1 BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native Excavating Duckels Construction City of Steamboat Springs Grand Junction, CO Steamboat Springs, CO Steamboat Springs, CO ITEM Spec. DESCRIPTION EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS No. Sec. *Contractor must write unit price in words* QTY 1 SP General Conditions / Mobilization/Bonding/Permits/Temporary Facilities 1 LS $ 100, $ 100, $ 100, $ 100, $ 79, $ 79, $ 181, $ 181, SP Construction Surveying 1 LS $ 35, $ 35, $ 17, $ 17, $ 11, $ 11, $ 38, $ 38, SP Traffic, Pedestrian, and Bicycle Control 1 LS $ 20, $ 20, $ 53, $ 53, $ 9, $ 9, $ 55, $ 55, SP Railroad Right of Entry Agreement and Construction Coordination 1 LS $ 15, $ 15, $ 25, $ 25, $ 3, $ 3, $ 15, $ 15, SP Materials Testing 1 LS $ 25, $ 25, $ 24, $ 24, $ 24, $ 24, $ 20, $ 20, SP Dust Control and Daily Site Cleanup (Performed Daily) 1 LS $ 10, $ 10, $ 6, $ 6, $ 13, $ 13, $ 1, $ 1, SP Construction Site Management Plan/Temporary Stormwater Management/Dewatering Admin 1 LS $ 10, $ 10, $ 19, $ 19, $ 11, $ 11, $ 20, $ 20, SP Dewatering to Sanitary Sewer 20 DAY $ $ 4, $ $ 3, $ $ 6, $ $ 5, SP Dewatering to Surface 20 DAY $ $ 13, $ $ 4, $ $ 5, $ $ 10, SP Potholing (As Directed) 10 EA $ $ 6, $ $ 3, $ 1, $ 16, $ $ 3, Saw cut Asphalt 761 LF $ 3.00 $ 2, $ 3.75 $ 2, $ 2.58 $ 1, $ 4.00 $ 3, Demo Asphalt (Chunk/Mill) 5,262 SY $ 4.50 $ 23, $ 3.15 $ 16, $ 2.04 $ 10, $ 2.50 $ 13, Demo Concrete Flatwork (Sidewalks/Drives, etc.) 120 SY $ 8.50 $ 1, $ $ 4, $ 9.38 $ 1, $ $ 3, Demo Curb/Gutter/Valley Pan 448 LF $ $ 4, $ 8.25 $ 3, $ 9.19 $ 4, $ $ 4, Connect to Existing Storm Sewer System 1 EA $ 1, $ 1, $ 2, $ 2, $ $ $ $
2 16 Plan Remove/Reset ROW Fencing 100 LF $ $ 1, $ $ 7, $ $ 1, $ $ 3, Plan Demo/Remove Existing Stormsewer Pipe(All Sizes) 200 LF $ $ 5, $ $ 8, $ $ 3, $ $ 5, Plan Demo Existing Utility Poles 2 EA $ 1, $ 2, $ $ 1, $ $ 1, $ $ 1, Tree Protection 9 EA $ $ 1, $ $ $ $ $ $ 2, Plan Remove Street Light (Return to Hampton Inn in Good Working Order) 4 EA $ $ 1, $ $ 1, $ $ $ $ 2, SP Remove & Reset Street Light 1 EA $ $ $ 1, $ 1, $ 3, $ 3, $ 1, $ 1, Aggregate Base Course - Roadbase 465 CY $ $ 23, $ $ 25, $ $ 24, $ $ 18, Aggregate Base Course - Pit Run 930 CY $ $ 46, $ $ 39, $ $ 39, $ $ 35, Unclassified Excavation 400 CY $ $ 4, $ $ 10, $ $ 9, $ $ 4, SP Embankment Material 1780 CY $ $ 26, $ $ 65, $ $ 71, $ $ 44, SP Export Unsuitable Material 250 CY $ $ 8, $ $ 5, $ $ 6, $ $ 4, SP Rough & Fine Grading 26,000 SY $ 2.50 $ 65, $ 2.10 $ 54, $ 0.56 $ 14, $ 4.00 $ 104, Topsoil 200 CY $ $ 13, $ $ 19, $ $ 9, $ $ 14, " Sidewalks (All widths/except Core Trail) Class D Concrete 18,110 SF $ 9.50 $ 172, $ 7.87 $ 142, $ $ 209, $ 9.00 $ 162, Concrete Curb and Gutter (Mountable, Catch & Spill Curb - Class D Concrete) 2,097 LF $ $ 62, $ $ 58, $ $ 107, $ $ 77, Valley Pan (All Widths) 511 LF $ $ 17, $ $ 18, $ $ 26, $ $ 5, Plan Median (Including Associated Earthwork) 350 SF $ $ 7, $ $ 7, $ $ 7, $ $ 4, Plan Driveway/Dumpster Pad (8" Thick/Reinforced - Class D Concrete) 1,081 SF $ $ 18, $ $ 12, $ $ 16, $ $ 14,053.00
3 34 Plan Construct Dumpster Enclosure (Includes Cedar Fencing/Excludes Concrete Pad) 2 EA $ 10, $ 20, $ 4, $ 8, $ 6, $ 13, $ 10, $ 20, Plan Detectable Warning Plates (All radii/all Sizes) 69 SF $ $ 3, $ $ 2, $ $ 3, $ $ 3, " Asphalt Pavement (Patching) - SX PG SY $ $ 2, $ $ 4, $ $ 6, $ $ 6, " Asphalt Pavement (Main Line Paving - 2 Lifts) - SX PG ,588 SY $ $ 335, $ $ 170, $ $ 250, $ $ 245, SP Pavement Marking - Striping & Parking 2,625 LF $ 2.00 $ 5, $ 3.00 $ 7, $ 3.60 $ 9, $ 3.35 $ 8, SP Pavement Marking - Symbols/Crosswalk/Hatching 5,667 SF $ 2.50 $ 14, $ 7.00 $ 39, $ 7.49 $ 42, $ $ 64, Shouldering (Road/Walk/Parking) - 4" Class 6 ABC 105 CY $ $ 5, $ $ 11, $ $ 5, $ $ 7, SP Semi-Permenant Road Closure (Jersery Barriers/Traffic Control Devices, etc.) 1 LS $ 10, $ 10, $ 6, $ 6, $ 3, $ 3, $ 3, $ 3, SP Railroad Crossing Tie-In 1 LS $ 20, $ 20, $ 12, $ 12, $ 4, $ 4, $ 10, $ 10, SP Flow Fill (Perpendicular to Travel Way) 25 CY $ $ 5, $ $ 3, $ $ 4, $ $ 5, Plan Remove Signs 2 EA $ $ $ $ $ $ $ $ Plan New Signs 25 EA $ $ 6, $ $ 7, $ $ 10, $ $ 7, Plan Remove and Replace Signage 1 EA $ $ $ $ $ $ $ $ Plan Delineators 27 EA $ $ 4, $ $ 7, $ $ 8, $ $ 4, "ф HDPE Culvert Pipe 104 LF $ $ 13, $ $ 8, $ $ 11, $ $ 9, "ф HDPE Culvert Pipe 16 LF $ $ 1, $ $ 1, $ $ 1, $ $ 1, "ф HDPE Fittings 1 EA $ $ $ $ $ $ $ $ "ф HDPE Culvert Pipe 281 LF $ $ 23, $ $ 19, $ $ 18, $ $ 19,670.00
4 "ф HDPE Fittings 1 EA $ $ $ $ $ $ $ $ "ф HDPE Culvert Pipe 255 LF $ $ 19, $ $ 15, $ $ 16, $ $ 14, "ф PVC Drain Pipe 208 LF $ $ 12, $ $ 8, $ $ 5, $ $ 9, "ф PVC Drain Pipe 160 LF $ $ 7, $ $ 8, $ $ 4, $ $ 4, " HDPE Flared End Section 2 EA $ $ 1, $ $ 1, $ $ 1, $ $ 1, " HDPE Flared End Section 1 EA $ $ $ $ $ $ $ $ " HDPE Flared End Section 7 EA $ $ 3, $ $ 3, $ $ $ $ 1, " HDPE Flared End Section 3 EA $ $ 1, $ $ $ $ $ $ Rip Rap (d50=18"), FES Outfall - 5 CY per outfall 65 CY $ $ 4, $ $ 11, $ $ 8, $ $ 6, Rip Rap Bedding 65 CY $ $ 3, $ $ 4, $ $ 5, $ $ 8, Storm Manhole 1 EA $ 5, $ 5, $ 5, $ 5, $ 5, $ 5, $ 4, $ 4, Type 13 Inlet Structure 1 EA $ 4, $ 4, $ 3, $ 3, $ 2, $ 2, $ 4, $ 4, Plan 18" Nyloplast Drain Basin 5 EA $ 2, $ 12, $ 2, $ 14, $ 2, $ 10, $ 2, $ 11, Plan Western Curb Line Drain Assembly (Neenah R-3928) 12 EA $ $ 9, $ 1, $ 18, $ $ 10, $ 3, $ 39, Plan Intersection Light Poles Base (City Supplied Light Pole/Fixture, Includes 1x2 Polymer Junction Boxes, Vertical Sweeps Inside Pole, Ground Rods) 4 EA $ 3, $ 13, $ 4, $ 16, $ 1, $ 7, $ 3, $ 12, Plan 2" Sch. 40 UL Listed Conduit 486 LF $ $ 9, $ $ 9, $ $ 19, $ $ 8, Plan 2" Sch. 40 UL Listed Sweeps 10 EA $ $ $ $ 1, $ $ $ $ " CL-52 Ductile Iron Pipe 20 LF $ $ 3, $ $ 2, $ $ 2, $ $ 1,920.00
5 70 30 Relocate Fire Hydrant Assembly 1 EA $ 3, $ 3, $ 2, $ 2, $ 1, $ 1, $ 4, $ 4, Thrust Blocks - Standard 1 EA $ $ $ $ $ $ $ $ Valve Box Grade Adjustment 3 EA $ $ $ $ $ $ $ $ 1, Sanitary Sewer Mahole 1 EA $ 5, $ 5, $ 4, $ 4, $ 2, $ 2, $ 5, $ 5, " SDR 35 Sanitary Sewer Pipe 114 LF $ $ 8, $ $ 4, $ $ 8, $ $ 8, " SDR 35 Sanitary Cap/Plug 1 EA $ $ $ 2, $ 2, $ $ $ $ SP Adjust Sanitary Manhole Cone Section/Grade Adjustments/New Lid/Core & Install New Steps 3 EA $ 2, $ 7, $ $ 1, $ 1, $ 4, $ $ 2, " Water Main Tap (Includes Saddle/Corp) - Irrigation 1 EA $ 1, $ 1, $ 2, $ 2, $ 1, $ 1, $ 1, $ 1, " Type K Copper - Irrigation 25 LF $ $ 1, $ $ 2, $ $ 1, $ $ 1, " Curb Stop - Irrigation 1 EA $ $ $ 2, $ 2, $ $ $ $ " Copper Tee - Irrigation 1 EA $ $ $ $ $ $ $ $ " Air Chuck - Irrigation 1 EA $ $ $ 1, $ 1, $ $ $ $ Valve Box Top & Lid (Air Chuck Cover) 1 EA $ $ $ $ $ $ $ $ Irrigation Vault Assembly (Includes: Ball Valve/Meter/Remote Read Out/Backflow Preventer/Vault/1/2" PVC Conduit) 1 EA $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, $ 2, $ 2, Plan Fencing - Decorative Cedar 134 LF $ $ 5, $ $ 6, $ $ 2, $ $ 9, Concrete Unit Pavers (Includes 2" Sand Bedding) 967 SF $ $ 14, $ $ 12, $ $ 18, $ $ 13, Revegetation 7,800 SF $ 1.50 $ 11, $ 0.30 $ 2, $ 0.15 $ 1, $ 0.54 $ 4,212.00
6 FORCE ACCOUNT 87 SP Demuck Area A 1 FA $ 23, $ 23, $ 23, $ 23, $ 23, $ 23, $ 23, $ 23, Maximum Hourly Rate (Mini Excavator/Loader/Dump Truck/Crew) HR $ $ 1, $ SP Demuck Area B 1 FA $ 28, $ 28, $ 28, $ 28, $ 28, $ 28, $ 28, $ 28, Maximum Hourly Rate (Mini Excavator/Loader/Dump Truck/Crew) HR $ $ 2, $ SP Irrigation Repair 1 FA $ 5, $ 5, $ 5, $ 5, $ 5, $ 5, $ 5, $ 5, Maximum Hourly Rate HR $ $ $ SP Landscaping 1 FA $ 16, $ 16, $ 16, $ 16, $ 16, $ 16, $ 16, $ 16, SP Remove Contaminated Material 1 FA $ 10, $ 10, $ 10, $ 10, $ 10, $ 10, $ 10, $ 10, SP Minor Contract Revisions 1 FA $ 20, $ 20, $ 20, $ 20, $ 20, $ 20, $ 20, $ 20, GRAND TOTAL $ 1,498, $ 1,359, $ 1,404, $ 1,585, ADD (Reconstruct Emerald Park Parking Lot) " Mill & 2" Overlay - SX PG ,734 SY $ $ 183, $ $ 111, $ $ 148, $ $ 110, " Asphalt Pavement (Parking Lot) - SX PG ,208 SY $ $ 50, $ $ 33, $ $ 45, $ $ 48, SP Rough & Fine Grading 2,000 SY $ 2.50 $ 5, $ 4.50 $ 9, $ 0.69 $ 1, $ 6.00 $ 12, Aggregate Base Course - Roadbase 135 CY $ $ 6, $ $ 13, $ $ 7, $ $ 5, Aggregate Base Course - Pit Run 270 CY $ $ 13, $ $ 18, $ $ 12, $ $ 10, Pavement Marking - Striping & Parking 4,875 LF $ 2.00 $ 9, $ 1.25 $ 6, $ 1.21 $ 5, $ 1.70 $ 8, Pavement Marking - Symbols/Crosswalk/Hatching 144 SF $ 2.50 $ $ 6.50 $ $ 4.39 $ $ $ 1, Sidewalks (All widths/except Core Trail) Class D Concrete 2,765 SF $ 9.50 $ 26, $ $ 27, $ $ 35, $ $ 27, Concrete Curb and Gutter (Mountable, Catch & Spill Curb - Class D Concrete) 295 LF $ $ 8, $ $ 12, $ $ 14, $ $ 9, Valley Pan (All Widths) 48 LF $ $ 1, $ $ 3, $ $ 3, $ $ 2,640.00
7 Shouldering (Road/Walk/Parking) - 4" Class 6 ABC 15 CY $ $ $ $ 3, $ $ $ $ 1, Plan Modular Concrete Block 20 EA $ $ 7, $ $ 11, $ $ 2, $ $ 2, "ф HDPE Culvert Pipe 38 LF $ $ 3, $ $ 4, $ $ 3, $ $ 2, " HDPE Flared End Section 2 EA $ $ 1, $ $ 1, $ $ $ $ Flow Fill (Perpendicular to Travel Way) 10 CY $ $ 2, $ $ 1, $ $ 1, $ $ 2, Plan New Signs 6 EA $ $ 1, $ $ 1, $ $ 2, $ $ 2, ADD/ALT TOTAL $ 322, $ 261, $ 286, $ 247, UNIT PRICING in cal Quaking Aspen (Nursery Grown) EA $ $ $ in cal Lanceleaf Cottonwood EA $ $ $ in cal Patmore Ash EA $ $ $ Ground Cover/Weed Barrier, Mirafi 140S SF $ $ 0.15 $ SP Shredded Cedar Mulch (3" Thick) including Filter Fabrix Mirafi 140n SF $ 5.00 $ 2.81 $ " Irrigation Sleeve, Schedule 40 PVC (includes trenching and backfill at a depth of 3-ft) LF $ $ 2.75 $ Crusher Fines 4" Depth, including filter fabric Mirafi 140S SF $ $ 1.17 $ SP Cobble Mulch including filter fabric Mirafi 140S SF $ 7.00 $ 3.25 $ Plan Fencing - Mild Steel LF $ $ $ SP Sod SF $ 2.00 $ 3.44 $ % Needle Punched Non-Woven Polyproplemen Pavement Renforcement Fabric SY $ 1.25 $ 1.00 $ 10.00
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationBID TABULATION BID REQUEST NO
BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS
More informationBID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00
More information19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown
19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL
More informationSubject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122
Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot
More information33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.
CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler
More information2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.
ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationBid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221
Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More informationCITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018
CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More informationCITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $
RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More informationMunilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL
JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE
More information69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11
69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to
More informationBIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.
More informationNE WEST KINGSTON ROAD CULVERT REPLACEMENT
NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS
More informationAnnual Services Construction Contract (ASCC) #15 Project Number: PUCN
Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction
More informationLETTING : CALL : 056 COUNTIES : MILLE LACS
S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE
More informationCITY OF TAMPA ADDENDUM 2. April 18, 2018
CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project
More informationBID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012
Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00
More informationBID TABULATION PAGE 1 OF 8
BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $
More informationRANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price
2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF
More informationFailure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.
Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017
More informationSandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING
ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00
More informationCrushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:
Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and
More informationCertified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University
Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1
More information2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationPART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.
BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.
More informationPART A ROADWAY - BASE BID
May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00
More informationENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal
Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
More informationCITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS
1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating
More informationADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO
ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents
More informationFALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00
More informationReviax Constracting Corp. DeSantis Construction
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.
More informationUtility Committee Meeting AGENDA. October 3, 2017
Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid
More informationBID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #
ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00
More informationITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT
Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20
More informationFuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $
SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00
More informationADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:
ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation
More informationBID TABULATION. Engineer's Estmated Opinion of Costs
Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%
More informationAVERAGE OF BID ITEMS ENGINEERS ESTIMATE
ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian
More informationRFB Addendum 3
Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER
More informationTown of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562
Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More informationLETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY
LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines
More informationNAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA
Unit BID ITEMS 1 1070-206-A-3 TRAFFIC CONTROL 0.5 0.5 1 LS $ 2,200.00 $ 2,200.00 $ 2,800.00 $ 2,800.00 $ 2,688.00 $ 2,688.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 2 2010-108-C-0
More informationAddendum 1 Downtown North CRA Sidewalks
Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More information1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) -
Charlotte County Board Of County Commissioners Agenda Item Summary Item Number: R- 5 1 DEPARTMENT MAKING REQUEST 2 MEETING DATE Purchasing 6/24/2014 9:00:00 AM 3 REQUESTED MOTION/ACTION Award Bid #14-209
More informationDORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial
More informationBID TABULATION PAGE 1 OF 6
BID TABULATION PAGE 1 OF 6 BID PRE-BID ESTIMATE R.G. Huston Company, Inc. Kopplin & Kinas Co., Inc. Cottage Grove, WI Green Lake, WI NO. DESCRIPTION OF WORK QUANT. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT
More informationThe bid due date has been changed to 2:50 p.m. May 25, 2018.
May 18, 2018 BL051-18 Addendum #1 Construction and Rehab of Gravity and Sewer Force Mains on an Contract Make the following changes/additions or clarifications to the above referenced bid: The bid due
More informationALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN
ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA
More information2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationNorthumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate
Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)
More informationFor Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.
Job 11-4518 Solicitation B-12-059-DD PROPOSAL of BID PROPOSAL, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER STEM: Pursuant to Instructions Invitation
More informationREPLACEMENT OF MERCER COUNTY BRIDGE
ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade
More informationCITY-TIF COMMISSION EXPENSES Cost Description Project Cost Data Reimbursable From Public Funds Developer Equity COST TIF Super TIF State TIF CID SCTC PRIVATE I. Legal $ 750,000 $ 750,000 $ - $ - $ - $
More informationSunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List
Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements
More informationTAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.
DAVID TAUSSIG & Associates, Inc. Annual Report Fiscal Year 2014-2015 City of Irvine Community Facilities District No. 2013-3 (Great Park) October 27, 2015 Public Finance Public Private Partnerships Urban
More informationNorth Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL
North Baker Ave. - City Limits to 23rd St. NE Bid Documents BD-1 To the Board of County Commissioners Douglas County, Washington Gentlemen: North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL
More informationCITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS
CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center
More informationAddendum 1 13 TH Street Streetscape. September 1, 2017
Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationActive Construction RV Associates Scarsella JR Hayes
CITY OF PORT ORCHARD PUBLIC WORKS DEPARTMENT TREMONT STREET IMPROVEMENTS SR 16 to Port Orchard Boulevard Opening: 6/6/2017 Fed Aid Proj No: STPUS-6610(004) $ 12,779,179.17 $ 12,855,082.55 $ 12,901,887.92
More informationTAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.
DAVID TAUSSIG & Associates, Inc. Annual Report Fiscal Year 2016-2017 City of Irvine Community Facilities District No. 2013-3 (Great Park) September 26, 2017 Public Finance Public Private Partnerships Urban
More informationCONTRACT TIME DETERMINATION
CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during
More informationAppendix B Example Project Designs and Engineers Opinion of Costs
Appendix B Example Project Designs and Engineers Opinion of Costs 32 nd Street from E. 2 nd to Main Avenue CR 251 and CR 250 9 th Street Sidewalk Improvements 15 th Street Improvements Intermodal Facility
More informationPRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer
G-7 STAFF REPORT MEETING DATE: November 27, 2018 TO: FROM: City Council Petr Skala, Associate Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher
More informationSUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION
Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING
More informationNOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No
NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,
More information2001 Average Bid Tabs
Municipality of Anchorage Department of Planning, Development and Public Works Project Management and Engineering Department 2001 Average Bid Tabs SPEC. 20.02 Clearing and Grubbing 1 L.S. $ 750.00 $ 11,793.52
More informationJob No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL
Date: BID PROPOSAL PROPOSAL OF A corporation A partnership consisting of An individual doing business as THE SAN ANTONIO WATER SYSTEM Pursuant to Instructions and Invitations to Bidders, the undersigned
More information8 EA $ 1, $ $ 1, $ 8, $ 1, $ 8, EA $ 6, $6, $ 7, $ 7, $ 5, $ 5,445.
Palmetto Park Road, SW 7th AVE. To SW 5th Avenue LWDD E4 (E Rio) Canal ENGECON CONSTRUCTON RUSSELL ENGNEERNG TEM# TEM DESCRPTON QTY UNTS Total Total ROADWAY TEMS 5 Regular Excavation 937 CY $ 14.28 $17.52
More informationMarket Street Gateway Improvements Phase 1
PROPOSAL FORM Market Street Gateway Improvements Phase 1 CITY OF PORTSMOUTH, N.H. To the City of Portsmouth, New Hampshire, herein called the Owner. The undersigned, as Bidder, herein referred to as singular
More informationA DESIGN-BUILD PROJECT
Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,
More informationFLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, Fargo City Commission Chambers 3:00 PM
1. Call to order FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, 2017 Fargo City Commission Chambers 3:00 PM 2. Recommended contracting actions a. Schmidt & Sons Construction,
More informationVETERANS PARK ATHLETIC COMPLEX BUILD-OUT PHASE 1
BID DOCUMENTS FOR VETERANS PARK ATHLETIC COMPLEX BUILD-OUT PHASE 1 BID NO. 18-033 PROJECT NO. HM1601 DUE DATE: January 9, 2018 @ 2:00 P.M. City of College Station, Texas Purchasing Division City Hall PO
More informationAugust 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA
August 22, 2016 Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA RE: Hammond Northshore Regional Airport Runway 18-36/13-31 Runway Intersection
More informationRegion 5 Upcoming Projects for Summer/Fall 2018
Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The
More informationExhibit 4 Page 1 of 8
Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:
More informationCITY OF PALM DESERT PUBLIC WORKS DEPARTMENT
BEFORE YOU CAN PERFORM ANY CONSTRUCTION OR MAINTENANCE WORK IN THE PUBLIC RIGHT-OF-WAY, YOU MUST HAVE A VALID ENCROACHMENT PERMIT ISSUED BY THIS DEPARTMENT This work includes but is not limited to driveway
More informationPublic Works Maintenance STORMWATER AND
Public Works Maintenance STORMWATER AND TRANSPORTATION Mission Statement T H E P U B L I C W O R K S M A I N T E N A N C E D I V I S I O N I S T H E M A I N C U S T O D I A N A N D P R I N C I P A L C
More informationCOST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS. PREPARED BY CSD-Planning Division. City of Kitchener- Letter of Credit (2017)
This information is available in accessible formats upon request. Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. COST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS PREPARED BY
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION 1 Civic Center Dr., San Marcos, CA 92069-2918 (760) 744-1050 FAX (760) 591-4135 FEE SCHEDULE FOR GRADING & IMPROVEMENT PLAN
More informationJob No Medina River Sewer Outfall, Segment 5 Solicitation No. B BB BID PROPOSAL
Solicitation No. B-11-030-BB Date: BID PROPOSAL PROPOSAL OF A corporation A partnership consisting of An individual doing business as THE SAN ANTONIO WATER SYSTEM Pursuant to Instructions and Invitations
More informationOCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager
REPLACEMENT RESERVE REPORT FY 2017 OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 Community Management by: POSTON & COMPANY Melissa Blocker,
More informationThe following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin
The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin within the Vendor Self Service portal at wvoasis.gov.
More informationApplying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA
Applying for a Kinder Morgan Canada Proximity Permit Design and Construction Guidelines CANADA A Guide to Applying for a Kinder Morgan Canada Proximity Permit Kinder Morgan Canada operates the Trans Mountain
More informationPROJECT COST. Prepared for City of Burlington, Iowa Downtown/Riverfront Revitalization Project
PROJECT COST Prepared for City of Burlington, Iowa Downtown/Riverfront Revitalization Project City of Burlington Downtown/Riverfront Revitalization Project TIGER Grant Budget Date: 4/29/2016 Project Budget
More informationEngineer's Preliminary Estimate - 100% Submittal
EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000
More informationJob No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars
BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned
More informationEXCAVATION PERMIT GUIDELINES
TOWN OF HANOVER, NEW HAMPSHIRE PUBLIC WORKS DEPARTMENT PO Box 483, 194 Lebanon St TEL. 643-3327 FAX. 643-0736 EXCAVATION PERMIT GUIDELINES 1. Application & Permit (Page 1 & 2): a. Application must be filled
More informationAWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET
STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213
More informationAECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option
More informationAVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP
AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, 2014 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 1 $19 $18,500.00 1 2013 2013.602/00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32
More information