1 US Army Corps of Engineers Detroit District Public Notice Applicant: Enbridge Pipelines (Lakehead), LLC In Reply Refer To: Corps File No. LRE N18 Date: January 29, 2019 Expires: February 17, 2019 Proposed anchor structures, dredging, and discharge at the Enbridge Line 5 pipeline in the Straits of Mackinac, Michigan Applicant: Enbridge Pipelines (Lakehead) LLC 26 East Superior Street, Suite 309, Duluth, MN Project Location: The site is located in the Straits of Mackinac between Point LaBarbe and McGulpin Point, Emmet and Mackinac Counties, Michigan. Federal Authority: The applicant has applied for a Department of the Army permit under Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act. State Authority: Section 401 of the Clean Water Act requires that all discharges of dredged or fill material must be certified by the State as complying with applicable effluent limitations and water quality standards. Coastal Zone Management Certification (or waiver thereof) is required from the State of Michigan if this proposed activity would occur within the designated coastal zone. Project Description: As shown on the attached plans, the applicant proposes to install 51 helical anchor structures on the existing pipeline, including the 48 anchors described in the USACE public notice of June 29, 2018, and 3 additional anchors proposed in September Anchors would consist of a helical anchoring system with saddle mounts. The anchors would be augured into the lakebed to a depth of approximately 10 feet. Work would be conducted from a barge with diver assistance. A total of up to 10 cubic yards of material would be dredged from an area approximately 4 feet long, 2 feet wide, and 1 foot deep, if needed to accommodate anchor saddle installation at some proposed anchor locations. A total of up to 5 cubic yards of material would be dredged from a similar sized area at 3 locations where anchors were authorized in 2017 but have not yet been installed. The dredged material would be discharged on the lakebed adjacent to the dredge area. The applicant further proposes to dredge and discharge lakebed sediment in association with the inspection of 128 existing pipeline anchor structures. A total of up to 300 cubic yards of sediment would be dredged from an area up to 40 feet long, 5
2 File No. LRE N18 January 29, 2019 feet wide, and 2 feet deep at up to 128 anchor sites by pumping, water jetting, and hand excavation to expose the pipeline for inspection, if needed. If coating repairs are needed in close proximity to an anchor, approximately 4 cubic yards of sand bags would be temporarily placed in a 6-foot by 6-foot area underneath the pipeline to support it as the anchor saddle is removed and replaced following coating repair. A total of 13 cubic yards would be dredged from areas approximately 5 feet wide and 3 feet deep, and discharged on the adjacent lakebed for pipeline coating inspection and possible repair at 3 locations not associated with anchor structures. The purpose of the proposed work is to maintain the existing pipeline in accordance with state and federal requirements. Avoidance & Minimization: The applicant has stated the following concerning avoidance and minimization of impacts to Waters of the United States: Enbridge has sought to minimize impacts to waters of the United States by limiting the extent of bottom disturbance to the minimal amount necessary to safely complete the proposed work activities. The extent of bottom disturbance described in our application is the maximum potential. The actual amount of bottom disturbance is anticipated to be significantly less. The Corps has not verified the adequacy of the applicant s avoidance and minimization statement at this time. Compensatory Mitigation: The applicant has stated the following concerning compensatory mitigation for unavoidable impacts to Waters of the United States: Enbridge believes compensatory mitigation should not be required for the work activities described in our applications due to the minimal footprint of bottom disturbance, all of which qualify under the nationwide permits. The Corps has not verified the adequacy of this mitigation proposal at this time. Other Authorizations: A permit is required from the Michigan Department of Environmental Quality under applicable provisions of the Natural Resources and Environmental Protection Act (NREPA), 1994 PA 451. The State file number is 24- Enbridge Energy, LP - Straits of Mackinac Comments: We are publishing this notice in compliance with Title 33 Code of Federal Regulations Parts Comments on the project should be submitted in writing and postmarked or delivered by the expiration date of this public notice. Comments of a positive or negative nature may be submitted. All responses must refer to file number LRE N18. We will interpret a lack of response as meaning that there is no objection to the permit application. Comments should be filed with: 2
3 File No. LRE N18 January 29, 2019 Kerrie E. Kuhne Chief, Permit Evaluation Western Branch Regulatory Office Detroit District, Corps of Engineers 477 Michigan Avenue Detroit, Michigan Comments may be ed to: but must include a name and mailing address. Public Hearing: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Evaluation: The decision whether to issue the Department of the Army permit will be based on evaluation of the probable impacts of the proposed activity on the public interest. That decision will reflect the national concerns for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. This activity involves the discharge of dredged or fill material into waters of the United States. Therefore, the U.S. Army Corps of Engineers' evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by 3
4 File No. LRE N18 January 29, 2019 the Administrator of the Federal Environmental Protection Agency, under the authority of Section 404(b)(1) of the Clean Water Act. Endangered Species: We will review this application for the potential impact on threatened or endangered species pursuant to Section 7 of the Endangered Species Act as amended. We are not aware of the presence of any listed species or critical habitat at or in the vicinity of the proposed worksite. We invite information and/or comments regarding the potential presence of, or impacts to, any listed species or critical habitat. Cultural Resources: The District Staff has reviewed existing information on historic properties potentially affected by the proposed project, including the National Register of Historic Places. There are no recorded historic properties within the permit area. The proposed work is of such a limited nature and extent that little likelihood exists for the project to impinge upon an unrecorded historic property. The District Engineer invites responses to this public notice from federal, state and local agencies, historical and archaeological societies, Indian tribes, and other parties likely to have knowledge of or concerns with historic properties in the area. Additional Information: This public notice and drawings are also available for viewing/printing at: px. Questions concerning this application may be directed to Katie Otanez at the Corps of Engineers address listed above, or telephone number (313) FOR THE DISTRICT ENGINEER: Kerrie E. Kuhne Chief, Permit Evaluation Western Branch Regulatory Office NOTICE TO POSTMASTERS: We request that the above notice be conspicuously and continuously posted for the time period of this notice. 4
5 Supplemental Information Enbridge Pipelines (Lakehead) L.L.C Line 5 Anchor Installation Project Mackinac and Emmet Counties, Michigan PROJECT SUMMARY 3 Proposed Activities and Construction Methods Enbridge Pipelines (Lakehead) L.L.C. (Enbridge) is planning to conduct maintenance on the existing dual 20-inch-diameter pipelines beneath the Straits of Mackinac. Enbridge is proposing to install pipeline anchors at 48 locations to comply with federal consent decree (Case 1:16-cv-00914, ECF No. 3 filed 7/20/16) condition 68. These pipeline anchors are in addition to the 22 anchors applied for in 2017 (submission number 2RD-DFDK-Y35G). Enbridge, considering the history of previous pipeline anchor installation work, is seeking authorization to complete this project from the Michigan DEQ under Act 451, Section 325 and from USACE under Nationwide Permit 12. Project activities will involve the installation of pipeline anchors which consist of a helical anchoring system with saddle mounts around the pipeline at each of the proposed locations. The 48 anchors will be augured directly into the lake bed. Each anchor uses two 10-inch-diameter by 10-foot long screws. The total lake bottom impact from the anchors will be approximately 20 cubic yards with a total footprint of about 53 ft 2. The proposed locations for installation of the anchors are provided in Attachment A. Attachment B contains typical drawings depicting the auguring apparatus, as well as equipment that will be used for installation. Attachment C contains the anchor installation procedure. A marine infrastructure and utility contractor, Ballard Marine Construction, will work from barges to complete the anchor installation. No new on-land staging, temporary workspaces, or new access routes will be required for the Project. The Project is scheduled to begin in July Ballard Marine Construction will maintain a safety plan and an environmental protection plan for this work activity (Attachment D). In the unlikely event of pipeline damage during this project, Enbridge will implement a repair plan. If a release were to occur from the pipeline during this project, Enbridge would respond following the company Integrated Contingency Plan and Straits Tactical Response Plan. 4 Project Purpose, Use and Alternatives The installation of 48 pipeline anchors is being proposed to comply with federal consent decree (Case 1:16-cv-00914, ECF No. 3 filed 7/20/16) condition 68. This Project is pipeline maintenance and is not associated with a new utility installation. The proposed activities are for the sole purpose of maintaining the previously authorized 1
6 Supplemental Information Enbridge Pipelines (Lakehead) L.L.C Line 5 Anchor Installation Project Mackinac and Emmet Counties, Michigan pipelines, and are consistent with those activities authorized under Nationwide Permit 12. The method of anchor installation is anticipated to incur no environmental impacts. 2
7 Canada WI Michigan IL IN OH WAP-3 WAP-4 WAP-5 WAP-6 WAP-7 WAP-8 WAP-9 WAP-10 WAP Miles 1 inch = 1 miles For Environmental Review Purposes Only WAP-12 WAP-13 WAP-14 WAP-15 WAP-16 WAP-17 WAP-18 WAP-19 WAP-20 WAP-1 WAP-2 EAP-1 EAP-2 EAP-3 EAP-4 EAP-5 EAP-6 EAP-7 EAP-8 EAP-9 EAP-10 EAP-11 EAP-12 EAP-13 EAP-14 EAP-15 EAP-16 EAP-17 EAP-18 EAP-19 EAP-20 EAP-21 EAP-22 EAP-23 EAP-24 EAP-25 EAP-26 EAP-27 EAP-28 Figure 1a Line 5 Straits of Mackinac Enbridge Pipelines (Lakehead) L.L.C Proposed Anchor Locations Copyright: 2013 National Geographic Society, i-cubed 2018 Proposed Anchor Locations Line 5 Date: (2/14/2018) Source: Z:\Clients\E_H\Enbridge\Line_5_Straits_of_Mackinac\Permitting\Maintenance\201802\L5_Straits_of_Mackinac_2018_Anchors_Overview_Topo.mxd
8 Supplemental Information Enbridge Pipelines (Lakehead) L.L.C. Line 5 Anchor Installation Project September 2018 Mackinac and Emmet Counties, Michigan PROJECT SUMMARY 3 Proposed Activities and Construction Methods Enbridge Pipelines (Lakehead) L.L.C. (Enbridge) is planning to conduct preventive maintenance on its existing dual 20-inch-diameter pipelines beneath the Straits of Mackinac following a visual survey. Enbridge is proposing to install three anchors along the pipelines to comply with federal consent decree (Case 1:16-cv-00914, ECF No. 3 filed 7/20/16) condition 68 and its subsequent modifications. Enbridge, considering the history of previous anchor installation work, is seeking authorization to complete this project from the Michigan Department of Environmental Quality (DEQ) under Act 451, Section 325 and from U.S. Army Corps of Engineers (USACE) under Nationwide Permit 12. These pipeline anchors are in addition to the application for the 48 anchors applied for earlier in 2018 (DEQ submission number HNC-AR90-WAHM0; USACE File N18). Project activities will involve the installation of a helical anchoring system with saddle mounts around the pipeline in each of the proposed locations. Two of the three installation locations will require minor excavations to properly install the anchors. Less than 1 cubic yard of sediment will need to be excavated at each location. The three anchors will be augured directly into the lake bed. Each anchor uses two 10-inch-diameter by 10-foot-long screws. The proposed locations for installation of the three anchors are provided in Attachment A. Attachment B contains typical drawings depicting the plan and profile view, auguring apparatus, as well as equipment that will be utilized for installation. Attachment C contains the anchor installation methodology. A marine infrastructure and utility contractor, Ballard Marine Construction, working from barges, will be used to complete the anchor installation. No new on-land staging, temporary workspaces, or new access routes will be required for the Project. The Project is expected to take approximately one week to complete, depending on weather. Ballard Marine Construction will maintain a safety plan and an environmental protection plan for this work activity (Attachment D). In the unlikely event of pipeline damage during this project, Enbridge will implement a repair plan. If a release were to occur from the pipeline during this project, Enbridge would respond following the company Integrated Contingency Plan and Straits Tactical Response Plan. 1
9 Supplemental Information Enbridge Pipelines (Lakehead) L.L.C. Line 5 Anchor Installation Project September 2018 Mackinac and Emmet Counties, Michigan 4 Project Purpose, Use and Alternatives These three proposed anchors are for compliance with federal consent decree (Case 1:16-cv-00914, ECF No. 3 filed 7/20/16) condition 68 and its subsequent modifications. This Project is not associated with a new utility installation. The proposed activities are for the sole purpose of maintaining the previously authorized pipelines and are consistent with those activities authorized under Nationwide Permit 12. The method of anchor installation is anticipated to incur no environmental impacts. 2
10 Canada WI Michigan WAP-21 OH EAP-29 (! (! EAP-30 Copyright: 2013 National Geographic Society, i-cubed inch = 1 miles 1 Miles For Environmental Review Purposes Only 4 Figure 1a Line 5 Straits of Mackinac Enbridge Pipelines (Lakehead) L.L.C. Proposed Anchor Locations (! Proposed Anchor Locations Line 5 Source: Z:\Clients\E_H\Enbridge\Line_5_Straits_of_Mackinac\Permitting\Maintenance\201802\L5_Straits_of_Mackinac_2018_Anchors_Overview_Topo.mxd (! IN Date: (9/17/2018) IL
11 Supplemental Information Enbridge Pipelines (Lakehead) L.L.C Line 5 Anchor Installation Project Mackinac and Emmet Counties, Michigan 3
12
13
14
15
16
17
18
19
20
ENBRIDGE ENERGY LIMITED PARTNERSHIP SPECIAL USE PERMIT
Page 1 of 6 Chequamegon- Nicolet National Forest ENBRIDGE ENERGY LIMITED PARTNERSHIP SPECIAL USE PERMIT Fact Sheet July 5, 2017 Situation: Enbridge Energy Limited Partnership (Enbridge) has requested to
More informationADMINISTRA TIVE APPEAL DECISION RUDOLPH AND ROSEANN KRAUSE FILE NUMBER (LP-CR) JACKSONVILLE DISTRICT
ADMINISTRA TIVE APPEAL DECISION RUDOLPH AND ROSEANN KRAUSE FILE NUMBER 2002 8023 (LP-CR) JACKSONVILLE DISTRICT Review Officer: Arthur L. Middleton, US Army Corps of Engineers (USACE), South Atlantic Division
More informationProtecting the Common Waters of the Great Lakes Basin Through Public Trust Solutions
Protecting the Common Waters of the Great Lakes Basin Through Public Trust Solutions December 3, 2018 Mr. Scott Rasmusson Michigan Department of Environmental Quality Water Resources Division Gaylord Field
More informationPublic Notice. LOCATION: On the left bank of the Ohio River at Mile 596.2, in Jefferson County, Kentucky
Public Notice US Army Corps of Engineers Louisville District Public Notice No. Open Date: Close Date: LRL-1981-00042-mck 27 Nov 2015 28 Dec 2015 Please address all comments and inquiries to: U.S. Army
More informationThe Section 10/404 permit application contains additional project details and a list of attachments that include:
Public Notice APPLICANT: Enbridge Energy, Limited Partnership ISSUED: 20 DEC 2018 EXPIRES: 21 JAN 2019 REFER TO: 2014-01071-TJH SECTION: 404 - Clean Water Act SECTION: 10 - Rivers and Harbors Act SECTION:
More informationThe Mackinac Straits Oil Pipeline Lessons for Advocacy & Policy Mike Shriberg, Ph.D. Great Lakes Regional Executive Director, National Wildlife
The Mackinac Straits Oil Pipeline Lessons for Advocacy & Policy Mike Shriberg, Ph.D. Great Lakes Regional Executive Director, National Wildlife Federation Enbridge Lakehead Pipeline System Superior, Wisc.
More informationWHEREAS, on December 19, 2018, Enbridge and the Authority entered into the Tunnel Agreement. The Parties hereby agree as follows:
THIRD AGREEMENT BETWEEN THE STATE OF MICHIGAN, MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY, AND MICHIGAN DEPARTMENT OF NATURAL RESOURCES AND ENBRIDGE ENERGY, LIMITED PARTNERSHIP, ENBRIDGE ENERGY COMPANY,
More informationPermit Coordination and Evaluation
Permit Coordination and Evaluation Presented by USACE Detroit District Regulatory Office and MDEQ Water Resources Division October 10, 2017 US Army Corps of Engineers BUILDING STRONG Permit Coordination
More informationProposed Report 1 DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC
Proposed Report 1 REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC 20310-2600 DAEN THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my
More information6 th Floor G. Mennen Williams Building Environmental Quality 525 W. Ottawa Street Constitution Hall
June 27, 2014 SUBMITTED VIA ELECTRONIC MAIL Hon. Bill Schuette Hon. Dan Wyant Attorney General Director Michigan Dept. of Attorney General Michigan Department of 6 th Floor G. Mennen Williams Building
More informationPublic Notice. Engineering Department 1410 West 5 th Street Owensboro, Kentucky 42302
Regulatory Division South Branch Public Notice No. LRL-2017-768-cat Public Notice US Army Corps of Engineers Louisville District Public Notice No. Open Date: Closing Date: LRL-2017-768-cat Sep 05, 2017
More informationBOCA RATON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION
BOCA RATON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION WHEREAS the Department of Environmental Protection, in partnership with the City of Boca Raton. has sponsored a study of the
More informationADMINISTRATIVE APPEAL DECISION BARBARA MOORE FILE NUMBER (LP-VA) JACKSONVILLE DISTRICT
" I, ADMINISTRATIVE APPEAL DECISION BARBARA MOORE FILE NUMBER 200004449 (LP-VA) JACKSONVILLE DISTRICT Review Officer: Arthur L. Middleton, US Anny Corps of Engineers (USACE), South Atlantic Division, Atlanta,
More informationJACKSONVILLE DISTRICT. DATE: September 13, Appellant's Representative: Douglas Rillstone, Attorney, Broad and Cassel
AD~INISTRA TIVE APPEAL DECISION A~DREW CONLYN, FILE NO. 200001477 (IP-TWM) JACKSONVILLE DISTRICT DATE: September 13, 2005 Review Officer: Mores Bergman, US Army Corps of Engineers Appellant: Andrew Conlyn
More informationDAEN SUBJECT: Lower San Joaquin River Feasibility Study Report, California
1.33 miles of new setback levee along the Delta Front to eliminate the eastern portions of the Fourteenmile Slough levee in North Stockton. 0.59 miles of height improvements between 1.8 and 2.7 feet on
More informationDEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C
.t DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 REPLY TO A TTENTION OF: CECW-PE (l0-1-7a) 1 3 OCT 199B SUBJECT: Tampa Harbor, Big Bend Channel, Florida THE SECRETARY
More information6.0 MONITORING AND CONTINGENCY PLANS
6.0 MONITORING AND CONTINGENCY PLANS 6.1 MONITORING The primary objective of compliance and effects monitoring is to confirm whether mitigation and protective measures are effectively implemented and to
More informationLocal Damage Assessment. Pocket Guide
Local Damage Assessment Pocket Guide INTENTIONALLY BLANK The Purpose of the Damage Assessment Guide Damage assessment is the process which determines the impacts of a natural or human-made disaster. Specifically,
More informationPERMIT Under the Environmental Conservation Law (ECL)
PERMIT Under the Environmental Conservation Law (ECL) EMERGENCY GENERAL PERMIT GP-0-17-006 Lake Ontario Erosion Control Permittee and Facility Information Permit Issued To: Applicant shown on Application/Authorization
More informationCOMMUNITY CERTIFICATIONS
OMB No. xxxxxxxx Expires: xxxxxxxx National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS D R A F T CRS COMMUNITY CERTIFICATIONS The following community certifications are part
More informationFINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT ADDENDUM
FINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT BREVARD COUNTY, FLORIDA HURRICANE AND STORM DAMAGE REDUCTION PROJECT MARCH 2014 U.S. Army Corps of Engineers
More informationPublic Notice. Activity: Fort Worth District Mitigation Banks. Date: January 24, 2019
Public Notice Number: CESWF-18-MITB Activity: Fort Worth District Mitigation Banks Date: January 24, 2019 Purpose The purpose of this Public Notice is to inform you of mitigation banking guidelines being
More informationDear Director Grether, Director Creagh, Lt. Col. District Commander Sugrue, Chief Simon, Chief Kuhne, and Regulatory Project Manager Otanez:
Protecting the Common Waters of the Great Lakes Basin Through Public Trust Solutions September 28, 2018 Ms. Heidi Grether, Director Michigan Department of Environmental Quality Constitutional Hall 525
More informationDEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C
DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20310-2600 REPLY TO ATTENTION OF CECW-P (1105-2-10a) 0 2 JUN 2003 THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress
More informationWorldwide, capture fisheries are already fully,
U.S. Army Corps of Engineers Regulation of Offshore Aquaculture Worldwide, capture fisheries are already fully, or near fully, exploited, but seafood demand continues to increase with a growing global
More information[Bank Name] Mitigation Bank CA BEI template_pdt FINAL Draft dot
MITIGATION BANK ENABLING INSTRUMENT Table of Contents RECITALS... 1 AGREEMENT...2 Section I: Purpose and Authorities... 2 A. Purpose...2 B. Authorities... 2 Section II: Definitions... 4 Section III: Stipulations...
More informationEnbridge Energy, Limited Partnership and Enbridge Pipelines (Southern Lights) L.L.C. Routing Permit for a Crude Oil Pipeline. Alberta Clipper Project
Routing Permit for a Crude Oil Pipeline Alberta Clipper Project MPUC Docket No. PL9/PPL-07-361 November 18, 2009 Docket No. PL9/PPL-07-361 November 18, 2009 REVISED Mile Post 893 Deviation Request Enbridge
More informationArticle 23-6 FLOODPLAIN DISTRICT
AMENDING THE CODE OF THE CITY OF PITTSFIELD CHAPTER 23, ZONING ORDINANCE SECTION I That the Code of the City of Pittsfield, Chapter 23, Article 23-6 Floodplain District, shall be replaced with the following:
More informationSUBJECT: Flagler County, Florida, Hurricane and Storm Damage Reduction Project
DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC 20310-2600 REPLY TO ATTENTION OF DAEN B3 DEC 2014 THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report
More informationIssue Paper 3: Michigan s Great Lakes Bottomlands and Wind Energy
Issue Paper 3: Michigan s Great Lakes Bottomlands and Wind Energy Development of offshore wind energy in Michigan requires placement of wind turbines on or over the bottomlands 1 within the state-owned
More informationDecision Memo Lake Ocoee Inn and Marina Permit Renewal
Decision Memo Lake Ocoee Inn and Marina Permit Renewal USDA Forest Service Ocoee/ Hiwassee Ranger District, Cherokee National Forest Polk County, Tennessee Approximately 8.03 acres of USA Tract K-986;
More informationWetland. Streams. Floodplains
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERWAYS ENGINEERING AND WETLANDS CHAPTER 105 FEE(S) CALCULATION WORKSHEET Additional information can be found at 25 PA Code
More informationSUBJECT: Amite River and Tributaries, Louisiana, East Baton Rouge Parish Watershed
DEPARTMENi OF THE ARMY OFFICE OF 'rhe CHIEF OF ENGINEERS WASHINGTON. D.C. 20314-1000 REPLY TO AT1'~NTIQN OF: (lo-1-7a) THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report on East
More informationUPDATE ON DALLAS FLOODWAY
UPDATE ON DALLAS FLOODWAY ENVIRONMENTAL IMPACT STATEMENT [ EIS ] Transportation and Trinity River Project Committee Rob Newman Director, Trinity River Corridor Project, Fort Worth District 28 April 2014
More informationINTERAGENCY COORDINATION AGREEMENT ON WETLAND MITIGATION BANKING WITHIN THE REGULATORY BOUNDARIES OF CHICAGO DISTRICT, CORPS OF ENGINEERS January 1997
INTERAGENCY COORDINATION AGREEMENT ON WETLAND MITIGATION BANKING WITHIN THE REGULATORY BOUNDARIES OF CHICAGO DISTRICT, CORPS OF ENGINEERS January 1997 SECTION 1, PURPOSE The Chicago District of the U.S.
More informationPublic Notice. Number: CESWF-12-MITB Activity: Fort Worth District Mitigation Banks Date: June 27, 2016
Public Notice Number: CESWF-12-MITB Activity: Fort Worth District Mitigation Banks Date: June 27, 2016 Purpose The purpose of this Public Notice is to inform you of mitigation banking guidelines being
More informationInteragency Regulatory Guide
Interagency Regulatory Guide Advance Permittee-Responsible Mitigation U.S. Army Corps of Engineers Washington State Department of Ecology Washington State Department of Fish and Wildlife US Army Corps
More informationGOAL 1: Protect coastal resources and human life and limit public expenditures in areas that are subject to destruction by natural disasters..
GOALS, OBJECTIVES, AND POLICIES GOAL 1: Protect coastal resources and human life and limit public expenditures in areas that are subject to destruction by natural disasters.. OBJECTIVE 1.1: The City will
More informationIN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF MICHIGAN NATIONAL WILDLIFE FEDERATION,
2:16-cv-11727-GCS-EAS Doc # 1 Filed 05/16/16 Pg 1 of 27 Pg ID 1 IN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF MICHIGAN NATIONAL WILDLIFE FEDERATION, Case No. Plaintiff, v. Judge ADMINISTRATOR
More informationAGENDA FOR REGULAR COMMON COUNCIL MEETING SUPERIOR, WISCONSIN Wednesday, April 6, :30 p.m. - Government Center, Board Room 201
1. PLEDGE OF ALLEGIANCE 2. ROLL CALL AGENDA FOR REGULAR COMMON COUNCIL MEETING SUPERIOR, WISCONSIN Wednesday, April 6, 2016 6:30 p.m. - Government Center, Board Room 201 3. PROCLAMATIONS AND COMMENDATIONS
More informationAugust 24, Ms. Heidi Grether Director Michigan Department of Environmental Quality P.O. Box Lansing, Michigan
August 24, 2016 Ms. Heidi Grether Director Michigan Department of Environmental Quality P.O. Box 30458 Lansing, Michigan 48909-7958 Ms. Kim Fish Acting Chief Water Resources Division Michigan Department
More informationa) Ensure public safety through reducing the threats to life and personal injury.
SECTION VII: FLOODPLAIN DISTRICT 7-1 Statement Of Purpose The purposes of the Floodplain District are to: a) Ensure public safety through reducing the threats to life and personal injury. b) Eliminate
More informationStraits of Mackinac and Line 5 Pipeline
Straits of Mackinac and Line 5 Pipeline Stakeholder Briefing Corporate Enbridge Agenda Meeting Administration Safety Moment Public Affairs Risk Management Integrity Marine Pollution Control T&T Marine
More informationOrder in Council Decret
Order in Council Decret Executive Council Consei! des mlnlstres On the recommendation olthe undersigned, the Lieutenant Governor, by and with the advice and concurrence of the Executive Council, orders
More informationCEQA ENVIRONMENTAL REVIEW GUIDELINES
CEQA ENVIRONMENTAL REVIEW GUIDELINES Adopted by City Council on September 18, 2007 by Resolution No. 07-113 Revised by City Council on June 3, 2014 by Resolution No. 14-49 CITY OF BENICIA CEQA ENVIRONMENTAL
More informationMinnesota Section 404 Assumption Feasibility Study
Minnesota Section 404 Assumption Feasibility Study Prepared by: Minnesota Department of Natural Resources and the Minnesota Board of Water and Soil Resources January 17, 2017 Complete report available
More informationIN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF MICHIGAN NATIONAL WILDLIFE FEDERATION,
Case 2:17-cv-10031-MAG-RSW ECF# 1 Filed 01/05/17 Pg 1 of 42 Pg ID.1 IN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF MICHIGAN NATIONAL WILDLIFE FEDERATION, Case No. Plaintiff, v. Judge SECRETARY
More informationOctober 9, Kimberly D Bose, Secretary Federal Energy Regulatory Commission 888 1st Street, N.E., Washington, DC 20426
Kimberly D Bose, Secretary Federal Energy Regulatory Commission 888 1st Street, N.E., Washington, DC 20426 Re: INGAA Comments Regarding Federal Energy Regulatory Commission Upland Erosion Control, Revegetation
More informationMITIGATION BANK ENABLING INSTRUMENT Table of Contents
MITIGATION BANK ENABLING INSTRUMENT Table of Contents RECITALS... 1 AGREEMENT... 3 Section I: Purpose and Authorities... 3 A. Purpose... 3 B. Authorities... 3 Section II: Definitions... 5 Section III:
More informationDraft Tunnel Agreement Outline
November 1, 2018 Barbara J. Brown, Vice-Chair Mackinac Bridge Authority 84 Prospect Street St. Ignace, MI 49781 SENT VIA EMAIL Dear Vice-Chair Brown: I write to formally request that at your meeting on
More informationTHE FLOOD HAZARD AREA Valda Opara New Jersey Department of Environmental Protection June 8, 2012
THE FLOOD HAZARD AREA Valda Opara New Jersey Department of Environmental Protection June 8, 2012 Individual Permits Building Requirements 0% Net-fill Standards JET SKIING DURING A FLOOD ESCAPING THE FLOOD
More informationFREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality
FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial
More informationDAEN SUBJECT: Little Colorado River at Winslow, Arizona, Flood Risk Management Project
per year. In addition to the above, the Navajo County Flood Control District would be fully responsible for performing the investigation, cleanup, and response of hazardous materials on the project sites.
More informationAppendix 1 Enbridge Line 5 Sustained Adverse Weather Conditions Procedure This Appendix is designed to facilitate an effective emergency response to a potential release incident by specifying procedures
More informationCHAPTER 16- RECREATION DEVELOPMENT POLICY FOR OUTGRANTED CORPS LANDS
30 Mar09 CHAPTER 16- RECREATION DEVELOPMENT POLICY FOR OUTGRANTED CORPS LANDS 16-1. Purpose. This guidance establishes a consistent, nationwide policy that will be applied to evaluate requests for recreation
More informationOffsetting Impacts to Wetlands and Waters in the United States. Palmer Hough U.S. Environmental Protection Agency November 2013
Offsetting Impacts to Wetlands and Waters in the United States Palmer Hough U.S. Environmental Protection Agency November 2013 1 Problem: Wetlands Loss Approximately 221 million acres in 1700 (lower 48)
More informationADMINISTRATIVE APPEAL DECISION PRIME DEVELOPERS, S.E. FILE NO. SAJ JACKSONVILLE DISTRICT. 9 March 2015
ADMINISTRATIVE APPEAL DECISION PRIME DEVELOPERS, S.E. FILE NO. SAJ-1996-04379 JACKSONVILLE DISTRICT 9 March 2015 Review Officer: Mike Vissichelli, U.S. Army Corps of Engineers, North Atlantic Division
More informationNATIONAL WETLAND MITIGATION BANKING STUDY Model Banking Instrument
NATIONAL WETLAND MITIGATION BANKING STUDY Model Banking Instrument Institute for Water Resources Water Resources Support Center U.S. Army Corps of Engineers Alexandria, Virginia 22315 May 1996 IWR Technical
More informationCAPTIVA ISLAND EMERGENCY MAINTENANCE PLAN. December, 1998
CAPTIVA ISLAND EMERGENCY MAINTENANCE PLAN December, 1998 Contents Introduction... 4 Purpose... 4 Initial Restoration and Renourishment Design... 4 Emergency Maintenance Criteria... 5 Storm Damage and Response...
More informationDocket No. CP
MEMORANDUM OF AGREEMENT AMONG THE FEDERAL ENERGY REGULATORY COMMISSION THE ADVISORY COUNCIL ON HISTORIC PRESERVATION THE OHIO STATE HISTORIC PRESERVATION OFFICE AND ROVER PIPELINE LLC REGARDING THE ROVER
More informationHUD s Environmental Review Process. Disaster Assistance Training 2012 Jerimiah Sanders, Environmental Specialist
HUD s Environmental Review Process Disaster Assistance Training 2012 Jerimiah Sanders, Environmental Specialist Goals: Understand NEPA Overview of levels of environmental review Spot red flags New Tools
More informationSENATE, No. 806 STATE OF NEW JERSEY. 217th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2016 SESSION
SENATE, No. 0 STATE OF NEW JERSEY th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 0 SESSION Sponsored by: Senator LORETTA WEINBERG District (Bergen) Senator ROBERT M. GORDON District (Bergen and Passaic)
More informationFloodplain Development Permit Application
Floodplain Development Permit Application City of Jonesboro, AR This is an application packet for a Floodplain Development Permit. Certain sections are to be completed by the Applicant, and certain sections
More informationASBPA PARTNERING COMMITTEE S GUIDANCE ON INCORPORATING SURFING CONCERNS INTO PLANNING AND DESIGN OF FEDERAL SHORE PROTECTION AND NAVIGATION PROJECTS
ASBPA PARTNERING COMMITTEE S GUIDANCE ON INCORPORATING SURFING CONCERNS INTO PLANNING AND DESIGN OF FEDERAL SHORE PROTECTION AND NAVIGATION PROJECTS PURPOSE This document is intended to succinctly outline
More informationDEPARTMENT OF TH E ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC MAY
DEPARTMENT OF TH E ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC 20314-1000 MAY 11 2018 The Honorable Bill Shuster Chairman, Committee on Transportation and Infrastructure United States
More informationCERTIFICATE OC-063. IN THE MATTER OF the National Energy Board Act (NEB Act) and the regulations made thereunder; and
BEFORE the Board on 19 April 2016. CERTIFICATE IN THE MATTER OF the National Energy Board Act (NEB Act) and the regulations made thereunder; and IN THE MATTER OF an application dated 5 November 2014 under
More informationEnbridge s emergency response readiness
Enbridge s emergency response readiness Staying prepared: Living our commitment Aquickand effective emergency response Safety in the Straits Regional emergency plans Working with emergency response groups
More informationARTICLE 2 ADMINISTRATIVE PROVISIONS
WHATCOM COUNTY CRITICAL AREAS ORDINANCE 16.16.200 Authority ARTICLE 2 ADMINISTRATIVE PROVISIONS This Chapter is adopted under the authority of Chapters 36.70 and 36.70A, RCW and Article 11 of the Washington
More informationThe FY 2012 Budget. California Marine and Navigation Conference. Gary A. Loew Chief, Programs Integration Division Civil Works Directorate, HQUSACE
The FY 2012 Budget California Marine and Navigation Conference Gary A. Loew Chief, Programs Integration Division Civil Works Directorate, HQUSACE March 24, 2011 US Army Corps of Engineers BUILDING STRONG
More informationBenefits and Challenges of Port-Sponsored Mitigation Banks
Benefits and Challenges of Port-Sponsored Mitigation Banks Presented by Dan Berlin, PWS October 10, 2018 1 Presentation Outline Mitigation Overview Mitigation Banking Process Port-Led Mitigation Banking
More informationCHAPTER 4. REGULATIONS AND DEVELOPMENT STANDARDS
CHAPTER 4. REGULATIONS AND DEVELOPMENT STANDARDS Regulations and development standards, which can be used by communities to reduce damage from natural hazards, work best when using an effective planning
More informationEnvironmental Assessment Approval
Environmental Assessment Approval Approval Date: /fp,,1 ( &, 1 2o l'( Project Name: Money Point Quarry Expansion Project Proponent Name: Dexter Construction Company Limited Bay Road Valley, Victoria County,
More information[Letter to be printed on official Levee Sponsor letterhead]
[Letter to be printed on official Levee Sponsor letterhead] [Date] COL Joel R. Cross, Commander US Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901 RE: [Levee Sponsor
More informationIn-Lieu Fee Program Instrument Outline For Proposed In-Lieu Fee Programs in the States of Kansas and Missouri
In-Lieu Fee Program Instrument Outline For Proposed In-Lieu Fee Programs in the States of Kansas and Missouri The U.S. Army Corps of Engineers (Corps) and U.S. Environmental Protection Agency joint regulation
More informationINSTRUCTIONS FOR COMPLETING THE APPLICATION FORMS FOR CONDITIONAL LETTERS OF MAP REVISION AND LETTERS OF MAP REVISION
INSTRUCTIONS FOR COMPLETING THE APPLICATION FORMS FOR CONDITIONAL LETTERS OF MAP REVISION AND LETTERS OF MAP REVISION GENERAL In 1968, the U.S. Congress passed the National Flood Insurance Act, which created
More informationEROSION & SEDIMENT POLLUTION CONTROL (E&SPC) PLAN REVIEW APPLICATION
325 Smiths Pond Road Shavertown, PA 18708 Phone: (570) 674-7991 Fax: (570) 674-7989 www.luzernecd.org EROSION & SEDIMENT POLLUTION CONTROL (E&SPC) PLAN REVIEW APPLICATION Project Name: Applicant s Name:
More informationExecutive Summary Levee Engineering Assessments September 26, 2014
Executive Summary s September 26, 2014 Purpose Multnomah County Drainage District (MCDD), the agency responsible for managing the Columbia Corridor levee system, received notification that in August of
More informationDEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C AUG 2339
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C. 20314-1000 8 1 AUG 2339 CECW-PC MEMORANDUM FOR COMMANDERS, MAJOR SUBORDINATE COMMANDS SUBJECT: Implementation Guidance
More informationADMINISTRATIVE APPEAL DECISION JAMES JOHNSON, PERMIT NUMBER (IP-MN) JACKSONVILLE DISTRICT
ADMINISTRATIVE APPEAL DECISION JAMES JOHNSON, PERMIT NUMBER 199601445(IP-MN) JACKSONVILLE DISTRICT Review Officer: Arthur L. Middleton, U.S. Army Corps of Engineers (USACE), South Atlantic Division, Atlanta
More informationConservation Commission Procedures Standard Flow Chart - NOT
Conservation Commission Procedures Standard Flow Chart - NOT Mark s Rule of Three Rule 1 - Hearings, site visits, acquire information, close the hearing Rule 2 - Paperwork Issue a great Order of Conditions
More informationBritannia Village Flood Control Project
Britannia Village Flood Control Project Summary of Background Information February 2011 Contents 1) Flood Risks in the Village 2) Alternative Flood Risk Management Approaches Status Quo The Proposed Remedial
More informationTown of North Topsail Beach
Daniel Tuman, Mayor Tom Leonard, Mayor Pro Tem Aldermen: Suzanne Gray Don Harte Richard Macartney Richard Peters Town of North Topsail Beach Stuart Turille Town Manager Carin Z. Faulkner, MPA Town Clerk
More informationENGINEERING AND CONSTRUCTION BULLETIN
ENGINEERING AND CONSTRUCTION BULLETIN No. 2016-8 Issuing Office: CECW-CE Issued: 22 Feb 16 Expires: 22 Feb 18 SUBJECT: Interim Risk Reduction Measures (IRRMs) for Levee Safety CATEGORY: Directive and Policy
More informationAddendum to Enbridge s 2013 Corporate Social Responsibility Report (with a focus on 2013 data)
Addendum to Enbridge s 2013 Corporate Social Responsibility Report (with a focus on 2013 data) Spills, Leaks and Releases Performance Data Sheet This performance data sheet relates to the following Global
More informationDear Michigan Department of Environmental Quality Director Grether, Officials, and Staff:
August 25, 2016 Ms. Heidi Grether Director Michigan Department of Environmental Quality P.O. Box 30458 Lansing, Michigan 48909-7958 Ms. Kim Fish Acting Chief Water Resources Division Michigan Department
More informationCommunity Incentives for Nature-Based Flood Solutions
Community Incentives for Nature-Based Flood Solutions A GUIDE TO FEMA S COMMUNITY RATING SYSTEM FOR CONSERVATION PRACTITIONERS The Federal Emergency Management Agency (FEMA) uses a Community Rating System
More informationCreetown (Potentially Vulnerable Area 14/17) Local Plan District Local authority Main catchment Dumfries and Galloway Solway Moneypool Burn Council Ba
Creetown (Potentially Vulnerable Area 14/17) Local Plan District Solway Local authority Dumfries and Galloway Council Main catchment Moneypool Burn Summary of flooding impacts 90 residential properties
More informationCoastal Works Review
Coastal Works Review MM CB Ltd Proposed Shoreline Modification and Excavation of an Access Channel and Flushing Inlets for an Inland Boat Marina and Swimming Lagoon. CAYMAN BRAC Block: 95B Parcels: 25,
More informationTHAMES-COROMANDEL DISTRICT COUNCIL COASTAL HAZARDS POLICY
THAMES-COROMANDEL DISTRICT COUNCIL COASTAL HAZARDS POLICY 1. OBJECTIVES a) To sustainably manage the effects of coastal hazards on the District s coastal foreshore land by ensuring risk to life and property
More informationAn act to add and repeal Division 36 (commencing with Section 71200) of the Public Resources Code, relating to ballast water.
BILL NUMBER: AB 703 BILL TEXT CHAPTERED CHAPTER 849 FILED WITH SECRETARY OF STATE OCTOBER 10, 1999 APPROVED BY GOVERNOR OCTOBER 8, 1999 PASSED THE ASSEMBLY SEPTEMBER 9, 1999 PASSED THE SENATE SEPTEMBER
More informationDIRE STRAITS - OIL TRANSPORT IN THE GREAT LAKES BASIN ENVIRONMENTAL LAW SECTION WEBINAR, OCTOBER 14, 2015 JIM OLSON
DIRE STRAITS - OIL TRANSPORT IN THE GREAT LAKES BASIN ENVIRONMENTAL LAW SECTION WEBINAR, OCTOBER 14, 2015 JIM OLSON FLOW Reports 1. Legal Analysis of Line 5, December 2013 to April, 2014. 2. Letter and
More informationSTAFF REPORT - HARBOR DISTRICT MEETING July 26, 2018
COMMISSIONERS 1 st Division Larry Doss 2 nd Division Greg Dale 3 rd Division Stephen Kullmann 4 th Division Richard Marks 5 th Division Patrick Higgins TO: FROM: Humboldt Bay Harbor, Recreation and Conservation
More information15 Plan Implementation Requirements
14.4.1 Advance Maintenance The increase in inner harbor shoaling due to the closing of the sediment basin will change operations and maintenance dredging requirements. With the increase in shoaling, dredges
More informationFloodplain Development Permits A Technical Guidance Document
Floodplain Development Permits A Technical Guidance Document To Prevent Loss of Life, Reduce Property Damage and to Protect and Enhance the Natural and Beneficial Functions of Floodplains Iredell County
More informationEdmonton to Hardisty Pipeline Project - Certificate OC-062 and Order XO-E A3V9D6 Adobe Pg 4
Edmonton to Hardisty Pipeline Project Section 52 - Condition # 9 OC-062 Hearing Order - OH-001-2013 Section 52 Commitments Tracking Table as of July 13, 2018 Enbridge Pipelines Inc. - Edmonton to Hardisty
More informationRisk-Based Project Management Approach for Large- Scale Civil Engineering Projects
Risk-Based Project Management Approach for Large- Scale Civil Engineering Projects Alex Bredikhin, P.E., Risk Manager - Megaprojects, U.S. Army Corps of Engineers, Pittsburgh District 1000 Liberty Ave.,
More information2. Final Environmental Impact Report (EIR), dated December Findings and Statement of Overriding Considerations, dated December 2007.
Department of Public Works Bureau of Engineering Report No. 2 May 8, 2015 CD No. 11 CONSIDERATION OF AN APPEAL OF CITY ENGINEER S APPROVAL OF COASTAL DEVELOPMENT PERMIT (CDP) 10-04 FOR THE VENICE DUAL
More informationADMINISTRATIVE APPEAL DECISION RICHARD S. PACULA JURISDICTIONAL DETERMINATION NUMBER WILMINGTON DISTRICT
ADMINISTRATIVE APPEAL DECISION RICHARD S. PACULA JURISDICTIONAL DETERMINATION NUMBER 200100717 WILMINGTON DISTRICT Review Officer: Arthur L. Middleton, U.S. Army Corps of Engineers (USACE), South Atlantic
More informationHuntington Beach LCPA 1-16 (Sunset Beach Specific Plan) DRAFT Hazard Analysis Sug Mod Working Document/Not for general circulation.
LCPA 1-16 (Sunset Beach Specific Plan) DRAFT Hazard Analysis Sug Mod Working Document/Not for general circulation. 3.3 Regulations (page 34) 3.3.9 (page 60) Add new Section 3.3.9 below after Flood Plain
More informationCHAPTER 17 NON-RECREATION OUTGRANT POLICY
CHAPTER 17 NON-RECREATION OUTGRANT POLICY 17-1. Purpose. The purpose of this guidance is to establish a consistent, nationwide policy that will be applied to evaluate non-recreational real estate outgrant
More information