40 AECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A
41 Item Description Unit QTY Rates $ Alternative Alignment - Option 1 Sub-Element Totals $ Element Totals $ Alternative Alignment - Option 2 Preferred NOR Option Comments QTY Rates Sub-Element Totals $ Element Totals $ Comments QTY Rates Sub-Element Totals $ Element Totals $ Comments $ $ D1 Preliminary and General $12,145, $10,942, $6,717, Establishment and dis-establishment LS 1 $1,041, $1,041, $938, $938, $575, $575, On-site overheads LS 1 $6,247, $6,247, $5,628, $5,628, $3,455, $3,455, Off-site overheads incl. profit LS 1 $4,857, $4,857, $4,376, $4,376, $2,686, $2,686, D2 Network Maintenance $20, $20, $15, Survey & setout LS 1 $20, $20, $20, $20, $15, $15, D3 Traffic Management & Temporary Works $1,048, $1,048, $206, Preparation of Temporary Traffic Management Plans LS 1 $40, $40, $40, $40, $5, $5, Implementation of Temporary Traffic Management Plans LS 1 $1,008, $1,008, $20,000 per 11months 1 $1,008, $1,008, $20,000 per 12months 1 $201, $201, $7,500 per 8months D4 Dayworks $3,254, $2,927, $1,817, Labour (Provisional Sum) hr $35.00 $651, $35.00 $585, $35.00 $363, Plant Hire - Based on "Blue Book" Rates (eg Enter 90% to recover 90% of "Blue % $0.90 $1,171, $0.90 $1,053, $0.90 $654, Book" rates. (Prov Item) 4.03 Material - Purchase Price (eg Enter 110% to recover purchase cost plus 10 % oncost) (Prov Item) % $1.10 $1,431, $1.10 $1,287, $1.10 $799, D5 Fencing $217, $217, $217, Dismantle and remove existing fence m 4000 $15.00 $60, $15.00 $60, $15.00 $60, New fence - Post & Wire m 6000 $25.00 $150, $25.00 $150, $25.00 $150, New gate - paddock entrance ea 10 $ $7, $ $7, $ $7, D6 Site Clearance & Earthworks $5,998, $27,037, $11,348, Sediment control LS 1 $285, $285, $1,287, $1,287, $540, $540, Clearing - General LS 1 $150, $150, $150, $150, $100, $100, Remove or relocated road furniture LS 1 $5, $5, $5, $5, $0.00 $ Clearing - nominated trees (girth <600mm, 1m from ground) ea 50 $ $12, $ $12, $ $12, Clearing - nominated trees (girth >600mm, 1m from ground) ea 5 $ $3, $ $3, $ $3, Clearing - kerb & channel m 0 $7.50 $ $7.50 $ $7.50 $ Clearing - footpaths m 0 $12.00 $ $12.00 $ $12.00 $ Clearing - vehicle crossings sq.m 500 $20.00 $10, $20.00 $10, $20.00 $ Strip and stockpile topsoil cu.m $10.00 $200, $10.00 $200, $10.00 $200, Cut to waste cu.m $25.00 $518, $25.00 $339, $25.00 $428, Cut to fill cu.m $35.00 $2,902, $35.00 $1,901, $35.00 $2,396, Borrow to fill (from selected borrow area) cu.m $35.00 $1,511, $35.00 $22,728, $35.00 $7,266, Undercut & replacement of unsuitable material cu.m $40.00 $400, $40.00 $400, $40.00 $400, D7 Ground Improvement Works $1,210, $1,510, $610, Site decontamination LS 1 $0.00 $ $0.00 $ $0.00 $ Ground improvement (eg. drainage blankets, wick drains, geotextiles, etc) m² $30.00 $1,200, $30.00 $1,500, $30.00 $600, Geotech monitoring (boreholes, piezometers) LS 1 $10, $10, $10, $10, $10, $10, Dewatering bores, buttress drains. LS 1 $0.00 $ $0.00 $ $0.00 $0.00 D8 Drainage $2,498, $2,973, $2,002, Geotextile wrapped aggregate subsoil drain (F/6) m 7500 $35.00 $262, $35.00 $262, $35.00 $175, Remove existing catchpit and lead m 0 $ $ $ $ $ $ Remove existing manhole ea 0 $ $ $ $ $ $ Open channel drain m 0 $5.00 $ $5.00 $ $5.00 $ Single catchpit ea 100 $1, $186, $1, $186, $1, $186, Double catchpit ea 70 $2, $171, $2, $171, $2, $171, Manhole 1050 dia, m depth, standard lid & cover ea 140 $3, $525, $3, $525, $3, $525, Manhole 1050 dia, m depth, lid & catchpit grate ea 40 $4, $190, $4, $190, $4, $190, Culverts installed up to 1.5m depth, bedding, backfill to subgrade level $0.00 $0.00 $ RCRRJ Class 2 culvert - 300mm m 1500 $ $247, $ $247, $ $247, RCRRJ Class 2 culvert - 375mm m 900 $ $157, $ $262, $ $131, RCRRJ Class 2 culvert - 600mm m 1000 $ $740, $ $1,110, $ $370, Precast headwall 600dia ea 6 $3, $18, $3, $18, $3, $6, Stormwater wetland treatment area ea 0 $380, $ $380, $ $380, $0.00 D9 Kerb, Channel, Traffic Islands, Footpaths, Crossings $435, $435, $427, Standard kerb and channel m 5000 $85.00 $425, $85.00 $425, $85.00 $425, Standard Nib Kerb m 0 $45.00 $ $45.00 $ $45.00 $ Stormwater connectors (roof downpipe outlets) ea 0 $30.00 $ $30.00 $ $30.00 $ Concrete infill to traffic islands sq.m 50 $45.00 $2, $45.00 $2, $45.00 $2, Footpaths - concrete sq.m 0 $45.00 $ $45.00 $ $45.00 $ Footpaths - asphalt sq.m 0 $40.00 $ $40.00 $ $40.00 $ Residential crossing (100mm) sq.m 150 $55.00 $8, $55.00 $8, $55.00 $ Commercial crossing (150mm reinforced) sq.m 0 $ $ $ $ $ $0.00 D10 Retaining Structures $3,247, $3,872, $4,672, Retaining wall - gabion or similar - 0 to 3m high sq.m 0 $ $ $ $ $ $ Retaining wall - gabion or similar - 0 to 6m high sq.m 0 $2, $ $2, $ $2, $ Retaining wall - gabion or similar - 0 to 9m high sq.m 0 $5, $ $5, $ $5, $ Retaining wall - pile & timber or similar - 0 to 3m high (Incl. rock toe) sq.m 0 $ $ $ $125, $ $ Retaining wall - pile & timber or similar - 0 to 6m high (incl. rock toe) sq.m 0 $ $ $ $ $ $ Retaining wall - pile & timber or similar - 0 to 9m high (incl. rock toe) sq.m 0 $ $ $ $ $ $ Retaining wall - MSE - 0 to 3m high sq.m 0 $ $ $ $ $ $ Retaining wall - MSE - 0 to 6m high sq.m $ $0.00 $ $ $ $ Retaining wall - MSE - 0 to 12m high sq.m 0 $ $ $ $ $ $ Retaining wall - MSE - 0 to 15m high sq.m 0 $1, $ $1, $ $1, $ Retaining wall - Reinforced Earth walls (Vertical pre-cast panels) 0-3m high sq.m 90 $1, $135, $1, $135, $1, $135, Retaining wall - Reinforced Earth walls (Vertical pre-cast panels) 0-6m high sq.m 300 $2, $750, $2, $1,250, $2, $2,175, Retaining wall - Reinforced Earth walls (Vertical pre-cast panels) 0-9m high sq.m 675 $3, $2,362, $3, $2,362, $3, $2,362, Retaining wall - additional cost for concrete facing to MSE wall sq.m 0 $ $ $0.00 D11 Pavement Layer Construction $1,650, $1,650, $1,650, Sawcut pavement m 0 $2.50 $ $2.50 $ $2.50 $ Score existing seal sq.m 0 $1.75 $ $1.75 $ $1.75 $ Rip existing seal sq.m $2.50 $50, $2.50 $50, $2.50 $50, Salvage existing basecourse and place as upper selected layer cu.m 0 $35.00 $ $35.00 $ $35.00 $ Cement stabilise pavement - 250mm depth - 1.5% cement sq.m $2.20 $66, $2.20 $66, $2.20 $66, Preparation of subgrade sq.m $2.00 $60, $2.00 $60, $2.00 $60, Lower Selected Layer (granular material > 15% CBR) cu.m 1000 $55.00 $55, $55.00 $55, $55.00 $55, Subgrade Sand Improvement Layer (250mm depth) cu.m 6000 $80.00 $480, $80.00 $480, $80.00 $480, Subbase Gap 65 (250mm depth) cu.m 6000 $80.00 $480, $80.00 $480, $80.00 $480, M / 4 AP40 Basecourse (150mm depth) cu.m 4000 $ $400, $ $400, $ $400, GAP 20 to accessways cu.m 300 $ $34, $ $34, $ $34, Running Course cu.m 1000 $25.00 $25, $25.00 $25, $25.00 $25, D12 Pavement Surfacing $1,575, $1,575, $1,575, First coat seal (Grade 4 chipseal) sq.m $3.00 $75, $3.00 $75, $3.00 $75, First coat seal (Grade 3/5 double coat chipseal) sq.m 0 $5.00 $ $5.00 $ $5.00 $ Asphaltic concrete Mix 15 (40mm depth) sq.m $25.00 $625, $25.00 $625, $25.00 $625, Stone Mastic Asphalt (SMA14) 35mm depth sq.m $35.00 $875, $35.00 $875, $35.00 $875,000.00
42 Alternative Alignment - Option 1 Alternative Alignment - Option 2 Preferred NOR Option Item Description Unit QTY Rates Sub-Element Totals $ Element Totals $ Comments QTY Rates Sub-Element Totals $ Element Totals $ Comments QTY Rates Sub-Element Totals $ Element Totals $ Comments $ $ $ Open Graded Porous Asphalt - Ogpa (35mm depth) sq.m 0 $30.00 $ $30.00 $ $30.00 $0.00 D13 Pavement Markings and Signs $165, $165, $165, Remove old markings & Signs LS 1 $10, $10, $10, $10, $10, $10, Pavement markings (incl. lettering and green cycling/bus lanes markings) km 2.5 $45, $112, $45, $112, $45, $112, Raised Road Pavement Markers km 2 $1, $2, $1, $2, $1, $2, New marker posts (provisional) ea 40 $20.00 $ $20.00 $ $20.00 $ Road signs LS 1 $40, $40, $40, $40, $40, $40, D14 Safety Barriers $618, $618, $615, Remove existing guardrail m 150 $20.00 $3, $20.00 $3, $20.00 $ Guardrail safety barrier m 4000 $ $600, $ $600, $ $600, Trailing/Leading end guardrail terminals ea 4 $3, $15, $3, $15, $3, $15, D15 Lighting $260, $260, $260, Install new columns and outreaches and connect to power supply ea 40 $3, $140, $3, $140, $3, $140, Trenching and cabling m 3000 $40.00 $120, $40.00 $120, $40.00 $120, Remove existing street lighting and fittings ea 0 $1, $ $1, $ $1, $ Relocate existing street lighting ea 0 $2, $ $2, $ $2, $0.00 D16 Traffic Signals $0.00 $0.00 $ Remove existing traffic signals LS 0 $15, $ $15, $ $15, $ Relocate existing traffic signals LS 0 $ $ $ New traffic signals (all inclusive) LS 0 $450, $ $450, $ $450, $0.00 D17 Landscaping $440, $440, $440, Topsoil spreading to berms cu.m $15.00 $300, $15.00 $300, $15.00 $300, Grassing - sowing sq.m $1.50 $75, $1.50 $75, $1.50 $75, Grassing - hydroseeding sq.m $1.00 $50, $1.00 $50, $1.00 $50, Screen planting of selected species LS 1 $15, $15, $15, $15, $15, $15, Landscaping inside traffic islands LS 1 $ $ $0.00 D18 Structures $14,700, $15,712, $12,358, Mill Road over-bridge (CH 3500) sq.m 0 $2, $ $2, $ $2, $ Gully Bridge 1 (CH 3950) sq.m 4200 $3, $14,700, $3, $14,700, $2, $10,500, Gully Bridge 2 (CH 4850) sq.m 0 $2, $ $2, $ $2, $1,750, Box Culverts of Watercare trunk watermains m 0 $2, $ $2, $1,012, $1, $108, D19 Property Modifications $221, $221, $10, Type A (Red) ea $0.00 $0.00 $ Type B (Orange) ea $0.00 $0.00 $ Type C (Blue) ea $0.00 $0.00 $ Temporary protection/support to adjacent properties during construction LS 1 $25, $25, $25, $25, $10, $10, Noise attenuation fences m 700 $ $196, Road is now closer to Polo Prince Aera Approx 700m long wall 700 $ $196, Road is now closer to Polo Prince Aera Approx 700m long wall 0 $ $0.00 D20 Utility Services $31,851, $1,851, $ Vector Power and Communications - relocate and or protect existing services, supply PS 1 $1,000, $1,000, Assumption that existing 1 $1,000, $1,000, Assumption that existing 1 $0.00 $0.00 and lay overhead lines will be underground. overhead lines will be underground Vector Gas - relocate and protect existing services, supply and lay PS 1 $0.00 $ $0.00 $ $0.00 $ Chorus - Relocate and or protect existing services, supply and lay PS 1 $0.00 $ $0.00 $ $0.00 $ Watercare - Watermains and Wastewater mains, capping / supply and lay PS 1 $30,750, $30,750, Assumption that existing water supply pipes will be relocated and the Manurewa Line #1 and Waikato bulk supply mains will be relocated 1 $750, $750, Assumption that existing water supply pipes will be relocated 1 $0.00 $ Transpower - relocation of 2 pylons PS 1 $0.00 $ $0.00 $ $0.00 $ Relocate and or protect survey marks PS 1 $1, $1, Assumption 1 $1, $1, Assumption 1 $0.00 $ Relocate private services ( water supply, power supply, house connections) PS 1 $100, $100, $100, $100, $0.00 $0.00 D21 Extraordinary Construction Costs $0.00 $0.00 $ Street furnishings LS 0 $0.00 $ $0.00 $ $0.00 $ LS 1 $ $ $0.00 $81,556, $81,556, $73,477, $73,477, $45,109, $45,109,600.00
Engineer's Preliminary Estimate - 100% Submittal
EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationNorthumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate
Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More informationENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal
Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More informationBID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00
More informationPART A ROADWAY - BASE BID
May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00
More informationLETTING : CALL : 056 COUNTIES : MILLE LACS
S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE
More informationBid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221
Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00
More informationAVERAGE OF BID ITEMS ENGINEERS ESTIMATE
ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20
More informationCITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018
CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00
More informationCECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075
Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration
More informationBID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012
Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00
More informationOpinion of Probable Cost
Appendix E Opinion of Probable Cost 01054/8410233/14/Rohner_Alt_Analysis_Report Rohner Creek Flood Control, Habitat and Seismic Improvement Project Alternatives Analysis Cost Alternative 1: Improved Channel
More informationCITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $
RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement
More informationSubject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122
Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot
More informationBID TABULATION BID REQUEST NO
BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More information2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.
ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense
More informationRANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price
2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationBIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.
More informationSUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION
Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00
More informationFOR OFFICE USE ONLY CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT
40555 Utica Road P.O. Box 8009 Sterling Heights, MI 48311-8009 TEL 586-446-2720 FAX 586-276-4061 CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING
More informationAVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP
AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, 2014 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 1 $19 $18,500.00 1 2013 2013.602/00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32
More informationFailure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.
Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017
More informationSandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING
ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00
More informationSunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List
Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements
More information33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.
CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler
More information2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time
TABULATION PAGE 1 OF 6 PRE- ESTIMATE Pitlik and Wick, Inc. CONTRACT A - BASE Highway X (Friedle Road to Dam Road) A1.1 Single Layer Chip Seal 75,100 sq. yds. $ 2.50 $ 187,750.00 $ 1.60 $ 120,160.00 $ 1.19
More informationCrushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:
Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and
More informationCONTRACT TIME DETERMINATION
CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during
More informationA DESIGN-BUILD PROJECT
Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,
More informationCITY-TIF COMMISSION EXPENSES Cost Description Project Cost Data Reimbursable From Public Funds Developer Equity COST TIF Super TIF State TIF CID SCTC PRIVATE I. Legal $ 750,000 $ 750,000 $ - $ - $ - $
More informationBID TABULATION PAGE 1 OF 8
BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $
More informationWollert DCP. Revised Road Project and Intersection Cost Estimates. Prepared for Wollert Developer Consortium CG140690
Wollert CP Revised Road Project and Intersection Cost stimates CG140690 Prepared for Wollert eveloper Consortium 4 ecember 2015 Wollert CP Revised Road Project and Intersection Cost stimates ocument Information
More informationBID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as
Description 103 REMOVE, STORE AND REINSTALL EXISTING RETAINING WALL 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) 203.1 TACK COAT BID PROPOSAL PROPOSAL OF, a corporation, a partnership consisting of an individual
More informationNE WEST KINGSTON ROAD CULVERT REPLACEMENT
NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS
More informationFuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $
SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT
More informationMunilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL
JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE
More informationCertified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University
Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1
More informationTown of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562
Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated
More informationCOST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS. PREPARED BY CSD-Planning Division. City of Kitchener- Letter of Credit (2017)
This information is available in accessible formats upon request. Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. COST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS PREPARED BY
More informationReviax Constracting Corp. DeSantis Construction
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.
More informationAnnual Services Construction Contract (ASCC) #15 Project Number: PUCN
Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction
More informationEST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS
BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native
More informationPROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM
NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. 4907 1.08 miles of roadway reconstruction including clearing, grade establishment, sand subbase,
More informationAPPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI
APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: _100.00 Date: / / Receipt No: APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE,
More informationPROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM
NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. LH 4710 Removal of existing twin 48 CMP culverts, construction of new 16 x5 concrete box culvert,
More informationTabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT
Page 1 of 20 16 SSSEX ROTE 94 BLACK CREEK TRIBTARY CLVERT REPLACEMENT CONSTRCTION CORP INC. (2) KONKS CORPORATION (3) NORTHEAST REMSCO CONSTRCTION INC Quantity and nits nit Price nit Price nit Price 0001
More informationPROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM
NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. 4735 1.00 miles of roadway reconstruction including grade establishment, sand subbase, aggregate
More informationCITY OF SURREY (the Owner ) INVITATION TO TENDER (ITT)
CITY OF SURREY (the Owner ) INVITATION TO TENDER (ITT) Contract Name: District Energy System Phase 2a: Distribution Piping System (DPS), Energy Transfer Stations (ETS) and Containerized Boiler Plant (CBP)
More informationUtility Committee Meeting AGENDA. October 3, 2017
Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid
More informationALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN
ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA
More informationREPLACEMENT OF MERCER COUNTY BRIDGE
ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade
More informationTABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00
TABULATION OF BIDS Jesse Viertel Memorial Airport Boonville, Missouri Bids Received: 6/12/2018 Lochner Job No.: 000011332 RECONSTRUCT RUNWAY 1836, NORTH CONNECTING TAXIWAY AND TURNAROUND REPLACE EXISTING
More informationBID TABULATION. Engineer's Estmated Opinion of Costs
Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%
More information19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown
19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL
More informationPRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer
G-7 STAFF REPORT MEETING DATE: November 27, 2018 TO: FROM: City Council Petr Skala, Associate Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher
More informationNOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No
NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,
More informationCONSTRUCTION OF THE BYPASS OF 3 VILLAGES ALONG THE M3 NATIONAL ROAD CHISINAU- GIURGIULESTI
TRACECA PROJECT FICHE CONSTRUCTION OF THE BYPASS OF 3 VILLAGES ALONG THE M3 NATIONAL ROAD CHISINAU- GIURGIULESTI 1. BASIC INFORMATION TITLE: Construction of the bypass of 3 villages along the M3 National
More informationPART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.
BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.
More informationBID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #
ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00
More informationSHIPLEY S CHOICE DAM REHABILITATION COMMUNITY MEETING MINUTES
SHIPLEY S CHOICE DAM REHABILITATION COMMUNITY MEETING MINUTES A community meeting was held on September 13, 2018 at the Shipley s Choice Elementary School. County staff from the Watershed Protection and
More informationExhibit 4 Page 1 of 8
Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:
More information69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11
69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to
More informationAPPENDIX A-3: Cost Engineering
APPENDIX A-3: Cost Engineering ALISO CREEK MAINSTEM ECOSYSTEM RESTORATION STUDY Orange County, California September 217 Orange County Public Works Environmental Resources Department This page intentionally
More informationFALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00
More informationRFB Addendum 3
Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER
More informationWhat are Capital Reserves?
Capital Reserves What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs Stormwater pond repair, dredging and drainage improvements Fence repair, retaining
More informationBID TABULATION PAGE 1 OF 6
BID TABULATION PAGE 1 OF 6 BID PRE-BID ESTIMATE R.G. Huston Company, Inc. Kopplin & Kinas Co., Inc. Cottage Grove, WI Green Lake, WI NO. DESCRIPTION OF WORK QUANT. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT
More informationCONTRACT (Tender document only)
Contract No. 734-01 CONTRACT 734-01 (Tender document only) CIVIL WORKS AT 19 Flemington Road, North Melbourne Principal: Superintendent: Coughlan Civil Pty Ltd. TABLE OF CONTENTS FORMAL INSTRUMENT OF AGREEMENT
More informationQUONSET DEVELOPMENT CORPORATION (QDC) INVITATION TO BID
QUONSET DEVELOPMENT CORPORATION (QDC) A BID is solicited for the following work: INVITATION TO BID Name of Project: Background & Description of Work: Pavement Repairs: Utility Connections: On-Call Pavement
More informationPatchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.
Patchogue Road Culvert Crossing IFB 2015-03 ADDENDUM #1 07/13/2015 Addendum #1 addresses the questions submitted by contractors. Q1: Bid Item shows 22 LF of 60 RCP but plans show 27 LF, please clarify.
More informationCity of Markham Asset Management Plan
2016 City of Markham Asset Management Plan Table of Content 1. Executive Summary...4 2. Introduction...7 2.1 Provincial Guidelines on Asset Management Plans...7 2.2 City of Markham Goals / Strategic Plan...7
More informationPRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST
PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST Table of Contents 1. Introduction...2 2. Scope of Estimate...2 3. Subpackage Breakout....2 4. Assumptions Used in
More informationCITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS
1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating
More informationThe Three Planning Windows of Asset Management John Murray City of Hamilton May 9 th, 2012 CNAM - Montreal. Hamilton Asset Management Plan
The Three Planning Windows of Asset Management John Murray City of Hamilton May 9 th, 2012 CNAM - Montreal 1 City of Hamilton Amalgamated - 2001 7 Area Municipalities Population 500,000 The City of Waterfalls
More informationCITY OF TAMPA ADDENDUM 2. April 18, 2018
CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project
More informationARKANSAS SMALL BUSINESS PROVISION CERTIFICATION APPLICATION
SMALL BUSINESS PROVISION TITLE 49 CODE OF FEDERAL REGULATIONS PART 26 ARKANSAS SMALL BUSINESS PROVISION CERTIFICATION APPLICATION 10324 Interstate 30, P. O. Box 2261 Little Rock, Arkansas 72203-2261 Natasha
More informationDemolition, Landscaping and Insurance Requirements for the Razing of Buildings and other Structures Located in the City of Appleton
Demolition, Landscaping and Insurance Requirements for the Razing of Buildings and other Structures Located in the City of Appleton September 1999 Prepared by: City of Appleton DPW - Inspection Division
More informationCITY OF CHAMBLEE PIERCE DRIVE STORM SYSTEM EXTENSION PROJECT
CPL 14064.08 BID FORM SECTION 00 300-1 BID FORM BID NUMBER: CH2019-001Dev SUBMITTAL DATE: BY: (Bidder) PROJECT DESCRIPTION: The project consists of the construction of a sidewalk and associated grading,
More informationFor Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.
Job 11-4518 Solicitation B-12-059-DD PROPOSAL of BID PROPOSAL, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER STEM: Pursuant to Instructions Invitation
More informationAddendum 1 13 TH Street Streetscape. September 1, 2017
Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationSENATE, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED JUNE 6, 2016
SENATE, No. STATE OF NEW JERSEY th LEGISLATURE INTRODUCED JUNE, 0 Sponsored by: Senator BOB SMITH District (Middlesex and Somerset) Senator SAMUEL D. THOMPSON District (Burlington, Middlesex, Monmouth
More informationDORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION 1 Civic Center Dr., San Marcos, CA 92069-2918 (760) 744-1050 FAX (760) 591-4135 FEE SCHEDULE FOR GRADING & IMPROVEMENT PLAN
More informationASSEMBLY, No STATE OF NEW JERSEY. 211th LEGISLATURE INTRODUCED JUNE 14, 2004
ASSEMBLY, No. 00 STATE OF NEW JERSEY th LEGISLATURE INTRODUCED JUNE, 00 Sponsored by: Assemblyman WILFREDO CARABALLO District (Essex and Union) SYNOPSIS Changes liability of underground facility operators
More informationSEPA Technical Guidance Note Estimate of Amount of Financial Provision for Landfill Sites
SEPA Technical Guidance Note Estimate of Amount of Financial Provision for Landfill Sites This guidance document has been developed to assist SEPA staff in assessing financial provision submissions made
More informationTOWNSHIP OF HAMILTON TENDER # PR GORES LANDING WHARF REHABILITATION
Submitted by, TOWNSHIP OF HAMILTON TENDER # PR2017-06 GORES LANDING WHARF REHABILITATION Name of Firm or Individual Address (Include postal code) Telephone No. (Include area code) Name of Person Signing
More informationLETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY
LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/17/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : SP 03-626-17/ PLH 0399 (248) CONTRACT LOCATION: CSAH 26 WITHIN THE TAMARAC NATIONAL WILDLIFE REFUGE RECOMMENDATION: AWARD TO LOW BIDDER --------------------------------------------------------------------
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More informationNorth Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL
North Baker Ave. - City Limits to 23rd St. NE Bid Documents BD-1 To the Board of County Commissioners Douglas County, Washington Gentlemen: North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL