BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
|
|
- Vivien Mathews
- 5 years ago
- Views:
Transcription
1 PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225, $ 225, $ 225, $ 225, $ 225, $ 225, $ 225, $ 225, Right-of-way Preparation LS 1 $ 365, $ 365, $ 631, $ 631, $ 304, $ 304, $ 700, $ 700, Remove Chain Link Fence LF 1,000 $ 2.00 $ 2, $ 2.25 $ 2, $ 1.60 $ 1, $ 2.00 $ 2, feet Chain Link Fence with Gate(s) LF 200 $ $ 4, $ $ 4, $ $ 3, $ $ 4, feet Chain Link Fence with Gate(s) LF 200 $ $ 4, $ $ 5, $ $ 4, $ $ 5, feet Chain Link Fence with Barbed Wire Top LF 500 $ $ 16, $ $ 14, $ $ 15, $ $ 19, New Metal Beam Guard Fence LF 134 $ $ 11, $ $ 11, $ $ 3, $ $ 13, Street Light Poles to City s Street Maintenance Facility EA 30 $ $ 18, $ $ 13, $ $ 12, $ $ 19, Concrete Curb Stops EA 47 $ $ 8, $ $ 3, $ $ 5, $ $ 4, Marquee Signs EA 7 $ 1, $ 7, $ $ 6, $ $ 4, $ 1, $ 9, Operation of Pipe Rail Fence Gates EA 5 $ $ 3, $ $ 2, $ $ 3, $ $ 4, Pipe Rail Gate at UPRR Facility EA 1 $ 2, $ 2, $ 3, $ 3, $ $ $ $ Sliding Gate at UPRR Facility EA 1 $ 1, $ 1, $ 4, $ 4, $ 1, $ 1, $ 2, $ 2, Operation of Electric Gate Opener EA 1 $ 1, $ 1, $ 3, $ 3, $ 1, $ 1, $ 1, $ 1, Concrete Traffic Barrier to TxDOT s Maintenance Facility EA 4 $ $ 3, $ 1, $ 4, $ 1, $ 4, $ $ 2, Concrete Traffic Barrier Sections at UPRR s property EA 5 $ $ 2, $ $ 2, $ $ 4, $ $ Remove Two Posts And Panel Sections LS 1 $ 1, $ 1, $ 2, $ 2, $ 2, $ 2, $ 2, $ 2, UPRR Electric Service Panel EA 1 $ 1, $ 1, $ $ $ $ $ 1, $ 1, Unclassified Roadway Excavation CY 16,908 $ $ 218, $ $ 208, $ $ 250, $ $ 371, inch Subgrade Preparation SY 43,305 $ 4.60 $ 199, $ 3.95 $ 171, $ 4.20 $ 181, $ 6.00 $ 259, Hydrated Lime (54 lbs per SY) TN 1,169 $ $ 182, $ $ 178, $ $ 181, $ $ 198, Cement Stabilized Subgrade (45 lbs per SY) TN 974 $ $ 156, $ $ 185, $ $ 114, $ $ 136, inch Reinf. Conc. Pavement with 6-inch Monolithic Curb SY 40,052 $ $ 1,712, $ $ 1,463, $ $ 2,152, $ $ 2,082, inch Reinf. Conc. Pavement with 6-inch Monolithic Curb SY 1,300 $ $ 53, $ $ 47, $ $ 77, $ $ 65, inch Reinf. Conc. Pavement with 6-inch Monolithic Curb SY 155 $ $ 5, $ $ 5, $ $ 14, $ $ 9, inch Reinf. Conc. Pavement with 6-inch Monolithic Curb SY 586 $ $ 26, $ $ 32, $ $ 43, $ $ 46, Conc. Curb and Gutter LF 300 $ $ 5, $ $ 6, $ $ 8, $ $ 9, /23/2014 Page 1 of 9
2 128 6-inch thick Conc. Treated Base (CTB SY 200 $ $ 5, $ $ 6, $ $ 4, $ $ 4, inch Reinf. Conc. Drive Approach SY 4,110 $ $ 145, $ $ 172, $ $ 190, $ $ 267, inch Reinf. Conc. Drive Approach SY 823 $ $ 38, $ $ 44, $ $ 52, $ $ 74, inch Reinf. Conc. Sidewalk Pavement SY 4,600 $ $ 142, $ $ 162, $ $ 179, $ $ 197, Reinf. Conc. Sidewalk Curb LF 750 $ 6.25 $ 4, $ $ 8, $ 3.90 $ 2, $ $ 7, Retaining Wall (7-inch to 24-inch) LF 500 $ $ 35, $ $ 27, $ $ 23, $ $ 31, Retaining Wall (25-inch to 48-inch) LF 100 $ $ 11, $ $ 7, $ $ 7, $ $ 9, inch Asphalt Parking Lot Paving SY 1,366 $ $ 47, $ $ 61, $ $ 40, $ $ 68, inch HMAC (Type D) Surface Course for Pavement SY 157 $ $ 4, $ $ 3, $ $ 2, $ $ 3, inch HMAC (Type B) Base Course for Pavement SY 157 $ $ 5, $ $ 4, $ $ 4, $ $ 5, Curb Ramp Type 1 EA 7 $ 1, $ 7, $ $ 6, $ $ 5, $ 1, $ 7, Curb Ramp Type 7 EA 8 $ 1, $ 10, $ $ 7, $ $ 5, $ 1, $ 8, Pavestone Median/Monolithic Median Nose SY 1,500 $ $ 97, $ $ 136, $ $ 131, $ $ 153, Stamped and Stained Median Pavement (Grand Prairie s Specs) SY 763 $ $ 53, $ $ 49, $ $ 57, $ $ 61, Conc. Header LF 104 $ $ 1, $ $ 1, $ 8.80 $ $ 9.00 $ Crushed Rock TN 750 $ $ 18, $ $ 15, $ $ 10, $ $ 16, inch Type B HMAC for Traffic Detours SY 3,000 $ $ 99, $ $ 150, $ $ 110, $ $ 135, Rock Cushion CY 200 $ $ 7, $ $ 6, $ 7.35 $ 1, $ $ 8, Temporary Fence LF 200 $ 8.00 $ 1, $ 5.50 $ 1, $ 7.35 $ 1, $ 9.00 $ 1, inch High Early Strength Reinf. Conc. Paving SY 100 $ $ 2, $ $ 6, $ 4.50 $ $ $ 9, Signs for Businesses EA 40 $ $ 11, $ $ 8, $ $ 7, $ $ 10, GPS Monuments EA 2 $ 1, $ 3, $ 4, $ 9, $ 3, $ 7, $ 3, $ 6, Construction contingency LS 1 $ 375, $ 375, $ 375, $ 375, $ 375, $ 375, $ 375, $ 375, inch Curb for UPRR Private Driveway Access LF 400 $ $ 6, $ $ 6, $ $ 4, $ $ 4, SUBTOTAL PAVING IMPROVEMENTS: $ 4,374, $ 4,519, $ 4,851, $ 5,665, /23/2014 Page 2 of 9
3 DRAINAGE IMPROVEMENTS 201 Detention Pond Excavation CY 20,250 $ $ 222, $ $ 248, $ $ 252, $ $ 303, Trench Safety System LF 6,027 $ 1.00 $ 6, $ 1.05 $ 6, $ 1.05 $ 6, $ 1.00 $ 6, Class A Reinf. Conc. Pilot Channel and Walls CY 128 $ $ 59, $ $ 84, $ $ 79, $ $ 66, inch Class III RCP LF 19 $ $ 1, $ $ 1, $ $ 1, $ $ 1, inch Class III RCP LF 25 $ $ 1, $ $ 2, $ $ 2, $ $ 1, inch Class III RCP LF 217 $ $ 24, $ $ 23, $ $ 22, $ $ 16, inch Class III RCP LF 263 $ $ 34, $ $ 34, $ $ 31, $ $ 25, inch Class III RCP LF 1,034 $ $ 263, $ $ 258, $ $ 236, $ $ 248, inch Class IV RCP LF 5 $ $ $ $ $ $ $ $ inch Class IV RCP LF 1,110 $ $ 99, $ $ 109, $ $ 109, $ $ 69, inch Class IV RCP LF 611 $ $ 79, $ $ 71, $ $ 68, $ $ 50, inch Class IV RCP LF 692 $ $ 93, $ $ 97, $ $ 91, $ $ 71, inch Class IV RCP LF 404 $ $ 76, $ $ 70, $ $ 63, $ $ 55, inch Class IV RCP LF 217 $ $ 53, $ $ 48, $ $ 43, $ $ 41, inch Class IV RCP LF 322 $ $ 101, $ $ 90, $ $ 81, $ $ 80, feet x 3-feet Conc. Box Culvert LF 621 $ $ 114, $ $ 127, $ $ 125, $ $ 105, feet x 3-feet Conc. Box Culvert LF 527 $ $ 144, $ $ 170, $ $ 161, $ $ 168, feet Recessed Conc. Curb Inlet, EA 3 $ 2, $ 8, $ 4, $ 13, $ 3, $ 9, $ 3, $ 11, feet Recessed Conc. Curb Inlet EA 8 $ 3, $ 28, $ 5, $ 47, $ 4, $ 37, $ 5, $ 40, feet Recessed Conc. Curb Inlet EA 10 $ 5, $ 50, $ 6, $ 67, $ 5, $ 57, $ 6, $ 60, feet x 4-feet Drop Inlet EA 1 $ 4, $ 4, $ 5, $ 5, $ 4, $ 4, $ 6, $ 6, feet x 5-feet Storm Drain Junction Box EA 3 $ 5, $ 15, $ 5, $ 15, $ 6, $ 18, $ 5, $ 16, feet x 4-feet Storm Drain Junction Box EA 3 $ 4, $ 14, $ 4, $ 13, $ 5, $ 15, $ 4, $ 12, feet x 6-feet Storm Drain Junction Box EA 2 $ 5, $ 11, $ 6, $ 12, $ 8, $ 16, $ 7, $ 14, Connect Proposed RCP to Existing RCP EA 4 $ $ 2, $ $ 3, $ 1, $ 4, $ 1, $ 4, Connect Proposed Manhole to Existing RCP EA 5 $ $ 4, $ $ 3, $ $ 2, $ $ 4, Storm Drain Manhole for 60-inch RCP EA 3 $ 19, $ 57, $ 8, $ 25, $ 7, $ 22, $ 6, $ 19, /23/2014 Page 3 of 9
4 228 TxDOT TY 1-C Manhole Top EA 2 $ 2, $ 5, $ 2, $ 5, $ 1, $ 3, $ 1, $ 3, TxDOT CI 208 (FW) Curb Inlet EA 1 $ 4, $ 4, $ 11, $ 11, $ 5, $ 5, $ 6, $ 6, Detention Pond Outlet Structure EA 1 $ 15, $ 15, $ 16, $ 16, $ 18, $ 18, $ 11, $ 11, inch Articulated Block SF 3,600 $ $ 64, $ $ 50, $ $ 68, $ $ 68, TxDOT Type F Soil Retention Blanket SY 8,960 $ 3.00 $ 26, $ 1.05 $ 9, $ 0.90 $ 8, $ 1.00 $ 8, TxDOT Type G Soil Retention Blanket SY 1,880 $ 3.50 $ 6, $ 3.90 $ 7, $ 4.65 $ 8, $ 5.00 $ 9, Bermuda Hydromulch for Detention Pond SY 14,262 $ 0.50 $ 7, $ 0.60 $ 8, $ 0.80 $ 11, $ 1.25 $ 17, feet Chain Link Fence with Barbed Wire Top LF 1,458 $ $ 30, $ $ 35, $ $ 29, $ $ 36, feet x 8-feet Chain Link Fence Gate with Barbed Wire Top EA 1 $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, inch Type B HMAC for Temp Pavement LF 4,800 $ $ 48, $ $ 79, $ $ 226, $ $ 48, SWPPP LS 1 $ 75, $ 75, $ 75, $ 75, $ 75, $ 75, $ 75, $ 75, Grand Prairie Traffic Signal Loop Detectors LS 1 $ 3, $ 3, $ 3, $ 3, $ 10, $ 10, $ 3, $ 3, Deleted per Addendum # GPS Data on New Stormwater Attributes LS 1 $ 2, $ 2, $ 4, $ 4, $ 5, $ 5, $ 3, $ 3, SUBTOTAL DRAINAGE IMPROVEMENTS: $ 1,864, $ 1,961, $ 2,041, $ 1,794, ILLUMINATION, SIGNALS & COMMUNICATION feet Single Arm Street Light (LED) EA 2 $ 3, $ 7, $ 3, $ 6, $ 3, $ 6, $ 4, $ 9, feet Twin Arm Street Light (LED) EA 23 $ 5, $ 120, $ 4, $ 98, $ 4, $ 92, $ 6, $ 154, Street Light Pole Foundation (Arlington s Standard) EA 25 $ 1, $ 25, $ $ 20, $ $ 19, $ 1, $ 32, Street Light Pole Foundation (Oncor s Standard) EA 10 $ 1, $ 11, $ $ 8, $ $ 8, $ 1, $ 15, Illumination Pull Box (Arlington s Standard EA 9 $ $ 7, $ $ 4, $ $ 4, $ 1, $ 9, Illumination Pull Box (Oncor s Standard) EA 2 $ $ 1, $ $ 1, $ $ 1, $ 1, $ 2, Electrical Service Points EA 3 $ 1, $ 3, $ $ 2, $ $ 2, $ 1, $ 4, Amp (dual) Pole Mounted Streetlight Controller EA 3 $ 2, $ 6, $ 1, $ 3, $ 1, $ 3, $ 1, $ 4, inch PVC SCH 40 Conduit by Open Cut LF 5,721 $ 6.75 $ 38, $ 4.51 $ 25, $ 4.30 $ 24, $ 8.50 $ 48, inch PVC SCH 40 Conduit by Bore LF 330 $ $ 5, $ $ 4, $ $ 4, $ $ 7, /23/2014 Page 4 of 9
5 311 3 Conductor, #2 AWG Wire LF 4,621 $ 6.75 $ 31, $ 7.26 $ 33, $ 6.95 $ 32, $ 8.50 $ 39, #6-inch AWG Bare (ground) Conductor LF 4,621 $ 1.15 $ 5, $ 1.10 $ 5, $ 1.05 $ 4, $ 1.50 $ 6, ½-inch HDPE Purple Conduit (Communication) LF 5,200 $ 6.75 $ 35, $ 4.29 $ 22, $ 4.10 $ 21, $ 8.50 $ 44, Amp (dual) Pole Mounted Streetlight Controller EA 3 $ 2, $ 6, $ 1, $ 3, $ 1, $ 3, $ 1, $ 4, Signalization Pull Box EA 6 $ $ 4, $ $ 3, $ $ 3, $ 1, $ 6, inch PVC SCH 40 Conduit (Signals) LF 152 $ $ 2, $ 9.50 $ 1, $ 8.95 $ 1, $ $ 3, ½-inch HDPE purple conduit (Communication) by other than open cut LF 200 $ $ 7, $ $ 2, $ $ 2, $ $ 4, SUBTOTAL ILLUMINATION, SIGNALS & COMMUNICATION IMPROVEMENTS: $ 320, $ 250, $ 235, $ 394, PAVEMENT MARKINGS inch Type II - CR Pavement Markers EA 402 $ 3.50 $ 1, $ 3.25 $ 1, $ 3.40 $ 1, $ 4.00 $ 1, inch Reflectorized White Thermoplastic Lane Stripe LF 4,017 $ 1.50 $ 6, $ 1.25 $ 5, $ 1.00 $ 4, $ 1.50 $ 6, inch Reflectorized White Thermoplastic solid stripe LF 1,985 $ 2.00 $ 3, $ 1.65 $ 3, $ 1.90 $ 3, $ 2.00 $ 3, inch Reflectorized White Thermoplastic Solid Stripe LF 198 $ 4.00 $ $ 3.85 $ $ 3.15 $ $ 4.00 $ inch Reflectorized White Thermoplastic Solid Stripe LF 50 $ $ $ 6.60 $ $ 6.30 $ $ 7.50 $ Reflectorized Thermoplastic Markings (Turn Arrows) EA 34 $ $ 5, $ $ 4, $ $ 3, $ $ 5, Reflectorized Thermoplastic Markings, (Words) EA 5 $ $ $ $ $ $ $ $ SUBTOTAL PAVEMENT MARKINGS: $ 18, $ 16, $ 13, $ 19, LANDSCAPING & IRRIGATION 501 Tree Protection LS 1 $ 8, $ 8, $ 5, $ 5, $ 5, $ 5, $ 2, $ 2, Hybrid Buffalo Sod SY 9,820 $ 5.40 $ 53, $ 6.00 $ 58, $ 4.65 $ 45, $ 5.00 $ 49, inch Topsoil and Hydromulch SY 9,820 $ 2.25 $ 22, $ 3.10 $ 30, $ $ 5, $ 5.00 $ 49, Saint Augustine Block Sod SY 1,000 $ 3.75 $ 3, $ 5.25 $ 5, $ 3.85 $ 3, $ 5.00 $ 5, Bermuda Block Sod SY 1,000 $ 3.20 $ 3, $ 3.70 $ 3, $ 3.35 $ 3, $ 4.00 $ 4, /23/2014 Page 5 of 9
6 506 4-inch Topsoil and Buffalo Grass Hydromulch SY 3,000 $ 4.50 $ 13, $ 3.10 $ 9, $ $ 30, $ 5.00 $ 15, Bosque Elm Tree EA 8 $ $ 4, $ $ 5, $ $ 3, $ $ 4, Chitalpa Tree EA 21 $ $ 11, $ $ 6, $ $ 10, $ $ 13, Vitex EA 3 $ $ 1, $ $ $ $ 1, $ $ 1, Desert Willow EA 4 $ $ 2, $ $ 1, $ $ 2, $ $ 2, Texas Ash EA 3 $ $ 1, $ $ 1, $ $ 1, $ $ 1, Red Oak EA 3 $ $ 1, $ $ 2, $ $ 1, $ $ 1, Irrigation System LS 1 $ 27, $ 27, $ 19, $ 19, $ 25, $ 25, $ 56, $ 56, SUBTOTAL LANDSCAPING & IRRIGATION: $ 153, $ 150, $ 140, $ 206, WATER IMPROVEMENTS inch Ductile Iron Pressure Class 250 Water Pipe LF 800 $ $ 104, $ $ 96, $ $ 82, $ $ 92, inch PVC C900 Water Pipe LF 4,920 $ $ 457, $ $ 386, $ $ 378, $ $ 334, inch PVC C900 Water Pipe LF 1,490 $ $ 119, $ $ 95, $ $ 91, $ $ 74, inch Ductile Iron Pressure Class 350 Water Pipe LF 50 $ $ 4, $ $ 4, $ $ 3, $ $ 3, inch PVC C900 Water Pipe LF 250 $ $ 18, $ $ 15, $ $ 15, $ $ 18, inch Resilient Wedge Gate Valve with Spur Gear and Valve Box EA 2 $ 8, $ 17, $ 9, $ 19, $ 10, $ 21, $ 9, $ 18, inch Gate Valve and Valve Box EA 9 $ 2, $ 23, $ 2, $ 26, $ 3, $ 28, $ 2, $ 23, inch Gate Valve and Valve Box EA 7 $ 1, $ 9, $ 1, $ 10, $ 1, $ 11, $ 1, $ 9, inch Gate Valve and Valve Box EA 15 $ 1, $ 18, $ 1, $ 15, $ 1, $ 15, $ 1, $ 15, inch Direct Bury Detector Check Assembly and Meter Box EA 1 $ 3, $ 3, $ 8, $ 8, $ 4, $ 4, $ 11, $ 11, Standard (Lead Free) Fire Hydrant Assembly EA 14 $ 2, $ 40, $ 3, $ 50, $ 3, $ 44, $ 2, $ 40, Remove and Salvage Existing Fire Hydrant EA 13 $ $ 5, $ $ 3, $ $ 10, $ $ 6, inch Air Release Valve and Valve Vault EA 1 $ 5, $ 5, $ 5, $ 5, $ 5, $ 5, $ 5, $ 5, inch Polyethylene Pipe Water Service EA 11 $ 1, $ 12, $ 2, $ 29, $ 1, $ 17, $ 2, $ 24, inch Water Service EA 24 $ $ 17, $ 1, $ 26, $ 1, $ 25, $ 1, $ 28, Replace Exist. Meter Box, including detaching AMI Antenna EA 35 $ $ 5, $ $ 15, $ $ 9, $ $ 15, /23/2014 Page 6 of 9
7 617 Bore and Pressure Grout 6-inch, 8-inch, or 12-inch Water Pipe LF 100 $ $ 10, $ $ 10, $ $ 15, $ $ 22, Connect Exist. 16-inch Water Pipe, Gate Valve, Tee or Cross EA 2 $ 3, $ 6, $ 4, $ 9, $ 2, $ 5, $ 3, $ 6, Connect Exist. 12-inch Water Pipe, Gate Valve, Tee or Cross EA 1 $ 2, $ 2, $ 4, $ 4, $ 2, $ 2, $ 2, $ 2, Connect Exist. 10-inch Water Pipe, Gate Valve, Tee or Cross EA 4 $ 1, $ 7, $ 3, $ 14, $ 2, $ 8, $ 2, $ 10, Connect Exist. 8-inch Water Pipe, Gate Valve, Tee or Cross EA 2 $ 1, $ 2, $ 2, $ 5, $ 1, $ 3, $ 2, $ 4, Connect Exist. 6-inch Water Pipe, Gate Valve, Tee or Cross EA 1 $ 1, $ 1, $ 2, $ 2, $ 1, $ 1, $ 2, $ 2, inch Conc. Pavement Repair with 2-inch HMAC Type D SY 20 $ $ 2, $ $ 2, $ $ 3, $ $ 3, Temporary HMAC Trench Repair LF 7,860 $ 5.00 $ 39, $ $ 133, $ $ 206, $ 6.00 $ 47, Rock Cushion CY 100 $ $ 4, $ $ 2, $ $ 4, $ $ 3, Trench Safety Protection LF 7,860 $ 1.00 $ 7, $ 0.05 $ $ 1.05 $ 8, $ 1.00 $ 7, Conc. Encase Water Line LF 30 $ $ 1, $ $ 2, $ $ 3, $ $ 1, Construction Contingency, LS 1 $ 100, $ 100, $ 100, $ 100, $ 100, $ 100, $ 100, $ 100, GPS Data on New Water and Sanitary Sewer attributes LS 1 $ 5, $ 5, $ 4, $ 4, $ 5, $ 5, $ 3, $ 3, Cut and Plug Existing Water Line EA 10 $ $ 8, $ $ 3, $ $ 4, $ 1, $ 15, SUBTOTAL WATER IMPROVEMENTS: $ 1,058, $ 1,103, $ 1,136, $ 951, SANITARY SEWER IMPROVEMENTS inch SDR-26 PVC Sanitary Sewer Pipe LF 2,860 $ $ 291, $ $ 334, $ $ 201, $ $ 183, inch SDR-26 PVC Sanitary Sewer Pipe LF 1,940 $ $ 174, $ $ 194, $ $ 106, $ $ 97, inch PVC Sanitary Sewer Service EA 32 $ 1, $ 44, $ 2, $ 92, $ 1, $ 58, $ 1, $ 41, inch Ductile Iron Sanitary Sewer Service EA 4 $ 2, $ 11, $ 4, $ 18, $ 2, $ 8, $ 3, $ 12, inch Sanitary Sewer Service by Bore LF 200 $ $ 22, $ $ 15, $ $ 21, $ $ 19, feet Diameter Manhole (0-feet to 6-feet depth) EA 4 $ 3, $ 13, $ 3, $ 12, $ 3, $ 12, $ 2, $ 11, Extra Depth to 4-feet Diameter Manhole VF 4.5 $ $ $ $ $ $ $ $ 1, feet Diameter Manhole (0-feet to 6-feet depth) EA 10 $ 4, $ 46, $ 5, $ 59, $ 3, $ 36, $ 4, $ 42, Extra Depth to 5-feet Diameter Manhole VF 72 $ $ 36, $ $ 15, $ $ 18, $ $ 23, Remove and Dispose of Existing Manhole EA 10 $ $ 4, $ $ 5, $ 1, $ 15, $ $ 9, /23/2014 Page 7 of 9
8 711 Conc. Encase Sanitary Sewer Line LF 50 $ $ 1, $ $ 4, $ $ 5, $ $ 4, Temporary HMAC Trench Repair LF 6,190 $ 5.00 $ 30, $ $ 105, $ $ 162, $ 8.00 $ 49, Rock Cushion CY 100 $ $ 3, $ $ 2, $ $ 4, $ $ 3, Trench Safety Protection LF 6,190 $ 1.00 $ 6, $ 1.05 $ 6, $ 2.10 $ 12, $ 1.00 $ 6, SUBTOTAL SANITARY SEWER IMPROVEMENTS: $ 686, $ 866, $ 665, $ 503, ALTERNATE A 199A Green Cement LS 1 $ 1.00 $ 1.00 $ 1.00 $ 1.00 $ 1.00 $ 1.00 $ 0.50 $ 0.50 SUBTOTAL ALTERNATE A: $ 1.00 $ 1.00 $ 1.00 $ 0.50 ALTERNATE B 199B Relocate Existing City of Grand Prairie Fire Hydrant EA 2 $ 2, $ 4, $ 4, $ 9, $ 1, $ 3, $ 1, $ 2, SUBTOTAL ALTERNATE B: $ 4, $ 9, $ 3, $ 2, /23/2014 Page 8 of 9
9 SUBTOTAL PAVING IMPROVEMENTS: SUBTOTAL DRAINAGE IMPROVEMENTS: SUBTOTAL ILLUMINATION, SIGNALS & COMMUNICATION IMPROVEMENTS: SUBTOTAL PAVEMENT MARKINGS: SUBTOTAL LANDSCAPING & IRRIGATION: SUBTOTAL WATER IMPROVEMENTS: SUBTOTAL SANITARY SEWER IMPROVEMENTS: TOTAL BASE BID AMOUNT $ 4,374, $ 4,519, $ 4,851, $ 5,665, $ 1,864, $ 1,961, $ 2,041, $ 1,794, $ 320, $ 250, $ 235, $ 394, $ 18, $ 16, $ 13, $ 19, $ 153, $ 150, $ 140, $ 206, $ 1,058, $ 1,103, $ 1,136, $ 951, $ 686, $ 866, $ 665, $ 503, $ 8,476, $ 8,869, $ 9,085, $ 9,535, TOTAL BASE BID + ALTERNATE A $ 8,476, $ 8,869, $ 9,085, $ 9,535, TOTAL BASE BID + ALTERNATE B $ 8,481, $ 8,878, $ 9,088, $ 9,538, TOTAL BASE BID + ALTERNATES A + B $ 8,481, $ 8,878, $ 9,088, $ 9,538, /23/2014 Page 9 of 9
Rock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationCITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $
RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationBid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221
Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00
More information19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown
19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL
More informationCITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018
CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00
More informationEngineer's Preliminary Estimate - 100% Submittal
EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000
More informationBIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.
More informationRFB Addendum 3
Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER
More informationMunilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL
JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE
More informationBID TABULATION BID REQUEST NO
BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More information2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.
ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense
More informationSandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING
ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00
More informationNE WEST KINGSTON ROAD CULVERT REPLACEMENT
NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More information2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00
More informationCITY OF TAMPA ADDENDUM 2. April 18, 2018
CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project
More informationEST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS
BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native
More informationDORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial
More informationCrushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:
Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and
More informationLETTING : CALL : 056 COUNTIES : MILLE LACS
S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE
More informationFALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00
More informationBID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012
Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00
More informationITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT
Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00
More information33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.
CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler
More informationENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal
Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
More informationCertified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University
Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1
More informationPART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.
BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.
More informationAnnual Services Construction Contract (ASCC) #15 Project Number: PUCN
Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction
More informationRANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price
2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF
More information69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11
69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to
More informationSubject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122
Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot
More informationSUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION
Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury
More informationFuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $
SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20
More informationFor Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.
Job 11-4518 Solicitation B-12-059-DD PROPOSAL of BID PROPOSAL, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER STEM: Pursuant to Instructions Invitation
More informationPART A ROADWAY - BASE BID
May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00
More informationADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:
ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation
More informationALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN
ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA
More informationTABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00
TABULATION OF BIDS Jesse Viertel Memorial Airport Boonville, Missouri Bids Received: 6/12/2018 Lochner Job No.: 000011332 RECONSTRUCT RUNWAY 1836, NORTH CONNECTING TAXIWAY AND TURNAROUND REPLACE EXISTING
More information2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More information1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) -
Charlotte County Board Of County Commissioners Agenda Item Summary Item Number: R- 5 1 DEPARTMENT MAKING REQUEST 2 MEETING DATE Purchasing 6/24/2014 9:00:00 AM 3 REQUESTED MOTION/ACTION Award Bid #14-209
More informationAVERAGE OF BID ITEMS ENGINEERS ESTIMATE
ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian
More informationFailure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.
Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017
More informationUtility Committee Meeting AGENDA. October 3, 2017
Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid
More informationLETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY
LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines
More informationNOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No
NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,
More informationAddendum 1 Downtown North CRA Sidewalks
Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationBID TABULATION PAGE 1 OF 8
BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $
More informationNAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA
Unit BID ITEMS 1 1070-206-A-3 TRAFFIC CONTROL 0.5 0.5 1 LS $ 2,200.00 $ 2,200.00 $ 2,800.00 $ 2,800.00 $ 2,688.00 $ 2,688.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 2 2010-108-C-0
More informationAddendum 1 13 TH Street Streetscape. September 1, 2017
Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationExhibit 4 Page 1 of 8
Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:
More informationCITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS
1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating
More informationReviax Constracting Corp. DeSantis Construction
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.
More informationBID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as
Description 103 REMOVE, STORE AND REINSTALL EXISTING RETAINING WALL 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) 203.1 TACK COAT BID PROPOSAL PROPOSAL OF, a corporation, a partnership consisting of an individual
More informationREPLACEMENT OF MERCER COUNTY BRIDGE
ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade
More informationFLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, Fargo City Commission Chambers 3:00 PM
1. Call to order FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, 2017 Fargo City Commission Chambers 3:00 PM 2. Recommended contracting actions a. Schmidt & Sons Construction,
More informationNorth Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL
North Baker Ave. - City Limits to 23rd St. NE Bid Documents BD-1 To the Board of County Commissioners Douglas County, Washington Gentlemen: North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL
More informationCITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS
CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center
More informationSunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List
Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements
More informationMarket Street Gateway Improvements Phase 1
PROPOSAL FORM Market Street Gateway Improvements Phase 1 CITY OF PORTSMOUTH, N.H. To the City of Portsmouth, New Hampshire, herein called the Owner. The undersigned, as Bidder, herein referred to as singular
More informationCITY-TIF COMMISSION EXPENSES Cost Description Project Cost Data Reimbursable From Public Funds Developer Equity COST TIF Super TIF State TIF CID SCTC PRIVATE I. Legal $ 750,000 $ 750,000 $ - $ - $ - $
More informationCONTRACT TIME DETERMINATION
CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during
More informationTAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.
DAVID TAUSSIG & Associates, Inc. Annual Report Fiscal Year 2014-2015 City of Irvine Community Facilities District No. 2013-3 (Great Park) October 27, 2015 Public Finance Public Private Partnerships Urban
More informationThe bid due date has been changed to 2:50 p.m. May 25, 2018.
May 18, 2018 BL051-18 Addendum #1 Construction and Rehab of Gravity and Sewer Force Mains on an Contract Make the following changes/additions or clarifications to the above referenced bid: The bid due
More informationJob No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL
Date: BID PROPOSAL PROPOSAL OF A corporation A partnership consisting of An individual doing business as THE SAN ANTONIO WATER SYSTEM Pursuant to Instructions and Invitations to Bidders, the undersigned
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION 1 Civic Center Dr., San Marcos, CA 92069-2918 (760) 744-1050 FAX (760) 591-4135 FEE SCHEDULE FOR GRADING & IMPROVEMENT PLAN
More informationADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO
ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents
More informationPRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer
G-7 STAFF REPORT MEETING DATE: November 27, 2018 TO: FROM: City Council Petr Skala, Associate Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher
More informationActive Construction RV Associates Scarsella JR Hayes
CITY OF PORT ORCHARD PUBLIC WORKS DEPARTMENT TREMONT STREET IMPROVEMENTS SR 16 to Port Orchard Boulevard Opening: 6/6/2017 Fed Aid Proj No: STPUS-6610(004) $ 12,779,179.17 $ 12,855,082.55 $ 12,901,887.92
More informationBID TABULATION. Engineer's Estmated Opinion of Costs
Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%
More informationTAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.
DAVID TAUSSIG & Associates, Inc. Annual Report Fiscal Year 2016-2017 City of Irvine Community Facilities District No. 2013-3 (Great Park) September 26, 2017 Public Finance Public Private Partnerships Urban
More informationBID PROPOSAL Mobilization for Non-Emergency Work Orders; 200 EA $ $ Mobilization for Emergency Work Orders; 2 EA $ $
2018 Annual Water Distribution Leak Repairs Contract, Package 1 SAWS Job Nos. 18-0103 (O&M) and 18-1401 (CIP) Solicitation No. B-18-001-JG BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting
More information2001 Average Bid Tabs
Municipality of Anchorage Department of Planning, Development and Public Works Project Management and Engineering Department 2001 Average Bid Tabs SPEC. 20.02 Clearing and Grubbing 1 L.S. $ 750.00 $ 11,793.52
More informationBID TABULATION PAGE 1 OF 6
BID TABULATION PAGE 1 OF 6 BID PRE-BID ESTIMATE R.G. Huston Company, Inc. Kopplin & Kinas Co., Inc. Cottage Grove, WI Green Lake, WI NO. DESCRIPTION OF WORK QUANT. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT
More informationPflugerville, TX St. Hedwig, TX 78152
Pesado Construction Co., Inc. 7054 Pipestone Schertz, TX 78154 Lewis Contractors, Inc. P.O. Box 1623 Bertram, TX 78605 Wauters Engineering, LLC 12870 Adkins St. Hedwig Rd. St. Hedwig, TX 78152 Cash Construction
More informationBID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #
ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00
More informationADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL
II. ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL ITEM NO. 1: Page P-1, Proposal DELETE the Proposal (pages P-1 through P-9) in its entirety and REPLACE with the attached Proposal (pages P-1R
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018
LETTING DATE : 2018-06-14 CALL NUMBER : 772 OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE PAGE NO. 1 DATE PRINTED : JOB NUMBER : 170236 ESTIMATE NUMBER : PROJECT
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING
More informationAWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET
STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213
More informationA DESIGN-BUILD PROJECT
Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,
More informationPRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST
PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST Table of Contents 1. Introduction...2 2. Scope of Estimate...2 3. Subpackage Breakout....2 4. Assumptions Used in
More informationNorthumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate
Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)
More informationAECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option
More informationREPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager
REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA VILLAGE GREEN HOA REPLACEMENT RESERVE REPORT FY 2011 Community Management by: Ravenel Associates, Inc. Chad Hammond, Property Manager 3690 Bohicket
More informationFORM G PRICE PROPOSAL CAMINO REAL REGIONAL MOBILITY AUTHORITY ("CRRMA") The undersigned having familiarized themselves with the local conditions affec
FORM G PRICE PROPOSAL CAMINO REAL REGIONAL MOBILITY AUTHORITY ("CRRMA") The undersigned having familiarized themselves with the local conditions affecting the cost of work and with the Request for Proposals
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More informationVETERANS PARK ATHLETIC COMPLEX BUILD-OUT PHASE 1
BID DOCUMENTS FOR VETERANS PARK ATHLETIC COMPLEX BUILD-OUT PHASE 1 BID NO. 18-033 PROJECT NO. HM1601 DUE DATE: January 9, 2018 @ 2:00 P.M. City of College Station, Texas Purchasing Division City Hall PO
More informationCITY OF DEERFIELD BEACH Request for City Commission Agenda
Item: CITY OF DEERFIELD BEACH Request for City Commission Agenda Agenda Date Requested: 7/10/2012 Contact Person: Charles DaBrusco, P.E., Director of Environmental Services Description: Award of contract
More informationCITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE
CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE GENERAL INSTRUCTIONS 1. This pamphlet lists services available or required to process your project and fees or charges for these services. 2. Fees or deposits
More informationADDENDUM 1. Bid# , Bosque Bonito Units 1 and 2 Sewer System Improvement Project
County of El Paso Purchasing Department 500 East San Antonio, Room 500 El Paso, Texas 79901 (915) 546-2048 / Fax: (915) 546-8180 ADDENDUM 1 To: From: All Interested Proposers Claudia Sepulveda, Bid Clerk/Buyer
More informationAVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP
AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, 2014 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 1 $19 $18,500.00 1 2013 2013.602/00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32
More informationWAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP)
WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP) 2017 2026 DECEMBER 2015 Prepared For: Federal Aviation Administration Ohio Department of Transportation Office of Aviation Attachment A 10
More informationJob No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars
BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned
More informationNew Jersey Department of Transportation DATE : 11/16/10 PAGE : TABULATION OF BIDS
PAGE : 131-1 CONTRACT TIME : 11/30/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : STP-5042(107) ROUTE 129 RESURFACING FROM ROUTE 1 TO LAMBERTON ROAD CONNECTOR CITY OF TRENTON, TOWNSHIP OF
More information