STORMWATERR WASTEWATER OPERATIONS COMPLIANCE DIVISON Annual Report

Size: px
Start display at page:

Download "STORMWATERR WASTEWATER OPERATIONS COMPLIANCE DIVISON Annual Report"

Transcription

1 STORMWATERR WASTEWATER OPERATIONS COMPLIANCE DIVISON 212 Annual Report

2 Table of Contents Stormwater... Pond Maintenance Cost Comparison... 1 Channel Maintenance Cost Comparison... 2 Engineering & Consulting Cost Comparison... 3 Infrastructure Maintenance Cost Comparison... 4 Stormwater/Parks Service Level Agreement Cost Comparison Stormwater Contract Services... 6 Infrastructure Comparison... 7 Fleet Equipment Maintenance... 8 Mobilization/Utilization Cost for Equipment... 9 Landfill Management... 1 Incident Responses Snow Removal-Stormwater Facilities Snow Removal for Other Departments Labor Cost for Other Departments Exception Activities Wastewater... Wastewater Pressure Cleaning Footage Comparison Possible Stoppages in the Wastewater Collection System Comparison Sanitary Sewer Stoppages Comparison Possibles vs. Stoppages in the Wastewater Collection System Comparison CCTV Sanitary and Storm Sewer Extension Agreements... 2 CCTV Storm Drain Structures Inspected/Televised Footage CCTV Sanitary Televised Inspection Footage Sewer Main Repair Comparison Service Line Repair Comparison... 24

3 Sewer Manhole Repair Comparison Stormwater and Wastewater Overlay Repair Wastewater Infrastructure Comparison Wastewater Fleet Vehicle And Equipment Maintenance Cost Comparison Mobilization/Utilization Cost for Equipment Wastewater Incident Responses... 3 Wastewater Work for Others-Cost and Hours Exception Activities-Labor Hours Operations Compliance... Annual Facility Inspections Annual Grease and Sand Trap Inspections Annual City Pond Inspections Annual City Stormwater Channel Inspections Incident Response Comparison Exception Activities Labor Hours... 38

4 The City of Aurora Stormwater Division is responsible for the cleaning and maintenance of the City s curb inlets, storm drains, detention ponds, and storm channels. Some of these activities include: removing sediment and vegetation from channels, easements, forebays, and ponds; revegetation associated with channels and ponds; maintaining fall protection devices near stormwater infrastructure; flood monitoring and management; and snow removal. The Stormwater staff exceeded their goals per the Federal Emergency Management Agency (FEMA) and the National Pollutant Discharge Elimination Standards (NPDES) requirements for sediment removal of ponds & channels. All 68 miles of earthen and 8.5 miles of concrete channels were cleaned of debris & trash, 74 ponds & 222 trouble spots were maintained monthly and after each storm event, graffiti was power washed and/or painted, 4,79 inlets were inspected and 115 inlets cleaned. Stormwater crews cleaned the Binney Water Treatment Plant s forebay, responded proactively to several storm events that impacted Aurora, completed grading and reseeding activities at Rampart Reservoir, removed sediment from Conservatory Pond, removed accumulated sediment from Piney Creek near the intersection of Arapahoe and Liverpool streets, developed and implemented a private water quality pond research program, regraded and reseeded several locations disturbed during the evaluation of the Rampart Waterline s condition, completed several small sediment removal projects, continued to focus on the removal of noxious tree species in channels, provided support for the Highline Canal Cleanup and Household Chemical Roundup, and dedicated significant efforts to the operations required to maintain the stormwater system. During 212, members of Stormwater focused considerable energy on enhancing communication and teamwork. Two consultants provided support and members of the team played an active role supporting the communication and teamwork efforts throughout the year. The Stormwater Division s commitment to excellence was verified when the level of planned maintenance exceeded the Division s maintenance goals and staff responded proactively to numerous challenges. The Division remains strong, well organized, and committed to being cooperative, responsive, and efficient when addressing the operational activities associated with stormwater management, responding to customer service inquiries and requests from the public and providing operational support for other Aurora Water divisions and other City of Aurora departments. Respectfully, Joe McCleary Superintendent of Stormwater Operations

5 Pond Maintenance Cost Comparison $3, $265,74.79 $25, $25,12.71 TOTAL POND MAINTENANCE $2, $178,47.66 $15, * CONTRACT SERVICES $1, $15, $112, $15, $9, $5, $62,829.6 $49, $58, $ Pond Maintenance STORM MOSQUITO MANAGEMENT $ 2,82. $ - $ 4,24.4 $ 1, $ STORM SIGNS $ $ $ - $ $ 42.5 STORM WEED MAINTENANCE $ 2,196.6 $ 2,827.8 $ 2, $ $ STORM POND MAINTENANCE includes AFTER STORM TROUBLE SPOTS $ 14, $ 53,13.31 $ 25, $ 33, $ 62, STORM TRASH/DEBRIS/SEDIMENT REMOVAL $ 13, $ 9, $ 11,88.48 $ 5, $ 93, STORM - OTHER MISCELLANEOUS $ 34, * CONTRACT SERVICES $ 15, $ 112, $ 62,829.6 $ 49, $ 58, TOTAL POND MAINTENANCE $ 265,74.79 $ 178,47.66 $ 15, $ 9, $ 25,12.71 TOTAL AMOUNT OF PONDS MAINTENANCE COST PER POND $ 5,1.41 $ 2, $ 1, $ 1,27.82 $ 3,38.1 * See Contractor Costs on page 1 for details 1

6 $1,, Channel Maintenance Cost Comparison $9, $8, $733, $874, $793,67.6 $789, TOTAL CHANNEL MAINTENANCE $7, $6, $68,255.2 * CONTRACT SERVICES $5, $4, $417,71.32 $412,289.8 $3, $37,47.47 $277, $262, $2, $1, $ Channel Maintenance STORM CHANNEL MAINTENANCE $ 127, $ 188,843.6 $ 79,13.4 $ 61, $ 58,827.5 STORM CONCRETE EASEMENT $ 6,993.5 $ $ $ - $ 2, STORM CONCRETE REPAIR $ 2, $ 1,32.31 $ 13,77.99 $ 6,212.5 $ 4, STORM TRASH/DEBRIS/SEDIMENT REMOVAL $ 98,51.66 $ 72,12.72 $ 142,248.2 $ 76, $ 134, STORM EROSION CONTROL $ 16,41.73 $ 33, $ 44, $ 36,32.6 $ 21,688.7 STORM FALL PROTECTION $ 1, $ 2, $ 17, $ 2, $ 1, STORM FENCE CONST/UPGRADE $ 1, $ 2, $ 1, $ 18,37.42 $ STORM FENCE REPAIR $ 2, $ 3,74.97 $ 1, $ 12,28.53 $ 2, STORM LOCATES + PROJECT PLANNING $ $ $ 38,956.9 $ 44,452.6 $ 62, STORM TREE MAINTENANCE/WATER/PLANT $ 32, $ 16, $ 38,73.49 $ 25,776.7 $ 15, STORM OVERFLOW TRACT INSP $ 14,44.37 $ 12,69.59 $ 2, $ 7, $ 26, STORM MOSQUITO MGMT $ 8,22.8 $ 9, $ 12,899.7 $ 1, $ STORM REVEGETATION $ 3,889.6 $ 2,83.74 $ 1,566.1 $ 2,29.66 $ - STORM SIGNS $ 1, $ 3, $ 5,151.7 $ 3, $ 7,162.5 STORM WEED MAINTENANCE $ 98, $ 17,8.28 $ 88,36.57 $ 44,21.13 $ 37, STORM FLAPGATE INSPECTION + MAINTENANCE $ $ 1,194.5 $ 1,282.6 $ 1, $ 1, * CONTRACT SERVICES $ 37,47.47 $ 417,71.32 $ 277, $ 262, $ 412,289.8 TOTAL CHANNEL MAINTENANCE $ 733, $ 874, $ 793,67.6 $ 68,255.2 $ 789, TOTAL MILES OF CHANNEL MAINTAINED COST PER MILE $ 3,237.6 $ 3,273.2 $ 4, $ 4, $ 8,81.41 * See Contractor Costs on page 1 for details 2

7 Engineering & Consulting Cost Comparison $5, $45, $4, $35, $3, $25, $2, $15, $1, $5, $ N/A N/A N/A N/A $46,85.15 * TOTAL COST OF ENGINEERING AND CONSULTING SERVICES Consulting Firm Service Provided ERO RESOURCES PINEY CREEK - SEDIMENT REMOVAL N/A N/A N/A N/A $4,292.1 COA - PUBLIC WORKS ENGINEERING COA - PUBLIC WORKS SURVEYING VARIOUS PROJECT DESIGN SERVICES VARIOUS PROJECT SURVEYING SERVICES N/A N/A N/A N/A $6,47. N/A N/A N/A N/A $5,18. MULLER ENGINEERING 142 E COLFAX - FLOOD EVALUATION SHORT ELLIOT HEC-RAS FOR HENDRICKSON INC EASTERLY CREEK * TOTAL COST OF ENGINEERING AND CONSULTING SERVICES N/A N/A N/A N/A $17,275.5 N/A N/A N/A N/A $13,93. N/A N/A N/A N/A $ 46,85.15 * Cost of services not tracked prior to 212 3

8 Infrastructure Maintenance Cost Comparison $3, $25, $2, $186, $227, $248,62.4 $188, $238, TOTAL INFRASTRUCTURE MAINTENANCE COST $15, $1, $5, $ Infrastructure Maintenance STORM GRATE INSPECTION $ 5, $ $ $ $ - STORM GRATE MAINTENANCE $ 5,745.8 $ 1,823.3 $ 4,16.29 $ $ - STORM GRATE REPAIR $ 2, $ 1, $ $ $ INLET INSPECTIONS - includes AFTER STORM TROUBLE SPOTS $ 36, $ 91, $ 97,575.5 $ 95, $ 97, STORM INLET REPAIR $ $ 1, $ 1,916.1 $ 2, $ 5, STORM INLET MAINTENANCE $ 14,53.69 $ 7, $ 5,98.73 $ 19,178.2 $ 39, STORM DEBRIS REMOVAL (OUTFALLS) N/A $ 4, $ 29, $ 7,47.56 $ 13, STORM MANHOLE INSPECTION $ 1, $ 1,39.66 $ $ $ 1,27.65 STORM MANHOLE REPAIRS $ $ 23, $ 11,.64 $ 16,839.1 $ 17, STORM PIPE RPL/RPR $ 14, $ 14, $ 19,736.1 $ 14,1.61 $ - SD PRESSURE CLEAN $ - $ 2,776.9 $ 7, $ 8, $ 15, STORM TV INSPECTION $ - $ - $ - $ - $ - STORM MAIN INSPECTIONS N/A $ $ - $ - $ - STORM GRAFFITI REMOVAL $ 13, $ 12, $ 25,8. $ 22,793.3 $ 26, * CONTRACTOR COSTS N/A N/A N/A N/A $ 21, TOTAL INFRASTRUCTURE MAINTENANCE COST $ 186, $ 227, $ 248,62.4 $ 188, $ 238, * See Contractor Costs on page 1 for details 4

9 $14, $12, $1, Stormwater Service Level Agreement Parks and OSNR Cost Comparison $121,438. $12,22.35 $121, $114, $18,299. PARKS * OSNR ** $8, $83,617. $79,511. $6, $4, $2, $ Service Level Agreement PARKS * $ 121,438. $ 12,22.35 $ 121, $ 114, $ 18,299. TOTAL ACRES COST PER ACRE $ 1,37.93 $ 1,25.83 $ 1,37.14 $ $ * Turf Management Service Level Agreement OSNR ** N/A N/A N/A $ 83,617. $ 79,511. TOTAL ACRES N/A N/A N/A COST PER ACRE N/A N/A N/A $ 88.2 $ 83.7 ** Noxious Weed Management. 5

10 212 STORMWATER CONTRACT COSTS COMPANY SHARED EXPENSE SERVICES PROVIDED TOTAL COST PONDS CHANNELS OSNR SLA Weed Mtce $79, $79,511. PROS SLA * Turf Mtce $18,299. $21,659.8 $86,639.2 INFRASTRUCTURE REPAIR ENGINEERING & CONSULTING SERVICES GENERAL OPERATING EXPENSES ALBERT FREI * Aggregate Supplies $23, $4, $19,15.65 ALSCO Uniforms $1, $1, AMERICAN PEST CONTROL * Rodent Removal $4,94. $988. $3,952. ARKANSAS VALLEY SEED * Native Grass Seed $2,598. $519.6 $2,78.4 ASPHALT SPECIALTIES Asphalt Replacement $1,25.2 $1,25.2 BOWMAN CONSTRUCTION * Erosion Control Supplies $5, $1,94.25 $4, CINTAS First Aid Supplies $1, $1, COLORADO MOSQUITO CONTROL * Mosquito Control $47,5. $9,5. $38,. COMMON GROUND MEDIATION CENTER Communication Training $8,932. $8,932. DAVEY TREE * Large Tree Removal & Trimming $14,965. $2,993. $11,972. DENVER ATHLETIC - T-SHIRTS T-Shirts $1,78.75 $1,78.75 EDGE CONTRACTING INC Sediment Removal: Piney Creek $143, $143, ERO RESOURCES Wetland Consulting: Piney Creek $4,292.1 $4,292.1 FASICK CONCRETE Streets Concrete Replacement $9, $9, FLASHFILL SERVICES Flashfill $245. $245. INLET STRUCTURES INC Vault Repair: Alameda & Havana $1,38. $1,38. IRON WOMAN CONSTRUCTION Streets Concrete Replacement $583.1 $583.1 LIGHTNING MOBILE * Graffiti Removal $667.5 $133.5 $534. MULLER ENGINEERING Flooding Evaluation for 142 E Colfax $17,275.5 $17,275.5 OLD CASTLE PRECAST (WAREHOUSE) Manhole Supplies $4,25.17 $4,25.17 QUALITY WATER BIOSYSTEMS Pond Maintenance $6,252.7 $6,252.7 REDD FENCE CO * Fence Repairs $2,3. $4.6 $1,62.4 SHORT ELLIOT HENDRICKSON INC HEC-RAS for Easterly Creek $13,93. $13,93. STOCKYARDS RANCH SUPPLY INC * Fence posts $3,759.8 $ $3,7.84 THOUTT BROTHERS Streets Concrete Replacement $9,53.36 $9,53.36 WASTE MANAGEMENT * Hauling Trash to Dad's $15,22.31 $3,44.6 $12, WILDLIFE 2 Beaver Relocation $5,474.5 $5,474.5 WILLIAMS EQPT Vaccon Equipment Repair $ $ WORLDWIDE RENTAL SVCS Pond Maintenance $6,87. $6,87. ZEP Cleaning Supplies $ $ TOTAL CONTRACTOR COSTS $545, $58, $412,289.8 $21, $34,66.15 $17, * Expense shared between Ponds (2%) & Channels (8%) 6

11 9,. 8,. 7,. Infrastructure Comparison 8,88 8,92 8,224 8,227 8,19 6,925 6,966 6,969 6,989 6,991 MILES OF STORM PIPE MANHOLES OUTFALLS 6,. 5,. CHANNEL MILES PONDS 4,. INLETS 3,. 2,. 1,945 1,978 2,32 2,35 2,32 1, Infrastructure MANHOLES 6,925 6,966 6,969 6,989 6,991 INLETS 8,88 8,92 8,224 8,227 8,19 OUTFALLS 1,945 1,978 2,32 2,35 2,32 MILES OF STORM PIPE CHANNEL MILES PONDS

12 Fleet Equipment Maintenance $2, $18, $175,12 REPAIR COSTS $16, $14, $131,687 $142,516 FUEL COSTS $12, $1, $8, $6, $82,71 $6,288 $12,32 $94,626 $62,347 $63,974 $5,756 $4, $2, $ Equipment REPAIR COSTS $ 175,12 $ 131,687 $ 142,516 $ 12,32 $ 94,626 FUEL COSTS $ 82,71 $ 6,288 $ 5,756 $ 62,347 $ 63,974 DOWNTIME HOURS 11,57. 15, , , ,

13 Mobilization/Utilization Cost for Equipment $12, $1, $13, $9,799. *TOTAL COST OF EQUIPMENT MAINTENANCE $8, $63, $6, $52, $47,93.8 $4, $2, $ Equipment EQUIPMENT SERVICING N/A $6, $. $. $. EQUIPMENT HAULING $ $. $. $. $. EQUIPMENT INSPECTION & EQPT MISC $ 3,85.1 $7,65.8 $2, $ $. EQUIPMENT MAINTENANCE $ 98, $76, $6, $51, $47,93.8 INVENTORY/PARTS ADMIN $ 1,14.39 $. $. $. $. INVENTORY/PARTS PICKUP $ $11.22 $. $. $. *TOTAL COST OF EQUIPMENT MAINTENANCE $ 13, $ 9,799. $ 63, $ 52, $ 47,93.8 *Inludes trip inspections (pre and post) and any equipment related to maintenance and inspection i.e. fluids/lights etc. 9

14 Landfill Management $5, $45, $4, $35, $4,965.1 $46,84.76 $33, TOTAL COST OF LANDFILL MANAGEMENT $3, $25, $25,83.5 $2, $15, $14, $1, $5, $ Landfill Management STORM SOIL CONSOLIDATION $ 4, $46,84.76 $33, $14, $25,83.5 AGGREGATE HAULING $ $. $. $. $. TOTAL COST OF LANDFILL MANAGEMENT $ 4,965.1 $ 46,84.76 $ 33, $ 14, $ 25,83.5 1

15 5 284 Incident Responses TOTAL INCIDENT RESPONSES Incident Responses MANHOLE MISCELLANEOUS 1 STORM SIGNS 1 SINK HOLE 1 ODOR COMPLAINT 1 1 STORM FALL PROTECTION 1 STORM GRATE REPAIR 1 1 STORM OVERFLOW TRACT INSP 1 1 STORM POND MAINTENANCE 1 1 INSPECTION MISCELLANEOUS 2 OTHER DEPARTMENTS 2 5 STORM CHANNEL INSPECTION 2 3 STORM POND INSPECTION OTHER ACTIVITY 3 1 STORM GRATE INSPECTION 3 STORM CONCRETE EASEMENT 4 1 STORM FENCE REPAIR STORM MANHOLE REPAIRS 4 2 STORM MOSQUITO MANAGEMENT STORM MANHOLE INSPECTION 5 1 STORM TREE MAINTENANCE CUSTOMER EDUCATION 7 STORM CHANNEL MAINTENANCE STORM TRASH STORM WEED MAINTENANCE STORM INLET MAINTENANCE STORM DEBRIS REMOVAL/TRASH STORM INLET INSPECTION STORM FLOOD RESPONSE N/A N/A N/A N/A 1 STORM GRAFFITI REMOVAL STORM INSPECTION MISC STORM SPILL RESPONSE 6 N/A N/A N/A N/A WILDLIFE MANAGEMENT N/A N/A 4 1 TOTAL INCIDENT RESPONSES

16 Snow Removal Stormwater Maintenance Areas $5, $45, $4, $35, $36, $45,837.3 $38,93.55 SNOW REMOVAL OF DESIGNATED SW AREAS - TOTAL COSTS * $3, $25, $2, $19, $19, $15, $1, $5, $ Snow Removal SNOW REMOVAL OF DESIGNATED SW AREAS - TOTAL COSTS * $ 36, $ 45,837.3 $ 19, $ 38,93.55 $ 19, * Total Costs include employee labor and equipment used. 12

17 $12, $1, $11,57.73 Snow Removal for Other Departments **TOTAL SNOW REMOVAL FOR STREETS PAID BY STORMWATER $8, $6, $4, $2, $19, $24,8.8 $12,35.31 $23, $ Snow Removal *SNOW REMOVAL FOR PARKS $ 35, $ - $ - $ - $ - SNOW TRAINING N/A N/A N/A $ 5, $ 4,93.97 SNOW PREP, TRUCKS, PLOWS $ 1, $ 12, $ 13, $ 4, $ 9,41.96 SNOW REMOVAL FOR STREETS PAID BY STORMWATER $ 73,349.1 $ 6, $ 1, $ 2, $ 9,92.56 **TOTAL SNOW REMOVAL FOR STREETS PAID BY STORMWATER $ 11,57.73 $ 19, $ 24,8.8 $ 12,35.31 $ 23, *Parks includes right of ways and bike paths **This labor cost is paid from Stormwater's funds and includes employee labor and all Stormwater equipment used - does not include overtime paid by Streets. 13

18 $18, Stormwater Costs of Work for Other Departments $17, $16, $14, TOTAL COST OF STORMWATER WORK FOR OTHER DEPARTMENTS $12, $111, $1, $8, $6, $72, $69, $4, $43,51.23 $2, $ LABOR & VEHICLE COSTS WATER CONSERVATION/QUALITY $ $ 3, $ 1,19.3 $ - $ 6,188.6 METER MAINTENANCE $ - $ - $ - $ - $ 1, PARKS $ - $ 2, $ 1, $ 5, $ PUMPING $ 27,59.24 $ $ 1,6.77 $ 8,2.16 $ - SOURCE OF SUPPLY $ 23, $ 12, $ 19,19.43 $ 74, $ 68, STREETS $ - $ 4,21.56 $ 1,614.4 $ 1, $ - SUPPLY AND TREATMENT $ - $ 2,5.41 $ 5,84.13 $ 16,383.4 $ 11,28.72 TRADES $ - $ $ $ - $ - RISK MANAGEMENT $ $ - $ - $ - $ - PUBLIC IMPROVEMENTS/WORKS $ $ - $ 1, $ - $ WASTEWATER COLLECTIONS $ - $ - $ 2, $ 2,93.67 $ 1, WASTEWATER CONSTRUCTION $ 18, $ 7,55.41 $ 15, $ 33, $ 8, WASTEWATER CCTV $ $ $ 8,16.91 $ 18, $ WATER T&D $ 6.63 $ - $ $ 1,47.42 $ 2, WATER RESOURCES $ 1, $ $ - $ 4,64.83 $ 2,136.3 *OTHER DEPARTMENTS $ - $ 9,35.59 $ 2, $ 5,21.18 $ 7, TOTAL COST OF STORMWATER WORK FOR OTHER DEPARTMENTS $ 72, $ 43,51.23 $ 69, $ 17, $ 111, *Other Departments includes other Divisions within Aurora Water and other departments within the City of Aurora 14

19 4,5 4, 3,5 3, 2,5 2, 1,5 1, Exception Activities 212 Labor Hours , ,31.5 4, URBAN DRAINAGE FLOOD CONTROL LABOR HOURS NEW EMPLOYEE ORIENTATION LABOR HOURS CAPITAL PROJECTS LABOR HOURS CERTIFICATION LABOR HOURS CDL LABOR HOURS SAFETY LABOR HOURS CLASSROOM LABOR HOURS DAILY SUPERVISION LABOR HOURS MEETINGS LABOR HOURS GENERAL ADMINISTRATIVE LABOR HOURS Exception Activities-Labor URBAN DRAINAGE FLOOD CONTROL LABOR HOURS NEW EMPLOYEE ORIENTATION LABOR HOURS CAPITAL PROJECTS LABOR HOURS CERTIFICATION LABOR HOURS CDL LABOR HOURS SAFETY LABOR HOURS CLASSROOM LABOR HOURS INSPECTIONS/WALK-THROUGH N/A N/A N/A DAILY SUPERVISION LABOR HOURS 1, , ,538. 1,236. 1,833.5 MEETINGS LABOR HOURS 1, , ,31.5 GENERAL ADMINISTRATIVE LABOR HOURS 7,75. 6, , ,494. 4, Exception Activities-Labor URBAN DRAINAGE FLOOD CONTROL LABOR COST $ $ - $ - $ $ 1, NEW EMPLOYEE ORIENTATION LABOR COST $ $ $ $ 79.8 $ CAPITAL PROJECTS LABOR COST $ 2,84.86 $ 2, $ 2,11.3 $ 1, $ 3,243.9 CERTIFICATION LABOR COST $ 11,68.83 $ 3, $ 2,227. $ 1, $ 7, CDL LABOR COST $ 9, $ 7,712.7 $ 7,86.19 $ 22,768.4 $ 27,943.3 SAFETY LABOR COST $ 14,786.2 $ 5,659.9 $ 2,757.1 $ 4,84.57 $ 1, CLASSROOM LABOR COST $ 23,24.63 $ 2, $ 11, $ 16, $ 16, INSPECTIONS/WALK-THROUGH N/A N/A N/A $ 3,3.86 $ 2, DAILY SUPERVISON LABOR COST $ 59,73.61 $ 67, $ 59, $ 48, $ 71,374.1 MEETINGS LABOR COST $ 59, $ 51, $ 33,581.6 $ 28, $ 38,564.1 GENERAL ADMINISTRATIVE LABOR COST $ 231, $ 232, $ 184, $ 159, $ 166,763.1 * Hours and costs included for Superintendent and below. 15

20 It is with great honor that I bring to you the 212 Annual Report for the Wastewater Division. In 212, the division experienced another outstanding year in the amount of work accomplished. The division produced 4.6 million feet of wastewater collection lines that were cleaned, 61, feet of wastewater collection lines inspected and 963 repairs were done to the wastewater collection system. All of this work resulted in having zero sanitary sewer overflows and only two municipal sewer stoppages in 1,41 miles of wastewater collection lines. This feat is a direct reflection of the dedication and work effort of the entire Wastewater Division. I would like to express my thanks and gratitude to the entire staff of the Wastewater Division for making 212 a very successful year. Coby Shurtleff, Wastewater Superintendent

21 6,, Wastewater Pressure Cleaning Footage Comparison 5,, 4,97,59 4,686,47 4,548,736 4,62,664 TOTAL FOOTAGE 4,, 3,847,865 3,, 2,, 1,, Pressure Cleaning TOTAL FOOTAGE 3,847,865 4,97,59 4,686,47 4,548,736 4,62,664 TOTAL COST $413,41.15 $493, $492, $458,58.96 $571, COST PER FOOT $.11 $.1 $.11 $.1 $.12 TOTAL LABOR HOURS 9,99. 12, , , , # FEET PER MANHOUR Total Cost includes employee labor and equipment used 16

22 Possible Stoppages in the Wastewater Collection System Comparision NUMBER OF 'POSSIBLE' WORK ORDERS Possibles NUMBER OF 'POSSIBLE' WORK ORDERS TOTAL COST $15, $12,924.8 $19,25.92 $27,119.1 $13,1.27 COST PER 'POSSIBLE' WORK ORDER $55.76 $5.29 $68.19 $96.85 $

23 Sanitary Sewer Stoppages Comparison NUMBER OF WORK ORDERS - MUNICIPAL Municipal Stoppages NUMBER OF WORK ORDERS - MUNICIPAL TOTAL COST $ 1, $ 1,65.37 $ 2, $ $ 1, TOTAL COST PER WORK ORDER $ $ 1,65.37 $ $ $ TOTAL LABOR HOURS LABOR HOURS PER STOPPAGE RESTORATION COSTS $13,428. $12,. $272, $17,13.3 $ STOPPAGES PER 1 MILES Non-Municipal Stoppages NUMBER OF WORK ORDERS - NON-MUNICIPAL TOTAL COST $ 1, $ 1, $ - $ $ - TOTAL COST PER WORK ORDER $ 1, $ $ - $ $ - TOTAL LABOR HOURS LABOR HOURS PER STOPPAGE * Total Cost includes employee labor and equipment used 18

24 3 25 Possibles vs. Stoppages in the Wastewater Collection System Comparision NUMBER OF POSSIBLES NUMBER OF STOPPAGES - MUNICIPAL Possibles vs. Stoppages NUMBER OF POSSIBLES NUMBER OF STOPPAGES - MUNICIPAL

25 45 4 CCTV Sanitary and Storm Sewer Extension Agreements 41 SANITARY EXTENSION AGREEMENTS STORM SEWER EXTENSION AGREEMENTS SANITARY EXTENSION AGREEMENTS STORM SEWER EXTENSION AGREEMENTS

26 18 16 CCTV Storm Drain Structures Inspected *NEW STRUCTURES INSPECTED , 25, 25,72 CCTV Storm Drain Televised Footage # FEET OF PIPE TELEVISED 2, 15, 13,788 14,721 15,836 1, 1,768 5, Storm Drains Televised *NEW STRUCTURES INSPECTED # FEET OF PIPE TELEVISED 25,72 13,788 14,721 15,836 1,768 TOTAL COST $19, $9, $8,234.5 $8,75.72 $6, # LABOR HOURS # FEET PER HOUR TELEVISED COST PER FOOT $.77 $.69 $.56 $.55 $.58 * New structures inspected include manholes and inlets 21

27 7, 6, 5, 4, CCTV Sanitary Televised Inspection Footage NEW INSTALLATIO 512, ,668 59, ,346 61,281 N FOOTAGE EXISTING SANITARY SYSTEM FOOTAGE 3, 2, 1, 49,79 14,33 12,59 7,41 9,399 Sanitary TV Inspections NEW INSTALLATION FOOTAGE 49,79 14,33 12,59 7,41 9,399 EXISTING SANITARY SYSTEM FOOTAGE 512, ,668 59, ,346 61,281 TOTAL SANITARY FOOTAGE 561, , ,98 552,387 61,679 TOTAL COST $284, $297, $278, $29,57.4 $398,16.2 COST PER FOOT $.51 $.47 $.53 $.53 $.65 LABOR HOURS 8,888 9,115 8,343 8,765 1,53 FEET PER MANHOUR *Total cost includes employee labor and equipment used 22

28 Sewer Main Repair Comparison MAIN REPAIR WORK ORDERS Sewer Main Repairs MAIN REPAIR WORK ORDERS * TOTAL COST FOR MAIN REPAIRS $91,78.5 $27,95.6 $16, $15,38.38 $22,89.85 COST PER WORK ORDER $2, $1,178.7 $ $85.47 $3, * Total Cost includes employee labor, material and equipment used. 23

29 Service Line Repair Comparison SERVICE LINE REPAIR WORK ORDERS Service Line Repairs SERVICE LINE REPAIR WORK ORDERS * TOTAL COST FOR REPAIRS $1,73.5 $. $1, $2,86.74 $ COST PER WORK ORDER $34.7 $. $ $ $ * Total Cost includes employee labor, material and equipment used. 24

30 Sewer Manhole Repair Comparison SEWER MANHOLE REPAIR WORK ORDERS Sewer Manhole Repairs SEWER MANHOLE REPAIR WORK ORDERS TOTAL COST FOR REPAIRS $62, $73,81.5 $64, $58, $86,77.9 COST PER WORK ORDER $15.51 $ $ $153.1 $ * Total Cost includes employee labor, material and equipment used. 25

31 6 5 Stormwater and Wastewater Overlay Repair Comparison 495 OVERLAY REPAIR WORK ORDERS Overlay OVERLAY REPAIR WORK ORDERS WASTEWATER and STORMWATER INSPECTION COST N/A $12, $16, $19,8.11 $17,93.3 WASTEWATER REPAIR COST N/A $59,47.57 $23,59.8 $19,282.3 $44,395.2 STORMWATER REPAIR COST N/A $16,78.6 $2, $8, $7,22.45 * OVERLAY TOTAL COST $14, $88,36.3 $42, $47, $68,78.77 COST PER WORK ORDER $ $178.4 $21.72 $ $ *Overlay cost includes inspection and repair; cost includes labor hours, materials, equipment used 26

32 Wastewater Infrastructure Comparison 1,39.5 1, ,43. 1,45.39 *MILES OF SANITARY PIPE , Infrastructure WASTEWATER MANHOLES 26,82 26,845 26,896 26,937 27,56 *MILES OF SANITARY PIPE 1, ,39.5 1, ,43. 1,45.39 *GIS information for end of calendar year 27

33 $14, $12, Wastewater Fleet Vehicle and Equipment Maintenance Cost Comparison $118,475. REPAIR COSTS FUEL COSTS $1, $8, $84,249. $1, $85,19.24 $1,73.65 $97,3.34 $9, $84, $6, $63, $57, $4, $2, $ Vehicle & Equipment REPAIR COSTS $ 118,475. $ 1, $ 85,19.24 $ 1,73.65 $ 97,3.34 FUEL COSTS $ 84,249. $ 63, $ 57, $ 84, $ 9, DOWNTIME HOURS 6, , , , ,

34 $21, $25, Mobilization/Utilization Cost for Equipment $24,329.3 $26, $24, COST OF MAINTAINING EQUIPMENT $2, $198, $195, $19, $185,916.3 $185, $18, $175, *Equipment Maintenance COST OF MAINTAINING EQUIPMENT $ 198, $ 185,916.3 $ 24,329.3 $ 26, $ 24, * Includes trip inspections (pre and post) and any equipment related to maintenance and inspection, i.e. fluids/lights etc. 29

35 Wastewater Citizen Responses TOTAL CITIZEN RESPONSES Citizen Responses INSPECTION MISCELLANEOUS CUSTOMER EDUCATION SERVICE LINE TV INSPECTION 1 WW PRESSURE CLEAN 1 3 MAIN TV INSPECTION SEWER SERVICE LINE REPAIR 2 1 STOPPAGE OTHER DEPARTMENTS SINKHOLE OTHER ACTIVITY + ODOR SPILL RESPONSE MANHOLE MISCELLANEOUS SEWER MANHOLE REPAIRS SEWER MANHOLE INSPECTION POSSIBLE TOTAL CITIZEN RESPONSES

36 $8,. $7,. Wastewater Work for Others Costs $74, TOTAL COST $6,. $53, $5,. $4,. $3,. $27, $37, $33,29.75 $2,. $1,. $. 2,5. 2,. Wastewater Work for Others Labor Hours 2,38.6 TOTAL LABOR HOURS 1,5. 1,. 1, ,51. 1, Cost WORK FOR STORMWATER $4, $9,198.2 $2, $1, $96.61 WORK FOR OTHERS - PARKS $162.8 $ $ $1,29.62 $1,5.68 WW COST OF SNOW REMOVAL FOR STREETS DEPT - INCLUDES VEHICLE PREPARATION & TRAINING ** $2, $37, $8, $14,77.84 $27,46.37 * WORK FOR OTHERS MISC $2, $26, $25,97.9 $15,49.65 $24, TOTAL COST $27, $74, $37, $33,29.75 $53, Labor Hours WORK FOR STORMWATER WORK FOR OTHERS - PARKS WW COST OF SNOW REMOVAL FOR STREETS DEPT - INCLUDES VEHICLE PREPARATION & TRAINING ** 14. 1, * WORK FOR OTHERS MISC TOTAL LABOR HOURS 1, ,38.6 1, ,51. 1,45.5 * Work for others-misc includes work for various divisions within Aurora Water and other departments within the City of Aurora. Such work includes crane lifts, special cleaning, lift station cleaning, etc. ** Training for Snow Removal was not tracked separately until 211. Prior years' figures do not include training hours. 31

37 Exception Activities 212 Labor Hours NEW EMPLOYEE ORIENTATION HOURS 1, CPD LABOR HOURS CDL LABOR HOURS CERTIFICATION LABOR HOURS ,69.5 1, SAFETY LABOR HOURS CLASSROOM LABOR HOURS DAILY SUPERVISON LABOR HOURS MEETINGS LABOR HOURS GENERAL ADMINISTRATIVE LABOR HOURS Exception Activities - Labor Hours NEW EMPLOYEE ORIENTATION HOURS CPD LABOR HOURS CDL LABOR HOURS CERTIFICATION LABOR HOURS SAFETY LABOR HOURS CLASSROOM LABOR HOURS 1, DAILY SUPERVISON LABOR HOURS 1,93. 2,74.5 3, , ,69.5 MEETINGS LABOR HOURS 3, , ,25.5 1,582. 1, GENERAL ADMINISTRATIVE LABOR HOURS 14, , ,987. 9, , Exception Activities - Labor Cost NEW EMPLOYEE ORIENTATION LABOR COST $ $ $ $ $ CPD LABOR COST $ 2, $ 2, $ 3,53.93 $ 2,638.2 $ 2, CDL LABOR COST $ 6,755.8 $ $ 2, $ 4,83.63 $ 7, CERTIFICATION LABOR COST $ 9,4.56 $ 1, $ 4, $ $ 6, SAFETY LABOR COST $ 24, $ 1, $ 7,47.83 $ 16, $ 1,5.82 CLASSROOM LABOR COST $ 43,76.49 $ 26,81.65 $ 18,33.9 $ 2, $ 26, DAILY SUPERVISON LABOR COST $ 71, $ 12, $ 152, $ 182, $ 187,663. MEETINGS LABOR COST $ 124,13.67 $ 15,557.8 $ 79, $ 5, $ 5, GENERAL ADMINSTRATIVE LABOR COST $ 453, $ 384, $ 294, $ 342, $ 331, * Hours and costs included for Superintendent and below. 32

38

39 Annual Facility Inspections MAJOR INSPECTIONS 7 6 MINOR INSPECTIONS Inspections MAJOR INSPECTIONS MINOR INSPECTIONS TOTAL INSPECTIONS TOTAL WORK ORDER COST COST PER INSPECTION N/A $5, $7,95.3 $4, $5,7.72 N/A $ $68.1 $369.7 $

40 Annual Grease and Sand Trap Inspections SAND TRAP * WORK ORDERS GREASE TRAP WORK ORDERS 4 COMBINED TOTAL OF WORK ORDERS Inspections COMBINED TOTAL OF WORK ORDERS GREASE TRAP WORK ORDERS SAND TRAP * WORK ORDERS TOTAL WORK ORDER COST COST PER WORK ORDER $5,87. $12, $2, $21,28.16 $18,815.5 $7.83 $14.82 $19.11 $2.35 $18.11 * In 212, the number of sand traps includes Industrial Sites that have traps. 34

41 Annual City Pond Inspections CITY POND INSPECTION WORK ORDERS Inspections CITY POND INSPECTION WORK ORDERS NUMBER OF CITY PONDS TOTAL WORK ORDER COST COST PER WORK ORDER N/A N/A N/A N/A N/A N/A N/A N/A $8,51.19 N/A N/A N/A N/A $94.46 * Program started in

42 7 Annual Stormwater Channel Inspections NUMBER OF MILES Stormwater Channel Inspections NUMBER OF MILES TOTAL WORK ORDER COST $5, $21, $24,766.6 $19,91.8 $22,662.7 COST PER MILE $ $ $535.2 $ $

43 Incident Response Comparison NUMBER OF WORK ORDERS NUMBER OF PRIVATE PONDS INSPECTED ** * Incident Response 28* NUMBER OF WORK ORDERS SPILL N/A SANITARY SEWER OVERFLOW (SSO) N/A ILLICIT DISCHARGE N/A OTHER N/A NUMBER REPORTABLE BY LAW TOTAL WORK ORDER COST (EXCLUDES PRIVATE PONDS) ** COST PER RESPONSE (EXCLUDES PRIVATE PONDS) ** NUMBER OF PRIVATE PONDS INSPECTED ** COST OF PRIVATE POND INSPECTIONS ** COST PER RESPONSE FOR PRIVATE POND INSPECTIONS ** N/A $9, $21, $25, $31,5.23 $19, $93.39 $ $15.8 $ $ N/A * N/A * N/A * N/A * 14 N/A * N/A * N/A * N/A * $11,97.84 N/A * N/A * N/A * N/A * $792.7 Definitions: Spill-release of non-stormwater to land surface (no impact to MS4) SSO-sanitary sewer overflow (no impact to MS4) Illicit Discharge-release of non-stormwater to MS4 (including SSO's) Other- other incident responses (i.e. abandoned hazardous materials, private pond complaint investigations, sanitary sewer trouble spot investigations) * Tracking not itemized ** Private pond inspection program started in

44 Exception Activities 212 Labor Hours ,27. CERTIFICATION LABOR HOURS NEW EMPLOYEE ORIENTATION LABOR HOURS DAILY SUPERVISION LABOR HOURS CDL LABOR HOURS STORMWATER PERMIT TRAINING LABOR HOURS SAFETY LABOR HOURS CLASSROOM LABOR HOURS MEETING LABOR HOURS *GENERAL ADMINISTRATIVE LABOR HOURS Exception Activities-Labor Hours CERTIFICATION LABOR HOURS NEW EMPLOYEE ORIENTATION LABOR HOURS DAILY SUPERVISION LABOR HOURS CDL LABOR HOURS STORMWATER PERMIT TRAINING LABOR HOURS SAFETY LABOR HOURS CLASSROOM LABOR HOURS MEETING LABOR HOURS *GENERAL ADMINISTRATIVE LABOR HOURS 1, , , , ,27. Exception Activities-Labor Cost CERTIFICATION LABOR COST $ $ 2,72.36 $ $ - $ 1, NEW EMPLOYEE ORIENTATION LABOR COST $ $ - $ $ - $ DAILY SUPERVISON LABOR COST $ $ - $ - $ - $ - CDL LABOR COST $ 91. $ - $ - $ - $ - STORMWATER PERMIT TRAINING LABOR COST $ $ 4,422.7 $ 9, $ 9, $ 12, SAFETY LABOR COST $ $ $ - $ $ CLASSROOM LABOR COST $ 6,89.49 $ 14, $ 5, $ 1, $ 6, MEETINGS LABOR COST $ 16,87.38 $ 22, $ 7, $ 7, $ 9,112.5 *GENERAL ADMINISTRATIVE LABOR COST $ 49,272.8 $ 84, $ 33,13.67 $ 4,11.38 $ 77, * General Administrative Labor includes inspection-related paperwork and tracking, incident follow-up, development and writing of plans and specs, special assignments (BI driven activities, ETC.), telephone calls. 38

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

STORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office 1294 Chestnut Street, Clarkston 5:30-7:30 p.m.

STORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office 1294 Chestnut Street, Clarkston 5:30-7:30 p.m. County of Asotin Regional Stormwater Program P.O. Box 160 135 2 nd Street Asotin, WA 99402 509-243-2071 Fax 509-243-2003 STORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office

More information

PUBLIC WORKS DEPARTMENT FY16 BUDGET

PUBLIC WORKS DEPARTMENT FY16 BUDGET PUBLIC WORKS DEPARTMENT FY16 BUDGET Respectfully submitted by: Joseph Bettis Jr., Director of Public Works PUBLIC WORKS DEPARTMENT 18 SEPARATE BUDGETS REGISTRY OF DEEDS PARKING TICKET DEPARTMENT TOWN HALL

More information

PUBLIC WORKS DEPARTMENT

PUBLIC WORKS DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED RECOMM. General Fund: Revenue Administration 494,646 501,667 501,035 508,551 Municipal Trash Collection 101,185 60,358 60,358 60,962 Total Revenues

More information

PUBLIC WORKS DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration

PUBLIC WORKS DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration 494,751 453,181 494,253 501,667 Municipal Trash Collection 59,158 59,760 59,760 60,358 Total Revenues

More information

Public Works Maintenance STORMWATER AND

Public Works Maintenance STORMWATER AND Public Works Maintenance STORMWATER AND TRANSPORTATION Mission Statement T H E P U B L I C W O R K S M A I N T E N A N C E D I V I S I O N I S T H E M A I N C U S T O D I A N A N D P R I N C I P A L C

More information

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach i City of Centerville s Table of Contents Minimum Control Measure 1. Public Education and Outreach Best Management Practice Page 1-1: Outreach Publications...1 1-2: 30-day Public Notice for Annual Storm

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

Public Works Department

Public Works Department Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration 246,334 316,548 245,742 245,742 Municipal Trash Collection 57,049 57,000 58,169 58,169 Total Revenues

More information

MAINTENANCE DEPARTMENT

MAINTENANCE DEPARTMENT MAINTENANCE DEPARTMENT E-78 City of Mercer Island 2007-2008 Budget Department: Maintenance The Maintenance Department consists of the following functions: 1) administration, 2) capital projects engineering,

More information

Section K Public Works Administration

Section K Public Works Administration Section K Public Works Administration Public Works Organizational Chart... K-1 Public Works Administration... K-2 Engineering and Capital Improvements Department... K-5 Fleet Management Department... K-9

More information

Stormwater Utility Agency Overview

Stormwater Utility Agency Overview Stormwater Utility Agency Overview Agency Mission The mission of the Stormwater Utility is to provide stormwater management services to the City of Madison with an equitable rate structure. Agency Overview

More information

Stormwater Utility Agency Overview

Stormwater Utility Agency Overview Agency Overview Agency Mission The mission of the Stormwater Utility is to provide stormwater management services to the City of Madison with an equitable rate structure. Agency Overview The Stormwater

More information

West Virginia Department of Environmental Protection MS4 Phase II Storm Water Program Storm Water Management Annual Report

West Virginia Department of Environmental Protection MS4 Phase II Storm Water Program Storm Water Management Annual Report West Virginia Department of Environmental Protection MS4 Phase II Srm Water Program Srm Water Management Annual Report City of Vienna, West Virginia May 23, 2009 1.0 INTRODUCTION The City of Vienna was

More information

Finance Committee Meeting

Finance Committee Meeting Finance Committee Meeting FY18 Strategic Business and Operating Plan and Preliminary Budget Review April 04, 2017 1 Finance Committee Meeting FY18 Strategic Business Operating Plan and Preliminary Budget

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

County Administrator Departments Organization Department Summary

County Administrator Departments Organization Department Summary County Administrator Departments Organization Department Summary The County Administrator section presents the majority of the Board's operating departments. These departments provide a variety of services

More information

*** DRAFT - NOT YET FILED ***

*** DRAFT - NOT YET FILED *** 3745-39-03 Ohio EPA NPDES requirements for small MS4s. [Comment: For dates of non-regulatory government publications, publications of recognized organizations and associations, federal rules and federal

More information

Water Resources Engineering Division Public Works City of Colorado Springs

Water Resources Engineering Division Public Works City of Colorado Springs Water Resources Engineering Division Public Works City of Colorado Springs Richard Mulledy, P.E. Division Manager City of Colorado Springs/Pueblo County IGA City of Colorado Springs/Pueblo County IGA $460

More information

Lake County Stormwater Utility Fee

Lake County Stormwater Utility Fee County of Lake Stormwater Management Department 550 Blackbrook Road Painesville, OH 44077 Phone: (440) 350-2770 Fax: (440) 352-8133 www.lakecountyohio.org/smd Lake County Stormwater Utility Fee Credit

More information

City of Madison 2019 Operating Budget 296

City of Madison 2019 Operating Budget 296 City of Madison 2019 Operating Budget 296 City of Madison 2019 Operating Budget 297 Agency: Sewer Proposed Budget Cost to Continue Proposed Change Revenue -$38,331,199 -$40,684,110 -$2,352,911 Expenditures

More information

Gateway Services Community Development District

Gateway Services Community Development District Gateway Services Community Development District Financial Report December 31, 2017 Prepared by Gateway Services Community Development District Table of Contents BASIC FINANCIAL STATEMENTS Report Page #

More information

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: APPLICATION DATE: ADDRESS OF WORK OR ENCROACHMENT: CROSS STREET: STARTING DATE: APN: - - No. Street City/Township ESTIMATED COST: $ COMPLETION

More information

PERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS

PERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS CONTRACTOR OWNER/ AGENT APPLICANT CITY OF DALY CITY DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION 333 90 th Street, 1 st Floor, Daly City, CA 94015 Tel: (650) 991-8064 Fax: (650) 991-8243 ENGINEERING

More information

TO: CITY COUNCIL DATE: May 18,2009. THROUGH: MUNICIPAL SERVICES COMMITTEE (April 29,2009)

TO: CITY COUNCIL DATE: May 18,2009. THROUGH: MUNICIPAL SERVICES COMMITTEE (April 29,2009) TO: CITY COUNCIL DATE: May 18,2009 THROUGH: MUNICIPAL SERVICES COMMITTEE (April 29,2009) FROM: CITY MANAGER SUBJECT: ADOPTION OF THE SEWER SYSTEM MANAGEMENT PLAN (SSMP) RECOMMENDATION: It is recommended

More information

City of Mountlake Terrace. Second Quarter 2016 Financial Report September 19, 2016

City of Mountlake Terrace. Second Quarter 2016 Financial Report September 19, 2016 City of Mountlake Terrace Second Quarter 2016 Financial Report September 19, 2016 1 Overview Reviewing the City s finances on a regular basis, and posting the review on the City s website, highlights the

More information

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

B O A R D S T A T U S R E P O R T DECEMBER 18, A. Invitation for Bids. Benson Avenue Stormwater Improvement Project.

B O A R D S T A T U S R E P O R T DECEMBER 18, A. Invitation for Bids. Benson Avenue Stormwater Improvement Project. B O A R D S T A T U S R E P O R T DECEMBER 18, 2018 I. BIDS A. Invitation for Bids. Benson Avenue Stormwater Improvement Project. Bids Opening December 19, 2018 II. PURCHASING A. BLUE CROSS & BLUE SHIELD

More information

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction

More information

A Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative

A Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative A Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative June 3, 2015 Ellie Baker Horsley Witten Group, Inc. What will we cover today? Introduction

More information

Enterprise Community Development District

Enterprise Community Development District Enterprise Operating and Debt Service Budget Fiscal Year 2010 Adopted August 25, 2009 COMMUNITY DEVELOPMENT DISTRICT GENERAL FUND Adopted Budget - Fiscal Year 2010 ADOPTED ACTUAL PROJECTED TOTAL PROPOSED

More information

CITY OF ELMHURST, ILLINOIS ANNUAL BUDGET FOR THE FISCAL YEAR ENDING DECEMBER 31, 2018 In Conformance with Section 3.19 of the Elmhurst Municipal Code

CITY OF ELMHURST, ILLINOIS ANNUAL BUDGET FOR THE FISCAL YEAR ENDING DECEMBER 31, 2018 In Conformance with Section 3.19 of the Elmhurst Municipal Code CITY OF ELMHURST, ILLINOIS ANNUAL BUDGET FOR THE FISCAL YEAR ENDING DECEMBER 31, 2018 In Conformance with Section 3.19 of the Elmhurst Municipal Code Exhibit "A" The following sums, or so much thereof

More information

Gateway Services Community Development District

Gateway Services Community Development District Gateway Services Community Development District Fiscal Year 2018 Operating and Debt Service Budgets (Version 3 - Adopted on August 17, 2017) Table of Contents Page # Operating Budgets General Fund 001.........

More information

CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP)

CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP) CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP) APRIL 2009 Table of Contents INTRODUCTION... 3 SECTION I: GOALS... 3 SECTION II: ORGANIZATION... 4 SECTION III: LEGAL AUTHORITY...

More information

COUNTY ADMINISTRATOR PUBLIC WORKS

COUNTY ADMINISTRATOR PUBLIC WORKS COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm

More information

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) 2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion

More information

PUBLIC WORKS CIP SUPPORT

PUBLIC WORKS CIP SUPPORT PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm water management, and

More information

City of Mountlake Terrace. Fourth Quarter 2014 Financial Report April 2, 2015

City of Mountlake Terrace. Fourth Quarter 2014 Financial Report April 2, 2015 City of Mountlake Terrace Fourth Quarter 2014 Financial Report April 2, 2015 1 Overview Reviewing the City s finances on a regular basis, and posting the review on the City s website, highlights the City

More information

Actual TOTAL $ 2,793,103 $ 3,115,212 $ 3,206,457 $ 3,296,810

Actual TOTAL $ 2,793,103 $ 3,115,212 $ 3,206,457 $ 3,296,810 REVENUE AND EXPENDITURE SUMMARY ITEM Revenues, Other Sources, and Fund Balance Sales/Charges for Services $ 2,773,135 $ 3,077,010 $ 3,191,580 $ 3,288,810 Miscellaneous Income 9,538 8,000 8,416 8,000 Investment

More information

Gateway Services Community Development District

Gateway Services Community Development District Gateway Services Community Development District Financial Report December 31, 2016 Prepared by Gateway Services Community Development District Table of Contents BASIC FINANCIAL STATEMENTS Report Page #

More information

Gateway Services Community Development District

Gateway Services Community Development District Gateway Services Community Development District Financial Report January 31, 2017 Prepared by Gateway Services Community Development District Table of Contents BASIC FINANCIAL STATEMENTS Report Page #

More information

WATER POLLUTION CONTROL

WATER POLLUTION CONTROL WATER POLLUTION CONTROL WATER POLLUTION CONTROL NARRATIVE City of Warrensburg Water Pollution Control Division is under the supervision of the Public Works Department. The Administration budget includes

More information

City of Pacifica General Fund Budget

City of Pacifica General Fund Budget City of Pacifica 2017-18 General Fund Budget General Government Lorenzo Hines Jr. City Manager s Office May 2, 2017 City of Pacifica 1 General Government 2017-18 DRAFT Budget Mission We strive to manage

More information

APPLICATION. How did you hear about our program? AGREEMENT

APPLICATION. How did you hear about our program? AGREEMENT HILLSBOROUGH COUNTY ADOPT-A-POND APPLICATION/AGREEMENT You must complete and return the original, signed application/agreement to be considered for the Adopt-A-Pond Program. You may call Adopt-A-Pond at

More information

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS TABLE OF CONTENTS ENTERPRISE FUNDS Storm Drainage Fund... 121-124 Off Street Parking Fund... 125-126 Airport Fund... 127-131 Water Service Fund... 132-145 STORM DRAINAGE FUND CURRENT OPERATIONS This fund

More information

SIGNIFICANT BUDGET CHANGES

SIGNIFICANT BUDGET CHANGES Department of Environmental Services Our Mission: To build and maintain water delivery, sanitary sewer collection, and wastewater treatment systems that provide high-quality water and sewer services and

More information

Solid Waste & Recycling

Solid Waste & Recycling Solid Waste & Recycling The Solid Waste & Recycling Fund accounts for the activities of Chatham County's waste management, including the collection sites, hauling, and disposal costs. The Solid Waste &

More information

Long Lake Ranch Community Development District

Long Lake Ranch Community Development District Long Lake Ranch Community Development District Budget Proposal Packet for Fiscal Year 2016/2017 Presented by: Rizzetta & Company, Inc. Wesley Chapel Office 5844 Old Pasco Rd.; Suite 100 Wesley Chapel,

More information

MOUNTAIN HOUSE COMMUNITY SERVICES DISTRICT Providing Quality Services to the Community STAFF REPORT

MOUNTAIN HOUSE COMMUNITY SERVICES DISTRICT Providing Quality Services to the Community STAFF REPORT MOUNTAIN HOUSE COMMUNITY SERVICES DISTRICT Providing Quality Services to the Community STAFF REPORT AGENDA TITLE: Approval of Amendments to Severn Trent Contract Extension MEETING DATE: September 9, 2015

More information

NPDES Small MS4 General Permit (OHQ000002) Annual Reporting Form

NPDES Small MS4 General Permit (OHQ000002) Annual Reporting Form NPDES Small MS4 General Permit (OHQ000002) Annual Reporting Form City of Middletown Updated Management Plan - 2011 City of Middletown Updated Management Plan Ohio EPA Facility Permit Number: 1GQ00055*AG

More information

St. Lucie West Services Distric t FINAL BUDGET FOR FISCAL YEAR ENDED SEPTEMBER 30, 2016

St. Lucie West Services Distric t FINAL BUDGET FOR FISCAL YEAR ENDED SEPTEMBER 30, 2016 St. Lucie West Services Distric t FINAL BUDGET FOR FISCAL YEAR ENDED SEPTEMBER 30, 2016 July 28, 2015 Honorable Harvey Cutler, Chairman and Members of the Board of Supervisors St. Lucie West Services District

More information

REGIONAL DISTRICT OF CENTRAL OKANAGAN 2017 BUDGET AND FINANCIAL PLAN

REGIONAL DISTRICT OF CENTRAL OKANAGAN 2017 BUDGET AND FINANCIAL PLAN 2017 BUDGET AND FINANCIAL PLAN 2017-2021 TABLE OF CONTENTS BUDGET SUMMARY. 1 General Revenue Fund Budget Summary 2 General Capital Fund Budget Summary 4 Water Revenue Fund Budget Summary 5 Water Capital

More information

SEWER LINE CHEMICAL ROOT CONTROL. TECHNICAL SPECIFICATIONS (as provided by Duke s Root Control, Inc.)

SEWER LINE CHEMICAL ROOT CONTROL. TECHNICAL SPECIFICATIONS (as provided by Duke s Root Control, Inc.) SEWER LINE CHEMICAL ROOT CONTROL TECHNICAL SPECIFICATIONS (as provided by Duke s Root Control, Inc.) TABLE OF CONTENTS 1. General 2. Contractor Responsibilities 3. Guarantee 4. Composition of the Chemical

More information

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018 CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00

More information

PUBLIC WORKS. FY 17 Recommended Public Works Budget $4,937,107

PUBLIC WORKS. FY 17 Recommended Public Works Budget $4,937,107 PUBLIC WORKS FY 17 Recommended Public Works Budget $4,937,107 RSWA Contribution 11% Facilities And Environmental Services 89% FY15 FY16 FY16 FY17 FY17 FY17 $ % EXPENDITURES ACTUAL ADOPTED PROJECTED REQUEST

More information

DEPARTMENT OF PUBLIC WORKS

DEPARTMENT OF PUBLIC WORKS DEPARTMENT OF PUBLIC WORKS Mission Statement: Public Works is dedicated to providing transportation, drainage, facilities and fleet services to the citizens of Rio Rancho and other City Departments. Primary

More information

Proposed FY Storm Drainage Management Fund Budget. Presented to the Dallas City Council August 19, 2009

Proposed FY Storm Drainage Management Fund Budget. Presented to the Dallas City Council August 19, 2009 Proposed FY2009 10 Storm Drainage Management Fund Budget Presented to the Dallas City Council August 19, 2009 Purpose Storm Drainage Management (SDM) Fund background Current rate structure Proposed rates

More information

City of Portsmouth Portsmouth, New Hampshire Public Works Department Request for Proposals # 27-11

City of Portsmouth Portsmouth, New Hampshire Public Works Department Request for Proposals # 27-11 City of Portsmouth Portsmouth, New Hampshire Public Works Department Request for Proposals # 27-11 GREASE TRAP INSPECTION, PUMPING, HAULING & DISPOSAL (RECYCLING) A PILOT PROJECT The City of Portsmouth

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

Wastewater Utility Enterprise

Wastewater Utility Enterprise Wastewater Utility Enterprise Wastewater Utility Operating Fund Summary Wastewater Utility Revenue (62) Wastewater Utility Collection Systems Operations (62-4510) Wastewater Treatment Operations (62-4515)

More information

SUBDIVISION IMPROVEMENTS AGREEMENT

SUBDIVISION IMPROVEMENTS AGREEMENT SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El

More information

Belmont Community Development District

Belmont Community Development District Belmont Community Development District Budget Proposal Packet for Fiscal Year 2016/2017 Presented by: Rizzetta & Company, Inc. Tampa Office 3434 Colwell Ave.; Suite 200 Tampa, FL 33614 813.933.5571 rizzetta.com

More information

The Three Planning Windows of Asset Management John Murray City of Hamilton May 9 th, 2012 CNAM - Montreal. Hamilton Asset Management Plan

The Three Planning Windows of Asset Management John Murray City of Hamilton May 9 th, 2012 CNAM - Montreal. Hamilton Asset Management Plan The Three Planning Windows of Asset Management John Murray City of Hamilton May 9 th, 2012 CNAM - Montreal 1 City of Hamilton Amalgamated - 2001 7 Area Municipalities Population 500,000 The City of Waterfalls

More information

LETTING : CALL : 056 COUNTIES : MILLE LACS

LETTING : CALL : 056 COUNTIES : MILLE LACS S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE

More information

The catch basins consist of both separated and combined-sewer catch basins. Basins may be located on public rights of way and / or private property.

The catch basins consist of both separated and combined-sewer catch basins. Basins may be located on public rights of way and / or private property. This Catch Basin Cleaning Services Contract ( Contract ) made this day of, 2016 between the Greater Augusta Utility District ( District ) and ( Contractor ) is the execution of the first year Contract

More information

Enterprise Community Development District

Enterprise Community Development District Enterprise Community Development District Operating and Debt Service Budget Fiscal Year 2009 (Adopted 8-23-08) REPORT DATE 9/14/2008 V.3 ENTERPRISE CDD GENERAL FUND ADOPTED BUDGET FY 2009 ADOPTED ADOPTED

More information

Wastewater Utilities. FY Budget Presentation

Wastewater Utilities. FY Budget Presentation Utilities FY 2018-19 Budget Presentation 1 Volume Forecast Wastewater Customers by Class Fiscal Year Residential Commercial Wholesale Total Growth 2013 26,995 1.1% 3,091 0.8% 4 30,090 1.1% 2014 27,548

More information

FTE 1 Table Year (proposed) # Budgeted FTE s

FTE 1 Table Year (proposed) # Budgeted FTE s P1 ENVIRONMENTAL SERVICES DEPARTMENT PROPOSED SERVICE PLAN 2019-2022 1. Mandate: Environmental Services (ENVS) provides leadership in environmental protection and sustainable service for the citizens of

More information

Wastewater Rate Study. Villa Park, Illinois

Wastewater Rate Study. Villa Park, Illinois Wastewater Rate Study Villa Park, Illinois June 2013 Executive Summary General The Village of Villa Park s Wastewater Utility is responsible for operation and maintenance of the Village s separate sanitary

More information

FY17 DPU Administration Budget Narrative

FY17 DPU Administration Budget Narrative FY17 DPU Administration Budget Narrative DPU Administration Administration oversee and directs the divisions of the Public Utilities and provide support services to the Divisions and the Department of

More information

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...

More information

City of Shawano Park and Rec Dept. 220 E Division St., Shawano, (715) Fax: (715)

City of Shawano Park and Rec Dept. 220 E Division St., Shawano, (715) Fax: (715) September 11, 2018 To Whom it May Concern: The City of Shawano is requesting proposals from qualified contractors for demolition and removal of various structures and items at 909 S. Lincoln, Shawano,

More information

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY DRAFT Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY JANUARY 2019 Table of Contents Introduction 3 Definitions 3

More information

Finance Committee Meeting

Finance Committee Meeting Finance Committee Meeting FY19 Strategic Business and Operating Plan and Preliminary Budget Review April 3, 2018 1 Finance Committee Meeting FY19 Strategic Business Operating Plan and Preliminary Budget

More information

TOTAL QUANTITY UNIT COST UNIT

TOTAL QUANTITY UNIT COST UNIT BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50

More information

Full Reserve Study. The Ridge at Rock Creek Marysville, WA 11/13/2012

Full Reserve Study. The Ridge at Rock Creek Marysville, WA 11/13/2012 Full Reserve Study The Ridge at Rock Creek Marysville, WA 11/13/2012 Report # 1100 Phone: 253-241-8151 E-mail: jeremy@reservesolutions.net www.reservesolutions.net The Ridge at Rock Creek Client Info:

More information

Electric Service Information Sheet Georgia Power Company

Electric Service Information Sheet Georgia Power Company Electric Service Information Sheet Georgia Power Company Project: Location: Developer: (Name of S/D or Customer) (Street Address or road Name) (Developer s Name) Georgia Power Company (the Company) will

More information

Stormwater Management Utility Fee Reduction Credit Application

Stormwater Management Utility Fee Reduction Credit Application Stormwater Management Utility City of Dubuque, IA Winter 2003 Stormwater Management Utility Stormwater Management Utility Introduction The City of Dubuque established a Stormwater Management Utility on

More information

COUNTY OF GREENVILLE PROPRIETARY FUNDS

COUNTY OF GREENVILLE PROPRIETARY FUNDS Fiscal Years 2012 and 169 COUNTY OF GREENVILLE PROPRIETARY FUNDS Proprietary funds are used to account for activities, which are similar to those found in the private sector. The County s proprietary fund

More information

Impacts from the July 8, 2013 Storm Event on the City of Toronto

Impacts from the July 8, 2013 Storm Event on the City of Toronto STAFF REPORT ACTION REQUIRED Impacts from the July 8, 2013 Storm Event on the City of Toronto Date: September 10, 2013 To: From: Wards: Executive Committee City Manager All Reference Number: SUMMARY The

More information

MUNICIPAL SERVICE REVIEW FINAL

MUNICIPAL SERVICE REVIEW FINAL FIVE CANYONS COUNTY SERVICE AREA MUNICIPAL SERVICE REVIEW FINAL November 29, 2012 Prepared for the Local Agency Formation Commission of Alameda County by Baracco and Associates, Policy Consulting Associates,

More information

Right of Way Permits. Contact Information:

Right of Way Permits. Contact Information: Right of Way Permits A Right-of-Way Use Permit is required for any work performed in the public right-of-way (including but not limited to sewer or water extensions, franchise utility work, storm drainage,

More information

FY Annual Budget: Mobility Solutions, Infrastructure, & Sustainability

FY Annual Budget: Mobility Solutions, Infrastructure, & Sustainability FY 2018-19 Annual Budget: Mobility Solutions, Infrastructure, & Sustainability City Council Briefing August 15, 2018 Majed Al-Ghafry, Assistant City Manager Overview FY 2018-19 Budget by Strategic Priority

More information

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted, ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT

More information

PUBLIC WORKS DEPARTMENT PUBLIC WORKS ADMINISTRATION & ENGINEERING STREETS MAINTENANCE PARKS MAINTENANCE GOVERNMENT BUILDINGS

PUBLIC WORKS DEPARTMENT PUBLIC WORKS ADMINISTRATION & ENGINEERING STREETS MAINTENANCE PARKS MAINTENANCE GOVERNMENT BUILDINGS PUBLIC WORKS DEPARTMENT PUBLIC WORKS ADMINISTRATION & ENGINEERING STREETS MAINTENANCE PARKS MAINTENANCE GOVERNMENT BUILDINGS 180 PUBLIC WORKS ADMINISTRATION & ENGINEERING General Fund Department 4301 DEPARTMENT

More information

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY REPORT January 2017 WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY PREPARED BY: ECONOMICS STRATEGY STAKEHOLDERS SUSTAINABILITY www.newgenstrategies.net 3420

More information

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury

More information

REGIONAL DISTRICT OF CENTRAL OKANAGAN 2018 PROGRAM BUDGET AND FIVE YEAR FINANCIAL PLAN CONTENTS

REGIONAL DISTRICT OF CENTRAL OKANAGAN 2018 PROGRAM BUDGET AND FIVE YEAR FINANCIAL PLAN CONTENTS 2018 PROGRAM BUDGET AND 2018-2022 FIVE YEAR FINANCIAL PLAN CONTENTS ENGINEERING SERVICES -- David Komaike ENGINEERING SERVICES (Lime Green Pages) 004 -- Engineering Services 1 047 -- Mosquito Control --

More information

Finance Committee Meeting

Finance Committee Meeting Finance Committee Meeting FY16 Strategic Business and Operating Plan and Preliminary Budget Review April 8, 2015 Finance Committee Meeting FY16 Strategic Business Operating Plan and Preliminary Budget

More information

City of Lebanon, Tennessee Stormwater Utility Credit Manual for Stormwater Fees

City of Lebanon, Tennessee Stormwater Utility Credit Manual for Stormwater Fees City of Lebanon, Tennessee Stormwater Utility Credit Manual for Stormwater Fees Prepared by: Jeff Baines, P.E. Commissioner of Public Services Lebanon, Tennessee May 25, 2018 Instruction Revisions June

More information

SANITARY SEWER MANAGEMENT PLAN

SANITARY SEWER MANAGEMENT PLAN SANITARY SEWER Prepared by: 1307 N. Commerce Drive #200 Saratoga Springs, Utah 84045 With Assistance from: Bowen, Collins & Associates 154 E. 14000 S. Draper, Utah 84020 November 2017 TABLE OF CONTENTS

More information

FINANCIAL REPORT. Report o verv. ~ ~~W - August General Fund Governmental Capital Fund. Water Fund Sewer Fund

FINANCIAL REPORT. Report o verv. ~ ~~W - August General Fund Governmental Capital Fund. Water Fund Sewer Fund ~,.;!\.city~~---.'. _. T1i~~rl)~on -.,-' ''"---,--~ ~-- Report o verv. ~ ~~W - FINANCIAL REPORT ~:-----~ ;-;;:.-. '. August 2018 General Fund Governmental Capital Fund Water Fund Sewer Fund Thornton Development

More information

City of Oak Ridge North Monthly Trend Report of Revenues and Expenditures

City of Oak Ridge North Monthly Trend Report of Revenues and Expenditures City of Oak Ridge North Monthly Trend Report of Revenues and Expenditures Amended October November December January February March April May June FY 2017 YTD Total % GENERAL REVENUES 00 51010 Curr Coll-Prop

More information

GENERAL PROVISIONS I. WORK REQUIREMENTS

GENERAL PROVISIONS I. WORK REQUIREMENTS GENERAL PROVISIONS I. WORK REQUIREMENTS 1. Inspection The Permittee shall request initial inspection from the County at 408-573-2429 a minimum of twenty-four (24) hours prior to any work being performed.

More information

(i) Sale of property by the dependent special district to private developers, including:

(i) Sale of property by the dependent special district to private developers, including: Stevens Plantation (City of St. Cloud, Florida), Special Assessment Revenue Bonds, Series 2003A, $7,055,000 and Special Assessment Revenue Bonds, Series 2003B, $20,150,000, Dated: November 20, 2003 1.

More information

Environment and Climate Protection Committee. Tax Supported Programs

Environment and Climate Protection Committee. Tax Supported Programs Environment and Climate Protection Committee Tax Supported Programs Tabled November 8, 2017 Table of Contents Environment and Climate Protection Committe - Tax Supported Briefing Notes... 1 Infrastructure

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

CITY OF FLORENCE, SC Monthly Financial Report August 2010

CITY OF FLORENCE, SC Monthly Financial Report August 2010 CITY OF FLORENCE, SC Monthly Financial Report City of Florence Finance Department City of Florence, SC Monthly Financial Report Table of Contents For the Month Ended August 31, 21 General Fund 2 General

More information

CITY OF FLORENCE, SC Monthly Financial Report July 2010

CITY OF FLORENCE, SC Monthly Financial Report July 2010 CITY OF FLORENCE, SC Monthly Financial Report City of Florence Finance Department City of Florence, SC Monthly Financial Report Table of Contents For the Month Ended July 31, 21 General Fund 2 General

More information

Flood Resilience Study Findings

Flood Resilience Study Findings Services of the San Francisco Public Utilities Commission Flood Resilience Study Findings Presentation to Citizens Advisory Committee Special Session May 17, 2016 Stefani Harrison, Project Manager 1 Agenda

More information