The Three Planning Windows of Asset Management John Murray City of Hamilton May 9 th, 2012 CNAM - Montreal. Hamilton Asset Management Plan

Size: px
Start display at page:

Download "The Three Planning Windows of Asset Management John Murray City of Hamilton May 9 th, 2012 CNAM - Montreal. Hamilton Asset Management Plan"

Transcription

1 The Three Planning Windows of Asset Management John Murray City of Hamilton May 9 th, 2012 CNAM - Montreal 1

2 City of Hamilton Amalgamated Area Municipalities Population 500,000 The City of Waterfalls 2

3 3

4 Facility Construction - last 50 yrs Hamilton now has over 300 corporate and community facilities 4

5 Facility Construction - Next 50 yrs? Replace 300 corp. and comm. facilities and additional facilities?? 5

6 Presentation Summary Hamilton s Asset Management Plan The Three Planning Windows of Asset Management - Strategic Planning Window - Tactical Planning Window - Project Planning Window What would we change / do different? 6

7 Infrastructure Today 6500 Lane Kms of Road / 15,000 Street Segments 2100 Kms Water Main s / 35,000 Pipes 2700 Kms Sewer Main s / 45,000 Pipes 1 Water Treatment Plant 2 Waste Water Treatment Plants 700 Facilities (includes park facilities) 5,520 Acres of Parkland / 430 Parks Fleet Vehicles / Transit Vehicles Waste Management Assets 7

8 Asset Management is Service Management The Asset is the conduit for the service Infrastructure provides services that bring our city to life Pipes provide clean drinking water Roads provide a transportation network Buses provide public transportation Facilities provide recreation programs 8

9 Cost-effective AM = Wise Investments: Doing the right thing To the right asset At the right time 9

10 Asset Management The Framework: What do we own and where is it? What is it worth? What condition is it in? What do we need to do to it? When do we need to do it? How much money do we need? How do we achieve sustainability? Two additional important questions: Do we still need it? (should be question 2 above) How do we maintain sustainability? 10

11 The Asset Management Plan The Strategic Planning Window State of the infrastructure Reports Life Cycle Analysis Revenue Plans and projections Key Communication Tools STRATEGIC PLANNING Sustainable Asset Management Life Cycle

12 Strategic Planning & Communication A New Way of looking at the same Infrastructure 13

13 State of the Infrastructure Reports Public Works Assets (2005, 2006, 2009) Water Waste Water Storm Water Roads & Traffic Fleet & Transit Corporate Facilities Waste Management Parks & Open Spaces Forestry Cemeteries 14

14 State of the Infrastructure Reports Community Services Assets (2008) Housing Recreation Culture Long Term Care 15

15 Objectives of the SotI Report It is: A revenue plan An order of magnitude Long-term & strategic Service based Life-cycle based It is not: A budget Fixed time /short-term Tactical/operational Project specific It identifies trends and issues, Not policies. 16

16 First Step: What do we own? Water Asset Type Asset Component 2009 Inventory Mains - trunk (greater than 450 mm) Mains - Local (less than 450 mm) 175,094 m 1,771,874 m Linear Facilities Appurtenances included as part of local mains Meters Hydrants 12,118 Valves & Chambers 16,655 Services 132,988 Industrial Residential 132,9881 Water Treatment Plant 1 Pumping Stations 25 Storage (Reservoirs and Towers) 20 Wells (Communal systems) 8 Surge Tanks2 1 17

17 First Step: What do we own? Transit Asset Type Asset Component 2009 Inventory Fleet Infrastructure HSR (Buses) 211 ATS (ParaTransit) 66 Non-Revenue 15 Shelters 536 Loops and Terminals 24 Bus Stops 2,253 18

18 Second Step: Asset Valuation (Wastewater System Replacement Value) Asset Type Asset Component 2009 Replacement Cost ($M) Linear Facilities Interceptors1 $247 Trunk Sewers (greater than or equal to 450 mm) Local Sewers (less than 450 mm) Combined Sewers (less than 450 mm) $476 $571 Maintenance Holes $697 Sewer Laterals2 $689 Replacement Value Sub-Totals $2,680 Wastewater Treatment Plants $835 CSO Tanks $135 Pumping Stations $187 Wastewater Control Gates $16 Replacement Value Sub-Totals $1,172 Replacement Value Totals $3,852 19

19 Third Step: Asset Rating Condition and Performance A - F Capacity versus Need A - F Funding versus Need A - F 20

20 Fourth & Fifth Step: What do we need to do, and When? 0 25% of asset life Minor Maintenance 25 50% of asset life Major Maintenance 50 75% of asset life Rehabilitation % of asset life Replacement x 4x 50x 200x Operating Budget Capital Budget 21

21 Sixth Step: Financial Analysis Capital Costs Construction Costs $ + Growth 0.5%/year + Engineering cost $ 15% + Contingency $ 10% + Overhead & Admin $ 10% + Borrowing Costs $ 50% Total Capital Requirements $ O & M Costs + O & M (inc. growth) + Overhead & Admin + Cost Allocations 2.5% 10% 2% Total O & M Requirements $ Seventh Step: Sustainable Funding Level/Year 22 Total O&M + Capital / life-cycle $

22 Primary Goal of SotI: to move from Measurement Strategic Management 23

23 State of the Infrastructure Reports Key Communications & Analysis 24

24 2009 Infrastructure Report Card Public Works Assets 25

25 Asset Replacement Value per 50 property frontage - $92,300 Public Works Asset Replacement Values Per Property 26

26 SotI Communication Tools Waste Management $400 Funding Requirements (Millions) $350 $300 $250 $200 $150 $100 $ years $ Year 27

27 SotI Communication Tools Facilities $100 Funding Requirements (Millions) $90 $ $70 years $60 $50 $40 $30 $20 $10 $0 Year 28

28 The Future is Dynamic Typical Age Distribution of Infrastructure % of asset life Minor Maintenance 26% 23% 14% 25 50% of asset life Major Maintenance 37% 26% 23% 50 75% of asset life Rehabilitation 14% 37% 26% % of asset life Replacement 23% 14% 37% 29

29 Network Capital Investment Requirements Roads $3,000 $2,500 $2,000 Average Annual Investment = $138 million 2008 Investment = $42.4 million Millions $1,500 $1,000 $500 $0 2010s 2020s 2030s 2040s 2050s 2060s 2070s 2080s 2090s 2100s Decade 30

30 Capital Budget vs. Deficit Ratio Capital Program 2010 Funding $000's Asset Value $000's Lifecycle of Asset Years Forecast Lifecycle Years Deficit Years Deficit Ratio Roads 40,000 4,397, Corporate Facilities 5, , Recreation Facilities 9, , Cultural Facilities 3, , Park Development 4, , Park Operations 1,200 86,

31 Asset Inventory Corporate Facilities - $354 (3%) Fleet - $86 (1%) Transit - $127 (1%) Parks - $314 (2%) Waste Mgm't - $149 (1%) Cemetery - $250 (2%) Water - $2,290 (17%) Roads and Traffic - $4,397 (32%) Wastewater - $3,852 (29%) Stormwater - $1,565 (12%) Total Value = $13.4 Billion (Values shown are in $ millions) 32

32 100 yr Investment Requirements 33

33 Daily Household Cost Comparisons 34

34 The new science of accountineering Pacioli Help engineers think like MBAs and act like engineers and Help accountants think like P.Eng.s and act like accountants Leonardo Da Vinci 35

35 The Strategic Planning Window What would we change or do different? Communication / Communication / Communication Make State of the Infrastructure Reports first priority New AM groups can use PSAB data as a base Builds council understanding & support from the onset Builds stakeholder involvement & support Integrate Public Engagement results and metrics 36

36 The Asset Management Plan STRATEGIC PLANNING Sustainable Asset Budget Forecast Management Life Cycle TACTICAL PLANNING Summary Budget 3 to 20 Years PROJECT PLANNING Detailed Operating and Capital Budget 1 to 3 Years 37

37 The Tactical Planning Window Infrastructure management systems Asset Risk and Criticality Analysis Capital Program Development Sustainability Plans Long Term Project Listings Council approved methodologies TACTICAL PLANNING Summary Budget 3 to 20 Years 38

38 Asset Management Team Structure Manager - Asset Management Admin Secretary Key Consultants & Industry Experts Senior Project Manager Surface Infrastructure Programming Senior Project Manager Subsurface Infrastructure Programming Project Mgr Manager Surface Infrastructure (1) Project Manager Parks & Facilities (1) Coordinator Infrastructure Programming (2) Project Manager Subsurface Infrastructure (1) Project Manager Infrastructure Mgmt Systems (1) Infrastructure Programming Tech (2) Facilities Tech. (1) Infrastructure Programming Tech (2) Application Development Technologist (3) Finance Systems 39

39 Infrastructure Management Systems Move from Project based to Program based Budgets Pavement Management System (2001 ) Water/Sewer Condition Indexes (2002 ) Water/Sewer Risk/Criticality Models (2006 ) Bridge Management System (2002 onward ) Capital Project Management System (2003 ) Facilities Management System (2006 ) Parks Management System (2008 ) TCA System PSAB 3150 (2009..) ROW IDSS (2012 and ongoing) 40

40 Pavement Management System 6,300 Lane KMs of Road / 14,000 street segments 41

41 Pavement Life Cycle Analysis Results 42

42 Water Distribution Network Analysis - 2,100 Km of Water Mains to Assess (32,000 Pipes) - 25% of Mains are 75yrs or Older Break History 43

43 Water Main Overall Condition Ratings New Rehab Replace Based On: Age Size Material Type Breaks Rate Soil Condition Water Quality 44

44 Sewers Mains CCTV Formula Based Insp. 45

45 Sewer Main Overall Condition Ratings Zoom Inspection 90% of inventory CCTV Camera ,213 Km (50%) 46

46 Facilities / Parks System 500 facilities / 450 Parks 47

47 Capital Asset Accounting System 48

48 GIS Coordination of Needs 49

49 Risk / Criticality Assessment Risk = Consequence of Failure X Probability of Failure 50

50 Consequences of Failure Reflects the relative Impact of asset failure Economic Repair Cost Operational Expense Operational Customer Type Length of Interruption Environmental Damage to Property and Adjacent Infrastructure Damage to the Environment Social Impact on Public Safety Disruption to Traffic and Business 51

51 Risk serves as the basis for a Tactical Planning Framework Criticality Model Consequences of Failure Economic Impact Operational Impact Environmental Impact Social Impacts Probability of Failure CoF Rating Systems Condition & Reliability Operational Adequacy Regulatory Compliance Economic Efficiency PoF Decision Model Business Case Planning Tools Long Range Forecast Lifecycle Models What if? Analysis Sustainable Funding Full Cost of Services Response Toolbox Capital Program Urgent Action Planned Action Repair & Renewal New Growth Others? Maintenance Program Planned Work Predictive Work Preventive Work Others? Inspection Trouble Reports Visual Inspection Testing Regiment Flow Monitoring Others? Program 52

52 Multi-Criteria Weighted Model 53

53 ROW Coordination Interaction between Infrastructure networks Coordination of activities Optimize spending Minimize disruption Trench 54

54 Integrated Management of ROW To turn a window of opportunity into A window of opportunities 55

55 ROW - many windows / many opportunities Road N/ A Road No work Req d Road Overlay Road Grinding Road Mill + Road Replace Water N/A Water No work Req d Water Rehab Water Replace Sanitary N/A Sanitary No work Req d Sanitary Rehab Sanitary Replace Storm N/A Storm No work Req d Storm Rehab Storm Replace 56

56 One window of opportunities = One integrated project Road N/A Road No work Req d Road Overlay Road Grind Road Mill + Road Replace Water Replace Sanitary N/A Sanitary No work Req d Sanitary Rehab Sanitary Replace Storm N/A Storm No work Req d Storm Rehab Storm Replace 57

57 Pilot Project Integrated ROW 3 City wards: Roads, Water, Storm and Sanitary Sewers Options Individual Network Project Projections Coordinated Project Projections Results: 12% Return on Investment Using Coordinated Approach Total $16.5 M/yr ASAP JIT EOL Integ. Indiv. Integ. Indiv. Integ. Indiv. $14.9 M/yr $12.2 M/yr $13.9 M/yr $13.8 M/yr $13.8 M/yr ROI (19%) (7%) 12% - 1% 1% 58

58 ROW Integrated management Next Steps: 59

59 New Assets: Detailed Sustainability Plans Includes Red Hill Valley Parkway (34 Ln Km) Lincoln M. Alexander Parkway (44 Ln KM) 60

60 ROW ASSETS: What do we own? Asset Type Asset Component UM Quantities Ramps m 2 86,400 Shoulders m 2 158,400 Curbs m 56,000 Roadway Median m 11,000 Noise Barriers m 20,000 LINC Traffic Drainage Fencing m 6,000 Guide/Guard Rails m 2,000 Crash Attenuators ea 264 Striping m 80,000 Marking ea 380 Signs & Supports ea 48 Overhead Signs & Supports ea 24 Signals Ea 11 Lighting Ea 119 Catch Basins Ea 220 Ditches M 11,000 Inlets/Outlets Ea 20 Pipes/Culverts M 1, Storm Water Management Outlet Control Ea 2 Ponds m 2 2,000 Access Roads M 1,000 Fencing (Ponds) M 800

61 What is it worth? (all assets) LINC RHVP RHCV Asset Type Asset Quantity Asset Replacement Value ($M) Road 44 lnkm $85.0 Structures 14 $53.5 Traffic Control - $2.6 Water Management - $1.7 Road 34 lnkm $65.3 Structures 38 $118.5 Traffic Control - $1.6 Water Management 23 $1.8 Waterway 7 km <$1 Trails 7 km $1 Natural Heritage Areas ~100ha - Total: $332 62

62 Annual Maintenance Requirements Asset Type Lincoln Alexander Parkway & Redhill Valley Project Asset Maintenance Requirement ($K) Winter Control $2,750 Roadway $480 Drainage $300 Traffic $110 Storm Water Management $124 Structures $164 Total $3,928 63

63 Sustainability Plan Recommendations An average annual O&M budget of $4 million (Road) An average annual O&M budget of $245,000 (Red Hill Valley); Average annual contribution to capital reserves of $6 (maximum life) to $10 million (minimum life) - based on the 100 year life-cycle; 64

64 New Assets: Impact of debt financing (Central Composting Facility) Millions $100 $90 TOTAL = $160M/25 yrs $80 $70 $60 $50 $40 $30 $20 Interest $19M Principal $35M O&M $83M Rehab $23M Repl. Reserve $0M (or $0M/yr) Need: $73M cash (or borrow + $21M interest) $10 $0 Year O&M Sherman-Dergis Formula Debt-Financing - Principal Debt-Financing - Interest Construction Inflation Future CCF DF - Interest 65

65 Benefits of PAYG (Central Composting Facility) Millions $80 $70 TOTAL = $195M/25 yrs $60 $50 $40 $30 $20 Interest $19M Principal $35M O&M $83M Rehab $23M Repl. Reserve $35M (or $1.4M/yr) Need: $0 $10 $ Year Reserve Contribution O&M Sherman-Dergis Formula Debt-Financing - Principal Debt-Financing - Interest Construction Inflation 66

66 The Tactical Planning Window What would we change or do different? We had the right team and support from Senior Mgmt Build Risk Management into the process earlier Bring total cost of ownership concept forward earlier Implement a ROW coordination system earlier 67

67 The Asset Management Plan STRATEGIC PLANNING Sustainable Asset Budget Forecast Management Life Cycle TACTICAL PLANNING Summary Budget 3 to 20 Years PROJECT PLANNING Detailed Operating and Capital Budget 1 to 3 Years 68

68 The Asset Management Plan The Project Planning Window Projects are defined Limits, Scope, Budget Projects are delivered for detailed design Implementation of key methodologies OPERATIONAL PLANNING Detailed Operating and Capital Budget 1 to 3 Years 69

69 Capital Delivery Program Based not Project Based Annual Expenditure: $50 M Roads $70M Sew / Wat Multi Year: Coordinated Program Driven 70

70 Local / Collector Rd. Methodology Provincial Surplus Funds : 157 LnKms 16 Neighbourhoods Cost of ($33.5 mill) Regular Resurfacing Method: Cost of ($56 mill) Savings - $22.5 mill 71

71 230km lined to date $59 mill spent Approx $150 mill Open Cut Replacement Less Community Disruption (green tech) Sewer Main Lining Program Implementation 72

72 The Project Planning Window What would we change or do different? The ROW approach has had great benefits We have implemented some key AM methodologies Bring more tactical analysis forward to project level Track key delivery metrics link to Tactical / Strategic Plan Link to Service Level - communicate to council 73

73 Asset Management is Service Management is Risk Management 74

74 QUESTIONS 75

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

Building Detail and Buy-in For Your Long-Term Multi-Asset Investment Plan

Building Detail and Buy-in For Your Long-Term Multi-Asset Investment Plan Building Detail and Buy-in For Your Long-Term Multi-Asset Investment Plan Michael E. Trickey, P.Eng., PE Senior Asset Management Consultant Urban Systems Limited 250-762-2517 mtrickey@urban-systems.com

More information

Toronto Water Budget BU Recommended Operating Budget Recommended Capital Plan 2017 Recommended Water Rate

Toronto Water Budget BU Recommended Operating Budget Recommended Capital Plan 2017 Recommended Water Rate 2017 BU25.1 Toronto Water Budget 2017 Recommended Operating Budget 2017 2026 Recommended Capital Plan 2017 Recommended Water Rate Lou Di Gironimo, General Manager, Toronto Water Budget Committee, November

More information

City of Welland. Comprehensive Asset Management Plan. GMBP File: January 13, Prepared By:

City of Welland. Comprehensive Asset Management Plan. GMBP File: January 13, Prepared By: Prepared By: City of Welland Comprehensive Asset Management Plan GMBP File: 614013 January 13, 2015 GUELPH OWEN SOUND LISTOWEL KITCHENER EXETER HAMILTON GTA 650 WOODLAWN RD. W., BLOCK C, UNIT 2, GUELPH

More information

City of Markham Asset Management Plan

City of Markham Asset Management Plan 2016 City of Markham Asset Management Plan Table of Content 1. Executive Summary...4 2. Introduction...7 2.1 Provincial Guidelines on Asset Management Plans...7 2.2 City of Markham Goals / Strategic Plan...7

More information

MAINTENANCE DEPARTMENT

MAINTENANCE DEPARTMENT MAINTENANCE DEPARTMENT E-78 City of Mercer Island 2007-2008 Budget Department: Maintenance The Maintenance Department consists of the following functions: 1) administration, 2) capital projects engineering,

More information

THE ASSET MANAGEMENT PLAN FOR THE CITY OF NIAGARA FALLS

THE ASSET MANAGEMENT PLAN FOR THE CITY OF NIAGARA FALLS THE ASSET MANAGEMENT PLAN FOR THE CITY OF NIAGARA FALLS 2013 THE CITY OF NIAGARA FALLS 4310 QUEEN STREET NIAGARA FALLS, ONTARIO, L2E 6X5 SUBMITTED DECEMBER 2013 BY PUBLIC SECTOR DIGEST 148 FULLARTON STREET,

More information

Environment and Climate Protection Committee. Tax Supported Programs

Environment and Climate Protection Committee. Tax Supported Programs Environment and Climate Protection Committee Tax Supported Programs Tabled November 8, 2017 Table of Contents Environment and Climate Protection Committe - Tax Supported Briefing Notes... 1 Infrastructure

More information

Bylaw No The Capital Reserve Bylaw. Codified to Bylaw No (December 18, 2017)

Bylaw No The Capital Reserve Bylaw. Codified to Bylaw No (December 18, 2017) Bylaw No. 6774 The Capital Reserve Bylaw Codified to Bylaw No. 9476 (December 18, 2017) Page 1 Bylaw No. 6774 The Capital Reserve Bylaw The Council of The City of Saskatoon enacts: Purpose 1. The purpose

More information

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES TO: FROM: Mayor and Members of Council Gerry Wolting, B. Math, CPA, CA General Manager, Corporate Services DATE: January 13, 2014 SUBJECT: 2013 Asset Management

More information

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc. DAVID TAUSSIG & Associates, Inc. Annual Report Fiscal Year 2014-2015 City of Irvine Community Facilities District No. 2013-3 (Great Park) October 27, 2015 Public Finance Public Private Partnerships Urban

More information

MUNICIPALITY OF MISSISSIPPI MILLS. plan. December, 2016

MUNICIPALITY OF MISSISSIPPI MILLS. plan. December, 2016 MUNICIPALITY OF MISSISSIPPI MILLS plan December, 2016 PREFACE This Asset Management Plan is intended to describe the infrastructure owned, operated and maintained by the Municipality of Mississippi Mills

More information

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc. DAVID TAUSSIG & Associates, Inc. Annual Report Fiscal Year 2016-2017 City of Irvine Community Facilities District No. 2013-3 (Great Park) September 26, 2017 Public Finance Public Private Partnerships Urban

More information

TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN

TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN JUNE 24, 2014 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview 1-1 1.2 Plan Development 1-1 1.3 Maintaining the Asset Management Plan 1-2 1.4

More information

Capital and Debt. Capital Expenditures 2017 to 2021 Capital Plan. Capital Plan Introduction. PSAB Tangible Capital Asset Five year Capital Plan

Capital and Debt. Capital Expenditures 2017 to 2021 Capital Plan. Capital Plan Introduction. PSAB Tangible Capital Asset Five year Capital Plan Capital and Debt CAPITAL AND DEBT Capital Expenditures 2017 to 2021 Capital Plan Capital Plan Introduction Asset Management Plans Bringing it all Together The City of Regina is building an asset management

More information

Asset Management Investment Plan

Asset Management Investment Plan Asset Management Plan Prepared for the City of Kimberley 304-1353 Ellis Street Kelowna, BC, V1Y 1Z9 T: 250.762.2517 F: 250.763.5266 June 2016 File: 1162.0014.01 A s s e t M a n a g e m e n t I n v e s

More information

Proud Heritage, Exciting Future ASSET MANAGEMENT PLAN

Proud Heritage, Exciting Future ASSET MANAGEMENT PLAN Proud Heritage, Exciting Future ASSET MANAGEMENT PLAN TABLE OF CONTENTS PAGE 3 OVERVIEW 8 FACILITIES 12 FLEET 16 PLAYGROUND EQUIPMENT 19 ROADWAYS 23 BRIDGES 26 WATER RELATED ASSETS One of the goals outlined

More information

Header Tile ATTACHMENT 2. City of Saskatoon

Header Tile ATTACHMENT 2. City of Saskatoon Header Tile ATTACHMENT 2 2 Building Better Infrastructure The Administration evaluates the condition of the City s assets in order to develop annual programs to maintain the assets at a minimum cost. Where

More information

DRAFT MULTI-YEAR Water and Wastewater & Treatment Budget December 17, ANNUAL UPDATE INVESTING IN OUR FUTURE. london.

DRAFT MULTI-YEAR Water and Wastewater & Treatment Budget December 17, ANNUAL UPDATE INVESTING IN OUR FUTURE. london. 6 MULTI-YEAR BUDGET FOR THE 2019 ANNUAL UPDATE INVESTING IN OUR FUTURE london.ca/budget DRAFT 2019 Water and Wastewater & Treatment Budget December 17, 2018 Table of Contents Recommendations... 1 WATER

More information

2016 Asset Management Plan

2016 Asset Management Plan R I C H M O N D H I L L 2016 Asset Management Plan Richmond Hill, where people come together to build our community. The 2016 Asset Management Plan was received by Richmond Hill Council on December 12,

More information

The Corporation of the County of Prince Edward

The Corporation of the County of Prince Edward Prepared for: Prepared by: The Corporation of the County of Prince Edward KPMG LLP Shire Hall, 332 Main Street 863 Princess Street, Suite 400 Picton, ON K0K 2T0 Kingston, ON K7L 5C8 Tel: 613.476.2148 Tel:

More information

CITY OF PORT MOODY 2009 CAPITAL BUDGET SUMMARY

CITY OF PORT MOODY 2009 CAPITAL BUDGET SUMMARY SUMMARY ACCOUNT 4710 4711 4790 4727 4728 4724 4771 4700 4712 4774 4772 4701 TOTAL TAXATION TAXATION LIFE CYCLE MRN CAPITAL REPLACE LAND STAT. PRIVATE DEV. ASSET DEPARTMENT EXP. (Strategic) (Operating)

More information

COUNTY ADMINISTRATOR PUBLIC WORKS

COUNTY ADMINISTRATOR PUBLIC WORKS COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm

More information

TOWNSHIP OF WEST LINCOLN

TOWNSHIP OF WEST LINCOLN TOWNSHIP OF WEST LINCOLN April 18, 2016 dfa DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 664-B Vine Street St. Catharines Ontario Canada L2M 7L8 Telephone: (905) 938-0965

More information

This page intentionally left blank

This page intentionally left blank 197 This page intentionally left blank 198 Capital Improvement Program PROCEDURE Each year the Capital Improvement Program (CIP) is prepared from project requests submitted by the various departments.

More information

CITY OF PORT MOODY 2012 CAPITAL & OPERATING BUDGET SUMMARY

CITY OF PORT MOODY 2012 CAPITAL & OPERATING BUDGET SUMMARY 2012 & OPERATING BUDGET SUMMARY ACCOUNT 4710 4790 4727 4728 4724 4721 4771 4700 4712 4774 4772 4701 4736 TOTAL LIFE CYCLE MRN ASSET DEPARTMENT EXP. TAXATION SURPLUS RESERVE RESERVE RESERVE RESERVE RESERVE

More information

THE DISTRICT OF MUSKOKA ASSET MANAGEMENT PLAN FOR ROADS, BRIDGES, WATER AND WASTEWATER ASSETS

THE DISTRICT OF MUSKOKA ASSET MANAGEMENT PLAN FOR ROADS, BRIDGES, WATER AND WASTEWATER ASSETS THE DISTRICT OF MUSKOKA ASSET MANAGEMENT PLAN FOR ROADS, BRIDGES, WATER AND WASTEWATER ASSETS MAY 29, 2014 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview 1-1 1.2 Plan Development 1-1

More information

ASSET MANAGEMENT PLAN. HEMSON C o n s u l t i n g L t d. 30 Saint Patrick Street, Suite 1000 Toronto, ON, M5T 3A3

ASSET MANAGEMENT PLAN. HEMSON C o n s u l t i n g L t d. 30 Saint Patrick Street, Suite 1000 Toronto, ON, M5T 3A3 ASSET MANAGEMENT PLAN C o n s u l t i n g L t d. 30 Saint Patrick Street, Suite 1000 Toronto, ON, M5T 3A3 March 2017 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 A. STATE OF THE LOCAL INFRASTRUCTURE... 1 B.

More information

Asset Management Plan 2016 Township of King

Asset Management Plan 2016 Township of King Asset Management Plan 206 Township of King GHD Allstate Parkway Suite 30 Markham Ontario L3R 9T8 T 905 752 4300 F 905 752 430 5432 Table of Contents. 2. 3. 4. 5. 6. Executive Summary. Introduction.2 State

More information

Carroll County Maryland. Community Investment Plan Request Fiscal Years

Carroll County Maryland. Community Investment Plan Request Fiscal Years Carroll County Maryland Community Investment Plan Request Fiscal Years 2019-2024 PRODUCED BY The Department of Management and Budget Ted Zaleski... Director Deborah Effingham... Chief, Bureau of Budget

More information

Village of Point Edward Asset Management Plan Page 1

Village of Point Edward Asset Management Plan Page 1 The existing infrastructure in the Village of Point Edward is aging and deteriorating. Over the next 50 years, much of the infrastructure will require replacement or rehabilitation. The Asset Management

More information

Finance Committee Meeting

Finance Committee Meeting Finance Committee Meeting FY18 Strategic Business and Operating Plan and Preliminary Budget Review April 04, 2017 1 Finance Committee Meeting FY18 Strategic Business Operating Plan and Preliminary Budget

More information

Self Assessment Tool

Self Assessment Tool Self Assessment Tool Objectives of SAT Provide objective assessments for municipalities Measure progression over time of AM Educate the municipalities about the complexity of AM and their progress on the

More information

Nith Peninsula, Brant County Fiscal Impact Study

Nith Peninsula, Brant County Fiscal Impact Study Fiscal Impact Study October 25, 2017 Fiscal Impact Study Prepared for: Losani Homes Prepared by: 33 Yonge Street Toronto Ontario M5E 1G4 Phone: (416) 641 9500 Fax: (416) 641 9501 economics@altusgroup.com

More information

Asset Management Plan Contract No. ES-13-2

Asset Management Plan Contract No. ES-13-2 Asset Management Plan Contract No. ES-13-2 Prepared For: Prepared By: Robinson Consultants Inc. In association with BMA Management Inc. Our Project No. 13030 November 2013 Acknowledgements Robinson Consultants

More information

FY Annual Budget: Mobility Solutions, Infrastructure, & Sustainability

FY Annual Budget: Mobility Solutions, Infrastructure, & Sustainability FY 2018-19 Annual Budget: Mobility Solutions, Infrastructure, & Sustainability City Council Briefing August 15, 2018 Majed Al-Ghafry, Assistant City Manager Overview FY 2018-19 Budget by Strategic Priority

More information

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m. PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00

More information

WATER AND WASTEWATER FUND REVENUES

WATER AND WASTEWATER FUND REVENUES WATER AND WASTEWATER FUND REVENUES Water revenues comprise $12.11 million, or 70.6% of total revenues of the fund, while wastewater (sewer) charges comprise $4.25 million, or 24.7% of total revenues. Water

More information

CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No

CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No. 112301 April 1st 2016 DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 33 Raymond

More information

Asset Management Plan Public Works, Social Housing, Parks and Recreation Infrastructure City of Brantford, Ontario

Asset Management Plan Public Works, Social Housing, Parks and Recreation Infrastructure City of Brantford, Ontario 2017 Asset Management Plan Public Works, Parks and Recreation and Social Housing Infrastructure Asset Management Plan Public Works, Social Housing, Parks and Recreation Infrastructure City of Brantford,

More information

We want to hear from you! 2019 Financial Plan Feedback

We want to hear from you! 2019 Financial Plan Feedback $ We want to hear from you! 2019 Financial Plan Feedback Before Council sets the 2019 property tax rates, the City is seeking your input on the proposed 2019 Financial Plan share your views on the proposed

More information

City of Cornwall 2014 Capital Report First Quarter

City of Cornwall 2014 Capital Report First Quarter C33093 '12 Nick Kaneb Dr Extension - Marleau to 10th St -2012 approved funding 75,000 55,749 19,251 0 Apr-14 notice of completion issued, final public review underway C33097 '13 Tenth St to Virginia to

More information

Asset Management Plan The Corporation of the Town of Wasaga Beach

Asset Management Plan The Corporation of the Town of Wasaga Beach Asset Management Plan The Corporation of the Town of Wasaga Beach Council Approved Nov-2016 Table of Contents Executive Summary... 2 Introduction... 4 Mission and Goals... 6 State of Local Infrastructure...

More information

Township of Centre Wellington Asset Management Plan

Township of Centre Wellington Asset Management Plan Township of Centre Wellington 2016 Asset Management Plan November 16, 2016 Contents Page Executive Summary... i 1. Introduction... 1-1 1.1 Overview... 1-1 1.2 Plan Development... 1-1 1.3 Maintaining the

More information

Stephanie Smith, Project EngineerW

Stephanie Smith, Project EngineerW MEMORANDUM v TO: Paul Oehme, Director of Public Works/ City Engineer o FROM: Stephanie Smith, Project EngineerW 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 9522271100 Fax

More information

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $ RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement

More information

2018 Asset Report Cards

2018 Asset Report Cards 2018 s Bridges & Culverts ASSET TOTAL VALUE ($) TREND Annual Deficit Infrastructure Gap $58M -($500K) $6 M Sanitary Sewers $141M $80K $10 M Fleet $16M - - Pumping Stations $13M $140K $625K Roads $280M

More information

Strategic Asset Management Policy

Strategic Asset Management Policy Strategic Asset Management Policy Submission Date: 2018-04-24 Approved by: Council Approval Date: 2018-04-24 Effective Date: 2018-04-24 Resolution Number: Enter policy number. Next Revision Due: Enter

More information

Implementation of the Gas Tax Funding Agreement in Manitoba. Annual Implementation Report for the Period of April 1, 2012 to March 31, 2013

Implementation of the Gas Tax Funding Agreement in Manitoba. Annual Implementation Report for the Period of April 1, 2012 to March 31, 2013 Implementation of the Gas Tax Funding Agreement in Manitoba Annual Implementation Report for the Period of April 1, 2012 to March 31, 2013 October 2013 Table of Contents Introduction.... 5 Oversight Committee..

More information

2019 CAPITAL BUDGET BRIEFING NOTE State of Good Repair (SOGR) Backlog

2019 CAPITAL BUDGET BRIEFING NOTE State of Good Repair (SOGR) Backlog BN#13 Feb 13 Josie La Vita Executive Director Heather Taylor Chief Financial Officer and Treasurer Financial Planning Division City Hall, 7 th Floor, East Tower 100 Queen Street West Toronto, Ontario,

More information

AMP2016. i t r i g e s t. c o w w w. p u b l i c s e c t o r d i g e s t. c o m. The 2016 Asset Management Plan for the Township of Hamilton

AMP2016. i t r i g e s t. c o w w w. p u b l i c s e c t o r d i g e s t. c o m. The 2016 Asset Management Plan for the Township of Hamilton AMP2016 i t r i g e s t. c o w w w. p u b l i c s e c t o r d i g e s t. c o m The 2016 Asset Management Plan for the Township of Hamilton SUBMITTED BY THE PUBLIC SECTOR DIGEST INC. (PSD) WWW.PUBLICSECTORDIGEST.COM

More information

CITY OF KELOWNA FINANCIAL PLAN

CITY OF KELOWNA FINANCIAL PLAN CITY OF KELOWNA FINANCIAL PLAN 2014-2018 The City of Kelowna has developed a comprehensive Financial Plan that provides a five year summary of general revenues, operating expenditures and capital expenditures.

More information

PUBLIC WORKS CIP SUPPORT

PUBLIC WORKS CIP SUPPORT PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm water management, and

More information

The 2018 Budget Table of Contents

The 2018 Budget Table of Contents The Budget Table of Contents General Purposes Budget (approved March 27, ) General Purposes Budget Table of Contents Schedule A General Purposes Budget Expense Summary Schedule B General Purposes Budget

More information

PACP Based Asset Management

PACP Based Asset Management PACP Based Asset Management Objectives of Asset Management Maintain function or level of service as cost effectively as possible Maintain individual components (assets) at lowest life cycle cost possible

More information

CITY OF BRAMPTON Budget Highlights. As Approved by City Council on February 23, 2011

CITY OF BRAMPTON Budget Highlights. As Approved by City Council on February 23, 2011 CITY OF BRAMPTON 2011 Budget Highlights As Approved by City Council on February 23, 2011 EXEXCUTIVE SUMMARY The current economic climate, meeting provincial growth targets and other budget drivers places

More information

p Local governments in Canada moved from a modified accrual to a full accrual accounting approach.

p Local governments in Canada moved from a modified accrual to a full accrual accounting approach. PSAB 3150 p Local governments in Canada moved from a modified accrual to a full accrual accounting approach. p The primary change for local governments was the accounting treatment for tangible capital

More information

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN 15-013 GSS Engineering Consultants Ltd. Unit 104D 1010 9 th Avenue West Owen Sound ON N4K 5R7 519.372.4828 TABLE OF CONTENTS

More information

Guelph/Eramosa 2016 Budget Presentation. Thursday, February 18, 2016

Guelph/Eramosa 2016 Budget Presentation. Thursday, February 18, 2016 Guelph/Eramosa 2016 Budget Presentation Thursday, February 18, 2016 1 Our Township We cover 292 km 2 and provide services to 12,380 residents The Township is responsible for maintaining: 225 km of roads

More information

SUBJECT/REPORT NO: Ontario Ministry of Infrastructure Asset Management Plan Requirements (FCS13077/PW13077) (City Wide)

SUBJECT/REPORT NO: Ontario Ministry of Infrastructure Asset Management Plan Requirements (FCS13077/PW13077) (City Wide) TO: Mayor and Members General Issues Committee WARD(S) AFFECTED: CITY WIDE COMMITTEE DATE: October 16, 2013 SUBJECT/REPORT NO: Ontario Ministry of Infrastructure Asset Management Plan Requirements (FCS13077/PW13077)

More information

Building Markham s Future Together. Angus Glen Tennis Facility Budget. Community Consultation Meeting

Building Markham s Future Together. Angus Glen Tennis Facility Budget. Community Consultation Meeting Angus Glen Tennis Facility 2012 Budget Community Consultation Meeting Opening Remarks by Ward 7 Councillor Logan Kanapathi, Vice Chair of Budget Sub-Committee Agenda Budget Presentation by Andrea Tang,

More information

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d. WATER AND WASTEWATER RATE STUDY Town of Midland C o n s u l t i n g L t d. December 2010 TABLE OF CONTENTS EXECUTIVE SUMMARY.........1 I BACKGROUND AND STUDY OBJECTIVES.........9 ll ASSOCIATED LEGISLATION.........13

More information

THE CORPORATION OF THE VILLAGE OF LUMBY

THE CORPORATION OF THE VILLAGE OF LUMBY THE CORPORATION OF THE VILLAGE OF LUMBY CONSOLIDATED FINANCIAL STATEMENTS December 31, 2016 December 31, 2016 CONTENTS Page INDEPENDENT AUDITORS' REPORT 3 FINANCIAL STATEMENTS Consolidated Statement of

More information

2018 BUDGET AND FINANCIAL PLAN

2018 BUDGET AND FINANCIAL PLAN Questionnaire 2018 BUDGET AND FINANCIAL PLAN January 1, 2018 - January 23, 2018 The Township of Langley is reviewing the Draft 2018 2022 Five-Year Financial Plan with emphasis on the 2018 Budget. Your

More information

PW25. REPORT FOR ACTION

PW25. REPORT FOR ACTION PW25. REPORT FOR ACTION Contract Award for Tender Call 265-2017, Contract No. 17ECS-MI-03WA for the Rehabilitation of the Rosehill Reservoir and Amendment to Purchase Order No. 6045909 for Professional

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates. , Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...

More information

TOWNSHIP OF RUSSELL ASSET MANAGEMENT PLAN WATER / WASTEWATER JUNE WSP 100 Commerce Valley Drive West Thornhill, ON L3T 0A1

TOWNSHIP OF RUSSELL ASSET MANAGEMENT PLAN WATER / WASTEWATER JUNE WSP 100 Commerce Valley Drive West Thornhill, ON L3T 0A1 TOWNSHIP OF RUSSELL ASSET MANAGEMENT PLAN WATER / WASTEWATER JUNE 2017 WSP 100 Commerce Valley Drive West Thornhill, ON L3T 0A1 Contact: Kevin Morawski Email: kevin.morawski@wspgroup.com Phone +1 905-882-1100

More information

CITY OF PORT MOODY 2011 CAPITAL BUDGET SUMMARY

CITY OF PORT MOODY 2011 CAPITAL BUDGET SUMMARY SUMMARY ACCOUNT 4710 4711 4790 4727 4728 4724 4771 4700 4712 4774 4772 4701 4736 TOTAL TAXATION TAXATION LIFE CYCLE MRN CAPITAL REPLACE LAND STAT. PRIVATE DEV. ASSET DEPARTMENT EXP. (Strategic) (Operating)

More information

WATER and WASTEWATER & TREATMENT COUNCIL APPROVED December 12, 2017

WATER and WASTEWATER & TREATMENT COUNCIL APPROVED December 12, 2017 WATER and WASTEWATER & TREATMENT COUNCIL APPROVED December 12, 2017 TABLE OF CONTENTS Approval of 2018 Annual Update... 1 WATER 2018-2019 Multi-Year Summary - Water... 5 2016-2019 Water Operating Overview...

More information

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association Replacement Reserve Study REPLACEMENT RESERVE STUDY Oakton, Virginia Property Management: Flint Hill Manor Townhouse Association Jamie Critchfield Vice President Email: tommie0200@aol.com Consultant: RICHARD

More information

Where the Money Goes (Uses) FY 2011

Where the Money Goes (Uses) FY 2011 Capital Expenditure Analysis The total FY2011 capital budget for the Village of Orland Park is $23,650,283, a 33% decrease from the fiscal year 2010 adopted capital budget of $31,446,027. The decrease

More information

Toronto Water Budget. Toronto Water Budget. Water. Recommended. Lou Di Gironimo General Managou Di Gironi. Budget Committee.

Toronto Water Budget. Toronto Water Budget. Water. Recommended. Lou Di Gironimo General Managou Di Gironi. Budget Committee. 2016 Toronto Water Budget Toronto Water Budget 2016 2016 Recommended Recommended Ope Opearting 2016 Recommned2016 Budget Operating 2016 2025 2016-2025 Budget Recommended rating Recommended Budget Capital

More information

FY 2019 Approved Budget Approved by the Board of Directors on March 1, 2018

FY 2019 Approved Budget Approved by the Board of Directors on March 1, 2018 FY 2019 Approved Budget Approved by the Board of Directors on March 1, 2018 DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Enhanced Clarification Facility Lucy Tunnel Boring Machine First Street Tunnel

More information

City of La Verne Cost Allocation Study

City of La Verne Cost Allocation Study HF&H Consultants Presentation Outline Study Purpose Current Overhead Cost Allocations Administrative Operational Potential Enterprise Reimbursements Public Safety Governmental Facilities Capital Right-of-Way

More information

Where are your taxes going?

Where are your taxes going? BUDGET HIGHLIGHTS Building for the Future The City s 2017 proposed Budget continues to build for the future, investing in community priorities essential to Regina s continued growth. The Budget goals were

More information

Fleet Services CAPITAL BUDGET AND PLAN OVERVIEW Capital Budget and Plan Highlights CAPITAL ANALYST NOTES.

Fleet Services CAPITAL BUDGET AND PLAN OVERVIEW Capital Budget and Plan Highlights CAPITAL ANALYST NOTES. CAPITAL ANALYST NOTES Contents Fleet Services 2023 CAPITAL BUDGET AND PLAN OVERVIEW 2023 Capital Budget and Highlights Fleet Services manages a City fleet of over 5,000 vehicles and pieces of equipment,

More information

2018 Budget Public Budget Consultation Meeting November 16 th, 2017

2018 Budget Public Budget Consultation Meeting November 16 th, 2017 2018 Budget Public Budget Consultation Meeting November 16 th, 2017 2 1. 2018 Budget Process and Communications Plan 2. 2018 Proposed Capital Budget a. Funding Sources b. Expenditures c. Life Cycle Reserve

More information

Capital Investment Program (CIP) About CIP

Capital Investment Program (CIP) About CIP Capital Investment Program (CIP) About CIP The Capital Investment Program (CIP) is a multi-year program aimed at upgrading and expanding City facilities, buildings, grounds, streets, parks and roads. The

More information

2017 ENTERPRISE ASSET MANAGEMENT PLAN

2017 ENTERPRISE ASSET MANAGEMENT PLAN Corporate Asset Management 2017 ENTERPRISE ASSET MANAGEMENT PLAN Investments in Peel s Infrastructure We are all asset managers! Executive Summary The Region s infrastructure is a public investment with

More information

Impacts from the July 8, 2013 Storm Event on the City of Toronto

Impacts from the July 8, 2013 Storm Event on the City of Toronto STAFF REPORT ACTION REQUIRED Impacts from the July 8, 2013 Storm Event on the City of Toronto Date: September 10, 2013 To: From: Wards: Executive Committee City Manager All Reference Number: SUMMARY The

More information

Stormwater Utility & Water Utility Charges & Rates. October 20, 2015

Stormwater Utility & Water Utility Charges & Rates. October 20, 2015 Stormwater Utility & Water Utility Charges & Rates October 20, 2015 1 Agenda Fiscal Policies/Goals System Development Charge Stormwater Utility Charges & Rates Water Utility Charges & Rates 2 Fiscal Policies/Goals

More information

FTE 1 Table Year (proposed) # Budgeted FTE s

FTE 1 Table Year (proposed) # Budgeted FTE s P1 ENVIRONMENTAL SERVICES DEPARTMENT PROPOSED SERVICE PLAN 2019-2022 1. Mandate: Environmental Services (ENVS) provides leadership in environmental protection and sustainable service for the citizens of

More information

Progressive Planning for Financially Robust Water Systems

Progressive Planning for Financially Robust Water Systems Canadian Water Network: Blue Cities 2017 Progressive Planning for Financially Robust Water Systems May 17, 2017 CITY OF ATLANTA Kasim Reed, Mayor Kishia L. Powell, Commissioner 5/25/2017 1 Discussion I.

More information

TOWNSHIP OF SOUTH GLENGARRY FINANCIAL STATEMENTS

TOWNSHIP OF SOUTH GLENGARRY FINANCIAL STATEMENTS FINANCIAL STATEMENTS December 31, 2017 December 31, 2017 CONTENTS Page INDEPENDENT AUDITORS' REPORT 1 FINANCIAL STATEMENTS Statement of Financial Position 2 Statement of Financial Activities 3 Statement

More information

2017 Year-end Capital Variance. That the 2017 Year-end Capital Variance Report (CS ), dated May 7, 2018, be received.

2017 Year-end Capital Variance. That the 2017 Year-end Capital Variance Report (CS ), dated May 7, 2018, be received. Staff Report To Service Area Committee of the Whole Corporate Services Date Monday, May 7, 2018 Subject Report Number 2017 Year-end Capital Variance CS-2018-15 Recommendation That the 2017 Year-end Capital

More information

TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION CAPITAL PROGRAM TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily

More information

BUDGET DRAFT 1 November 19, 2019

BUDGET DRAFT 1 November 19, 2019 BUDGET 2019 DRAFT 1 November 19, 2019 Executive summary For the consideration of our Mayor and Council, City of Lloydminster Administration is pleased to provide a first draft of the 2019 Municipal Budget.

More information

SUBMITTED MARCH 2014 BY PUBLIC SECTOR DIGEST 148 FULLARTON STREET, SUITE 1410 LONDON, ONTARIO, N6A 5P3

SUBMITTED MARCH 2014 BY PUBLIC SECTOR DIGEST 148 FULLARTON STREET, SUITE 1410 LONDON, ONTARIO, N6A 5P3 THE ASSET MANAGEMENT PLAN FOR THE MUNICIPALITY OF LAMBTON SHORES 2014 THE MUNICIPALITY OF LAMBTON SHORES 7883 AMTELECOM PARKWAY FOREST, ONTARIO, N0N IJ0 SUBMITTED MARCH 2014 BY PUBLIC SECTOR DIGEST 148

More information

Asset Management Plan

Asset Management Plan 2016 Asset Management Plan United Counties of Prescott and Russell 6/1/2016 Preface This Asset Management Plan is intended to describe the infrastructure owned, operated, and maintained by the United Counties

More information

City of Coquitlam. Statement of Financial Information 2016

City of Coquitlam. Statement of Financial Information 2016 City of Coquitlam Statement of Financial Information 2016 June 10, 2017 Notice to Reader The Financial Information Act requires municipalities and other Government organizations to prepare annual financial

More information

NEW JERSEY ENVIRONMENTAL INFRASTRUCTURE TRUST

NEW JERSEY ENVIRONMENTAL INFRASTRUCTURE TRUST Welcome David Zimmer Executive Director NJ Environmental Infrastructure Trust NJEIT Mission Statement The New Jersey Environmental Infrastructure Trust is the independent State Financing Authority responsible

More information

Funding Source: Highway Safety Improvement Program (HSIP) Grant - $315,100; Measure I - $60,500

Funding Source: Highway Safety Improvement Program (HSIP) Grant - $315,100; Measure I - $60,500 FY 2017-18 Capital Improvement Program Detail STREETS Raised Median on Pipeline Avenue S14009 Program Year Initiated: FY 2013-14 Construction Year: FY 2016-17 Project Description: Install raised median

More information

Overview of the 2016 Proposed Budget

Overview of the 2016 Proposed Budget Overview of the 2016 Proposed Budget City of Burnsville November 24, 2015 2016 Budget Process Meeting Dates June 9 July 14 August 11 September 8 October 20 October 27 Discussion Topics Financial Management

More information

City of Des Moines. Budget Workshop. December 7, 2015

City of Des Moines. Budget Workshop. December 7, 2015 City of Des Moines Budget Workshop December 7, 2015 Today s Agenda SSMID Review Sanitary and Storm Sewer 2 Self-Supported Municipal Improvement Districts 3 Operation and Terms Each SSMID has a separate

More information

Town of Huntsville Municipal Asset Management Plan

Town of Huntsville Municipal Asset Management Plan Town of Huntsville Municipal Asset Management Plan Adopted by Council (Resolution 470-13) December 20, 2013 1 P a g e Table of Contents Executive Summary... 3 Introduction... 4 State of Local Infrastructure...

More information

Gateway Services Community Development District

Gateway Services Community Development District Gateway Services Community Development District Financial Report December 31, 2017 Prepared by Gateway Services Community Development District Table of Contents BASIC FINANCIAL STATEMENTS Report Page #

More information

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager REPLACEMENT RESERVE REPORT FY 2017 OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 Community Management by: POSTON & COMPANY Melissa Blocker,

More information

Water Service Asset Management Plan

Water Service Asset Management Plan Water Service Asset Management Plan November 2016 Joel Shaw, P.Eng. 1435 Water Street Kelowna, BC V1Y 1J4 TEL (250) 469-8739 jshaw@kelowna.ca kelowna.ca Document Control Rev No Date Revision Details Author

More information

2017 Mid-Year Financial Report

2017 Mid-Year Financial Report 2017 Mid-Year Financial Report BACKGROUND The mid-year report provides information regarding the City of Regina s (City) financial performance. This report provides a high level summary on how the City

More information

VILLAGE OF NEW MARYLAND 2015 GENERAL OPERATING FUND BUDGET. 1. Total Budget - Total Page 17 $4,466,360

VILLAGE OF NEW MARYLAND 2015 GENERAL OPERATING FUND BUDGET. 1. Total Budget - Total Page 17 $4,466,360 1. Total Budget - Total Page 17 $4,466,360 2. Less: Non-Tax Revenue - Total Page 7 $311,392 3. Net Budget $4,154,968 4. Less: Community Funding and Equalization Grant $6,108 5. Warrant to be Raised by

More information