1 100 MOBILIZATION LS $ 15, $ 143, $ 69, BRSTL 101 CONSTRUCTION SURVEYING CONSTR. LS $ 2, $ 59, $ 12, BRSTL 102 CONSTRUCTION SURVEYING MIN.-PLAN LS $ 15, $ 15, $ 15, BRSTL 104 DESIGN BUILD EA $ 1.00 $ 1.00 $ 1.00 BRSTL 110 CLEARING AND GRUBBING LS $ 5, $ 40, $ 21, BRSTL 120 REGULAR EXCAVATION CY $ 7.58 $ $ BRSTL 125 GRADING LS $ 80, $ 80, $ 80, BRSTL 140 BORROW EXCAVATION CY $ 3.00 $ $ BRSTL 211 MINOR STR. EXCAV. PIPE CULVERT CY $ $ $ BRSTL 212 MINOR STR. EXCAV. BOX CULVERT CY $ $ $ BRSTL 270 SELECT MATL. TY. I MIN. CBR-30 TON $ $ $ BRSTL 505 BEDDING MATL.AGGR.NO. 25 OR 26 TON $ $ $ BRSTL 522 CONCRETE CLASS A4 BOX CULVERT CY $ $ $ BRSTL 525 CONCRETE CLASS A3 MISC. CY $ $ 1, $ BRSTL 529 FLOWABLE BACKFILL CY $ $ $ BRSTL 541 CORROSION RESISTANT REINF.STEEL CL. I LB $ 2.50 $ 2.50 $ 2.50 BRSTL 542 EPOXY COATED REINF. STEEL LB $ 3.00 $ 3.00 $ 3.00 BRSTL 588 UNDERDRAIN UD-4 LF $ $ $ BRSTL " PIPE LF $ $ $ BRSTL " PIPE LF $ $ $ BRSTL " CONC. PIPE LF $ $ $ BRSTL 1186 STORM SEWER PIPE 18" LF $ $ $ BRSTL 1216 STORM SEWER PIPE 21" LF $ $ $ BRSTL " CONC. PIPE LF $ $ $ BRSTL 1246 STORM SEWER PIPE 24" LF $ $ $ BRSTL " PIPE LF $ $ $ BRSTL " CONC. PIPE LF $ $ $ BRSTL " CONC. PIPE LF $ $ $ BRSTL " PIPE LF $ $ $ BRSTL " END SECTION ES-1 OR 2 EA $ $ $ BRSTL " END SECTION ES-1 OR 2 EA $ $ $ BRSTL " END SECTION ES-1 EA $ $ $ BRSTL 6745 DROP INLET DI-2A EA $ 2, $ 2, $ 2, BRSTL 6747 DROP INLET DI-2B,L=4' EA $ 2, $ 2, $ 2, BRSTL Page 1 of 129

2 6749 DROP INLET DI-2B,L=8' EA $ 6, $ 6, $ 6, BRSTL 6750 DROP INLET DI-2B,L=10' EA $ 6, $ 6, $ 6, BRSTL 6751 DROP INLET DI-2B,L=12' EA $ 6, $ 6, $ 6, BRSTL 6752 DROP INLET DI-2B,L=14' EA $ 6, $ 6, $ 6, BRSTL 6817 DROP INLET DI-3B,L=4' EA $ 2, $ 2, $ 2, BRSTL 7506 DROP INLET DI-5 EA $ 2, $ 4, $ 3, BRSTL 9056 MANHOLE MH-1 OR 2 LF $ $ 1, $ BRSTL 9057 FRAME & COVER MH-1 EA $ $ $ BRSTL 9148 EROS.CTRL.STONE CL.A1 EC-1 TON $ $ $ BRSTL 9150 EROS.CTRL.STONE CL. I, EC-1 TON $ $ $ BRSTL 9151 EROS.CTRL.STONE CL. I, EC-1 SY $ $ $ BRSTL 9152 EROS.CTRL.STONE CL. II, EC-1 TON $ $ $ BRSTL 9250 SLOPE DRAIN EA $ $ $ BRSTL AGGR. MATL. NO. 1 TON $ 0.01 $ $ BRSTL AGGR. MATL. NO. 21A OR 21B TON $ $ $ BRSTL AGGR. MATL. NO. 21B TON $ $ $ BRSTL AGGR. MATL. NO. 25 OR 26 TON $ $ $ BRSTL AGGR.BASE MAT.TY. I NO.21A OR 21B TON $ $ $ BRSTL AGGR.BASE MAT.TY. I NO.21A OR 21B TON $ $ $ BRSTL AGGR. BASE MATL. TY. I NO. 21B TON $ 0.01 $ $ BRSTL TACK COAT GAL $ 0.10 $ 2.51 $ 1.68 BRSTL COVER MATL. AGGR. NO. 8 TON $ $ $ BRSTL ASPHALT CONCRETE TY. SM-19.0A TON $ $ $ BRSTL ASPHALT CONCRETE TY. SM-19.0D TON $ $ $ BRSTL ASPH. CONC. TY. SM-19.0E TON $ $ $ BRSTL ASPHALT CONCRETE TY. SM-12.5A TON $ $ $ BRSTL ASPHALT CONCRETE TY. SM-12.5D TON $ $ $ BRSTL ASPHALT CONC. TY. SM-12.5E TON $ $ $ BRSTL ASPHALT CONCRETE TY. IM-19.0A TON $ $ $ BRSTL ASPHALT CONCRETE TY. IM-19.0E TON $ $ $ BRSTL FLEX. PAVE.TIE-IN PLANING ABOVE 2"-4" SY $ 5.52 $ 5.52 $ 5.52 BRSTL FLEXIBLE PAVE.PLANING 0"-2" SY $ 1.37 $ $ 4.51 BRSTL FLEXIBLE PAVE. PLANING ABOVE 2"-4" SY $ 4.49 $ 4.49 $ 4.49 BRSTL ASPHALT CONC.TY. SM-9.5A TON $ $ $ BRSTL Page 2 of 129

3 10642 ASPHALT CONCRETE TY. BM-25.0A TON $ $ $ BRSTL RUMBLE STRIP, ASPHALT LF $ 0.30 $ 3.00 $ 0.43 BRSTL LIQ.ASPH. RUMBLE STRIP COATING SY $ 0.35 $ 2.00 $ 0.75 BRSTL REINF. HYDR.CEM.CONC. PAVE. 8" SY $ $ $ BRSTL STD. CURB CG-2 LF $ $ $ BRSTL STD. MED. CURB MC-1 LF $ $ $ BRSTL ASPHALT CONC. CURB TY. MC-3B LF $ 5.90 $ $ 6.58 BRSTL ASPH.CONC.CURB BACKUP MATL. TON $ $ $ BRSTL STD. COMB. CURB & GUTTER CG-6 LF $ $ $ BRSTL RAD. COMB. CURB & GUTTER CG-6 LF $ $ $ BRSTL ENTRANCE GUTTER CG-9D SY $ $ $ BRSTL CG-12 DETECTABLE WARNING SURFACE SY $ $ $ BRSTL HYDR. CEMENT CONC. SIDEWALK 4" SY $ $ $ BRSTL GUARDRAIL GR-MGS1 LF $ $ $ BRSTL GUARDRAIL GR-MGS1A LF $ $ $ BRSTL GUARDRAIL GR-MGS1, 9' POST LF $ $ $ BRSTL RADIAL GUARDRAIL GR-MGS1 LF $ $ $ BRSTL RADIAL GUARDRAIL GR-MGS1A LF $ $ $ BRSTL RADIAL GUARDRAIL GR-MGS1, 9' POST LF $ $ $ BRSTL GUARDRAIL TERMINAL GR-MGS2 EA $ 2, $ 3, $ 2, BRSTL GUARDRAIL END ANCHORAGE GR-MGS3 EA $ $ 1, $ BRSTL GUARDRAIL HEIGHT TRANSITION GR-MGS4 EA $ $ 1, $ BRSTL GUARDRAIL GR-8 NCHRP 350 TL-3 LF $ $ $ BRSTL GUARDRAIL GR-8A NCHRP 350 TL-3 LF $ $ $ BRSTL GUARDRAIL GR-8B NCHRP 350 TL-3 LF $ $ $ BRSTL GUARDRAIL TERMINAL GR-6 NCHRP 350 LF $ $ $ BRSTL GUARDRAIL TERMINAL GR-7 NCHRP 350 EA $ $ 3, $ 2, BRSTL GUARDRAIL TERMINAL GR-11 EA $ $ 1, $ BRSTL GUARDRAIL GR-2 LF $ $ $ BRSTL GUARDRAIL GR-2 8' POST LF $ $ $ BRSTL GUARDRAIL GR-2A LF $ $ $ BRSTL RAD. GUARDRAIL GR-2 LF $ $ $ BRSTL RAD. GUARDRAIL GR-2A LF $ $ $ BRSTL GUARDRAIL GR-3 LF $ 8.00 $ 8.00 $ 8.00 BRSTL Page 3 of 129

4 13336 GUARDRAIL TERMINAL GR-3 EA $ 1, $ 1, $ 1, BRSTL ALT.BREAKAWAY CABLE TERM. GR-9 EA $ 1, $ 5, $ 2, BRSTL REMOVE GR-7 TERMINAL EA $ 0.01 $ 2, $ BRSTL GUARDRAIL TER.SITE PREPARATION EA $ $ 1, $ BRSTL GUARDRAIL GR-10 LF $ $ $ BRSTL RAILING, TEXAS T-6 LF $ $ $ BRSTL FIXED OBJECT ATTACH. GR-FOA-1 TY. I EA $ 1, $ 5, $ 2, BRSTL FIXED OBJECT ATTACH. GR-FOA-1 TY. II EA $ $ 1, $ BRSTL FIXED OBJECT ATTACH. GR-FOA-3 TY. I EA $ 1, $ 1, $ 1, BRSTL FIXED OBJECT ATTACH. GR-FOA-3 TY.II EA $ $ $ BRSTL FIXED OBJECT ATTACH. GR-FOA-4 TY. I EA $ 1, $ 3, $ 1, BRSTL FIXED OBJECT ATTACH. GR-FOA-4 TY. II EA $ $ $ BRSTL FIXED OBJECT ATTACH. GR-FOA-4 TY. III EA $ $ 2, $ BRSTL FIXED OBJECT ATTACH. GR-FOA-2 TY. I EA $ 1, $ 2, $ 2, BRSTL FIXED OBJECT ATTACH. GR-FOA-2 TY. II EA $ $ $ BRSTL MEDIAN BARRIER MB-3 LF $ $ $ BRSTL TRAF. BARR. SER. CONC. SGL FC PAR.MB-10A LF $ $ $ BRSTL TRAF. BARR. SER. CONC. DBL FC PAR.MB-11A LF $ $ $ BRSTL RETAINING WALL RW-3 CY $ $ 1, $ BRSTL RETAINING WALL EXCAVATION CY $ $ $ BRSTL IMPACT ATTEN. TY.1 TL-3, LOW MAINTENANCE EA $ 30, $ 30, $ 30, BRSTL IMPACT ATTEN.SER. TY. 1 TL-3, >=40 MPH EA $ 7, $ 24, $ 10, BRSTL IMPACT ATTEN.SER.TY.1 TL-2,<40 MPH EA $ 5, $ 8, $ 7, BRSTL IMPACT ATTEN. TL-2, < 40 MPH DES.SP EA $ 3, $ 5, $ 4, BRSTL IMPACT ATTENUATOR SER. TYPE I EA $ 17, $ 17, $ 17, BRSTL REMOVE SIDEWALK AND ENTRANCE SY $ $ $ BRSTL CRUSHER RUN AGGR. NO. 25 OR 26 TON $ $ $ BRSTL AGGR. MATL. NO. 25 OR 26 TON $ $ $ BRSTL CURB CG-2 LF $ $ $ BRSTL SAW CUT SIDEWALK LF $ 1.00 $ 1.00 $ 1.00 BRSTL EMUL. ASPH. SLURRY SEAL TYPE C SY $ 2.00 $ 2.03 $ 2.02 BRSTL AGR.BASE MAT.TY.I OR II NO. 21A OR21B TON $ $ $ BRSTL LIQUID ASPHALT MATL. CRS-2L GAL $ $ $ BRSTL ASPH. CONC TY. SM-9.5E TON $ $ $ BRSTL Page 4 of 129

5 16350 ASPH. CONC. TY. SM-12.5A TON $ $ $ BRSTL ASPH. CONC. TY. SM-12.5D TON $ $ $ BRSTL ASPH. CONC. TY. SM-12.5E TON $ $ $ BRSTL ASPH. CONC. TY. SM-19.0A TON $ $ $ BRSTL ASPH. CONC. TY. IM-19.0A TON $ $ $ BRSTL MACHINING SHOULDERS LF $ 3.00 $ 3.00 $ 3.00 BRSTL ASPH. CONC. TY. BM-25.0A TON $ $ $ BRSTL MANUAL SHOULDERS RESTORATION LF $ $ $ BRSTL FLX.PAV.TIE-IN PLANING 0"-2" SY $ 4.41 $ 8.00 $ 5.22 BRSTL FLEXIBLE PAVE.PLANING 0"-2" SY $ 0.87 $ 5.36 $ 1.65 BRSTL FLEXIBLE PAVEMENT PLANING ABOVE 2"-4" SY $ 3.74 $ $ 6.23 BRSTL W BEAM TERM CONNECTOR EA $ 0.01 $ $ BRSTL W BEAM END SECT FLARED EA $ 0.01 $ 0.01 $ 0.01 BRSTL W BEAM END SECT ROUNDED EA $ $ $ BRSTL W BEAM BACKUP PLATE EA $ 5.00 $ $ 9.55 BRSTL GUARDRAIL BEAM LF $ 8.00 $ $ BRSTL RADIAL GUARDRAIL BEAM LF $ 9.00 $ $ BRSTL RUB RAIL LF $ 5.00 $ $ BRSTL POST (WOOD, CONC., OR STEEL) EA $ $ $ BRSTL RUB RAIL OFFSET BLOCK EA $ 5.00 $ $ BRSTL OFFSET BLOCK EA $ 6.00 $ $ BRSTL BR-GR POST ATTACHMENT VARIOUS TYPES EA $ $ $ BRSTL DRILL HOLE EA $ 1.00 $ $ BRSTL REALIGN POST EA $ 0.01 $ $ BRSTL EMERGENCY MOBILIZATION EA $ 3.00 $ 10, $ 1, BRSTL POST STEEL GR-8 BENT PLATE OR S3X5.7 ST EA $ $ $ BRSTL GUARDRAIL DELINEATOR EA $ 0.01 $ 7.50 $ 4.68 BRSTL GUARDRAIL BEAM (ST. OWNED) LF $ 0.01 $ $ 0.28 BRSTL POST (WOOD, CONC. OR STEEL) (ST. OWNED) EA $ 0.01 $ 0.01 $ 0.01 BRSTL MEDIAN STRIP MS-1A SY $ $ $ BRSTL FENCE FE-W1 LF $ $ $ BRSTL LINE BRACE UNIT FE-W1,FE-W2 EA $ $ $ BRSTL GATE FE-CL L=10' EA $ $ $ BRSTL WATER GATE FE-4 TY.III LF $ $ $ BRSTL Page 5 of 129

6 23560 TEMP. SAFETY FENCE 4' LF $ 3.00 $ 5.00 $ 3.73 BRSTL ALLAYING DUST HR $ 8.00 $ $ BRSTL TYPE 3 BARRICADE 4' EA $ $ $ BRSTL TYPE 3 BARRICADE 8' EA $ $ $ BRSTL TEMPORARY (CONSTRUCTION) SIGN SF $ 0.01 $ $ BRSTL CR. RUN AGGR. NO. 25 OR 26 TON $ $ $ BRSTL TRUCK MOUNTED ATTENUATOR HR $ 0.01 $ $ 5.00 BRSTL GROUP 2 CHANNELIZING DEVICES DAY $ 0.01 $ $ 0.84 BRSTL PORT.CHANGEABLE MESS. SIGN HR $ 0.01 $ $ 4.65 BRSTL ELECTRONIC ARROW BOARD HR $ 0.01 $ $ 3.03 BRSTL FLAGGER SERVICE HR $ 0.01 $ $ BRSTL WARNING LIGHT TY. B DAY $ 0.20 $ 3.70 $ 1.81 BRSTL TRAFFIC BARRIER SER. CONC. MB-7D PC LF $ $ $ BRSTL OBSCURING ROADWAY UNIT $ 1, $ 1, $ 1, BRSTL DEMO. OF PAVEMENT FLEXIBLE SY $ 1.00 $ $ 4.66 BRSTL REMOVE EXISTING GUARDRAIL LF $ 0.01 $ $ 2.46 BRSTL HANDRAIL HR-1 TYPE II LF $ $ $ BRSTL FIELD OFFICE TY.I MO $ 1, $ 1, $ 1, BRSTL FIELD OFFICE TY.II MO $ 1, $ 1, $ 1, BRSTL PROGRESS SCHEDULE BASELINE LS $ 10, $ 10, $ 10, BRSTL PROGRESS SCHEDULE UPDATES EA $ $ $ BRSTL DESIGN BUILD PRELIMINARY ENG EA $ 1.00 $ 1.00 $ 1.00 BRSTL DESIGN BUILD QAQC EA $ 1.00 $ 1.00 $ 1.00 BRSTL DRY RIPRAP CL. AI TON $ $ $ BRSTL DRY RIPRAP CL.I 18" TON $ $ $ BRSTL DRY RIPRAP CL.I 26" TON $ $ $ BRSTL DRY RIPRAP CL.III 36" TON $ $ $ BRSTL TOPSOIL CLASS A 2" ACRE $ 11, $ 15, $ 11, BRSTL TOPSOIL CLASS B 2" ACRE $ 5, $ 5, $ 5, BRSTL TEMPORARY SEED LB $ $ $ BRSTL REGULAR SEED LB $ 7.00 $ $ BRSTL OVERSEEDING LB $ 7.00 $ $ BRSTL LEGUME SEED LB $ $ $ BRSTL LEGUME OVERSEEDING LB $ $ $ BRSTL Page 6 of 129

7 27215 FERTILIZER LB $ 0.90 $ $ 1.85 BRSTL FERTILIZER NITROGEN - N LB $ 1.30 $ 1.30 $ 1.30 BRSTL FERTILIZER PHOSPHOROUS - P LB $ 1.30 $ 1.30 $ 1.30 BRSTL FERTILIZER POTASSIUM - K LB $ 1.30 $ 1.30 $ 1.30 BRSTL LIME TON $ $ $ BRSTL ROLLED EROSION CTRL PRODUCT EC-2 TYPE 1 SY $ 2.03 $ 2.03 $ 2.03 BRSTL ROLLED EROSION CTRL PRODUCT EC-2 TYPE 2 SY $ 3.00 $ 3.00 $ 3.00 BRSTL ROLLED EROSION CTRL PRODUCT EC-3 TYPE 1 SY $ 6.72 $ 6.72 $ 6.72 BRSTL CHECK DAM ROCK TY. II EA $ $ $ BRSTL DEWATERING BASIN EC-8 EA $ $ 2, $ 1, BRSTL SILTATION CONTROL EXCAVATION CY $ 0.01 $ $ 2.83 BRSTL INLET PROTECTION, TYPE A EA $ $ 1, $ BRSTL INLET PROTECTION, TYPE B EA $ $ $ BRSTL TEMP. SILT FENCE TYPE B LF $ 6.67 $ 8.00 $ 7.82 BRSTL TEMP. SILT FENCE TYPE A LF $ 2.50 $ 9.00 $ 3.38 BRSTL TEMP. FILTER BARRIER LF $ 0.01 $ 3.00 $ 0.40 BRSTL COFFERDAM EA $ 2, $ 2, $ 2, BRSTL STORM WATER MAN. BASIN EXCAV. CY $ $ $ BRSTL STORMWATER MAN.DRAIN.STR.SWM-1 LF $ $ $ BRSTL /4" WATER SERVICE LINE LF $ $ $ BRSTL " WATER SERVICE LINE LF $ 9.60 $ $ BRSTL DESIGN BUILD UTILITIES EA $ 1.00 $ 1.00 $ 1.00 BRSTL " WATER MAIN LF $ $ $ BRSTL " WATER MAIN LF $ $ $ BRSTL " DI WATER MAIN LF $ $ $ BRSTL " DI WATER MAIN LF $ $ $ BRSTL " DI WATER MAIN LF $ $ $ BRSTL " GATE VALVE & BOX EA $ $ $ BRSTL " GATE VALVE & BOX EA $ $ 1, $ 1, BRSTL " GATE VALVE & BOX EA $ 1, $ 1, $ 1, BRSTL " GATE VALVE & BOX EA $ 3, $ 3, $ 3, BRSTL ADJUST EXIST. VALVE BOX EA $ $ $ BRSTL " BLOW-OFF VALVE & BOX EA $ 1, $ 1, $ 1, BRSTL FIRE HYDRANT EA $ 3, $ 3, $ 3, BRSTL Page 7 of 129

8 " AIR RELEASE VALVE & MANHOLE EA $ 1, $ 1, $ 1, BRSTL /8" WATER METER BOX & YOKE EA $ 1, $ 1, $ 1, BRSTL ADJUST EXIST. WATER METER BOX EA $ $ $ BRSTL " SANITARY SERVICE LATERAL CONNECTION LF $ $ $ BRSTL " DI SANITARY SEWER PIPE LF $ $ $ BRSTL " DI SANITARY SEWER PIPE LF $ $ $ BRSTL SANITARY SEWER MANHOLE LF $ $ $ BRSTL MANHOLE FRAME & COVER F&C-1 EA $ $ $ BRSTL " SEWER CLEANOUT EA $ $ $ BRSTL " STEEL ENCASE. PIPE LF $ $ $ BRSTL ROAD EDGE DELINEATOR, ED-2 EA $ $ $ BRSTL SIGN PANEL SF $ $ 13, $ BRSTL VA SIGN POST, W4 x 13 LF $ $ $ BRSTL VIA SIGN POST, W14 X 26 LF $ $ $ BRSTL VIA SIGN POST, W16 X 31 LF $ $ $ BRSTL SIGN POST STP-1, 2", 14 GAUGE LF $ $ $ BRSTL SIGN POST STP-1, 2 3/16", 10 GAUGE LF $ $ $ BRSTL SIGN POST STP-1, 2 1/2", 10 GAUGE LF $ $ $ BRSTL SIGN POST STP-1, 2 1/2", 12 GAUGE LF $ $ $ BRSTL CONC. SIGN FDN. STP-1 TY.A EA $ $ $ BRSTL CONC. SIGN FDN. STP-1 TY.B EA $ $ $ BRSTL CONC. SIGN FDN. STP-1, TY.F EA $ $ 1, $ BRSTL CONC.SGN.FOUND.SSP-V A 1'9" DIA.X 4'6" D EA $ 2, $ 2, $ 2, BRSTL CONC.SGN.FOUND.SSP-VI A 3'0" DIA.X 7' DE EA $ 2, $ 2, $ 2, BRSTL CONC.SGN.FOUND.SSP-VI A 4' DIA.X 9'6" DE EA $ 2, $ 2, $ 2, BRSTL CONC.FOUND.O/H SIGN STRUCTURE CY $ 1, $ 1, $ 1, BRSTL RELOC.EXIST.SIGN STRUCT.TY.VIA EA $ 1, $ 1, $ 1, BRSTL RELOC.EXIST.SIGN STR.TY.WP-1 EA $ $ $ BRSTL REM.-DISPOSE SIGN STRUCT.TY.I EA $ $ $ BRSTL REM.-DISPOSE SIGN STR. TY. V A EA $ $ $ BRSTL REM.-DISPOSE SIGN STR.TY. WP-2 EA $ $ $ BRSTL FLASHING BEACON FB-2 EA $ $ $ BRSTL ELECTRICAL SERVICE SE-5 EA $ 3, $ 3, $ 3, BRSTL /3 CONDUCTOR CABLE LF $ 4.33 $ 4.33 $ 4.33 BRSTL Page 8 of 129

9 52424 ELECTRICAL SERVICE SE-3 TYPE A EA $ 2, $ 2, $ 2, BRSTL TYPE A PVMT LINE MRKG 4" LF $ 0.05 $ 7.25 $ 0.06 BRSTL TY A PVMT LINE MRKG 6" LF $ 0.07 $ 5.00 $ 0.08 BRSTL TYPE A PVMT LINE MRKG 8" LF $ 0.37 $ 1.75 $ 0.47 BRSTL TYPE A PAVEMENT LINE MRKG 24" LF $ 4.65 $ 7.00 $ 6.10 BRSTL TYPE B CLASS I PVMT LINE MRKG 4" LF $ 0.44 $ 6.60 $ 0.47 BRSTL TY B CL I PVMT LINE MRKG 6" LF $ 0.70 $ 4.24 $ 0.78 BRSTL TYPE B CLASS I PVMT LINE MRKG 8" LF $ 2.10 $ 2.10 $ 2.10 BRSTL TY B CL I PVMT LINE MRKG 12" LF $ 5.80 $ 7.50 $ 6.63 BRSTL TY.B CL.I PAVE. LINE MARK. 24" LF $ $ $ BRSTL TY.B CL.II PAVE. LINE MARK. 12" LF $ $ $ BRSTL TY.B CL.IV PVMT LINE MRKG 24" LF $ $ $ BRSTL TY.B CL.VI PVMT LINE MRKG 4" LF $ 2.98 $ 7.00 $ 3.59 BRSTL TY.B CL.VI PVMT LINE MRKG 6" LF $ 2.92 $ 4.46 $ 3.06 BRSTL TY.B CL.VI PVMT LINE MRKG 8" LF $ 3.95 $ 4.27 $ 4.23 BRSTL TY.B CL.VI CONTRAST PVMT MRKG, 4" LF $ 3.80 $ $ 6.50 BRSTL ERADICATE EX. LINEAR PVMT MRKG LF $ 1.00 $ 4.00 $ 1.66 BRSTL ERAD. EXIST.NONLINEAR PVMT MRKG SF $ 5.25 $ 8.00 $ 5.32 BRSTL REM.EXIST.RAISED PAVE. MARKER EA $ 7.75 $ $ 8.19 BRSTL REPL.LENS SNOW PLOW.RAISED MARKER EA $ 8.00 $ 8.30 $ 8.15 BRSTL SNOW PLOW.RAISED PAVE.MARK.ASPH.CONC EA $ $ $ BRSTL SNOW PLOW.RAISED PAVE.MARK.HYD. CONC EA $ $ $ BRSTL TEMP. PAVE. MARKER 1 WAY EA $ 4.00 $ $ 5.89 BRSTL TEMP. PAVE. MARKER 2 WAY EA $ 4.50 $ $ 5.26 BRSTL PVMT MESSAGE, 8', CHARACTER TY. B,CL.I EA $ $ $ BRSTL PVMT MESSAGE MARK. ONLY EA $ $ $ BRSTL PVMT MESSAGE MARK. SCHOOL ZONE EA $ $ 1, $ BRSTL BONUS ELIG.PAVE.MESSAGE MARK.SCHOOL ZONE EA $ 1, $ 1, $ 1, BRSTL PVMT MESSAGE MARK.R/R CROSSING EA $ $ 1, $ 1, BRSTL TEMP. PVMT MRKG, TY. A, 4" LF $ 0.09 $ 1.84 $ 0.10 BRSTL TEMP. PVMT MRKG, TY. A, 6" LF $ 0.12 $ 0.12 $ 0.12 BRSTL TEMP. PVMT MRKG, TY. A, 8" LF $ 2.90 $ 2.90 $ 2.90 BRSTL TEMP. PVMT MRKG, TY. A, 24" LF $ 6.50 $ $ BRSTL TYPE E TEMP. PVMT MRKG 6" LF $ 5.00 $ 8.00 $ 5.74 BRSTL Page 9 of 129

10 54512 TY. D, CL. II TEMP. PVMT MRKG 4" LF $ 1.72 $ 4.00 $ 1.77 BRSTL TY.D,CL.II TEMP. PVMT MRKG 8" LF $ 5.00 $ 5.25 $ 5.14 BRSTL TY. D, CL. II TEMP. PVMT MRKG 12" LF $ $ $ BRSTL TY.D,CL.II TEMP. PVMT MRKG 24" LF $ 4.00 $ $ BRSTL PVMT SYMB MRKG THRU ARROW TY B, CL I EA $ $ $ BRSTL PVMT SYMB MRKG SGL TURN ARROW TY A EA $ $ $ BRSTL PVMT.SYMB MRKG SGL TURN ARR. TY B CL I EA $ $ $ BRSTL PVMT SYMB MRKG SGL TURN ARR. TY B CL II EA $ $ $ BRSTL DBL TURN ARR.THRU/LT OR RT TY B, CL I EA $ $ $ BRSTL SYMB MRKG DBL TURN ARR LT/RT TY.B CL I EA $ $ $ BRSTL SYMB MRKG WRONG-WAY ARROW TY A EA $ $ $ BRSTL SYMB MRKG HELMETED BICYCLIST TY B CL I EA $ $ $ BRSTL CONDUCTOR CABLE LF $ 4.40 $ 4.40 $ 4.40 BRSTL CONDUCTOR CABLE, NO. 8 EGC LF $ 8.66 $ 8.66 $ 8.66 BRSTL JUNCTION BOX JB-R2 EA $ 3, $ 3, $ 3, BRSTL JUNCTION BOX JB-S1 EA $ 1, $ 1, $ 1, BRSTL " PVC CONDUIT LF $ 8.66 $ 8.66 $ 8.66 BRSTL " PVC CONDUIT LF $ 3.30 $ 8.66 $ 4.98 BRSTL " PVC CONDUIT LF $ $ $ BRSTL TRENCH EXCAVATION ECI-1 LF $ $ $ BRSTL TEST BORE EA $ 2, $ 2, $ 2, BRSTL ITS CONTROLLER CABINET POLE MOUNTED EA $ 9, $ 9, $ 9, BRSTL CCTV CAMERA DIGITAL EA $ 5, $ 5, $ 5, BRSTL DIGITAL VIDEO ENCODER EA $ 2, $ 2, $ 2, BRSTL DIGITAL VIDEO DECODER EA $ 2, $ 2, $ 2, BRSTL CCTV CAMERA POLE 60' W/LOWERING DEVICE EA $ 28, $ 28, $ 28, BRSTL CONC. CLASS A4 MOD. LOW SHRINKAGE CY $ $ $ BRSTL CONC. CLASS A4 MOD. LTWT LOW SHRINKAGE CY $ $ $ BRSTL CONC. CL. A4 BRIDGE APPR. SLAB CY $ $ $ BRSTL REINF. STEEL BRIDGE APPR. SLAB LB $ 1.05 $ 1.05 $ 1.05 BRSTL BRIDGE DECK GROOVING SY $ 9.50 $ $ BRSTL COVER DEPTH SURVEY SY $ 3.40 $ 3.40 $ 3.40 BRSTL GRDRAIL, THRIE BEAM LF $ $ $ BRSTL PREST.CONC.SLAB 3'X21"X(+30'-35') EA $ 17, $ 17, $ 17, BRSTL Page 10 of 129

11 61182 PREST. CONC. SLAB 4' X 21" X(+30'-35') EA $ 19, $ 19, $ 19, BRSTL PREST. CONC. SLAB 4' X 21" X(+45'-50') EA $ 16, $ 16, $ 16, BRSTL PREST.CONC.BOX BEAM 3' X 2'3"X(+45'-50') EA $ 25, $ 25, $ 25, BRSTL CORROSION RESISTANT REINF.STEEL CL. I LB $ 2.30 $ 2.30 $ 2.30 BRSTL CORROSION RESISTANT REINF.STEEL CL. II LB $ 2.93 $ 3.17 $ 3.09 BRSTL CORROSION RESISTANT REINF.STEEL CL. III LB $ 3.60 $ 4.00 $ 3.60 BRSTL STR.STEEL ROLLED BEAM ASTM A709 GRADE50W LS $ 255, $ 255, $ 255, BRSTL RAILING,KANSAS CORRAL 32" W/OUT CURB LF $ $ $ BRSTL RAILING, BR27D 2 RAILS LF $ $ $ BRSTL RAILING, BR27D 3 RAILS LF $ $ $ BRSTL EPOXY OVERLAY SY $ $ $ BRSTL STRUCTURE EXCAVATION CY $ $ $ BRSTL POROUS BACKFILL CY $ $ $ BRSTL GEOCOMPOSITE WALL DRAIN SY $ $ $ BRSTL PIPE UNDERDRAIN 6" LF $ $ $ BRSTL CONCRETE CLASS A3 CY $ $ $ BRSTL CONCRETE CLASS B2 CY $ $ $ BRSTL REINF. STEEL LB $ 0.99 $ 0.99 $ 0.99 BRSTL CORROSION RESISTANT REINF.STEEL CL. I LB $ 2.21 $ 2.70 $ 2.34 BRSTL CORROSION RESISTANT REINF.STEEL CL. III LB $ 4.00 $ 4.00 $ 4.00 BRSTL CONCRETE PARAPET LF $ $ $ BRSTL COFFERDAM EA $ 1, $ 3, $ 2, BRSTL DRY RIPRAP CL. A1 20" SY $ $ $ BRSTL DRY RIPRAP CL.II 38" TON $ $ $ BRSTL TRAFFIC BARRIER SERVICE CONC. LF $ $ $ BRSTL DECK DRAINAGE SYSTEM LS $ 4, $ 7, $ 6, BRSTL CONCRETE PARAPET LF $ $ $ BRSTL RAILING, TEXAS T-6 LF $ $ $ BRSTL RAILING,KANSAS CORRAL 32" W/OUT CURB LF $ $ $ BRSTL RAILING, BR27D 2 RAILS LF $ $ $ BRSTL RAILING, BR27D 3 RAILS LF $ $ $ BRSTL CONCRETE CLASS A4 CY $ $ 1, $ BRSTL CONC. CLASS A4 MOD.LOW SHRINKAGE CY $ $ $ BRSTL COVER DEPTH SURVEY SY $ 8.81 $ $ BRSTL Page 11 of 129

12 68090 BRIDGE DECK GROOVING SY $ 5.17 $ $ BRSTL CORROSION RESISTANT REINF.STEEL CL. I LB $ 2.20 $ 3.00 $ 2.57 BRSTL CORROSION RESISTANT REINF.STEEL CL. II LB $ 3.14 $ 5.00 $ 3.14 BRSTL CORROSION RESISTANT REINF.STEEL CL. III LB $ 5.00 $ 5.00 $ 5.00 BRSTL REINF. STEEL LB $ 2.00 $ 2.00 $ 2.00 BRSTL STR.STEEL PLATE GIRDER ASTM A709 GR. 50W LS $ 215, $ 512, $ 376, BRSTL REPLACE ANCHOR BOLT EA $ $ $ BRSTL EMBEDDED GALVANIC ANODES EA $ $ $ BRSTL MODIFY EXIST. FIXED BEARING EA $ 1, $ 1, $ 1, BRSTL PARTIAL BEAM/GIRDER REPLACEMENT LB $ $ $ BRSTL REINF. STL. SPLICER #4 BAR EA $ $ $ BRSTL REINF. STL. SPLICER #5 BAR EA $ $ $ BRSTL REINF. STL. SPLICER #6 BAR EA $ $ $ BRSTL REINF. STL. SPLICER #7 BAR EA $ $ $ BRSTL REINF. STL. SPLICER #8 BAR EA $ $ $ BRSTL PARAPET CLOSURE TYPE A EA $ $ $ BRSTL PARAPET CLOSURE TYPE B EA $ $ $ BRSTL PARAPET CLOSURE TYPE C EA $ $ $ BRSTL CRACK REPAIR DRILL CRACK ARREST HOLES EA $ $ $ BRSTL TYPE A MILLING 1/2" SY $ $ $ BRSTL PATCHING TYPE B SY $ $ $ BRSTL H.E.S. PATCHING TYPE B SY $ $ $ BRSTL PATCHING TYPE C SY $ $ $ BRSTL H.E.S. PATCHING TYPE C SY $ $ $ BRSTL DECK SLAB CLOSURE SY $ $ $ BRSTL EPOXY RESIN TYPE EP-3B/EP-3T SY $ $ $ BRSTL ELASTOMERIC EXP. DAM 0" TO 2" LF $ $ $ BRSTL ELASTOMERIC EXP. DAM 2+" TO 3" LF $ $ $ BRSTL ELASTOMERIC EXP. DAM 3+" TO 4" LF $ $ $ BRSTL EXPANSION JOINT REMOVAL LF $ $ $ BRSTL RECONSTRUCT EXPANSION JOINT LF $ $ $ BRSTL RECONSTRUCT EXPANSION JOINT, HES LF $ $ $ BRSTL CLEAN AND RESEAL EXPANSION JOINT LF $ $ $ BRSTL EXPANSION JOINT PREPARATION LF $ $ $ BRSTL Page 12 of 129

13 68578 RECONSTRUCT BACK WALL LF $ $ $ BRSTL RECONSTRUCT BACK WALL, HES LF $ $ $ BRSTL BEAM END REPAIR EA $ 1, $ 1, $ 1, BRSTL JACKING AND BLOCKING BEAM EA $ $ $ BRSTL CONC. SUPERSTR. SURFACE REPAIR SY $ 1, $ 1, $ 1, BRSTL FURN LATEX MOD CONCRETE 1-1/4" - 1-3/4" CY $ 1, $ 1, $ 1, BRSTL PLACE LATEX MODIFIED CONCRETE OVERLAY SY $ $ $ BRSTL PLACE CLASS A4 BRIDGE DECK CONC OVERLAY SY $ $ $ BRSTL FURN.HIGH EARLY MOD CONC. 2-1/4"-2-3/4" CY $ 1, $ 1, $ 1, BRSTL FURN.VERY ERLY MOD.CONC. 2-1/4"- 2-3/4" CY $ 1, $ 1, $ 1, BRSTL PLC.HIGH EARLY MOD.CONC.OVERLAY SY $ $ $ BRSTL PLACE VERY EARLY MOD.CONC.OVERLAY SY $ $ $ BRSTL FURN.LATEX MOD.CONC. 2-1/4" - 2-3/4" CY $ 1, $ 1, $ 1, BRSTL FURN.CL. A4 BRIDGE DECK CONC. 4"-4-1/2" CY $ $ $ BRSTL TYPE A HYDRO-DEMOLITION 1/2" SY $ $ $ BRSTL TYPE B HYDRO-DEMOLITION 4" SY $ $ $ BRSTL REPLACE CONCRETE CURB LF $ $ $ BRSTL EPOXY OVERLAY SY $ $ $ BRSTL TRAF.BARR.SER.CONC.SINGLE FACE LF $ $ $ BRSTL TRAF.BARR.SER.CONC.DOUBLE FACE LF $ $ $ BRSTL FLOWABLE BACKFILL CY $ $ $ BRSTL GEOCOMPOSITE WALL DRAIN SY $ $ $ BRSTL POROUS BACKFILL CY $ $ $ BRSTL PIPE UNDERDRAIN 6" LF $ $ $ BRSTL STRUCTURE EXCAVATION CY $ $ $ BRSTL SELECT BACKFILL ABUTMENT ZONE TON $ $ $ BRSTL CONCRETE CLASS A3 CY $ $ 1, $ BRSTL CONCRETE CLASS A4 CY $ $ $ BRSTL RAILING, BR27D 3 RAILS LF $ $ $ BRSTL CORROSION RESISTANT REINF.STEEL CL. I LB $ 2.20 $ 4.76 $ 2.48 BRSTL REINF. STEEL LB $ 1.70 $ 1.70 $ 1.70 BRSTL CONCRETE SUBSTRUCT. SURFACE REPAIR SY $ 1.00 $ 1, $ BRSTL COFFERDAM EA $ 1, $ 3, $ 2, BRSTL DRY RIPRAP CL. I 26" TON $ $ $ BRSTL Page 13 of 129

14 70093 DESIGN BUILD RIGHT OF WAY (ADMIN COSTS) EA $ 1.00 $ 1.00 $ 1.00 BRSTL 100 MOBILIZATION LS $ 5, $ 88, $ 56, CULPR 101 CONSTRUCTION SURVEYING CONSTR. LS $ 5, $ 55, $ 19, CULPR 102 CONSTRUCTION SURVEYING MIN.-PLAN LS $ 10, $ 10, $ 10, CULPR 104 DESIGN BUILD EA $ 1.00 $ 1.00 $ 1.00 CULPR 110 CLEARING AND GRUBBING LS $ 2, $ 42, $ 20, CULPR 120 REGULAR EXCAVATION CY $ $ $ CULPR 124 ROCK EXCAVATION CY $ $ $ CULPR 125 GRADING LS $ 50, $ 50, $ 50, CULPR 140 BORROW EXCAVATION CY $ $ $ CULPR 143 BORROW EXCAVATION MIN. CBR-30 CY $ $ $ CULPR 212 MINOR STR. EXCAV. BOX CULVERT CY $ $ $ CULPR 522 CONCRETE CLASS A4 BOX CULVERT CY $ $ $ CULPR 525 CONCRETE CLASS A3 MISC. CY $ $ 2, $ CULPR 529 FLOWABLE BACKFILL CY $ $ $ CULPR 535 CONCRETE CLASS C1 CY $ $ $ CULPR 540 REINF. STEEL LB $ 1.35 $ 6.00 $ 5.57 CULPR 541 CORROSION RESISTANT REINF.STEEL CL. I LB $ 1.80 $ 1.80 $ 1.80 CULPR 574 ENDWALL GRATE & FRAME EW-11A EA $ 1, $ 1, $ 1, CULPR 588 UNDERDRAIN UD-4 LF $ 9.30 $ $ CULPR 591 CROSSDRAIN CD-2 LF $ $ $ CULPR 595 OUTLET PIPE LF $ $ $ CULPR 596 ENDWALL EW-12 EA $ $ 1, $ CULPR 597 UNDERDRAIN UD-7 LF $ $ $ CULPR " PIPE LF $ $ $ CULPR " CONC. PIPE LF $ $ $ CULPR 1156 STORM SEWER PIPE 15" LF $ $ $ CULPR " PIPE LF $ $ $ CULPR " CONC. PIPE LF $ $ $ CULPR 1186 STORM SEWER PIPE 18" LF $ $ $ CULPR " PIPE LF $ $ $ CULPR " CONC. PIPE LF $ $ $ CULPR " CONC. PIPE LF $ $ $ CULPR 1246 STORM SEWER PIPE 24" LF $ $ $ CULPR Page 14 of 129

15 " CONC. PIPE LF $ $ $ CULPR " X 19" ELLIPTICAL CONC. PIPE LF $ $ $ CULPR " X 13" ARCH PIPE LF $ $ $ CULPR " X 15" ARCH PIPE LF $ $ $ CULPR " END SECTION ES-1 OR 2 EA $ 1, $ 1, $ 1, CULPR " END SECTION ES-1 OR 2 EA $ 1, $ 1, $ 1, CULPR " X 13" END SECTION ES-3 EA $ $ $ CULPR 6740 DROP INLET DI-1 EA $ 3, $ 5, $ 3, CULPR 6745 DROP INLET DI-2A EA $ 4, $ 6, $ 5, CULPR 6747 DROP INLET DI-2B,L=4' EA $ 5, $ 5, $ 5, CULPR 6748 DROP INLET DI-2B,L=6' EA $ 7, $ 7, $ 7, CULPR 6749 DROP INLET DI-2B,L=8' EA $ 7, $ 7, $ 7, CULPR 6756 DROP INLET DI-2BB,L=4' EA $ 5, $ 5, $ 5, CULPR 6765 DROP INLET DI-2C,L=6' EA $ 7, $ 7, $ 7, CULPR 6817 DROP INLET DI-3B,L=4' EA $ 3, $ 5, $ 4, CULPR 6818 DROP INLET DI-3B,L=6' EA $ 5, $ 6, $ 5, CULPR 6820 DROP INLET DI-3B,L=10' EA $ 4, $ 4, $ 4, CULPR 6835 DROP INLET DI-3C,L=6' EA $ 4, $ 4, $ 4, CULPR 7506 DROP INLET DI-5 EA $ 5, $ 6, $ 5, CULPR 8914 DROP INLET DI-12A,L=6' EA $ 6, $ 6, $ 6, CULPR 9056 MANHOLE MH-1 OR 2 LF $ $ 1, $ CULPR 9057 FRAME & COVER MH-1 EA $ $ $ CULPR 9148 EROS.CTRL.STONE CL.A1 EC-1 TON $ $ $ CULPR 9150 EROS.CTRL.STONE CL. I, EC-1 TON $ $ $ CULPR 9151 EROS.CTRL.STONE CL. I, EC-1 SY $ $ $ CULPR AGGR. MATL. NO. 21B TON $ $ $ CULPR AGGR.BASE MAT.TY. I NO.21A OR 21B CY $ $ $ CULPR AGGR. BASE MATL. TY. I NO. 21A TON $ $ $ CULPR AGGR. BASE MATL. TY. I NO. 21B TON $ $ $ CULPR TACK COAT GAL $ 0.01 $ 2.00 $ 1.86 CULPR BLOTTED SEAL COAT TY. D SY $ 5.20 $ $ 6.15 CULPR ASPHALT CONCRETE TY. SM-12.5A TON $ $ $ CULPR ASPHALT CONCRETE TY. SM-12.5D TON $ $ $ CULPR ASPHALT CONC. TY. SM-12.5E TON $ $ $ CULPR Page 15 of 129

16 10610 ASPHALT CONCRETE TY. IM-19.0A TON $ $ $ CULPR ASPHALT CONCRETE TY. IM-19.0D TON $ $ $ CULPR FLEXIBLE PAVE.PLANING 0"-2" SY $ 5.00 $ $ CULPR FLEXIBLE PAVE. PLANING ABOVE 2"-4" SY $ $ $ CULPR ASPHALT CONC.TY. SM-9.5A TON $ $ $ CULPR ASPHALT CONC.TY. SM-9.5D TON $ $ $ CULPR ASPHALT CONCRETE TY. BM-25.0A TON $ $ $ CULPR RUMBLE STRIP, ASPHALT LF $ 0.25 $ 1.10 $ 0.42 CULPR STD. CURB CG-2 LF $ $ $ CULPR RADIAL CURB CG-2 LF $ $ $ CULPR ASPHALT CONC. CURB MC-3 LF $ $ $ CULPR ASPHALT CONC. CURB TY. MC-3B LF $ $ $ CULPR STD. COMB. CURB & GUTTER CG-6 LF $ $ $ CULPR RAD. COMB. CURB & GUTTER CG-6 LF $ $ $ CULPR STD. COMB. CURB & GUTTER CG-7 LF $ $ $ CULPR RAD. COMB. CURB & GUTTER CG-7 LF $ $ $ CULPR ENTRANCE GUTTER CG-9D SY $ $ $ CULPR CG-12 DETECTABLE WARNING SURFACE SY $ $ $ CULPR MAILBOX POST, SINGLE EA $ $ $ CULPR MAILBOX POST, DOUBLE EA $ $ $ CULPR HYDR. CEMENT CONC. SIDEWALK 4" SY $ $ $ CULPR GUARDRAIL GR-MGS1 LF $ $ $ CULPR GUARDRAIL GR-MGS1A LF $ $ $ CULPR GUARDRAIL GR-MGS1, 9' POST LF $ $ $ CULPR RADIAL GUARDRAIL GR-MGS1 LF $ $ $ CULPR RADIAL GUARDRAIL GR-MGS1A LF $ $ $ CULPR RADIAL GUARDRAIL GR-MGS1, 9' POST LF $ $ $ CULPR GUARDRAIL TERMINAL GR-MGS2 EA $ 2, $ 2, $ 2, CULPR GUARDRAIL END ANCHORAGE GR-MGS3 EA $ $ $ CULPR GUARDRAIL HEIGHT TRANSITION GR-MGS4 EA $ $ $ CULPR GUARDRAIL GR-8 NCHRP 350 TL-3 LF $ $ $ CULPR RAD.GRDRAIL GR-8 NCHRP 350 TL-3 LF $ $ $ CULPR GUARDRAIL TERMINAL GR-6 NCHRP 350 LF $ $ $ CULPR GUARDRAIL TERMINAL GR-7 NCHRP 350 EA $ 2, $ 2, $ 2, CULPR Page 16 of 129

17 13315 GUARDRAIL TERMINAL GR-11 EA $ $ $ CULPR GUARDRAIL GR-2 LF $ $ $ CULPR GUARDRAIL GR-2 8' POST LF $ $ $ CULPR GUARDRAIL GR-2A LF $ $ $ CULPR RAD. GUARDRAIL GR-2 LF $ $ $ CULPR RAD. GUARDRAIL GR-2A LF $ $ $ CULPR GUARDRAIL GR-3 LF $ $ $ CULPR GUARDRAIL TERMINAL GR-3 EA $ $ $ CULPR ALT.BREAKAWAY CABLE TERM. GR-9 EA $ 2, $ 6, $ 3, CULPR GUARDRAIL TER.SITE PREPARATION EA $ 1, $ 1, $ 1, CULPR GUARDRAIL GR-10 LF $ $ $ CULPR GUARDRAIL TER. GR-8 TYPE II EA $ $ $ CULPR RAILING, TEXAS T-6 LF $ $ $ CULPR FIXED OBJECT ATTACH. GR-FOA-1 TY. I EA $ 1, $ 2, $ 2, CULPR FIXED OBJECT ATTACH. GR-FOA-1 TY. II EA $ $ $ CULPR FIXED OBJECT ATTACH. GR-FOA-3 TY. I EA $ 1, $ 1, $ 1, CULPR FIXED OBJECT ATTACH. GR-FOA-3 TY.II EA $ $ $ CULPR FIXED OBJECT ATTACH. GR-FOA-4 TY. I EA $ 2, $ 2, $ 2, CULPR FIXED OBJECT ATTACH. GR-FOA-4 TY. II EA $ 1, $ 1, $ 1, CULPR FIXED OBJECT ATTACH. GR-FOA-4 TY. III EA $ $ $ CULPR FIXED OBJECT ATTACH. GR-FOA-2 TY. I EA $ 1, $ 2, $ 1, CULPR FIXED OBJECT ATTACH. GR-FOA-2 TY. II EA $ $ $ CULPR MEDIAN BARRIER MB-3 LF $ $ $ CULPR MEDIAN BARRIER MB-7F LF $ $ $ CULPR MEDIAN BARRIER MB-8A TYPE I LF $ $ $ CULPR POROUS BACKFILL CY $ $ $ CULPR RETAINING WALL EXCAVATION CY $ $ $ CULPR TRAF.BAR.SER.GD.RAIL TER.GR-6 LF $ $ $ CULPR IMPACT ATTENUATION UNIT EA $ 20, $ 20, $ 20, CULPR BULL NOSE BARRIER EA $ 5, $ 5, $ 5, CULPR IMPACT ATTEN. TY.1 TL-3, LOW MAINTENANCE EA $ 40, $ 40, $ 40, CULPR IMPACT ATTEN. TL-2, < 40 MPH DES.SP EA $ 8, $ 8, $ 8, CULPR EMUL. ASPH. SLURRY SEAL TYPE B SY $ 2.01 $ 2.01 $ 2.01 CULPR LATEX MOD. EMUL. TREAT. TYPE C TON $ $ $ CULPR Page 17 of 129

18 16161 MODIFIED SINGLE SEAL SY $ 1.09 $ 1.09 $ 1.09 CULPR MODIFIED DOUBLE SEAL SY $ 1.68 $ 2.67 $ 1.75 CULPR AGR.BASE MAT.TY.I OR II NO. 21A OR21B TON $ $ $ CULPR ASPH. CONC. TY. SM-4.75A TON $ $ $ CULPR ASPH. CONC. TY. SM-9.5A TON $ $ $ CULPR ASPH. CONC. TY. SM-12.5A TON $ $ $ CULPR ASPH. CONC. TY. SM-12.5D TON $ $ $ CULPR ASPH. CONC. TY. IM-19.0A TON $ $ $ CULPR ASPH. CONC. TY. IM-19.0A T TON $ $ $ CULPR MACHINING SHOULDERS LF $ 2.50 $ 6.00 $ 3.61 CULPR ASPH. CONC. TY. BM-25.0A T TON $ $ $ CULPR MANUAL SHOULDERS RESTORATION LF $ 6.00 $ 6.00 $ 6.00 CULPR STONE MATRIX ASPH. SMA E-22 TON $ $ $ CULPR STONE MATRIX ASPH. SMA E-22 TON $ $ $ CULPR FLX.PAV.TIE-IN PLANING 0"-2" SY $ 5.50 $ $ 7.97 CULPR FLEXIBLE PAVE.PLANING 0"-2" SY $ 1.25 $ 3.05 $ 1.82 CULPR FLEXIBLE PAVEMENT PLANING ABOVE 2"-4" SY $ 4.40 $ 4.40 $ 4.40 CULPR W BEAM TERM CONNECTOR EA $ $ $ CULPR W BEAM END SECT ROUNDED EA $ $ $ CULPR W BEAM BACKUP PLATE EA $ $ $ CULPR GUARDRAIL BEAM LF $ $ $ CULPR RADIAL GUARDRAIL BEAM LF $ $ $ CULPR RUB RAIL LF $ $ $ CULPR POST (WOOD, CONC., OR STEEL) EA $ $ $ CULPR RUB RAIL OFFSET BLOCK EA $ $ $ CULPR OFFSET BLOCK EA $ $ $ CULPR BR-GR POST ATTACHMENT VARIOUS TYPES EA $ $ 4, $ 2, CULPR DRILL HOLE EA $ $ $ CULPR REALIGN POST EA $ 5.00 $ 5.00 $ 5.00 CULPR STEEL TUBE GR-7 EA $ 1.00 $ 1.00 $ 1.00 CULPR SOIL PLATE GR-7 EA $ 1.00 $ 1.00 $ 1.00 CULPR BREAKAWAY POST GR-7 EA $ $ $ CULPR CABLE ASSEM.& ANCHOR PLATES GR-7 EA $ 5.00 $ 5.00 $ 5.00 CULPR STRUT AND YOKE ASSEMBLY GR-7 EA $ 5.00 $ 5.00 $ 5.00 CULPR Page 18 of 129

19 17353 CABLE GR-3 LF $ 4.00 $ 4.00 $ 4.00 CULPR POST S3X5.7 GR-3 EA $ $ $ CULPR END POST CAPS, GR-3 EA $ 1.00 $ 1.00 $ 1.00 CULPR BEARING PLATE, GR-3 EA $ 5.00 $ 5.00 $ 5.00 CULPR HOOK BOLTS, GR-3 EA $ 5.00 $ 5.00 $ 5.00 CULPR BREAKAWAY ANCHOR ANGLE, GR-3 EA $ 5.00 $ 5.00 $ 5.00 CULPR STEEL TURNBUCKLE CABLE ASSEM. GR-3 EA $ 5.00 $ 5.00 $ 5.00 CULPR SPRING CABLE END ASSEM. GR-3 EA $ 5.00 $ 5.00 $ 5.00 CULPR CONCRETE ANCHOR ASSEMBLY, GR-3 EA $ 5.00 $ 5.00 $ 5.00 CULPR RE-TENSION EXIST. CABLE GUARDRAIL, GR-3 EA $ $ $ CULPR EMERGENCY MOBILIZATION EA $ $ 30, $ CULPR POST STEEL GR-8 BENT PLATE OR S3X5.7 ST EA $ $ $ CULPR END POST SUPPORT ANGLES, GR-8 EA $ 1.00 $ 1.00 $ 1.00 CULPR GUARDRAIL DELINEATOR EA $ 4.00 $ 7.00 $ 4.05 CULPR MEDIAN STRIP MS-1 SY $ $ $ CULPR MEDIAN STRIP MS-1A SY $ $ $ CULPR FENCE FE-CL LF $ $ $ CULPR FENCE WOOD BOARD LF $ $ $ CULPR WATER GATE FE-4 TY.II EA $ 2, $ 2, $ 2, CULPR ALLAYING DUST HR $ $ $ CULPR TYPE 3 BARRICADE 4' EA $ $ $ CULPR TYPE 3 BARRICADE 8' EA $ $ $ CULPR TEMPORARY (CONSTRUCTION) SIGN SF $ 1.00 $ $ CULPR CR. RUN AGGR. NO. 25 OR 26 TON $ $ $ CULPR TRUCK MOUNTED ATTENUATOR HR $ 1.00 $ $ CULPR GROUP 2 CHANNELIZING DEVICES DAY $ 0.01 $ 1.25 $ 0.93 CULPR PORT.CHANGEABLE MESS. SIGN HR $ 0.10 $ $ 5.52 CULPR ELECTRONIC ARROW BOARD HR $ 1.00 $ $ 7.03 CULPR FLAGGER SERVICE HR $ 1.00 $ $ CULPR FLEXIBLE POST DELINEATOR EA $ $ $ CULPR WARNING LIGHT TY. B DAY $ 0.23 $ 0.23 $ 0.23 CULPR TRAFFIC BARRIER SER. CONC. MB-7D PC LF $ $ $ CULPR OBSCURING ROADWAY UNIT $ $ $ CULPR DEMO. OF PVMT. COMBINATION SY $ $ $ CULPR Page 19 of 129

20 24430 DEMO. OF PAVEMENT FLEXIBLE SY $ 8.00 $ $ CULPR REMOVE EXISTING GUARDRAIL LF $ 0.40 $ 9.50 $ 1.28 CULPR HANDRAIL HR-1 TYPE II LF $ $ $ CULPR DESIGN BUILD PRELIMINARY ENG EA $ 1.00 $ 1.00 $ 1.00 CULPR DESIGN BUILD QAQC EA $ 1.00 $ 1.00 $ 1.00 CULPR DRY RIPRAP CL.I 26" SY $ $ $ CULPR REGULAR SEED LB $ $ $ CULPR OVERSEEDING LB $ 3.10 $ $ 5.21 CULPR FERTILIZER LB $ - $ - $ - CULPR FERTILIZER LB $ 1.00 $ 1.00 $ 1.00 CULPR FERTILIZER NITROGEN - N LB $ 1.00 $ $ 1.94 CULPR FERTILIZER PHOSPHOROUS - P LB $ 1.00 $ $ 1.55 CULPR FERTILIZER POTASSIUM - K LB $ 1.00 $ $ 2.07 CULPR LIME TON $ $ $ CULPR EROSION CONTROL MULCH SY $ 0.40 $ 1.00 $ 0.50 CULPR ROLLED EROSION CTRL PRODUCT EC-2 TYPE 2 SY $ 5.00 $ 8.00 $ 5.82 CULPR ROLLED EROSION CTRL EC-2 TYPE 4 SY $ 8.00 $ 8.00 $ 8.00 CULPR TEMPORARY DIVERSION DIKE LF $ 1.00 $ 1.00 $ 1.00 CULPR EROSION CONTROL RIPRAP TON $ $ $ CULPR CHECK DAM, ROCK TY. I EA $ 1, $ 1, $ 1, CULPR CHECK DAM ROCK TY. II EA $ $ $ CULPR DEWATERING BASIN EC-8 EA $ $ $ CULPR SILTATION CONTROL EXCAVATION CY $ 0.01 $ $ 7.51 CULPR INLET PROTECTION, TYPE A EA $ $ $ CULPR INLET PROTECTION, TYPE B EA $ $ $ CULPR TEMP. SILT FENCE TYPE B LF $ 4.50 $ 4.50 $ 4.50 CULPR TEMP. SILT FENCE TYPE A LF $ 2.25 $ 8.00 $ 3.08 CULPR TEMP. FILTER BARRIER LF $ 8.00 $ 8.00 $ 8.00 CULPR COFFERDAM EA $ $ $ CULPR /4" WATER SERVICE LINE LF $ $ $ CULPR " WATER SERVICE LINE LF $ $ $ CULPR DESIGN BUILD UTILITIES EA $ 1.00 $ 1.00 $ 1.00 CULPR " DI WATER MAIN LF $ $ $ CULPR " GATE VALVE & BOX EA $ 1, $ 1, $ 1, CULPR Page 20 of 129

21 41104 ADJUST EXIST. VALVE BOX EA $ $ $ CULPR " AIR RELEASE VALVE & BOX EA $ 3, $ 3, $ 3, CULPR /8" WATER METER & BOX EA $ 1, $ 1, $ 1, CULPR " WATER METER & BOX EA $ 2, $ 2, $ 2, CULPR SIGN PANEL SF $ $ $ CULPR VA SIGN POST, W4 x 13 LF $ $ $ CULPR SIGN POST STP-1, 2", 14 GAUGE LF $ $ $ CULPR SIGN POST STP-1, 2 3/16", 10 GAUGE LF $ $ $ CULPR SIGN POST STP-1, 2 1/2", 10 GAUGE LF $ $ $ CULPR SIGN POST STP-1, 2 1/2", 12 GAUGE LF $ $ $ CULPR CONC. SIGN FDN. STP-1 TY.A EA $ $ $ CULPR CONC. SIGN FDN. STP-1 TY.B EA $ $ $ CULPR CONC. SIGN FDN. STP-1 TY.C EA $ $ $ CULPR CONC. SIGN FDN. STP-1 TY.D EA $ $ $ CULPR CONC. SIGN FDN. STP-1 TY.E EA $ $ $ CULPR CONC.SGN.FOUND.SSP-V A 1'9" DIA.X 4'6" D EA $ 1, $ 1, $ 1, CULPR LOCAL CONTROLLER, TY. A EA $ 21, $ 21, $ 21, CULPR FLASHER EA $ 1, $ 1, $ 1, CULPR ELECTRICAL SERVICE SE-5 EA $ 4, $ 4, $ 4, CULPR TRAF. SIG. HEAD SEC 12" LED EA $ $ $ CULPR PEDESTAL POLE PF-2 10' EA $ $ $ CULPR CONC. FOUND. SIGNAL POLE PF-8 CY $ 1, $ 1, $ 1, CULPR CONC. FOUNDATION PF-2 EA $ $ $ CULPR CONCRETE FOUND. CF-1 EA $ 1, $ 1, $ 1, CULPR CONCRETE FOUNDATION CF-4 EA $ 2, $ 4, $ 2, CULPR SIGNAL MAST ARM POLE MP-3, TY. A EA $ 6, $ 6, $ 6, CULPR SIGNAL MAST ARM POLE MP-3, TY. B1 EA $ 9, $ 9, $ 9, CULPR SIGNAL MAST ARM POLE MP-3, TY. B2 EA $ 9, $ 9, $ 9, CULPR SIGNAL MAST ARM POLE MP-3, TY. C EA $ 9, $ 9, $ 9, CULPR SIGNAL MAST ARM POLE MP-3, TY. D EA $ 7, $ 7, $ 7, CULPR SIGNAL MAST ARM POLE MP-3, TY. E2 EA $ 11, $ 11, $ 11, CULPR SIGNAL MAST ARM POLE MP-3, TY. F EA $ 10, $ 10, $ 10, CULPR MAST ARM 40' EA $ 3, $ 3, $ 3, CULPR MAST ARM 49' EA $ 3, $ 3, $ 3, CULPR Page 21 of 129

22 51488 MAST ARM 60' EA $ 6, $ 6, $ 6, CULPR MAST ARM 65' EA $ 7, $ 7, $ 7, CULPR MAST ARM 70' EA $ 8, $ 9, $ 8, CULPR MAST ARM 75' CASE 1 LOADING EA $ 11, $ 11, $ 11, CULPR MAST ARM 75' CASE 2 LOADING EA $ 10, $ 10, $ 10, CULPR VIDEO DET. CAMERA EA $ 6, $ 6, $ 6, CULPR VIDEO DET. CABLE LF $ 2.70 $ 2.70 $ 2.70 CULPR EVP DETECTION SYSTEM 4-WAY EA $ 10, $ 10, $ 10, CULPR EVP DETECTOR CABLE LF $ 2.15 $ 2.15 $ 2.15 CULPR LOOP DETECTOR AMPLIFIER EA $ $ $ CULPR /3 CONDUCTOR CABLE LF $ $ $ CULPR /3 CONDUCTOR CABLE LF $ 2.00 $ 2.00 $ 2.00 CULPR /4 CONDUCTOR CABLE LF $ 3.73 $ 3.73 $ 3.73 CULPR /5 CONDUCTOR CABLE LF $ 2.50 $ 2.50 $ 2.50 CULPR /7 CONDUCTOR CABLE LF $ 2.00 $ 3.72 $ 3.55 CULPR /1 ENCLOSED COND. CABLE LF $ 1.00 $ 2.13 $ 1.57 CULPR /2 CONDUCTOR CABLE SHIELDED LF $ 1.30 $ 2.77 $ 2.08 CULPR SPAN WIRE 1/2" LF $ 3.94 $ 3.94 $ 3.94 CULPR TETHER WIRE, 1/4" LF $ 3.24 $ 3.24 $ 3.24 CULPR HANGER ASSEMBLY SW-2, ONE WAY EA $ $ $ CULPR HANGER ASSEMBLY SW-2, TWO WAY EA $ $ $ CULPR HANGER ASSEMBLY SMB-1, ONE WAY EA $ $ $ CULPR LOOP SAW CUT 3/8" LF $ $ $ CULPR LOOP SAW CUT 5/8" LF $ $ $ CULPR REMOVE EXISTING POLE EA $ 1, $ 1, $ 1, CULPR REMOVE EXISTING FOUNDATION EA $ 1, $ 2, $ 1, CULPR REMOVE EXISTING SIGNAL HEAD EA $ $ $ CULPR REMOVE EXISTING CONTROLLER EA $ $ 1, $ CULPR REMOVE EXISTING MANHOLE/JUNCTION BOX EA $ $ $ CULPR RELOCATE EXISTING SIGNAL HEAD EA $ $ $ CULPR INSTALL SIGN EA $ $ $ CULPR UNINTERRUPTIBLE POWER SUPPLY TYPE 1 EA $ 3, $ 5, $ 5, CULPR UNINTERRUPTIBLE POWER SUPPLY TYPE 2 EA $ 5, $ 5, $ 5, CULPR UNINTERRUPT. PWR SUPPLY BATTERY PAC EA $ 2, $ 2, $ 2, CULPR Page 22 of 129

23 51997 UNINTERRUPT. PWR SUPPLY CABINET DET EA $ 2, $ 2, $ 2, CULPR PEDESTRIAN SIGNAL HEAD SP-6 EA $ $ $ CULPR PEDESTRIAN SIGNAL HEAD SP-7 EA $ $ $ CULPR PEDESTRIAN SIGNAL HEAD SP-8 EA $ $ $ CULPR ELECTRICAL SERVICE SE-3 TYPE A EA $ 2, $ 2, $ 2, CULPR TYPE A PVMT LINE MRKG 4" LF $ 0.16 $ $ 0.18 CULPR TY A PVMT LINE MRKG 6" LF $ 0.29 $ 0.75 $ 0.29 CULPR TYPE A PAVEMENT LINE MRKG 24" LF $ 0.80 $ $ 3.52 CULPR TYPE B CLASS I PVMT LINE MRKG 4" LF $ 6.60 $ $ 9.88 CULPR TY B CL I PVMT LINE MRKG 6" LF $ 2.10 $ 7.73 $ 3.34 CULPR TY.B CL.I PAVE. LINE MARK. 24" LF $ 8.40 $ $ CULPR TY.B CL.II PAVE. LINE MARK. 4" LF $ 1.25 $ 4.00 $ 3.17 CULPR TY.B CL.II PAVE. LINE MARK. 24" LF $ $ $ CULPR TY.B CL.III PVMT LINE MRKG 4" LF $ 1.00 $ 1.00 $ 1.00 CULPR TY.B CL.III PVMT LINE MRKG 24" LF $ $ $ CULPR TY.B CL.VI PVMT LINE MRKG 6" LF $ 3.05 $ 4.75 $ 3.15 CULPR TY.B CL.VI CONTRAST PVMT MRKG, 4" LF $ 5.50 $ $ 7.66 CULPR TY.B CL.VI CONTRAST PVMT MRKG, 6" LF $ 6.14 $ 7.00 $ 6.45 CULPR ERADICATE EX. LINEAR PVMT MRKG LF $ 0.01 $ $ 1.18 CULPR ERAD. EXIST.NONLINEAR PVMT MRKG SF $ 3.90 $ $ 6.47 CULPR REM.EXIST.RAISED PAVE. MARKER EA $ $ $ CULPR SNOW PLOW.RAISED PAVE.MARK.ASPH.CONC EA $ $ $ CULPR TEMP. PAVE. MARKER 1 WAY EA $ 6.00 $ 6.00 $ 6.00 CULPR PVMT MESSAGE, 8', CHARACTER TY. B,CL.II EA $ $ $ CULPR PVMT MESSAGE MARK. ONLY TY B CL II EA $ $ $ CULPR PVMT MSG MARK. SCHOOL ZONE TY B CL II EA $ 1, $ 1, $ 1, CULPR PVMT MSG MARK. R/R CROSSING TY B, CL II EA $ $ 1, $ 1, CULPR TEMP. PVMT MRKG, TY. A, 4" LF $ 0.08 $ 0.35 $ 0.10 CULPR TEMP. PVMT MRKG, TY. A, 6" LF $ 0.01 $ 0.46 $ 0.26 CULPR TYPE E TEMP. PVMT MRKG 6" LF $ 2.50 $ 2.50 $ 2.50 CULPR TY. D, CL. II TEMP. PVMT MRKG 4" LF $ 1.50 $ 2.25 $ 1.62 CULPR TY.D,CL.II TEMP. PVMT MRKG 8" LF $ 2.50 $ 5.00 $ 3.56 CULPR TY.D,CL.II TEMP. PVMT MRKG 24" LF $ $ $ CULPR PVMT SYMB MRKG THRU ARROW TY B, CL II EA $ $ $ CULPR Page 23 of 129

DISTRICT AVERAGES 31, 2014 THROUGH 1, 2016 ITEM ITEM DESCRIPTION UNIT MINIMUM MAXIMUM AVERAGE DISTRICT

DISTRICT AVERAGES 31, 2014 THROUGH 1, 2016 ITEM ITEM DESCRIPTION UNIT MINIMUM MAXIMUM AVERAGE DISTRICT 100 MOBILIZATION LS $ 20,000.00 $ 143,384.14 $ 74,567.11 BRSTL 101 CONSTRUCTION SURVEYING (CONSTR.) LS $ 2,500.00 $ 59,277.82 $ 13,090.66 BRSTL 102 CONSTRUCTION SURVEYING(MIN. PLAN) LS $ 15,000.00 $ 15,000.00

More information

A DESIGN-BUILD PROJECT

A DESIGN-BUILD PROJECT Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00

More information

LETTING : CALL : 056 COUNTIES : MILLE LACS

LETTING : CALL : 056 COUNTIES : MILLE LACS S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE

More information

BID TABULATION BID REQUEST NO

BID TABULATION BID REQUEST NO BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS

More information

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m. PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00

More information

PART A ROADWAY - BASE BID

PART A ROADWAY - BASE BID May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00

More information

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)

More information

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00

More information

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) 2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion

More information

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING

More information

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction

More information

TOTAL QUANTITY UNIT COST UNIT

TOTAL QUANTITY UNIT COST UNIT BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50

More information

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT

More information

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221 Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. At the pleasure of the Board.

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. At the pleasure of the Board. BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: May 19, 2016 # 6 SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Identification of Construction Funding for Traffic

More information

BID TABULATION. Engineer's Estmated Opinion of Costs

BID TABULATION. Engineer's Estmated Opinion of Costs Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%

More information

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE

More information

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, 2014 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 1 $19 $18,500.00 1 2013 2013.602/00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32

More information

Engineer's Preliminary Estimate - 100% Submittal

Engineer's Preliminary Estimate - 100% Submittal EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000

More information

REPLACEMENT OF MERCER COUNTY BRIDGE

REPLACEMENT OF MERCER COUNTY BRIDGE ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade

More information

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.

More information

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted, ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT

More information

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00

More information

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122 Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot

More information

SUBDIVISION IMPROVEMENTS AGREEMENT

SUBDIVISION IMPROVEMENTS AGREEMENT SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El

More information

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown 19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL

More information

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

NE WEST KINGSTON ROAD CULVERT REPLACEMENT NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS

More information

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,

More information

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018

OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018 LETTING DATE : 2018-06-14 CALL NUMBER : 772 OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE PAGE NO. 1 DATE PRINTED : JOB NUMBER : 170236 ESTIMATE NUMBER : PROJECT

More information

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 AWARDED PROJECT PROJECT NO. 016002 PID. 19109 BEL-7-3.68 TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT

More information

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native

More information

RFB Addendum 3

RFB Addendum 3 Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER

More information

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $ RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement

More information

CONTRACT TIME DETERMINATION

CONTRACT TIME DETERMINATION CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during

More information

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT: ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation

More information

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018 CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00

More information

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY. ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense

More information

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price 2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 1988 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 1988 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 217 10.00 CONTRACT ID: 187601030 PROJECT: BR 1502(017) CONTRACT: 04153032 AWARD : 3,278,223.27 PROJECTED : 3,289,223.27 ADJ. PROJECTED : 3,289,223.27

More information

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600. CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler

More information

KANE COUNTY DIVISION of TRANSPORTATION

KANE COUNTY DIVISION of TRANSPORTATION Carl Schoedel, P.E. Director of Transportation County Engineer KANE COUNTY DIVISION of TRANSPORTATION 41W011 Burlington Road St. Charles, IL 60175 (630) 584-1170 Fax: (630) 584-5265 Section 13-00176-02-BR

More information

CITY OF TAMPA ADDENDUM 2. April 18, 2018

CITY OF TAMPA ADDENDUM 2. April 18, 2018 CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project

More information

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following: Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and

More information

New Jersey Department of Transportation DATE : 11/16/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 11/16/10 PAGE : TABULATION OF BIDS PAGE : 131-1 CONTRACT TIME : 11/30/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : STP-5042(107) ROUTE 129 RESURFACING FROM ROUTE 1 TO LAMBERTON ROAD CONNECTOR CITY OF TRENTON, TOWNSHIP OF

More information

ADDENDUM No. 1 January 29, Paving Program Village of Milford

ADDENDUM No. 1 January 29, Paving Program Village of Milford ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for

More information

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT Page 1 of 20 16 SSSEX ROTE 94 BLACK CREEK TRIBTARY CLVERT REPLACEMENT CONSTRCTION CORP INC. (2) KONKS CORPORATION (3) NORTHEAST REMSCO CONSTRCTION INC Quantity and nits nit Price nit Price nit Price 0001

More information

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA

More information

Department of Public Works Engineering

Department of Public Works Engineering Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan

More information

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1

More information

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 This Addendum changes the terms of the Bid Proposal and/or plans associated with the project indicated below. By submitting a bid, any and all

More information

New Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS PAGE : 107-1 CONTRACT TIME : 01/24/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : FS-0022(105) ROUTE 37 FROM ROUTE 70 TO GARDEN STATE PARKWAY RESURFACING CONTRACT NO. 000103080 TOWNSHIP OF

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 240 0.00 CONTRACT ID: 090249068 PROJECT: STP 2014(119)TE CONTRACT: 08163051 AWARD AMOUNT: $2,150,084.20 PROJECTED AMOUNT: $2,344,277.78 ADJ. PROJECTED

More information

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

OFFICIAL BID TABULATION AWARDED PROJECT

OFFICIAL BID TABULATION AWARDED PROJECT AWARDED PROJECT PROJECT NO. 990073 PID. 17004 CLI-68-19.746 TE21-G990(144) TYPE: TWO LANE RESURFACING LETTING: 03/03/99 COMPLETION DATE: 09/30/99 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR

More information

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS 1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating

More information

Market Street Gateway Improvements Phase 1

Market Street Gateway Improvements Phase 1 PROPOSAL FORM Market Street Gateway Improvements Phase 1 CITY OF PORTSMOUTH, N.H. To the City of Portsmouth, New Hampshire, herein called the Owner. The undersigned, as Bidder, herein referred to as singular

More information

BID TABULATION PAGE 1 OF 8

BID TABULATION PAGE 1 OF 8 BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $

More information

$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC

$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC -73,034.10 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 56 5.00 CONTRACT ID: 629625001 PROJECT: RMC - 629625001 CONTRACT: 02164011 AWARD : $446,216.00 PROJECTED : $446,222.00 ADJ. PROJECTED : $373,187.90

More information

AECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option

More information

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00

More information

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated

More information

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11 69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to

More information

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)

More information

OFFICIAL BID TABULATION AWARDED PROJECT

OFFICIAL BID TABULATION AWARDED PROJECT AWARDED PROJECT PROJECT NO. 990206 PID. 17900 HAN-37-5.118 TE21-G990(271) TYPE: SIGNALIZATION LETTING: 04/28/99 COMPLETION DATE: 10/31/99 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT

More information

Utility Committee Meeting AGENDA. October 3, 2017

Utility Committee Meeting AGENDA. October 3, 2017 Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid

More information

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury

More information

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial

More information

PROJECT NO PID SCI NON-FEDERAL TYPE: BRIDGE REPLACEMENT (1 BRIDGE) LETTING: 04/18/01 COMPLETION DATE: 06/30/04

PROJECT NO PID SCI NON-FEDERAL TYPE: BRIDGE REPLACEMENT (1 BRIDGE) LETTING: 04/18/01 COMPLETION DATE: 06/30/04 AWARDED PROJECT PROJECT NO. 010178 PID. 11858 SCI-23-0.00 NON-FEDERAL TYPE: BRIDGE REPLACEMENT (1 BRIDGE) LETTING: 04/18/01 COMPLETION DATE: 06/30/04 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR

More information

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements

More information

PROJECT NO PID CLA TE21-G010(290) TYPE: MISCELLANEOUS LETTING: 07/11/01 COMPLETION DATE: 11/30/01

PROJECT NO PID CLA TE21-G010(290) TYPE: MISCELLANEOUS LETTING: 07/11/01 COMPLETION DATE: 11/30/01 AWARDED PROJECT PROJECT NO. 010313 PID. 22620 CLA-70-20.92 TE21-G010(290) TYPE: MISCELLANEOUS LETTING: 07/11/01 COMPLETION DATE: 11/30/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT

More information

Active Construction RV Associates Scarsella JR Hayes

Active Construction RV Associates Scarsella JR Hayes CITY OF PORT ORCHARD PUBLIC WORKS DEPARTMENT TREMONT STREET IMPROVEMENTS SR 16 to Port Orchard Boulevard Opening: 6/6/2017 Fed Aid Proj No: STPUS-6610(004) $ 12,779,179.17 $ 12,855,082.55 $ 12,901,887.92

More information

Exhibit 4 Page 1 of 8

Exhibit 4 Page 1 of 8 Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/07/16 HIGHWAY: 11/04/2014 ESTIMATE PAID: AWARD DATE: 11/20/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/07/16 HIGHWAY: 11/04/2014 ESTIMATE PAID: AWARD DATE: 11/20/2014 ESTIMATE PERIOD: 216,972.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/07/16 388 6 CONTRACT ID: 627908001 PROJECT: RMC - 627908001 CONTRACT: 11144009 AWARD AMOUNT: $319,350.50 PROJECTED AMOUNT: $319,351.50 ADJ. PROJECTED

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

FORM G PRICE PROPOSAL CAMINO REAL REGIONAL MOBILITY AUTHORITY ("CRRMA") The undersigned having familiarized themselves with the local conditions affec

FORM G PRICE PROPOSAL CAMINO REAL REGIONAL MOBILITY AUTHORITY (CRRMA) The undersigned having familiarized themselves with the local conditions affec FORM G PRICE PROPOSAL CAMINO REAL REGIONAL MOBILITY AUTHORITY ("CRRMA") The undersigned having familiarized themselves with the local conditions affecting the cost of work and with the Request for Proposals

More information

ARKANSAS SMALL BUSINESS PROVISION CERTIFICATION APPLICATION

ARKANSAS SMALL BUSINESS PROVISION CERTIFICATION APPLICATION SMALL BUSINESS PROVISION TITLE 49 CODE OF FEDERAL REGULATIONS PART 26 ARKANSAS SMALL BUSINESS PROVISION CERTIFICATION APPLICATION 10324 Interstate 30, P. O. Box 2261 Little Rock, Arkansas 72203-2261 Natasha

More information

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00

More information

Addendum 1 Downtown North CRA Sidewalks

Addendum 1 Downtown North CRA Sidewalks Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE

More information

Reviax Constracting Corp. DeSantis Construction

Reviax Constracting Corp. DeSantis Construction Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.

More information

8 EA $ 1, $ $ 1, $ 8, $ 1, $ 8, EA $ 6, $6, $ 7, $ 7, $ 5, $ 5,445.

8 EA $ 1, $ $ 1, $ 8, $ 1, $ 8, EA $ 6, $6, $ 7, $ 7, $ 5, $ 5,445. Palmetto Park Road, SW 7th AVE. To SW 5th Avenue LWDD E4 (E Rio) Canal ENGECON CONSTRUCTON RUSSELL ENGNEERNG TEM# TEM DESCRPTON QTY UNTS Total Total ROADWAY TEMS 5 Regular Excavation 937 CY $ 14.28 $17.52

More information

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA August 22, 2016 Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA RE: Hammond Northshore Regional Airport Runway 18-36/13-31 Runway Intersection

More information

CITY OF CHAMBLEE PIERCE DRIVE STORM SYSTEM EXTENSION PROJECT

CITY OF CHAMBLEE PIERCE DRIVE STORM SYSTEM EXTENSION PROJECT CPL 14064.08 BID FORM SECTION 00 300-1 BID FORM BID NUMBER: CH2019-001Dev SUBMITTAL DATE: BY: (Bidder) PROJECT DESCRIPTION: The project consists of the construction of a sidewalk and associated grading,

More information

WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP)

WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP) WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP) 2017 2026 DECEMBER 2015 Prepared For: Federal Aviation Administration Ohio Department of Transportation Office of Aviation Attachment A 10

More information

NOTICE TO BIDDERS. Specifications and bidding blanks may be obtained at the Road Commission office at the above address.

NOTICE TO BIDDERS. Specifications and bidding blanks may be obtained at the Road Commission office at the above address. NOTICE TO BIDDERS Sealed proposals will be received by the Ottawa County Road Commission, at its offices at 14110 Lakeshore Drive, Grand Haven, Michigan 49417, until Wednesday November 16, 2016 at 10:00am

More information

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents

More information

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT # ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00

More information

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075 Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration

More information

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL North Baker Ave. - City Limits to 23rd St. NE Bid Documents BD-1 To the Board of County Commissioners Douglas County, Washington Gentlemen: North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

More information

CITY-TIF COMMISSION EXPENSES Cost Description Project Cost Data Reimbursable From Public Funds Developer Equity COST TIF Super TIF State TIF CID SCTC PRIVATE I. Legal $ 750,000 $ 750,000 $ - $ - $ - $

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017

More information

TABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00

TABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00 TABULATION OF BIDS Jesse Viertel Memorial Airport Boonville, Missouri Bids Received: 6/12/2018 Lochner Job No.: 000011332 RECONSTRUCT RUNWAY 1836, NORTH CONNECTING TAXIWAY AND TURNAROUND REPLACE EXISTING

More information

FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, Fargo City Commission Chambers 3:00 PM

FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, Fargo City Commission Chambers 3:00 PM 1. Call to order FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, 2017 Fargo City Commission Chambers 3:00 PM 2. Recommended contracting actions a. Schmidt & Sons Construction,

More information

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc. DAVID TAUSSIG & Associates, Inc. Annual Report Fiscal Year 2014-2015 City of Irvine Community Facilities District No. 2013-3 (Great Park) October 27, 2015 Public Finance Public Private Partnerships Urban

More information

Bid Comparison. Contract ID: 1651 Description: Joint replacement on the Cass Avenue bridge. Location:

Bid Comparison. Contract ID: 1651 Description: Joint replacement on the Cass Avenue bridge. Location: Bid Comparison Contract ID: 1651 Description: Joint replacement on the Cass Avenue bridge. Location: Projects(s): Cass Avenue over North Branch Clinton River Clinton Township, Macomb County 1651 Rank Bidder

More information

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

PART II - Prospect Street 37. 8 Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050. BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 123 COUNTY: 11/03/2016 ESTIMATE PAID: AWARD DATE: 11/17/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 123 COUNTY: 11/03/2016 ESTIMATE PAID: AWARD DATE: 11/17/2016 ESTIMATE PERIOD: 10,070.68 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 37 5.00 CONTRACT ID: 036605044 PROJECT: STP 2017(285) CONTRACT: 11163011 AWARD : $611,559.93 PROJECTED : $611,559.93 ADJ. PROJECTED : $621,630.61

More information