1 Contract No CONTRACT (Tender document only) CIVIL WORKS AT 19 Flemington Road, North Melbourne Principal: Superintendent: Coughlan Civil Pty Ltd.

2 TABLE OF CONTENTS FORMAL INSTRUMENT OF AGREEMENT 3 LETTER OF AWARD 5 ANNEXURE TO AS PART A 7 TENDER FORM 10 SCHEDULE 3 BILL OF QUANTITIES 12 SPECIFICATION 17 PLANS 30

3 CONTRACT CIVIL WORKS FORMAL INSTRUMENT OF AGREEMENT Page 3

4 FORMAL INSTRUMENT OF AGREEMENT AGREEMENT made day of 2014 BETWEEN.Pty Ltd AND UAG HOLDINGS PTY LTD ABN ( the Contractor ), ABN ( the Principal ). 1.0 The Contractor will perform the work under the Contract for the Principal in accordance with the Contract. 2.0 The Contract sum shall be the amount of.($0.00) (excluding GST). 3.0 IT IS AGREED the below mentioned documents (attached to this agreement and which the Contractor acknowledges receipt of) shall together comprise the Contract between the parties :- 1) Formal Instrument of Agreement; 2) Letter of Award; 3) Annexure Part A General Conditions of Contract AS ; 4) Tender Form; 5) Contractors submitted tender; 6) Specification that includes: a) Contract General Clauses b) Contract Specific Clauses c) Specification for Road and Drainage Works d) Standard Drawings 7) Plans as listed in the contract documents If there is any inconsistency between the above documents, they shall be read in the order of precedence shown above. UAG HOLDINGS PTY LTD ABN Director...Witness THE COMMON SEAL OF the Contractor Contractor ) A.B.N. as here unto affixed in accordance with it s) Articles of Association in the presence of: )......Director Witness FORMAL INSTRUMENT OF AGREEMENT: PAGE 1 OF 1 Page 4

5 CONTRACT CIVIL WORKS LETTER OF AWARD Page 5

6 Insert letter of Award here Page 6

7 CONTRACT CIVIL WORKS ANNEXURE to AS PART A Page 7

8 AS ANNEXURE to the Australian Standard General Conditions of Contract PART A This Annexure shall be issued as part of the tender and is to be attached to the General Conditions of Contract and shall be read as part of the Contract. The law applicable is that of the State or Territory of: (Clause 1) Payments under the Contract shall be made at: (Clause 1) The Principal: (Clause 2) The address of the Principal: The Superintendent: (Clause 2) VICTORIA BALLARAT C\- Urban Develop, Level 1, 125 Flinders Lane, Melbourne, Victoria, 3000 Coughlan Civil The address of the Superintendent: 6 Webster Street, Ballarat, Victoria Limits of accuracy applying to quantities for which the Principal accepted rates: (Clause 3.2) Bill of Quantities - the alternative applying: (Clause 4.1) The time for lodgement of the priced copy of the Bill of Quantities: (Clause 4.2) # Contractor shall provide security in the amount of: (Clause 5.2) # Principal shall provide security in the amount of: (Clause 5.2) The percentage to which the entitlement to security and retention moneys is reduced: (Clause 5.7) Interest on retention moneys and security - the alternative applying: (Clause 5.9) The number of copies to be supplied by the Principal: (Clause 8.3) The number of copies to be supplied by the Contractor: (Clause 8.4) The time within which the Superintendent must give a decision and return the Contractor s copies: (Clause 8.4) Work which cannot be subcontracted without approval: (Clause 9.2) The percentage for profit and attendance: (Clause 11) Insurance of the Works - the alternative applying: (Clause 18) The assessment for insurance purposes of the costs of demolition and removal of debris: (Clause 18) The assessment for insurance purposes of consultants fees: (Clause 18) The value of materials to be supplied by the Principal: (Clause 18) The additional amount or percentage: (Clause 18) Public Liability Insurance - the alternative applying: (Clause 19) + OR - FIVE (5) PERCENT ALTERNATIVE ONE AT SUBMISSION OF TENDER NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE ALTERNATIVE ONE TWO (2) COPIES NOT APPLICABLE NOT APPLICABLE NO WORKS CAN BE SUBCONTRACTED WITHOUT APPROVAL NOT APPLICABLE ALTERNATIVE ONE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE ALTERNATIVE ONE Page 8

9 The amount of Public Liability Insurance shall be not less than: (Clause 19) $10,000,000 The time for giving possession of the Site: (Clause 27.1) # The time for Practical Completion (Clause 35.2) 14 DAYS FROM DATE OF ACCEPTANCE OF TENDER 6 WEEKS FROM THE AGREED COMMENCEMENT DATE # Liquidated Damages per day (Clauses 35.6) $500 # Limit of Liquidated Damages: (Clause 35.7) UNLIMITED # Bonus per day for early Practical Completion: (Clause 35.8) NOT APPLICABLE # Limit of Bonus: (Clause 35.8) NOT APPLICABLE Event Amount # Compensation for Delay Costs: (Clause 36) NOT APPLICABLE # The Defects Liability Period: (Clause 37) TWELVE (12) MONTHS FROM COUNCIL COMPLIANCE The charge for overheads, profit, etc. for Daywork: (Clause 41(f)) Times for payment claims: (Clause 42.1) NOT APPLICABLE Claims lodged with the Superintendent by the 14 th of each month will be certified within 14 days of receipt. An invoice is then to be lodged by the Contractor with the Principal, for the Certified amount, by the 28 th day of the month. Payments will then be made by the Principal within 30 days of receipt of the invoice. Unfixed plant and materials for which payment claims may be made notwithstanding that they are not on Site: (Clause 42.2) Retention Moneys on: (Clause 42.3) Unfixed Plant or Materials - the alternative applying: (Clause 42.4) NOT APPLICABLE (a) work incorporated into the Works and any work or items for which a different amount of retention is not provided, 10 % of the value until 5 % of the Contract Sum is held; (b) items on Site but not yet incorporated into the Work, N / A %; (c) items off Site but in Australia N / A %; (d) items not in Australia N / A %; (e) disbursements incurred by the Contractor for customs, duties, freight, marine insurance, primage, landing and transport in respect of the work under the Contract N / A %; ALTERNATIVE TWO The rate of interest on overdue payments: (Clause 42.9) FIVE (5) PERCENT PER ANNUM The delay in giving possession of the Site which shall be a substantial breach: (Clause 44.7) The person to nominate an arbitrator: (Clause 46) THREE (3) MONTHS PRESIDENT OF THE INSTITUTE IN ARBITRATORS, VICTORIA # Where there are Separable Portions these items must be deleted or left blank. COPYRIGHT Page 9

10 CONTRACT CIVIL WORKS TENDER FORM Page 10

11 TENDER FORM Name of person, firm or company tendering USE BLOCK LETTERS Address. Of.. hereby tender(s) to perform the work for: Description of works Civil Works at 19 Flemington Road, North Melbourne For: (Contract No ) in accordance with the following Documents: List Documents * Australian Standard AS General Conditions of Contract as amended * Coughlan Civil Contract No * Specification for Contract No *WSA Sewerage Code of Australia *WSA Water Code of Australia * Coughlan Civil Plans, as included in the tender documentation:. Sewer and Water Plans: 734SW-01 Rev 1 734SW-02 Rev 1 * Standard drawings City of Melbourne * Standard drawings VicRoads * Standard drawings and Specifications City West Water 1. For the sum of excluding GST ($ 0.00); 2. At the rates in the attached Schedule of Rates for the purpose of assessing variations. Insert date. DATED this. day of..., If the tenderer is a firm the full names of the individual members of the firm must be stated here.. Signature of Tenderer By signing this form, I/we acknowledge that we are in possession of the documentation listed above and that we understand that the scope of works is described by that documentation. Page 11

12 CONTRACT CIVIL WORKS SCHEDULE 3 BILL OF QUANTITIES Page 12

13 SCHEDULE 3 BILL OF QUANTITIES "The payments quoted are exclusive of any Goods & Services Tax ("GST") which is payable. If the tenderer is successful and GST is payable because of the performance of the Services, the payments will be those quoted or otherwise agreed plus GST" Page 13

14 Project: FLEMINGTON ROAD CLOSING DATE: 14 November 2014 TENDERER Company: Contact Person: Address: TENDER A. Site Establishment B. Water Reticulation Works Contingency TOTAL TENDER AMOUNT: - SIGNATURE OF AUTHORISED PERSON: PRINTED NAME: DATE OF TENDER: Quantities are calculated with care but are not guaranteed. Tenderers should verify quantities for themselves and advise Coughlan Civil of any apparent discrepancies with the drawings and or schedule. Variations resulting from such discrepancies will not be considered under the contract.

15 Flemington Road, North Melbourne Item No. Description of Works Qty Unit Rate Extended ($) Amount ($) A. Site Establishment 1.1 Allow for establishment on site of all plant and facilities and obtaining of road opening permits, etc. Preparation and implementation of Project Management Plan including identification of site hazards, all necessary training, signage, temporary or permanent works to meet legislative, workcover and construction industry guidelines and environmental management plan all as specified. 1 Item 1.2 Proving of services on site proir to works on site 1 Item B. WATER RETICULATION WORKS Construction of water supply works as detailed, including supply and installation of all material, including tees, reducers, bends, thrust restraints, valve covers,ancillary fittings, disposal of spoil of surplus excavated material all to W.S.A.A specifications 1 Water Reticulation Mains Supply all materials, excavate, bed, lay, joint, thrust block, backfill and reinstate pavement complete as specified the following pipes: mm dia upvc (Class 16) HDD m mm dia upvc (Class 16) Open trench 15.1 m 2 Hydrants and Washout Assemblies Supply all materials and install complete (incl. Hydrant indicator post & RRPM) as specified: mm hydrant 1 No 3 Fittings Supply all materials and install the following valves, reducers, bends and tees where required as per Authority's standard drawings and as specified mm-100mm Reducer 2 No mm x 90 degree bend with thrust block 3 No Tee with thrust block 2 No Tee with thrust block 2 No mm dia Stop Valve 3 No mm x 90 degree bend with thrust block 1 No Tee with thrust block 1 No 4 House Connections Water tapping and extension to existing house service to 4.1 match existing (25mm typical) Water tapping and connection to existing house service to 4.2 match existing (25mm typical) 3 No 2 No 1 of 2

16 Flemington Road, North Melbourne Item No. Description of Works Qty Unit Rate Extended ($) Amount ($) 5 Main Connections 5.1 Connection to existing 100mm dia CICL main during shut off to be arranged by contractor in accordance with CWW procedures 3 No 5.2 Connection to existing 150mm dia CICL main during shut off to be arranged by contractor in accordance with CWW procedures 1 No 6 Quality Assurance Costs 6.1 Preparation of Quality Plan, Test and Inspection Plan, completion of Water Authority's Certification and Verification requirements for construction as specified. Compile and maintain records and field notes. 1 Item 7 Testing 7.1 Flush out, pressure test and water quality testing 1 Item 7.2 As Constructed plans to Yarra Valley Water standards to be submitted to superintendent 1 Item 8 PROVISIONALS All or part to be expended only with written authorisation of the Superintendent 8.1 Additional over and above item 4.1 for new service connection to replace existing service that is in too poor condition or otherwise unable to be extended/connected to new main including capping and sealing of existing service. DN25PE as per MRWA-W No mm x 90 degree bend with thrust block 1 No 8.3 Rock Rate Excavation of solid rock in open trench m mm dia coring through solid rock m TOTAL WATER RETICULATION WORKS CONTRACT TOTAL 2 of 2

17 CONTRACT CIVIL WORKS SPECIFICATION Page 17

18 CONTENTS 1. - Contract General Clauses 2. - Contract Specific Clauses 3. - Specification for Road and Drainage Works 4. - Standard Drawings Page 18

19 1. GENERAL CLAUSES The Contract General Conditions and the Contract Specific Conditions take precedence over AS if conflict of requirements occurs. Contract Specific Conditions take precedence over Contract General Conditions PROJECT DESCRIPTION This contract is for the supply and construction of civil infrastructure for the residential developments at 19 Flemington Road, North Melbourne Completion of works shall be deemed to include completion satisfactory to the Superintendent and the relevant Authorities. The Contractor shall be responsible for completion of his respective parts of the works within the specified periods. The works shall be known as:- Civil Works at 19 Flemington Road, North Melbourne This contract comprises the execution of the above works including supply of all labour and materials as specified and detailed in drawings and schedules SITE OF THE WORKS 19 Flemington Road, North Melbourne 1.03 DATE OF COMMENCEMENT AND PRACTICAL COMPLETION Subject to Clause 35 of the General Conditions of Contract, the Contractor shall commence and complete the works within the times nominated hereunder: DATE OF COMMENCEMENT: DATE OF PRACTICAL COMPLETION 14 days from the date of acceptance of tender or as otherwise specified in the Letter of Acceptance. 6 weeks from the date of acceptance of tender or as otherwise specified in the Letter of Acceptance. Notwithstanding that possession of the site has been given and final Date of Commencement has been nominated, the Contractor shall not be permitted to continue the work on the site if he has not provided security, as required by Sub-Clause 5.4 of the General Conditions of Contract, within the time specified PUBLIC LIABILITY INSURANCE From the Date of Commencement of work until the expiration of the maintenance period, the Contractor shall be insured and remain insured by means of the Public Liability Policy against claims arising from injury or damage to persons or property in, on, about or arising from the works. The Insurance Policy shall be extended to include the Principal and Superintendent. Written notification shall be presented from the Contractor s insurer to this effect GENERAL CONDITIONS OF CONTRACT Australian Standard AS , General Conditions of Contract shall be deemed to form part of this Contract and is to be read in conjunction with this document STANDARD SPECIFICATION The VicRoads Standard Roadworks Specification (Selected Elements) and Standard Drawings shall be deemed to form part of this Contract as per Section 3 of this specification and is to be read in conjunction with this document THIS SECTION EXCLUDED Page 19

20 1.08 SUPERVISION All parts of the work shall be carried out in accordance with the requirements of the Superintendent. The Superintendent will carry out general supervision and contract administration. When requested by the Superintendent, the Contractor shall cease work on all or part of the works, which is deemed unsatisfactory by the Superintendent. The Contractor shall not be paid for any extras requested by or arising out of any directions by any Person or Authority, unless formally approved by the Superintendent prior to commencement of the works WORKS PROGRAMME The Contractor shall submit a works programme and carry out the works accordingly. At the request of the Contractor, the programme may be varied with the approval of the Superintendent. Should the Contractor fail to carry out the works accordingly, the Principal shall without prejudice to any other rights granted by Clause 44 of the General Conditions: (a) Suspend payment under the Contract, or (b) Take the work remaining to be completed wholly or partly out of the hands of the Contractor or of any other person in whose hand or possession the works or any part of it may be, or (c) Determine the Contract, and Sub-clause 44.4 and 44.6 of the General Conditions of Contract shall apply in any such event as if the action taken by the Principal has been taken under Clause 44.5 of the General Conditions RELEVANT AUTHORITIES The Contractor shall be responsible for ensuring the co-ordination of the works of all the relevant Authorities and his own activities SITE CONTROL (a) The Contractor is to allow in the tender price any costs whatsoever incurred in the complete removal of rubbish and debris from the site of the works. (b) Except as otherwise provided in the Contract, delivery of materials for the works, space for storage of same and for building sheds, office and workshops will be allowed only after arrangement between the Contractor and the Superintendent. (c) All material stored on site shall be in storage areas as identified in the Site Management Plan and kept in a neat and tidy manner to minimise hazards to persons, materials and equipment. (d) The Contractor shall be responsible for the proper disposal of all solid, liquid and hazard wastes in accordance with all Statutory Requirements. Refuse from construction operations shall be removed from the site. Refuse shall not be dropped free but hoppers and shutters or refuse buckets shall be used. (e) The Contractor shall take such steps as necessary to prevent erosion of any lands used or occupied by the Contractor in the execution of the work under the Contract. (f) No trees, shrubs, etc. shall be removed without the prior written consent of the Superintendent. The Contractor will compensate the Principal $500, for each tree removed without the written consent of the Superintendent. (g) Stockpile of topsoil and re-useable material shall be located as directed on site by the Superintendent. The Contractor shall restore all these, including topsoiling and seeding. Topsoil shall be stockpiled in approved areas clear of all works and not simply pushed up along the edges of the roadwork excavations. All such stockpiling and restoration of the site shall be included in the tender price. Page 20

21 1.12 NOTICES The Contractor shall provide to the Superintendent, seven clear days written notice of intention to commence the works SANITARY ACCOMMODATION The Contractor shall provide approved sanitary accommodation for all employees on the works and the Superintendent, in accordance with the requirements of the Environmental Protection Authority and the Occupational Health and Safety Act SURVEY MARKS AND SET-OUT WORKS The set-out for this work shall be as shown on the drawings prepared by the Superintendent. The Contractor shall check the differences in level between any Bench Marks and, prior to setting out the works, advise the Superintendent if there is any discrepancy in levels. In addition to Clause 28 of AS 2124, General Conditions of Contract, the Contractor shall, when setting out the works during construction:- (a) use not less than two previously established bench marks or other reliable level points; (b) line in the work both in horizontal and vertical planes over at least three set out points; (c) check actual depth of excavation in all types of works against those depths shown on the longitudinal sections; (d) report to the Superintendent any apparent inconsistency or mistake or error between the set out and data supplied by the Superintendent and shall not proceed with further construction works without the authority of the Superintendent. On commencement of the Contract, the Contractor shall check that all survey marks required for settling out of the works are in position. Where necessary, survey marks which are missing will be replaced by the Superintendent at the cost of Principal. The Contractor shall ensure that sufficient survey or reference marks remain in position to allow the work to be checked by the Superintendent at any time and to satisfy the construction requirements. Checking and replacement of survey marks required by the Superintendent during construction maintenance will be arranged by the Superintendent at the cost of the Contractor. The Contractor should note that the cost of re-establishing survey marks and or bench marks will depend to a degree on the care taken to preserve these marks HOURS OF WORK No works shall be performed outside of the hours of 7.30am and 5.00pm, Monday to Friday inclusive, 7:30am to 1:00pm Saturday or on any Public or Municipal Holiday, unless approval in writing is given by the Superintendent PUBLIC HOLIDAY WORK When construction works are carried out on Public Holidays, it will be necessary for the Contractor to give the Superintendent 24 hours prior notice of his intention to work LIVESTOCK Before entering the site of the works to commence work or effect delivery of plant, materials or equipment, the Contractor shall make proper provision to ensure that any livestock on or near the site of the works are adequately restrained from straying. In this regard the Contractor shall give proper advance notice to the occupier (if any) of the site, the Principal and the Superintendent. Page 21

22 1.18 SITE ACCESS Access is to be obtained from Flemington Road, North Melbourne. Site access shall be restricted to that shown on the Site Management Plan or authorised in writing by the Superintendent CONTRACTOR S OFFICES, SHEDS STORES & LAYOUT OF TEMPORARY INSTALLATIONS The Contractor shall provide and maintain all such offices, sheds and stores as is necessary for the execution of the works. Before starting work on the site the Contractor shall submit to the Superintendent for approval, plans showing the proposed positions of all Site Offices, ancillary buildings, topsoil stockpiles and other temporary structures and installations which the Contractor proposes to provide for the construction of the works. Such plans must be in accordance with the Environmental Management Plan and Site Management Plan. Also such plans may be amended from time to time, subject to the approval of the Superintendent, before work is commenced on any particular item. Such approval shall not relieve the Contractor of any of his responsibilities in connection with the works. In preparing these plans, the Contractor shall take into account any problems associated with the possession of various portions of the site at successive times for other works PROTECTION OF COUNCIL & PUBLIC ROADS The Contractor will be held responsible for any vehicle engaged on the works depositing material or rubbish on road pavements, road reserves, or other improvements. The Contractor, at his own expense, will ensure that all material or rubbish deposited is promptly and effectively removed and the area cleaned off. The Contractor shall establish and maintain the roads on the haul route in the manner as described in the Environmental Management Plan SAFETY DEVICES The Contractor shall provide, set up, operate, maintain and remove all necessary warning lights and barriers, temporary devices to protect the public, workmen, plant and equipment and the works. All warning and temporary devices shall be set up and maintained in accordance with AS 1742 and to the approval of the Superintendent PROTECTION OF PROPERTY AND SERVICES The Contractor shall execute and maintain the whole of the works in such a manner that injury or damage shall not be occasioned to any person, or any private or public property including all roads used for the transfer of materials or plant, buildings, fencing, public utility services or other structures. In the event of any damage to any such person, structure, service or property, the party controlling it must be immediately informed of the damage. The Contractor shall at his own expense arrange the repair and restore any structure, service or property damaged in any way, to the like order and condition in which it was before such damage. The repairs may be made by the party controlling the structure, service or property, and the cost of such repairs shall be at the expense of the Contractor. The Contractor shall also be liable for any loss which maybe result from such damage or interference to any structure, service or property, and for any claim arising from delay in repairing and restoring it. The location of the various underground and overhead structures and services and other property where shown on the drawings, and dimensions, if such were given, are believed to be, but do not purport to be absolutely, correct. They have been provided for the information of the Contractor, only. The Contractor shall satisfy himself by such means as he shall consider proper as to the location of all structures or services or other property that may be encountered in the performance of the Contract FIELD ASSISTANCE Page 22

23 The Contractor shall provide a person to assist with the checking and surveying of constructed works during the course of the contract, as may be required by the Superintendent DEFECTS LIABILITY AND MAINTENANCE PERIOD Clause 37 of the General Conditions refers to a Defects Liability Period. The Relevant Authorities require in addition to the responsibilities of the Contractor under Clause 37 of the General Conditions, Maintenance Works as specified in Clause 1.27 herein. The Defects Liability Period shall be concurrent with the Maintenance Period as specified and shall continue until such time as the Relevant Authorities certify that the works have been taken over, and the period shall be not less than twelve (12) months PRACTICAL COMPLETION In addition to the provisions of Clause 35 of the General Conditions and Clause 1.26 herein, a Certificate of Practical Completion shall not be issued until the Responsible Authorities certify in writing that the separate portions of the work have been released onto the Maintenance Period FINAL CERTIFICATE In addition to the provisions of Clause 42.8 of the General Conditions and Clause 1.27 herein, a Final Certificate shall not be issued until all the Responsible Authorities certify in writing that the works satisfy the criteria of the Authority to the future care and maintenance of the works following future full construction MAINTENANCE WORKS AND REQUIREMENTS PRIOR TO ISSUE OF PRACTICAL COMPLETION AND FINAL CERTIFICATES In additions to the provisions of Clause 37 of the General Conditions, the Contractor shall make provision in his tender price for a concurrent Maintenance Period. Provision shall include works arising out of normal wear and tear and all requirements of the Relevant Authorities to obtain the Authorities certifications required in Clause 1.24 and 1.25 herein ADVERSE WEATHER CONDITIONS The Contractor is required to provide a construction program. Only delays affecting critical activities identified in the accepted construction program will be considered as time lost due to adverse weather conditions INTERPRETATIONS In addition to the Interpretations of terms made in Clause 1 of the General Conditions, certain works and expressions shall have the meanings as specified hereby assigned to them except where the context otherwise requires. * the Principal means the developer, * the Superintendent means Coughlan Civil Pty Ltd. * the Engineer means the Superintendent as defined in Clause 3 of the General Conditions name as the Superintendent in Annexure Part a - AS * the Responsible Authority means the relevant Authority which is to take over future care and maintenance of the separable portions of the works following future full construction. Page 23

24 1.32 DUST CONTROL Where and when dusty conditions exist which result in reduced visibility for road users and a nuisance factor to abutting property owners the Contractor shall take immediate action to minimise the dust hazard. Payment for this work shall be deemed to be included in the relevant items in the Bill of Quantities NOISE CONTROL The Contractor shall take all practicable precautions to minimise noise arising out of or resulting from any activity associated with the work under the Contract. All construction equipment shall be fitted with noise suppressors unless specially designed for quiet operation. In general the provisions of the relevant EPA Noise Control guidelines shall apply UNAUTHORISED DISPOSAL The Contractor is to ensure that the Site is properly signed and barricaded to prevent unauthorised disposal of any waste or other material on the Site by others. Any rubbish or waste deposited is to be cleared from the Site immediately. The Contractor may only recover costs for such removal from persons undertaking dumping. The Contractor is also responsible for all excess spoil to be removed and disposed off site except where detailed in the documents or directed by the Superintendent CONTROL OF RUNOFF The Contractor is to provide protective measures to the approval of the Responsible Authority and the Superintendent to control runoff from the land and ensure that polluted and sediment laden runoff does not enter existing drains, roadways and watercourse downstream. Prior to commencing site works the Contractor, when requested, is to provide a plan detailing the proposed protective measures, which will have to be approved by both the Superintendent and the Responsible Authority. Examples of runoff control measures can be found in the publications "Guidelines for Minimising Soil Erosion and Sedimentation from Construction Sites (1979)" and "Control of Soil Erosion for Construction Sites (1982)" published by Soil Conservation Authority now known as the Land Protection Services - Department of Conservation and Natural Resources and in the publication No. 275 Construction Techniques for Sediment Pollution Control (May 1991) published by the EPA. 2. CONTRACT SPECIFIC CLAUSES 2.1 SITE MEETINGS Generally as required, but not exceeding one fortnight, the Contractor or his representative shall attend a meeting convened by the Superintendent. The Principal may attend and Subcontractors shall attend as required by the Superintendent. The Superintendent or his representative shall be Chairperson of the meeting and shall arrange for any recording of minutes. Depending on the circumstances, it may be necessary to hold a pre-start conference. One major item to be decided on is the Contractor's Works Area, upon which shall be located all temporary huts, sanitary facilities and equipment storage. Page 24

25 2.2 REPEGGING DURING THE CONTRACT The Contractor shall ensure that sufficient survey pegs or reference marks remain in position to allow the work to be checked by the Superintendent at any time and to satisfy the Relevant Authorities' requirements. Checking and replacement of survey marks required by the Superintendent during construction will be arranged by the Contractor with the Principal's Licensed Surveyor and at the Contractor's expense. Should the Contractor fail to instruct the Principal's Licensed Surveyor to carry out necessary survey Works, the Superintendent may instruct the Principal's Licensed Surveyor to carry out the pegging and the cost of such Work shall be deducted from the Contract price. The Contractor should note that the cost of re-establishing survey pegs and benchmarks will be borne by the contractor in all instances. 2.3 GEOTECHNICAL INFORMATION Geotechnical Investigation reports are available and a copy can be provided upon request. The contractor must become familiar and be fully aware of all ground conditions. 2.4 SOIL DISPOSAL FOR EXCAVATIONS Surplus soil from the excavation shall be removed off site on the route and to the dump sites as approved in writing by the Superintendent. 2.5 PROTECTION OF EXISTING VEGETATION The Contractor shall allow for the use of appropriate machinery and equipment when working between and around trees. The utmost care must be taken by the Contractor to protect all existing vegetation in accordance with the Contractor s approved Site Environmental Management Plan (SEMP). Under no circumstances may trees be altered, damaged or removed without the written consent of the Superintendent. Should any tree be removed without the Superintendent s written authority or damaged by the Contractor, then the Contractor shall pay a penalty nominated by either, the Superintendent, City of Melbourne, VicRoads or Department of Sustainability and Environment. 2.6 ACCESS The Contractor must ensure that works will provide for continuous access to all traffic in both directions. 2.7 TRAFFIC MANAGEMENT The Contractor must submit to the Superintendent for approval a Traffic Management Plan and a Pedestrian Management Plan. These plans must be submitted at least two weeks prior to any works commencing within site. 3. ROAD AND DRAINAGE WORKS STANDARD SPECIFICATIONS The specification for the works comprises the following standard specifications, as amended in Section 3.2 Contract Specific Specifications. Page 25

26 3.1 VICROADS SPECIFICATIONS The following sections of the Vic Roads Standard Specifications for Roadworks and Bridgeworks (as amended in Section 3.2 below) apply: a) GENERAL 160 Construction - General 165 Procurement of Roadmaking Materials 166 Traffic Management 173 Examination and Testing of Materials and Work (Roadworks) 180 Ride Quality for Pavements b) FLEXIBLE PAVEMENTS 304 Flexible Pavement Construction 322 Site Wet Mixing of Crushed Rock c) ASPHALT AND SURFACE TREATMENTS 407 Hot Mix Asphalt 408 Priming, Primersealing and Sealing d) INCIDENTAL CONSTRUCTION 701 Underground Stormwater Drains 702 Sub Surface Drainage 703 Cast-In-Place Concrete Edgings, Paths and Other Surfacings 705 Drainage Pits 706 Installation of Utility Services in Road Reserves 707 Fencing 710 Fixing Raised Pavement Markers 713 Beaching 714 Erection of Signs 733 Service Ducts Conduits and Pits e) MATERIALS 801 Source Rock for the Production of Crushed Rock and Aggregates 811 Gravel, Sand and soft or ripped rock for base and subbase pavement 812 Crushed Rock and Plant Mixed wet-mix Crushed Rock for Base and Subbase Pavement 860 Manufacture of Road Signs 3.2 CONTRACT SPECIFIC CLAUSES FOR THE VICROADS SPECIFICATIONS CONSTRUCTION - GENERAL 160.A1 The Quality System Strike out AS/NZS ISO 9001:1994 and AS/NZS ISO 9002:1994 so that AS/NZS ISO 9003:1994 applies. 160.A3 Quality System Documents With reference to part (a), the Contractor shall submit a controlled copy of the contract specific quality plan within four weeks of the date of acceptance of tender. Page 26

27 160.A3 Records Insert the following paragraph: As part of the Contractor s Quality System, the Contractor shall forward duplicate copies of all Quality Records to the Superintendent at the time of issue. 160.A7 Surveillance and Audits Replace references to VicRoads with the Superintendent. Delete the second and third sentences in the fourth paragraph. 160.C3 Sanitary Accommodation Delete this clause. 160.C5 Contractor s Identification Signs This clause is replaced with the following: No identification signs shall be erected without prior consultation with the Superintendent and the Superintendent s approval. 160.D1 Construction Program This clause is deleted. Refer to Clause 33.2 in the Special Conditions of Contract. 160.D2 Adverse Weather Conditions Delete the second and third paragraphs. Page 27

28 FLEXIBLE PAVEMENT CONSTRUCTION Grading of Pavement Material after Compaction Table Sieve Size (mm) Permitted Grading After Compaction (% Passing) Schedule of Details Compaction Scale B shall be used for the Testing and Acceptance of Compaction (Clause (a)) of the sub-base, as nominated by the Superintendent. Compaction Scale A shall be used for the Testing and Acceptance of Compaction (Clause (a)) of the base, as nominated by the Superintendent PRIMING, PRIMERSEALING AND SEALING Schedule of Details Refer to drawings, Australian Standards and manufacturer s recommendations SUBSURFACE DRAINAGE Schedule of Details Refer to drawings CAST-IN-PLACE CONCRETE EDGINGS, PATHS AND OTHER SURFACINGS Setting Out Strike out sub-clause (b) Bedding Preparation Strike out sub-clause (a) INSTALLATION OF UTILITY SERVICES WITHIN ROAD RESERVES Page 28

29 Schedule of Details Refer to drawings and service authority requirements PAINTED PAVEMENT MARKINGS - NEW INSTALLATIONS Standards Items (a), (b) and (c) apply Materials Delete items (i), (ii) and (iii) Layout of Markings Delete item (a) CRUSHED ROCK AND PLANT MIXED WET-MIX CRUSHED ROCK FOR BASE AND SUBBASE PAVEMENT Product In sub-clause (b), the maximum permeability for Class 2 Base and Class 3 Subbase material shall be 5x10-6 cm/sec. 4. STANDARD DRAWINGS The following standard drawings form part of this specification. a) VicRoads Standard Drawings b) City of Melbourne Standard Drawings in their entirety. c) City West Water standard drawings and specifications in their entirety. d) Sewerage Code of Australia (WSA ). e) Water Code of Australia (WSA ). Page 29

30 CONTRACT CIVIL WORKS PLANS Page 30

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: APPLICATION DATE: ADDRESS OF WORK OR ENCROACHMENT: CROSS STREET: STARTING DATE: APN: - - No. Street City/Township ESTIMATED COST: $ COMPLETION

More information

Between the Parramatta Park Trust (the Trust) (LAND OWNER) and

Between the Parramatta Park Trust (the Trust) (LAND OWNER) and PERMIT TO ENTER Between the Parramatta Park Trust (the Trust) (LAND OWNER) and (ENTRANT) DEED made the day of, over land at / known as: Address Parramatta Park Certificate of Title LAND OWNER Parramatta

More information

Between the Western Sydney Parklands Trust (the Trust) (LAND OWNER) and

Between the Western Sydney Parklands Trust (the Trust) (LAND OWNER) and PERMIT TO ENTER Between the Western Sydney Parklands Trust (the Trust) (LAND OWNER) and (ENTRANT) DEED made the day of, over land at / known as: Address Western Sydney Parklands Certificate of Title LAND

More information

CONDITIONS OF CONTRACT. The Builder must execute and complete the Works in a workmanlike manner and ensure the Works are adequately supervised.

CONDITIONS OF CONTRACT. The Builder must execute and complete the Works in a workmanlike manner and ensure the Works are adequately supervised. CONDITIONS OF CONTRACT 1. RESPONSIBILITY OF BUILDER The Builder must execute and complete the Works in a workmanlike manner and ensure the Works are adequately supervised. 2. WORK PERFORMED OR MATERIALS

More information

TRENCH PERMIT. CITY OF SOMERSWORTH NH 18 Lilac Lane - (603) Please Fax at (603) Date: Permit# Dig Safe # Fee = $70.

TRENCH PERMIT. CITY OF SOMERSWORTH NH 18 Lilac Lane - (603) Please Fax at (603) Date: Permit# Dig Safe # Fee = $70. TRENCH PERMIT CITY OF SOMERSWORTH NH 18 Lilac Lane - (603) 692-4266 - Please Fax at (603) 692-4281 Date: Permit# Dig Safe # Fee = $70.00 Name of Applicant Address of Applicant Phone Number Reason for Excavation

More information

PERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS

PERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS CONTRACTOR OWNER/ AGENT APPLICANT CITY OF DALY CITY DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION 333 90 th Street, 1 st Floor, Daly City, CA 94015 Tel: (650) 991-8064 Fax: (650) 991-8243 ENGINEERING

More information

GENERAL CONDITIONS OF ELECTRICAL INSTALLATION CONTRACT

GENERAL CONDITIONS OF ELECTRICAL INSTALLATION CONTRACT GENERAL CONDITIONS OF ELECTRICAL INSTALLATION CONTRACT 1. Definition and Duration These conditions form part of a quotation submitted by the Contractor to the Client named in the quotation. The Contractor

More information

Any additional services not detailed in the Quotation, and the price is subject to variation to take account of changes in any exclusions.

Any additional services not detailed in the Quotation, and the price is subject to variation to take account of changes in any exclusions. STANDARD TERMS & CONDITIONS for QUOTATIONS. Bitu-mill (Road Maintenance) Pty Ltd, Bitu-mill (Civil) Pty Ltd, Bitu-mill Services Pty Ltd and Bitu-mill Equipment Pty Ltd ( Bitu-mill ) These terms and conditions

More information

QUONSET DEVELOPMENT CORPORATION (QDC) INVITATION TO BID

QUONSET DEVELOPMENT CORPORATION (QDC) INVITATION TO BID QUONSET DEVELOPMENT CORPORATION (QDC) A BID is solicited for the following work: INVITATION TO BID Name of Project: Background & Description of Work: Pavement Repairs: Utility Connections: On-Call Pavement

More information

Conditions of Contract

Conditions of Contract Conditions of Contract Request for Quotation (RFQ) RFQ Title RFQ Number Level 1 Essential Energy Works for the Warialda Truck Wash GWY_1819_Q03 Issue Date 21st December 2018 This document contains the

More information

Conditions of Contract

Conditions of Contract Conditions of Contract 1. Responsibilities of Builder and Results of Construction (a) The Builder will, subject to these Conditions and the contract work details in Schedule 3, execute and complete the

More information

GP-4-1 of 9 GP-4 SCOPE OF WORK

GP-4-1 of 9 GP-4 SCOPE OF WORK GP-4 SCOPE OF WORK GP-4-1 of 9 GP-4 SCOPE OF WORK GP-4.01 CONTRACT INTENT The Contractor shall (within specified tolerances) perform all work in accordance with the lines, grades, typical cross sections,

More information

STANDARD CONSTRUCTION CONTRACT. THESE ARTICLES OF AGREEMENT made in duplicate and effective the day of 2017: NEW BRUNSWICK POWER CORPORATION

STANDARD CONSTRUCTION CONTRACT. THESE ARTICLES OF AGREEMENT made in duplicate and effective the day of 2017: NEW BRUNSWICK POWER CORPORATION STANDARD CONSTRUCTION CONTRACT THESE ARTICLES OF AGREEMENT made in duplicate and effective the day of 2017: BETWEEN: NEW BRUNSWICK POWER CORPORATION (referred to herein as the Owner) AND (referred to herein

More information

AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC)

AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC) AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC) FOR USE IN CONJUNCTION WITH THE FORMS OF MAIN CONTRACT FOR PUBLIC WORKS ISSUED BY THE OFFICE OF GOVERNMENT PROCUREMENT, DEPARTMENT OF PUBLIC EXPENDITURE

More information

SOUTHERN RESPONSE CANTERBURY EARTHQUAKE RECONSTRUCTION PROJECT GENERAL CONDITIONS OF CONTRACT FOR HOUSING REBUILD AND REPAIRS

SOUTHERN RESPONSE CANTERBURY EARTHQUAKE RECONSTRUCTION PROJECT GENERAL CONDITIONS OF CONTRACT FOR HOUSING REBUILD AND REPAIRS SOUTHERN RESPONSE CANTERBURY EARTHQUAKE RECONSTRUCTION PROJECT GENERAL CONDITIONS OF CONTRACT FOR HOUSING REBUILD AND REPAIRS TABLE OF CONTENTS Background 1 1. Introduction 1 2. Contract Works 1 3. Project

More information

Request for Tender The Owners Corporation of Units Plan 2413 Landmark Strata and Building Management Services

Request for Tender The Owners Corporation of Units Plan 2413 Landmark Strata and Building Management Services Request for Tender The Owners Corporation of Units Plan 2413 Landmark Strata and Building Management Services TABLE OF CONTENTS SECTION 1 - INFORMATION ADVICE TO TENDERERS... 2 SECTION 2 - SCOPE OF SERVICES...

More information

Conditions of Contract for PLANT and Design-Build

Conditions of Contract for PLANT and Design-Build Conditions of Contract for PLANT and Design-Build FOR ELECTRICAL AND MECHANICAL WORKS AND FOR BUILDING AND ENGINEERING WORKS DESIGNED BY THE CONTRACTOR General Conditions 1st Edition 1999 FEDERATION INTERNATIONALE

More information

CENTRAL GOLDFIELDS SHIRE COUNCIL TENDER G CIVIL & TRAFFIC ENGINEERING CONSULTANCY SERVICES

CENTRAL GOLDFIELDS SHIRE COUNCIL TENDER G CIVIL & TRAFFIC ENGINEERING CONSULTANCY SERVICES 0 CENTRAL GOLDFIELDS SHIRE COUNCIL TENDER G530-09 CIVIL & TRAFFIC ENGINEERING CONSULTANCY SERVICES 1 TABLE OF CONTENTS Page No. 1. NOTICE TO TENDERERS AND GENERAL CONDITIONS OF TENDERING...3 2. SCHEDULE

More information

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST Applicant shall provide three (3) copies of the following attachments: Geotechnical Report (Soils Report with grading specifications and

More information

CS ENERGY LIMITED SERVICE CONDITIONS

CS ENERGY LIMITED SERVICE CONDITIONS CS ENERGY LIMITED SERVICE CONDITIONS 1. DEFINITIONS In these Conditions: Agreement means the agreement between CS Energy and the Contractor for the provision of Services and comprises the relevant Service

More information

Western Water Development Consultant Accreditation Deed

Western Water Development Consultant Accreditation Deed Western Water Development Consultant Accreditation Deed Western Water ABN 67 433 835 375 and Company name: ABN : February 2018 TABLE OF CONTENTS 1. DEFINITIONS AND INTERPRETATION... 1 1.1 Definitions...

More information

Village of Fife Lake 616 Bates/Box 298 Fife Lake, MI Phone: (231) Fax: (231)

Village of Fife Lake 616 Bates/Box 298 Fife Lake, MI Phone: (231) Fax: (231) Village of Fife Lake 616 Bates/Box 298 Fife Lake, MI 49633 Phone: (231)879-4291 Fax: (231)879-5153 RIGHT OF WAY PERMIT APPLICATION APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN

More information

Booth Creek at Myrnam Street Culvert Upgrade

Booth Creek at Myrnam Street Culvert Upgrade City of Coquitlam Contract Documents 81302 Booth Creek at Myrnam Street Culvert Upgrade File #: 11-5330-20/81302/1 Doc #: 2012611.v1 TC 1 Table of Contents File #: 11-5330-20/81302/1 Doc #: 2012551.v1

More information

Drainage Improvements, Diversion #5

Drainage Improvements, Diversion #5 City of Coquitlam Contract Documents 80351B Drainage Improvements, Diversion #5 File #: 97/1 Doc #: 894544.v1 TC 1 Table of Contents File #: 11-5330-20/80351/1 Doc #: 1987035.v1 Contract No. 80351B Drainage

More information

NC STATE SURPLUS PROPERTY AGENCY BID CONTRACT. RE-Bid # D05083 Bid Opening: May 8, 10:00AM

NC STATE SURPLUS PROPERTY AGENCY BID CONTRACT. RE-Bid # D05083 Bid Opening: May 8, 10:00AM Bids will be publicly opened at the NC State Surplus Property Agency (SSPA) at the time and date specified. By signature, I certify that all bidder information is accurate and I agree to the Instructions,

More information

TENDER DOCUMENT FOR BRAZEAU COUNTY 2016 AGGREGATE PRODUCTION AND STOCKPILING

TENDER DOCUMENT FOR BRAZEAU COUNTY 2016 AGGREGATE PRODUCTION AND STOCKPILING TENDER DOCUMENT FOR BRAZEAU COUNTY 2016 AGGREGATE PRODUCTION AND STOCKPILING Location: Legal: Berrymoor Pit SW13-50-6-W5M CONTRACTOR: DATE OF CONTRACT: INSTRUCTIONS TO BIDDERS 1. Project overview The Brazeau

More information

Spartanburg County Roads & Bridges 9039 Fairforest Road Spartanburg, South Carolina Telephone Fax

Spartanburg County Roads & Bridges 9039 Fairforest Road Spartanburg, South Carolina Telephone Fax Spartanburg County Roads & Bridges 9039 Fairforest Road Spartanburg, South Carolina 29301 Telephone 864-595-5320 Fax 864-595-5364 ENCROACHMENT PERMIT APPLICATION Applicant s Name Address City, State, Zip

More information

Odessa Marine Pty Ltd ACN Terms & Conditions of Trade

Odessa Marine Pty Ltd ACN Terms & Conditions of Trade Odessa Marine Pty Ltd ACN 620 372 474 Terms & Conditions of Trade 1. Definitions and Interpretation 1.1 Unless otherwise specified the following words and phrases have the following meanings in these Terms:

More information

OLMSTED STONE ARCH BRIDGE REPAIR PROJECT

OLMSTED STONE ARCH BRIDGE REPAIR PROJECT SPECIFICATIONS FOR OLMSTED STONE ARCH BRIDGE REPAIR PROJECT CITY OF JEFFERSONTOWN, KENTUCKY CITY HALL 10416 Watterson Trail Jeffersontown, Kentucky 40299 May 28, 2013 NOTICE TO BIDDERS The City of Jeffersontown,

More information

1. APPLICATION OF THESE CONDITIONS

1. APPLICATION OF THESE CONDITIONS 1. APPLICATION OF THESE CONDITIONS (a) These conditions, subject to any variations agreed to in writing, apply to all supplies made by VPS (or any Related Body Corporate specified in a relevant invoice

More information

REVISION CONTROL LAND DEVELOPMENT - GUIDELINES AND PRICING 01

REVISION CONTROL LAND DEVELOPMENT - GUIDELINES AND PRICING 01 2012 Central Highlands Water All rights reserved. This publication is protected by copyright and is provided under licence. No part of this publication may be reproduced, distributed, transmitted, stored

More information

TERMS AND CONDITIONS OF TRADE

TERMS AND CONDITIONS OF TRADE 1. Definitions TERMS AND CONDITIONS OF TRADE 1.1 Nqpetro means Nqpetro Pty Ltd, its successors and assignor any person acting on behalf of and with the authority of Nqpetro Pty Ltd. 1.2 Customer means

More information

WORK IN OR ABOUT QR PROPERTY

WORK IN OR ABOUT QR PROPERTY SYSTEMS AND CAPABILITY TECHNICAL REQUIREMENT NO: MCE-SR-002 ISSUE: Revision E DATE: 22-12-2009 PAGE: 1 of 12 WORK IN OR ABOUT QR PROPERTY ISSUE DATE DESCRIPTION / REASON Initial 05.03.1997 Revision A 14.05.1997

More information

WATER CHAPTER 8 PIPE INSTALLATION SYSTEM SPECIFICATIONS JUNE 2016

WATER CHAPTER 8 PIPE INSTALLATION SYSTEM SPECIFICATIONS JUNE 2016 SECTION 6 ENGINEERING STANDARDS CHAPTER 8 PIPE INSTALLATION 6.1. GENERAL CONSTRUCTION STANDARDS The following is in addition to Denver Water Engineering Standards Chapter 8 - Pipe Installation. All excavations

More information

Works Appointment: We, on behalf of the Employer, would like to inform you that your quotation, Reference Number

Works Appointment: We, on behalf of the Employer, would like to inform you that your quotation, Reference Number 6/F Dorset House, Taikoo Place, 979 King's Road, Quarry Bay, Hong Kong Project Works Order Works Order No.: Name of Contractor: Description of the works: Date: "Contractor") "Works") Address of premises:

More information

ASCENT STRUCTURAL & ARCHITECTURAL STEEL

ASCENT STRUCTURAL & ARCHITECTURAL STEEL ASCENT STRUCTURAL & ARCHITECTURAL STEEL (Terms & Conditions of Trade) 1. Definitions 1.1 ASAS shall mean Malborough Investments Pty Ltd trading as Ascent Structural & Architectural Steel ABN 90 225 482

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017

More information

We are pleased to provide this Offer to carry out Energex Connection Services as requested in your application.

We are pleased to provide this Offer to carry out Energex Connection Services as requested in your application. Page 1 of 12 Model Standing Offer Basic Connection Service New Connection or a Connection Alteration up to 100 amps (minimal or no augmentation or extension of the network required) Customer Name: Customer

More information

REQUEST FOR PROPOSALS FOR BID TOWN OF MIDDLESEX, VERMONT TROPICAL STROM IRENE FEDERAL BUYOUT DEMOLITIONS

REQUEST FOR PROPOSALS FOR BID TOWN OF MIDDLESEX, VERMONT TROPICAL STROM IRENE FEDERAL BUYOUT DEMOLITIONS REQUEST FOR PROPOSALS FOR BID TOWN OF MIDDLESEX, VERMONT TROPICAL STROM IRENE FEDERAL BUYOUT DEMOLITIONS Contact: Sarah Merriman Town Clerk/Select Board Assistant Town of Middlesex 5 Church Street Middlesex,

More information

Northern Town of La Ronge Box Hildebrand Drive La Ronge, Saskatchewan S0J 1L0 TENDER TOWN OF LA RONGE

Northern Town of La Ronge Box Hildebrand Drive La Ronge, Saskatchewan S0J 1L0 TENDER TOWN OF LA RONGE Northern Town of La Ronge Box 5680 1212 Hildebrand Drive La Ronge, Saskatchewan S0J 1L0 TENDER TOWN OF LA RONGE Equipment Rental Services 2018 ERS01-2018 - 1 - Town of La Ronge Table of Contents: Acknowledgement

More information

Proposal and Agreement for Construction on Purchaser s Lot

Proposal and Agreement for Construction on Purchaser s Lot Proposal and Agreement for Construction on Purchaser s Lot This Proposal and Agreement is made this day of, 200, by and between The Company, (hereinafter referred to as The Company), and (hereinafter referred

More information

TERMS AND CONDITIONS OF SALE ACN: ABN:

TERMS AND CONDITIONS OF SALE ACN: ABN: TERMS AND CONDITIONS OF SALE ACN: 169 441 383 ABN: 28 169 441 383 OFFER TO SUPPLY / QUOTATION VALIDITY Our offer is valid for a period of 30 days from the date of quotation. Notwithstanding; the details

More information

Steadiform Pty Ltd and any associated entity terms and conditions of trade Definitions Acceptance Price And Payment

Steadiform Pty Ltd and any associated entity terms and conditions of trade Definitions Acceptance Price And Payment Steadiform Pty Ltd and any associated entity terms and conditions of trade 1. Definitions 1.1 Company means Steadiform Pty Ltd ACN 605 375 568, associated entities, its successors and assigns or any person

More information

BETWEEN name. address. AND name (hereinafter called the Subcontractor ) address

BETWEEN name. address. AND name (hereinafter called the Subcontractor ) address AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR CONTRACTOR S COPY SUBCONTRACT NO. Alberta Standard Construction Subcontract THIS AGREEMENT made this day of, A.D. 20 BETWEEN name (hereinafter called the

More information

Management Agreement

Management Agreement Management Agreement An Agreement between: THE AUSTRALIAN NATIONAL UNIVERSITY (the University) and (PM) with respect to the project known as: (Project) Date: (date) Commercial in Confidence Rev: March

More information

City of Charlevoix ADVERTISEMENT FOR BIDS. Tree Trimming

City of Charlevoix ADVERTISEMENT FOR BIDS. Tree Trimming City of Charlevoix ADVERTISEMENT FOR BIDS Tree Trimming The City of Charlevoix will accept sealed proposals for the removal and disposal of hazardous limbs, dead trees and stump grinding until 10:00 am

More information

DEMOLITION 535 Fraser Street

DEMOLITION 535 Fraser Street DEMOLITION 535 Fraser Street Request for Quotations 201602 Quotations are invited for the demolition and removal of a house and site remediation located at 535 Fraser Street, Esquimalt. The Township of

More information

LABOUR ONLY CONDITIONS OF CONTRACT

LABOUR ONLY CONDITIONS OF CONTRACT LABOUR ONLY CONDITIONS OF CONTRACT Revision J. Date 01/05/12 1. Definitions 1.1 In these Conditions the Company means BDW Trading Limited and the Contractor means the individual firm or company named in

More information

TENDER DOCUMENT FOR BRAZEAU COUNTY 2016 AGGREGATE PRODUCTION AND STOCKPILING

TENDER DOCUMENT FOR BRAZEAU COUNTY 2016 AGGREGATE PRODUCTION AND STOCKPILING TENDER DOCUMENT FOR BRAZEAU COUNTY 2016 AGGREGATE PRODUCTION AND STOCKPILING Location : Smithinsky Pit Legal : SE 34-46-9-W5M SITE VISIT : October 11 th, 2016 @ 9:30 AM CLOSING DATE FOR QUESTIONS FROM

More information

ARTICLE RIGHT-OF-WAY RULES AND REGULATIONS

ARTICLE RIGHT-OF-WAY RULES AND REGULATIONS Page 1 of 8 ARTICLE 3.1000. RIGHT-OF-WAY RULES AND REGULATIONS Sec. 3.1001. Findings and purpose. The purpose of this article is to: (a) Assist in the management of facilities placed in, on or over the

More information

PERMIT TO ENTER YOU ARE REQUIRED TO COMPLY WITH THE ENDORSEMENTS AND DETAILS SHOWN ON THIS PERMIT

PERMIT TO ENTER YOU ARE REQUIRED TO COMPLY WITH THE ENDORSEMENTS AND DETAILS SHOWN ON THIS PERMIT PERMIT TO ENTER PERMIT NO: YOU ARE REQUIRED TO COMPLY WITH THE ENDORSEMENTS AND DETAILS SHOWN ON THIS PERMIT KIWIRAIL OFFICE DETAILS OFFICE: Area Office, KiwiRail Network, CONTACT: PHONE NO: Mob Fax PROTECTION

More information

Terms & Conditions of Trade AGA Doors and Windows PPSR PROTECTION 2018

Terms & Conditions of Trade AGA Doors and Windows PPSR PROTECTION 2018 1. Definitions 1.1 ADW means PK Carmichael trading as AGA Doors and Windows (ABN: 36 601 273 830) by its successors assigns or any person acting on behalf of AGA DOORS and WINDOWS and with the authority

More information

Australian Standard. Water Corporation Version July 2012 AS (Incorporating Amendment No. 1)

Australian Standard. Water Corporation Version July 2012 AS (Incorporating Amendment No. 1) Water Corporation Version July 2012 AS 4910 2002 (Incorporating Amendment No. 1) AS 4910 2002 Australian Standard Water Corporation General conditions of contract amended from General conditions of contract

More information

CHECKLIST FOR CONSTRUCTION STAGING PLAN IN CORAL GABLES

CHECKLIST FOR CONSTRUCTION STAGING PLAN IN CORAL GABLES CHECKLIST FOR CONSTRUCTION STAGING PLAN IN CORAL GABLES _ A Construction Staging Plan is required prior to permit issuance for all commercial and multi-family residential projects. It is intended to reduce

More information

TENDER FOR THE TOWNSHIP OF SEVERN

TENDER FOR THE TOWNSHIP OF SEVERN TENDER FOR THE TOWNSHIP OF SEVERN Contract No. PW2017-1O 1 Page S Contract No. PW2017-1O The Corporation of the Township of Severn Tender Closing Date is February 17, 2017 at 10:00 a.m. Local Time Lowest

More information

General Conditions of the Construction Contract Between CONSTRUCTION MANAGER AND CONTRACTOR

General Conditions of the Construction Contract Between CONSTRUCTION MANAGER AND CONTRACTOR CMAA Document CMAR-3 General Conditions of the Construction Contract Between CONSTRUCTION MANAGER AND CONTRACTOR 2004 EDITION This document is to be used in connection with the Standard Form of Agreement

More information

LONG ISLAND UNIVERSITY STANDARD TERMS AND CONDITIONS

LONG ISLAND UNIVERSITY STANDARD TERMS AND CONDITIONS LONG ISLAND UNIVERSITY STANDARD TERMS AND CONDITIONS CONTENTS I. Scope II. Review of Contract Documents III. Responsible Business Practices IV. Schedules and Time of Completion V. Plans, Specifications,

More information

SECTION 7 - PROSECUTION OF THE WORK TABLE OF CONTENTS

SECTION 7 - PROSECUTION OF THE WORK TABLE OF CONTENTS SECTION 7 - PROSECUTION OF THE WORK TABLE OF CONTENTS Section Page 7-1 BEGINNING OF WORK... 7.1 7-2 AMOUNT OF WORK UNDER CONSTRUCTION... 7.1 7-3 PRECONSTRUCTION CONFERENCE AND PROGRESS MEETINGS... 7.1

More information

REQUEST FOR BIDS MILLING AND RESURFACING CITY OF SANDERSVILLE

REQUEST FOR BIDS MILLING AND RESURFACING CITY OF SANDERSVILLE REQUEST FOR BIDS MILLING AND RESURFACING CITY OF SANDERSVILLE Scope The City of Sandersville (City) is seeking a Contractor to provide asphalt milling and resurfacing services. The City has identified

More information

Terms and Conditions. Doc ID /v3

Terms and Conditions. Doc ID /v3 1. Definitions and Interpretation In this Agreement: Agreement means the agreement between the Supplier and the Customer relating to the hire of Equipment, the supply of Consumables, and the provision

More information

2 CONTRACT 3 SPECIFIC ITEMS INCLUDED AND EXCLUDED FROM QUOTE. Balclutha. Cromwell

2 CONTRACT 3 SPECIFIC ITEMS INCLUDED AND EXCLUDED FROM QUOTE. Balclutha. Cromwell TERMS OF TRADE 1 DEFINITIONS (a) Quote means the quotation provided by Balcrom for the supply of Products. (b) Products means all goods and materials provided by Balcrom to the Customer under the Contract.

More information

Encroachment Permit. Permit Fee: Receipt #: Bond Fee: Receipt #: Expiration Date: Phone# Mailing Address:

Encroachment Permit. Permit Fee: Receipt #: Bond Fee: Receipt #: Expiration Date: Phone# Mailing Address: A (Office Use Only) Encroachment Permit Permit #: City of Seaside Public Works 440 Harcourt Avenue Seaside, Ca 93955 Phone: (831) 899-6825, Fax: (831) 899-6211 All information except signature must be

More information

Page 1 of 40 Development Agreement Annexure A Standard Conditions 1 February 2017 V1.0

Page 1 of 40 Development Agreement Annexure A Standard Conditions 1 February 2017 V1.0 Page 1 of 40 Development Agreement Annexure A Standard Conditions 1 February 2017 CONTENTS 1. Interpretation... 3 2. Operation of Document... 11 3. Amendment and Assignment... 13 4. The Developer... 14

More information

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT BEFORE YOU CAN PERFORM ANY CONSTRUCTION OR MAINTENANCE WORK IN THE PUBLIC RIGHT-OF-WAY, YOU MUST HAVE A VALID ENCROACHMENT PERMIT ISSUED BY THIS DEPARTMENT This work includes but is not limited to driveway

More information

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

Project Z Pty Ltd T/A Harbour Glass Terms & Conditions of Trade 17.6 The Seller may license or sub-contract all or any part of its rights and

Project Z Pty Ltd T/A Harbour Glass Terms & Conditions of Trade 17.6 The Seller may license or sub-contract all or any part of its rights and 1. Definitions 1.1 Seller shall mean Project Z Pty Ltd T/A Harbour Glass its successors and assigns or any person acting on behalf of and with the authority of Project Z Pty Ltd T/A Harbour Glass. 1.2

More information

REQUEST FOR PROPOSALS. Demolition

REQUEST FOR PROPOSALS. Demolition JEFFERSON COUNTY, WEST VIRGINIA Engineering Department 116 East Washington Street P.O. Box 716 Charles Town, West Virginia 25414 Phone: 304-728-3257 Email: engineering@jeffersouncountywv.org Fax: 304-728-3953

More information

AIRPORT AUTHORITY HONG KONG

AIRPORT AUTHORITY HONG KONG AIRPORT AUTHORITY HONG KONG GENERAL CONDITIONS OF CONTRACT BUILDING AND CIVIL WORKS ISSUE NO. 10 August 2011 [this page not used] GENERAL CONDITIONS OF CONTRACT FOR BUILDING AND CIVIL WORKS TABLE OF CONTENTS

More information

Form of Agreement Between the Client And the Quantity Surveyor

Form of Agreement Between the Client And the Quantity Surveyor Form of Agreement Between the Client And the Quantity Surveyor Second ACQS Edition (May 2009) Contents Agreement 1 Terms of Appointment 1. Quantity Surveyor's obligations 2 2. Client's obligations 2 3.

More information

Terms of Trade. 1 P a g e

Terms of Trade. 1 P a g e These terms shall apply unless other terms are expressly agreed in writing by a duly authorised officer of the Supplier. Terms of Trade 1. APPLICATION (a) The terms in this document ( Conditions ) apply

More information

Contract Documents 73541

Contract Documents 73541 City of Coquitlam Contract Documents 73541 Schoolhouse Area Neighbourhood Pavement Rehabilitation File #: 11-5330-20/73541/2 Doc #: 1651299.v1 Table of Contents Contract No. 73541 TC 1 Schoolhouse Area

More information

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following: Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and

More information

Town of South Bruce Peninsula. Tender PW Maintenance Gravel

Town of South Bruce Peninsula. Tender PW Maintenance Gravel Tender PW 17-05 Maintenance Gravel Tender PW 17-05 Maintenance Gravel The Town of South Bruce Peninsula is requesting tenders for the supply, application, and stockpile of granular A maintenance gravel

More information

1.3 All employees are equally responsible for complying with the Ontario Occupational Health & Safety Act and its Regulations.

1.3 All employees are equally responsible for complying with the Ontario Occupational Health & Safety Act and its Regulations. Revision No: 1 Page: 1 of 14 1.0 PURPOSE 1.1 The purpose of this policy is to establish guidelines for contractors in order to provide and maintain a safe work environment for all employees. Advance planning

More information

OPTION A: 2 BITUMINOUS PAVING WITH SHOULDERS OPTION B: SCRATCH COURSE BITUMINOUS PAVING WITHOUT SHOULDERS

OPTION A: 2 BITUMINOUS PAVING WITH SHOULDERS OPTION B: SCRATCH COURSE BITUMINOUS PAVING WITHOUT SHOULDERS SHIAWASSEE COUNTY ROAD COMMISSION PROPOSAL FOR 2018 BITUMINOUS PAVING PROGRAM JUDDVILLE ROAD FROM CLINTON COUNTY LINE (MERIDIAN ROAD) TO GENESSEE COUNTY LINE (M-13) IN SHIAWASSEE COUNTY + / - 22.34 MILES

More information

BP Plus Terms and Conditions

BP Plus Terms and Conditions BP Plus Terms and Conditions 1. Terms and Conditions Binding. By applying for or first using the BP Plus Card, the Customer acknowledges acceptance of these terms and conditions and ensures their observance

More information

MANITOBA HOUSING SUPPLEMENTAL CONDITIONS CONTRACT #: XXXX GENERAL

MANITOBA HOUSING SUPPLEMENTAL CONDITIONS CONTRACT #: XXXX GENERAL GENERAL 1. Stipulated Price Contract CCDC2-2008 2. CCDC2-2008 Supplemental Conditions The Construction Contract for this project is the standard Construction Document- CCDC2 2008, Stipulated Price Contract.

More information

Australian Independent Hire A.B.N

Australian Independent Hire A.B.N Australian Independent Hire A.B.N. 47 114 959 296 PO Box 1158, Ashmore City QLD 4214 15 Jade Dr, Molendinar QLD 4214 Ph: (07) 5578 3777 Fax: (07) 5578 3999 www.aihire.com.au Email: sales@aihire.com.au

More information

CITY OF MEMPHIS CITY ENGINEER S OFFICE PROCEDURES FOR MONITORING WELL PERMIT

CITY OF MEMPHIS CITY ENGINEER S OFFICE PROCEDURES FOR MONITORING WELL PERMIT CITY OF MEMPHIS CITY ENGINEER S OFFICE PROCEDURES FOR MONITORING WELL PERMIT Amended 6/09 APPLICABILITY: These procedures will apply where an individual desires to install or abandon a temporary monitoring

More information

Headland Machinery Pty Ltd ( Headland ) Sale and Installation of Parts Terms and Conditions

Headland Machinery Pty Ltd ( Headland ) Sale and Installation of Parts Terms and Conditions Headland Machinery Pty Ltd ( Headland ) Sale and Installation of Parts Terms and Conditions These are the terms and conditions upon which Headland (as named in section 1.1(o) below) sell and quote for

More information

TERMS AND CONDITONS PARTIES

TERMS AND CONDITONS PARTIES TERMS AND CONDITONS PARTIES The Supplier: Build Complete Pty Ltd (ABN: 29 161 245 343) The Customer: DEFINITIONS The Supplier is Build Complete Pty Ltd, 1 Brickport Road, Cooee, Tasmania, 7320, AUSTRALIA.

More information

IOP(SA) PLUMBING WORKS AGREEMENT

IOP(SA) PLUMBING WORKS AGREEMENT IOP(SA) PLUMBING WORKS AGREEMENT 1. INTERPRETATION 1.1 In this Agreement, unless inconsistent with the context, the words and phrases defined hereunder shall bear the meanings assigned to them in this

More information

City of Shawano Park and Rec Dept. 220 E Division St., Shawano, (715) Fax: (715)

City of Shawano Park and Rec Dept. 220 E Division St., Shawano, (715) Fax: (715) September 11, 2018 To Whom it May Concern: The City of Shawano is requesting proposals from qualified contractors for demolition and removal of various structures and items at 909 S. Lincoln, Shawano,

More information

TERMS AND CONDITIONS OF SALE

TERMS AND CONDITIONS OF SALE Condition of Sales 1 INTERPRETATION 1.1 In these terms and conditions: (a) Accession means an "Accession" as defined in PPSA 2009. (b) Account means an "Account" as defined in s 10 of PPSA 2009. (c) Amendment

More information

INVITATION TO QUOTE. The Regional District of Fraser Fort George invites written quotations for the following:

INVITATION TO QUOTE. The Regional District of Fraser Fort George invites written quotations for the following: INVITATION TO QUOTE The Regional District of Fraser Fort George invites written quotations for the following: Sanding Services ES-15-12 Closing Date: Tuesday, November 10, 2015 (10:00 a.m.) PART 1: GENERAL

More information

CODE OF PRACTICE FOR WORKS AFFECTING THE CANAL & RIVER TRUST

CODE OF PRACTICE FOR WORKS AFFECTING THE CANAL & RIVER TRUST CODE OF PRACTICE FOR WORKS AFFECTING THE CANAL & RIVER TRUST PART 3 FORMS April 2018 Third Party Works Code of Practice: Part 3: Forms April 2018 1 CONTENTS FORM 1:NOTIFICATION FORM FORM 2: COST UNDERTAKING

More information

LAFAYETTE, LOUISIANA, AS SHOWN ON THESE SPECIFICATIONS...

LAFAYETTE, LOUISIANA, AS SHOWN ON THESE SPECIFICATIONS... DEPARTMENT: Physical Plant/Campus REQUISITION NO. M FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TRANSPORTATION, SUPERVISION, PERMITS, ETC. NECESSARY TO, LOCATED ON THE CAMPUS OF THE UNIVERSITY OF LOUISIANA

More information

Body Corporate Operational Rules - Tattoo BC #

Body Corporate Operational Rules - Tattoo BC # Body Corporate Operational Rules - Tattoo BC # 437512 1. Interpretation of terms, and rules binding on owners, occupiers, employees, agents, invitees, licences and tenants a. Terms defined in the Unit

More information

CONSTRUCTION CONTRACT EXAMPLE

CONSTRUCTION CONTRACT EXAMPLE P a g e 1 CONSTRUCTION CONTRACT EXAMPLE THIS AGREEMENT, made and entered into this date, by and between, hereinafter called CONTRACTOR, and NPC QUALITY BURGER, INC., hereinafter called OWNER. IT IS HEREBY

More information

Name of the work: AIR CONDITIONING WORKS TO BE CARRIED OUT AT OUR EXISTING BRANCHES IN THE REGION RO JAIPUR. SYNDICATEBANK:

Name of the work: AIR CONDITIONING WORKS TO BE CARRIED OUT AT OUR EXISTING BRANCHES IN THE REGION RO JAIPUR. SYNDICATEBANK: Name of the work: AIR CONDITIONING WORKS TO BE CARRIED OUT AT OUR EXISTING BRANCHES IN THE REGION RO JAIPUR. SYNDICATEBANK: SCHEDULE OF ITEMS FOR A.C. WORKS - EXISTING BRANCHES IN THE REGION RO JAIPUR

More information

TERMS AND CONDITIONS FOR METER RELOCATION SERVICES FOR PREMISES CONNECTED TO ACTEWAGL S GAS DISTRIBUTION NETWORK IN NSW AND ACT

TERMS AND CONDITIONS FOR METER RELOCATION SERVICES FOR PREMISES CONNECTED TO ACTEWAGL S GAS DISTRIBUTION NETWORK IN NSW AND ACT TERMS AND CONDITIONS FOR METER RELOCATION SERVICES FOR PREMISES CONNECTED TO ACTEWAGL S GAS DISTRIBUTION NETWORK IN NSW AND ACT (ANNUAL CONSUMPTION LESS THAN TEN (10) TERAJOULES) 2 MAY 2016 INTRODUCTION

More information

Right to Refuse The City of Coralville reserves the right to reject any and all bids and to waive any technicalities in the bidding process.

Right to Refuse The City of Coralville reserves the right to reject any and all bids and to waive any technicalities in the bidding process. City of Coralville Coralville Parks & Recreation Invitation to Bid Turf and Horticulture Contract The City of Coralville seeks qualified bidders for a maintenance contract related to contract mowing, tree,

More information

CONTRACT AGREEMENT FOR PARKING AREA CONSTRUCTION. THIS AGREEMENT, made this day of, 2018,

CONTRACT AGREEMENT FOR PARKING AREA CONSTRUCTION. THIS AGREEMENT, made this day of, 2018, CONTRACT AGREEMENT FOR PARKING AREA CONSTRUCTION THIS AGREEMENT, made this day of, 2018, signed between Nampa & Meridian Irrigation District, hereafter referred to as "NMID" and, of (address), hereinafter

More information

RFP GENERAL TERMS AND CONDITIONS

RFP GENERAL TERMS AND CONDITIONS RFP GENERAL TERMS AND CONDITIONS PUBLIC RECORD After an award is made, copies of the proposals will be available for public inspection, under the supervision of the City's Finance Department from 8:00

More information

Town of South Bruce Peninsula. Tender PW Resurfacing of D Line

Town of South Bruce Peninsula. Tender PW Resurfacing of D Line Town of South Bruce Peninsula Tender PW 17-14 Resurfacing of D Line Town of South Bruce Peninsula Tender PW 17-14 Resurfacing of D Line The Town of South Bruce Peninsula is requesting tenders for the resurfacing

More information

Document A Exhibit A

Document A Exhibit A Design-Build Amendment Document A141 2014 Exhibit A This Amendment is incorporated into the accompanying AIA Document A141 2014, Standard Form of Agreement Between Owner and Design-Builder dated the day

More information

ANNEX A Standard Special Conditions For The Salvation Army

ANNEX A Standard Special Conditions For The Salvation Army ANNEX A Standard Special Conditions For The Salvation Army TO BE ATTACHED TO AIA B101-2007 EDITION ABBREVIATED STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT 1. Contract Documents. This Annex supplements,

More information

Terms of trade 1. Definitions 2. Quotations 3. Acceptance 4. Orders and Order Cancellations 5. Prices and Payments

Terms of trade 1. Definitions 2. Quotations 3. Acceptance 4. Orders and Order Cancellations 5. Prices and Payments Terms of trade 1. Definitions Company means Surfacefix Ltd Customer means the person, or company buying the goods from the Company. Products means benchtops or countertops or including any products that

More information

3. Period The period of the agreement shall not exceed 12 months and is set out in Item 4 of the Schedule.

3. Period The period of the agreement shall not exceed 12 months and is set out in Item 4 of the Schedule. THE UNITING CHURCH IN AUSTRALIA SYNOD OF VICTORIA AND TASMANIA LICENCE AGREEMENT NON EXCLUSIVE USE OF CHURCH BUILDINGS FOR UP TO 12 MONTHS THIS AGREEMENT is made.. day of.. 200 between The Uniting Church

More information

AIA Document A133 TM 2009

AIA Document A133 TM 2009 AIA Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

More information