PACP Based Asset Management
|
|
- Damian Newton
- 6 years ago
- Views:
Transcription
1 PACP Based Asset Management Objectives of Asset Management Maintain function or level of service as cost effectively as possible Maintain individual components (assets) at lowest life cycle cost possible Asset Management in Wastewater Systems Key asset management questions: What pipes, manholes, and laterals do we own? Where are these assets located? What are their materials, dimensions, depth, and ground cover? What is the condition of each asset? What other community assets would be affected by failure of a particular asset? Which assets are critical to sustained performance? What are my best O&M and CIP investment strategies? What will be the rehabilitation cost? What effect will this have upon the utility budget? How should all of this be communicated to stake holders? 1
2 PACP in Asset Management PACP can assist in developing an asset management plan by collecting asset information such as: Pipe segment length Relative location details Pipe size Pipe shape Pipe material Upstream manhole data Pipe segment lateral data Consequence of failure Defect codes (Structural and O&M) Condition grades Risk in Asset Management Risk = Calculation that takes into account Physical condition The impact of failure to System performance Stakeholders Risk in Asset Management Risk Likelihood of something bad happening and Severity of consequence(s) of failure 2
3 Risk in Asset Management Risk = LoF x CoF Likelihood of Failure (LoF) -Probability of failure of an asset Consequence of Failure (CoF) -Direct and indirect impacts that would result from an asset failure Likelihood Of Failure (LoF) PACP condition grades can determine segment scores Segment scores can be used to calculate Likelihood of Failure for pipelines The Modified PACP Quick Rating based upon highest grade defect observed within a particular pipe segment Appendix C PACP Condition Grading System PACP Grading System for Pipelines, Manholes and Laterals 5 Most significant defect grade 4 Significant defect grade 3 Moderate defect grade 2 Minor to moderate defect grade 1 Minor defect grade 3
4 Pipe Rating System PACP Quick Rating 10 to 14 =A 15 to 19 = B 20 to 24 = C Etc. 10 to 14 =A 15 to 19 = B 20 to 24 = C Etc. Likelihood of Failure Rules An asset s Likelihood of Failure is determined based on the following scenarios: No condition assessment data is available Condition assessment data is available and there are no defects There are no more than 9 occurrences of the highest condition grade The second character is a letter (indicating more than 9 occurrences) In all cases we divide the first two digits of the quick rating by 10 Calculate LoF 4
5 Calculate LoF Consequence of Failure (CoF) Direct and indirect impacts on the vicinity and community due to a potential asset failure Expressed as Triple Bottom Line (TBL) o Economic Impacts o Social Impacts o Environmental Impacts Consequence of Failure (CoF) Social costs Sustainability Environmental costs Economical costs 5
6 Economical Impacts Impact of Direct and Indirect economic losses o Direct costs Asset Repairs Legal Fees Fines o Indirect costs Property Values Increased Insurance Rates Utility's Credibility Typically expressed in dollars and include property damage, repair cost, and production loss, etc. Social Impacts Impact on Society due to asset failure Factors include o Number of properties/clients affected o Types of affected properties (hospitals, schools, businesses, parks, critical services, etc.) o Duration of Failure o Utility s Credibility o Public Health and Safety In addition, there must be consideration for safety issues (i.e. public exposure to health-threatening problems, injuries, or even fatalities) Environmental Impacts Impact to ecological conditions occurring as a result of asset failure Environmentally cost considerations based on o Proximity to wetlands and waterways o Federal Emergency Management Agency (FEMA) flood zones o Possible contamination of potable water sources o Sensitivity of nearby soils 6
7 Rating Methodology 56 inch combined trunk sewer 100 feet downstream of a Combined Sewer Overflow (CSO) that crosses a body of water Higher CoF Vs. Lower CoF 8 inch sanitary sewer at the upstream end of the system that only serves one resident Rating Methodology Considers locational and demographical information o Network Position o Location of Pipe o Proximity to Environmentally Sensitive Features o Service to customer of significant importance o Accessibility for maintenance and inspection A good GIS map helps to determine these considerations CoF assigned on a scale from 1 to 6 Assets with no CoF assigned are given a value of 0 (Zero) CoF Examples CoF Descriptions and Associated Factors Examples include o Pipe Depth o Relative Network Position of the Pipe o Pipe Diameter o Location of Pipe o Distance between Pipe and Waterway o Customers of High Importance o Accessibility The system owner must decide upon CoF factors and weighting 7
8 Pipe Depth Typically an economicconsideration since deeper pipe is generally more expensive to repair/replace * Assets with no CoF assigned shall be given a value of 0 (Zero) Relative Network Position of Pipe Pipe Diameter o Economic Costs more to repair, replace, and rehabilitate o Social Impacts more customers o Environmental impacts to sensitive geographical area Relative Network Position Sum of relative position of all pipes discharging to an upstream structure Pipe Diameter Affects Economic, Environmental and Social costs Larger diameter pipes generally Serve more customers Cost more to rehabilitate * Assets with no CoF assigned shall be given a value of 0 (Zero) 8
9 Relative Network Position of Pipe Relative Network Position of Pipe Location of Pipe GIS based maps with layers including street network, buildings, waterways and other datasets can be utilized to assign Consequence of Failure based on surface location Location of Pipe Disruption to the community and the cost of managing emergency repairs of a pipe Accessibility for repair, rehabilitation or replacement in case of emergency Pipe failure on a major road causes more disruption to traffic compared to failure of a pipe on a local road * Assets with no CoF assigned shall be given a value of 0 (Zero) 9
10 Proximity to Environmentally Sensitive Features Consequence of Failure factor is set based on the distance between a pipe and an environmentally sensitive feature Factor affected by the nature of the sensitive environment GIS can be set-up to assign CoF based on distance to environmentally sensitive features Service to Customer of Significant Importance Hospitals, schools, manufacturing facilities, emergency services, etc., as determined by utility Providing uninterrupted service to these facilities may be a priority for the utility 10
11 Accessibility for Maintenance/Inspection Response time for a service crew may be significantly higher if access is difficult Failure may cause significant damage to the environment as well as private properties due to delays in response 11
12 Sample Calculation of Overall CoF 4.03 Enter Consequence of Failure value in Field 22 of the PACP Inspection Form Header Section Managing Asset Risk Risk matrix provides a basis for a maintenance and rehabilitation program Overall risk a function of LoF and CoF 12
13 Appendix D PACP Based Risk Management Considers PACP Role Regarding Risk Management in Asset Management Managing Asset Risk CoF and LoF have a range between 0 and 6 A score of 0 (LoFor CoF) represents a data gap Information should be promptly collected Do not use/graph 0 scores! On the graph o The green area represents assets with lower risk o The red area represents assets with higher risk; resources should be focused on rehabilitating assets that fall in the red area Non-zero risk scores can be used to prioritize projects Collect asset condition information Sample Asset Management Plan Graph this data to help set priorities 13
14 Managing Asset Risk (Examples) 2.4, , , , , , 2.1 Managing Asset Risk (Examples) $40,000 available for rehab $25,000 available for rehab $20,000 available for rehab 2.4, , , , , , 2.1 Successful Asset Management Results Shift from emergency response to strategic riskbased management of critical assets Reduce the number of asset failures Minimize the negative impacts of failures when they occur Improve performance & reliability of the system Manage O&M costs more accurately 14
15 Questions? More Information? Ted DeBoda, PE Jane Bayer NASSCO, Inc. (410)
Wastewater Asset Management Unique Perspectives from the Engineer & Municipality
Wastewater Asset Management Unique Perspectives from the Engineer & Municipality Alex Mattia GHD Charlie Card GHD Matt Lamb GHD Patrick Fellrath Plymouth Twp. 2018 Boyne Falls Agenda for today Introduction
More information2016 Collection Systems Workshop. Asset Management for Small to Midsized Communities
2016 Collection Systems Workshop FISHBECK, THOMPSON, CARR & HUBER, INC. Asset Management for Small to Midsized Communities Ohio Water Environment Association May 18 2016 An asset management program identifies
More informationFlood Resilience Study Findings
Services of the San Francisco Public Utilities Commission Flood Resilience Study Findings Presentation to Citizens Advisory Committee Special Session May 17, 2016 Stefani Harrison, Project Manager 1 Agenda
More informationRisk-based Prioritization of Transmission & Distribution Projects in Westchester County
Risk-based Prioritization of Transmission & Distribution Projects in Westchester County NYS AWWA Water Event April 26, 2017 Alberto Quiroz, PE Outline Background Methodology Results SUEZ in North America
More informationBy Shayne C. Kavanagh and Jennifer Belknap Williamson
Risk-Aware Infrastructure Maintenance By Shayne C. Kavanagh and Jennifer Belknap Williamson This article is part of an ongoing series about financial sustainability, based on GFOA s new financial sustainability
More informationCITY OF STURGIS INTEGRATING 20 YEARS OF MAINTENANCE HISTORY INTO AN AMP
CITY OF STURGIS INTEGRATING 20 YEARS OF MAINTENANCE HISTORY INTO AN AMP ASSET MANAGEMENT FROM PLAN TO PROGRAM - JANUARY 25, 2017 Tom Sikorski WWTP Superintendent Allen Gelderloos, PE AMP Project Manager
More informationUsing Tolerable Risk to Drive Asset Management Decision Making
Using Tolerable Risk to Drive Asset Management Decision Making Richmond, Virginia May 12, 2016 1 Principal Asset Management Consultant with GHD and has over 25 years experience in utility management. Nationally
More informationOptimal Risk-Based Life-Cycle Cost Scheduling of Water & Sewer Main Replacements
Optimal Risk-Based Life-Cycle Cost Scheduling of Water & Sewer Main Replacements The firefighter who was driving the firetruck when it fell into the Valley Village sinkhole caused by a broken water line
More informationNew Strategies for Prioritizing Old Projects Using Risk and Triple Bottom Line Criteria Presenter: Celine Hyer, PE ARCADIS/Malcolm Pirnie 5/23/2012
New Strategies for Prioritizing Old Projects Using Risk and Triple Bottom Line Criteria Presenter: Celine Hyer, PE ARCADIS/Malcolm Pirnie 5/23/2012 Today s Agenda Overview of Toho Water Authority Risk
More informationThe City of Owen Sound Asset Management Plan
The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to
More informationAsset Management Helping to Move the Detroit Water and Sewerage Department into the 21st Century OWEA Collection Systems Workshop
Asset Management Helping to Move the Detroit Water and Sewerage Department into the 21st Century 2018 OWEA Collection Systems Workshop 17 May 2018 Agenda Detroit s Infrastructure Challenges Creation of
More informationAs presented at the Institute of Municipal Engineering of South Africa (IMESA) conference 2013
Paper title: OUTCOMES FROM A SEWER MAINTENANCE BACKLOG INVESTIGATION As presented at the Institute of Municipal Engineering of South Africa (IMESA) conference 2013 Morné Pienaar a a Aurecon Port Elizabeth,
More informationAPPENDIX J. CIP Renewal and Replacement Process. Revision History
APPENDIX J CIP Renewal and Replacement Process Revision History Revision Date Approval Reason 0 09/30/05 Original 1 05/25/11 2 09/27/12 3 03/26/14 4 11/14/16 E. Yong Updated Clearinghouse process and replaced
More informationHeader Tile ATTACHMENT 2. City of Saskatoon
Header Tile ATTACHMENT 2 2 Building Better Infrastructure The Administration evaluates the condition of the City s assets in order to develop annual programs to maintain the assets at a minimum cost. Where
More informationCHAPTER 15: FLOODPLAIN OVERLAY DISTRICT "FP"
CHAPTER 15: FLOODPLAIN OVERLAY DISTRICT "FP" SECTION 15.1 STATUTORY AUTHORIZATION The legislature of the State of Minnesota in Minnesota Statutes, Chapter 103F and Chapter 394 has delegated the responsibility
More informationPROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET
CITY OF PLACERVILLE PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET 2016/2017 CAPITAL IMPROVEMENT PROGRAM POLICY Each year the City faces the challenge of meeting infrastructure and equipment needs with limited
More informationChicopee River CSO Project Springfield Water & Sewer Commission. APWA Congress September 9, CSO Control Plan. CSO Control
Chicopee River CSO Project Springfield Water & Sewer Commission APWA Congress September 9, 2007 CSO Control Plan Typical Approach Different Thinking on Controlling Costs Case Example Springfield MA CSO
More informationCommittee of the Whole
Committee of the Whole Committee of the Whole to be held at City of Penticton, Council Chambers 171 Main Street, Penticton, B.C. Tuesday, June 19, 2018 Recessed from the Regular Council Meeting at 1:00
More information112 th Annual Conference May 6-9, 2018 St. Louis, Missouri
10:30 12:10 May 9, 2018 Room 100-102 112 th Annual Conference May 6-9, 2018 St. Louis, Missouri Moderator/Speakers: Cynthia L. Freeman, Budget & Fiscal Officer, 16th Circuit Court of Jackson County, MO
More informationStatement of Policy. Milwaukee Metropolitan Sewerage District s Private Property Inflow and Infiltration Reduction Program.
Milwaukee Metropolitan Sewerage District s 2011-2020 Private Property Inflow and Infiltration Reduction Program Introduction Infiltration is the quantity of water entering a sewer system through such sources
More informationFREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality
FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial
More informationMONETIZING RISKS A PRIORITIZATION & OPTIMIZATION SOLUTION JASON DE STIGTER, P.E. 13 October 2014
13 October 2014 MONETIZING RISKS A PRIORITIZATION & OPTIMIZATION SOLUTION JASON DE STIGTER, P.E. SENIOR CONSULTANT SOUTHWEST SECTION AWWA ANNUAL CONFERENCE TULSA, OKLAHOMA TOP 5 INDUSTRY ISSUES MIDWEST
More informationSession of HOUSE BILL No By Committee on Judiciary 2-7
Session of 0 HOUSE BILL No. By Committee on Judiciary - 0 0 0 AN ACT concerning utilities; relating to the Kansas underground utility damage prevention act; definitions; location of facilities and duty
More informationa) Ensure public safety through reducing the threats to life and personal injury.
SECTION VII: FLOODPLAIN DISTRICT 7-1 Statement Of Purpose The purposes of the Floodplain District are to: a) Ensure public safety through reducing the threats to life and personal injury. b) Eliminate
More informationFloodplain Management Annual Conference Atlanta, Georgia April 2017
Floodplain Management 2017 Annual Conference Atlanta, Georgia April 2017 Floodplain Mapping and Flood Zones Zone Deisgnations: Zone A: No base flood elevations have been determined it is an approximated
More informationArticle 23-6 FLOODPLAIN DISTRICT
AMENDING THE CODE OF THE CITY OF PITTSFIELD CHAPTER 23, ZONING ORDINANCE SECTION I That the Code of the City of Pittsfield, Chapter 23, Article 23-6 Floodplain District, shall be replaced with the following:
More informationCITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP)
CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP) APRIL 2009 Table of Contents INTRODUCTION... 3 SECTION I: GOALS... 3 SECTION II: ORGANIZATION... 4 SECTION III: LEGAL AUTHORITY...
More informationFort Collins Utilities Asset Management Program. Topics
Fort Collins Utilities Asset Management Program Rocky Mountain Chapter NASTT Fall Conference November 2012 Chris Parton, P.E. Asset Manager Fort Collins Utilities 1 Topics Fort Collins Utilities Organization
More informationThe Use of Clementine at South West Water to reduce sewer flooding incidents
The Use of Clementine at South West Water to reduce sewer flooding incidents Tony Hoar - Business Performance Manager Ben Plastow - Data Quality Analyst Presentation Topics (Tony) Overview of South West
More informationPractical Water Utility Asset Management Plans
Kevin Campanella, Utility Planning Leader, Burgess & Niple September, 2016 Practical Water Utility Asset Management Plans Inconsistency Treatment plants One tracked pencils, another didn t track small
More informationThe Three Planning Windows of Asset Management John Murray City of Hamilton May 9 th, 2012 CNAM - Montreal. Hamilton Asset Management Plan
The Three Planning Windows of Asset Management John Murray City of Hamilton May 9 th, 2012 CNAM - Montreal 1 City of Hamilton Amalgamated - 2001 7 Area Municipalities Population 500,000 The City of Waterfalls
More informationKansas Underground Utility Damage Prevention Act. With Changes Mandated by HB 2637
NOT AN OFFICIAL PUBLICATION. Kansas One-Call/Kansas 811 has made every attempt to ensure that all information contained below is both accurate and true. However, none of this information contained on this
More informationSEWER LINE CHEMICAL ROOT CONTROL. TECHNICAL SPECIFICATIONS (as provided by Duke s Root Control, Inc.)
SEWER LINE CHEMICAL ROOT CONTROL TECHNICAL SPECIFICATIONS (as provided by Duke s Root Control, Inc.) TABLE OF CONTENTS 1. General 2. Contractor Responsibilities 3. Guarantee 4. Composition of the Chemical
More informationRisk Assessment and Critical Assets
Asset Management as a Process Workshop Photo Risk Assessment and Critical Assets 2016 APWA Washington Puyallup, Washington Bryan Chappell, Water Quality Supervisor 1 Condition Risk Assessment Assessment
More informationEmergency Management. December 16, 2010
Applications of Hazus-MH for Emergency Management December 16, 2010 What is Hazus-MH? Free ArcGIS extension Facilitates a risk-based approach to mitigation Identifies and visually displays hazards and
More informationFinance Committee Meeting
Finance Committee Meeting FY18 Strategic Business and Operating Plan and Preliminary Budget Review April 04, 2017 1 Finance Committee Meeting FY18 Strategic Business Operating Plan and Preliminary Budget
More informationMultisector Asset Management Case Studies CHAPTER 5 THE PORTLAND, OREGON, EXPERIENCE
56 Multisector Asset Management Case Studies CHAPTER 5 THE PORTLAND, OREGON, EXPERIENCE The City of Portland (City) with a population of 568,000 comprises an area of approximately 145 square miles in north-western
More informationCity of Memphis, Tennessee
REQUIREMENTS FOR PREPARING AND SUBMITTING STATEMENT OF QUALIFICATIONS (SOQ) FOR Sewer System Evaluation Survey (SSES) December 17, 2013 Sewer System Evaluation Survey (SSES) SOQ No. 179821.78.0003 City
More informationPROPERTY OWNERS MEETING SEWER SERVICE RATES
PROPERTY OWNERS MEETING SEWER SERVICE RATES Crystal Springs County Sanitation District (District) Highlands Elementary School 2320 Newport Street San Mateo Highlands April 25, 2012 7:00 P.M. County of
More informationPROPERTY OWNERS MEETING SEWER SERVICE CHARGE RATES
PROPERTY OWNERS MEETING SEWER SERVICE CHARGE RATES Devonshire County Sanitation District Harbor Industrial Sewer Maintenance District Scenic Heights County Sanitation District Clifford Elementary School
More informationRisk Assessment Mitigation Phase Risk Mitigation Plan Lessons Learned (RAMP B) November 30, 2016
Risk Assessment Mitigation Phase Risk Mitigation Plan Lessons Learned (RAMP B) November 30, 2016 #310403 Risk Management Framework Consistent with the historic commitment of Southern California Gas Company
More informationG318 Local Mitigation Planning Workshop. Module 2: Risk Assessment. Visual 2.0
G318 Local Mitigation Planning Workshop Module 2: Risk Assessment Visual 2.0 Unit 1 Risk Assessment Visual 2.1 Risk Assessment Process that collects information and assigns values to risks to: Identify
More informationBenefit-cost analysis of water and sewerage network management options
F I N A L R E P O R T Benefit-cost analysis of water and sewerage network management options Prepared for Icon Water June 2017 THE CENTRE FOR INTERNATIONAL ECONOMICS The Centre for International Economics
More informationAPPENDIX K Drainage Study
APPENDIX K Drainage Study Storm Drainage Study For Project 65 Sacramento, California Prepared for: Capital Station 65, LLC Prepared by: Nolte Associates, Inc. 2495 Natomas Park Drive, Fourth Floor Sacramento,
More informationCharging arrangements for new connection services. Our latest proposals. December 2017.
Charging arrangements for new connection services. Our latest proposals. December 2017. 1 April 2018 to 31 March 2019 1 Index. Charging arrangements 1. Introduction... 2. You have a choice... Water charging
More informationBartlett Tree Experts Tree Risk Assessment and Recommendations
Bartlett Tree Experts Tree Risk Assessment and Recommendations Prepared for: Town of Weston Scenic Roadways, Inventory/Assesment Weston, Massachusetts 02493 Assessed by: Andrew Balon The F.A. Bartlett
More informationCNAM Risk Management for Utility Managers
CNAM 2013 Heather McGinnity PEng. Region of Peel Project Manager Roop Lutchman, PEng. GHD Leader, Business Consulting May 07 th, 2013 Agenda 1. Introduction 2. Risk Management Framework 3. Case Study (Lake
More informationOverview of Asset Management s 5 Core Components
Overview of Asset Management s 5 Core Components When you know better you do better Maya Angelou THE AM THOUGHT PROCESS CONSISTS OF 5 CORE COMPONENTS Moderate Risk High Risk Low Risk Moderate Risk Probability
More informationKern Sanitation Authority Budget Unit 9144
SPECIAL DISTRICTS Kern Sanitation Authority Budget Unit 9144 Department Head: Daphne B. Harley, Appointed SUMMARY OF EXPENDITURES AND REVENUES APPROPRIATIONS: Salaries and Benefits Services and Supplies
More informationHUD s Environmental Review Process. Disaster Assistance Training 2012 Jerimiah Sanders, Environmental Specialist
HUD s Environmental Review Process Disaster Assistance Training 2012 Jerimiah Sanders, Environmental Specialist Goals: Understand NEPA Overview of levels of environmental review Spot red flags New Tools
More informationStormwater System Asset Management Plan. June 2018
Stormwater System Asset Management Plan June 2018 City Council Citizens, stakeholders Strategic Priorities Level of Service Goals Performance Measures What actions are needed to meet Level of Service Goals
More informationSewer Rate Study July 2016
July 2016 Prepared By The Finance Division TABLE OF CONTENTS SECTION 1: EXECUTIVE SUMMARY... 1 1.1 Background... 1 1.2 Purpose... 1 1.3 Current Sewer Rates... 1 1.4 Five Year Financial Projection... 1
More informationFinance Committee Meeting
Finance Committee Meeting FY16 Strategic Business and Operating Plan and Preliminary Budget Review April 8, 2015 Finance Committee Meeting FY16 Strategic Business Operating Plan and Preliminary Budget
More informationCITY OF PETALUMA DEPARTMENT OF PUBLIC WORKS AND UTILITIES. Sewer System Management Plan (SSMP) 2018 SSMP Audit
CITY OF PETALUMA DEPARTMENT OF PUBLIC WORKS AND UTILITIES Sewer System Management Plan (SSMP) 2018 SSMP Audit PURPOSE The purpose of the SSMP Audit is to evaluate the effectiveness of the City s SSMP,
More informationA Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative
A Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative June 3, 2015 Ellie Baker Horsley Witten Group, Inc. What will we cover today? Introduction
More informationQUALITY OF SERVICE STANDARDS FOR THE SUPPLY AND DISTRIBUTION OF WATER AND WASTEWATER SERVICES. December Final Decision - Summary
QUALITY OF SRVIC STANDARDS FOR TH SUPPLY AND DISTRIBUTION OF WATR AND WASTWATR SRVICS December 2017 Final Decision - Summary i Table of Contents 1. INTRODUCTION...1 Purpose of this Document... 1 Acknowledgement...
More informationDISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Board of Directors
Environmental Quality and Operations Committee - I. Call to Order - James Patteson, Chairperson DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Board of Directors Meeting of the Environmental Quality and
More informationHOUSE BILL No page 2
HOUSE BILL No. 2178 AN ACT concerning utilities; relating to the Kansas underground utility damage prevention act; definitions; location of facilities and duty to mark, exceptions; amending K.S.A. 66-1802,
More informationA. All Responses to Request for Statements shall be sent to:
CITY OF FEDERAL WAY REQUEST FOR STATEMENT OF QUALIFICATIONS ARCHITECTURAL AND ENGINEERING SERVICES Surface Water Management ( SWM ) Comprehensive Plan Capital Improvements Program Update and Rate Study
More informationDornoch (Potentially Vulnerable Area 01/07) Local Plan District Highland and Argyll Local authority The Highland Council Main catchment Dornoch coasta
Dornoch (Potentially Vulnerable Area 01/07) Local authority The Highland Council Main catchment Dornoch coastal Summary of flooding impacts
More informationFloodplain Development Permit Application
Floodplain Development Permit Application City of Jonesboro, AR This is an application packet for a Floodplain Development Permit. Certain sections are to be completed by the Applicant, and certain sections
More informationInfrastructure Asset Management. Southwest Chula Vista Civic Association April 26, 2007
Infrastructure Asset Management Southwest Chula Vista Civic Association April 26, 2007 Chula Vista s Municipal Infrastructure Pavement* Traffic Signals Alleys Streetlights Parking Lots Street Signs Sidewalks*
More informationSTORMWATER MANAGEMENT FUND Department of Environmental Services
Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More informationTO: CITY COUNCIL DATE: May 18,2009. THROUGH: MUNICIPAL SERVICES COMMITTEE (April 29,2009)
TO: CITY COUNCIL DATE: May 18,2009 THROUGH: MUNICIPAL SERVICES COMMITTEE (April 29,2009) FROM: CITY MANAGER SUBJECT: ADOPTION OF THE SEWER SYSTEM MANAGEMENT PLAN (SSMP) RECOMMENDATION: It is recommended
More informationSurvey of Hazus-MH: FEMA s Tool for Natural Hazard Loss Estimation
Survey of Hazus-MH: FEMA s Tool for Natural Hazard Loss Estimation What is Hazus? Software tools and support system designed by FEMA for the purpose of providing communities with the means to identify
More informationThe catch basins consist of both separated and combined-sewer catch basins. Basins may be located on public rights of way and / or private property.
This Catch Basin Cleaning Services Contract ( Contract ) made this day of, 2016 between the Greater Augusta Utility District ( District ) and ( Contractor ) is the execution of the first year Contract
More informationPolicy CIE The following are the minimum acceptable LOS standards to be utilized in planning for capital improvement needs:
Vision Statement: Provide high quality public facilities that meet and exceed the minimum level of service standards. Goals, Objectives and Policies: Goal CIE-1. The City shall provide for facilities and
More informationWEF Collection Systems Conference 2017
Enhanced Affordability Analysis of Combined Sewer Overflow Long-Term Control Plans Omaha s CSO! Program Jason Mumm, Stantec, James Theiler, City of Omaha, Andy Baker, Stantec, and Carol Malesky, Stantec
More informationVolusia County Floodplain Management Plan 2012
Volusia County Floodplain Management Plan 2012 Introduction The National Flood Insurance Program (NFIP) provides federally supported flood insurance in communities that regulate development in floodplains.
More informationTOWN OF FARMINGTON DEPARTMENT OF PUBLIC WORKS & DEVELOPMENT SERVICES ENGINEERING DIVISION
TOWN OF FARMINGTON DEPARTMENT OF PUBLIC WORKS & DEVELOPMENT SERVICES ENGINEERING DIVISION Russell Arnold, Jr. Matt Walsh, P.E. Director of Public Works Assistant Town Engineer (860) 675-2305 (860) 675-2305
More informationORDINANCE ESTABLISHING STANDARDS FOR REDUCTION OF INFLOW AND INFILTRATION. January, Western Lake Superior Sanitary District Duluth, Minnesota
ORDINANCE ESTABLISHING STANDARDS FOR REDUCTION OF INFLOW AND INFILTRATION January, 2009 Western Lake Superior Sanitary District Duluth, Minnesota WESTERN LAKE SUPERIOR SANITARY DISTRICT ORDINANCE ESTABLISHING
More informationControlling Risk Ranking Variability Using a Progressive Risk Registry
Controlling Risk Ranking Variability Using a Progressive Risk Registry 32nd Annual National VPPPA Safety & Health Conference/Expo September 1, 2016 Agenda What is a Progressive Risk Registry? How does
More informationAPPLICATION FOR CERTIFICATE OF QUALIFICATIONS TO PROPOSE FOR PROFESSIONAL SERVICES
THE METROPOLITAN ST. LOUIS SEWER DISTRICT 2350 MARKET STREET ST. LOUIS, MO 63103 (USED IN PREQUALIFYING CONSULTANTS ON ARCHITECTURAL, ENGINEERING, AND SURVEYING SERVICES) January 1, 2014 through December
More informationRequest for Proposal For Design Engineering Services. Northwest Lansing Relief Sewer Project
Request for Proposal For Design Engineering Services City of Lansing, Kansas Wastewater Utility Department 800 First Terrace Lansing, Kansas 66043 February 14, 2018 Page 1 of 14 A. INTRODUCTION The City
More informationAn Approach for the Assessment of the Maximum Probable Loss for Insurance Purposes
1. INTRODUCTION An Approach for the Assessment of the Maximum Probable Loss for Insurance Purposes During the last decades, the financing of the construction and maintenance of new motorways in various
More informationREQUEST FOR PROPOSALS FOR THE DEVELOPMENT OF A STRATEGIC PLAN TO IMPROVE PUBLIC AREA TRASH/RECYCLING BINS AND CONTAINER MANAGEMENT
REQUEST FOR PROPOSALS FOR THE DEVELOPMENT OF A STRATEGIC PLAN TO IMPROVE PUBLIC AREA TRASH/RECYCLING BINS AND CONTAINER MANAGEMENT Issued: April 9, 2013 Proposals Due: April 26, 2013 Vanessa Marcadejas
More information6.0 MONITORING AND CONTINGENCY PLANS
6.0 MONITORING AND CONTINGENCY PLANS 6.1 MONITORING The primary objective of compliance and effects monitoring is to confirm whether mitigation and protective measures are effectively implemented and to
More informationAsset Management Investment Plan
Asset Management Plan Prepared for the City of Kimberley 304-1353 Ellis Street Kelowna, BC, V1Y 1Z9 T: 250.762.2517 F: 250.763.5266 June 2016 File: 1162.0014.01 A s s e t M a n a g e m e n t I n v e s
More informationSpecial Conditions, Regulations and Instructions for Right of Way Permit Applications
Special Conditions, Regulations and Instructions for Right of Way Permit Applications The Department of Environmental Services (DES) issues public right of way (PROW) permits to contractors with a valid
More informationMapping Flood Risk in the Upper Fox River Basin:
Mapping Flood Risk in the Upper Fox River Basin: Vulnerable Populations and Adverse Health Effects Presented by: Angelina Hanson STUDY AREA: Wisconsin's Upper Fox River Basin Total Population 139,309.
More informationPUBLIC WORKS DEPARTMENT
Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED RECOMM. General Fund: Revenue Administration 494,646 501,667 501,035 508,551 Municipal Trash Collection 101,185 60,358 60,358 60,962 Total Revenues
More informationPublic Notice. Proposed anchor structures, dredging, and discharge at the Enbridge Line 5 pipeline in the Straits of Mackinac, Michigan
US Army Corps of Engineers Detroit District Public Notice Applicant: Enbridge Pipelines (Lakehead), LLC In Reply Refer To: Corps File No. LRE-2010-00463-56-N18 Date: January 29, 2019 Expires: February
More informationHAZARD DESCRIPTION... 1 LOCATION... 2 EXTENT... 4 HISTORICAL OCCURRENCES... 6 PROBABILITY OF FUTURE EVENTS... 6 VULNERABILITY AND IMPACT...
DAM FAILURE HAZARD DESCRIPTION... 1 LOCATION... 2 EXTENT... 4 HISTORICAL OCCURRENCES... 6 PROBABILITY OF FUTURE EVENTS... 6 VULNERABILITY AND IMPACT... 6 Hazard Description Dams are water storage, control
More informationEfficient Capital Replacement Planning The Economic Optimization Approach. March 26, 2018
Efficient Capital Replacement Planning The Economic Optimization Approach March 26, 2018 DO YOU HAVE AGING INFRASTRUCTURE? Dahuloe Break the old paradigms How Long does a Sewer Main Last? -Clay Pipe -Cast
More informationCity of Madison 2019 Operating Budget 296
City of Madison 2019 Operating Budget 296 City of Madison 2019 Operating Budget 297 Agency: Sewer Proposed Budget Cost to Continue Proposed Change Revenue -$38,331,199 -$40,684,110 -$2,352,911 Expenditures
More informationCase Study: Key Performance Indicators implementation in gas transmission pipeline. María José Gutiérrez Argentina
Paper Number: 2015-07 Case Study: Key Performance Indicators implementation in gas transmission pipeline María José Gutiérrez Argentina Abstract Corrosion is a major threat that affects many assets of
More informationCity of Des Moines. Budget Workshop. December 7, 2015
City of Des Moines Budget Workshop December 7, 2015 Today s Agenda SSMID Review Sanitary and Storm Sewer 2 Self-Supported Municipal Improvement Districts 3 Operation and Terms Each SSMID has a separate
More informationChapter 8: Lifecycle Planning
Chapter 8: Lifecycle Planning Objectives of lifecycle planning Identify long-term investment for highway infrastructure assets and develop an appropriate maintenance strategy Predict future performance
More informationMaurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM
TO: FROM: Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 SUBJECT: - MEMORANDUM Introduction The (City) provides sewer sanitary collection services
More informationFive Year Capital Improvement Program
Sewer Projects City of Pomona 201819 Proposed Budget Five Year Capital Improvement Program Expended as of 2/28/18 Remaining Budget Proposed 2018/19 Page # Sewer ~ Funded Projects ~ Sewer Force Mains Pumping
More information2016 Annual Conference & Exposition
2016 Annual Conference & Exposition SUN05 Designing a Risk-based Pipeline R&R Planning Program Using a Combination of Inspection and Analytical Approaches June 19, 2016 Chicago, Illinois Workshop Agenda
More informationTHE DISTRICT OF MUSKOKA ASSET MANAGEMENT PLAN FOR ROADS, BRIDGES, WATER AND WASTEWATER ASSETS
THE DISTRICT OF MUSKOKA ASSET MANAGEMENT PLAN FOR ROADS, BRIDGES, WATER AND WASTEWATER ASSETS MAY 29, 2014 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview 1-1 1.2 Plan Development 1-1
More informationApplying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA
Applying for a Kinder Morgan Canada Proximity Permit Design and Construction Guidelines CANADA A Guide to Applying for a Kinder Morgan Canada Proximity Permit Kinder Morgan Canada operates the Trans Mountain
More informationCITY OF HALF MOON BAY. Request for Proposals for Sewer Collection System Maintenance Services. RFP Issue Date: January 22, 2018
CITY OF HALF MOON BAY Request for Proposals for Sewer Collection System Maintenance Services RFP Issue Date: January 22, 2018 Proposal Due Date: February 20, 4:00 PM PST City of Half Moon Bay John Doughty
More informationMONROE COUNTY 2015 LMS STEP TWO: CHARACTERIZATION FORM
MONROE COUNTY 2015 LMS STEP TWO: CHARACTERIZATION FORM This form is used to submit information necessary for the LMS Work Group to score and prioritize an initiative relative to other initiatives and projects.
More informationCITY OF SACRAMENTO CALIFORNIA. April 27, 2012
OFFICE OF THE CITY MANAGER CALIFORNIA April 27, 2012 CITY HALL 5 th FLOOR 915 I STREET SACRAMENTO, CA 95814-2684 PH 916-808-5704 FAX 916-808-7618 Honorable Mayor and City Council Sacramento, California
More informationSPILLWAY ADEQUACY ANALYSIS ROUGH RIVER LAKE LOUISVILLE DISTRICT
SPILLWAY ADEQUACY ANALYSIS OF ROUGH RIVER LAKE LOUISVILLE DISTRICT RICHARD PRUITT (502) 315-6380 Louisville District COE richard.l.pruitt@lrl02.usace.army.mil Spillway ROUGH RIVER LAKE PERTINENT DATA Construction
More informationRequirements for Mapping Levees Complying with Section of the NFIP Regulations
FACT SHEET Requirements for Mapping Levees Complying with Section 65.10 of the NFIP Regulations As part of a mapping project, it is the levee owner s or community s responsibility to provide data and documentation
More informationPREFERRED FINANCIAL PLAN SCENARIO & WATER RATE DESIGN ALTERNATIVE
Mid Flat Rate Increases Limited CIP through Year 5 Reserves recover by Year 10 Phased In CIP Spending 2. 10 Year Phase In 100% of CIP by Year 10 100% of Reserves by Year 10 3. 5 Year Phase In 100% of CIP
More informationRight of Way Permits. Contact Information:
Right of Way Permits A Right-of-Way Use Permit is required for any work performed in the public right-of-way (including but not limited to sewer or water extensions, franchise utility work, storm drainage,
More information