1 AWARDED PROJECT PROJECT NO PID CLI TE21-G990(144) TYPE: TWO LANE RESURFACING LETTING: 03/03/99 COMPLETION DATE: 09/30/99 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: JOHN R JURGENSEN COMPANY AWARDED AMOUNT: $ 1,126, ENGINEERS ESTIMATE: $ 1,225, AWARDED BIDDER BIDDER 02 JOHN R JURGENSEN COMPANY BARRETT PAVING MATERIALS INC MOSTELLER RD 7374 MAIN ST CINCINNATI,OH CINCINNATI,OH BIDDER 03 L P CAVETT COMPANY 600 SHEPHERD AVE LOCKLAND,OH 45215
2 PROJECT NO PAGE NO M54101 RSD PVMT MRK RMVD/STRG, APP 2 203M12000 EXCAVATION W/O EMBANKMENT 3 252M01000 FULL DPT PVMT REM/FLEX REPL 4 252M01500 FULL DEPTH PAVEMENT SAWING 5 253M02000 PAVEMENT REPAIR 6 254M01000 PAVEMENT PLANING, BITUMINOUS 7 254M01600 PATCHING PLANED SURF EACH AWD $ $ $ $ $ $ CU METER AWD $ $ 5, $ $ 6, $ $ 13, , SQ METER AWD $ $ 306, $ $ 318, $ $ 349, , METER AWD $ $ 33, $ $ 41, $ $ 33, CU METER AWD $ $ 131, $ $ 131, $ $ 131, , SQ METER AWD $ $ 79, $ $ 103, $ $ 85, , SQ METER AWD $ $ 1, $ $ 1, $ $ 2, M46000 BITUMINOUS AGGREGATE BASE, PG CU METER AWD $ $ 32,327.46
3 PROJECT NO PAGE NO M20000 AGGREGATE BASE M10000 TACK COAT 02 $ $ 31, $ $ 37, CU METER AWD $ $ 9, $ $ 7, $ $ 8, , LITER AWD $ $ 9, $ $ 7, $ $ 6, M50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1H 4, CU METER AWD $ $ 306, $ $ 420, $ $ 348, M50001 ASPH CONC SURFACE, TYPE 1H, APP M09000 CATCH BASIN ADJ TO GRADE M34500 MANHOLE ADJUSTED TO GRADE M12460 WORK ZONE MARKING SIGN CU METER AWD $ $ 14, $ $ 15, $ $ 13, EACH AWD $ $ 10, $ $ 5, $ $ 10, EACH AWD $ $ 11, $ $ 5, $ $ 12, EACH AWD $ $ 2, $ $ 1, $ $ M13000 BITUMINOUS CONCRETE FOR MAINTAINING TRAF
4 PROJECT NO PAGE NO M20400 TEMP LANE LINE, CL II M21000 TEMP CL, CL I M23000 TEMP CH LINE, CLASS I M26000 TEMP STOP LINE, CL I M30000 TEMP LANE ARROW, CL I M10100 COMPACTED AGGREGATE, TYPE A M20000 SHOULDER PREPARATION CU METER AWD $ $ 8, $ $ 7, $ $ 8, KILOMETER AWD $ $ $ $ $ $ KILOMETER AWD $ $ 2, $ $ 4, $ $ 3, METER AWD $ $ $ $ $ $ METER AWD $ $ 1, $ $ $ $ EACH AWD $ $ $ $ $ $ CU METER AWD $ $ 10, $ $ 17, $ $ 11, , SQ METER AWD $ $ 1, $ $ 1,177.70
5 PROJECT NO PAGE NO M25000 WATER 03 $ $ 1, CU METER AWD $ $ $ $ $ $ M00200 RAISED PAVEMENT MARKER, INSTALL ONLY M03100 GR MTD SUPP, #3 POST M80100 SIGN, FLAT SHEET M26500 DETECTOR LOOP M27200 LOOP DETECTOR TIE IN M10800 VALVE BOX ADJUSTED TO GRADE M00102 EDGE LINE, TYPE EACH AWD $ $ 1, $ $ 1, $ $ 1, METER AWD $ $ $ $ $ $ SQ METER AWD $ $ $ $ $ $ EACH AWD $ $ 25, $ $ 25, $ $ 23, EACH AWD $ $ 2, $ $ 2, $ $ 1, EACH AWD $ $ 5, $ $ 1, $ $ 3,900.00
6 PROJECT NO PAGE NO M00202 LANE LINE, TYPE M00302 CENTER LINE, TYPE M00402 CHANNELIZING LINE, TYPE M00502 STOP LINE, TYPE M00602 CROSSWALK LINE, TYPE M00702 TRANSVERSE LINE, TYPE M00802 CURB MARKING, TYPE KILOMETER AWD $ $ 2, $ $ 2, $ $ 2, KILOMETER AWD $ $ $ $ $ $ KILOMETER AWD $ $ 2, $ $ 2, $ $ 2, METER AWD $ $ $ $ $ $ METER AWD $ $ 1, $ $ 1, $ $ 1, , METER AWD $ $ 3, $ $ 3, $ $ 3, METER AWD $ $ 1, $ $ 1, $ $ 1, , METER AWD $ $ 2, $ $ 2, $ $ 2,710.23
7 PROJECT NO PAGE NO M00902 ISLAND MARKING, TYPE M01002 RR SYMBOL MARKING, TYPE M01102 SCHOOL SYMBOL MKG, 1800, TYPE M01202 PARKING LOT STALL MKG, TYPE M01302 LANE ARROW, TYPE M01402 WORD ON PVMT, 1800 MM, TYPE M01512 DOTTED LINE, 150 MM, TYPE SQ METER AWD $ $ $ $ $ $ EACH AWD $ $ $ $ $ $ EACH AWD $ $ $ $ $ $ , METER AWD $ $ 4, $ $ 4, $ $ 4, M01704 HANDICAP SYMBOL MARKING, TYPE EACH AWD $ $ 1, $ $ 1, $ $ 1, EACH AWD $ $ 1, $ $ 1, $ $ 1, METER AWD $ $ $ $ $ $ EACH
8 PROJECT NO PAGE NO M98000 MISC. TRAFFIC DIVIDERS REPLACEMENT M98400 MISC. TRAFFIC DIVIDERS S.1 ITEMS OF WORK TOTALS M05000 PERFORMANCE BOND M11000 MAINTAINING TRAFFIC M10000 MOBILIZATION M10001 CONST LAYOUT STAKES, APP AWD $ $ $ $ $ $ EACH AWD $ $ $ $ $ $ AWD $ $ $ 1, $ 1, $ $ AWD $ 1,041, $ 1,187, $ 1,139, AWD $ 5, $ 5, $ 3, $ 3, $ 1, $ 1, AWD $ 33, $ 33, $ 48, $ 48, $ 105, $ 105, AWD $ 40, $ 40, $ 8, $ 8, $ 21, $ 21, AWD $ 6, $ 6, $ 4, $ 4, $ 5, $ 5,000.00
9 PROJECT NO PAGE NO. 8 S.2 INCIDENTALS TOTALS TOTAL AMOUNT OF THE BID AWD $ 84, $ 63, $ 133, AWD $ 1,126, $ 1,251, $ 1,272,692.57
10 AWARDED PROJECT PROJECT NO PID WOO/LUC /0.000 TE21-G990(95) TYPE: FOUR LANE RESURFACING LETTING: 03/03/99 COMPLETION DATE: 11/30/99 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: S E JOHNSON COMPANIES INC AWARDED AMOUNT: $ 7,251, ENGINEERS ESTIMATE: $ 7,419, AWARDED BIDDER BIDDER 02 S E JOHNSON COMPANIES INC E S WAGNER COMPANY 1345 FORD ST 840 PATCHEN RD 29 A OREGON,OH MAUMEE,OH BIDDER 03 BIDDER 04 VELOTTA COMPANY MILLER BROS CONST INC 6740 RIDGE RD 1613 S DEFIANCE ST SHARON CENTER,OH ARCHBOLD,OH 43502
11 PROJECT NO PAGE NO M11000 CLEARING AND GRUBBING 2 202M22900 APPROACH SLAB REM 3 202M23500 WEARING COURSE REMOVED 4 202M38000 GUARDRAIL REMOVED 5 202M38100 GUARDRAIL REM FOR STRG AWD $ 1, $ 1, $ 110, $ 110, $ 5, $ 5, $ 15, $ 15, SQ METER AWD $ $ 14, $ $ 18, $ $ 18, $ $ 18, , SQ METER AWD $ $ 2, $ $ 4, $ $ 4, $ $ 5, METER AWD $ $ $ $ $ $ $ $ , METER AWD $ $ 7, $ $ 7, $ $ 7, $ $ 7, M54100 RAISED PVMT MRK RMVD FOR STORAGE 7 203M12000 EXCAVATION W/O EMBANKMENT EACH AWD $ $ 4, $ $ 3, $ $ 3, $ $ 3, , CU METER AWD $ $ 45, $ $ 45,680.00
12 PROJECT NO PAGE NO M40000 BORROW 9 203M50000 SUBGRADE COMPACTION M60100 LINEAR GRADING M10000 FULL DTPH RMVL & REPL, CL C M20000 FULL DEPTH PAVEMENT SAWING M20000 AGGREGATE BASE M13000 GUARDRAIL, TYPE 5 03 $ $ 51, $ $ 39, CU METER AWD $ $ $ $ 1, $ $ 2, $ $ 1, , SQ METER AWD $ $ 9, $ $ 6, $ $ 9, $ $ 8, , METER AWD $ $ 32, $ $ 19, $ $ 18, $ $ 3, SQ METER AWD $ $ 53, $ $ 49, $ $ 31, $ $ 37, METER AWD $ $ 2, $ $ 2, $ $ 1, $ $ 2, CU METER AWD $ $ 1, $ $ 9, $ $ 18, $ $ 14,085.00
13 PROJECT NO PAGE NO M13050 GUARDRAIL, TYPE 5A M15500 GR, BARRIER DES, TYPE M17000 RAISING TYPE 5 GR M17900 GUARD POST M22000 ANCHOR ASSMEBLY, TYPE B M26100 ANCHOR ASSEMBLY, TYPE E 2, METER AWD $ $ 67, $ $ 67, $ $ 67, $ $ 67, METER AWD $ $ $ $ $ $ $ $ METER AWD $ $ 2, $ $ 2, $ $ 2, $ $ 2, , METER AWD $ $ 16, $ $ 16, $ $ 16, $ $ 16, EACH AWD $ $ $ $ $ $ $ $ EACH AWD $ 1, $ 5, $ 1, $ 5, $ 1, $ 5, $ 1, $ 5, EACH AWD $ 1, $ 31, $ 1, $ 31, $ 1, $ 31, $ 1, $ 31,160.00
14 PROJECT NO PAGE NO M26500 ANCHOR ASSEMBLY, TYPE T M35000 BRIDGE TERM. ASSY, TYPE M35100 BRIDGE TERM ASSY, TYPE EACH AWD $ $ 1, $ $ 1, $ $ 1, $ $ 1, EACH AWD $ $ 12, $ $ 12, $ $ 12, $ $ 12, EACH AWD $ $ 1, $ $ 1, $ $ 1, $ $ 1, M60010 IMPACT ATT, T 1-98 (BI-DIRECTIONAL) M15000 FENCE, TYPE M26000 CURB, TYPE M25000 APPROACH SLAB (T=380 MM) EACH AWD $ 3, $ 7, $ 3, $ 7, $ 3, $ 7, $ 3, $ 7, METER AWD $ $ 14, $ $ 14, $ $ 14, $ $ 14, METER AWD $ $ 2, $ $ 3, $ $ 1, $ $ 2, , SQ METER AWD $ $ 128,125.00
15 PROJECT NO PAGE NO M10300 DELINEATOR, C, POST MOUNTED M15300 DELINEATOR, D, POST MOUNTED M24000 CONC BARRIER, TYPE D M00100 BARRIER REFLECTOR, TYPE A M00200 BARRIER REFLECTOR, TYPE B S.1 ROADWAY TOTALS M30000 FILTER FABRIC FENCE 02 $ $ 158, $ $ 182, $ $ 169, EACH AWD $ $ 9, $ $ 9, $ $ 9, $ $ 9, EACH AWD $ $ 8, $ $ 8, $ $ 8, $ $ 8, METER AWD $ $ 24, $ $ 19, $ $ 25, $ $ 18, EACH AWD $ $ $ $ $ $ $ $ EACH AWD $ $ $ $ $ $ $ $ AWD $ 512, $ 642, $ 564, $ 527,998.84
16 PROJECT NO PAGE NO M70000 STRAW OR HAY BALES M10000 SEEDING AND MULCHING M20000 COMMERCIAL FERTILIZER M35000 WATER S.2 EROSION CONTROL TOTALS M32200 ROCK CH PROT, C W/FILTER METER AWD $ $ $ $ $ $ $ $ EACH AWD $ $ $ $ $ $ $ $ SQ METER AWD $ $ $ $ $ $ $ $ KILOGRAM AWD $ $ $ $ $ $ $ $ CU METER AWD $ $ $ $ $ $ $ $ AWD $ 1, $ 1, $ 1, $ 1, CU METER AWD $ $ $ $ $ $ 1, $ $
17 PROJECT NO PAGE NO M MM CONDUIT, TYPE B M MM CONDUIT, TYPE E M MM CONDUIT, TYPE F M MM CONDUIT, TYPE F, TYPE C M00800 CATCH BASIN, NO. 3A S.3 DRAINAGE TOTALS M01000 PAVEMENT PLANING, BITUMINOUS METER AWD $ $ $ $ $ $ $ $ METER AWD $ $ $ $ $ $ $ $ METER AWD $ $ $ $ $ $ $ $ METER AWD $ $ 12, $ $ 10, $ $ 13, $ $ 12, EACH AWD $ 2, $ 8, $ 1, $ 7, $ 1, $ 7, $ 1, $ 5, AWD $ 22, $ 18, $ 24, $ 19, , SQ METER AWD $ $ 137, $ $ 91,804.20
18 PROJECT NO PAGE NO M10000 TACK COAT 03 $ $ 107, $ $ 206, , LITER AWD $ $ 3, $ $ 5, $ $ 5, $ $ 7, M14000 TACK COAT FOR INTERMEDIATE COURSE 12, LITER AWD $ $ 2, $ $ 1, $ $ 1, $ $ 2, M46061 ASPH CONC INT CRS TYPE 1 UNDER GR APP M42000 CONCRETE MEDIAN M10100 COMPACTED AGGREGATE, TYPE A M40100 RUMBLE STRIPS, TYPE 2 (ASPHALT) CU METER AWD $ $ 31, $ $ 26, $ $ 30, $ $ 37, SQ METER AWD $ $ 3, $ $ 4, $ $ 6, $ $ 2, CU METER AWD $ $ 26, $ $ 17, $ $ 17, $ $ 39, , METER AWD $ $ 9, $ $ 28, $ $ 17, $ $ 9, M10100 STONE MAS CON INT (HEAVY SBS POLYMER)
19 PROJECT NO PAGE NO. 18 6, CU METER AWD $ $ 633, $ $ 640, $ $ 640, $ $ 678, M10300 STONE MAST CONC SURF (HEAVY SBS POLYMER) S.4 PAVEMENT TOTALS M75000 FENCE REMOVED M75800 DISCONNECT EXISTING CIRCUIT M MM CONDUIT, TYPE E M40500 GATE, TYPE 47 5, CU METER AWD $ $ 622, $ $ 540, $ $ 540, $ $ 587, AWD $ 1,470, $ 1,357, $ 1,368, $ 1,570, METER AWD $ $ $ $ $ $ $ $ EACH AWD $ $ $ $ $ $ $ $ METER AWD $ $ $ $ $ $ $ $ EACH AWD $ $ $ $ $ $ $ $
20 PROJECT NO PAGE NO M00500 CONNECTOR KIT, TYPE II M01500 CABLE SPLICING KIT M10500 LIGHT POLE, MISC.: AT1.0BB M14500 LT POLE FOUND M23200 #4 AWG 5000 V DIST CABLE M23300 #2 AWG 5000 V DIST CABLE M23400 #10 AWG POLE & BRKT CABLE EACH AWD $ $ 3, $ $ 3, $ $ 4, $ $ 4, EACH AWD $ $ $ $ $ $ $ $ EACH AWD $ 1, $ 44, $ 1, $ 44, $ 1, $ 35, $ 1, $ 35, EACH AWD $ $ 18, $ $ 18, $ $ 20, $ $ 20, METER AWD $ $ 2, $ $ 2, $ $ 2, $ $ 2, METER AWD $ $ $ $ $ $ $ $ METER AWD $ $ 1,766.40
21 PROJECT NO PAGE NO M MM DUCT W/3 #4AWG 5000V M MM DUCT W/3 #2 AWG 5000V M25500 CONDUIT, 76 MM, M25900 COND, JACKED OR DRILLED, 76MM 02 $ $ 1, $ $ 1, $ $ 1, , METER AWD $ $ 12, $ $ 12, $ $ 12, $ $ 12, METER AWD $ $ 4, $ $ 4, $ $ 5, $ $ 5, METER AWD $ $ $ $ $ $ $ $ METER AWD $ $ 8, $ $ 8, $ $ 7, $ $ 7, M26260 LUMINAIRE, HIGH MAST, TYPE V, 400 WATT, HPS, 480 VOLT M29002 TRENCH, 0.6 M DEEP EACH AWD $ $ 26, $ $ 24, $ $ 24, $ $ 24, , METER AWD $ $ 9, $ $ 9, $ $ 16, $ $ 16,350.00
22 PROJECT NO PAGE NO M30700 PULL BOX, , 450 MM M30706 PULL BOX, , 600 MM M32000 GROUND ROD M33000 STRUCTURE GRNDNG SYST M34001 POWER SERVICE, APP M34901 LIGHT POLE REMOVED, AS PER PLAN M35091 LUMINAIRE REMOVED, APP EACH AWD $ $ 1, $ $ 1, $ $ 2, $ $ 2, EACH AWD $ $ $ $ $ $ $ $ EACH AWD $ $ 2, $ $ 2, $ $ 5, $ $ 5, EACH AWD $ 2, $ 2, $ 2, $ 2, $ 2, $ 2, $ 2, $ 2, EACH AWD $ 3, $ 3, $ 3, $ 3, $ 3, $ 3, $ 3, $ 3, EACH AWD $ $ 1, $ $ 1, $ $ $ $ EACH AWD $ $
23 PROJECT NO PAGE NO M35600 LT POLE FOUND REMOVED M40000 MAINTAIN EX LTNG S.5 LIGHTING TOTALS M00300 PRISMATIC RETROREFLECTOR 02 $ $ $ $ $ $ EACH AWD $ $ 1, $ $ 1, $ $ $ $ AWD $ $ $ $ $ $ $ $ AWD $ 150, $ 147, $ 149, $ 149, EACH AWD $ $ 4, $ $ 4, $ $ 4, $ $ 4, M00600 RAISED PVMT MARKER CASTING, INSTALL ONLY M32000 GROUND ROD M75000 SIGH ATTACHMENT ASSEMBLY EACH AWD $ $ 6, $ $ 6, $ $ 6, $ $ 6, EACH AWD $ $ $ $ $ $ $ $
24 PROJECT NO PAGE NO M75106 LUMINAIRE SUPP ASSY, 31.21M M80200 SIGN, EXTRUSHEET, TYPE G M84900 RMVL/GR MTD SIGN & DISP EACH AWD $ $ 24, $ $ 36, $ $ 36, $ $ 36, EACH AWD $ $ 1, $ $ 1, $ $ 1, $ $ 1, SQ METER AWD $ $ 118, $ $ 120, $ $ 120, $ $ 120, EACH AWD $ $ $ $ $ $ $ $ M86310 RMVL OF STRUC MTD SIGN & DISPOSAL M87400 RMVL/OVHD MTD SIGN/DISP M87500 RMVL POLE MTD SIGN & DISP EACH AWD $ $ 1, $ $ $ $ $ $ EACH AWD $ $ 6, $ $ 4, $ $ 4, $ $ 4, EACH AWD $ $ $ $ $ $ 94.00
25 PROJECT NO PAGE NO M84000 SIGN SERVICE M84300 SIGN WIRED M85500 SWITCH ENCL MTG BR ASSY M87102 BLST, CMRI ,INTEGRAL M89100 MERC VAP LUM, 31.21M, 100W M28200 DISCONNECT SWITCH W/ENCL M00100 EDGE LINE, TYPE 1 04 $ $ EACH AWD $ $ $ $ $ $ $ $ EACH AWD $ $ $ $ $ $ $ $ EACH AWD $ $ $ $ $ $ $ $ EACH AWD $ $ $ $ $ $ $ $ EACH AWD $ $ 1, $ $ 1, $ $ 1, $ $ 1, EACH AWD $ $ 1, $ $ 1, $ $ 1, $ $ 1, KILOMETER
26 PROJECT NO PAGE NO M00200 LANE LINE, TYPE M10000 EDGE LINE M10100 LANE LINE M10200 CENTER LINE M10300 CHANNELIZING LINE M10400 STOP LINE AWD $ $ $ $ $ 4, $ 2, $ $ KILOMETER AWD $ $ $ $ $ 4, $ 2, $ $ KILOMETER AWD $ 1, $ 50, $ 1, $ 49, $ 1, $ 49, $ 1, $ 49, KILOMETER AWD $ 1, $ 21, $ 1, $ 21, $ 1, $ 21, $ 1, $ 21, KILOMETER AWD $ 3, $ $ 3, $ $ 3, $ $ 3, $ , METER AWD $ $ 8, $ $ 8, $ $ 8, $ $ 8, METER AWD $ $ $ $ $ $ $ $
27 PROJECT NO PAGE NO M10600 TRANSVERSE LINE S.6 TRAFFIC CONTROL TOTALS 1, METER AWD $ $ 22, $ $ 22, $ $ 22, $ $ 22, AWD $ 274, $ 286, $ 288, $ 285, M46000 BITUMINOUS AGGREGATE BASE, PG M11100 LEO WITH PATROL CAR M12350 TEMPORARY IMPACT ATTENAUTOR, G.R.E.A.T. TYPE, MODEL NO NF6GCZ BIDIRECTIONAL 1, CU METER AWD $ $ 83, $ $ 128, $ $ 128, $ $ 124, HOUR AWD $ $ 1, $ $ 1, $ $ 1, $ $ 1, EACH AWD $ 7, $ 7, $ 7, $ 7, $ 7, $ 7, $ 7, $ 7, M12360 TEMP IMPACT ATTENUATOR (REPLACEMENT), G.R.E.A.T. TYPE, MODEL NO NF6GCZ, BIDIRECTIONAL M12460 WORK ZONE MARKING SIGN EACH AWD $ 4, $ 4, $ 4, $ 4, $ 4, $ 4, $ 4, $ 4,950.00
28 PROJECT NO PAGE NO M12470 WORK ZONE SPEED LIMIT SIGN M12480 DOUBLED FINES IN WORK ZONE SIGN M12500 REPLACEMENT SIGN M12600 REPLACEMENT DRUM M12756 TEMP CROSSOVER LTG SYSTEM EACH AWD $ $ 2, $ $ 2, $ $ 3, $ $ 2, EACH AWD $ $ 2, $ $ 6, $ $ 2, $ $ 2, EACH AWD $ $ 4, $ $ 7, $ $ 3, $ $ 3, SQ METER AWD $ $ 1, $ $ $ $ 1, $ $ EACH AWD $ $ 3, $ $ 3, $ $ 3, $ $ 3, M18510 PORTABLE CHANGEABLE MESSAGE SIGN EACH AWD $ 13, $ 27, $ 13, $ 26, $ 15, $ 30, $ 11, $ 22, MONTH AWD $ 2, $ 42, $ 2, $ 52, $ 1, $ 21, $ 2, $ 42,000.00
29 PROJECT NO PAGE NO M20400 TEMP LANE LINE, CL II M22000 TEMP EDGE LINE, CLASS I M23000 TEMP CH LINE, CLASS I M10000 TEMPORARY ROAD M20000 TEMP PAVEMENT, CLASS A M10000 WATER M20000 CALCIUM CHLORIDE KILOMETER AWD $ $ 10, $ $ 25, $ $ 10, $ $ 23, KILOMETER AWD $ 1, $ 12, $ $ 6, $ $ 3, $ 3, $ 36, , METER AWD $ $ 10, $ $ 10, $ $ 10, $ $ 37, AWD $ 130, $ 130, $ 75, $ 75, $ 92, $ 92, $ 77, $ 77, , SQ METER AWD $ $ 153, $ $ 181, $ $ 176, $ $ 129, CU METER AWD $ $ $ $ 2, $ $ $ $ 1, METRIC TON AWD $ $ 1,000.00
30 PROJECT NO PAGE NO M40021 PORTABLE CONC BARR, 813 MM, APP A 02 $ $ $ $ 1, $ $ 1, , METER AWD $ $ 68, $ $ 58, $ $ 89, $ $ 41, M40021 PORTABLE CONC BARR, 813 MM, APP B 1, METER AWD $ $ 15, $ $ 10, $ $ 9, $ $ 15, M40021 PORTABLE CONC BARR, 813 MM, APP C S.7 MAINTENANCE OF TRAFFIC TOTALS METER AWD $ $ 14, $ $ 1, $ $ 11, $ $ 7, AWD $ 595, $ 613, $ 610, $ 585, M00050 SURF PREP OF EX STEEL, SYSTEM OZEU 1, SQ METER AWD $ $ 25, $ $ 25, $ $ 33, $ $ 35, M00056 FIELD PTG EX STEEL, PRIME COAT, OZEU 1, SQ METER AWD $ $ 9, $ $ 7, $ $ 6, $ $ 8,250.00
31 PROJECT NO PAGE NO M00060 FLD PTG EX STEEL, INTERMEDIATE, OZEU 1, SQ METER AWD $ $ 9, $ $ 9, $ $ 6, $ $ 8, M00066 FLD PTG EX STEEL, FINISH COAT, OZEU S.8 BRIDGE PAINTING TOTALS 1, SQ METER AWD $ $ 9, $ $ 9, $ $ 6, $ $ 8, AWD $ 52, $ 51, $ 51, $ 60, M00050 SURF PREP OF EX STEEL, SYSTEM OZEU 1, SQ METER AWD $ $ 29, $ $ 29, $ $ 37, $ $ 40, M00056 FIELD PTG EX STEEL, PRIME COAT, OZEU 1, SQ METER AWD $ $ 10, $ $ 8, $ $ 6, $ $ 9, M00060 FLD PTG EX STEEL, INTERMEDIATE, OZEU 1, SQ METER AWD $ $ 10, $ $ 10, $ $ 6, $ $ 9, M00066 FLD PTG EX STEEL, FINISH COAT, OZEU 1, SQ METER AWD $ $ 10, $ $ 10,266.00
32 PROJECT NO PAGE NO. 31 S.9 BRIDGE NO. WOO RIGHT TOTALS 03 $ $ 6, $ $ 9, AWD $ 59, $ 58, $ 58, $ 68, M00050 SURF PREP OF EX STEEL, SYSTEM OZEU 1, SQ METER AWD $ $ 27, $ $ 27, $ $ 35, $ $ 38, M00056 FIELD PTG EX STEEL, PRIME COAT, OZEU 1, SQ METER AWD $ $ 9, $ $ 8, $ $ 6, $ $ 8, M00060 FLD PTG EX STEEL, INTERMEDIATE, OZEU 1, SQ METER AWD $ $ 9, $ $ 9, $ $ 6, $ $ 8, M00066 FLD PTG EX STEEL, FINISH COAT, OZEU S.10 BRIDGE NO. WOO LEFT TOTALS 1, SQ METER AWD $ $ 9, $ $ 9, $ $ 6, $ $ 8, AWD $ 56, $ 55, $ 55, $ 65, M00050 SURF PREP OF EX STEEL, SYSTEM OZEU 1, SQ METER AWD $ $ 27,659.00
33 PROJECT NO PAGE NO $ $ 27, $ $ 35, $ $ 38, M00056 FIELD PTG EX STEEL, PRIME COAT, OZEU 1, SQ METER AWD $ $ 9, $ $ 8, $ $ 6, $ $ 8, M00060 FLD PTG EX STEEL, INTERMEDIATE, OZEU 1, SQ METER AWD $ $ 9, $ $ 9, $ $ 6, $ $ 8, M00066 FLD PTG EX STEEL, FINISH COAT, OZEU S.11 BRIDGE NO. WOO RIGHT TOTALS 1, SQ METER AWD $ $ 9, $ $ 9, $ $ 6, $ $ 8, AWD $ 56, $ 55, $ 55, $ 65, M01301 ELASTOMERIC STRIP SEAL W/O STEEL EXTR M12510 PATCHING BRIDGE DECK METER AWD $ $ 15, $ $ 20, $ $ 17, $ $ 21, SQ METER AWD $ $ 11, $ $ 8, $ $ 11, $ $ 22, M00050 SURF PREP OF EX STEEL, SYSTEM OZEU
34 PROJECT NO PAGE NO , SQ METER AWD $ $ 430, $ $ 430, $ $ 557, $ $ 595, M00056 FIELD PTG EX STEEL, PRIME COAT, OZEU 25, SQ METER AWD $ $ 152, $ $ 126, $ $ 101, $ $ 139, M00060 FLD PTG EX STEEL, INTERMEDIATE, OZEU 25, SQ METER AWD $ $ 152, $ $ 152, $ $ 101, $ $ 139, M00066 FLD PTG EX STEEL, FINISH COAT, OZEU 25, SQ METER AWD $ $ 152, $ $ 152, $ $ 101, $ $ 139, M00070 FLD PTG NEW STEEL, SYSTEM OZEU SQ METER AWD $ $ 3, $ $ 3, $ $ $ $ 2, M10201 STRC STEEL MEM, MISC. LEVEL FAB, APP, ASTM A36 REPAIR OF EXPANSION END CROSS FRAMES S.12 BRIDGE NO. WOO TOTALS 1, KILOGRAM AWD $ $ 11, $ $ 18, $ $ 15, $ $ 9, AWD $ 927, $ 911, $ 907,107.00
35 PROJECT NO PAGE NO $ 1,068, M01301 ELASTOMERIC STRIP SEAL W/O STEEL EXTR M44000 BRG/INT LAM/PLATE (<50 MM) (30MMX178MMX279) AND LOAD PLATE (38MMX229MMX305MM) M44100 BRG/INT LAM/PLATE(50-75 MM) (59MMX178MMX279MM) AND LOAD PLATE (38MMX229MMX305MM) M47000 JACKING/TEMP SUPP SUPERST M12510 PATCHING BRIDGE DECK M00010 FLD PTG EX, SPOT CLEAN, OZEU METER AWD $ $ 9, $ $ 13, $ $ 11, $ $ 13, EACH AWD $ $ 8, $ $ 6, $ $ 8, $ $ 7, EACH AWD $ $ 8, $ $ 6, $ $ 8, $ $ 7, AWD $ 15, $ 15, $ 10, $ 10, $ 13, $ 13, $ 15, $ 15, SQ METER AWD $ 1, $ 2, $ $ $ $ $ $ 1, AWD $ 8, $ 8, $ 4, $ 4, $ 2, $ 2, $ 6, $ 6,400.00
36 PROJECT NO PAGE NO M00014 FLD PTG EX, SPOT PRIME, OZEU AWD $ 8, $ 8, $ 1, $ 1, $ 5, $ 5, $ 1, $ 1, M00018 FLD PTG EX, SPOT INTERMEDIATE, OZEU M00022 FLD PTG EX, SPOT FINISH, OZEU S.13 BRIDGE NO. LUC TOTALS AWD $ 8, $ 8, $ 1, $ 1, $ 5, $ 5, $ 1, $ 1, AWD $ 8, $ 8, $ 1, $ 1, $ 5, $ 5, $ 1, $ 1, AWD $ 77, $ 47, $ 58, $ 55, M01301 ELASTOMERIC STRIP SEAL W/O STEEL EXTR M11211 STRUC CXP JT INC ELAST,APP M11100 PATCHING CONC STRUC METER AWD $ $ 6, $ $ 10, $ $ 7, $ $ 9, METER AWD $ 1, $ 21, $ $ 11, $ $ 14, $ $ 13, SQ METER AWD $ $ 5, $ $ 4,840.00
37 PROJECT NO PAGE NO M12001 RIPRAP, GROUTED, APP 03 $ $ 2, $ $ 6, SQ METER AWD $ $ 3, $ $ 3, $ $ 4, $ $ 5, M00050 SURF PREP OF EX STEEL, SYSTEM OZEU 17, SQ METER AWD $ $ 291, $ $ 291, $ $ 376, $ $ 402, M00056 FIELD PTG EX STEEL, PRIME COAT, OZEU 17, SQ METER AWD $ $ 102, $ $ 85, $ $ 68, $ $ 94, M00060 FLD PTG EX STEEL, INTERMEDIATE, OZEU 17, SQ METER AWD $ $ 102, $ $ 102, $ $ 68, $ $ 94, M00066 FLD PTG EX STEEL, FINISH COAT, OZEU S.14 BRIDGE NO. LUC TOTALS 17, SQ METER AWD $ $ 102, $ $ 102, $ $ 68, $ $ 94, M11203 PORT OF STR REM, >6 METER, APP AWD $ 636, $ 613, $ 611, $ 720,791.00
38 PROJECT NO PAGE NO M20001 EMBANKMENT, APP M11100 COFFERDAMS, CRIBS & SHEETING M21100 UNCLASSIFIED EXCAVATION AWD $ 80, $ 80, $ 120, $ 120, $ 236, $ 236, $ 150, $ 150, CU METER AWD $ $ 4, $ $ 4, $ $ 8, $ $ 5, AWD $ $ $ $ $ $ $ $ CU METER AWD $ $ 9, $ $ 13, $ $ 6, $ $ 8, M67510 SLG OF CONC SURF (EPOXY-URETHANE) M MM PREFORMED EXP JT FILLER SQ METER AWD $ $ 4, $ $ 6, $ $ 6, $ $ 6, M14020 SEMI-INTEGRAL ABTMT EXP JT. SEAL SQ METER AWD $ $ $ $ $ $ $ $ METER AWD $ $ 1, $ $ 5, $ $ 1, $ $ 3,996.00
39 PROJECT NO PAGE NO M44000 BRG/INT LAM/PLATE (<50 MM) 254MM X 406MM X 57.5M (STEEL LOAD PLATE) 280MM X 432MM X 38MM M47000 JACKING/TEMP SUPP SUPERST M21200 POROUS BACKFILL W/FILT FABRIC M MM PERF CORR. PLASTIC PIPE EACH AWD $ $ 6, $ $ 6, $ $ 7, $ $ 4, AWD $ 6, $ 6, $ 7, $ 7, $ 8, $ 8, $ 12, $ 12, CU METER AWD $ $ 10, $ $ 7, $ $ 10, $ $ 8, METER AWD $ $ 1, $ $ 1, $ $ $ $ M MM NON-PERF CORR PLASTIC PIPE M11100 PATCHING CONC STRUC M12600 EPOXY INJECTION METER AWD $ $ $ $ $ $ $ $ SQ METER AWD $ 1, $ 2, $ 1, $ 2, $ 1, $ 2, $ $ 1, METER
40 PROJECT NO PAGE NO M20500 CR AGG SLOPE PROT M25400 CONDUIT, 51 MM, M00500 CAULKING AWD $ $ 2, $ $ $ $ $ $ 1, CU METER AWD $ $ 2, $ $ 1, $ $ 2, $ $ 1, METER AWD $ $ 2, $ $ 1, $ $ 1, $ $ 1, METER AWD $ $ $ $ $ $ $ $ M48000 HIGH PERFORMANCE CONCRETE SPSTRC (DECK) CU METER AWD $ $ 173, $ $ 219, $ $ 136, $ $ 204, M48020 HIGH PERFORMANCE CONCRETE SPSTRC (PARA) CU METER AWD $ $ 25, $ $ 28, $ $ 23, $ $ 30, M49000 HIGH PERFORMANCE CONCRETE TRIAL MIX AWD $ 4, $ 4, $ $ $ $ $ $
41 PROJECT NO PAGE NO M49010 HIGH PERFORMANCE CONCRETE TESTING AWD $ 9, $ 9, $ 10, $ 10, $ 4, $ 4, $ 2, $ 2, M49500 HIGH PERFORMANCE CONCRETE, MISC.: (ABUTMENT) M20000 WELDED STUD SHEAR CONNECTOR S.15 STRUCTURES OVER 6 METER SPAN TOTALS M11203 PORT OF STR REM, >6 METER, APP M20001 EMBANKMENT, APP M11100 COFFERDAMS, CRIBS & SHEETING CU METER AWD $ 1, $ 39, $ $ 15, $ $ 20, $ $ 18, , EACH AWD $ $ 4, $ $ 6, $ $ 5, $ $ 5, AWD $ 390, $ 462, $ 483, $ 467, AWD $ 65, $ 65, $ 120, $ 120, $ 236, $ 236, $ 150, $ 150, CU METER AWD $ $ 4, $ $ 4, $ $ 9, $ $ 6, AWD $ $ $ $
42 PROJECT NO PAGE NO M21100 UNCLASSIFIED EXCAVATION 03 $ $ $ $ CU METER AWD $ $ 8, $ $ 15, $ $ 7, $ $ 10, M67510 SLG OF CONC SURF (EPOXY-URETHANE) M MM PREFORMED EXP JT FILLER SQ METER AWD $ $ 4, $ $ 7, $ $ 7, $ $ 6, M14020 SEMI-INTEGRAL ABTMT EXP JT. SEAL SQ METER AWD $ $ $ $ $ $ $ $ METER AWD $ $ 1, $ $ 6, $ $ 1, $ $ 4, M44000 BRG/INT LAM/PLATE (<50 MM) 254MM X 406MM X 57.5M (STEEL LOAD PLATE) 280MM X 432MM X 38MM M47000 JACKING/TEMP SUPP SUPERST EACH AWD $ $ 7, $ $ 7, $ $ 8, $ $ 5, AWD $ 6, $ 6, $ 7, $ 7, $ 8, $ 8, $ 14, $ 14,000.00
43 PROJECT NO PAGE NO M21200 POROUS BACKFILL W/FILT FABRIC M MM PERF CORR. PLASTIC PIPE CU METER AWD $ $ 12, $ $ 9, $ $ 12, $ $ 9, METER AWD $ $ 1, $ $ 1, $ $ $ $ M MM NON-PERF CORR PLASTIC PIPE M11100 PATCHING CONC STRUC M12600 EPOXY INJECTION M20500 CR AGG SLOPE PROT M00500 CAULKING METER AWD $ $ $ $ $ $ $ $ SQ METER AWD $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, $ $ METER AWD $ $ 2, $ $ $ $ $ $ 1, CU METER AWD $ $ 2, $ $ 1, $ $ 2, $ $ 1, METER AWD $ $ $ $
44 PROJECT NO PAGE NO $ $ $ $ M48000 HIGH PERFORMANCE CONCRETE SPSTRC (DECK) CU METER AWD $ $ 189, $ $ 249, $ $ 159, $ $ 239, M48020 HIGH PERFORMANCE CONCRETE SPSTRC (PARA) CU METER AWD $ $ 25, $ $ 29, $ $ 24, $ $ 30, M49000 HIGH PERFORMANCE CONCRETE TRIAL MIX AWD $ 4, $ 4, $ $ $ $ $ $ M49010 HIGH PERFORMANCE CONCRETE TESTING AWD $ 9, $ 9, $ 10, $ 10, $ 4, $ 4, $ 2, $ 2, M49500 HIGH PERFORMANCE CONCRETE, MISC.: (ABUTMENT) M20000 WELDED STUD SHEAR CONNECTOR S.16 BRIDGE NO. WOO R TOTALS CU METER AWD $ 1, $ 48, $ $ 25, $ $ 24, $ $ 22, , EACH AWD $ $ 5, $ $ 7, $ $ 6, $ $ 5,772.00
45 PROJECT NO PAGE NO M11203 PORT OF STR REM, >6 METER, APP M20001 EMBANKMENT, APP M11100 COFFERDAMS, CRIBS & SHEETING M21100 UNCLASSIFIED EXCAVATION AWD $ 400, $ 507, $ 516, $ 513, AWD $ 73, $ 73, $ 110, $ 110, $ 236, $ 236, $ 185, $ 185, CU METER AWD $ $ 11, $ $ 10, $ $ 22, $ $ 9, AWD $ $ $ $ $ $ $ $ CU METER AWD $ $ 13, $ $ 16, $ $ 9, $ $ 6, M67510 SLG OF CONC SURF (EPOXY-URETHANE) M MM PREFORMED EXP JT FILLER SQ METER AWD $ $ 2, $ $ 3, $ $ 3, $ $ 3, SQ METER AWD $ $ $ $ $ $ $ $
46 PROJECT NO PAGE NO M14020 SEMI-INTEGRAL ABTMT EXP JT. SEAL METER AWD $ $ 1, $ $ 4, $ $ 1, $ $ 3, M44000 BRG/INT LAM/PLATE (<50 MM) 254MM X 406MM X 57.5M (STEEL LOAD PLATE) 280MM X 432MM X 38MM M47000 JACKING/TEMP SUPP SUPERST M21200 POROUS BACKFILL W/FILT FABRIC M MM PERF CORR. PLASTIC PIPE EACH AWD $ $ 6, $ $ 6, $ $ 7, $ $ 5, AWD $ 6, $ 6, $ 7, $ 7, $ 8, $ 8, $ 13, $ 13, CU METER AWD $ $ 14, $ $ 10, $ $ 13, $ $ 8, METER AWD $ $ $ $ 1, $ $ $ $ M MM NON-PERF CORR PLASTIC PIPE M20500 CR AGG SLOPE PROT METER AWD $ $ $ $ $ $ $ $
47 PROJECT NO PAGE NO M00500 CAULKING CU METER AWD $ $ 3, $ $ 1, $ $ 3, $ $ 1, METER AWD $ $ $ $ 1, $ $ $ $ 1, M48000 HIGH PERFORMANCE CONCRETE SPSTRC (DECK) CU METER AWD $ $ 205, $ $ 207, $ $ 112, $ $ 169, M48020 HIGH PERFORMANCE CONCRETE SPSTRC (PARA) CU METER AWD $ $ 19, $ $ 23, $ $ 20, $ $ 26, M49000 HIGH PERFORMANCE CONCRETE TRIAL MIX AWD $ 4, $ 4, $ $ $ $ $ $ M49010 HIGH PERFORMANCE CONCRETE TESTING AWD $ 9, $ 9, $ 10, $ 10, $ 4, $ 4, $ 2, $ 2, M49500 HIGH PERFORMANCE CONCRETE, MISC.: (ABUTMENT) CU METER AWD $ $ 30, $ $ 19, $ $ 26,350.00
48 PROJECT NO PAGE NO M20000 WELDED STUD SHEAR CONNECTOR S.17 BRIDGE NO. WOO L TOTALS M11203 PORT OF STR REM, >6 METER, APP M20001 EMBANKMENT, APP M11100 COFFERDAMS, CRIBS & SHEETING M21100 UNCLASSIFIED EXCAVATION 04 $ $ 22, , EACH AWD $ $ 4, $ $ 5, $ $ 4, $ $ 4, AWD $ 408, $ 442, $ 476, $ 463, AWD $ 65, $ 65, $ 110, $ 110, $ 236, $ 236, $ 150, $ 150, CU METER AWD $ $ 10, $ $ 10, $ $ 22, $ $ 9, AWD $ $ $ $ $ $ $ $ CU METER AWD $ $ 13, $ $ 16, $ $ 9, $ $ 6, M67510 SLG OF CONC SURF (EPOXY-URETHANE) SQ METER AWD $ $ 2,275.00
49 PROJECT NO PAGE NO M MM PREFORMED EXP JT FILLER 02 $ $ 3, $ $ 3, $ $ 3, SQ METER AWD $ $ $ $ $ $ $ $ M14020 SEMI-INTEGRAL ABTMT EXP JT. SEAL METER AWD $ $ 1, $ $ 4, $ $ 1, $ $ 3, M44000 BRG/INT LAM/PLATE (<50 MM) 254MM X 406MM X 57.5M (STEEL LOAD PLATE) 280MM X 432MM X 38MM M47000 JACKING/TEMP SUPP SUPERST M21200 POROUS BACKFILL W/FILT FABRIC M MM PERF CORR. PLASTIC PIPE EACH AWD $ $ 6, $ $ 6, $ $ 7, $ $ 5, AWD $ 6, $ 6, $ 7, $ 7, $ 8, $ 8, $ 13, $ 13, CU METER AWD $ $ 14, $ $ 10, $ $ 13, $ $ 8, METER AWD $ $ $ $ 1, $ $ $ $
50 PROJECT NO PAGE NO M MM NON-PERF CORR PLASTIC PIPE M20500 CR AGG SLOPE PROT M25400 CONDUIT, 51 MM, M00500 CAULKING METER AWD $ $ $ $ $ $ $ $ CU METER AWD $ $ 3, $ $ 1, $ $ 3, $ $ 1, METER AWD $ $ 2, $ $ 1, $ $ 1, $ $ 1, METER AWD $ $ $ $ 1, $ $ $ $ 1, M48000 HIGH PERFORMANCE CONCRETE SPSTRC (DECK) CU METER AWD $ $ 285, $ $ 207, $ $ 159, $ $ 199, M48020 HIGH PERFORMANCE CONCRETE SPSTRC (PARA) CU METER AWD $ $ 19, $ $ 23, $ $ 20, $ $ 26, M49000 HIGH PERFORMANCE CONCRETE TRIAL MIX AWD $ 4, $ 4,500.00
PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02
AWARDED PROJECT PROJECT NO. 016002 PID. 19109 BEL-7-3.68 TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT
More informationOFFICIAL BID TABULATION AWARDED PROJECT
AWARDED PROJECT PROJECT NO. 990206 PID. 17900 HAN-37-5.118 TE21-G990(271) TYPE: SIGNALIZATION LETTING: 04/28/99 COMPLETION DATE: 10/31/99 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT
More informationPROJECT NO PID CLA TE21-G010(290) TYPE: MISCELLANEOUS LETTING: 07/11/01 COMPLETION DATE: 11/30/01
AWARDED PROJECT PROJECT NO. 010313 PID. 22620 CLA-70-20.92 TE21-G010(290) TYPE: MISCELLANEOUS LETTING: 07/11/01 COMPLETION DATE: 11/30/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT
More informationBID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012
Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00
More informationPROJECT NO PID SCI NON-FEDERAL TYPE: BRIDGE REPLACEMENT (1 BRIDGE) LETTING: 04/18/01 COMPLETION DATE: 06/30/04
AWARDED PROJECT PROJECT NO. 010178 PID. 11858 SCI-23-0.00 NON-FEDERAL TYPE: BRIDGE REPLACEMENT (1 BRIDGE) LETTING: 04/18/01 COMPLETION DATE: 06/30/04 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00
More informationLETTING : CALL : 056 COUNTIES : MILLE LACS
S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20
More informationSubject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122
Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING
More informationAVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP
AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, 2014 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 1 $19 $18,500.00 1 2013 2013.602/00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32
More informationPART A ROADWAY - BASE BID
May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00
More informationBID TABULATION. Engineer's Estmated Opinion of Costs
Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%
More informationBID TABULATION BID REQUEST NO
BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS
More informationEngineer's Preliminary Estimate - 100% Submittal
EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000
More information2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.
ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense
More informationAVERAGE OF BID ITEMS ENGINEERS ESTIMATE
ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian
More informationENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal
Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
More informationMunilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL
JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE
More informationFuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $
SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT
More informationBID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00
More informationCONTRACT TIME DETERMINATION
CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during
More informationCrushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:
Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and
More informationCertified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University
Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1
More informationNOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS
NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 This Addendum changes the terms of the Bid Proposal and/or plans associated with the project indicated below. By submitting a bid, any and all
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationKANE COUNTY DIVISION of TRANSPORTATION
Carl Schoedel, P.E. Director of Transportation County Engineer KANE COUNTY DIVISION of TRANSPORTATION 41W011 Burlington Road St. Charles, IL 60175 (630) 584-1170 Fax: (630) 584-5265 Section 13-00176-02-BR
More information19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown
19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL
More informationALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN
ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA
More informationNE WEST KINGSTON ROAD CULVERT REPLACEMENT
NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More informationNew Jersey Department of Transportation DATE : 11/16/10 PAGE : TABULATION OF BIDS
PAGE : 131-1 CONTRACT TIME : 11/30/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : STP-5042(107) ROUTE 129 RESURFACING FROM ROUTE 1 TO LAMBERTON ROAD CONNECTOR CITY OF TRENTON, TOWNSHIP OF
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 1988 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:
0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 217 10.00 CONTRACT ID: 187601030 PROJECT: BR 1502(017) CONTRACT: 04153032 AWARD : 3,278,223.27 PROJECTED : 3,289,223.27 ADJ. PROJECTED : 3,289,223.27
More informationBIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.
More informationNOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No
NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,
More informationREPLACEMENT OF MERCER COUNTY BRIDGE
ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade
More information2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time
TABULATION PAGE 1 OF 6 PRE- ESTIMATE Pitlik and Wick, Inc. CONTRACT A - BASE Highway X (Friedle Road to Dam Road) A1.1 Single Layer Chip Seal 75,100 sq. yds. $ 2.50 $ 187,750.00 $ 1.60 $ 120,160.00 $ 1.19
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More informationCITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $
RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement
More informationA DESIGN-BUILD PROJECT
Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,
More informationSandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING
ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00
More informationBID TABULATION PAGE 1 OF 8
BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationCITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018
CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00
More informationBid Comparison. Contract ID: 1651 Description: Joint replacement on the Cass Avenue bridge. Location:
Bid Comparison Contract ID: 1651 Description: Joint replacement on the Cass Avenue bridge. Location: Projects(s): Cass Avenue over North Branch Clinton River Clinton Township, Macomb County 1651 Rank Bidder
More informationRANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price
2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF
More informationExhibit 4 Page 1 of 8
Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:
More informationADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:
ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation
More informationN E W J E R S E Y T U R N P I K E A U T H O R I T Y PROCEDURE FOR PREQUALIFICATION AND AWARD OF CONSTRUCTION CONTRACTS
N E W J E R S E Y T U R N P I K E A U T H O R I T Y PROCEDURE FOR PREQUALIFICATION AND AWARD OF CONSTRUCTION CONTRACTS (a) All prospective bidders for construction in excess of $50,000.00 shall be prequalified
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018
LETTING DATE : 2018-06-14 CALL NUMBER : 772 OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE PAGE NO. 1 DATE PRINTED : JOB NUMBER : 170236 ESTIMATE NUMBER : PROJECT
More informationITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT
Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00
More informationTown of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562
Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/07/16 HIGHWAY: 11/04/2014 ESTIMATE PAID: AWARD DATE: 11/20/2014 ESTIMATE PERIOD:
216,972.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/07/16 388 6 CONTRACT ID: 627908001 PROJECT: RMC - 627908001 CONTRACT: 11144009 AWARD AMOUNT: $319,350.50 PROJECTED AMOUNT: $319,351.50 ADJ. PROJECTED
More informationBRIDGE ALTERNATE STUDY No. 1
BRIDGE ALTERNATE STUDY No. 1 RURAL STREAM CROSSING Prepared for U. S. Bridge Cambridge, Ohio Prepared by RICHLAND ENGINEERING LIMITED 29 North Park Street, Mansfield, Ohio 44902-1769 419/524-0074 FAX 419/524-1812
More informationDISTRICT AVERAGES 31, 2014 THROUGH 1, 2016 ITEM ITEM DESCRIPTION UNIT MINIMUM MAXIMUM AVERAGE DISTRICT
100 MOBILIZATION LS $ 20,000.00 $ 143,384.14 $ 74,567.11 BRSTL 101 CONSTRUCTION SURVEYING (CONSTR.) LS $ 2,500.00 $ 59,277.82 $ 13,090.66 BRSTL 102 CONSTRUCTION SURVEYING(MIN. PLAN) LS $ 15,000.00 $ 15,000.00
More informationAugust 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA
August 22, 2016 Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA RE: Hammond Northshore Regional Airport Runway 18-36/13-31 Runway Intersection
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More informationNew Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS
PAGE : 107-1 CONTRACT TIME : 01/24/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : FS-0022(105) ROUTE 37 FROM ROUTE 70 TO GARDEN STATE PARKWAY RESURFACING CONTRACT NO. 000103080 TOWNSHIP OF
More informationARKANSAS SMALL BUSINESS PROVISION CERTIFICATION APPLICATION
SMALL BUSINESS PROVISION TITLE 49 CODE OF FEDERAL REGULATIONS PART 26 ARKANSAS SMALL BUSINESS PROVISION CERTIFICATION APPLICATION 10324 Interstate 30, P. O. Box 2261 Little Rock, Arkansas 72203-2261 Natasha
More informationBid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221
Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More information$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC
-73,034.10 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 56 5.00 CONTRACT ID: 629625001 PROJECT: RMC - 629625001 CONTRACT: 02164011 AWARD : $446,216.00 PROJECTED : $446,222.00 ADJ. PROJECTED : $373,187.90
More informationQUONSET DEVELOPMENT CORPORATION (QDC) INVITATION TO BID
QUONSET DEVELOPMENT CORPORATION (QDC) A BID is solicited for the following work: INVITATION TO BID Name of Project: Background & Description of Work: Pavement Repairs: Utility Connections: On-Call Pavement
More informationDISTRICT AVERAGES 1, 2016 THROUGH 1, 2018 ITEM ITEM DESCRIPTION UNIT MINIMUM MAXIMUM AVERAGE DISTRICT
100 MOBILIZATION LS $ 15,000.00 $ 143,384.14 $ 69,597.83 BRSTL 101 CONSTRUCTION SURVEYING CONSTR. LS $ 2,000.00 $ 59,277.82 $ 12,621.73 BRSTL 102 CONSTRUCTION SURVEYING MIN.-PLAN LS $ 15,000.00 $ 15,000.00
More informationSUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION
Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 240 0.00 CONTRACT ID: 090249068 PROJECT: STP 2014(119)TE CONTRACT: 08163051 AWARD AMOUNT: $2,150,084.20 PROJECTED AMOUNT: $2,344,277.78 ADJ. PROJECTED
More informationPART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.
BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.
More informationReviax Constracting Corp. DeSantis Construction
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.
More informationMarket Street Gateway Improvements Phase 1
PROPOSAL FORM Market Street Gateway Improvements Phase 1 CITY OF PORTSMOUTH, N.H. To the City of Portsmouth, New Hampshire, herein called the Owner. The undersigned, as Bidder, herein referred to as singular
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationLETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY
LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/17/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : SP 03-626-17/ PLH 0399 (248) CONTRACT LOCATION: CSAH 26 WITHIN THE TAMARAC NATIONAL WILDLIFE REFUGE RECOMMENDATION: AWARD TO LOW BIDDER --------------------------------------------------------------------
More informationEST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS
BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native
More informationRFB Addendum 3
Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER
More informationAECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option
More information69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11
69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: SH 29 COUNTY: 01/06/2016 ESTIMATE PAID: AWARD DATE: 01/28/2016 ESTIMATE PERIOD:
0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 31 CONTRACT ID: 033702041 PROJECT: STP 2016(576) CONTRACT: 01163208 AWARD : $1,499,000.00 PROJECTED : $1,520,990.00 ADJ. PROJECTED : $1,520,990.00
More informationPatchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.
Patchogue Road Culvert Crossing IFB 2015-03 ADDENDUM #1 07/13/2015 Addendum #1 addresses the questions submitted by contractors. Q1: Bid Item shows 22 LF of 60 RCP but plans show 27 LF, please clarify.
More informationBERRIEN COUNTY ROAD COMMISSION
PROPOSAL AND SPECIFICATIONS FOR ROCKY GAP HMA OVERLAY WITH ALTERNATE SYLAVAN AND FORT ROAD HMA OVERLAY BENTON CHARTER TOWNSHIP BOARD OF COUNTY ROAD COMMISSIONERS OF THE COUNTY OF BERRIEN 2860 EAST NAPIER
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: US 59 COUNTY: 02/02/2017 ESTIMATE PAID: AWARD DATE: 02/23/2017 ESTIMATE PERIOD:
48,793.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 69 18.00 CONTRACT ID: 017701102 PROJECT: NH 2017(641) CONTRACT: 02173007 AWARD : $2,215,251.08 PROJECTED : $2,257,251.08 ADJ. PROJECTED : $2,306,044.60
More informationCITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER
CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS 12835 NEWCASTLE WAY, SUITE 200 DECEMBER 18, 2012 SPECIAL MEETING 12:00 P.M. 1. CALL TO ORDER 2. GENERAL BUSINESS a. AB 12 077 Resolution Authorizing
More informationNOTICE OF VARIOUS BID RENEWALS
NOTICE OF VARIOUS BID RENEWALS April 22, 2015 TO WHOM IT MAY CONCERN: This letter shall serve notice that the Board of Acquisition and Contract (BAC) approved the following bid renewal option on April
More informationTabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT
Page 1 of 20 16 SSSEX ROTE 94 BLACK CREEK TRIBTARY CLVERT REPLACEMENT CONSTRCTION CORP INC. (2) KONKS CORPORATION (3) NORTHEAST REMSCO CONSTRCTION INC Quantity and nits nit Price nit Price nit Price 0001
More informationBID TABULATION PAGE 1 OF 6
BID TABULATION PAGE 1 OF 6 BID PRE-BID ESTIMATE R.G. Huston Company, Inc. Kopplin & Kinas Co., Inc. Cottage Grove, WI Green Lake, WI NO. DESCRIPTION OF WORK QUANT. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT
More informationCECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075
Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 958 COUNTY: 06/08/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 166 CONTRACT ID: 100802018 PROJECT: C 1008-2-18 CONTRACT: 06163219 AWARD : $3,498,600.69 PROJECTED : $3,564,104.69 ADJ. PROJECTED : $3,564,104.69 CONTRACT:
More informationTRENCH PERMIT. CITY OF SOMERSWORTH NH 18 Lilac Lane - (603) Please Fax at (603) Date: Permit# Dig Safe # Fee = $70.
TRENCH PERMIT CITY OF SOMERSWORTH NH 18 Lilac Lane - (603) 692-4266 - Please Fax at (603) 692-4281 Date: Permit# Dig Safe # Fee = $70.00 Name of Applicant Address of Applicant Phone Number Reason for Excavation
More informationElectric Service Information Sheet Georgia Power Company
Electric Service Information Sheet Georgia Power Company Project: Location: Developer: (Name of S/D or Customer) (Street Address or road Name) (Developer s Name) Georgia Power Company (the Company) will
More informationActive Construction RV Associates Scarsella JR Hayes
CITY OF PORT ORCHARD PUBLIC WORKS DEPARTMENT TREMONT STREET IMPROVEMENTS SR 16 to Port Orchard Boulevard Opening: 6/6/2017 Fed Aid Proj No: STPUS-6610(004) $ 12,779,179.17 $ 12,855,082.55 $ 12,901,887.92
More informationNorthumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate
Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)
More informationBID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #
ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00
More informationCITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS
1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/15
68,460.45 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/15 101 28.00 CONTRACT ID: 207501053 PROJECT: NH 2013(466) CONTRACT: 03133207 AWARD : $3,794,106.27 PROJECTED : $3,958,638.27 ADJ. PROJECTED :
More informationWAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP)
WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP) 2017 2026 DECEMBER 2015 Prepared For: Federal Aviation Administration Ohio Department of Transportation Office of Aviation Attachment A 10
More informationGladwin County Road Commission 2016 Hot Mix Asphalt (HMA) Paving. Page 1 of 5
Page 1 of 5 SEALED PROPOSALS (BIDS) WILL BE RECEIVED UNTIL 9:30 A.M., EST, WEDNESDAY, March 9, 2016 Board of County Road Commissioners of the County of Gladwin, 301 South State Street, Gladwin, Michigan
More informationCITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS
CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center
More informationSPECIAL SPECIFICATION. Atmos Energy - Natural Gas Distribution System
2004 Specifications CSJ 2374-02-110, etc. SPECIAL SPECIFICATION 5191 Atmos Energy - Natural Gas Distribution System 1. Description. This Item will govern the installation of approximately two thousand
More informationCITY-TIF COMMISSION EXPENSES Cost Description Project Cost Data Reimbursable From Public Funds Developer Equity COST TIF Super TIF State TIF CID SCTC PRIVATE I. Legal $ 750,000 $ 750,000 $ - $ - $ - $
More informationINVITATION TO BID. CONTRACT PERIOD: The contract shall cover the County s needs for the period of July 21, 2015 through July 20, 2015.
INVITATION TO BID The Etowah County Commission will, on June 22, 2015 in the Commission Chambers, 1st floor, 800 Forrest Avenue, Gadsden, AL, receive competitive bids on SUPERPAVE BITUMINOUS CONCRETE ASPHALT
More information