Route Route Z Intersection Realignment

Size: px
Start display at page:

Download "Route Route Z Intersection Realignment"

Transcription

1 Route Route Z Intersection Realignment Sponsor County Highway Project No. RB Project Type Traffic Flow TOTAL FUNDING Total County Sponsor Federal $3,310,000 $1,776,000 $0 $1,534,000 Project Description This project involves a reconfiguration of the intersection of Route Z at Route N. Due to considerable existing traffic delays at the intersection, MoDOT was able to get federal funds through East-West Gateway to reconstruct this intersection. Their plan was to replace the unconventional split dual intersections with a pair of roundabouts in a dogbone configuration. County administration was concerned with the dogbone layout, since it appeared to only address short-term delays and not the long-term growth anticipated for the area, especially as the David Hoekel Parkway (DHP) corridor continues to develop. A single intersection with a traffic signal was determined by Roads and Traffic to be the best alternative. As a result of discussion between MoDOT, the County, and East-West Gateway, it was decided that St. Charles County should administer the project, and the traffic signal option would be built at an intersection by the east end. Route Z would be realigned behind the existing Walgreens location. This configuration also allows for a new direct connection to Buckner Road to the west to match the long range plan for DHP, which could be easily incorporated into the intersection realignment in the future as the DHP#3 project.

2

3 FUNDING FOR IMPROVEMENTS County Sponsor Federal Other Total Design $200, $200, Utility Relocations $61, $61, Right-of-Way $500, $500, Construction $1,014, $1,534, $2,548, TOTAL $1,776, $1,534, $3,310, PERCENT (%) 53.66% 0.00% 46.34% 0.00% % FINANCIAL PLAN Design County Sponsor Federal Other Total 2019 $200, $200, Utility Relocations County Sponsor Federal Other Total $61, $61, Right-of-Way County Sponsor Federal Other Total $500, $500, Construction County Sponsor Federal Other Total $1,014, $1,534, $2,548,500.00

4 ROUTE N AND ROUTE Z INTERSECTION REALIGNMENT ROUTE N ROUTE Z ROUTE N FUTURE DHP #3 BUCKNER RD ROUTE Z ROUTE N AND ROUTE Z INTERSECTION REALIGNMENT PROJECT LENGTH: ROUTE N: 0.11 MILES ROUTE Z: 0.45 MILES N NOT TO SCALE

5 Estimate of Project Costs Project Sponsor: Saint Charles County Highway Department Project Title: David Hoekel Parkway #3 - Route N and Route Z Date: 4/9/2018; updated 6/4/18 Specific Roadway Items Item Quantity Unit Unit Price Amount Clearing and Grubbing 1 Lump Sum $ 75, $75, Removal of Improvements 1 Lump Sum $ 90, $90, Mobilization 1 Lump Sum $ 100, $100, Surveying 1 Lump Sum $ 50, $50, Earthwork Cubic Yards $ $450, Retaining Walls 2500 Square Feet $ $62, " Aggregate Base Square Yards $ 6.00 $76, Pavement: Square Yards $ &3-12' lanes, 4'&6' shldr $540, Driveways 800 Square Yards $ $32, Curb and Gutter 0 Linear Feet $ Drainage Structures 1 Lump Sum $ 100, $100, Traffic Control 1 Lump Sum $ 75, $75, Traffic Signal 1 Each $ 200, $200, Erosion Control 1 Lump Sum $ 60, $60, Temporary Pavement 3000 Square Yards $ $75, Sodding 4500 Square Yards $ 5.00 $22, Seeding 5 Acres $ 3, $15, Pavement Markings Linear Feet $ 1.00 SUBTOTAL $12, $2,035, Specific Bicycle Items Item Quantity Unit Unit Price Amount SUBTOTAL Specific Pedestrian Items Item Quantity Unit Unit Price Amount 5 Foot Wide Sidewalks 0 Square Yards $ SUBTOTAL

6 Specific Transit Items Item Quantity Unit Unit Price Amount SUBTOTAL Miscellaneous Other Items Item Quantity Unit Unit Price Amount Utility Relocations 1 Lump Sum $50, SUBTOTAL $50, $50, Construction Cost Total Contingency Inflation Preliminary Engineering Right-of-Way Construction Engineering/Inspection Project Total (rounded) $2,085, $417, $62, $200, $500, $40, $3,310,000.00

7 Route N and Route Z Intersection Realignment Project Schedule Start Date (MO/YR) Finish Date (MO/YR) Receive EWG Notification Letter to Take Over Project 6/18 7/18 Execute Agreement (Project sponsor & MoDOT) 12/18 4/19 Engineering Services Contract Submitted & Approved N/A N/A Obtain Environmental Clearances 7/18 7/20 Public Meeting/Hearing 2/19 2/19 Develop and Submit Preliminary Plans 7/17 2/19 Preliminary Plans Approved 3/19 5/19 Develop and Submit Right-of-Way Plans 6/19 1/20 Review and Approval of Right-of-Way Plans 2/20 3/20 Submit and Receive Approval for Notice to Proceed for Right-of-Way Acquisition (A-Date) 3/20 4/20 Right-of-Way Acquisition 5/20 9/20 Develop and Submit PS&E 4/20 7/20 District Approval of PS&E/Advertise for Bids 8/20 10/20 Submit and Receive Bids for Review and Approval 11/20 12/20 Project Implementation/Construction 1/21 12/21

8

9

10

11

12

13

14

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates. , Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...

More information

LADOTD COST ESTIMATING PROCESS. Charles Nickel, P.E. Value Engineering & Cost Estimate Director Office: (225)

LADOTD COST ESTIMATING PROCESS. Charles Nickel, P.E. Value Engineering & Cost Estimate Director Office: (225) LADOTD COST ESTIMATING PROCESS Charles Nickel, P.E. Value Engineering & Cost Estimate Director Office: (225) 379-1078 E-mail: Charles.Nickel@la.gov Project Management Body of Knowledge (PMBOK) Cost Management

More information

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial

More information

Appendix B Example Project Designs and Engineers Opinion of Costs

Appendix B Example Project Designs and Engineers Opinion of Costs Appendix B Example Project Designs and Engineers Opinion of Costs 32 nd Street from E. 2 nd to Main Avenue CR 251 and CR 250 9 th Street Sidewalk Improvements 15 th Street Improvements Intermodal Facility

More information

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 OF THE CITY OF SAN JACINTO December 11, 2003 REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 CITY OF SAN JACINTO Prepared for CITY OF SAN

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION CAPITAL PROGRAM TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily

More information

CITY OF SAN MARCOS ENGINEERING DIVISION

CITY OF SAN MARCOS ENGINEERING DIVISION AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION 1 Civic Center Dr., San Marcos, CA 92069-2918 (760) 744-1050 FAX (760) 591-4135 FEE SCHEDULE FOR GRADING & IMPROVEMENT PLAN

More information

Exhibit 4 Page 1 of 8

Exhibit 4 Page 1 of 8 Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:

More information

NON-MOTORIZED FACILITIES

NON-MOTORIZED FACILITIES NON-MOTORIZED FACILITIES POLICY The Board of Road Commissioners of the County of Kalamazoo non-motorized policy provides a guideline for the development of non-motorized facilities in the public right-of-way.

More information

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements

More information

Implementation Project Development and Review 255

Implementation Project Development and Review 255 Introduction 248 Implementation Principles 249 Public Agency Fiduciary Responsibilities 250 Project Development and Review Process 252 Project Development and Review 255 Maintenance 23 Implementation Implementation

More information

SOUND TRANSIT STAFF REPORT MOTION NO. M Agreement with the City of Newcastle for the Newcastle Transit Center Project

SOUND TRANSIT STAFF REPORT MOTION NO. M Agreement with the City of Newcastle for the Newcastle Transit Center Project SOUND TRANSIT STAFF REPORT MOTION NO. M2007-19 Agreement with the City of Newcastle for the Newcastle Transit Center Project Meeting: Date: Type of : Staff Contact: Phone: Finance Committee 2/1/07 Discussion/Possible

More information

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines

More information

TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures

TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures Alameda CTC Programs Annual Compliance Report 00 Reporting Year TABLE BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and DATE : Revised /0/ Column A Column B Column C Column D Column E Column F Column

More information

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP) HINDS Project: 480001 Responsible Agency: CITY OF CLINTON Total Project Cost: $6,068,000 Route: PINEHAVEN/NORTHSIDE DR Fund Source: EARMARK Project Length: 1.25 Pinehaven Dr from Northside Dr to 400' N

More information

City of Portsmouth Portsmouth, New Hampshire Department of Public Works

City of Portsmouth Portsmouth, New Hampshire Department of Public Works RFP# 10-07 City of Portsmouth Portsmouth, New Hampshire Department of Public Works MARKET STREET BICYCLE AND PEDESTRIAN PATH BETWEEN MICHAEL SUCCI DRIVE AND THE NH PORT AUTHORITY REQUEST FOR PROPOSAL Sealed

More information

Preliminary Budget Cost Estimate-Raft Island RIIA Roads 26952 SY Construction Items Budget Preliminary Temporary Erosion Control/Miscellaneous Work $ 18,500.00 Traffic Control $ 10,000.00 Pulverizing $

More information

Fees/Privatization/Sponsorship Opportunities

Fees/Privatization/Sponsorship Opportunities Fees/Privatization/Sponsorship Opportunities Mike Holder, PE, Chief Engineer Joint Transportation Legislative Oversight Committee January 27, 2015 Statutory Requirement Section 34.17 of Budget Bill: Board

More information

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)

More information

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) 2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion

More information

Traffic Impact Analysis Guidelines Methodology

Traffic Impact Analysis Guidelines Methodology York County Government Traffic Impact Analysis Guidelines Methodology Implementation Guide for Section 154.037 Traffic Impact Analysis of the York County Code of Ordinances 11/1/2017 TABLE OF CONTENTS

More information

Appendix E: Revenues and Cost Estimates

Appendix E: Revenues and Cost Estimates Appendix E: Revenues and Cost Estimates Photo Source: Mission Media Regional Financial Plan 2020-2040 Each metropolitan transportation plan must include a financial plan. In this financial plan, the region

More information

7 31 32 33 34 35 37 38 39 40 41 42 43 A G R E E M E N T Between Morrison County, The City of Pierz and Rich Prairie Sewer and Water District THIS AGREEMENT is made and entered into between Morrison

More information

Tribal Transportation Program Transportation Improvement Program

Tribal Transportation Program Transportation Improvement Program Funding Source TTP, 2% Planning (Bridge, 2% Planning, Safety, etc) Current FY 2015 Project Name General Administration Location Pawnee Nation Reserve Type of Work Program Administration Route Num and Section

More information

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis Attachment B Project Cost Estimates for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET CITY OF PLACERVILLE ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET 2012/2013 1 2 CAPITAL IMPROVEMENT PROGRAM POLICY Each year the City faces the challenge of meeting infrastructure and equipment needs with

More information

COUNTY ADMINISTRATOR PUBLIC WORKS

COUNTY ADMINISTRATOR PUBLIC WORKS COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm

More information

CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE

CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE GENERAL INSTRUCTIONS 1. This pamphlet lists services available or required to process your project and fees or charges for these services. 2. Fees or deposits

More information

ADDENDUM No. 1 January 29, Paving Program Village of Milford

ADDENDUM No. 1 January 29, Paving Program Village of Milford ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for

More information

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

NE WEST KINGSTON ROAD CULVERT REPLACEMENT NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS

More information

Chapter 5: Cost and Revenues Assumptions

Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions INTRODUCTION This chapter documents the assumptions that were used to develop unit costs and revenue estimates for the

More information

Quarterly Status Report

Quarterly Status Report Capital Projects Quarterly Status Report 2nd Quarter FY2018 : October 01 - December 31, 2017 Report prepared for the March 01, 2018 TA Board Meeting SAN MATEO COUNTY TRANSPORTATION AUTHORITY QUARTERLY

More information

Capital Improvements Program. City Council October 14, 2014

Capital Improvements Program. City Council October 14, 2014 Capital Improvements Program City Council October 14, 2014 Neighborhood Attendees ~15 (Paul Kaspar) Presentation Today CIP Advantages/Process Approved CIP Program (FY14 - FY18 CIP) Financial Forecast Projects

More information

LETTING : CALL : 056 COUNTIES : MILLE LACS

LETTING : CALL : 056 COUNTIES : MILLE LACS S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE

More information

Chapter 4: Plan Implementation

Chapter 4: Plan Implementation This chapter discusses the financial and regulatory needs associated with the implementation of this Transportation System Plan. Projected Funding for Transportation Improvements Projecting the revenue

More information

Indiana LTAP Road School 2007 Purdue University West Lafayette, Indiana March 7, 2007

Indiana LTAP Road School 2007 Purdue University West Lafayette, Indiana March 7, 2007 Review of GASB Statement No. 34 capital asset provisions and discussion of the Indiana LTAP and Government Fixed Asset Services, Inc. Procedure Manual for Implementation of GASB Statement No. 34 Indiana

More information

MONTE SERENO BETTER STREETS COMMISSION AGENDA 7:00 P.M. Thursday March 8, 2018 Regular Meeting

MONTE SERENO BETTER STREETS COMMISSION AGENDA 7:00 P.M. Thursday March 8, 2018 Regular Meeting MONTE SERENO BETTER STREETS COMMISSION AGENDA 7:00 P.M. Thursday March 8, 2018 Regular Meeting Monte Sereno City Council Chambers 18041 Saratoga-Los Gatos Road, Monte Sereno, CA 95030 MEETING CALLED TO

More information

County Barn Road RPUD. Deviation Justification

County Barn Road RPUD. Deviation Justification 1. Deviation 1 seeks relief from LDC Section 6.06.02.A.2 which requires dual sidewalks on local roads internal to the site, to allow a sidewalk on one side of the roadway where the property is permitted

More information

REQUEST FOR PROPOSALS. Demolition

REQUEST FOR PROPOSALS. Demolition JEFFERSON COUNTY, WEST VIRGINIA Engineering Department 116 East Washington Street P.O. Box 716 Charles Town, West Virginia 25414 Phone: 304-728-3257 Email: engineering@jeffersouncountywv.org Fax: 304-728-3953

More information

To: From: By: Subject:

To: From: By: Subject: To: From: By: Subject: CITY OF WOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rd Avenue NE, Woodinville, WA 98072 WWW.CI.WOODINVILLE.WA.US Honorable City Council ~., / Richard A. Leahy, City Manager~

More information

Capital Cost Estimation Methodology

Capital Cost Estimation Methodology West Broadway Transit Study Capital Cost Estimation Methodology 7/6/2015 Prepared by the SRF Consulting Group Team for Capital Cost Estimation Methodology Page i Introduction... 1 1. Capital Costs... 1

More information

FEDERAL LANDS ACCESS PROGRAM PROJECT MEMORANDUM OF AGREEMENT

FEDERAL LANDS ACCESS PROGRAM PROJECT MEMORANDUM OF AGREEMENT FEDERAL LANDS ACCESS PROGRAM PROJECT MEMORANDUM OF AGREEMENT Project / Facility Name: South Ocean Beach Trail Project Route: Bicycle Route 95 State: California City(ies): City and County of San Francisco

More information

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

BOULEVARD CID FULTON INDUSTRIAL BOULEVARD STREETSCAPE IMPROVEMENTS CONSULTING SERVICES REQUEST FOR PROPOSAL RFP ID#:

BOULEVARD CID FULTON INDUSTRIAL BOULEVARD STREETSCAPE IMPROVEMENTS CONSULTING SERVICES REQUEST FOR PROPOSAL RFP ID#: BOULEVARD CID FULTON INDUSTRIAL BOULEVARD STREETSCAPE IMPROVEMENTS CONSULTING SERVICES REQUEST FOR PROPOSAL RFP ID#: 2017 01 1 INTRODUCTION: FULTON INDUSTRIAL COMMUNITY IMPROVEMENT DISTRICT REQUEST FOR

More information

CHAPTER 6: COST ESTIMATES

CHAPTER 6: COST ESTIMATES CHAPTER 6: COST ESTIMATES 115 116 UNION STATION GEORGETOWN: ALTERNATIVES ANALYSIS for PREMIUM TRANSIT SERVICE The Recommended Alternative could be designed and constructed under a number of financing options.

More information

Department of Public Works Engineering

Department of Public Works Engineering Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34 the basics

GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34 the basics GASB Statement No. 34 Indiana LTAP Annual Road School Conference Purdue University West Lafayette, Indiana March 11, 2004 GASB Statement No. 34 Summary of Capital Asset and General Infrastructure Accounting

More information

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213

More information

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC J-17 STAFF REPORT MEETING DATE: October 24, 2017 TO: City Council FROM: Russ Thompson, Public Works Director PRESENTER: Russ Thompson, Public Works Director SUBJECT: RECEIVE A REPORT AND APPROVE PROPOSED

More information

TYSONS CORNER. Neighborhood Traffic Impact Study. Traffic Analysis Report. Task Order No Prepared by: Prepared for:

TYSONS CORNER. Neighborhood Traffic Impact Study. Traffic Analysis Report. Task Order No Prepared by: Prepared for: TYSONS CORNER Neighborhood Traffic Impact Study Traffic Analysis Report Task Order No. 07 077 03 Prepared by: Prepared for: December 2010 Tysons Corner Neighborhood Impact Study Page 2 TABLE OF CONTENTS

More information

DEVELOPMENT AGREEMENT BETWEEN MENARD, INC., AND THE CITY OF INDEPENDENCE, MISSOURI

DEVELOPMENT AGREEMENT BETWEEN MENARD, INC., AND THE CITY OF INDEPENDENCE, MISSOURI DEVELOPMENT AGREEMENT BETWEEN MENARD, INC., AND THE CITY OF INDEPENDENCE, MISSOURI This Agreement made this day of, 2014, by and between Menard, Inc. (hereinafter Developer ), and the City of Independence,

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 217218 AGENCY CONTACT INFORMATION Agency Name: City of San Leandro Date: 12/14/218 Primary Point of Contact Name: Norite

More information

A. Approve updated Measure R Early Action Project list (Attachment A) ; and

A. Approve updated Measure R Early Action Project list (Attachment A) ; and One Gateway Plaza Los Angeles, CA 90012-2952 213-922.2000 Te metro. net 21 PLANNING AND PROGRAMMING COMMITTEE OCTOBER 17, 2012 SUBJECT: ACTION: MEASURER 1-710 EARLY ACTION PROJECT LIST UPDATE APPROVE RECOMMENDATION

More information

QUALITY TRANSPORTATION SUMMARY

QUALITY TRANSPORTATION SUMMARY QUALITY TRANSPORTATION SUMMARY Quality Transportation Overview... 126 Department of Transportation... 127 Traffic Field Operations... 129 Winston-Salem Transit Authority... 131 Quality Transportation Non-Departmental...

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six DISTRICT SIX PROJECT OVERVIE Florida s Turnpike Enterprise continues to make project investments in District Six. In FY 2017 and FY 2018, current Turnpike projects total over $109 million within Miami-Dade

More information

Corridors of Commerce DRAFT Scoring and Prioritization Process. Patrick Weidemann Director of Capital Planning and Programming November 1, 2017

Corridors of Commerce DRAFT Scoring and Prioritization Process. Patrick Weidemann Director of Capital Planning and Programming November 1, 2017 Corridors of Commerce DRAFT Scoring and Prioritization Process Patrick Weidemann Director of Capital Planning and Programming November 1, 2017 Project Purpose To develop and implement a scoring and project

More information

TOWN OF JUPITER Community Redevelopment Agency

TOWN OF JUPITER Community Redevelopment Agency TOWN OF JUPITER Community Redevelopment Agency DATE: September 14, 2012 TO: THRU: FROM: Honorable Chair and Commissioners of the Community Redevelopment Agency Andrew D. Lukasik, Executive Director Brenda

More information

How to Read the Project Modification Listings - Roadway Section

How to Read the Project Modification Listings - Roadway Section How to Read the Project Modification Listings - Roadway Section Sa m pl e The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 21, 2013

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 21, 2013 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 21, 2013 DATE: September 4, 2013 SUBJECT: Fiscal Year 2014 HB 2313 (House Bill 2313) Local Share Funding Allocations and Priorities

More information

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013 BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013 Total Uncommitted Funds FY 2013 A + B = C C + D = E E - F = G A B C D E F G Balance Carryover from FY 12 FY (includes all adjustments) Total Available Total Obligations

More information

PUBLIC WORKS CIP SUPPORT

PUBLIC WORKS CIP SUPPORT PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm water management, and

More information

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary The adopted FY 2016 FY 2020 CIP is $205.3 million (including prior year expenditures) and is $2.9 million lower than the previous CIP

More information

Instructions for Completing the Annual Road and Street Finance Report

Instructions for Completing the Annual Road and Street Finance Report Instructions for Completing the Annual Road and Street Finance Report Additional information you wish to submit may be attached to the report on 8.5" by 11" paper. Please round all amounts up or down to

More information

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted, ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT

More information

SUBDIVISION IMPROVEMENTS AGREEMENT

SUBDIVISION IMPROVEMENTS AGREEMENT SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El

More information

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221 Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00

More information

Military Highway Continuous Flow Intersection (CFI) Initial Financial Plan

Military Highway Continuous Flow Intersection (CFI) Initial Financial Plan Military Highway Continuous Flow Intersection (CFI) Initial Financial Plan State Project Number(s): 0013-122-V03, 0165-122-V04, 0165-122-181 UPC(s): 9783, 1765, 84243 1 Table of Contents 1. Project Description...

More information

A Benefit Cost Analysis of the 45th Street at Calumet Avenue Grade Separation Project. Presented to the Town of Munster

A Benefit Cost Analysis of the 45th Street at Calumet Avenue Grade Separation Project. Presented to the Town of Munster A Benefit Cost Analysis of the 45th Street at Calumet Avenue Grade Separation Project Presented to the Town of Munster June 3, 2015 Table of Contents Executive Summary... 3 Project Description and Cost...

More information

Quarterly Status Report

Quarterly Status Report Capital Projects Quarterly Status Report 3rd Quarter FY2016 : January 1 - March 31, 2016 Report prepared for the June 2, 2016 TA Board Meeting SAN MATEO COUNTY TRANSPORTATION AUTHORITY QUARTERLY CAPITAL

More information

City of Aurora. Special Assessment Hearing. For the 2015 Street Improvement Project May 5, 2015

City of Aurora. Special Assessment Hearing. For the 2015 Street Improvement Project May 5, 2015 City of Aurora Special Assessment Hearing For the 2015 Street Improvement Project May 5, 2015 APPEALS DISCLAIMER No appeal may be taken as to the amount of an assessment unless a written objection signed

More information

Removed Projects TR th Way SE (Snake Hill) Improvements o Will be completed in TR th Ave SE Gap Project

Removed Projects TR th Way SE (Snake Hill) Improvements o Will be completed in TR th Ave SE Gap Project Agenda Bill City Council Regular Meeting June 19, 2018 SUBJECT: 2019-2024 Six-Year Transportation Improvement Plan (TIP) DATE SUBMITTED: June 12, 2018 DEPARTMENT: Public Works NEEDED FROM COUNCIL: Action

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One DISTRICT ONE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make project investments in District One. In FY 2017 and FY 2018, current Turnpike projects total over $105 million within Okeechobee

More information

Tech Memo #4: Capital Costs

Tech Memo #4: Capital Costs MILWAUKEE COUNTY EAST-WEST BUS RAPID TRANSIT Tech Memo #4: Capital Costs REVISION #1 DATE June 28, 2016 Prepared for: Milwaukee County 10320 W. Watertown Plank Rd. Wauwatosa, WI 53226 Prepared by: AECOM

More information

QUAIL ROAD EXIT TOWN HALL MEETING NOVEMBER 4, 2017

QUAIL ROAD EXIT TOWN HALL MEETING NOVEMBER 4, 2017 QUAIL ROAD EXIT TOWN HALL MEETING NOVEMBER 4, 2017 Speakers: David Palmer, President Kevin Harker, Association Attorney Mitch Mitchener Alternate Exit Committee Member John Williams Special Roads District

More information

SOUTH CENTRAL PLANNING AND DEVELOPMENT COMMISSION. Scope of Services. Terrebonne Parish

SOUTH CENTRAL PLANNING AND DEVELOPMENT COMMISSION. Scope of Services. Terrebonne Parish SOUTH CENTRAL PLANNING AND DEVELOPMENT COMMISSION Scope of Services Terrebonne Parish Houma-Thibodaux Metropolitan Planning Organization Project Description This project will review the feasibility of

More information

ALL Counties. ALL Districts

ALL Counties. ALL Districts TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation

More information

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian

More information

CITY OF DEERFIELD BEACH Request for City Commission Agenda

CITY OF DEERFIELD BEACH Request for City Commission Agenda Item: CITY OF DEERFIELD BEACH Request for City Commission Agenda Agenda Date Requested: 6/5/2012 Contact Person: Charles DaBrusco, P.E., Director of Environmental Services Description: Award of contract

More information

Hot Springs Bypass Extension TIGER 2017 Application. Benefit-Cost Analysis Methodology Summary

Hot Springs Bypass Extension TIGER 2017 Application. Benefit-Cost Analysis Methodology Summary TIGER 2017 Application Overview This project proposes to extend the Hot Springs Bypass (US 70/US 270) from US 70 to State Highway 7 in Garland County, Arkansas. The 5.5 mile facility will initially consist

More information

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT Project Type: GDOT District: Federal Route Number: State Route Number: P.I. Number: County: MPO ID Number: Project Description (provide

More information

I. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL

I. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL WHATCOM COUNTY COUNCIL AGENDA BILL NO. 2016-248 CLEARANCES Initial Date Date Received in Council Office AxendaDate Assixned to: Originator: James Karcher, P.E. 9J7J:. 1 1-'> lft:; RrECE~VfEfD Division

More information

1. Presentation by North Carolina Department of Transportation Regarding Plans/Options for Possible Reconfiguration of Highway 74

1. Presentation by North Carolina Department of Transportation Regarding Plans/Options for Possible Reconfiguration of Highway 74 Table of Contents Agenda 2 Presentation by North Carolina Department of Transportation Regarding Plans/Options for Possible Reconfiguration of Highway 74 Staff Report 3 Synchronized Street Flier 5 Senior

More information

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m. PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00

More information

Infrastructure and Capital Projects Planning and Funding

Infrastructure and Capital Projects Planning and Funding Infrastructure and Capital Projects Planning and Funding September 6, 2018 Preview of FY 2020 2024 CIP process Why are we here? Overview Current Assets Overview and Highlights of Adopted FY 2019 2023 CIP

More information

SOUND TRANSIT STAFF REPORT MOTION NO. M D Street-to-M Street Track & Signal Project Preferred Alternative

SOUND TRANSIT STAFF REPORT MOTION NO. M D Street-to-M Street Track & Signal Project Preferred Alternative SOUND TRANSIT STAFF REPORT MOTION NO. M2007-126 D Street-to-M Street Track & Signal Project Preferred Alternative Meeting: Date: Type of Action: Staff Contact: Phone: Board 12/13/07 Discussion/Possible

More information

Special Conditions, Regulations and Instructions for Right of Way Permit Applications

Special Conditions, Regulations and Instructions for Right of Way Permit Applications Special Conditions, Regulations and Instructions for Right of Way Permit Applications The Department of Environmental Services (DES) issues public right of way (PROW) permits to contractors with a valid

More information

Planning Board Worksession No.6: Transportation and Staging

Planning Board Worksession No.6: Transportation and Staging Planning Board Worksession No.6: Transportation and Staging Prior Worksessions January 27: Focused on transportation analysis and staging recommendations in the Draft Plan. February 9: Reviewed the Executive

More information

CITY OF DEERFIELD BEACH Request for City Commission Agenda

CITY OF DEERFIELD BEACH Request for City Commission Agenda Item: CITY OF DEERFIELD BEACH Request for City Commission Agenda Agenda Date Requested: 7/10/2012 Contact Person: Charles DaBrusco, P.E., Director of Environmental Services Description: Award of contract

More information

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form FY of Allocation Action: 2009/10 Project Name: Implementing Agency: Curb Ramps Department of Public Works Category: Subcategory: EXPENDITURE PLAN INFORMATION C. Street & Traffic Safety iv. Bicycle and

More information

How to Read the Project Modification Listings Roadway Section

How to Read the Project Modification Listings Roadway Section How to Read the Project Modification Listings Roadway Section The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation Improvement

More information

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT 10-Year Capital Highway Investment Plan DRAFT 2018-2027 DRAFT AUGUST 2017 1 Table of Contents PURPOSE OF 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN... 1 This page intentionally left blank. SUMMARY OF INVESTMENT

More information

April 24, Subject: Amendments to the FY Transportation Improvement Program

April 24, Subject: Amendments to the FY Transportation Improvement Program CAMPO Capital Area Metropolitan Planning Organization April 24, 2006 Mr. Robert Daigh District Engineer Texas Department of Transportation - Austin District PO Drawer 15426 Austin, TX 78761 Subject: Amendments

More information

Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements

Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements Resurfacing projects are among the most common and routine types of projects regularly conducted by highway agencies. When resurfacing projects

More information

2040 Long Range Transportation Plan. Financial Summary

2040 Long Range Transportation Plan. Financial Summary 2040 Long Range Transportation Plan Financial Summary FINANCIAL OUTLOOK Establishing MPO Transportation Plan fiscal forecasts for a twenty year planning horizon in today s transportation environment is

More information

STAFF REPORT. Highway 101 Milpas to Cabrillo/Hot Springs Project. MEETING DATE: January 15, 2009 AGENDA ITEM: 12

STAFF REPORT. Highway 101 Milpas to Cabrillo/Hot Springs Project. MEETING DATE: January 15, 2009 AGENDA ITEM: 12 STAFF REPORT SUBJECT: Highway 101 Milpas to Cabrillo/Hot Springs Project MEETING DATE: January 15, 2009 AGENDA ITEM: 12 STAFF CONTACT: Jim Kemp, Steve VanDenburgh RECOMMENDATION: Authorize the Executive

More information

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary The adopted FY 2017 FY 2021 CIP is $235.8 million (including prior year expenditures) and is $28 million higher than the previous CIP

More information

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.

More information