ANNEX. Support to the Productive Safety Net Programme (PSNP) CRIS 2008/ Total cost EC contribution : EUR 20,230,000

Size: px
Start display at page:

Download "ANNEX. Support to the Productive Safety Net Programme (PSNP) CRIS 2008/ Total cost EC contribution : EUR 20,230,000"

Transcription

1 ANNEX 1. IDTIFICATION Title/Number Support to the Productive Safety Net Programme (PSNP) CRIS 2008/ Total cost EC contribution : EUR 20,230,000 Aid method / Management mode Contribution of the beneficiary country: N/A Contribution of other donors: EUR 95,000,000 1 Project approach 2 joint management with an international organization (World Bank) DAC-code Sector Food security 2. RATIONALE 2.1. Sector context Chronic food insecurity is a salient feature of rural Ethiopia in any year, irrespective of the presence of unusual climatic, social or economic shocks. Repeated shocks lead the rural poor into a spiral of poverty which results in an increased number of chronically food insecure caseload over time. In particular, in 2008 Ethiopia is facing yet another drought situation due to the failure of the belg rains, which usually occur from February to April. Under normal circumstances the belg season contributes about 10% to the country s agricultural production, but it is significantly more important in some regions of Ethiopia. The consequence of this severe drought is having dramatic negative impact on PSNP beneficiaries and it will be further exacerbated in the lean period of July September when under normal circumstances people are not expected to receive transfers from the programme. Furthermore, this situation is being aggravated by continued grain price increases resulting in the need for further additional assistance to the beneficiaries during this period. The surge in grain prices, which increased twofold between February July 2008, coupled with shortage of food supply to markets due to the drought, has considerably eroded the purchasing power of cash beneficiaries by about two third. The Productive Safety Nets Programme (PSNP), has started in 2005 as one of three major components of the GoE Food Security Programme. The PSNP represents an innovative approach to move away from responding to chronic hunger through emergency appeals towards a more predictable response to address these recurring problems. Targeted and timely transfers to the poor allow them to retain factors of production and to integrate into society's productive strata, providing them with a springboard for development. The EC contribution to the Safety Net Programme since 2006 amounts 98 M Euro 3 out of which 86 M Euro has already been disbursed to the Multi Donors Trust Fund established at the World Bank. In the 10 th EDF 100 M Euro have been allocated for the PSNP for the period , and in 2008 a first Financing proposal has been submitted for the amount of 42 M Euro. The present proposal is therefore to be considered in the same framework of the previous one, representing an additional support aimed at strengthening the programme in a critical phase of its life span. 1 Estimation based on the announced additional support made by WB, DFID, SIDA in cash, and USAID, WFP and CIDA in food (details in chapter 3 of this Action Fiche). 2 Sector Budget Support could be envisaged in future beyond M Euro from the 9 th EDF and 20 M Euro from the BL.

2 2.2. Lessons learnt The EC mid-term evaluation (MTE, October 2007), the regular biannual Joint Review and Implementation Support (JRIS) Missions 4 during the implementation of the current PSNP programme contributed to identify weaknesses, strengths, lessons learned and provided recommendations for further improvement. The major lessons learned are: a) delays in timely transfer of resources to beneficiaries should be minimised; b) inclusion and exclusion errors in targeting should be addressed; c) institutional capacities of woredas 5 to effectively deliver the programme have to be reinforced; d) integration of PSNP with other food security programmes needs to be enhanced, and e) an increase in the wage rate is required to respond to price hikes for grains. The EC MTE noted that the programme has also exhibited significant improvement over the years in achieving its core objective of filling consumption gaps and protecting depletion of household assets. The implementation difficulties of the transition phase 6 led the GoE to revise a number of design and implementation features and to incorporate lessons learnt including: (i) a shift of the financial management to MoFED as well as frontloading of funds from the federal level to regions and woredas; (ii) improving and strengthening the retargeting methodology; (iii) a number of measures to strengthen federal, regional and woreda capacities, including training for woreda staff, provision of payroll management tools and recruitment of additional cashiers and accountants at woreda level; (iv) increase in the cash wage rate with a view to compensate for the increasing cereal prices; (v) endorsement of a re-visioning process to update and strengthen GoE s strategy to address food security issues with increased integration with other development interventions Complementary actions The PSNP should be considered as a strategic cornerstone of the EC interventions in the sector which is complemented by several other EC funded programmes linked to the Safety Nets Programme implemented through ECHO, UNICEF, FAO as well as several NGO funded through the Food Security Budget Line. Under the Food Facility EUR 45.4 million have been allocated to Ethiopia, out of them EUR 20 million is additional support to the PSNP which aims at responding quickly to the impacts of soaring food prices on the poor and vulnerable segment of the population, who in the Ethiopian context are PSNP beneficiaries. The remaining funds will be allocated to NGOs through Call for Proposals and are intended to implement activities that contribute to increased agricultural production, creation of additional incomes to beneficiaries in order to improve their food security situation, building capacities of local level institutions for improved implementation of food security related interventions. The NGOs interventions will mainly be implemented in the same geographical locations as the PSNP and maximum care has been taken during the evaluation of the proposals to avoid overlap and ensure that the interventions put forward by the applicant NGOs are complementary to what the PSNP is doing and have an added value in terms of enhancing the impact of the PSNP on targeted population. Hence general actions implemented by NGOs with the funds obtained from the Food Facility are aligned with the food security strategy of the GoE and are complementary to the objectives of the PSNP. The Food Facility fund together with the EUR million from the B- Envelope will ensure availability of adequate resources to the PSPN in order to cover additional costs of the programme created as the result of increased wage rates of PSNP beneficiaries due to soaring food prices. Several other programmes implemented by other donors (GTZ, Italian Cooperation, Irish Cooperation) complement EC and PSNP intervention. Complementarity with government s actions: Other Food Security Programmes and the Resettlement Programme is ensured. 4 Held in April/May and in September/October each year. 5 Woreda is the equivalent Amharic word for district 6 The period from the start of the programme in 2005 up to the end of 2006 is commonly considered the "transition phase". The period from 2007 up to 2010, end of the programme is agreed as "consolidation phase".

3 2.4. Donor coordination Harmonization among donors and between donors and GoE has been a central feature of the programme. The design process of the PSNP took place within a common framework, with joint donor missions during the concept development and design and appraisal phases. Strong coordination has been established with the GoE through different mechanisms like the bi-annual Joint Review and Implementation Supervision mission, the Joint Coordination Committee and the Rapid Response Mechanism. Common arrangements also include a coordinated dialogue with Government and the commitment to common financial and procurement procedures. 3. DESCRIPTION In order to cope with the emergency situation the country is experiencing in 2008, PSNP Donors and the Government have agreed to provide an additional three months (July to September) extended assistance to 5.7 million PSNP beneficiaries living in drought affected "hotspot" woredas. This extra coverage requires a frontloading of funds during this period from existing programme resources. The proposed EC allocation will fill the cash flow gap created due to frontloading to respond to the emergency situation and is deemed vital in ensuring the timely availability of funds for the programme in The Delegation considers therefore that additional funding channelled through the existing programme is the most cost effective and rapid way to promptly respond to this emergency situation Objectives The PSNP general objective is stated as following: Food sufficiency for male and female members of chronic and transitory food insecure households in PSNP woredas achieved and status of livelihood maintained and improved. The specific objective is: Food consumption assured and vulnerability reduced by 2010 for 8.29 million chronically food insecure people in 286 targeted woredas 7. The present proposal supports the implementation of the PSNP in the same regions as the previous programme: Oromiya, Amhara, Tigray, SNNPR, Harari and Afar, as well as Dire Dawa City Administration, covering about 286 woredas by Expected results and main activities The expected results and linked activities are: 1. Appropriate timely and predictable transfers (cash and/or food) received by households in response to chronic requirements o Identify eligible participants through annual targeting/ graduation process o Ensure mainstreaming of gender and HIV/AIDS in targeting process o Prepare and approve annual plan, including cash/food split, and disbursement schedule o Make cash and/or food transfers to participants 2. Quality, new and existing, community assets with operational management mechanisms established o Identify public works through participatory planning, including contingency planning o Construct public works o Identify and plan management and maintenance arrangements for new and existing public works 3. Markets for food and non-food products promoted o Monitor relative values of cash and food transfers and adjust as necessary o Plan for sufficient availability of food and cash to respond to participant demand 4. Institutional capacity to manage the PSNP strengthened 7 The 5.7 million benefiting from this extended assistance are among the 8.29 million chronically food insecure population covered by the PSNP

4 o Assess key programme management systems for adequacy, accountability and transparency on an ongoing basis and amend as necessary o Implement plan for adequate staff availability o Implement plan for adequate capacity building equipment and services 3.3. Risks and assumptions The major risks and mitigating measures related to this programme are: Programme Expansion and Links with the Emergency System: Possible delays of transfers to beneficiaries could pose humanitarian risk. In the past, the GoE responded adequately by invoking the primacy of transfers and issuing instructions to expedite transfers. In addition, the GoE emergency system should provide a back-up system, ready to be activated in case of failure of the PSNP to deliver on a timely manner. Targeting: the PSNP beneficiaries constitute some of the poorest and most vulnerable members of the population. While the targeting system has considerably improved over the years it still remains a critical issue which is systematically being reviewed both by the Rapid Response Mechanism and the bi-annual review missions, and more recently through the on going analysis of the graduation process. Cash and food mix: A large capital injection could lead to localized price inflation as food prices rise in the short term. This risk has been fully integrated into the programme design from the start and the decision over which woredas get all food or a percentage of food is made taking account of woreda capacity, geographical remoteness and access to markets. Moreover, woredas have the opportunity to shift to food during the year if price hikes are too high. Institutional Capacity: The PSNP entails a substantial increase in the responsibilities of local level administration to deliver assistance to the chronically food insecure. GoE has shown strong commitment to increase the institutional capacity, including the necessary recruitment, procurement and training. Capacity assessments have been carried out in 2005 and the resulting action plans have been resourced. Financial Management: Overall, the scale of resources flowing into woredas has increased significantly during the transition phase. Added to this is the fiduciary risk of the disbursement mode adopted (meant to reduce humanitarian risk) that triggers replenishment upon disbursement to woredas rather than upon submission of expenditure reports. Continuous training programmes, recruitment of additional staff and provision of office equipment to increase financial management capacities of woredas have been undertaken in the past to ensure that this risk is minimized. Assumptions: No security problems will occur in programme areas that will hamper smooth implementation Donors commitment to provide resources to support the programme will continue The programme remains a top priority in the development agenda of the government at federal, regional and woreda levels to address food insecurity problems in the country Efforts will continue to strengthen integration of the PSNP with Other Food Security Programmes to enable beneficiaries create household assets 3.4. Cross-cutting Issues An Environmental and Social Management Framework has been established in order to ensure criteria for Public Work (PW) project selection, basic check list for their preliminary assessment, list of mitigating measures to be adopted for various types of PW projects during the PSNP implementation. Gender equality and vulnerable female-headed households will be particularly targeted by the PSNP through a number of measures such as: (i) the provision of direct support to labour poor female-headed households, and (ii) an explicit provision to assist, through public works, in the productivity enhancement of lands owned by labour poor female-headed households.

5 3.5. Stakeholders Food consumption gap of 8.29 million chronically food insecure people filled and household assets protected through the transfer of cash and/or food resources to beneficiaries. Out of the 8.29 million beneficiaries 5.7 million will benefit from the extended assistance. The Agriculture and Rural Development structures at Federal, Regional and Woreda levels through the Food Security Offices are primary government stakeholders who are responsible for the planning, implementation and supervision of the programme. The government has taken important measures to enhance capacities of implementing institutions, including that of the Ministry of Finance and Economic Development and its counterparts at regional and woreda levels. PSNP donors (Irish Aid, DfID, EC, WB, USAid, SIDA, CIDA and WFP) are the other stakeholders of the programme which have shown continued support for the programme through allocation of funds until 2009/2010. Donors are also actively engaged in the follow up of the implementation process of the programme through established monitoring mechanisms such as joint supervision and rapid response missions as well as the Joint Coordination Committee consultations. 4. IMPLEMTATION ISSUES 4.1. Method of implementation The implementation method will be joint management with the World Bank. This first rider to the Financing Agreement No 10027/ET/ will be signed between the Commission and the Government of Ethiopia for the implementation of this programme. Subsequently a new rider will be signed between the Commission and the World Bank who will manage the funds on behalf of the Commission. A Multi-donor Trust Fund has already been established at the World Bank to which donors channel resources for the implementation of the programme. The rules and procedures of the World Bank will apply in managing the Trust Fund Procurement and grant award procedures The EC will sign an Administration Agreement with the World Bank for the management of its contribution under the PSNP Multi-Donor Trust Fund (MDTF). This fund will be managed, monitored and audited in accordance with the Trust Fund and Co-financing Framework Agreement between the EC and the World Bank signed on 8 November 2001 and revised on 17 March All contracts implementing the action must be awarded and implemented in accordance with the procedures and standard documents laid down and published by the International Organisation concerned Budget and calendar The overall amount required to cover the extended assistance for the year 2008 was estimated at $ 44.8 million equivalent to about 29.9 million. On top of that, the additional food aid support is estimated to be about MT; mainly provided by USAID, WFP and CIDA. Other donors have agreed to cover this extended assistance: SIDA (Swedish) has increased its contribution by $ 6 million and DFID by $ 9.8 million. These two contributions have already been transferred to the pooled account. WB has frontloaded a relevant part of its contribution for 2009 in order to cover these urgent needs. Other PNSP donors are planning additional contributions through their respective HQs. The million is the amount specifically requested from the EC to fill the financing gap created due to frontloading from existing commitments to cover the extended support to the PSNP beneficiaries.

6 The breakdown of the EC contribution is as follows: Budget item Amount EC-WB Administration agreement for the MDTF 20,230,000 Total 20,230,000 No allocation is planned for technical support, evaluation and audits as far as these costs are already budgeted in the on going Financing Agreement (ET/FOOD/2006/18376) with the GoE which coincides with the implementation period of this proposal. The regular donors contribution to PSNP in cash and/or food is of approximately Euro 220 million per year for the period WB, DFID and EC are the major cash contributors (EC with Euro 78 million through EDF IX, Euro 20 million through the Budget line and Euro 42 million through EDF X). The contribution of the GoE is evaluated at 2 billion Birr per year (i.e. around 150 million Euro at the exchange rate of February 2008). Foreseen operational duration is 16 months as from signature of Financing Agreement Performance monitoring Financial and technical performances of the programme are reported through technical reports from the Food Security Programme Department 8 (FSPD) (quarterly and annually), financial reports from Ministry of Finance and Economic Development (MoFED) (quarterly, half yearly and annually) and through the FSPD Information Centre reports (bi-monthly). Furthermore, the revised PSNP logical framework details specific indicators for any of the hierarchical levels. As in the previous phases, the close follow-up of the PSNP implementation by the Donors Working Group will continue through the established monitoring mechanisms. They include monthly meetings of the Joint Coordination Committee, bi-annual GoE-donors Joint Review and Implementation Supervision (JRIS) missions, bimonthly Donors Working Group meetings, joint Government-Donors Rapid Response Mechanism (RRM). The monitoring system as defined in the Programme Implementation Manual (PIM) will provide regular data on the number of programme beneficiaries as well as on the nature of the projects undertaken. EuropeAid Standard Indicator defined in the identification phase (serial number 604: Number of targeted people to whom food aid and non-food aid is distributed) have been taken into account (see attached Annex 1) Evaluation and audit Internal evaluation will include participatory assessments, quantitative surveys to identify errors of inclusion and exclusion as well as engineering assessments of the quality of public works performed, and beneficiary assessments. An independent evaluation will be undertaken at the end of the programme. It will, amongst other things, feed into the joint review missions and provide information in view of possible further financial support to the PSNP from the Commission. The cost for audit and evaluation is not included in this proposal as this is already budgeted in the on going Financing Agreements with the GoE. 8 Following restructuring of the Ministry of Agriculture and Rural Development the Food Security Coordination Bureau has been re-named as Food Security Programme Department (FSPD)

7 4.6 Communication and visibility A communication strategy for the overall FSP has been developed since 2007 on the coordinated initiative of Donors and FSPD. A framework and timeline for appropriate communication to target audiences through different media such as programme brochures, TV documentaries, regular news announcements and a web site, has been identified. These audiences are the general public, the PSNP implementers, beneficiaries and communities. Special care will be taken in applying EC Visibility guidelines particularly when providing supplies and equipment and when implementing technical assistance and studies.

8 Annex 1 (AIDCO note 11557/ ) Project Title: Support to the Productive Safety Nets Programme (PSNP) CRIS Code No: 2008/ DAC Sector code(s): Baseline value Final value Serial No. Indicator Unit Value at beginning of project (EFY 2005) Final without project value (EFY 2010) Final with project value (EFY 2010) Definition and comments Source Remarks 604 Number of targeted people to whom food aid and non-food aid is distributed No 13 million chronically and acute food insecure people 13 million people continue to need food assistance 8.29 million chronically food insecure people receive resources through the programme Food consumption gap of 8.29 million chronically food insecure people filled and household assets protected through the transfer of cash and/or food resources to beneficiaries. Community assets such as soil and water conservation, rural infrastructures (access roads, schools, health posts, etc.) will be created with labour contribution of beneficiaries. Out of the 8.29 million beneficiaries 5.7 million will benefit from the extended assistance Reports of FSPD and final evaluation reports 8 Error! Unknown document property name.

EN 1 EN. Annex. 1. IDENTIFICATION Title/Number

EN 1 EN. Annex. 1. IDENTIFICATION Title/Number EN EN EN Annex 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation Support to the Productive Safety Nets Programme of Ethiopia CRIS No. ET/FED/021-962 EU contribution: EUR 58

More information

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE ANNEX 1 1. IDTIFICATION Title/Number Support Services to the National Authorising Officer CRIS NO: FED/2009/021-496 Total cost Total: 315,800 (EC Contribution:

More information

Institutional Arrangements. Ethiopia Productive Safety Net Program

Institutional Arrangements. Ethiopia Productive Safety Net Program Institutional Arrangements Ethiopia Productive Safety Net Program Overview: PSNP and Food Security Program PSNP is one component of the Government s food security program The other components of the FSP

More information

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management ANNEX Action Document for 11 th EDF EU-TL Co-operation Support Facility (CSF) 1. IDENTIFICATION Title/Number Total cost 11 th EDF EU-TL Co-operation Support Facility (CSF) CRIS number: 2014/37442 Total

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

New Ways of Working: linkages between humanitarian assistance and the productive safety net program in Ethiopia

New Ways of Working: linkages between humanitarian assistance and the productive safety net program in Ethiopia New Ways of Working: linkages between humanitarian assistance and the productive safety net program in Ethiopia Linking Humanitarian Assistance and Social Protection Systems Berhanu Woldemichael Director,

More information

ANNEX. DAC code Sector Economic and Development Planning

ANNEX. DAC code Sector Economic and Development Planning ANNEX 1. IDTIFICATION Title Total cost Aid method management mode Technical Cooperation Facility 1.5M (2.4% of NIP) Project approach partially decentralised management DAC code 15010 Sector Economic and

More information

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode ANNEX 1. IDTIFICATION Title Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode DAC-code 15010 Project approach Partially decentralised management.

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

Case Study on Ethiopia s Productive Safety Net Programme

Case Study on Ethiopia s Productive Safety Net Programme Case Study on Ethiopia s Productive Safety Net Programme Workshop on Fraud & Error Control in Social Protection Programs May 17 th, 2007 Presentation Outline 1. Background to the PSNP 2. Experiences with

More information

Annex I Action Fiche for West Bank and Gaza Strip/ ENPI

Annex I Action Fiche for West Bank and Gaza Strip/ ENPI Annex I Action Fiche for West Bank and Gaza Strip/ ENPI 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation PEGASE: Support to Recurrent Expenditures of the PA EUR 158,500,000

More information

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I)

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I) Action Fiche for Syrian Arab Republic 1. IDTIFICATION Title/Number Support to the EU-Syria Association Agreement Programme (SAAP I) Total cost EU contribution: EUR 5 000 000 Beneficiary contribution: tbc

More information

Action Fiche for Lebanon

Action Fiche for Lebanon Action Fiche for Lebanon 1. IDENTIFICATION Title/Number Facility in support of SMEs energy efficiency investments Total cost EU Contribution : 15,000,000 Aid method / Method of implementation Project approach

More information

ANNEX. Support to the reform of criminal justice system in Georgia - CRIS N ENPI/2008/19630

ANNEX. Support to the reform of criminal justice system in Georgia - CRIS N ENPI/2008/19630 ANNEX ACTION FICHE GEORGIA PI AAP 2008 1. IDTIFICATION Title Total cost 16 M Aid method / management mode Support to the reform of criminal justice system in Georgia - CRIS N PI/2008/19630 Sector Policy

More information

E Distribution: GENERAL PROJECTS FOR EXECUTIVE BOARD APPROVAL. Agenda item 9

E Distribution: GENERAL PROJECTS FOR EXECUTIVE BOARD APPROVAL. Agenda item 9 Executive Board Second Regular Session Rome, 8 11 November 2010 PROJECTS FOR EXECUTIVE BOARD APPROVAL Agenda item 9 For approval E Distribution: GENERAL WFP/EB.2/2010/9-D 19 October 2010 ORIGINAL: ENGLISH

More information

Action Fiche for Libya

Action Fiche for Libya Action Fiche for Libya 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation Public administration capacity-building facility (ENPI/2011/276-708) EU contribution: EUR 4.5 million

More information

CASH TRANSFERS AND HIGH FOOD PRICES:

CASH TRANSFERS AND HIGH FOOD PRICES: CASH TRANSFERS AND HIGH FOOD PRICES: Explaining outcomes on Ethiopia s Productive Safety Net Programme Presentation at the CPRC Conference: Ten Years of War against Poverty Manchester, 8 September 2010

More information

Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation CRIS n ENPI/2008/

Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation CRIS n ENPI/2008/ EN 1 EN ACTION FICHE FOR ARMENIA - ENPI AAP 2008 1. IDENTIFICATION Title Total cost Aid method / Management mode Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation

More information

Management response to the recommendations deriving from the evaluation of the Mali country portfolio ( )

Management response to the recommendations deriving from the evaluation of the Mali country portfolio ( ) Executive Board Second regular session Rome, 26 29 November 2018 Distribution: General Date: 23 October 2018 Original: English Agenda item 7 WFP/EB.2/2018/7-C/Add.1 Evaluation reports For consideration

More information

RUTH VARGAS HILL MAY 2012 INTRODUCTION

RUTH VARGAS HILL MAY 2012 INTRODUCTION COST BENEFIT ANALYSIS OF THE AFRICAN RISK CAPACITY FACILITY: ETHIOPIA COUNTRY CASE STUDY RUTH VARGAS HILL MAY 2012 INTRODUCTION The biggest source of risk to household welfare in rural areas of Ethiopia

More information

Ethiopia Productive Safety Net Programme (PSNP): Prospects for graduation and sustainability beyond 2014

Ethiopia Productive Safety Net Programme (PSNP): Prospects for graduation and sustainability beyond 2014 Ethiopia Productive Safety Net Programme (PSNP): Prospects for graduation and sustainability beyond 2014 Safety Net Core Course, Washington D.C. 16 Dec 2010 Presentation Objectives 1) To assess the feasibility

More information

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument Action Fiche for EU- Brazil Sector Dialogues Support Facility 1. IDENTIFICATION Title

More information

Draft COMMISSION DECISION

Draft COMMISSION DECISION Draft COMMISSION DECISION of on the 2008 Annual Action Programme of Accompanying Measures for Sugar Protocol Countries in favour of Trinidad and Tobago to be financed under Article 21.060300 of the general

More information

E Distribution: GENERAL. Executive Board Second Regular Session. Rome, 6 10 November 2006

E Distribution: GENERAL. Executive Board Second Regular Session. Rome, 6 10 November 2006 Executive Board Second Regular Session Rome, 6 10 November 2006 E Distribution: GENERAL 30 October 2006 ORIGINAL: ENGLISH This document is printed in a limited number of copies. Executive Board documents

More information

Assessing the Impact of the Ethiopian Productive Safety Net Programme (PSNP)

Assessing the Impact of the Ethiopian Productive Safety Net Programme (PSNP) Assessing the Impact of the Ethiopian Productive Safety Net Programme (PSNP) Alemayehu Seyoum Taffesse International Food Policy Research Institute Fifth Transfer Project Research Workshop: Evaluating

More information

ANNEX Action Fiche for Technical Cooperation Facility II for Palau

ANNEX Action Fiche for Technical Cooperation Facility II for Palau ANNEX Action Fiche for Technical Cooperation Facility II for Palau 1. IDENTIFICATION Title Technical Cooperation Facility CRIS no. FED/2013/024-369 Total cost 180,000 (6.2% of NIP A envelope) EDF contribution

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

RATIONALE AND COUNTRY CONTEXT

RATIONALE AND COUNTRY CONTEXT ANNEX 1. IDENTIFICATION Title/Number Total cost Support to the implementation of the agriculture sector wide approach (ASWAp) and the Green Belt Initiative (GBI) CRIS: MAI/FED/23181 EUR 97 843 000 A Envelope

More information

HEALTH SERVICE FUND SUPPORT PROGRAMME CRIS

HEALTH SERVICE FUND SUPPORT PROGRAMME CRIS ANNEX 1. IDENTIFICATION Title/Number HEALTH SERVICE FUND SUPPORT PROGRAMME CRIS no. 2010 / 022651 Total cost EUR 4 000 000 10 th EDF - B Envelope Aid method / Joint Management with UNICEF Method of implementation

More information

COMMISSION DECISION. of [.. ] on the financing of humanitarian actions in Sierra Leone from the 10th European Development Fund (EDF)

COMMISSION DECISION. of [.. ] on the financing of humanitarian actions in Sierra Leone from the 10th European Development Fund (EDF) EUROPEAN COMMISSION Brussels C(2010) XXX final COMMISSION DECISION of [.. ] on the financing of humanitarian actions in Sierra Leone from the 10th European Development Fund (EDF) (ECHO/SLE/EDF/2010/01000)

More information

CERF and Country-Based Pooled Funds Stocktaking

CERF and Country-Based Pooled Funds Stocktaking CERF and Country-Based Pooled Funds Stocktaking CERF secretariat, April 2013 1. Introduction The present paper provides an overview of the main findings regarding complementarity at country level between

More information

ANNEX. MALAWI 2011 Annual Action Programme for the Accompanying Measures for Sugar Protocol Countries DCI-SUCRE/MW/

ANNEX. MALAWI 2011 Annual Action Programme for the Accompanying Measures for Sugar Protocol Countries DCI-SUCRE/MW/ ANNEX 1. IDENTIFICATION Title MALAWI 2011 Annual Action Programme for the Accompanying Measures for Sugar Protocol Countries DCI-SUCRE/MW/023-135 Total cost Aid method EUR 11 586 000 EU contribution Project

More information

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures EN ANNEX V Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures 1. Title/basic act/ CRIS number 2. Zone benefiting from the action/location CRIS number: 2018/41357

More information

Project approach - Decentralised management. DAC-code Government Administration

Project approach - Decentralised management. DAC-code Government Administration ANNEX Annex1 ACTION FICHE FOR SYRIAN ARAB REPUBLIC / ENPI / LOCAL DEVELOPMENT 1. IDENTIFICATION Title/Number Promoting Decentralisation and Local Development (DLD) Total Cost EC contribution 20,000,000

More information

Action Fiche for Armenia Sector Multi Sector

Action Fiche for Armenia Sector Multi Sector Action Fiche for Armenia 1. IDENTIFICATION Title Total cost Aid method / Management mode DAC-code Twinning Projects between 3 or 4 Armenian administrations and their equivalent in EU Member States to foster

More information

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS Informal Consultation 7 December 2015 World Food Programme Rome, Italy PURPOSE 1. This update of the country strategic planning approach summarizes the process

More information

Action Fiche for the West Bank and Gaza Strip

Action Fiche for the West Bank and Gaza Strip Action Fiche for the West Bank and Gaza Strip 1. IDENTIFICATION Title/Number Land development and basic infrastructure in Area C (ENPI/2012/023-776) Total cost EU contribution: EUR 7,000,000 Aid method

More information

MONTENEGRO. Enhanced control and management of fisheries INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

MONTENEGRO. Enhanced control and management of fisheries INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Enhanced control and management of fisheries Action summary The objective of the Action is to align the electronic data collection

More information

Evaluation of the European Union s Co-operation with Kenya Country level evaluation

Evaluation of the European Union s Co-operation with Kenya Country level evaluation "FICHE CONTRADICTOIRE" Evaluation of the European Union s Co-operation with Kenya Country level evaluation Recommendations Responses of Services: Follow-up (one year later) GENERAL RECOMMENDATIONS 1 Give

More information

DAC-code Sector Public Sector Policy and Administrative Management

DAC-code Sector Public Sector Policy and Administrative Management ANNEX 1 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementatio n Framework Programme in support of EU-Ukraine Agreements CRIS: ENPI/2012/23714

More information

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting. EN EN EN ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA 1. IDENTIFICATION Beneficiary Bosnia and Herzegovina CRIS number 2010 / 022-674 Year 2010 Cost EUR 6 000 000 Implementing Authority

More information

COMMUNITY-LED ACCELERATED WASH (COWASH) PROJECT Phase I (Jun 2011-Sep 2014)

COMMUNITY-LED ACCELERATED WASH (COWASH) PROJECT Phase I (Jun 2011-Sep 2014) COMMUNITY-LED ACCELERATED WASH (COWASH) PROJECT Phase I (Jun 2011-Sep 2014) Phase I Completion report of Component 1 (June, 2011 September 7, 2014) Date and location: January20, 2014, Addis Ababa by the

More information

This action is funded by the European Union

This action is funded by the European Union This action is funded by the European Union ANNEX 10 of the Commission implementing Decision on the Annual Action Programme 2015 of the DCI Pan-African Programme Action Document for "Support Measures Annual

More information

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Support to the Tax Administration Action summary This Action aims to support Montenegro in the process of fulfilling the EU preaccession

More information

BUSINESS-BASED SOLUTIONS IN HUMANITARIAN CRISES: LESSONS FROM ZIMBABWE

BUSINESS-BASED SOLUTIONS IN HUMANITARIAN CRISES: LESSONS FROM ZIMBABWE BUSINESS-BASED SOLUTIONS IN HUMANITARIAN CRISES: LESSONS FROM ZIMBABWE Credit: Cynthia R Matonhodze 2017/CARE EXECUTIVE SUMMARY / In response to heightened food insecurity in Zimbabwe, Crown Agents and

More information

EN 7 EN. Annex II Action Fiche for West Bank and Gaza Strip/ENPI. 1. IDENTIFICATION Title/Number Total cost 10,500,000

EN 7 EN. Annex II Action Fiche for West Bank and Gaza Strip/ENPI. 1. IDENTIFICATION Title/Number Total cost 10,500,000 Annex II Action Fiche for West Bank and Gaza Strip/ENPI 1. IDENTIFICATION Title/Number Total cost 10,500,000 Aid method / Method of implementation PEGASE: Governance and Social Development [note: No co-financing

More information

EN AIDCO/ (YYYY) D/NNN EN EN

EN AIDCO/ (YYYY) D/NNN EN EN EN AIDCO/ (YYYY) D/NNN EN EN ANNEX 1. IDENTIFICATION Title/Number St. Kitts and Nevis Accompanying Measures for Sugar Protocol Countries Allocation 2010 CRIS Number: 022-412 Budget heading Budget line

More information

Ethio-Italian Cooperation Framework

Ethio-Italian Cooperation Framework Ethio-Italian Cooperation Framework 2009-2011 I. CONTEXT AND RATIONALE 1. Ethiopia and Italy have long lasted political, economic and cultural relations. During the last 25 years the development cooperation,

More information

Action Fiche for West Bank and Gaza Strip. PEGASE: Private Sector Development CRIS: 2010/22476 EU Contribution: EUR11 million.

Action Fiche for West Bank and Gaza Strip. PEGASE: Private Sector Development CRIS: 2010/22476 EU Contribution: EUR11 million. Action Fiche for West Bank and Gaza Strip 1. IDENTIFICATION Title/Number Total cost PEGASE: Private Sector Development CRIS: 2010/22476 EU Contribution: EUR11 million. Aid method / Method of implementation

More information

Draft COMMISSION DECISION

Draft COMMISSION DECISION Draft COMMISSION DECISION of on the Annual Action Programme 2008 on Accompanying Measures on Sugar in favour of St. Kitts and Nevis to be financed under Article 21.060300 of the general budget of the European

More information

Marche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015

Marche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015 Marche Region 2014-2020 COMMITTENTE RDP for Marche Ex Ante Evaluation report Roma, June 2015 Executive summary EXECUTIVE SUMMARY Introduction The Ex Ante Evaluation (EAE) of the Rural Development Programme

More information

Annex 1. IDENTIFICATION

Annex 1. IDENTIFICATION 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation Annex DAC-code 15112 Sector Ghana Decentralisation Support Programme - GDSP- Component I CRIS ref. GH/FED/022-108 EUR 5 000

More information

INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) ALBANIA European Union Integration Facility. Action summary

INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) ALBANIA European Union Integration Facility. Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 ALBANIA European Union Integration Facility Action summary The Action will strengthen the capacity and accountability of the Albanian public administration

More information

Hawala cash transfers for food assistance and livelihood protection

Hawala cash transfers for food assistance and livelihood protection Afghanistan Hawala cash transfers for food assistance and livelihood protection EUROPEAN COMMISSION Humanitarian Aid and Civil Protection In response to repeated flooding, ACF implemented a cash-based

More information

The DAC s main findings and recommendations. Extract from: OECD Development Co-operation Peer Reviews

The DAC s main findings and recommendations. Extract from: OECD Development Co-operation Peer Reviews The DAC s main findings and recommendations Extract from: OECD Development Co-operation Peer Reviews Luxembourg 2017 Luxembourg has strengthened its development co-operation programme The committee concluded

More information

ANNEX. Title/Number RWANDA - Sector Budget Support Programme (SBSP) for Decentralised Agriculture - Addendum N 1; FED/2009/21572

ANNEX. Title/Number RWANDA - Sector Budget Support Programme (SBSP) for Decentralised Agriculture - Addendum N 1; FED/2009/21572 Identification ANNEX Title/Number RWANDA - Sector Budget Support Programme (SBSP) for Decentralised Agriculture - Addendum N 1; FED/2009/21572 Total cost Aid method / Method of implementation EDF contribution:

More information

Empowerment of non state actors in Botswana

Empowerment of non state actors in Botswana Annex: Empowerment of non state actors in Botswana 1. IDENTIFICATION Title/Number Empowerment of non state actors in Botswana BW/FED/022-316 Total cost EUR 10 000 000 European Union contribution : EUR

More information

Natural Resources & Environmental (NRE) Governance in Ghana DFID, NL, WB, EC, France, Switzerland Government of Ghana

Natural Resources & Environmental (NRE) Governance in Ghana DFID, NL, WB, EC, France, Switzerland Government of Ghana Natural Resources & Environmental (NRE) Governance in Ghana DFID, NL, WB, EC, France, Switzerland Government of Ghana Strengthening the Development Results and Impacts of the Paris Declaration through

More information

Annex. 11 th EDF Support to the Office of the NAO CRIS No. TZ/FED/ Total estimated cost: EUR

Annex. 11 th EDF Support to the Office of the NAO CRIS No. TZ/FED/ Total estimated cost: EUR Annex of the Commission Decision on the individual measure in favour of Tanzania to be financed from the 11 th European Development Fund Action Document for 11 th EDF Support to the Office of the NAO 1

More information

Policy Implementation for Enhancing Community. Resilience in Malawi

Policy Implementation for Enhancing Community. Resilience in Malawi Volume 10 Issue 1 May 2014 Status of Policy Implementation for Enhancing Community Resilience in Malawi Policy Brief ECRP and DISCOVER Disclaimer This policy brief has been financed by United Kingdom (UK)

More information

Irish Aid. Evaluation of the Irish Aid/ Tigray Regional Support Programme (TRSP)

Irish Aid. Evaluation of the Irish Aid/ Tigray Regional Support Programme (TRSP) DAI Europe Ltd. 2nd Floor, Strand Bridge House 138/142 Strand London WC2R 1HH Tel: +44 207 420 8600 Fax: +44 207 420 8601 www.dai-europe.com Irish Aid Evaluation of the Irish Aid/ Tigray Regional Support

More information

Assets Channel: Adaptive Social Protection Work in Africa

Assets Channel: Adaptive Social Protection Work in Africa Assets Channel: Adaptive Social Protection Work in Africa Carlo del Ninno Climate Change and Poverty Conference, World Bank February 10, 2015 Chronic Poverty and Vulnerability in Africa Despite Growth,

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof, L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)

More information

EVALUATION REPORTS. Agenda item 6

EVALUATION REPORTS. Agenda item 6 Executive Board Second Regular Session Rome, 8 11 November 2010 EVALUATION REPORTS Agenda item 6 For consideration E MANAGEMENT RESPONSE TO THE RECOMMENDATIONS OF THE SUMMARY REPORT OF THE MID-TERM EVALUATION

More information

UN BHUTAN COUNTRY FUND

UN BHUTAN COUNTRY FUND UN BHUTAN COUNTRY FUND Terms of Reference Introduction: 1. The UN system in Bhutan is implementing the One Programme 2014-2018. The One Programme is the result of a highly consultative and participatory

More information

ANNEX 3 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION

ANNEX 3 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION ANNEX 3 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation Third EU Contribution to the Eastern Europe Energy Efficiency and

More information

shocks do not have long-lasting adverse development consequences (Food Security Information Network)

shocks do not have long-lasting adverse development consequences (Food Security Information Network) Submission by the World Food Programme to the Executive Committee of the Warsaw International Mechanism for Loss and Damage on best practices, challenges and lessons learned from existing financial instruments

More information

El Niño and Household Debts in Amhara National Regional State, Ethiopia

El Niño and Household Debts in Amhara National Regional State, Ethiopia Agriculture Knowledge, Learning, Documentation and Policy (AKLDP) Project Field Notes June 2016 El Niño and Household Debts in Amhara National Regional State, Ethiopia Introduction In Ethiopia in 2015

More information

EN AIDCO/ (2010) EN EN

EN AIDCO/ (2010) EN EN EN AIDCO/ (2010) 87827 EN EN Annex 1. Identification Title/Number Total cost Aid method / Method of implementation DAC-code Support to the Greenland Education and Vocational Training Sector 2010, CRIS

More information

Action Fiche for NEPAL. DAC-code 11200, Sector: Basic Education

Action Fiche for NEPAL. DAC-code 11200, Sector: Basic Education Action Fiche for NEPAL 1. Identification Title/Number Total cost School Sector Reform (SSR), Nepal. DCI-ASIE/2009/21209 Total cost of the project : 1 969 520 000 1 (approx.) Total EC Contribution: 26 353

More information

SCALING UP RESILIENCE THROUGH SOCIAL PROTECTION

SCALING UP RESILIENCE THROUGH SOCIAL PROTECTION Sendai, 16 th March, 2015 SCALING UP RESILIENCE THROUGH SOCIAL PROTECTION Jehan Arulpragasam, Practice Manager Social Protection and Labor Global Practice Main messages Social protection helps poor households

More information

E Distribution: GENERAL. Executive Board Second Regular Session. Rome, October September 2007 ORIGINAL: ENGLISH

E Distribution: GENERAL. Executive Board Second Regular Session. Rome, October September 2007 ORIGINAL: ENGLISH Executive Board Second Regular Session Rome, 22 26 October 2007! E Distribution: GENERAL 11 September 2007 ORIGINAL: ENGLISH Cost (United States dollars) Current budget Increase Revised budget WFP food

More information

Council of the European Union Brussels, 12 June 2015 (OR. en)

Council of the European Union Brussels, 12 June 2015 (OR. en) Council of the European Union Brussels, 12 June 2015 (OR. en) 9807/15 NOTE From: To: General Secretariat of the Council Delegations No. prev. doc.: 6770/15 Subject: ACP 89 FIN 427 RELEX 467 COAFR 186 CFSP/PESC

More information

ANNEX. 1. IDENTIFICATION Beneficiary CRIS/ABAC Commitment references Total cost EU Contribution Budget line. Turkey IPA/2017/40201

ANNEX. 1. IDENTIFICATION Beneficiary CRIS/ABAC Commitment references Total cost EU Contribution Budget line. Turkey IPA/2017/40201 ANNEX to Commission Implementing Decision adopting an Annual Action Programme for Turkey under the Instrument for Pre-accession Assistance (IPA II) for the year 2017 1. IDENTIFICATION Beneficiary CRIS/ABAC

More information

ECHO Drought Risk Reduction Action Plan for the Horn of Africa Region ( ) (Kenya, Uganda, Ethiopia, Djibouti)

ECHO Drought Risk Reduction Action Plan for the Horn of Africa Region ( ) (Kenya, Uganda, Ethiopia, Djibouti) ECHO Drought Risk Reduction Action Plan for the Horn of Africa Region (2012-2013) (Kenya, Uganda, Ethiopia, Djibouti) DRRAP Partners planning meeting Naivasha, 24-25 July 2012 DG Humanitarian Aid and Civil

More information

Joint Partnership Arrangement

Joint Partnership Arrangement Joint Partnership Arrangement Concerning Common Arrangements for Joint Support to the Health Strategic Plan 2008-2015 between the Royal Government of Cambodia and the 2nd Health Sector Support Program

More information

Joint SCUK/UNICEF STUDY Ethiopia Country Report

Joint SCUK/UNICEF STUDY Ethiopia Country Report SAVE THE CHILDREN FUND/UNICEF MULTI-YEAR, MULTI-COUNTRY RESEARCH PROGRAMME ON THE IMPACTS OF CASH TRANSFERS ON CHILDREN IN EASTERN AND SOUTHERN AFRICA Joint SCUK/UNICEF STUDY Ethiopia Country Report Draft

More information

The Federal Democratic Republic of Ethiopia Audit Services Corporation

The Federal Democratic Republic of Ethiopia Audit Services Corporation Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized M-1-1 9"CaDo MA"?AM-+ Wc 67i) The Federal Democratic Republic of Ethiopia Audit Services

More information

Final. Food Security Programme

Final. Food Security Programme Final Food Security Programme 2010-2014 Ministry of Agriculture and Rural Development August 2009 Final TABLE OF CONTENTS TABLE OF CONTENTS... 2 ACRONYMS... 4 1 BACKGROUND... 6 1.1 FOOD SECURITY IN ETHIOPIA...

More information

Action Fiche for Mongolia. EU contribution: EUR

Action Fiche for Mongolia. EU contribution: EUR Action Fiche for Mongolia IDENTIFICATION Title/Number Support to Technical and Vocational Education and Training (TVET) Programme DCI-ASIE/2011/022-921 Total cost EUR 7 000 000 Aid method / Method of implementation

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. Food Facility: Interim report on Measures Taken SEC(2010)245

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. Food Facility: Interim report on Measures Taken SEC(2010)245 EN EN EN EUROPEAN COMMISSION Brussels, 12.3.2010 COM(2010)81 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL Food Facility: Interim report on Measures Taken SEC(2010)245 EN

More information

Implementation Challenges of the Social Protection System in Ethiopia. December 2014 Washington, D.C.

Implementation Challenges of the Social Protection System in Ethiopia. December 2014 Washington, D.C. Implementation Challenges of the Social Protection System in Ethiopia December 2014 Washington, D.C. Outline 1. Background 2. Programme Environment 3. Programme Fragment issues 4. Factors Driving the Need

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 May /10 ECOFIN 249 ENV 265 POLGEN 69

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 May /10 ECOFIN 249 ENV 265 POLGEN 69 COUNCIL OF THE EUROPEAN UNION Brussels, 11 May 2010 9437/10 ECOFIN 249 ENV 265 POLGEN 69 NOTE from: to: Subject: The General Secretariat of the Council Delegations Financing climate change- fast start

More information

Action Fiche Trinidad and Tobago

Action Fiche Trinidad and Tobago Action Fiche Trinidad and Tobago 1. Identification Title/Number Accompanying Measures for Sugar Protocol Countries, Trinidad and Tobago 2011-2013 CRIS Number: 023-150 Total cost EU Contribution: EUR 31

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 13.10.2011 COM(2011) 638 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

El Niño and Indebtedness in Ethiopia Impacts of drought on household debts in Tigray National Regional State

El Niño and Indebtedness in Ethiopia Impacts of drought on household debts in Tigray National Regional State Agriculture Knowledge, Learning, Documentation and Policy (AKLDP) Project Field Notes June 2016 El Niño and Indebtedness in Ethiopia Impacts of drought on household debts in Tigray National Regional State

More information

Food security and linking relief, rehabilitation and development in the European Commission

Food security and linking relief, rehabilitation and development in the European Commission FAO International Workshop on Food Security in Complex Emergencies: building policy frameworks to address longer-term programming challenges Tivoli, 23-25 September 2003 Food security and linking relief,

More information

FINAL EVALUATION VIE/033. Climate Adapted Local Development and Innovation Project

FINAL EVALUATION VIE/033. Climate Adapted Local Development and Innovation Project FINAL EVALUATION VIE/033 Climate Adapted Local Development and Innovation Project PROJECT SUMMARY DATA Country Long project title Short project title LuxDev Code Vietnam Climate Adapted Local Development

More information

EN 20 EN ACTION FICHE FOR EGYPT. Annex IDENTIFICATION Title

EN 20 EN ACTION FICHE FOR EGYPT. Annex IDENTIFICATION Title Annex 3 ACTION FICHE FOR EGYPT 1. IDENTIFICATION Title Total cost Aid method / management mode Education Sector Policy Support Programme Additional Commitment EUR 20 000 000 (EC contribution) Sector Policy

More information

Zambia s poverty-reduction strategy paper (PRSP) has been generally accepted

Zambia s poverty-reduction strategy paper (PRSP) has been generally accepted 15 ZAMBIA The survey sought to measure objective evidence of progress against 13 key indicators on harmonisation and alignment (see Foreword). A four-point scaling system was used for all of the Yes/No

More information

Multi-country European Integration Facility

Multi-country European Integration Facility 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries

More information

Seminar on Strengthening Social Protection Systems in Namibia

Seminar on Strengthening Social Protection Systems in Namibia Seminar on Strengthening Social Protection Systems in Namibia PRESENTATION OVERVIEW 1. Social Support Model in Malawi 2. Objectives of the Policy/Programme 3. Interventions 4. Challenges 5. Reforms to

More information

EN 1 EN ANNEX I 1. IDENTIFICATION. Total cost EC contribution EUR Aid method / Method of implementation

EN 1 EN ANNEX I 1. IDENTIFICATION. Total cost EC contribution EUR Aid method / Method of implementation ANNEX I 1. IDENTIFICATION Title/Number Demining Action Total cost EC contribution EUR 20.000.000 Aid method / Method of implementation Project approach. Partially decentralised management DAC-code 15250

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA-3646A TF TF-52696) ON A CREDIT

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA-3646A TF TF-52696) ON A CREDIT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00001850 IMPLEMENTATION COMPLETION AND RESULTS

More information

SOCIAL PROTECTION IN SOUTH CENTRAL SOMALIA. The findings of a feasibility study October 2013 January 2014

SOCIAL PROTECTION IN SOUTH CENTRAL SOMALIA. The findings of a feasibility study October 2013 January 2014 SOCIAL PROTECTION IN SOUTH CENTRAL SOMALIA The findings of a feasibility study October 2013 January 2014 Introduction Assess whether aspects of a formal social protection system might provide a better

More information

SCALING UP EXISTING SOCIAL SAFETY NETS TO PROVIDE HUMANITARIAN RESPONSE

SCALING UP EXISTING SOCIAL SAFETY NETS TO PROVIDE HUMANITARIAN RESPONSE IS CASH TRANSFER PROGRAMMING FIT FOR THE FUTURE? ANNEXES SCALING UP EXISTING SOCIAL SAFETY NETS TO PROVIDE HUMANITARIAN RESPONSE A case study of Ethiopia s Productive Safety Net Programme and Kenya s Hunger

More information

with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming

with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming PAGE 1 OF 12 Country (or region) Executive Summary (in one page) Union of the Comoros Submission Date 29/05/2015

More information

This action is funded by the European Union

This action is funded by the European Union EN This action is funded by the European Union ANNEX 3 of the Commission Implementing Decision on the Annual Action Programme 2015 part II in favour of the Republic of Lebanon Action Document for "Civil

More information

Evaluation of the European Neighbourhood Instrument Draft Report Executive summary January 2017

Evaluation of the European Neighbourhood Instrument Draft Report Executive summary January 2017 Evaluation of the European Neighbourhood Instrument Draft Report Executive summary January 2017 Development and Cooperation EuropeAid This report has been prepared by Lead company Consortium composed by

More information