LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY
|
|
- Audra Gregory
- 5 years ago
- Views:
Transcription
1 LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines some basic terms and conditions under which we have an interest in selling to you the above referenced property. Form of Transaction: The transaction is contemplated to be a sale of all remaining townhome pads and single family lots in Heritage Hills, both completed and uncompleted. Buyer is to assume all obligations of the developer under this transaction Seller: Purchase Property: Heritage Hills Investment Partners, LLC Located in Metro Nashville & Davidson County and Mt. Juliet, TN See Exhibits A & B attached. Purchase Price: The Purchase Price is $,53,000 Unit Type Units Total Land Price Purchase Price Calculation Land Price Per Unit Estimated Cost to Complete per Unit Total Land and Estimated Cost to Complete Per Unit Townhome 46 $ 598,000 $ 3,000 $ 4,070 $ 7,070 Single Family 2 $ 95,000 $ 7,500 $ 20,92 $ 27,692 Total 58 $,53,000
2 Description of Improvements: Roads: The property was initially developed in The main street into the community, Lady Nashville Drive is complete, except for the final surface coat, within the Townhome section to the entry of the Single Family Section. The roads in the Single Family Section appear to be on subgrade. Some final grading is needed prior to placement of base stone. See Road Plan Exhibit C attached. Sanitary Sewer: Complete, approved and active within the Townhome Section. The sanitary sewer is complete and inspected within the Single Family Section except for a 600 foot section of offsite sewer. The manholes in the Single Family Section need to be cleaned out of debris, need the top collar and need the sewer lids. CPS obtained the easement for the offsite sewer. See Sewer Plan Exhibit D attached. Water: Complete within the Townhome Section. None in the Single Family Section which is partially within the Metro Water System (76 lots) and partially within the West Wilson Utility District (36 lots). The water plan for Metro is complete and approved. The water plan for West Wilson Utility District has not been designed. See Water Plan Exhibit E attached. Storm Drainage: Complete within the Townhome Section. Partially installed within the Single Family Section. See Storm Water Plan Exhibit F attached. Grading: The townhome pads appear to be on plan grade. The single family lots will be improved by excavating the lots on the high side of the roads and filling the lots on the low side of the roads. See Grading Plan Exhibit G attached. Estimated Cost to Complete: The following estimates are provided by Seller to allow Buyer as additional information. Seller obtained estimates from an engineer and site work contractor in Seller has also estimated the cost to complete improvements in 203 based on full working drawings, past experience and contractors bids on other projects within the last 6 months. However, Seller makes no warranties related to such estimates. Estimated Cost To Complete Item Description Engineer's Estimate 2009 Single Family Section Contractor's bid 2009 CPS Land 204 Mobilization $ 25,000 $ 0,000 Erosion Conrol $ 4,895 $ 2,000 Mass Earthwork $ 54,687 $ 27,655 $ 245,000 Storm Drainage $ 275,478 $ 277,64 $ 323,000 Sanitary Sewer $ 39,03 $ 46,28 $ 20,000 Water $ 344,896 $ 407,05 $ 40,000 Elec, CATV $ 254,68 $ 256,24 $ 202,000 Comments CPS and engineer include 600 feet of offsite sanitary sewer. No construction documents for West Wilson UD portion of the site. Assuming blasting for road included drill and shoot for utilities.
3 Fine Grading $,20 $ 9,000 Estimated cost to finish road grading. Replace Topsoil $ 86,477 $ 38,000 CPS estimate of ' deep 0 ' behind curb Paving, curbs & Topcoat $ 457,627 $ 55,532 $ 546,000 Infrastructure Subtotal $,763,90 $,756,302 $,925,000 Contingency $ 96,250 5% of estimated cost Entry $ 40,000 Buffers $ 20,000 WWUD Fees $ 22,700 Street Signs $ 2,500 Engineering $ 45,000 Total Site Development Estimate $,763,90 $,756,302 $ 2,26,450 $,700 per lot (capacity and lot fee) for 36 lots plus 5% design and review fee. Estimated Cost Per Lot (2 Lots) $ 5,749 $ 5,68 $ 20,92 Item Description Townhome Section CPS Land 204 Comments Topcoat roads $ 25,000 Surface layer on existing roads after current work is complete. Repair curbs $ 7,000 After current work is complete. Final pavement striping $ 0,000 Direction arrows and crosswalks Sidewalks $ 26,200 5' wide walks per approved plans Clean out and reshape detention pond $ 35,000 Pond functions and has the required volume but may need slight reshaping. Street Trees $ 26,000 As approved in the final plans Misc. Engineering, Plat and As-Builts $ 35,000 Plat of Bolivia Ct. and utility asbuilt plans. Add 4 Street Lights $ 8,000 Along Lady Nashville Drive. Replace Elec. Pads $ 2,500 Misc clean up $ 2,500 Total Site Work on Townhome Section $ 87,200 Estimated Cost Per Townhome Pad (46) $ 4,070
4 A detailed breakdown of the CPS cost estimate is included as Exhibit "H". Bonds: Seller currently has a bond in the amount of $29,000 for the infrastructure items listed above under Town Home Section. Buyer will assume the responsibility for this bond and the associated punch list items. Initial Earnest Money: $25,000 of earnest money, which is fully refundable, is due at the execution of contract. All earnest money is to be deposited with Tune Entrekin White, Escrow Agent. Inspection Period: Closing Period: Buyer shall have an inspection period of 45 days after the contract effective date. Closing shall occur within 30 days from the end of the Inspection Period at which time $25,000 of the earnest money shall be credited toward the Purchase Price. Site Access: Buyer agrees to provide Seller or Seller s designated contractors and builders, full access through the Purchase Property Buyer has installed a cable just past the intersection with Lady Nashville Court. Seller can open the lock for those wishing to visit the site. Seller s Costs: Buyer s Costs: Roll back taxes, delinquent taxes, pro rata portion of current year taxes, Seller s legal fees. Cost of any inspection and reports beyond what Seller has currently completed and will provide, cost of recording and transfer of taxes on the deed, buyer s legal fees, and owner s title insurance policy. The cost of engineering and other costs involved in any re-approval or platting process is to be paid by Buyer, directly to Buyer s consultants. Commission: No real estate agents have been involved in this transaction. Water and Sewer Fees: As far as Seller knows, no water or sewer capacity fees have been paid to Metro, Mt. Juliet or the West Wilson Utility District for the Single Family Section of the Property. Seller makes no warranty on any sewer and water fees that may be assessed by Metro, Mt. Juliet or the West Wilson UD in the future, however below is a list of fees that Seller has paid for past projects.
5 Estimated Utility Fees: Mt. Juliet / Wilson County Estimated Development Fees Item Cost Per Unit Comments S. Sewer Capacity Fee $ 2, S. Sewer Inspection Fee 5% of const. costs Road Inspection Fee $ 4.25 Per linear foot of road Water Capacity Fee $, Water Design and Inspection Fee $ 62, % of system cost County Facility Tax $ 3, Per home at building permit Metro Nashville Davidson County Estimated Development Fees Item Cost Per Unit Comments S. Sewer Capacity Fee $ 2, Per unit Water Capacity Fee $, Per unit Other: ) The Property is sold as-is with no warranty made unless noted otherwise. 2) Buyer agrees that any assignment to be agreed upon by Seller. 3) Property taxes will be pro rated to date of closing. 4) Seller will convey, by full special warranty deed, marketable and insurable fee simple title to the Property, subject to easements and restrictions of record, including all improvements, personal property and appurtenances thereto. 5) There will be no liens or claims against the Property except for current property taxes, and those other items specifically approved in writing by the Buyer. 6) All offsite sewer extensions have been completed to the Purchase Property to permit sewer access for all lots. 7) The terms of this letter of intent are subject to the approval and notification of the members of Heritage Hills Investment Partners. 8) All parties hereto have executed this non-binding Letter of Intent in order to express their intent to move forward in good faith and with all due diligence toward consummating the subject transaction pursuant to the above propositions. Upon receipt of this Letter of Intent, we shall prepare a formal contract, including the above and all other clauses usually found in a transaction of this nature, for execution by all parties. The contract will address specific issues including dedication of open space requirements, and the grade and utility interface with existing development and with the adjacent landowner off-site sewer easement. Allen Patton, Chief Manager Heritage Hills Investment Partners, LLC Accepted by: Buyer
6 Exhibit A Location Map Andrew Jackson Pkwy. Lebanon Pk Wilson County Tulip Grove Rd. SITE Metro Davidson County Photo Date August 20
7
8
9
10
11
12
13 Exhibit "H" Detailed Infrastructure Cost Estimate by CPS Heritage Hills Cost Estimate by CPS Single Family Section Item # Description Est. Quantity / Units Unit Unit Price Total Road and Site Grading / Prep Fine Grade Road Field Engineering 6,000 LF $ 3.7 $ 9,000 LS $ 7, $ 0,000 Strip Topsoil (' deep) 4,074 Topsoil Replacement (' deep 0' behind curb) 4,074 Erosion Control 2 Seed and mulch (0' behind curb 5 CY $ 2.50 $ 0,000 CY $ 4.00 $ 6,000 Lot $ $ 2,000 AC $ $ 2,000 Subtotal Road and Site Prep $ 79,000 2 Paving and Curbs 8" Stone base 2" Binder.5" topcoat Curb and Gutter Extruded Curb (Wilson County) 8,255 6,500 6,500 8,400 4,000 SY $ 7.50 $ 37,000 SY $ 8.00 $ 32,000 SY $ 9.00 $ 49,000 LF $.00 $ 92,000 LF $ 4.00 $ 6,000 Lane Markings LS $ 20, $ 20,000 Subtotal Paving and Curbs $ 546,000 3 Sanitary Sewer 8" DIP 500 LF $ $ 32,500 Manhole Manhole Collar and Cover and re grout 37 LS $ 2, $ 2,000 EA $ $ 8,500 Clean out manholes 36 EA $ $ 9,000
14 Clean and test lines LS $ 43, $ 43,000 Locate services 75 EA $ $ 5,000 Subtotal Sanitary Sewer $ 20,000 4 Water 8" Water Water Services 5,000 2 LF $ $ 300,000 EA $ $ 90,000 Fire Hydrants 8 EA $ 2, $ 20,000 Subtotal Water $ 40,000 5 Storm 8" RCP 24" RCP 30" RCP 36" RCP 57 2, LF $ $ 27,400 LF $ $ 40,000 LF $ $,000 LF $ $ 37,000 42" RCP 240 LF $ $ 22,000 Drill and Shoot LF $ 3.00 $ Single Inlet Double Inlet Triple Inlet 27 2 EA $, $ 45,000 EA $ 2, $ 28,000 EA $ 3, $ 6,600 Headwall 5 EA $, $ 6,000 Subtotal Storm Water $ 323,000 6 Electric Trenching Ground wire 3" Elect 2" Phone CATV labor only Transformer Pad Street Light Pedestal In and out sweeps 6,000 6,000 6,000 6,000 6, LF $ 7.00 $ 02,000 LF $ 4.40 $ 26,400 LF $ 2.50 $ 5,000 LF $.50 $ 9,000 LF $ 0.50 $ 3,000 EA $ $ 3,600 EA $, $ 23,000 EA $ $ 20,000
15 7 Misc Subtotal Electric $ 202,000 Lot Grading 39,000 CY $ 5.00 $ 95,000 Rework drainage ditch LS $ 50, $ 50,000 Sub Total Misc. $ 245,000 Grand Total $,925,000 Townhome Section Item # Description Est. Quantity / Units Unit Unit Price Total Roads 2 Curbs 3 Pavement Striping 4 5' Wide Sidewalks 5 Detention Pond 6 Street Trees 7 Replace Electric Pads 8 Street Lights 9 Misc Clean up 2, , SY $ 8.69 $ 25,000 LF $ $ 7,000 LS $ 0, $ 0,000 SF $ 3.40 $ 26,200 LS $ 35, $ 35,000 $ $ 26,000 Ea $ $ 2,500 Ea $ 4, $ 8,000 LS $ 2, $ 2,500 0 Misc Engineering LS $ 22, $ 22,500 Total $ 74,700 The above estimates are provided by Seller to allow Buyer as additional information. Seller has also estimated the cost to complete improvements in 204 based on full working drawings, past experience and contractors bids on other projects within the last 6 months. However, Seller makes no warranties related to such estimates.
SUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationSubject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122
Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot
More informationBID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00
More information33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.
CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler
More information2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.
ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense
More informationCITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $
RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement
More informationCITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018
CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00
More informationReviax Constracting Corp. DeSantis Construction
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.
More informationDORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION 1 Civic Center Dr., San Marcos, CA 92069-2918 (760) 744-1050 FAX (760) 591-4135 FEE SCHEDULE FOR GRADING & IMPROVEMENT PLAN
More informationBID TABULATION BID REQUEST NO
BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS
More informationSunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List
Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements
More information19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown
19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL
More informationTown of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562
Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More informationSUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION
Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More informationNorthumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate
Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)
More informationBID TABULATION PAGE 1 OF 6
BID TABULATION PAGE 1 OF 6 BID PRE-BID ESTIMATE R.G. Huston Company, Inc. Kopplin & Kinas Co., Inc. Cottage Grove, WI Green Lake, WI NO. DESCRIPTION OF WORK QUANT. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00
More informationBIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.
More informationCrushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:
Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and
More informationAnnual Services Construction Contract (ASCC) #15 Project Number: PUCN
Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction
More information7 31 32 33 34 35 37 38 39 40 41 42 43 A G R E E M E N T Between Morrison County, The City of Pierz and Rich Prairie Sewer and Water District THIS AGREEMENT is made and entered into between Morrison
More informationCertified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University
Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1
More informationBid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221
Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00
More informationREQUEST FOR PROPOSALS. Demolition
JEFFERSON COUNTY, WEST VIRGINIA Engineering Department 116 East Washington Street P.O. Box 716 Charles Town, West Virginia 25414 Phone: 304-728-3257 Email: engineering@jeffersouncountywv.org Fax: 304-728-3953
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationRANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price
2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More informationElectric Service Information Sheet Georgia Power Company
Electric Service Information Sheet Georgia Power Company Project: Location: Developer: (Name of S/D or Customer) (Street Address or road Name) (Developer s Name) Georgia Power Company (the Company) will
More information2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationCITY-TIF COMMISSION EXPENSES Cost Description Project Cost Data Reimbursable From Public Funds Developer Equity COST TIF Super TIF State TIF CID SCTC PRIVATE I. Legal $ 750,000 $ 750,000 $ - $ - $ - $
More informationREVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO
REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 OF THE CITY OF SAN JACINTO December 11, 2003 REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 CITY OF SAN JACINTO Prepared for CITY OF SAN
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20
More informationRoute Route Z Intersection Realignment
Route N @ Route Z Intersection Realignment Sponsor County Highway Project No. RB18-000016 Project Type Traffic Flow TOTAL FUNDING Total County Sponsor Federal $3,310,000 $1,776,000 $0 $1,534,000 Project
More informationFALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00
More informationJob No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars
BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned
More informationEST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS
BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native
More informationPROJECT COST. Prepared for City of Burlington, Iowa Downtown/Riverfront Revitalization Project
PROJECT COST Prepared for City of Burlington, Iowa Downtown/Riverfront Revitalization Project City of Burlington Downtown/Riverfront Revitalization Project TIGER Grant Budget Date: 4/29/2016 Project Budget
More informationDRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY
DRAFT Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY JANUARY 2019 Table of Contents Introduction 3 Definitions 3
More informationBID TABULATION PAGE 1 OF 8
BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $
More information69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11
69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to
More information2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationUtility Committee Meeting AGENDA. October 3, 2017
Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid
More informationLETTING : CALL : 056 COUNTIES : MILLE LACS
S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE
More informationNE WEST KINGSTON ROAD CULVERT REPLACEMENT
NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS
More informationPreliminary Budget Cost Estimate-Raft Island RIIA Roads 26952 SY Construction Items Budget Preliminary Temporary Erosion Control/Miscellaneous Work $ 18,500.00 Traffic Control $ 10,000.00 Pulverizing $
More informationHACKBERRY HIDDEN COVE PUBLIC IMPROVEMENT DISTRICT NO. 2 SERVICE AND ASSESSMENT PLAN (UTILITY IMPROVEMENTS)
HACKBERRY HIDDEN COVE PUBLIC IMPROVEMENT DISTRICT NO. 2 SERVICE AND ASSESSMENT PLAN (UTILITY IMPROVEMENTS) SEPTEMBER 15, 2009 HACKBERRY HIDDEN COVE PUBLIC IMPROVEMENT DISTRICT NO. 2 SERVICE AND ASSESSMENT
More informationPERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS
CONTRACTOR OWNER/ AGENT APPLICANT CITY OF DALY CITY DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION 333 90 th Street, 1 st Floor, Daly City, CA 94015 Tel: (650) 991-8064 Fax: (650) 991-8243 ENGINEERING
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 240 0.00 CONTRACT ID: 090249068 PROJECT: STP 2014(119)TE CONTRACT: 08163051 AWARD AMOUNT: $2,150,084.20 PROJECTED AMOUNT: $2,344,277.78 ADJ. PROJECTED
More informationITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT
Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00
More informationAMENDMENT TO SUBDIVISION AGREEMENT
SECOND AMENDMENT TO SUBDIVISION AGREEMENT THIS SECOND AMENDMENT TO SUBDIVISION AGREEMENT ( Second Amendment ) is made this day of, 2007 ( Effective Date ), by and among HILLCREST DEVELOPMENT COMPANY, L.L.C.,
More informationALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN
ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA
More informationCITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS
CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center
More informationPART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.
BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.
More informationPatchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.
Patchogue Road Culvert Crossing IFB 2015-03 ADDENDUM #1 07/13/2015 Addendum #1 addresses the questions submitted by contractors. Q1: Bid Item shows 22 LF of 60 RCP but plans show 27 LF, please clarify.
More informationRegular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact
CITY COUNCIL AGENDA Meeting Date: 09/16/2013 TITLE: Hatley Way Sidewalk Improvements 2013 Bid Award Responsible Staff: Ron Crumley Backup Material: Backup material attached Digital Presentation: Yes Other
More informationBID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012
Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00
More informationPublic Works Maintenance STORMWATER AND
Public Works Maintenance STORMWATER AND TRANSPORTATION Mission Statement T H E P U B L I C W O R K S M A I N T E N A N C E D I V I S I O N I S T H E M A I N C U S T O D I A N A N D P R I N C I P A L C
More informationNC STATE SURPLUS PROPERTY AGENCY BID CONTRACT. RE-Bid # D05083 Bid Opening: May 8, 10:00AM
Bids will be publicly opened at the NC State Surplus Property Agency (SSPA) at the time and date specified. By signature, I certify that all bidder information is accurate and I agree to the Instructions,
More informationTAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.
DAVID TAUSSIG & Associates, Inc. Annual Report Fiscal Year 2016-2017 City of Irvine Community Facilities District No. 2013-3 (Great Park) September 26, 2017 Public Finance Public Private Partnerships Urban
More information$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC
-73,034.10 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 56 5.00 CONTRACT ID: 629625001 PROJECT: RMC - 629625001 CONTRACT: 02164011 AWARD : $446,216.00 PROJECTED : $446,222.00 ADJ. PROJECTED : $373,187.90
More informationNAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA
Unit BID ITEMS 1 1070-206-A-3 TRAFFIC CONTROL 0.5 0.5 1 LS $ 2,200.00 $ 2,200.00 $ 2,800.00 $ 2,800.00 $ 2,688.00 $ 2,688.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 2 2010-108-C-0
More informationA DESIGN-BUILD PROJECT
Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,
More information(3/01) NW T.O. INDIANA AMERICAN WATER COMPANY, INC.
(3/01) NW T.O. INDIANA AMERICAN WATER COMPANY, INC. AGREEMENT FOR WATER MAIN EXTENSION DEVELOPER INSTALLED - SUBDIVISION WITH REVENUE REFUND NO SUBSEQUENT CONNECTOR THIS AGREEMENT, made and entered into
More informationADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL
II. ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL ITEM NO. 1: Page P-1, Proposal DELETE the Proposal (pages P-1 through P-9) in its entirety and REPLACE with the attached Proposal (pages P-1R
More informationTAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.
DAVID TAUSSIG & Associates, Inc. Annual Report Fiscal Year 2014-2015 City of Irvine Community Facilities District No. 2013-3 (Great Park) October 27, 2015 Public Finance Public Private Partnerships Urban
More informationTABLE OF CONTENTS. Table of Contents 3 List of Drawings 1. Procurement Requirements Advertisement for Bids 2
TABLE OF CONTENTS General Requirements Total Pages Table of Contents 3 List of Drawings 1 Procurement Requirements Advertisement for Bids 2 Instruction for Procurement Instructions to Bidders 8 Procurement
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More informationBID FORM. PROJECT: 2017 Water line replacement
Project Town of Georgetown P.O. Box 426 Georgetown, CO 80444 BID FORM PROJECT: 2017 Water line replacement THE UNDERSIGNED BIDDER, having familiarized himself with the Work required by the Contract Documents,
More informationTABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00
TABULATION OF BIDS Jesse Viertel Memorial Airport Boonville, Missouri Bids Received: 6/12/2018 Lochner Job No.: 000011332 RECONSTRUCT RUNWAY 1836, NORTH CONNECTING TAXIWAY AND TURNAROUND REPLACE EXISTING
More informationRFB Addendum 3
Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER
More informationBOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. At the pleasure of the Board.
BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: May 19, 2016 # 6 SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Identification of Construction Funding for Traffic
More informationREPLACEMENT OF MERCER COUNTY BRIDGE
ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade
More informationA Galveston County MUD No. 6 Page 1 Operating Fund August 6, 2018 CASH-CHECKING (End of last report) ($10,592.38) ADD: Maintenance tax $625.32 From M.M. $20,000.00 Voided Checks From Construction Interest
More informationAWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET
STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213
More informationNOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS
NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 This Addendum changes the terms of the Bid Proposal and/or plans associated with the project indicated below. By submitting a bid, any and all
More informationAddendum 1 Downtown North CRA Sidewalks
Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationNEVADA IRRIGATION DISTRICT. Appendix B
NEVADA IRRIGATION DISTRICT DEVELOPMENT STANDARDS DEVELOPER REQUIREMENTS FOR TREATED WATER SYSTEM EXTENSIONS Appendix B Conveyance Agreement Standard Form Preface The standard form of Conveyance Agreement
More informationCONTRACT TIME DETERMINATION
CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during
More informationFLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association
Replacement Reserve Study REPLACEMENT RESERVE STUDY Oakton, Virginia Property Management: Flint Hill Manor Townhouse Association Jamie Critchfield Vice President Email: tommie0200@aol.com Consultant: RICHARD
More informationBID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as
Description 103 REMOVE, STORE AND REINSTALL EXISTING RETAINING WALL 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) 203.1 TACK COAT BID PROPOSAL PROPOSAL OF, a corporation, a partnership consisting of an individual
More informationHillaire-Skyline Park Area Estimated Project Cost
Hillaire-Skyline Park Area Estimated Project Cost ITEM ITEM QUANTITY UNIT UNIT AMOUNT NO. PRICE 1 Detention Basin 1 LS $ 200,000 $ 200,000 2 Culvert Improvements 40 LF $ 100 $ 4,000 3 Channel Improvements
More informationSECTION BID. Valley Court Force Main Replacement Contract No. BE17-029
SECTION 00300 - BID BID TO: THE CITY AND BOROUGH OF JUNEAU 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER in the form included in the
More informationADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO
ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents
More information**REVISED BID PRICE FORM** October 24, 2018
**REVISED BID PRICE FORM** October 24, 2018 (Date) TO: RE: CHARLESTON COUNTY PARK AND RECREATION COMMISSION (CCPRC) 861 RIVERLAND DRIVE CHARLESTON, SC 29412 INVITATION FOR BID WANNAMAKER COUNTY PARK DOG
More informationFailure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.
Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017
More informationMunilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL
JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE
More informationPRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer
G-7 STAFF REPORT MEETING DATE: November 27, 2018 TO: FROM: City Council Petr Skala, Associate Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher
More informationTOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:
TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: APPLICATION DATE: ADDRESS OF WORK OR ENCROACHMENT: CROSS STREET: STARTING DATE: APN: - - No. Street City/Township ESTIMATED COST: $ COMPLETION
More informationFor Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.
Job 11-4518 Solicitation B-12-059-DD PROPOSAL of BID PROPOSAL, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER STEM: Pursuant to Instructions Invitation
More informationGalveston County MUD No. 6 Page 1 Operating Fund September 10, 2018
A Galveston County MUD No. 6 Page 1 Operating Fund September 10, 2018 CASH-CHECKING (End of last report) ($6,819.44) ADD: Maintenance tax $217.73 From M.M. $10,000.00 Voided Checks From Construction Interest
More informationAddendum 1 13 TH Street Streetscape. September 1, 2017
Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationSAN RAFAEL CITY COUNCIL AGENDA REPORT
Agenda Item No: 4.g Meeting Date: March 6, 2017 Department: Public Works SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Director of Public Works TOPIC: ADA-DOJ CURB RAMPS 2016-2017 City
More informationPART A ROADWAY - BASE BID
May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00
More informationCITY OF TAMPA ADDENDUM 2. April 18, 2018
CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project
More informationRight-of-Way Construction Permit Application
Address Permit # Date Approved: Right-of-Way Construction Permit Application APPLICANT INFORMATION Company s Legal Name (Owner of Facilities) Address City State Zip (Area Code) Telephone # 24-Hour Emergency
More information