coordination is limited and does not include joint programming or pooled funding. 3. DESCRIPTION 3.1. Objectives The overall objective of the programme is to support the implementation of the Government's development strategies and policies through improved assistance by the European Community. The project purpose is to improve the planning and implementation of development projects and programmes financed by the European Community (including the EDF and the sugar facility), strengthen the capacity of Government services and support the involvement of Non-State Actors in EU projects and programmes Expected results and main activities Expected results include: Improved efficiency and effectiveness of EU development assistance Better visibility of EU development assistance to the country Stronger involvement of Non-State Actors in the planning and implementation of EU development assistance. The main activities to be implemented under this intervention are: Technical Assistance. This component will help the Government of St Kitts and Nevis to plan and implement programmes and projects in accordance with EDF rules and procedures, providing TA services in particular during the identification and feasibility stage, but also at all other stages of the project cycle including monitoring, evaluation and audit if the TA required is not covered by the project itself. The component will also fund trade related technical assistance activities. Training Support for Projects and Programmes. This component will finance various educational actions related to the planning and implementation of EDF funded activities. Conferences and Seminars. This component will cover more general short term training activities for ACP officials and NSA staff, as well as participation in international conferences on development or trade issues, which are organized by institutions other than the Commission. 2

10 CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE Support to Non-State Actors. This component will finance various activities to support the involvement of NSA in the planning and implementation of EDF funded activities Risks and assumptions There are no particular risks involved in the implementation of the present project. Implementation is not subject to any specific conditions to be met by the Government Crosscutting Issues The project will support the integration of crosscutting issues in the planning and implementation of EU assistance in St Kitts and Nevis, by providing technical assistance and training during the relevant phases of the project cycle Stakeholders The stakeholders in this Technical Cooperation Facility project are those relevant to the EDF cooperation programmes in St Kitts and Nevis, especially government institutions, target groups according to EC programmes and projects for which the TCF would be use, and the citizens in general. 4. IMPLEMTATION ISSUES 4.1. Method of implementation The method of implementation will be partially decentralised management through the signature of a financing agreement with the Government of St Kitts and Nevis. The Commission controls ex ante all the procurement contracts except for procurement contracts under Programme Estimates where the Commission controls ex ante procurement contracts > EUR and ex post procurement contracts EUR. All grant contracts, whether being under Programme Estimates or not, are subject to ex ante controls. Any programme estimates under this project will take the form of direct decentralised operation. Through programme estimates, payments are decentralised for operating costs and contracts up to the ceilings indicated in the table below: The Authorising Officer ensures that, by using the model of financing agreement for decentralised management, the segregation of duties between the authorising officer and the accounting officer or of the equivalent functions within the delegated entity will be effective, so that the decentralisation of the payments can be carried out for contracts up to the ceilings specified below. Works Supplies Services Grants 3

11 CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE < 300,000 EUR 150,000 EUR < 200,000 EUR 100,000 EUR 4.2. Procurement and programme estimates All contracts implementing the action must be awarded and implemented in accordance with the procedures and standard documents laid down and published by the Commission for the implementation of external operations, in force at the time of the launch of the procedure in question. Participation in the award of contracts for the present action shall be open to all natural and legal persons covered by the 10 th EDF. Extensions of this participation to other natural or legal persons by the concerned authorising officer shall be subject to the conditions provided for in article 20 of Annex IV of the Cotonou Agreement. All programme estimates must respect the procedures and standard documents laid down by the Commission, in force at the time of the adoption of the programme estimates in question Budget and calendar - Technical Assistance 280,000 - Training 50,000 - Conferences and workshops 50,000 - Support to Non-State Actors 25,000 - Audits 10,000 - Evaluation 10,000 - Contingencies 25,000 Total 450,000 The execution period for this project will be 84 months, including an implementation period of 60 months and a closure period of 24 months Performance monitoring The project will be monitored regularly by the NAO and the Delegation Evaluation and audit An end-of programme evaluation is foreseen for this project. Regular audits will be carried out for the closure of the Programme Estimates. 4

12 CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE 4.6. Communication and visibility The present project will serve to support visibility activities for other interventions, if other funds are not available. However, no specific activities are planned for the visibility of the present project itself. 5

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode ANNEX 1. IDTIFICATION Title Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode DAC-code 15010 Project approach Partially decentralised management.

More information

ANNEX. DAC code Sector Economic and Development Planning

ANNEX. DAC code Sector Economic and Development Planning ANNEX 1. IDTIFICATION Title Total cost Aid method management mode Technical Cooperation Facility 1.5M (2.4% of NIP) Project approach partially decentralised management DAC code 15010 Sector Economic and

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

Draft COMMISSION DECISION

Draft COMMISSION DECISION Draft COMMISSION DECISION of on the Annual Action Programme 2008 on Accompanying Measures on Sugar in favour of St. Kitts and Nevis to be financed under Article 21.060300 of the general budget of the European

More information

ANNEX Action Fiche for Technical Cooperation Facility II for Palau

ANNEX Action Fiche for Technical Cooperation Facility II for Palau ANNEX Action Fiche for Technical Cooperation Facility II for Palau 1. IDENTIFICATION Title Technical Cooperation Facility CRIS no. FED/2013/024-369 Total cost 180,000 (6.2% of NIP A envelope) EDF contribution

More information

EN AIDCO/ (YYYY) D/NNN EN EN

EN AIDCO/ (YYYY) D/NNN EN EN EN AIDCO/ (YYYY) D/NNN EN EN ANNEX 1. IDENTIFICATION Title/Number St. Kitts and Nevis Accompanying Measures for Sugar Protocol Countries Allocation 2010 CRIS Number: 022-412 Budget heading Budget line

More information

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management ANNEX Action Document for 11 th EDF EU-TL Co-operation Support Facility (CSF) 1. IDENTIFICATION Title/Number Total cost 11 th EDF EU-TL Co-operation Support Facility (CSF) CRIS number: 2014/37442 Total

More information

Annex. 11 th EDF Support to the Office of the NAO CRIS No. TZ/FED/ Total estimated cost: EUR

Annex. 11 th EDF Support to the Office of the NAO CRIS No. TZ/FED/ Total estimated cost: EUR Annex of the Commission Decision on the individual measure in favour of Tanzania to be financed from the 11 th European Development Fund Action Document for 11 th EDF Support to the Office of the NAO 1

More information

11 th EDF National Indicative Programme (NIP) for Cooperation between Barbados and the European Union

11 th EDF National Indicative Programme (NIP) for Cooperation between Barbados and the European Union EN ANNEX 2 of the Commission Decision on the Technical Cooperation Facility and Support to the NAO in Barbados Action Document for Technical Cooperation Facility and Support to the NAO of Barbados 1. Title/basic

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I)

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I) Action Fiche for Syrian Arab Republic 1. IDTIFICATION Title/Number Support to the EU-Syria Association Agreement Programme (SAAP I) Total cost EU contribution: EUR 5 000 000 Beneficiary contribution: tbc

More information

Draft COMMISSION DECISION

Draft COMMISSION DECISION Draft COMMISSION DECISION of on the 2008 Annual Action Programme of Accompanying Measures for Sugar Protocol Countries in favour of Trinidad and Tobago to be financed under Article 21.060300 of the general

More information

Empowerment of non state actors in Botswana

Empowerment of non state actors in Botswana Annex: Empowerment of non state actors in Botswana 1. IDENTIFICATION Title/Number Empowerment of non state actors in Botswana BW/FED/022-316 Total cost EUR 10 000 000 European Union contribution : EUR

More information

1. Title/basic act/ CRIS number

1. Title/basic act/ CRIS number EN ANNEX 2 to the Commission Decision on the 2017 Annual Action Programme in favour of Antigua and Barbuda to be financed from the 11 th European Development Fund Action Document for Technical Cooperation

More information

Annex 1. IDENTIFICATION

Annex 1. IDENTIFICATION 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation Annex DAC-code 15112 Sector Ghana Decentralisation Support Programme - GDSP- Component I CRIS ref. GH/FED/022-108 EUR 5 000

More information

This action is funded by the European Union

This action is funded by the European Union This action is funded by the European Union ANNEX 10 of the Commission implementing Decision on the Annual Action Programme 2015 of the DCI Pan-African Programme Action Document for "Support Measures Annual

More information

Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation CRIS n ENPI/2008/

Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation CRIS n ENPI/2008/ EN 1 EN ACTION FICHE FOR ARMENIA - ENPI AAP 2008 1. IDENTIFICATION Title Total cost Aid method / Management mode Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation

More information

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures EN ANNEX V Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures 1. Title/basic act/ CRIS number 2. Zone benefiting from the action/location CRIS number: 2018/41357

More information

Practical Guide to procedures for programme. EDF et the BUDGET

Practical Guide to procedures for programme. EDF et the BUDGET Practical Guide to procedures for programme estimates financed by the EDF et the BUDGET (project approach) Information Session 10.2008 1 = Instrument allowing a more decentralised financial implementation

More information

Action Fiche for Armenia Sector Multi Sector

Action Fiche for Armenia Sector Multi Sector Action Fiche for Armenia 1. IDENTIFICATION Title Total cost Aid method / Management mode DAC-code Twinning Projects between 3 or 4 Armenian administrations and their equivalent in EU Member States to foster

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 13.10.2011 COM(2011) 638 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE

More information

1. Title/basic act/ CRIS number. 2. Zone benefiting from the action/location 3. Programming document

1. Title/basic act/ CRIS number. 2. Zone benefiting from the action/location 3. Programming document EN ANNEX 2 of the Commission Decision on the Technical Cooperation Facility and Support to the National Authorising Officer Action Document for Technical Cooperation Facility and Support to the National

More information

Follow-up by the European Commission to the EU-ACP JPA on the resolution on private sector development strategy, including innovation, for sustainable

Follow-up by the European Commission to the EU-ACP JPA on the resolution on private sector development strategy, including innovation, for sustainable Follow-up by the European Commission to the EU-ACP JPA on the resolution on private sector development strategy, including innovation, for sustainable Development. The European External Action Service

More information

DAC-code Sector Public Sector Policy and Administrative Management

DAC-code Sector Public Sector Policy and Administrative Management ANNEX 1 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementatio n Framework Programme in support of EU-Ukraine Agreements CRIS: ENPI/2012/23714

More information

Action Fiche Trinidad and Tobago

Action Fiche Trinidad and Tobago Action Fiche Trinidad and Tobago 1. Identification Title/Number Accompanying Measures for Sugar Protocol Countries, Trinidad and Tobago 2011-2013 CRIS Number: 023-150 Total cost EU Contribution: EUR 31

More information

RATIONALE AND COUNTRY CONTEXT

RATIONALE AND COUNTRY CONTEXT ANNEX 1. IDENTIFICATION Title/Number Total cost Support to the implementation of the agriculture sector wide approach (ASWAp) and the Green Belt Initiative (GBI) CRIS: MAI/FED/23181 EUR 97 843 000 A Envelope

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

The Mid-Term Review of the 10 th EDF. Information package for SRHR and Health advocates in the Global South

The Mid-Term Review of the 10 th EDF. Information package for SRHR and Health advocates in the Global South The Mid-Term Review of the 10 th EDF Information package for SRHR and Health advocates in the Global South Content 1. Overview : the EDF, CSPs, NIPs 2. The Mid-Term Review (MTR) 3. Advocacy Opportunities

More information

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting. EN EN EN ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA 1. IDENTIFICATION Beneficiary Bosnia and Herzegovina CRIS number 2010 / 022-674 Year 2010 Cost EUR 6 000 000 Implementing Authority

More information

Action Fiche for Lebanon

Action Fiche for Lebanon Action Fiche for Lebanon 1. IDENTIFICATION Title/Number Facility in support of SMEs energy efficiency investments Total cost EU Contribution : 15,000,000 Aid method / Method of implementation Project approach

More information

EN AIDCO/ (2010) EN EN

EN AIDCO/ (2010) EN EN EN AIDCO/ (2010) 87827 EN EN Annex 1. Identification Title/Number Total cost Aid method / Method of implementation DAC-code Support to the Greenland Education and Vocational Training Sector 2010, CRIS

More information

This action is funded by the European Union

This action is funded by the European Union EN This action is funded by the European Union ANNEX 2 on the Commission Decision on the Annual Action Programme 2016 in favour of the Republic of Ghana to be financed from the 11 th European Development

More information

COMMISSION DECISION. of on the Annual Action Programme 2016 in favour of Uganda to be financed from the 11 th European Development Fund

COMMISSION DECISION. of on the Annual Action Programme 2016 in favour of Uganda to be financed from the 11 th European Development Fund EUROPEAN COMMISSION Brussels, 22.11.2016 C(2016) 7555 final COMMISSION DECISION of 22.11.2016 on the Annual Action Programme 2016 in favour of Uganda to be financed from the 11 th European Development

More information

«FICHE CONTRADICTOIRE»

«FICHE CONTRADICTOIRE» «FICHE CONTRADICTOIRE» Evaluation of the Commission s External Cooperation with Angola (Country level evaluation) (*For details on the recommendations please refer to the main report) Recommendations STRATEGIC

More information

National Indicative Programme for Tanzania Public Sector policy and administrative management

National Indicative Programme for Tanzania Public Sector policy and administrative management This action is funded by the European Union ANNEX of the Commission Decision on the individual measure in favour of Tanzania to be financed from the 11 th European Development Fund Action Document for

More information

2.2. Lessons learnt 2.3. Complementary actions 2.4. Donor coordination

2.2. Lessons learnt 2.3. Complementary actions 2.4. Donor coordination 2.2. Lessons learnt EDF projects have been implemented in Sierra Leone for three decades for the rehabilitation of both main and rural roads, providing valuable experience to the SLRA as well as the Commission

More information

Annex I Action Fiche for West Bank and Gaza Strip/ ENPI

Annex I Action Fiche for West Bank and Gaza Strip/ ENPI Annex I Action Fiche for West Bank and Gaza Strip/ ENPI 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation PEGASE: Support to Recurrent Expenditures of the PA EUR 158,500,000

More information

ANNEX. Support to the reform of criminal justice system in Georgia - CRIS N ENPI/2008/19630

ANNEX. Support to the reform of criminal justice system in Georgia - CRIS N ENPI/2008/19630 ANNEX ACTION FICHE GEORGIA PI AAP 2008 1. IDTIFICATION Title Total cost 16 M Aid method / management mode Support to the reform of criminal justice system in Georgia - CRIS N PI/2008/19630 Sector Policy

More information

Project approach - Decentralised management. DAC-code Government Administration

Project approach - Decentralised management. DAC-code Government Administration ANNEX Annex1 ACTION FICHE FOR SYRIAN ARAB REPUBLIC / ENPI / LOCAL DEVELOPMENT 1. IDENTIFICATION Title/Number Promoting Decentralisation and Local Development (DLD) Total Cost EC contribution 20,000,000

More information

EN 1 EN ANNEX I 1. IDENTIFICATION. Total cost EC contribution EUR Aid method / Method of implementation

EN 1 EN ANNEX I 1. IDENTIFICATION. Total cost EC contribution EUR Aid method / Method of implementation ANNEX I 1. IDENTIFICATION Title/Number Demining Action Total cost EC contribution EUR 20.000.000 Aid method / Method of implementation Project approach. Partially decentralised management DAC-code 15250

More information

ANNEX. MALAWI 2011 Annual Action Programme for the Accompanying Measures for Sugar Protocol Countries DCI-SUCRE/MW/

ANNEX. MALAWI 2011 Annual Action Programme for the Accompanying Measures for Sugar Protocol Countries DCI-SUCRE/MW/ ANNEX 1. IDENTIFICATION Title MALAWI 2011 Annual Action Programme for the Accompanying Measures for Sugar Protocol Countries DCI-SUCRE/MW/023-135 Total cost Aid method EUR 11 586 000 EU contribution Project

More information

Screening report Montenegro

Screening report Montenegro Screening report Montenegro Chapter 22 Regional policy and coordination of Structural Instruments Date of screening meetings: Explanatory meeting: 14-15 November 2012 Bilateral meeting: 18 December 2012

More information

Council of the European Union Brussels, 12 June 2015 (OR. en)

Council of the European Union Brussels, 12 June 2015 (OR. en) Council of the European Union Brussels, 12 June 2015 (OR. en) 9807/15 NOTE From: To: General Secretariat of the Council Delegations No. prev. doc.: 6770/15 Subject: ACP 89 FIN 427 RELEX 467 COAFR 186 CFSP/PESC

More information

The role of the private sector in EU development policy

The role of the private sector in EU development policy The role of the private sector in EU development policy Seminar "Private Sector Development in EU External Action Programmes" Antti Karhunen, Head of Unit "Private framework development, trade and regional

More information

ANNEX. 1. IDENTIFICATION Beneficiary CRIS/ABAC Commitment references Total cost EU Contribution Budget line. Turkey IPA/2017/40201

ANNEX. 1. IDENTIFICATION Beneficiary CRIS/ABAC Commitment references Total cost EU Contribution Budget line. Turkey IPA/2017/40201 ANNEX to Commission Implementing Decision adopting an Annual Action Programme for Turkey under the Instrument for Pre-accession Assistance (IPA II) for the year 2017 1. IDENTIFICATION Beneficiary CRIS/ABAC

More information

European Commission Directorate General for Development and Cooperation - EuropeAid

European Commission Directorate General for Development and Cooperation - EuropeAid European Commission Directorate General for Development and Cooperation - EuropeAid Practical guide to procedures for programme estimates (project approach) Version 4.0 December 2012 CONTENTS 1. INTRODUCTION...

More information

EN 7 EN. Annex II Action Fiche for West Bank and Gaza Strip/ENPI. 1. IDENTIFICATION Title/Number Total cost 10,500,000

EN 7 EN. Annex II Action Fiche for West Bank and Gaza Strip/ENPI. 1. IDENTIFICATION Title/Number Total cost 10,500,000 Annex II Action Fiche for West Bank and Gaza Strip/ENPI 1. IDENTIFICATION Title/Number Total cost 10,500,000 Aid method / Method of implementation PEGASE: Governance and Social Development [note: No co-financing

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof, L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)

More information

Evaluation of the European Union s Co-operation with Kenya Country level evaluation

Evaluation of the European Union s Co-operation with Kenya Country level evaluation "FICHE CONTRADICTOIRE" Evaluation of the European Union s Co-operation with Kenya Country level evaluation Recommendations Responses of Services: Follow-up (one year later) GENERAL RECOMMENDATIONS 1 Give

More information

This action is financed by the European Union

This action is financed by the European Union EN This action is financed by the European Union ANNEX of the Commission Decision on the individual measure in favour of the of the Republic of Angola, Cape Verde, Guinea Bissau, Mozambique, São Tomé e

More information

STANDARD PROJECT FICHE

STANDARD PROJECT FICHE STANDARD PROJECT FICHE 1. Basic Information 1.1 CRIS Number : 2004-016-919.04 1.2 Title: Preparation for Extended Decentralized Implementation System (EDIS) in the management of pre-accession funds in

More information

Action Fiche for Libya

Action Fiche for Libya Action Fiche for Libya 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation Public administration capacity-building facility (ENPI/2011/276-708) EU contribution: EUR 4.5 million

More information

ANNEX 14 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument. Action Fiche for Public Diplomacy

ANNEX 14 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument. Action Fiche for Public Diplomacy ANNEX 14 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument Action Fiche for Public Diplomacy 1. IDENTIFICATION Title of the action Country(ies)/

More information

Annex I. DAC-code Sector Rural Development

Annex I. DAC-code Sector Rural Development Annex I 1. Identification Title/Number Total cost Aid method / Method of implementation Sector Budget Support Social Protection FED/2010/22173 EU contribution: EUR 20 million (5.7 % of NIP) Sector budget

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument Action Fiche for EU- Brazil Sector Dialogues Support Facility 1. IDENTIFICATION Title

More information

INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) ALBANIA European Union Integration Facility. Action summary

INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) ALBANIA European Union Integration Facility. Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 ALBANIA European Union Integration Facility Action summary The Action will strengthen the capacity and accountability of the Albanian public administration

More information

REPORT FROM THE COMMISSION TO THE COUNCIL

REPORT FROM THE COMMISSION TO THE COUNCIL EUROPEAN COMMISSION Brussels, 21.2.2017 COM(2017) 84 final REPORT FROM THE COMMISSION TO THE COUNCIL on the implementation of the financial assistance provided to the Overseas Countries and Territories

More information

«FICHE CONTRADICTOIRE»

«FICHE CONTRADICTOIRE» «FICHE CONTRADICTOIRE» Evaluation of the European Commission's cooperation with Nigeria (Country level evaluation) (*For details on the recommendations please refer to the main report) Recommendations

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 15 May /07 DEVGEN 89 ACP 94 RELEX 347

COUNCIL OF THE EUROPEAN UNION. Brussels, 15 May /07 DEVGEN 89 ACP 94 RELEX 347 COUNCIL OF THE EUROPEAN UNION Brussels, 15 May 2007 9558/07 DEVGEN 89 ACP 94 RELEX 347 NOTE from : General Secretariat on : 15 May 2007 No. prev. doc. : 9090/07 Subject : EU Code of Conduct on Complementarity

More information

This action is co-financed by UfM member countries for an amount of EUR 4.21 million. Aid method / Method of implementation

This action is co-financed by UfM member countries for an amount of EUR 4.21 million. Aid method / Method of implementation ANNEX 2 of the Commission Decision on the ENP Regional South Annual Action Programme 2013 Part II Action Fiche for EU support to the Secretariat of the Union for the Mediterranean in 2014 1. IDENTIFICATION

More information

1050 Meeting, 11 March Administration and Logistics

1050 Meeting, 11 March Administration and Logistics Ministers Deputies CM Documents CM(2009)10 final 13 March 2009 1050 Meeting, 11 March 2009 11 Administration and Logistics 11.1 Resource Management and Mobilisation Strategy for the Council of Europe Programme

More information

EUROPEAN COMMISSION Job Description Form. Job description version2 (Active) Job no in DEVCO.F.DEL.Afghanistan Valid from 04/01/2018 until

EUROPEAN COMMISSION Job Description Form. Job description version2 (Active) Job no in DEVCO.F.DEL.Afghanistan Valid from 04/01/2018 until EUROPEAN COMMISSION Job Description Form Job description version2 (Active) Job no.273628 in DEVCO.F.DEL.Afghanistan Valid from 04/01/2018 until Job Holder Name Job Profile Position CONTRACT AGENT FGIV

More information

Action Fiche for Syrian Arab Republic. EUR Beneficiary contribution: tbd Project approach partly decentralised management

Action Fiche for Syrian Arab Republic. EUR Beneficiary contribution: tbd Project approach partly decentralised management Action Fiche for Syrian Arab Republic 1. IDENTIFICATION Title/Number Reforming and Modernising the Judiciary Total cost Aid method / Method of implementation EUR 5 000 000 Beneficiary contribution: tbd

More information

COMMISSION DECISION. of on technical provisions necessary for the operation of the transition facility in the Republic of Croatia

COMMISSION DECISION. of on technical provisions necessary for the operation of the transition facility in the Republic of Croatia EUROPEAN COMMISSION Brussels, 13.6.2013 C(2013) 3463 final COMMISSION DECISION of 13.6.2013 on technical provisions necessary for the operation of the transition facility in the Republic of Croatia EN

More information

ANNEX 1. DAC-code Sector General Budget Support

ANNEX 1. DAC-code Sector General Budget Support ANNEX 1 IDENTIFICATION Title/Number Millennium Development Goals Contract (MDG-C) for Uganda Total cost EC contribution: EURO 175,000,000 Aid method / Management mode Direct General Budget support ( 175)

More information

BOSNIA AND HERZEGOVINA

BOSNIA AND HERZEGOVINA INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 BOSNIA AND HERZEGOVINA European Integration Facility Action Summary The Action is designed to provide support to institutions in Bosnia and Herzegovina

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 May /10 ECOFIN 249 ENV 265 POLGEN 69

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 May /10 ECOFIN 249 ENV 265 POLGEN 69 COUNCIL OF THE EUROPEAN UNION Brussels, 11 May 2010 9437/10 ECOFIN 249 ENV 265 POLGEN 69 NOTE from: to: Subject: The General Secretariat of the Council Delegations Financing climate change- fast start

More information

European Development Fund Procedures - A Guide. By Dr C. Manyeruke. TRADE AND DEVELOPMENT STUDIES CENTRE Harare, Zimbabwe

European Development Fund Procedures - A Guide. By Dr C. Manyeruke. TRADE AND DEVELOPMENT STUDIES CENTRE Harare, Zimbabwe European Development Fund Procedures - A Guide By Dr C. Manyeruke TRADE AND DEVELOPMENT STUDIES CENTRE Harare, Zimbabwe July 2007 1 Contents Introduction 3 The 9 th European Development Fund 5 Terms and

More information

Action Fiche for West Bank and Gaza Strip. PEGASE: Private Sector Development CRIS: 2010/22476 EU Contribution: EUR11 million.

Action Fiche for West Bank and Gaza Strip. PEGASE: Private Sector Development CRIS: 2010/22476 EU Contribution: EUR11 million. Action Fiche for West Bank and Gaza Strip 1. IDENTIFICATION Title/Number Total cost PEGASE: Private Sector Development CRIS: 2010/22476 EU Contribution: EUR11 million. Aid method / Method of implementation

More information

Annex 1. IDENTIFICATION

Annex 1. IDENTIFICATION Annex 1. IDENTIFICATION Title/Number Total cost Support to the Sustainable Energy for All (SE4All) initiative ACP/FED/024-335 EU contribution of EUR 400 000 000 from the following Regional Indicative Programmes:

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION COMMISSION OF THE EUROPEAN COMMUNITIES Draft Brussels, xxx C(2008) yyy final COMMISSION DECISION of on the Annual Action Programme 2008 in favour of Zambia to be financed from the 10th European Development

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 02.05.2005 COM(2005) 178 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL GENERAL REPORT ON PRE-ACCESSION ASSISTANCE (PHARE ISPA

More information

EN Official Journal of the European Union L 77/77

EN Official Journal of the European Union L 77/77 15.3.2014 EN Official Journal of the European Union L 77/77 REGULATION (EU) No 234/2014 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 March 2014 establishing a Partnership Instrument for cooperation

More information

(Legislative acts) REGULATIONS

(Legislative acts) REGULATIONS 5.12.2011 Official Journal of the European Union L 321/1 I (Legislative acts) REGULATIONS REGULATION (EU) No 1255/2011 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 30 November 2011 establishing a Programme

More information

Council of the European Union Brussels, 22 February 2017 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union

Council of the European Union Brussels, 22 February 2017 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union Council of the European Union Brussels, 22 February 2017 (OR. en) 6590/17 COVER NOTE From: date of receipt: 21 February 2017 To: No. Cion doc.: Subject: ACP 14 PTOM 7 FIN 130 RELEX 164 Secretary-General

More information

COMMISSION DECISION. C(2007)6376 on 18/12/2007

COMMISSION DECISION. C(2007)6376 on 18/12/2007 COMMISSION DECISION C(2007)6376 on 18/12/2007 adopting a horizontal programme on the Energy Efficiency Finance Facility for Albania, Bosnia and Herzegovina, Croatia, Montenegro, Serbia including Kosovo

More information

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION 1.1 OVERVIEW Preamble 1.1.1 The African Development Bank is the premier financial development institution in Africa dedicated to combating poverty and

More information

COMMISSION IMPLEMENTING DECISION. of adopting a Country Action Programme on Bosnia and Herzegovina for the year 2015

COMMISSION IMPLEMENTING DECISION. of adopting a Country Action Programme on Bosnia and Herzegovina for the year 2015 EUROPEAN COMMISSION Brussels, 7.12.2015 C(2015) 8777 final COMMISSION IMPLEMENTING DECISION of 7.12.2015 adopting a Country Action Programme on Bosnia and Herzegovina for the year 2015 EN EN COMMISSION

More information

Accessing funding What non-state actors need to know

Accessing funding What non-state actors need to know 5 5.1 Funding is available, but with limitations Accessing funding What non-state actors need to know 5.2 The two main funding routes 5.3 The three windows of the European Development Fund 5.4 Additional

More information

SPECIFIC TERMS OF REFERENCE. Fee-based service contract. TA support to the PFM Working Group Chair

SPECIFIC TERMS OF REFERENCE. Fee-based service contract. TA support to the PFM Working Group Chair SPECIFIC TERMS OF REFERENCE Fee-based service contract TA support to the PFM Working Group Chair FWC BENEFICIARIES 2013 - LOT 11: Macro Economy, Statistics, Public Finance Management EuropeAid/132633/C/SER/multi

More information

XIXth IRCC Meeting Report and June IRCC Technical Meeting and Follow-up of recommendations

XIXth IRCC Meeting Report and June IRCC Technical Meeting and Follow-up of recommendations XXth IRCC PLENARY MEETING 12 NOVEMBER 2010 SUMMARY OF DECISIONS DECISIONS XIXth IRCC Meeting Report and 28-29 June IRCC Technical Meeting and Follow-up of recommendations 1. Draft XIXth IRCC Report approved

More information

This action is funded by the European Union

This action is funded by the European Union This action is funded by the European Union ANNEX of the Commission Implementing Decision on the individual measure in favour of South Africa to be financed from the general budget of the European Union

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 10.10.2013 C(2013) 6750 final COMMISSION DECISION of 10.10.2013 on the Annual Action Programme 2013 Part 2 in favour of Intra-ACP cooperation to be financed from the 10 th

More information

COMMISSION IMPLEMENTING DECISION. of adopting a

COMMISSION IMPLEMENTING DECISION. of adopting a EUROPEAN COMMISSION Brussels, 10.12.2014 C(2014) 9352 final COMMISSION IMPLEMENTING DECISION of 10.12.2014 adopting a Cross-border cooperation Programme Montenegro- Albania for the years 2014-2020 and

More information

The DAC s main findings and recommendations. Extract from: OECD Development Co-operation Peer Reviews

The DAC s main findings and recommendations. Extract from: OECD Development Co-operation Peer Reviews The DAC s main findings and recommendations Extract from: OECD Development Co-operation Peer Reviews Luxembourg 2017 Luxembourg has strengthened its development co-operation programme The committee concluded

More information

ANNEX. Support to the Productive Safety Net Programme (PSNP) CRIS 2008/ Total cost EC contribution : EUR 20,230,000

ANNEX. Support to the Productive Safety Net Programme (PSNP) CRIS 2008/ Total cost EC contribution : EUR 20,230,000 ANNEX 1. IDTIFICATION Title/Number Support to the Productive Safety Net Programme (PSNP) CRIS 2008/020-930 Total cost EC contribution : EUR 20,230,000 Aid method / Management mode Contribution of the beneficiary

More information

VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP

VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP EUROPEAN COMMISSION EUROPEAN EXTERNAL ACTION SERVICE VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP ***LAST UPDATE 24 SEPTEMBER 2010*** Table of Contents PART I An Overview of the Eastern

More information

European Commission Directorate-General for Development and Cooperation - EuropeAid DEVCO Companion to financial and contractual procedures

European Commission Directorate-General for Development and Cooperation - EuropeAid DEVCO Companion to financial and contractual procedures European Commission Directorate-General for Development and Cooperation - EuropeAid DEVCO Companion to financial and contractual procedures Applicable to external actions financed from the general budget

More information

How the Post-Cotonou Agreement can support EU investment and private sector development in ACP countries

How the Post-Cotonou Agreement can support EU investment and private sector development in ACP countries 27 April 2018 How the Post-Cotonou Agreement can support EU investment and private sector development in ACP countries Following the European Commission s recommendation for a Council Decision authorising

More information

Action Fiche for NEPAL. DAC-code 11200, Sector: Basic Education

Action Fiche for NEPAL. DAC-code 11200, Sector: Basic Education Action Fiche for NEPAL 1. Identification Title/Number Total cost School Sector Reform (SSR), Nepal. DCI-ASIE/2009/21209 Total cost of the project : 1 969 520 000 1 (approx.) Total EC Contribution: 26 353

More information

Programming Aid Instruments

Programming Aid Instruments Programming Aid Instruments 2014-2020 Techni Policy Forum for Development 18 June 2013 Introduction Outline of presentation Policy Initiatives Implementing the principles of Agenda for Change Programming

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 31.1.2003 COM(2003) 44 final 2003/0020 (COD) Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL establishing a general Framework for

More information

Bilateral Guideline. EEA and Norwegian Financial Mechanisms

Bilateral Guideline. EEA and Norwegian Financial Mechanisms Bilateral Guideline EEA and Norwegian Financial Mechanisms 2014 2021 Adopted by the Financial Mechanism Committee on 9 February 2017 09 February 2017 Contents 1 Introduction... 4 1.1 Definition of strengthened

More information

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED 2014-2020 1. IDENTIFICATION (max. 200 characters) The purpose of this section is to identify only the programme concerned. It

More information

UN BHUTAN COUNTRY FUND

UN BHUTAN COUNTRY FUND UN BHUTAN COUNTRY FUND Terms of Reference Introduction: 1. The UN system in Bhutan is implementing the One Programme 2014-2018. The One Programme is the result of a highly consultative and participatory

More information

Project Fiche IPA National programmes IPA 2012/Component I

Project Fiche IPA National programmes IPA 2012/Component I Project Fiche IPA National programmes IPA 2012/Component I 1 IDENTIFICATION Project Title Strengthening the capacity of the Central Financing and Contracting Unit (CFCU) for efficient implementation of

More information

Reviewing the evidence: How well does the EDF perform?

Reviewing the evidence: How well does the EDF perform? Reviewing the evidence: How well does the EDF perform? Mikaela Gavas, ODI, m.gavas@odi.org.uk 31 January 2013 Contents 1. How is the Cotonou Agreement different to other agreements? 2. What are the proposals

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 12.1.2018 C(2018) 204 final COMMISSION DECISION of 12.1.2018 on the Annual Action Programme 2018 part 1 in favour of the Pacific Region to be financed from the 11 th European

More information

JAES Action Plan : Cross-cutting issues

JAES Action Plan : Cross-cutting issues JAES Action Plan 2011-13: Cross-cutting issues Both sides agree on the following options on cross-cutting issues to enhance the effectiveness of the Action Plan and to improve its working methods. Introduction

More information