1 Appendix B Example Project Designs and Engineers Opinion of Costs 32 nd Street from E. 2 nd to Main Avenue CR 251 and CR th Street Sidewalk Improvements 15 th Street Improvements Intermodal Facility and Project LIVE
2 PLAN SITE PLAN - 32ND ST (ZONE 2) Drafted: Checked: TM KF 0/1/ OF SP-1 File Name: R:\Current Projects\Land Projects 3\Durango Multimodal Master Plan\ACAD\Level 3 Production Dwgs\32ND SITE PLAN Plotted: /10/2012 2:0 PM Plot Style: HALF.STB Plotted By: KELLY FEARNEY
3 32nd St Improvement Project CODE ITEM DESCRIPTION UNIT AMOUNT PRICE COST 1 Mobilization Lump Sum 1 $ 8, $ 8, Removal of Structures Lump Sum 2 $ 1, $ 3, Asphalt Milling Square Yards 3850 $ 2.5 $ 10, Sidewalk Removal SquareYards 400 $ 8.50 $ 3, Curb and Gutter Removal Linear Foot 325 $ 5.00 $ 1, Aggregate Base Course (Class 6) Tons 100 $ $ 2, Hot Bituminous Pavement (Grading SX) (5) (PG Tons 625 $ $ 65, Sidewalk (assume 6") Square Yard 500 $ $ 15, " Concrete Pan LF 50 $ $ 1, Curb and Gutter Linear Foot 325 $ $ 6, ADA Ramp Ea. 8 $ $ 4, Driveway Aprons Ea. 4 $ 1, $ 6, Railroad Crossing Linear Foot 65 $ $ 32, Storm Drain Inlet Ea. 2 $ 1, $ 2, Landscape Strip Square Foot 1000 $ 5.00 $ 5, Signage and Striping Lump Sum 1 $ 5, $ 5, MP Lump Sum 1 $ 5, $ 5, Traffic Control Lump Sum 1 $ 10, $ 10, Survey Engineering Lump Sum 1 $ 15, $ 20, Total Construction $ 208, % Contingency $ 41,4.50 Total Cost $ 250, Multi Modal Transportation Master Plan Key Projects Engineers Opinion of Cost - 32th St. from E. 2nd to Main Ave. Improvements
4 TIE INTO EXISTING 5' SIDEWALK, TAPER OUT TO 10' WIDTH EXISTING CROSALK DRIVEWAY APRON (TYP) 34' ROADWAY 10' MIXED USE SIDEWALK 6' BUFFERED BIKE LANE NOTE: DESIGN FOR THESE ROAD IMPROVEMENTS HAS JUST BEGUN THROUGH THE LAPLATA ROAD & BRIDGE DEPARTMENT AND A PRIVATE CONSULTING FIRM. THE INITIALLY PROPOSED CROSS SECTION INCLUDED (2) 11' TRAVEL LANES, 5' SHOULDERS, AND A DETACHED 10' MULTI-USE PATH. THIS EXHIBIT MODIFIES THE COUNTY PROPOSED SECTION AND INCLUDES 6' BUFFERED BIKE LANES RATHER THAN 5' SHOULDERS TO IMPROVE BIKER ACCESS AND SAFETY. THE MULTI-USE PATH IS SHOWN ON THE SOUTHSIDE OF THE ROAD AS THERE IS MORE DEVELOPMENT ON THE SOUTHSIDE, THUS THE SOUTHSIDE PATH ALLOWS FOR BETTER CONNECTIVITY WITHOUT THE NEED TO CROSS CR 251. PLAN 5' LANDSCAPE STRIP TIE INTO EXISTING CURB AND GUTTER MATCHLINE STA: 8+4 MATCHLINE STA: 1+48 INSTALL WAYFINDING SIGNAGE QUASAR STREET EXTENSION (SOFT GRAVEL TRAIL CONNECTION) ' MIXED USE SIDEWALK 5' LANDSCAPE STRIP 34' ROADWAY 6' BUFFERED BIKE LANE CONCRETE PAN ACROSS DRIVEWAY (TYP) 6' BUFFERED BIKE LANE 11' TRAVEL LANE 6' BUFFERED BIKE LANE 11' TRAVEL LANE CURB AND GUTTER (TYP) MATCHLINE STA: MATCHLINE STA: 8+4 MATCHLINE STA: 1+48 SITE PLAN - CR 251 (ZONE 3,) Drafted: Checked: TM KF 0/1/ OF SP-2A File Name: R:\Current Projects\Land Projects 3\Durango Multimodal Master Plan\ACAD\Level 3 Production Dwgs\CR 251 SITE PLAN Plotted: /10/2012 2:40 PM Plot Style: HALF.STB Plotted By: KELLY FEARNEY
5 25+00 NOTE: DESIGN FOR THESE ROAD IMPROVEMENTS HAS JUST BEGUN THROUGH THE LAPLATA ROAD & BRIDGE DEPARTMENT AND A PRIVATE CONSULTING FIRM. THE INITIALLY PROPOSED CROSS SECTION INCLUDED (2) 11' TRAVEL LANES, 5' SHOULDERS, AND A DETACHED SIDEWALK ON BOTH SIDES. THIS EXHIBIT MODIFIES THE COUNTY PROPOSED SECTION TO INCLUDE 6' BUFFERED BIKE LANES TO IMPROVE BIKER ACCESS AND SAFETY. MATCHLINE STA: DRIVEWAY APRON (TYP) PLAN TRANSIT STOP TO FLORIDA ROAD TIE INTO EXISTING IMPROVEMENTS ON CR 250 CONSTRUCTED DURING FLORIDA ROAD CONSTRUCTION 11' CENTER TURN LANE 11' TRAVEL LANE 6' BUFFERED BIKE LANE 6' BUFFERED BIKE LANE 5' LANSDSCAPE STRIP 11' TRAVEL LANE 8' SIDEWALK ONLY 2+00 ONLY 65' TURN POCKET PEDESTRIAN CROSALK MARKING (TYP) ADA RAMP REDIRECT TAPER, 8' WIDE, 160' LENGTH TIE INTO EXISTING CURB, GUTTER, AND SIDEWALK TRANSITION/TAPER BACK AND TIE INTO EXISTING ASPHALT 8' SIDEWALK 5' LANDSCAPE STRIP 40' ROADWAY FUTURE CITY STREET TO BE CONSTRUCTED UPON ANIMAS ROAD STORAGE REDEVELOPMENT SITE PLAN - CR 250 AND 251 (ZONE 3,) Drafted: Checked: TM KF 0/1/ OF SP-2B File Name: R:\Current Projects\Land Projects 3\Durango Multimodal Master Plan\ACAD\Level 3 Production Dwgs\CR 251 SITE PLAN Plotted: /10/2012 2:42 PM Plot Style: HALF.STB Plotted By: KELLY FEARNEY
6 Drafted: TM Checked: KF 0/1/ OF SP-2C OVERALL SITE PLAN - CR 250 & 251 (ZONE 3,) File Name: R:\Current Projects\Land Projects 3\Durango Multimodal Master Plan\ACAD\Level 3 Production Dwgs\CR 251 SITE PLAN Plotted: /10/2012 2:11 PM Plot Style: HALF.STB Plotted By: KELLY FEARNEY PLAN
7 CR 251 / 250 Improvement Project CODE ITEM DESCRIPTION UNIT AMOUNT PRICE COST 1 Mobilization Lump Sum 1 $ 50, $ 50, Clearing and Grubbing Acre 3 $ 3, $ 10, Removal of Structures Lump Sum 2 $ 1, $ 3, Aggregate Base Course (Class 2) Tons 150 $ $ 40, Aggregate Base Course (Class 6) Tons 2600 $ $ 65, Hot Bituminous Pavement (Grading SX) (5) (PG 58-28) Tons 2500 $ $ 262, Sidewalk (assume 6") Square Yard 4300 $ $ 135, Curb and Gutter Linear Foot 160 $ $ 35, ADA Ramp Ea. 4 $ $ 2, Driveway Aprons Ea. 14 $ 1, $ 21, Storm Drain Inlet Ea. 2 $ 1, $ 2, Landscape Strip Square Foot 8800 $ 2.50 $ 22, Native Seeding Acre 2 $ 1, $ 2, Signage and Striping Lump Sum 1 $ 25, $ 25, MP Lump Sum 1 $ 50, $ 50, Traffic Control Lump Sum 1 $ 50, $ 50, Survey Engineering Lump Sum 1 $ 115, $ 115, Total Construction $ 891, % Contingency $ 18, Total Cost $ 1,069, Multi Modal Transportation Master Plan Key Projects Engineers Opinion of Cost - CR 251 and CR 250
8 PLAN SITE PLAN - 9TH ST (ZONE 6) Drafted: Checked: TM KF 0/1/ OF SP-3 File Name: R:\Current Projects\Land Projects 3\Durango Multimodal Master Plan\ACAD\Level 3 Production Dwgs\9TH ST AND PROJECT LIVE SITE PLAN Plotted: /10/2012 2:02 PM Plot Style: HALF.STB Plotted By: KELLY FEARNEY
9 9th St Improvement Project Code ITEM DESCRIPTION UNIT AMOUNT PRICE COST 1 Mobilization Lump Sum 1 $ 5, $ 5, Removal of Structures Lump Sum 1 $ 1, $ 1, Sidewalk Removal SquareYards 200 $ 8.50 $ 1, Curb and Gutter Removal Linear Foot 260 $ 5.00 $ 1, Aggregate Base Course (Class 6) Tons 105 $ $ 2, Sidewalk (assume 6") Square Yard 350 $ $ 11, Curb and Gutter Linear Foot 540 $ $ 10, ADA Ramp Each $ $ 3, Removal of Stairs / Ramp Installation Lump Sum 1 $ 5, $ 5, Driveway Aprons Each 2 $ 1, $ 3, Storm Drain Inlet - reset Each 1 $ 1, $ 1, Irrigation Vault cover Each 1 $ $ Landscape Strip Square Foot 500 $ 5.00 $ 2, Signage and Striping Lump Sum 1 $ 15, $ 15, MP Lump Sum 1 $ 5, $ 5, Traffic Control Lump Sum 1 $ 10, $ 10, Survey Engineering Lump Sum 1 $ 15, $ 15, Subtotal $ 94, % Contingency $ 18, Total Cost $ 113, Multi Modal Transportation Master Plan Key Projects Engineers Opinion of Cost - 9th St. Improvements
10 PLAN NOTE: IMPROVEMENTS TO INCLUDE FULL RECONSTRUCTION OD ASPHALT ON 15TH STREET SITE PLAN - 15TH ST AND E 2ND AVE (ZONE 6) Drafted: Checked: TM 0/1/ OF SP-4 File Name: R:\Current Projects\Land Projects 3\Durango Multimodal Master Plan\ACAD\Level 3 Production Dwgs\15TH AND 2ND SITE PLAN Plotted: /10/2012 2:21 PM Plot Style: HALF.STB Plotted By: KELLY FEARNEY
11 15th St and E 2nd Ave Improvement Project CODE ITEM DESCRIPTION UNIT AMOUNT PRICE COST 1 Mobilization Lump Sum 1 $ 8, $ 8, Removal of Structures Lump Sum 4 $ 1, $ 6, Sidewalk Removal SquareYards 320 $ 8.50 $ 2, Asphalt Removal Square Yards 200 $ $ 2, Curb and Gutter Removal Linear Foot 630 $ 5.00 $ 3, Aggregate Base Course (Class 6) Tons 160 $ $ 3, Sidewalk (assume 6") Square Yard 525 $ $ 16, Curb and Gutter Linear Foot 1000 $ $ 20, Raised Medain Square Yard 60 $ $ 1, ADA Ramp Ea. 6 $ $ 3, Driveway Aprons Ea. 3 $ 1, $ 4, Storm Drain Inlet - reset Ea. 3 $ 1, $ 3, Landscape Strip Square Foot 2500 $ 5.00 $ 12, Railroad Crossing Linear Foot 120 $ $ 60, Signage and Striping Lump Sum 1 $ 15, $ 15, MP Lump Sum 1 $ 5, $ 5, Traffic Control Lump Sum 1 $ 25, $ 25, Survey Engineering Lump Sum 1 $ 25, $ 25, Subtotal $ 216, % Contingency $ 43, Total Cost $ 260,33.00 Multi Modal Transportation Master Plan Key Projects Engineers Opinion of Cost - 15th St. Improvements
12 PLAN Project LIVE (Livability Inspiring Vitality and Efficiency) proposes the construction of an 118,200 square foot LEED certified, two-level intermodal facility integrated with the existing Transit Center. The facility will: 1. Provide storage for the transit fleet [8,000 sq ft] 2. Serve as a park and ride for regional transit commuters 3. Provide secure, covered, and heated bicycle storage [2500 sq ft] 4. House a bike-share program where bikes are loaned on an hourly/daily basis to provide connectivity and end of trip transportation options for transit users 5. Provide 12 charging stations for electric vehicles [2400 sq ft] 6. Provide transit related retail space [2,000 sq ft]. Allow for revenue space funding transit [30,600 sq ft] 8. Allow for Fee In Lieu Parking for infill housing development 9. Reduce greenhouse gas emissions by eliminating deadhead miles from our transit fleet 10. Increase mobility options for passengers of the numerous regional services served by the Transit Center including: Ignacio Road Runner, Durango Mountain Resort, and Durango Transit SITE PLAN - PROJECT LIVE (ZONE 6) Drafted: Checked: TM KF 0/1/2012 OF SP-5 File Name: R:\Current Projects\Land Projects 3\Durango Multimodal Master Plan\ACAD\Level 3 Production Dwgs\9TH ST AND PROJECT LIVE SITE PLAN Plotted: /10/2012 2:50 PM Plot Style: HALF.STB Plotted By: KELLY FEARNEY
13 Project LIVE Pedestrian Overpass and Trial Connection CODE ITEM DESCRIPTION UNIT AMOUNT PRICE COST 1 Mobilization Lump Sum 1 $ 50, $ 50, Pedestrian Overpass of Camino Del Rio Lump Sum 1 $ 00, $ 400, Aggregate Base Course (Class 6) Tons 50 $ $ 1, Trial Connection (6" Concrete) Square Yard 150 $ $ 4, Easement/ROW Acquisition Square Feet 3000 $ $ 45, MP Lump Sum 1 $ 15, $ 15, Traffic Control Lump Sum 1 $ 15, $ 15, Survey Engineering Lump Sum 1 $ 5, $ 5, Total Construction $ 605, % Contingency $ 121, Total Cost $ 2, CODE ITEM DESCRIPTION UNIT AMOUNT PRICE COST 9 Intermodal Facility Lump Sum 1 $ 11,544, $ 11,544, Multi Modal Transportation Master Plan Key Projects Engineers Opinion of Cost - Intermodal Facility and Project LIVE
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial
More informationRegion 5 Upcoming Projects for Summer/Fall 2018
Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The
More informationRoute Route Z Intersection Realignment
Route N @ Route Z Intersection Realignment Sponsor County Highway Project No. RB18-000016 Project Type Traffic Flow TOTAL FUNDING Total County Sponsor Federal $3,310,000 $1,776,000 $0 $1,534,000 Project
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More informationChapter 6: Financial Resources
Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation
More informationCITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS
CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center
More informationREVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO
REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 OF THE CITY OF SAN JACINTO December 11, 2003 REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 CITY OF SAN JACINTO Prepared for CITY OF SAN
More informationTech Memo #4: Capital Costs
MILWAUKEE COUNTY EAST-WEST BUS RAPID TRANSIT Tech Memo #4: Capital Costs REVISION #1 DATE June 28, 2016 Prepared for: Milwaukee County 10320 W. Watertown Plank Rd. Wauwatosa, WI 53226 Prepared by: AECOM
More informationPROJECT COST. Prepared for City of Burlington, Iowa Downtown/Riverfront Revitalization Project
PROJECT COST Prepared for City of Burlington, Iowa Downtown/Riverfront Revitalization Project City of Burlington Downtown/Riverfront Revitalization Project TIGER Grant Budget Date: 4/29/2016 Project Budget
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More informationChapter 5: Cost and Revenues Assumptions
Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions INTRODUCTION This chapter documents the assumptions that were used to develop unit costs and revenue estimates for the
More information33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.
CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler
More informationAWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET
STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213
More information2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.
ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense
More informationBid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221
Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00
More informationPublic Works Maintenance STORMWATER AND
Public Works Maintenance STORMWATER AND TRANSPORTATION Mission Statement T H E P U B L I C W O R K S M A I N T E N A N C E D I V I S I O N I S T H E M A I N C U S T O D I A N A N D P R I N C I P A L C
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION 1 Civic Center Dr., San Marcos, CA 92069-2918 (760) 744-1050 FAX (760) 591-4135 FEE SCHEDULE FOR GRADING & IMPROVEMENT PLAN
More informationEST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS
BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native
More informationCity of Clovis Date completed or revised: September 26, 2014
Date completed or revised: September 26, 2014 Completed by: (print) Renee Mathis The anticipated Fiscal Year 2014-15 revenue allocation for Street Maintenance sub-program: $912,013 X Street Maintenance
More informationSunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List
Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements
More informationCrushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:
Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and
More informationNorthumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate
Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)
More informationThis page intentionally left blank
197 This page intentionally left blank 198 Capital Improvement Program PROCEDURE Each year the Capital Improvement Program (CIP) is prepared from project requests submitted by the various departments.
More informationCounty Barn Road RPUD. Deviation Justification
1. Deviation 1 seeks relief from LDC Section 6.06.02.A.2 which requires dual sidewalks on local roads internal to the site, to allow a sidewalk on one side of the roadway where the property is permitted
More informationCITY OF BRENTWOOD DEVELOPMENT IMPACT FEE PROGRAM 2015
CITY OF BRENTWOOD DEVELOPMENT IMPACT FEE PROGRAM 2015 TABLE OF CONTENTS Page Introduction. 1 Program Overview. 1 Fee Summary 2 Land Use Categories and Growth Projections. 3 Administration 5 Community Facilities
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationCapital Investment Program (CIP) About CIP
Capital Investment Program (CIP) About CIP The Capital Investment Program (CIP) is a multi-year program aimed at upgrading and expanding City facilities, buildings, grounds, streets, parks and roads. The
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationPreliminary Budget Cost Estimate-Raft Island RIIA Roads 26952 SY Construction Items Budget Preliminary Temporary Erosion Control/Miscellaneous Work $ 18,500.00 Traffic Control $ 10,000.00 Pulverizing $
More informationCITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS
1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating
More information2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time
TABULATION PAGE 1 OF 6 PRE- ESTIMATE Pitlik and Wick, Inc. CONTRACT A - BASE Highway X (Friedle Road to Dam Road) A1.1 Single Layer Chip Seal 75,100 sq. yds. $ 2.50 $ 187,750.00 $ 1.60 $ 120,160.00 $ 1.19
More informationPublic Works and Development Services
City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement
More information7 31 32 33 34 35 37 38 39 40 41 42 43 A G R E E M E N T Between Morrison County, The City of Pierz and Rich Prairie Sewer and Water District THIS AGREEMENT is made and entered into between Morrison
More informationState of the Industry
Florida Department of TRANSPORTATION State of the Industry Howie Moseley State Bituminous Materials Engineer State Highway System 43,920 lane miles of roadway 8,242 interstate lane miles 33,465 arterial
More informationBIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.
More informationTRANSPORTATION CAPITAL PROGRAM
TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily
More informationCITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $
RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement
More informationSAN RAFAEL CITY COUNCIL AGENDA REPORT
Agenda Item No: 4.g Meeting Date: March 6, 2017 Department: Public Works SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Director of Public Works TOPIC: ADA-DOJ CURB RAMPS 2016-2017 City
More informationBID TABULATION. Engineer's Estmated Opinion of Costs
Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%
More informationCapital Cost Estimation Methodology
West Broadway Transit Study Capital Cost Estimation Methodology 7/6/2015 Prepared by the SRF Consulting Group Team for Capital Cost Estimation Methodology Page i Introduction... 1 1. Capital Costs... 1
More informationMEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION
MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 20172018 AGENCY CONTACT INFORMATION Agency Name: City of Alameda Date: 11/29/2018 Primary Point of Contact Name: Scott Wikstrom
More informationAddendum 1 13 TH Street Streetscape. September 1, 2017
Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationExhibit 4 Page 1 of 8
Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More informationTOWN OF JUPITER Community Redevelopment Agency
TOWN OF JUPITER Community Redevelopment Agency DATE: September 14, 2012 TO: THRU: FROM: Honorable Chair and Commissioners of the Community Redevelopment Agency Andrew D. Lukasik, Executive Director Brenda
More informationReport Accompanying the Diamond Lake Urban Renewal Plan
Report Accompanying the Diamond Lake Urban Renewal Plan Adopted by the City of Roseburg July 9, 2018 Ordinance No. 3502 Diamond Lake Urban Renewal Area Consultant Team Elaine Howard Consulting, LLC Elaine
More information69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11
69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to
More informationIMPLEMENTATION PLAN INTRODUCTION PROJECT PACKAGES
INTRODUCTION The Implementation Plan is intended to provide the City of Berkeley a framework to define the future steps for the West Berkeley Circulation Master Plan (WBCMP). Since the objective of the
More informationFiscal Responsibility to Further Invest in the Future. Executive Committee Department of Finance May 4, 2017
Fiscal Responsibility to Further Invest in the Future Executive Committee Department of Finance May 4, 2017 1 Asset Inventory Denver s Assets Parks and Recreation $1.8B Transportation $4.7B Buildings $1.9B
More informationOCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager
REPLACEMENT RESERVE REPORT FY 2017 OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 Community Management by: POSTON & COMPANY Melissa Blocker,
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More informationBID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00
More informationInfrastructure and Capital Projects Planning and Funding
Infrastructure and Capital Projects Planning and Funding September 6, 2018 Preview of FY 2020 2024 CIP process Why are we here? Overview Current Assets Overview and Highlights of Adopted FY 2019 2023 CIP
More informationNON-MOTORIZED FACILITIES
NON-MOTORIZED FACILITIES POLICY The Board of Road Commissioners of the County of Kalamazoo non-motorized policy provides a guideline for the development of non-motorized facilities in the public right-of-way.
More informationPART A ROADWAY - BASE BID
May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00
More informationAGENDA THE UNIVERSITY OF WEST FLORIDA BOARD OF TRUSTEES. Finance, Facilities & Operations Committee Meeting November 18, 2016
AGENDA THE UNIVERSITY OF WEST FLORIDA BOARD OF TRUSTEES Finance, Facilities & Operations Committee Meeting University of West Florida Conference Center, Bldg. 22 11000 University Parkway, Pensacola, FL
More informationBID TABULATION BID REQUEST NO
BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS
More informationNE WEST KINGSTON ROAD CULVERT REPLACEMENT
NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS
More informationMEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION
MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 20172018 AGENCY CONTACT INFORMATION Agency Name: City of Fremont Date: 12/21/2018 Primary Point of Contact Name: Tish Saini
More informationRevised Public Review Draft Report
Revised Public Review Draft Report Central City Specific Plan Public Facilities Finance Plan Prepared for: City of Sacramento Prepared by: Economic & Planning Systems, Inc. (EPS) February 6, 2018 EPS #152140
More informationAPPROVED 9 LOT TENTATIVE TRACT MAP - NEAR FINAL MAP
Rare Development Opportunity in Carlsbad, West of El Camino Real Owner Will Deliver Property with Final Map Ready to Record at Closing Surrounded by 12 Acres of Open Space 8,002-11,173 SF Lot Sizes Area
More informationBID TABULATION PAGE 1 OF 6
BID TABULATION PAGE 1 OF 6 BID PRE-BID ESTIMATE R.G. Huston Company, Inc. Kopplin & Kinas Co., Inc. Cottage Grove, WI Green Lake, WI NO. DESCRIPTION OF WORK QUANT. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT
More informationITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT
Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00
More information19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown
19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL
More informationCity of Lake Elsinore, California. Capital Improvement Plan Budget FY to FY
City of Lake Elsinore, California Capital Improvement Plan Budget FY2016-17 to FY2020-21 1 2 Capital Improvement Plan Budget Fiscal Years 2016-2021 City Council Brian Tisdale, Mayor Robert E. Magee, Mayor
More informationCity of Arcata Engineering Department Encroachment Permit Application
City of Arcata Engineering Department Encroachment Permit Application Complete and return to City of Arcata, 736 F Street, Arcata, CA 95521 707-825-2128 mdabill@cityofarcata.org or Location of Work AP
More informationCITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018
CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00
More informationINSPECTION SERVICES DIVISION FEE SCHEDULE
BUILDING INSPECTION SERVICES DIVISION FEE SCHEDULE Effective January 1, 2017 ** To calculate fees for building projects use the higher of the fees by valuation or square footage ** New Buildings, Additions
More informationOPTION A: 2 BITUMINOUS PAVING WITH SHOULDERS OPTION B: SCRATCH COURSE BITUMINOUS PAVING WITHOUT SHOULDERS
SHIAWASSEE COUNTY ROAD COMMISSION PROPOSAL FOR 2018 BITUMINOUS PAVING PROGRAM JUDDVILLE ROAD FROM CLINTON COUNTY LINE (MERIDIAN ROAD) TO GENESSEE COUNTY LINE (M-13) IN SHIAWASSEE COUNTY + / - 22.34 MILES
More informationREPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager
REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA VILLAGE GREEN HOA REPLACEMENT RESERVE REPORT FY 2011 Community Management by: Ravenel Associates, Inc. Chad Hammond, Property Manager 3690 Bohicket
More informationIndiana LTAP Road School 2007 Purdue University West Lafayette, Indiana March 7, 2007
Review of GASB Statement No. 34 capital asset provisions and discussion of the Indiana LTAP and Government Fixed Asset Services, Inc. Procedure Manual for Implementation of GASB Statement No. 34 Indiana
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00
More informationINVESTING STRATEGICALLY
11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program
More informationMETRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s):
METRO METRO METRO 2017 2026 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit
More informationSTRAIGHT STRIPE PAINTING, INC. 22b Remove Pavement Markings with Sand Blasting Per Hour 1 $ $ $ $
PAVEMENT MARKING STRAIGHT STRIPE PAINTING, AMERICAN PAVEMENT MARKING, LLC ITEM UNIT TOTAL UNIT TOTAL NUMBER DESCRIPTION UNIT QUANTITY COST AMOUNT COST AMOUNT 1 Mobilization L.S. 3 $ 400.00 $ 1,200.00 $
More informationFY Annual Budget: Mobility Solutions, Infrastructure, & Sustainability
FY 2018-19 Annual Budget: Mobility Solutions, Infrastructure, & Sustainability City Council Briefing August 15, 2018 Majed Al-Ghafry, Assistant City Manager Overview FY 2018-19 Budget by Strategic Priority
More informationTown of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562
Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated
More informationLETTING : CALL : 056 COUNTIES : MILLE LACS
S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE
More informationCity of New Smyrna Beach Permit Fee Schedule
Fifty percent of the permit fee will be paid in advance for plan review and shall not be eligible for refund. ALL PERMITS ARE CHARGED A STATE OF FLORIDA SURCHARGE OF 2.5% OR $4.00 WHICH EVER IS GREATER.
More informationPALMETTO STREETSCAPE Recommendations to Achieve Goals within Budget
Recommendations to Achieve Goals within Budget City Council Presentation August 8, 2016 Van Ocampo, Public Works Director Lee Panza, Associate Engineer A. Stedler, Economic Development Manager GOAL Recommendations
More informationTraffic Impact Analysis Guidelines Methodology
York County Government Traffic Impact Analysis Guidelines Methodology Implementation Guide for Section 154.037 Traffic Impact Analysis of the York County Code of Ordinances 11/1/2017 TABLE OF CONTENTS
More information418 Main Street Lemont, IL Mayor and Village Board. Chris Smith, Finance Director George Schafer, Village Administrator
418 Main Street Lemont, IL 60439 TO: FROM: THROUGH: SUBJECT: Mayor and Village Board Chris Smith, Finance Director George Schafer, Village Administrator Proposed Fiscal Year 2020-2024 Capital Improvement
More information32 nd Street Corridor Improvements
Benefit-Cost Analysis Supplementary Documentation TIGER Discretionary Grant Program 32 nd Corridor Improvements USDOT TIGER BCA Results City of Joplin, MO April 29, 2016 32nd Corridor Improvements Contents...
More informationALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN
ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationMEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION
MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 217218 AGENCY CONTACT INFORMATION Agency Name: City of San Leandro Date: 12/14/218 Primary Point of Contact Name: Norite
More informationPRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer
G-7 STAFF REPORT MEETING DATE: November 27, 2018 TO: FROM: City Council Petr Skala, Associate Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher
More information10-Year Capital Highway Investment Plan DRAFT
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway
More informationADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO
ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents
More informationMONTE SERENO BETTER STREETS COMMISSION AGENDA 7:00 P.M. Thursday March 8, 2018 Regular Meeting
MONTE SERENO BETTER STREETS COMMISSION AGENDA 7:00 P.M. Thursday March 8, 2018 Regular Meeting Monte Sereno City Council Chambers 18041 Saratoga-Los Gatos Road, Monte Sereno, CA 95030 MEETING CALLED TO
More informationBID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012
Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00
More informationEXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE
1. Building Permit EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE a. This fee schedule is applicable to all building permits issued by the City of Oldsmar, Building Division
More informationCITY-TIF COMMISSION EXPENSES Cost Description Project Cost Data Reimbursable From Public Funds Developer Equity COST TIF Super TIF State TIF CID SCTC PRIVATE I. Legal $ 750,000 $ 750,000 $ - $ - $ - $
More informationCURB CUTS SPECIFICATIONS AND STANDARDS
City of Elmira, New York CURB CUTS SPECIFICATIONS AND STANDARDS Just a click away Effective Date: April 1992 This document, the Curb Cut Permit Application, and other specifications and standar ds are
More informationRemoved Projects TR th Way SE (Snake Hill) Improvements o Will be completed in TR th Ave SE Gap Project
Agenda Bill City Council Regular Meeting June 19, 2018 SUBJECT: 2019-2024 Six-Year Transportation Improvement Plan (TIP) DATE SUBMITTED: June 12, 2018 DEPARTMENT: Public Works NEEDED FROM COUNCIL: Action
More informationCapital improvements program (Cip)
Capital Improvements Program (CIP) CAPITAL IMPROVEMENTS PROGRAM Introduction In accordance with the Texas Local Government Code and the Charter of the City of Southlake, the FY 219 to FY 223 Capital Improvements
More informationAve Maria Stewardship Community District
Ave Maria Stewardship Community District Final Budget For Fiscal Year 2017/2018 October 1, 2017 September 30, 2018 CONTENTS I II III IV V FINAL BUDGET DETAILED FINAL BUDGET DETAILED FINAL DEBT SERVICE
More informationStorm Water Mitigation Services ITB SEMINOLE TRIBE OF FLORIDA INVITATION TO BID
SEMINOLE TRIBE OF FLORIDA INVITATION TO BID Solicitation #: ITB 58-2018 Title: Description: Storm Water Mitigation Services The Seminole Tribe of Florida ( Tribe or STOF ) is requesting proposals from
More informationTAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.
DAVID TAUSSIG & Associates, Inc. Annual Report Fiscal Year 2016-2017 City of Irvine Community Facilities District No. 2013-3 (Great Park) September 26, 2017 Public Finance Public Private Partnerships Urban
More information