AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

Size: px
Start display at page:

Download "AVERAGE OF BID ITEMS ENGINEERS ESTIMATE"

Transcription

1 ROADWAY 1 Mobilization 1 LS $ 990, $ 80, $ 880, $ 880, $ 950, $ 950, $ 967, $ 967, $ 1,162, $ 1,162, Maintenance of Traffic ( incl. Pedestrian M.O.T. ) 1 LS $ 151, $ 21, $ 109, $ 109, $ 60, $ 60, $ 48, $ 48, $ 387, $ 387, Sediment Barrier (Silt Fence) 1,145 LF $ 2.88 $ 1.91 $ 2.00 $ 2, $ 4.00 $ 4, $ 3.00 $ 3, $ 2.50 $ 2, Clearing and Grubbing 1 LS $ 31, $ 12, $ 43, $ 43, $ 70, $ 70, $ 5, $ 5, $ 8, $ 8, Floating Turbidity Barrier 668 LF $ $ 9.57 $ $ 10, $ $ 13, $ $ 15, $ $ 8, Regular Excavation 154 CY $ $ 5.16 $ $ 8, $ $ 7, $ $ 4, $ $ 5, Embankment (Compacted in Place) 146 CY $ $ 8.11 $ $ 17, $ $ 7, $ $ 5, $ $ 2, Optional Base Group SY $ $ $ $ 25, $ $ 57, $ $ 49, $ $ 19, Optional Base Group SY $ $ $ $ 5, $ $ 12, $ $ 10, $ $ 4, Mill Existing Asphalt Pavement 1" 1,004 SY $ 9.66 $ 2.82 $ 7.00 $ 7, $ $ 10, $ $ 11, $ $ 10, Miscellaneous Asphalt Pavement 5.0 TN $ $ $ $ 1, $ $ 1, $ $ 1, $ $ 1, Superpave Asphalt Concrete (Traffic Level C) 1.5" 96.0 TN $ $ $ $ 27, $ $ 21, $ $ 23, $ $ 21, Asph. Concrete Friction Course ( 1.0" ) ( FC-9.5 ) TN $ $ $ $ 23, $ $ 21, $ $ 25, $ $ 28, Inlet (Closed Flume) Type I 1 EA $ 7, $ 3, $ 6, $ 6, $ 7, $ 7, $ 8, $ 8, $ 7, $ 7, Adjust Manholes 1 EA $ $ $ $ $ $ $ $ $ 1, $ 1, Adjust Valve Boxes 5 EA $ $ $ $ 2, $ $ 1, $ $ 1, $ $ 2, Adjust Fire Hydrant 1 EA $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, $ $ Concrete Curb ( Type D ) 138 LF $ $ $ $ 4, $ $ 5, $ $ 3, $ $ 3, Concrete Curb & Gutter ( Type F ) 295 LF $ $ $ $ 16, $ $ 11, $ $ 10, $ $ 7, Concrete Curb & Gutter (Drop Curb) 155 LF $ $ $ $ 5, $ $ 6, $ $ 6, $ $ 4, Conc Sidewalk ( 4" Thick ) 281 SY $ $ $ $ 14, $ $ 14, $ $ 19, $ $ 15, Conc Sidewalk ( 6"Thick ) (Driveways) 24 SY $ $ $ $ 1, $ $ 1, $ $ 2, $ $ 2, Pipe Guiderail ( Steel) 71 LF $ $ $ $ 3, $ $ 3, $ $ 3, $ $ 4, Guardrail ( Roadway ) 95 LF $ $ $ $ 4, $ $ 4, $ $ 4, $ $ 4, Guardrail Post 2 EA $ $ $ $ $ $ $ $ $ $ End Anchorage Assemblies ( Bridge ) 1 EA $ 2, $ 2, $ 2, $ 2, $ 2, $ 2, $ 2, $ 2, $ 2, $ 2, End Anchorage Assemblies ( Type Flared ) 1 EA $ 2, $ 2, $ 3, $ 3, $ 3, $ 3, $ 2, $ 2, $ 3, $ 3, Sodding 1,603 SY $ 5.25 $ 2.55 $ 5.00 $ 8, $ 6.00 $ 9, $ 5.00 $ 8, $ 5.00 $ 8, SUBTOTAL (ROADWAY) $ 1,236, $ 1,310, $ 1,243, $ 1,731, SIGNAL & LIGHTING PAY 29 Mast Arm,F&I, Wind Speed-150,Single Arm,W/0 Luminaire-36 2 EA $ 30, $ 24, $ 33, $ 66, $ 17, $ 34, $ 33, $ 66, $ 36, $ 73, Mast Arm, Remove Shallow Foundation, Bolt On Attachment 2 EA $ 2, $ 2, $ 2, $ 4, $ $ 1, $ 1, $ 3, $ 5, $ 10, Traffic Signal, F&I, Aluminum, 3 Sect, 1 Way 4 AS $ 1, $ $ 1, $ 4, $ 1, $ 4, $ 1, $ 4, $ 1, $ 5, Sign Panel, F&I Overhead Mount, Up To 12 SF 2 EA $ $ 1, $ $ 1, $ 1, $ 2, $ $ 1, $ $ 1, Lightpole Relocation 4 EA $ 6, $ 2, $ 14, $ 56, $ 7, $ 30, $ 1, $ 7, $ 1, $ 7, SUBTOTAL (SIGNAL & LIGHTING) $ 132, $ 71, $ 84, $ 98, F:\ROADWAY\PRO\2003\ \3_Award Spec Forms\1_Bid Tabulations\ Camino Real - Boca Club Bridge over Intracoastal Waterway Bid Tab Page 1 of 5

2 BRIDGE 34 Removal of Existing Structures / Bridges 1 LS $ 690, $ 450, $ 465, $ 465, $ 880, $ 880, $ 731, $ 731, $ 684, $ 684, Protection of Existing Structures 1 LS $ 43, $ 10, $ 5, $ 5, $ 20, $ 20, $ 14, $ 14, $ 135, $ 135, Superstructure 36 1'6"x4'0"x37'10 1/2" Prestressed Precast Deck Units 303 LF $ $ $ $ 99, $ $ 115, $ $ 92, $ $ 168, '6"x5'0"x37'10 1/2" Prestressed Precast Deck Units 303 LF $ $ $ $ 106, $ $ 115, $ $ 92, $ $ 173, '6"x4'0"x24'-2 1/2" Prestressed Precast Deck Units 194 LF $ $ $ $ 62, $ $ 73, $ $ 60, $ $ 108, '6"x5'0"x24'-2 1/2"Prestressed Precast Deck Units 194 LF $ $ $ $ 65, $ $ 73, $ $ 59, $ $ 111, Class 4 Finish Brige Decks And Approach Slabs 581 SY $ $ $ 4.00 $ 2, $ 8.00 $ 4, $ $ 15, $ $ 15, Concrete Traffic Railing Barrier - Texas C LF $ $ $ $ 91, $ $ 83, $ $ 78, $ $ 198, " Vertical Face Traffic Railing Barrier 120 LF $ $ $ $ 30, $ $ 30, $ $ 14, $ $ 18, Class IV Concrete - Closure Pours 34 CY $ $ $ $ 10, $ $ 18, $ $ 10, $ $ 17, Reinforcing Steel - Closure Pours 2,132 LB $ 1.50 $ 2.00 $ 1.00 $ 2, $ 1.00 $ 2, $ 1.00 $ 2, $ 3.00 $ 6, Class IV Concrete - Bascule Pier Deck And Sidewalk 76 CY $ 1, $ 1, $ 1, $ 114, $ 1, $ 76, $ $ 27, $ 1, $ 118, Class IV Concrete - Sidewalk 80 CY $ $ $ 1, $ 88, $ $ 72, $ $ 31, $ $ 36, Reinforcing Steel - Bascule Pier Deck And Sidewalk 22,764 LB $ 1.38 $ 2.00 $ 1.00 $ 22, $ 1.00 $ 22, $ 1.00 $ 22, $ 2.50 $ 56, Reinforcing Steel - Sidewalk 16,244 LB $ 1.38 $ 2.00 $ 1.00 $ 16, $ 1.00 $ 16, $ 1.00 $ 16, $ 2.50 $ 40, Substructure 49 CLASS IV CONCRETE - END BENT PILE CAPS 27 CY $ 1, $ 1, $ $ 21, $ 1, $ 27, $ $ 23, $ 1, $ 45, REINFORCING STEEL - END BENT PILE CAPS 4,557 LB $ 1.38 $ 2.00 $ 1.00 $ 4, $ 1.00 $ 4, $ 1.00 $ 4, $ 2.50 $ 11, CLASS IV CONCRETE - PIERS 2 AND 5 FOUNDATION 133 CY $ $ 1, $ $ 106, $ $ 99, $ $ 76, $ $ 105, CLASS IV CONCRETE - PIERS 2 AND 5 CAP 102 CY $ $ 1, $ 1, $ 102, $ 1, $ 112, $ $ 63, $ $ 80, REINFORCING STEEL - PIERS 2 AND 5 31,875 LB $ 1.25 $ 2.00 $ 1.00 $ 31, $ 1.00 $ 31, $ 1.00 $ 31, $ 2.00 $ 63, CLASS IV CONCRETE - PIERS 3 AND 4 FOUNDATION 51 CY $ $ 1, $ $ 40, $ 1, $ 61, $ $ 32, $ 1, $ 64, CLASS IV CONCRETE - PIERS 3 AND 4 COLUMN AND CAP 30 CY $ 1, $ 1, $ 1, $ 30, $ 1, $ 48, $ $ 19, $ 1, $ 38, REINFORCING STEEL - PIERS 3 AND 4 FOUNDATION, COLUMN, AND CAP 13,807 LB $ 1.38 $ 2.00 $ 1.00 $ 13, $ 1.00 $ 13, $ 1.00 $ 13, $ 2.50 $ 34, Auger Cast Piles 57 1'6" X 66'0" END BENT PILES 832 LF $ $ $ $ 56, $ $ 149, $ $ 128, $ $ 64, '6" X 59'0" INTERMEDIATE BENT PILES 2,204 LF $ $ $ $ 163, $ $ 484, $ $ 401, $ $ 171, '6" X 67'0" TENDER HOUSE PILES 422 LF $ $ $ $ 37, $ $ 139, $ $ 81, $ $ 97, AUGER CAST PILE LOAD TESTING 7 EA $ 32, $ 10, $ 44, $ 308, $ 37, $ 259, $ 40, $ 285, $ 9, $ 65, ROCK RUBBLE RIP RAP 770 TN $ $ $ $ 50, $ $ 77, $ $ 107, $ $ 233, BEDDING STONE 424 TN $ $ $ $ 25, $ $ 42, $ $ 47, $ $ 121, Approach Slabs 63 CLASS II (BRIDGE DECK) CONCRETE - APPROACH SLAB 94 CY $ $ $ $ 32, $ $ 28, $ $ 14, $ $ 42, REINFORCING STEEL - APPROACH SLAB 18,620 LB $ 1.25 $ 2.00 $ 1.00 $ 18, $ 1.00 $ 18, $ 1.00 $ 18, $ 2.00 $ 37, CLASS II CONCRETE - APPROACH SLAB SIDEWALK 40 CY $ $ $ $ 16, $ $ 12, $ $ 6, $ $ 15, REINFORCING STEEL - APPROACH SLAB SIDEWALK 2,338 LB $ 1.38 $ 2.00 $ 1.00 $ 2, $ 1.00 $ 2, $ 1.00 $ 2, $ 2.50 $ 5, F:\ROADWAY\PRO\2003\ \3_Award Spec Forms\1_Bid Tabulations\ Camino Real - Boca Club Bridge over Intracoastal Waterway Bid Tab Page 2 of 5

3 Bridge and Fender Repair 67 STRUCTURAL STEEL REPAIR - MACHINERY ROOM 1 LS $ 101, $ 10, $ 94, $ 94, $ 120, $ 120, $ 95, $ 95, $ 95, $ 95, CONCRETE RESTORATION 1 LS $ 76, $ 22, $ 22, $ 22, $ 60, $ 60, $ 22, $ 22, $ 200, $ 200, CLEAN AND COAT CONCRETE SURFACES ON EXISTING PIERS, CLASS V 1,723 SF $ 5.13 $ 5.00 $ 3.50 $ 6, $ 6.00 $ 10, $ 8.00 $ 13, $ 3.00 $ 5, STANDARD INTEGRAL PILE JACKET, STR LF $ $ $ $ 169, $ $ 88, $ $ 152, $ $ 192, Fenders 71 FENDER SYSTEM, PLASTIC MARINE LUMBER 13 MB $ 20, $ 14, $ 21, $ 273, $ 12, $ 156, $ 25, $ 328, $ 24, $ 312, FENDER SYSTEM, POLYMERIC PILES 1 LS $ 189, $ 413, $ 180, $ 180, $ 180, $ 180, $ 137, $ 137, $ 261, $ 261, LIGHTED CLEARANCE GAUGES 2 EA $ 9, $ 3, $ 5, $ 10, $ 7, $ 14, $ 6, $ 13, $ 20, $ 40, NAVIGATION LIGHTING 1 LS $ 54, $ 10, $ 55, $ 55, $ 45, $ 45, $ 52, $ 52, $ 67, $ 67, Miscellaneous 75 ACCESS PLATFORM ASSEMBLY 1 AS $ 9, $ 5, $ 12, $ 12, $ 7, $ 7, $ 5, $ 5, $ 12, $ 12, ACCESS HATCH, EQUIPMENT 2 EA $ 4, $ 2, $ 5, $ 11, $ 4, $ 9, $ 4, $ 9, $ 5, $ 10, CLASS IV CONCRETE - RETAINING WALLS 26 CY $ $ 1, $ 1, $ 31, $ 1, $ 26, $ $ 15, $ $ 14, REINFORCING STEEL - RETAINING WALLS 6,193 LBS $ 1.50 $ 2.00 $ 1.00 $ 6, $ 1.00 $ 6, $ 1.00 $ 6, $ 3.00 $ 18, STRUCTURAL STEEL, MISCELLANEOUS 11,080 LB $ 9.64 $ $ 9.00 $ 99, $ $ 110, $ $ 110, $ 9.57 $ 106, RIVET OR HIGH STRENGTH BOLTS - REPLACE 404 EA $ $ $ $ 28, $ $ 44, $ $ 46, $ $ 48, Bascule Bridge 81 CLASS IV CONCRETE (COUNTERWEIGHT RESURFACE) 3 CY $ 2, $ 1, $ 4, $ 12, $ 2, $ 6, $ 2, $ 8, $ 3, $ 9, STRUCTURAL STEEL, (REHAB) BASCULE LEAF 67,434 LB $ $ $ 9.00 $ 606, $ $ 842, $ $ 674, $ $ 698, METAL TRAFFIC RAILINGS, ALUMINUM POST AND RAIL 180 LF $ $ $ $ 34, $ $ 108, $ $ 120, $ $ 125, MOVABLE BRIDGE MACHINERY - REHAB, SPAN LOCKS, FURNISH AND INSTALL 2 AS $ 202, $ 150, $ 180, $ 360, $ 210, $ 420, $ 255, $ 511, $ 163, $ 327, MOVABLE BRIDGE MACHINERY - REHAB, LIVE LOAD SHOES, FURNISH AND INSTALL 1 LS $ 34, $ 20, $ 16, $ 16, $ 16, $ 16, $ 15, $ 15, $ 88, $ 88, MOVABLE BRIDGE MACHINERY - REHAB, SPEED REDUCER AND DRIVE TRAIN, RECONDITION 1 LS $ 72, $ 50, $ 190, $ 190, $ 35, $ 35, $ 37, $ 37, $ 28, $ 28, MOVABLE BRIDGE COUNTERWEIGHT, F&I, BALANCE BLOCKS 352 EA $ $ $ $ 38, $ $ 45, $ $ 51, $ $ 41, MOVABLE BRIDGE COUNTERWEIGHT, F&I, STEEL BALLAST 27 TN $ 8, $ 1, $ 4, $ 113, $ 10, $ 270, $ 10, $ 292, $ 9, $ 265, MOVABLE BRIDGE COUNTERWEIGHT, ADJUST 2 EA $ 33, $ 20, $ 21, $ 42, $ 34, $ 68, $ 38, $ 77, $ 40, $ 80, MOVABLE BRIDGE - PREVENTIVE MAINTENANCE 1 LS $ 143, $ 40, $ 60, $ 60, $ 20, $ 20, $ 198, $ 198, $ 295, $ 295, MOVABLE BRIDGE - FUNCTIONAL CHECKOUT 1 LS $ 32, $ 30, $ 37, $ 37, $ 50, $ 50, $ 25, $ 25, $ 19, $ 19, STEEL ROADWAY FLOOR (5" OPEN) 2,080 SF $ $ $ $ 228, $ $ 228, $ $ 282, $ $ 298, ALUMINUM SIDEWALK FLOOR 1,165 SF $ $ $ $ 151, $ $ 128, $ $ 172, $ $ 149, MOVABLE BRIDGE GATE, F&I 4 AS $ 39, $ 30, $ 45, $ 180, $ 30, $ 120, $ 32, $ 130, $ 51, $ 204, MOVABLE BRIDGE GATE, REMOVE & DISPOSE 4 AS $ 1, $ 2, $ 2, $ 8, $ 1, $ 5, $ $ 2, $ 1, $ 5, MOVABLE BRIDGE ELECTRICAL EQUIPMENT, REHABILITATION 1 LS $ 501, $ 520, $ 446, $ 446, $ 650, $ 650, $ 627, $ 627, $ 283, $ 283, MOVABLE BRIDGE EMERGENCY GENERATOR, F&I 1 AS $ 10, $ 5, $ 31, $ 31, $ 8, $ 8, $ $ $ 4, $ 4, MOVABLE BRIDGE - REHAB, PROGRAMMABLE LOGIC CONTROLLER F&I 1 EA $ 107, $ 50, $ 135, $ 135, $ 70, $ 70, $ 116, $ 116, $ 110, $ 110, MOVABLE BRIDGE - REHAB, LIMIT SWITCHES & TRANSDUCERS F&I 1 LS $ 39, $ 30, $ 33, $ 33, $ 12, $ 12, $ 54, $ 54, $ 58, $ 58, MOVABLE BRIDGE - REHAB, CONTROL CONSOLE, F&I 1 EA $ 89, $ 100, $ 145, $ 145, $ 60, $ 60, $ 75, $ 75, $ 78, $ 78, MOVABLE BRIDGE - REHAB, BRAKE SYSTEM, F&I 4 EA $ 16, $ 20, $ 16, $ 64, $ 15, $ 60, $ 15, $ 63, $ 17, $ 70, MOVABLE BRIDGE - REHAB, CONTROL PANEL - MOTOR CONTROLLER, F&I 1 EA $ 98, $ 139, $ 110, $ 110, $ 63, $ 63, $ 106, $ 106, $ 114, $ 114, MOVABLE BRIDGE INTEGRATED DRIVE SYS, F&I, 25KW OR LESS 2 AS $ 65, $ 100, $ 55, $ 110, $ 46, $ 92, $ 51, $ 102, $ 107, $ 215, MOVABLE BRIDGE CONTROL HOUSE, NEW 1 LS $ 527, $ 727, $ 600, $ 600, $ 400, $ 400, $ 536, $ 536, $ 575, $ 575, COATING EXISTING STRUCTURAL STEEL 1 LS $ 413, $ 600, $ 500, $ 500, $ 350, $ 350, $ 352, $ 352, $ 450, $ 450, Field Office (see SP's) 555 DYS $ $ $ $ 13, $ $ 55, $ $ 82, $ $ 111, SUBTOTAL (BRIDGE) $ 7,508, $ 8,277, $ 8,358, $ 9,283, F:\ROADWAY\PRO\2003\ \3_Award Spec Forms\1_Bid Tabulations\ Camino Real - Boca Club Bridge over Intracoastal Waterway Bid Tab Page 3 of 5

4 UTILITY 107 Subaqueous Coordination/Location, Comcast 1 LS $ 9, $ 3, $ $ $ 2, $ 2, $ 5, $ 5, $ 30, $ 30, SUBTOTAL (UTILITY) $ $ 2, $ 5, $ 30, CONTINGENCY 108 Class I Concrete (Miscellaneous ) 10 CY $ $ $ $ 7, $ $ 1, $ $ 8, $ $ 2, Flowable Fill 10 CY $ $ $ $ 3, $ $ 2, $ $ 3, $ $ 1, Changeable (Variable Message) Sign (Non MOT) 75 ED $ $ $ $ 1, $ $ 1, $ $ 1, $ $ 1, Traffic Control Officer (Non MOT) 60 HR $ $ $ $ 3, $ $ 3, $ $ 3, $ $ 3, SUBTOTAL (CONTINGENCY) $ 14, $ 9, $ 15, $ 8, TOTAL BID AMOUNT $ 8,891, $ 9,671, $ 9,707, $ 11,151, F:\ROADWAY\PRO\2003\ \3_Award Spec Forms\1_Bid Tabulations\ Camino Real - Boca Club Bridge over Intracoastal Waterway Bid Tab Page 4 of 5

5 THE AND QUANTITIES SHOWN, SHALL GOVERN OVER THE PLANS. PAY ITEM FOOTNOTES IN CONSTRUCTION PLANS SHALL ALSO BE INCLUDED IN ITEM UNIT PRICE. PAY ITEM FOOTNOTES: All costs for Maintenance of Traffic (MOT) and mobilization shall be considered incidental to, and shall be included in, unit prices for the pay items. All items shall include cost to furnish and install unless otherwise noted. Permitting agency pre-construction meetings and notices of commencement; compliance with stormwater pollution prevention plan and stormwater pollution control plan; installation of erosion/turbidity controls including silt fences, inlet protection, inspections and reporting; preparation and submittal of construction completion certifications and required record drawings by a professional engineer and/or land surveyor; utility notifications are considered incidental to mobilization. 12" compacted subgrade is considered incidental to the cost of base-rock construction. Prime and tack coats are considered incidental to asphalt construction. Wrapping of filter fabric around all pipe joints per FDOT index no. 280; and cost of coring existing structures for pipe connection is considered incidental to the cost of the pipe. The cost of detectable warning surfaces per FDOT index 304 and base compaction is considered incidental to sidewalk/pathway construction. The costs of transition curbs, flared end sections, straight end sections, curb face engraving and subgrade is considered incidental to curb and/or gutter construction. Contingency items may be increased, decreased or deleted as directed by the engineer. All structure boxes are 10 feet or less in depth, unless otherwise noted. Working days to complete project: 485 calendar days (See Special Provisions) Bids as read at opening on Tuesday, May 16, 2017; 2:00 PM All bids subject to OSBA SBE compliance and Board Approval. Prepared by: Donna Lewis Checked by: Holly B. Knight, P.E., Contracts Section Manager F:\ROADWAY\PRO\2003\ \3_Award Spec Forms\1_Bid Tabulations\ Camino Real - Boca Club Bridge over Intracoastal Waterway Bid Tab 5 of 5

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE

More information

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00

More information

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00

More information

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT # ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00

More information

8 EA $ 1, $ $ 1, $ 8, $ 1, $ 8, EA $ 6, $6, $ 7, $ 7, $ 5, $ 5,445.

8 EA $ 1, $ $ 1, $ 8, $ 1, $ 8, EA $ 6, $6, $ 7, $ 7, $ 5, $ 5,445. Palmetto Park Road, SW 7th AVE. To SW 5th Avenue LWDD E4 (E Rio) Canal ENGECON CONSTRUCTON RUSSELL ENGNEERNG TEM# TEM DESCRPTON QTY UNTS Total Total ROADWAY TEMS 5 Regular Excavation 937 CY $ 14.28 $17.52

More information

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221 Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00

More information

BID TABULATION BID REQUEST NO

BID TABULATION BID REQUEST NO BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS

More information

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,

More information

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)

More information

TOTAL QUANTITY UNIT COST UNIT

TOTAL QUANTITY UNIT COST UNIT BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50

More information

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) 2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING

More information

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m. PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00

More information

REPLACEMENT OF MERCER COUNTY BRIDGE

REPLACEMENT OF MERCER COUNTY BRIDGE ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade

More information

CITY OF TAMPA ADDENDUM 2. April 18, 2018

CITY OF TAMPA ADDENDUM 2. April 18, 2018 CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project

More information

PART A ROADWAY - BASE BID

PART A ROADWAY - BASE BID May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00

More information

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted, ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT

More information

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following: Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and

More information

Addendum 1 Downtown North CRA Sidewalks

Addendum 1 Downtown North CRA Sidewalks Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20

More information

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown 19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL

More information

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $ RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement

More information

LETTING : CALL : 056 COUNTIES : MILLE LACS

LETTING : CALL : 056 COUNTIES : MILLE LACS S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE

More information

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

NE WEST KINGSTON ROAD CULVERT REPLACEMENT NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS

More information

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.

More information

SUBDIVISION IMPROVEMENTS AGREEMENT

SUBDIVISION IMPROVEMENTS AGREEMENT SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El

More information

3\1:s11, Date. Agenda Item is over 50 pages; may be viewed in the Minutes Department. Agenda Item #: 3-C-7

3\1:s11, Date. Agenda Item is over 50 pages; may be viewed in the Minutes Department. Agenda Item #: 3-C-7 Recommended by:./4 J ). {J...Jv.l Department Director 3\1:s11, Date Agenda Item is over 50 pages; may be viewed in the Minutes Department Agenda Item #: 3-C-7 PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS

More information

Engineer's Preliminary Estimate - 100% Submittal

Engineer's Preliminary Estimate - 100% Submittal EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000

More information

Department of Public Works Engineering

Department of Public Works Engineering Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan

More information

CONTRACT TIME DETERMINATION

CONTRACT TIME DETERMINATION CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during

More information

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600. CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler

More information

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122 Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot

More information

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)

More information

Exhibit 4 Page 1 of 8

Exhibit 4 Page 1 of 8 Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:

More information

A DESIGN-BUILD PROJECT

A DESIGN-BUILD PROJECT Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,

More information

Utility Committee Meeting AGENDA. October 3, 2017

Utility Committee Meeting AGENDA. October 3, 2017 Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid

More information

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price 2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF

More information

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY. ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense

More information

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

RFB Addendum 3

RFB Addendum 3 Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER

More information

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11 69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to

More information

Solicitation No. B RA 2010 Concrete Placement Work Order Construction Contract Package No. 2 PROPOSAL. PROPOSAL OF, a corporation a

Solicitation No. B RA 2010 Concrete Placement Work Order Construction Contract Package No. 2 PROPOSAL. PROPOSAL OF, a corporation a Solicitation No. B-09-071-RA 2010 Concrete Placement Work Order Construction Contract Package No. 2 PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO

More information

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT Page 1 of 20 16 SSSEX ROTE 94 BLACK CREEK TRIBTARY CLVERT REPLACEMENT CONSTRCTION CORP INC. (2) KONKS CORPORATION (3) NORTHEAST REMSCO CONSTRCTION INC Quantity and nits nit Price nit Price nit Price 0001

More information

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA

More information

ADDENDUM No. 1 January 29, Paving Program Village of Milford

ADDENDUM No. 1 January 29, Paving Program Village of Milford ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for

More information

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury

More information

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction

More information

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT: ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation

More information

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements

More information

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017

More information

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1

More information

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents

More information

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, 2014 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 1 $19 $18,500.00 1 2013 2013.602/00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32

More information

Addendum 1 13 TH Street Streetscape. September 1, 2017

Addendum 1 13 TH Street Streetscape. September 1, 2017 Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE

More information

BID TABULATION. Engineer's Estmated Opinion of Costs

BID TABULATION. Engineer's Estmated Opinion of Costs Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%

More information

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native

More information

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS 1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating

More information

AECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option

More information

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL II. ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL ITEM NO. 1: Page P-1, Proposal DELETE the Proposal (pages P-1 through P-9) in its entirety and REPLACE with the attached Proposal (pages P-1R

More information

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT

More information

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075 Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration

More information

The bid due date has been changed to 2:50 p.m. May 25, 2018.

The bid due date has been changed to 2:50 p.m. May 25, 2018. May 18, 2018 BL051-18 Addendum #1 Construction and Rehab of Gravity and Sewer Force Mains on an Contract Make the following changes/additions or clarifications to the above referenced bid: The bid due

More information

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00

More information

Public Works Maintenance STORMWATER AND

Public Works Maintenance STORMWATER AND Public Works Maintenance STORMWATER AND TRANSPORTATION Mission Statement T H E P U B L I C W O R K S M A I N T E N A N C E D I V I S I O N I S T H E M A I N C U S T O D I A N A N D P R I N C I P A L C

More information

Reviax Constracting Corp. DeSantis Construction

Reviax Constracting Corp. DeSantis Construction Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.

More information

BRIDGE ALTERNATE STUDY No. 1

BRIDGE ALTERNATE STUDY No. 1 BRIDGE ALTERNATE STUDY No. 1 RURAL STREAM CROSSING Prepared for U. S. Bridge Cambridge, Ohio Prepared by RICHLAND ENGINEERING LIMITED 29 North Park Street, Mansfield, Ohio 44902-1769 419/524-0074 FAX 419/524-1812

More information

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00

More information

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018 CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00

More information

Preliminary Budget Cost Estimate-Raft Island RIIA Roads 26952 SY Construction Items Budget Preliminary Temporary Erosion Control/Miscellaneous Work $ 18,500.00 Traffic Control $ 10,000.00 Pulverizing $

More information

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS 12835 NEWCASTLE WAY, SUITE 200 DECEMBER 18, 2012 SPECIAL MEETING 12:00 P.M. 1. CALL TO ORDER 2. GENERAL BUSINESS a. AB 12 077 Resolution Authorizing

More information

CITY OF SAN MARCOS ENGINEERING DIVISION

CITY OF SAN MARCOS ENGINEERING DIVISION AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION 1 Civic Center Dr., San Marcos, CA 92069-2918 (760) 744-1050 FAX (760) 591-4135 FEE SCHEDULE FOR GRADING & IMPROVEMENT PLAN

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018

OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018 LETTING DATE : 2018-06-14 CALL NUMBER : 772 OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE PAGE NO. 1 DATE PRINTED : JOB NUMBER : 170236 ESTIMATE NUMBER : PROJECT

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

PART II - Prospect Street 37. 8 Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050. BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.

More information

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as Description 103 REMOVE, STORE AND REINSTALL EXISTING RETAINING WALL 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) 203.1 TACK COAT BID PROPOSAL PROPOSAL OF, a corporation, a partnership consisting of an individual

More information

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No. Job 11-4518 Solicitation B-12-059-DD PROPOSAL of BID PROPOSAL, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER STEM: Pursuant to Instructions Invitation

More information

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 AWARDED PROJECT PROJECT NO. 016002 PID. 19109 BEL-7-3.68 TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT

More information

CITY OF DEERFIELD BEACH Request for City Commission Agenda

CITY OF DEERFIELD BEACH Request for City Commission Agenda Item: CITY OF DEERFIELD BEACH Request for City Commission Agenda Agenda Date Requested: 7/10/2012 Contact Person: Charles DaBrusco, P.E., Director of Environmental Services Description: Award of contract

More information

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213

More information

TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION CAPITAL PROGRAM TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily

More information

New Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS PAGE : 107-1 CONTRACT TIME : 01/24/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : FS-0022(105) ROUTE 37 FROM ROUTE 70 TO GARDEN STATE PARKWAY RESURFACING CONTRACT NO. 000103080 TOWNSHIP OF

More information

Opinion of Probable Cost

Opinion of Probable Cost Appendix E Opinion of Probable Cost 01054/8410233/14/Rohner_Alt_Analysis_Report Rohner Creek Flood Control, Habitat and Seismic Improvement Project Alternatives Analysis Cost Alternative 1: Improved Channel

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 240 0.00 CONTRACT ID: 090249068 PROJECT: STP 2014(119)TE CONTRACT: 08163051 AWARD AMOUNT: $2,150,084.20 PROJECTED AMOUNT: $2,344,277.78 ADJ. PROJECTED

More information

I. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL

I. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL WHATCOM COUNTY COUNCIL AGENDA BILL NO. 2016-248 CLEARANCES Initial Date Date Received in Council Office AxendaDate Assixned to: Originator: James Karcher, P.E. 9J7J:. 1 1-'> lft:; RrECE~VfEfD Division

More information

FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, Fargo City Commission Chambers 3:00 PM

FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, Fargo City Commission Chambers 3:00 PM 1. Call to order FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, 2017 Fargo City Commission Chambers 3:00 PM 2. Recommended contracting actions a. Schmidt & Sons Construction,

More information

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors. Patchogue Road Culvert Crossing IFB 2015-03 ADDENDUM #1 07/13/2015 Addendum #1 addresses the questions submitted by contractors. Q1: Bid Item shows 22 LF of 60 RCP but plans show 27 LF, please clarify.

More information

MSCAA PROJECT NO

MSCAA PROJECT NO TIME: RBID ENVELOPE MSCAA PROJECT NO. 08-1260-02 NAME OF PROJECT: GLYCOL MANAGEMENT PROGRAM- BRIDGES AND SITE CONSTRUCTION BIDS DUE: U7/27/2017 U U 2:00 PM Local Time UBIDDER IDENTIFICATIONU: MEMPHIS SHELBY

More information

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 This Addendum changes the terms of the Bid Proposal and/or plans associated with the project indicated below. By submitting a bid, any and all

More information

BID TABULATION PAGE 1 OF 8

BID TABULATION PAGE 1 OF 8 BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $

More information

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center

More information

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 1988 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 1988 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 217 10.00 CONTRACT ID: 187601030 PROJECT: BR 1502(017) CONTRACT: 04153032 AWARD : 3,278,223.27 PROJECTED : 3,289,223.27 ADJ. PROJECTED : 3,289,223.27

More information

/2 1,!JM [ ] [] Agenda Item #: 3-C-4 PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY. Meeting Date: May 16, 2017 [X] Consent

/2 1,!JM [ ] [] Agenda Item #: 3-C-4 PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY. Meeting Date: May 16, 2017 [X] Consent Recommended by: /2 1,!JM ~ F:\ROADW A Y\AIS\2002\2002109-utility receive & file.doc ~epartment Director Administrator.... Date Agenda Item #: 3-C-4 PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA

More information

$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC

$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC -73,034.10 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 56 5.00 CONTRACT ID: 629625001 PROJECT: RMC - 629625001 CONTRACT: 02164011 AWARD : $446,216.00 PROJECTED : $446,222.00 ADJ. PROJECTED : $373,187.90

More information

PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY EXECUTIVE BRIEF

PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY EXECUTIVE BRIEF Agenda Item is over 5 pages; may be viewed in the Minutes Department Agenda Item #: 3-C-4 PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: July 12, 216 [X] Consent [ ]

More information

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned

More information

1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) -

1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) - Charlotte County Board Of County Commissioners Agenda Item Summary Item Number: R- 5 1 DEPARTMENT MAKING REQUEST 2 MEETING DATE Purchasing 6/24/2014 9:00:00 AM 3 REQUESTED MOTION/ACTION Award Bid #14-209

More information