1 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, /00003 CONSTRUCTION SURVEYING LS 1 $19 $18, /00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32 $10, /00010 MOBILIZATION LS 10 $700 $69, /00040 FIELD OFFICE TYPE D EACH 1 $5 $5, /00040 FIELD LABORATORY TYPE D EACH 1 $5 $5, /00010 COMBINATION FIELD LABORATORY-OFFICE EACH 3 $15 $5, $ /00010 MAINT & RESTORATION OF HAUL ROADS LS 6 $8 $1, /00130 ANTI-ICING SYSTEM LS 1 $157 $156, /00010 CLEARING ACRE 0 $1 $10, /00010 CLEARING TREE 2 $1 $ /00010 GRUBBING ACRE 0 $1 $10, /00010 GRUBBING TREE 2 $1 $ $ /00010 PAVEMENT MARKING REMOVAL L F 3,597 $4 $ /00007 REMOVE PERFORATED PIPE L F 72 $1 $ /00010 REMOVE PIPE CULVERTS L F 632 $5 $ /00012 REMOVE METAL CULVERT L F 226 $3 $ /00016 REMOVE SEWER PIPE (STORM) L F 177 $2 $ /00022 REMOVE CURB & GUTTER L F 1,046 $8 $ /00035 REMOVE FENCE L F 154 $1 $ /00041 REMOVE CABLE GUARDRAIL L F 2,073 $4 $ /00042 REMOVE GUARDRAIL-PLATE BEAM L F 2,219 $10 $ /00250 REMOVE SIGN WALKWAY L F 3,191 $76 $ /00021 REMOVE CONCRETE WALK S F 1,201 $4 $ /00100 REMOVE PAVEMENT S F 26,276 $33 $ /00111 REMOVE CONCRETE APPROACH PANEL S F 8,103 $24 $ /00121 REMOVE BITUMINOUS PAVEMENT S F 1,918 $2 $ /00110 REMOVE CONCRETE PAVEMENT S Y 10,007 $62 $ /00111 REMOVE CONCRETE APPROACH PANEL S Y 564 $23 $ /00120 REMOVE BITUMINOUS PAVEMENT S Y 44,490 $214 $ /00122 REMOVE BITUMINOUS SHOULDER PAVEMENT S Y 31,412 $39 $ /00012 REMOVE METAL APRON EACH 5 $0 $ /00013 REMOVE PIPE APRON EACH 23 $2 $
2 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, /00035 REMOVE HEADWALL EACH 30 $2 $ /00037 REMOVE ANCHORAGE ASSEMBLY-CABLE EACH 14 $2 $ /00038 REMOVE ANCHORAGE ASSEMBLY-PLATE BEAM EACH 3 $1 $ /00051 REMOVE GUIDE POST EACH 7 $0 $ /00055 REMOVE TWISTED END TREATMENT EACH 8 $2 $ /00102 REMOVE CATCH BASIN EACH 4 $1 $ /00103 REMOVE DROP INLET EACH 1 $1 $ /00105 REMOVE CASTING EACH 15 $1 $ /00172 REMOVE DELINEATOR / MARKER PANEL EACH 18 $0 $ /00174 REMOVE DELINEATOR / MARKER SIGN EACH 104 $2 $ /00180 REMOVE MARKER EACH 12 $0 $ /00203 REMOVE SIGN TYPE C EACH 58 $2 $ /00205 REMOVE SIGN TYPE D EACH 13 $1 $ /00209 REMOVE SIGN TYPE OH EACH 1 $6 $5, /00350 REMOVE SIGN LIGHTING SYSTEM EACH 4 $33 $8, /00400 REMOVE LIGHT STANDARD BASE EACH 1 $1 $ /00402 REMOVE LIGHT FOUNDATION EACH 1 $0 $ /00497 REMOVE SIGN PANEL TYPE C EACH 36 $1 $ /00498 REMOVE SIGN PANEL TYPE D EACH 28 $1 $ /00500 REMOVE SIGN PANEL TYPE OH EACH 11 $2 $ /00740 REMOVE ECCENTRIC LOADER BCT EACH 8 $1 $ /00010 SAWING CONCRETE PAVEMENT L F 101 $0 $ /00011 SAWING CONCRETE PAVEMENT (FULL DEPTH) L F 4,752 $16 $ /00010 SAWING BITUMINOUS PAVEMENT L F 733 $1 $ /00011 SAWING BIT PAVEMENT (FULL DEPTH) L F 17,118 $26 $ /00100 SALVAGE PIPE CULVERT L F 48 $1 $ /00218 SALVAGE GUARDRAIL-CABLE L F 150 $2 $ /00219 SALVAGE GUARDRAIL L F 1,006 $4 $ /00220 SALVAGE GUARDRAIL-PLATE BEAM L F 1,388 $5 $ /00004 SALVAGE CASTING EACH 3 $1 $ /00036 SALVAGE SLOTTED RAIL TERMINAL EACH 1 $0 $ /00037 SALVAGE ENERGY ABSORBING TERMINAL EACH 7 $2 $ /00072 SALVAGE MARKER EACH 7 $0 $ /00095 SALVAGE PIPE APRON EACH 13 $3 $ /00422 SALVAGE LIGHTING UNIT EACH 2 $2 $1, /00543 SALVAGE SIGN TYPE C EACH 46 $1 $ /00544 SALVAGE SIGN TYPE D EACH 7 $1 $ /00548 SALVAGE SIGN TYPE EO EACH 34 $3 $ /00606 SALVAGE SIGN PANEL TYPE C EACH 15 $0 $ /00608 SALVAGE SIGN PANEL TYPE D EACH 7 $0 $ /00017 ABANDON PIPE SEWER EACH 1 $4 $4, /00210 REMOVE REGULATED WASTE MATERIAL (BRIDGE) LS 1 $3 $2, /01011 HAUL SALVAGED MATERIAL LS 2 $1 $ /00100 REMOVE & REPLACE BITUMINOUS PAVEMENT L F 143 $5 $ $657 2
3 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, /00010 COMMON EXCAVATION C Y 7,833 $57 $ /00010 SELECT GRANULAR BORROW (LV) C Y 3,015 $63 $ $ /00010 EXCAVATION - COMMON C Y 48,886 $224 $ /00020 EXCAVATION - SUBGRADE C Y 39,623 $250 $ /00060 COMMON EMBANKMENT (CV) C Y 36,343 $124 $ /00080 SELECT GRANULAR EMBANKMENT (CV) C Y 40,860 $450 $ /00110 SELECT GRANULAR EMBANKMENT MOD 10% (CV) C Y 9,097 $172 $ $1, /00050 AGGREGATE SURFACING CLASS 5 TON 31 $0 $ /00010 DOZER HOUR 25 $3 $ / CU YD TRUCK HOUR 4 $0 $ /00020 TRACTOR MOUNTED BACKHOE HOUR 29 $3 $ $ /00010 CALCIUM CHLORIDE SOLUTION GAL 5,000 $11 $ /00050 AGGREGATE BASE CLASS 5 TON 6,449 $106 $ /00050 AGGREGATE BASE (CV) CLASS 5 C Y 19,783 $425 $ $ /00010 FULL DEPTH RECLAMATION S Y 113,853 $120 $ /00010 SHOULDER BASE AGGREGATE CLASS 1 TON 4,896 $64 $ /00020 SHOULDER BASE AGGREGATE CLASS 2 TON 13,639 $199 $ /00011 SHOULDER BASE AGGREGATE SPECIAL TON 43 $2 $ $ /00010 BITUMINOUS PATCHING MIXTURE TON 882 $118 $ /00040 MILL BITUMINOUS SURFACE (1.5") S Y 455,271 $281 $ /00050 MILL BITUMINOUS SURFACE (2.0") S Y 1,621 $4 $ /00080 MILL BITUMINOUS SURFACE (3.0") S Y 175,130 $293 $ /00050 MILL CONCRETE SURFACE (2.0") S Y 1,128 $5 $ /00010 MILLED RUMBLE STRIPS EACH 10 $8 $ /00025 MILLED RUMBLE STRIPS L F 61,962 $9 $
4 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, /00030 MILLED RUMBLE STRIPS-INTERMITTENT L F 182,756 $27 $ /00035 MILLED RUMBLE STRIPS-CENTERLINE L F 85,624 $11 $ /00100 MILL & PATCH BITUMINOUS PAVEMENT L F 176 $1 $ $ /01090 PLACE CONCRETE PAVEMENT 9" S Y 208 $22 $ /01095 PLACE CONCRETE PAVEMENT 9.5" S Y 89 $4 $ /01100 PLACE CONCRETE PAVEMENT 10.0" S Y 454 $21 $ /00010 STRUCTURAL CONCRETE C Y 202 $30 $ /00010 DOWEL BAR EACH 314 $3 $ /00016 DRILL & GROUT DOWEL BAR (EPOXY COATED) EACH 350 $6 $ /00021 DRILL & GROUT REINF BAR (EPOXY COATED) EACH 6 $0 $ $ /00130 PAVEMENT REPLACEMENT (TYPE CX) S Y 24 $5 $ /00030 SEAL BITUMINOUS PAVEMENT CRACKS RDST 1,876 $189 $ /00011 BITUMINOUS MATERIAL FOR FOG SEAL SPECIAL GAL 67,818 $281 $ /00010 BITUMINOUS MATERIAL FOR SHOULDER TACK GAL 110 $1 $ /22200 TYPE SP 12.5 WEARING COURSE MIX (2,B) TON 9,783 $563 $ /23200 TYPE SP 12.5 WEARING COURSE MIX (3,B) TON 41,696 $2,592 $ /23300 TYPE SP 12.5 WEARING COURSE MIX (3,C) TON 1,617 $136 $ /24200 TYPE SP 12.5 WEARING COURSE MIX (4,B) TON 29,249 $1,540 $ /24500 TYPE SP 12.5 WEARING COURSE MIX (4,E) TON 55,896 $3,434 $ /24200 TYPE SP 12.5 NON WEAR COURSE MIX (4,B) TON 2,527 $129 $ /24215 TYPE SP 12.5 WEAR CRS MIX(4,B)1.5" THICK S Y 347,079 $1,579 $ /24220 TYPE SP 12.5 WEAR CRS MIX(4,B)2.0" THICK S Y 190,098 $1,141 $ /20100 TYPE SP 12.5 BIT MIXTURE FOR PATCHING TON 678 $40 $ $11, /01143 STRUCTURAL CONCRETE (1A43) C Y 212 $74 $ /03643 STRUCTURAL CONCRETE (3Y43) C Y 562 $270 $ /03640 BRIDGE SLAB CONCRETE (3Y36HP) S F 7,989 $304 $ /01247 TYPE MOD F (TL-4)RAILING CONCRETE(3Y46A) L F 419 $23 $ /00010 REINFORCEMENT BARS LB 15,990 $16 $ /00011 REINFORCEMENT BARS (EPOXY COATED) LB 224,100 $224 $ /00020 REINFORCEMENT BARS (STAINLESS STEEL) LB 950 $5 $ /00010 STRUCTURE EXCAVATION LS 1 $50 $50,
5 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, /00300 FOUNDATION PREP PILE BENT PIERS LS 1 $50 $50, /00002 SPECIAL SURFACE FINISH (INPLACE) S F 20,477 $46 $ /00081 PAINTED SURFACE FINISH (INPLACE) S F 2,480 $7 $ /03634 STRUCTURAL CONCRETE (3Y33A) SPECIAL S F 150 $2 $ $1, /00010 FURNISHING STRUCTURAL STEEL (3310) LB 24,800 $151 $ /02001 ELASTOMERIC BEARING PAD TYPE 1 EACH 12 $5 $ /00400 EXPANSION JOINT DEVICES TYPE 4 L F 588 $71 $ /00500 EXPANSION JOINT DEVICES TYPE 5 L F 183 $22 $ /00068 POT-TYPE BEARING ASSEMBLY EACH 16 $139 $8, /01120 MODULAR BRIDGE JOINT SYSTEM TYPE 12 L F 63 $168 $2, $ /00200 CONCRETE WEARING COURSE (3U17A) S F 14,612 $107 $ /00250 CONCRETE WEARING COURSE (3U17A) 2.0" S F 100,938 $328 $ $ /00588 EXPANSION JOINTS, DESIGN E8H L F 92 $3 $ /00010 BRIDGE APPROACH PANELS S Y 2,606 $379 $ /00589 EXPANSION JOINTS, DESIGN E8 SPECIAL L F 588 $101 $ $ /00060 CONCRETE END POST EACH 8 $26 $3, /00310 ARCH SURFACE FINISH (SINGLE COLOR) S F 3,244 $3 $ /00525 ARCH CONC TEXTURE (FRACTURED GRANITE) S F 3,244 $39 $ $ /00007 REMOVE CONCRETE WEARING COURSE S F 88,188 $287 $ /00011 REMOVE SLAB TYPE 1 S F 2,000 $42 $ /00013 REMOVE SLAB TYPE 3 S F 150 $12 $ /00110 ANCHORAGES TYPE REINF BARS EACH 266 $7 $ /00010 REPAIR AGGREGATE SLOPE PAVING LS 1 $15 $15, /00120 RECONSTRUCT CONCRETE END POST EACH 4 $40 $10, /00060 RECONSTRUCT PAVING BRACKET L F 263 $58 $ /02010 RECONSTRUCT EXPANSION JOINT TYPE A L F 462 $261 $ /02020 RECONSTRUCT EXPANSION JOINT TYPE B L F 182 $71 $ /00003 SCARIFY CONCRETE APPROACHES S F 3,760 $15 $ /00050 MILL & PATCH CONCRETE SURFACE S F 70 $3 $
6 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, /00110 CONCRETE SURFACE REPAIR S F 80 $9 $ $ /00010 REMOVE EXISTING BRIDGE LS 1 $100 $100, /00030 AGGREGATE BEDDING (CV) C Y 101 $3 $ /00030 COARSE FILTER AGGREGATE (CV) C Y 22 $1 $ $ /02000 STEEL H-PILING DRIVEN 12" L F 1,540 $2 $ /03000 STEEL H-PILING DRIVEN 14" L F 1,100 $1 $ /02000 STEEL H-PILING DELIVERED 12" L F 1,540 $39 $ /03000 STEEL H-PILING DELIVERED 14" L F 1,100 $33 $ /02045 STEEL H-TEST PILE 45 FT LONG 12" EACH 2 $20 $10, /03060 STEEL H-TEST PILE 60 FT LONG 14" EACH 2 $40 $20, /00010 PILE ANALYSIS EACH 2 $10 $5, /00012 PILE TIP PROTECTION 12" EACH 46 $6 $ /00014 PILE TIP PROTECTION 14" EACH 24 $4 $ /00030 PILE ADVANCEMENT L F 144 $22 $ /00012 STEEL SHEET PILING (PERMANENT) S F 1,588 $71 $ $ / " CS PIPE CULVERT L F 46 $2 $ / " CS PIPE CULVERT L F 16 $1 $ / " CS PIPE CULVERT L F 8 $0 $ / " RC PIPE CULVERT L F 74 $4 $ / " CS PIPE APRON EACH 1 $0 $ / " RC PIPE APRON EACH 3 $2 $ / " GS SAFETY APRON EACH 2 $1 $ / " CS SAFETY APRON EACH 1 $1 $ / " RC SAFETY APRON EACH 3 $2 $ /00010 INSTALL PIPE CULVERT L F 48 $2 $ /00017 INSTALL PIPE APRON EACH 13 $6 $ / " SAFETY APRON EACH 4 $1 $ / " SAFETY APRON EACH 16 $7 $ / " PIPE CULVERT L F 130 $3 $ / " PIPE CULVERT L F 520 $15 $ $ / " PRECAST CONCRETE HEADWALL EACH 39 $6 $
7 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, / " PRECAST CONCRETE HEADWALL EACH 6 $2 $ /00010 DRAINAGE SYSTEM TYPE (B910) LS 1 $2 $2, / " TP PIPE DRAIN L F 475 $4 $ / " TP PIPE DRAIN L F 825 $12 $ / " PE PIPE DRAIN L F 60 $4 $ / " PERF TP PIPE DRAIN L F 4,200 $29 $ / " PERF PE PIPE DRAIN L F 1,229 $14 $ / " PERF PE PIPE DRAIN L F 307 $4 $ $ / " RC PIPE SEWER CLASS III L F 76 $5 $ / " RC PIPE SEWER DES 3006 L F 69 $4 $ / " RC PIPE SEWER DES 3006 CL III L F 122 $5 $ /00046 CONNECT INTO EXISTING DRAINAGE STRUCTURE EACH 3 $3 $ $ /00012 CONST DRAINAGE STRUCTURE DESIGN A OR F L F 14 $6 $ /00032 CONST DRAINAGE STRUCTURE DESIGN C OR G L F 13 $6 $ /00080 CONST DRAINAGE STRUCTURE DESIGN H L F 7 $3 $ /00010 CASTING ASSEMBLY EACH 22 $23 $1, /00010 INSTALL CASTING EACH 3 $1 $ /00011 ADJUST FRAME & RING CASTING EACH 5 $2 $ $ /00024 LINING CULVERT PIPE 24" L F 1,561 $114 $ /00036 LINING CULVERT PIPE 36" L F 172 $25 $ $ /00012 RANDOM RIPRAP CLASS II C Y 6 $0 $ /00013 RANDOM RIPRAP CLASS III C Y 580 $38 $ /00012 RANDOM RIPRAP CLASS II TON 24 $2 $ /00013 RANDOM RIPRAP CLASS III TON 403 $22 $ /00017 GEOTEXTILE FILTER TYPE VII S Y 429 $1 $ /00024 GEOTEXTILE FILTER TYPE IV (MOD) S Y 1,168 $2 $ $ /00020 CLSM HIGH DENSITY C Y 42 $15 $ /00005 CONCRETE WALK S F 864 $9 $
8 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, /02120 CONCRETE CURB & GUTTER DESIGN B424 L F 474 $17 $ /02320 CONCRETE CURB & GUTTER DESIGN B624 L F 267 $9 $ /19220 CONCRETE CURB & GUTTER DESIGN S524 L F 433 $8 $ / " CONCRETE DRIVEWAY PAVEMENT S Y 12 $1 $ /00050 CONCRETE CURB & GUTTER L F 231 $10 $ /00010 TRUNCATED DOMES S F 116 $6 $ $ /00150 MAIL BOX SUPPORT EACH 52 $6 $ /00001 ELECTRIC LIGHT SYSTEM LS 1 $39 $39, /00005 LIGHT FOUNDATION DESIGN E EACH 2 $1 $ / " NON-METALLIC COND (DIRECTIONAL BORE) L F 75 $2 $ /00404 DIRECT BURIED LIGHTING CABLE 4 COND NO 4 L F 150 $1 $ /00053 INSTALL LIGHTING UNIT EACH 2 $2 $ $ /00001 TRAFFIC BARRIER DESIGN SPECIAL L F 500 $31 $ /00040 TRAFFIC BARRIER DESIGN BULLNOSE L F 350 $20 $ /02038 TRAFFIC BARRIER DESIGN B8338 L F 2,651 $48 $ /00020 GUIDE POST TYPE B EACH 17 $1 $ /02007 INSTALL TRAFFIC BARRIER DESIGN B8307 L F 150 $1 $ /02038 INSTALL TRAFFIC BARRIER DESIGN B8338 L F 1,238 $7 $ /00020 ANCHORAGE ASSEMBLY - PLATE BEAM EACH 3 $2 $ /00025 END TREATMENT-ENERGY ABSORBING TERMINAL EACH 10 $18 $1, /00028 END TREATMENT-TANGENT TERMINAL EACH 10 $22 $2, /00005 IMPACT ATTENUATOR BARRELS EACH 208 $31 $ /00040 T-BARRIER BRIDGE CONN DES 8318 EACH 2 $0 $ /00126 INSTALL ENERGY ABSORBING TERMINAL EACH 6 $5 $ $ /00010 TRAFFIC CONTROL LS 9 $275 $30, /00100 TEMPORARY PEDESTRIAN ACCESS CONTROL LS 1 $5 $5, /00002 RAISED PAVEMENT MARKER TEMPORARY EACH 16,402 $25 $ /00098 TUBE DELINEATOR EACH 1,185 $36 $ $ /00012 CONCRETE FOOTINGS (TYPE OH SHAFT) C Y 7 $9 $1, /00122 STRUCT STEEL-POSTS FOR OH SIGNS (B) LB 781 $4 $ /00522 STR STEEL-PANEL MT PST FOR OH SIGNS (B) LB 2,766 $12 $
9 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, /00130 SIGN PANELS TYPE C S F 1,284 $23 $ /00140 SIGN PANELS TYPE D S F 1,049 $20 $ /00158 SIGN PANELS TYPE EO S F 168 $3 $ /00189 SIGN PANELS TYPE OVERLAY S F 1,099 $10 $ /00190 SIGN PANELS TYPE OH S F 1,541 $37 $ /00016 SAW SIGN PANELS TYPE OH L F 47 $0 $ /00010 SIGN PANEL OVERLAY TYPE A S F 110 $2 $ /00100 SIGN PANEL OVERLAY TYPE OH S F 16,973 $331 $ /00110 SIGN PANEL OVERLAY TYPE EO S F 744 $15 $ /00030 INSTALL SIGN PANEL TYPE EO EACH 34 $5 $ /00013 INSTALL SIGN TYPE C EACH 61 $9 $ /00014 INSTALL SIGN TYPE D EACH 14 $4 $ /00020 INSTALL SIGN TYPE OH EACH 1 $2 $2, /00010 OVERHEAD SIGN IDENTIFICATION PLATE EACH 81 $3 $ /00010 DELINEATOR EACH 102 $7 $ /00113 DELINEATOR TYPE X4-13 EACH 20 $4 $ /00010 REFERENCE POST MARKER EACH 11 $1 $ /00010 HAZARD MARKER X4-2 EACH 12 $1 $ /00010 CLEARANCE MARKER X4-4 EACH 2 $0 $ /00082 REPOSITION SIGN PANEL TYPE OH EACH 2 $0 $ /00555 PLAQUE TYPE X4-12 EACH 2 $0 $ /00720 INSTALL MARKER EACH 7 $1 $ $ /00010 TRAFFIC CONTROL SIGNAL SYSTEM SIGS 1 $159 $158, /00040 EMERGENCY VEHICLE PREEMPTION SYSTEM LS 1 $7 $7, /00100 REVISE SIGNAL SYSTEM SYS 1 $40 $40, $ /05050 CONIFEROUS TREE 5' HT B&B TREE 7 $3 $ /06150 DECIDUOUS TREE 1.5" CAL B&B TREE 12 $5 $ /06150 ORNAMENTAL TREE 1.5" CAL B&B TREE 31 $12 $ /01018 DECIDUOUS SHRUB 18" HT BR SHRB 585 $32 $ $ /00010 BALE BARRIER L F 1,524 $10 $ /00040 SILT FENCE, TYPE MS L F 30,668 $54 $ /00020 FLOTATION SILT CURTAIN TYPE MOVING WATER L F 248 $5 $ /00010 STORM DRAIN INLET PROTECTION EACH 45 $13 $ /00011 SEDIMENT CONTROL LOG TYPE STRAW L F 1,850 $7 $ /00017 SEDIMENT CONTROL LOG TYPE BLANKET SYSTEM L F 144 $4 $
10 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, /00010 STABILIZED CONSTRUCTION EXIT LS 1 $1 $1, /00010 CULVERT END CONTROLS EACH 62 $9 $ $ /00011 FERTILIZER TYPE 1 LB 10,671 $5 $ /00012 FERTILIZER TYPE 2 LB 571 $0 $ /00013 FERTILIZER TYPE 3 LB 914 $1 $ /00010 COMMON TOPSOIL BORROW C Y 392 $9 $ $ /00010 SEEDING ACRE 40 $8 $ /25141 SEED MIXTURE LB 2,122 $7 $ /25151 SEED MIXTURE LB 379 $1 $ /35241 SEED MIXTURE LB 213 $3 $ /00050 SODDING TYPE SALT TOLERANT S Y 48 $1 $ /00010 MULCH MATERIAL TYPE 1 TON 41 $6 $ /00030 MULCH MATERIAL TYPE 3 TON 7 $5 $ /00010 DISK ANCHORING ACRE 2 $0 $ /00011 EROSION CONTROL BLANKETS CATEGORY 1 S Y 2,986 $3 $ /00013 EROSION CONTROL BLANKETS CATEGORY 3 S Y 63,475 $80 $ /00010 RAPID STABILIZATION METHOD 4 S Y 723 $1 $ /00700 SITE RESTORATION EACH 9 $4 $ $ /00010 INTERIM PAVEMENT MARKING LS 1 $5 $5, /00010 INTERIM PAVEMENT MARKING L F 51,992 $17 $ $ /00010 REMOVABLE PREFORM PAVEMENT MARKING TAPE L F 17,949 $26 $ /00020 REMOVABLE PREFORMED PLASTIC MASK (BLACK) L F 880 $2 $ $ /01001 PAVT MSSG (LT ARROW) PAINT EACH 1 $0 $ /01002 PAVT MSSG (RT ARROW) PAINT EACH 3 $0 $ /01005 PAVT MSSG (STOP AHEAD) PAINT EACH 6 $1 $ /01006 PAVT MSSG (RR XING) PAINT EACH 1 $0 $ /01011 PAVT MSSG (STOP) PAINT EACH 9 $1 $ /02101 PAVT MSSG (LT ARROW) POLY PREF-GR IN EACH 6 $2 $ /02102 PAVT MSSG (RT ARROW) POLY PREF-GR IN EACH 2 $1 $
11 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, /03008 PAVT MSSG (STOP AHEAD) EPOXY EACH 1 $1 $ / " SOLID LINE WHITE-PAINT L F 403,318 $21 $ / " BROKEN LINE WHITE-PAINT L F 1,550 $0 $ / " STOP LINE WHITE-PAINT L F 211 $1 $ / " SOLID LINE YELLOW-PAINT L F 58,078 $3 $ / " BROKEN LINE YELLOW-PAINT L F 34,397 $2 $ / " DOUBLE SOLID LINE YELLOW-PAINT L F 23,299 $2 $ / " DOUBLE SOLID LINE YELLOW-POLY PREF L F 1,373 $8 $ / " SOLID LINE WHITE-POLY PREF-GR IN L F 13,750 $38 $ / " SOLID LINE WHITE-POLY PREF-GR IN L F 173 $4 $ / " BROKEN LINE WHITE-POLY PREF-GR IN L F 17,593 $49 $ / " SOLID LINE WHITE-EPOXY L F 260,588 $66 $ / " BROKEN LINE WHITE-EPOXY L F 1,437 $1 $ / " DOTTED LINE WHITE-EPOXY L F 240 $0 $ / " SOLID LINE YELLOW-EPOXY L F 158,754 $45 $ / " BROKEN LINE YELLOW-EPOXY L F 10,205 $2 $ / " DOUBLE SOLID LINE YELLOW-EPOXY L F 1,901 $1 $ /00130 CROSSWALK MARKING-POLY PREFORM-GR IN S F 216 $3 $ /00020 MOBILE RETROREFLECTOMETER MEASUREMENTS L F 62,605 $2 $ / " SOLID LINE WHITE-PAINT SPECIAL L F 716 $3 $ / " SOLID LINE WHITE-PAINT (WR) L F 179,404 $85 $ / " SOLID LINE WHITE-PAINT (WR) L F 964 $2 $ / " DOTTED LINE WHITE-PAINT (WR) L F 111 $0 $ / " SOLID LINE YELLOW-PAINT (WR) L F 9,183 $4 $ / " BROKEN LINE YELLOW-PAINT (WR) L F 16,175 $6 $ / " DOUBLE SOLID LINE YELLOW-PAINT (WR) L F 8,060 $6 $ / " SOLID LINE WHITE-EPOXY (WR) L F 347 $3 $ / " STOP LINE WHITE-EPOXY (WR) L F 64 $1 $ / " SOLID LINE YELLOW-EPOXY (WR) L F 598 $5 $ /00010 PAVEMENT MARKING SPECIAL S F 345 $7 $ $376 ========= $22,594 11
LETTING : CALL : 056 COUNTIES : MILLE LACS
S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/17/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : SP 03-626-17/ PLH 0399 (248) CONTRACT LOCATION: CSAH 26 WITHIN THE TAMARAC NATIONAL WILDLIFE REFUGE RECOMMENDATION: AWARD TO LOW BIDDER --------------------------------------------------------------------
More informationPART A ROADWAY - BASE BID
May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00
More informationBID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012
Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING
More informationENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal
Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00
More informationEngineer's Preliminary Estimate - 100% Submittal
EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000
More informationNE WEST KINGSTON ROAD CULVERT REPLACEMENT
NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More informationBID TABULATION BID REQUEST NO
BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More informationREPLACEMENT OF MERCER COUNTY BRIDGE
ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade
More informationPROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02
AWARDED PROJECT PROJECT NO. 016002 PID. 19109 BEL-7-3.68 TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationAVERAGE OF BID ITEMS ENGINEERS ESTIMATE
ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian
More informationBid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221
Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00
More informationSubject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122
Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More informationCONTRACT TIME DETERMINATION
CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during
More informationBID TABULATION. Engineer's Estmated Opinion of Costs
Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%
More informationFuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $
SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT
More informationBIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.
More informationNOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No
NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,
More informationNorthumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate
Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018
LETTING DATE : 2018-06-14 CALL NUMBER : 772 OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE PAGE NO. 1 DATE PRINTED : JOB NUMBER : 170236 ESTIMATE NUMBER : PROJECT
More informationTabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT
Page 1 of 20 16 SSSEX ROTE 94 BLACK CREEK TRIBTARY CLVERT REPLACEMENT CONSTRCTION CORP INC. (2) KONKS CORPORATION (3) NORTHEAST REMSCO CONSTRCTION INC Quantity and nits nit Price nit Price nit Price 0001
More informationBID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More information2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time
TABULATION PAGE 1 OF 6 PRE- ESTIMATE Pitlik and Wick, Inc. CONTRACT A - BASE Highway X (Friedle Road to Dam Road) A1.1 Single Layer Chip Seal 75,100 sq. yds. $ 2.50 $ 187,750.00 $ 1.60 $ 120,160.00 $ 1.19
More informationRANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price
2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF
More informationCrushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:
Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and
More informationADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:
ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation
More informationExhibit 4 Page 1 of 8
Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:
More informationCertified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University
Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1
More informationNOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS
NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 This Addendum changes the terms of the Bid Proposal and/or plans associated with the project indicated below. By submitting a bid, any and all
More information19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown
19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL
More informationBRIDGE ALTERNATE STUDY No. 1
BRIDGE ALTERNATE STUDY No. 1 RURAL STREAM CROSSING Prepared for U. S. Bridge Cambridge, Ohio Prepared by RICHLAND ENGINEERING LIMITED 29 North Park Street, Mansfield, Ohio 44902-1769 419/524-0074 FAX 419/524-1812
More informationMunilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL
JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE
More informationSandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING
ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00
More informationCECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075
Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration
More informationBID TABULATION PAGE 1 OF 8
BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $
More informationReviax Constracting Corp. DeSantis Construction
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.
More informationAnnual Services Construction Contract (ASCC) #15 Project Number: PUCN
Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction
More informationSUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION
Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury
More information2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.
ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense
More informationA DESIGN-BUILD PROJECT
Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,
More informationCITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER
CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS 12835 NEWCASTLE WAY, SUITE 200 DECEMBER 18, 2012 SPECIAL MEETING 12:00 P.M. 1. CALL TO ORDER 2. GENERAL BUSINESS a. AB 12 077 Resolution Authorizing
More information69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11
69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to
More informationTown of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562
Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated
More informationOFFICIAL BID TABULATION AWARDED PROJECT
AWARDED PROJECT PROJECT NO. 990206 PID. 17900 HAN-37-5.118 TE21-G990(271) TYPE: SIGNALIZATION LETTING: 04/28/99 COMPLETION DATE: 10/31/99 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT
More informationSunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List
Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationPROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM
NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. 4735 1.00 miles of roadway reconstruction including grade establishment, sand subbase, aggregate
More informationAECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option
More information33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.
CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler
More informationITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT
Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00
More informationPROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM
NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. 4907 1.08 miles of roadway reconstruction including clearing, grade establishment, sand subbase,
More informationALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN
ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 1988 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:
0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 217 10.00 CONTRACT ID: 187601030 PROJECT: BR 1502(017) CONTRACT: 04153032 AWARD : 3,278,223.27 PROJECTED : 3,289,223.27 ADJ. PROJECTED : 3,289,223.27
More informationOFFICIAL BID TABULATION AWARDED PROJECT
AWARDED PROJECT PROJECT NO. 990073 PID. 17004 CLI-68-19.746 TE21-G990(144) TYPE: TWO LANE RESURFACING LETTING: 03/03/99 COMPLETION DATE: 09/30/99 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More informationCITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018
CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00
More informationBID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #
ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00
More informationKANE COUNTY DIVISION of TRANSPORTATION
Carl Schoedel, P.E. Director of Transportation County Engineer KANE COUNTY DIVISION of TRANSPORTATION 41W011 Burlington Road St. Charles, IL 60175 (630) 584-1170 Fax: (630) 584-5265 Section 13-00176-02-BR
More informationPART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.
BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.
More informationCITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $
RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement
More informationNew Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS
PAGE : 107-1 CONTRACT TIME : 01/24/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : FS-0022(105) ROUTE 37 FROM ROUTE 70 TO GARDEN STATE PARKWAY RESURFACING CONTRACT NO. 000103080 TOWNSHIP OF
More informationPRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST
PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST Table of Contents 1. Introduction...2 2. Scope of Estimate...2 3. Subpackage Breakout....2 4. Assumptions Used in
More informationAddendum 1 13 TH Street Streetscape. September 1, 2017
Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationADOPTED BY SIV BOARD
SAN IGNACIO VISTAS INC. FUNDING PLAN 2016-2050 FOR THE RRP (REPLALCEMENT RESERVE PLAN) This plan is reviewed and adjusted as needed on an annual basis Year Contributions Expenditures Opening RETURN Reserve
More informationLETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY
LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines
More informationPROJECT NO PID SCI NON-FEDERAL TYPE: BRIDGE REPLACEMENT (1 BRIDGE) LETTING: 04/18/01 COMPLETION DATE: 06/30/04
AWARDED PROJECT PROJECT NO. 010178 PID. 11858 SCI-23-0.00 NON-FEDERAL TYPE: BRIDGE REPLACEMENT (1 BRIDGE) LETTING: 04/18/01 COMPLETION DATE: 06/30/04 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR
More informationEST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS
BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native
More informationActive Construction RV Associates Scarsella JR Hayes
CITY OF PORT ORCHARD PUBLIC WORKS DEPARTMENT TREMONT STREET IMPROVEMENTS SR 16 to Port Orchard Boulevard Opening: 6/6/2017 Fed Aid Proj No: STPUS-6610(004) $ 12,779,179.17 $ 12,855,082.55 $ 12,901,887.92
More informationAGENDA. Sartell City Council Special Meeting Sartell City Hall July 31, :30 pm. 2. Public Hearing - Vacation of Drainage and Utility Easements
AGENDA Sartell City Council Special Meeting Sartell City Hall July 31, 2017 5:30 pm 1. Agenda Review and Adoption 2. Public Hearing - Vacation of Drainage and Utility Easements 3. 4 th Avenue South Bid
More informationThe bid due date has been changed to 2:50 p.m. May 25, 2018.
May 18, 2018 BL051-18 Addendum #1 Construction and Rehab of Gravity and Sewer Force Mains on an Contract Make the following changes/additions or clarifications to the above referenced bid: The bid due
More informationFailure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.
Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationPROJECT NO PID CLA TE21-G010(290) TYPE: MISCELLANEOUS LETTING: 07/11/01 COMPLETION DATE: 11/30/01
AWARDED PROJECT PROJECT NO. 010313 PID. 22620 CLA-70-20.92 TE21-G010(290) TYPE: MISCELLANEOUS LETTING: 07/11/01 COMPLETION DATE: 11/30/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT
More informationN E W J E R S E Y T U R N P I K E A U T H O R I T Y PROCEDURE FOR PREQUALIFICATION AND AWARD OF CONSTRUCTION CONTRACTS
N E W J E R S E Y T U R N P I K E A U T H O R I T Y PROCEDURE FOR PREQUALIFICATION AND AWARD OF CONSTRUCTION CONTRACTS (a) All prospective bidders for construction in excess of $50,000.00 shall be prequalified
More informationARKANSAS SMALL BUSINESS PROVISION CERTIFICATION APPLICATION
SMALL BUSINESS PROVISION TITLE 49 CODE OF FEDERAL REGULATIONS PART 26 ARKANSAS SMALL BUSINESS PROVISION CERTIFICATION APPLICATION 10324 Interstate 30, P. O. Box 2261 Little Rock, Arkansas 72203-2261 Natasha
More informationMarket Street Gateway Improvements Phase 1
PROPOSAL FORM Market Street Gateway Improvements Phase 1 CITY OF PORTSMOUTH, N.H. To the City of Portsmouth, New Hampshire, herein called the Owner. The undersigned, as Bidder, herein referred to as singular
More informationCity of Newnan, Georgia
City of Newnan, Georgia Invitation to Bid Mill & Resurfacing of Various Streets- 2017 Issue Date: May 25, 2017 Issued By: Inquiries: Proposals Due: Bid Opening: City of Newnan Public Works Department 25
More informationBID TABULATION PAGE 1 OF 6
BID TABULATION PAGE 1 OF 6 BID PRE-BID ESTIMATE R.G. Huston Company, Inc. Kopplin & Kinas Co., Inc. Cottage Grove, WI Green Lake, WI NO. DESCRIPTION OF WORK QUANT. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT
More informationFOR OFFICE USE ONLY CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT
40555 Utica Road P.O. Box 8009 Sterling Heights, MI 48311-8009 TEL 586-446-2720 FAX 586-276-4061 CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT
More information8 EA $ 1, $ $ 1, $ 8, $ 1, $ 8, EA $ 6, $6, $ 7, $ 7, $ 5, $ 5,445.
Palmetto Park Road, SW 7th AVE. To SW 5th Avenue LWDD E4 (E Rio) Canal ENGECON CONSTRUCTON RUSSELL ENGNEERNG TEM# TEM DESCRPTON QTY UNTS Total Total ROADWAY TEMS 5 Regular Excavation 937 CY $ 14.28 $17.52
More informationBID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements
BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements BETHEL CHURCH ROAD BID Description Unit Qty Unit Price Extended Total Unit Price Extended Total Mobilization LS 1 $ 2,500.00 $
More informationNOTICE TO BIDDERS. Specifications and bidding blanks may be obtained at the Road Commission office at the above address.
NOTICE TO BIDDERS Sealed proposals will be received by the Ottawa County Road Commission, at its offices at 14110 Lakeshore Drive, Grand Haven, Michigan 49417, until Wednesday November 16, 2016 at 10:00am
More informationOn behalf of the City of Pittsburgh DEPARTMENT OF ADMINISTRATIVE SERVICES DIVISION OF PURCHASING AND SUPPLIES B I D. for
County of Allegheny RICH FITZGERALD COUNTY EXECUTIVE City of Pittsburgh LUKE RAVENSTAHL MAYOR On behalf of the City of Pittsburgh DEPARTMENT OF ADMINISTRATIVE SERVICES DIVISION OF PURCHASING AND SUPPLIES
More informationPatchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.
Patchogue Road Culvert Crossing IFB 2015-03 ADDENDUM #1 07/13/2015 Addendum #1 addresses the questions submitted by contractors. Q1: Bid Item shows 22 LF of 60 RCP but plans show 27 LF, please clarify.
More informationRFB Addendum 3
Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER
More informationFALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00
More informationPROPOSAL AND SPECIFICATIONS FOR COUNTY PRIMARY HOT MIX ASPHALT PAVING #2
NAME OF CONTRACTOR: PROPOSAL AND SPECIFICATIONS FOR COUNTY PRIMARY HOT MIX ASPHALT PAVING #2 APRIL 18, 2018 1. PH 3546 WAYLAND TOWNSHIP On 10 th Street, M-179 (129 th Avenue) to the Wayland City Limits
More informationRight of Way Permits. Contact Information:
Right of Way Permits A Right-of-Way Use Permit is required for any work performed in the public right-of-way (including but not limited to sewer or water extensions, franchise utility work, storm drainage,
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 240 0.00 CONTRACT ID: 090249068 PROJECT: STP 2014(119)TE CONTRACT: 08163051 AWARD AMOUNT: $2,150,084.20 PROJECTED AMOUNT: $2,344,277.78 ADJ. PROJECTED
More informationCITY OF TAMPA ADDENDUM 2. April 18, 2018
CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project
More informationAugust 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA
August 22, 2016 Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA RE: Hammond Northshore Regional Airport Runway 18-36/13-31 Runway Intersection
More informationRIGHT-OF-WAY PERMIT APPLICATION
PERMIT EXPIRES 180 DAYS AFTER DATE OF ISSUANCE. RIGHT-OF-WAY PERMIT APPLICATION DESCRIPTION OF WORK: (Mark all applicable) Pavement Cut: Directional Bore: Sewer / Water Connection: Driveway Apron: Sidewalk
More information