Offsetting Impacts to Wetlands and Waters in the United States. Palmer Hough U.S. Environmental Protection Agency November 2013
|
|
- Aileen Parks
- 5 years ago
- Views:
Transcription
1 Offsetting Impacts to Wetlands and Waters in the United States Palmer Hough U.S. Environmental Protection Agency November
2 Problem: Wetlands Loss Approximately 221 million acres in 1700 (lower 48) million acres today (~size of CA) was a time of major losses Rate of loss has decreased over last 40 years 2
3 Part of the Solution: Regulate Clean Water Act of 1972 Section 404 requires a permit to discharge dredged or fill materials into waters of the US Includes lakes, rivers, streams and wetlands Primary agencies involved: U.S. Army Corps of Engineers U.S. Environmental Protection Agency National goal of No Net Loss of wetlands established in 1989* 3
4 Mitigation Sequence* 1. Avoid 2. Minimize Evaluate alternative project locations and designs Least Environmentally Damaging Practicable Alternative 3. Compensate offset unavoidable wetland losses through wetland: 1. Restoration 2. Establishment 3. Enhancement 4. Preservation 4
5 What is Good Compensation? Ecological replacement Appropriate location in landscape Cumulative impacts Margin of safety to reflect the expected degree of success Temporal loss of functions Success measures/monitoring plan 5
6 Providing Compensation/Offsets 1. Mitigation Banks (Preferred): Initiated in advance of impacts* All credit release tied to performance Sponsors: private, government, non-profit 2. In-Lieu Fee (ILF) programs: Generally, initiated after impacts Sponsors: government or non-profit 3. Permittee-Responsible Mitigation (PRM): Generally initiated concurrent/after impacts Permittee retains responsibility
7 Bank Example: Virginia* 7
8 Bank Credit Ledger 8
9 Approval of Bank Sites Number of Banks Single Client Commercial Steve Martin - USACE/IWR,
10 Status and Distribution of Bank & ILF sites Banks 1,839 Bank sites loaded: 66% operational 15% pending 12% sold out 1% suspended 6% terminated or withdrawn ILF 33 Approved programs 32 Pending programs 301 ILF program sites loaded Steve Martin - USACE/IWR, 2013
11 Compensation (Offset) Mechanism, Compensation for Impacted Acres (as a % of Impacted Acres Requiring Compensation) Compensation for Impacted Linear Feet (as a % of Impacted Linear Feet Requiring Compensation) 100% 100% 90% 26% 90% 80% 42% 80% 42% 70% 60% 22% 70% 60% 63% 50% 40% 21% 10% 50% 40% 30% 30% 20% 10% 0% 7% 42% 29% % 20% 10% 0% 18% 10% 6% 19% 13% Key Permittee Responsible Offsite Permittee Responsible Onsite In Lieu Fee Mitigation Bank Katherine Birnie - Ecosystem Investment Partners, 2013
12 2008 Federal Regulations Mitigation Plan Components (33 CFR 332.4(c)) 1. Objectives 2. Site protection instrument 3. Baseline information 4. Work plan 5. Maintenance plan 6. Performance standards 7. Monitoring requirements 8. Financial assurances 9. Site selection factors 10. Credit determination 11. Long-term management plan 12. Adaptive management plan
13 Additionality Baseline Information requirements May occur on private or public lands Public lands: no credit for work that is already planned or in place No double-dipping Limits on preservation as offset Wetland Stream Species Number of bank credit withdrawal transactions 1995 to 2012 Steve Martin - USACE/IWR,
14 Credit determination rationale Amount of compensation Should use assessment methods If not available, minimum 1:1 ratio* Mitigation type Equivalency In-kind preferred over outof-kind 14
15 Performance and Monitoring Ecological performance standards Monitoring Requirements: Parameters to be monitored Length of monitoring period Party responsible Content of monitoring reports Frequency of report submittal 15
16 Permanence Site protection instrument Goal permanent protection Conservation easement, title transfer, restrictive covenant Long-term management Identify responsible party Describe necessary tasks and funding arrangements 16
17 Agriculture and Wetland Offset Program Can a farmer provide Section 404 wetland compensation/offset credits? Are there wetland restoration, establishment, enhancement and/or preservation opportunities on the property? Will the property be retired from crop production and restored wetland functions and values permanently protected? Was any of the work paid for with federal funds? 17
18 Regular Program Evaluation Self audits Independent audits: Government Oversight Agencies Academic institutions Non-profits Highlight strengths and weaknesses Prompt and direct reform 18
19 Clear Market Drivers 35,000 30,000 # of Permits 25,000 20,000 15,000 10,000 25,152 23,122 25,757 28,693 Acres of Fill 5,000-50,000 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000-3,000 5,397 4,877 3,633 3, ,835 34,962 13,645 9,142 25,033 10,224 13,291 8, Compensation (Offset) Required 2,500 Miles of Fill 2,000 1,500 1, ,523 1,852 1, Katherine Birnie - Ecosystem Investment Partners, 2013
20 Questions epa.gov/wetlandsmitigation geo.usace.army.mil/ribits 20
Interagency Regulatory Guide
Interagency Regulatory Guide Advance Permittee-Responsible Mitigation U.S. Army Corps of Engineers Washington State Department of Ecology Washington State Department of Fish and Wildlife US Army Corps
More informationFrequently Asked Questions about the PCILF Program
Frequently Asked Questions about the PCILF Program So, you want to use the PCILF Program? Here s what you need to know: 1. What is the PCILF Program? The Pierce County In-Lieu Fee (PCILF) Program is a
More informationProgram Options for Improving Compensatory Mitigation under NWP 21
Program Options for Improving Compensatory Mitigation under NWP 21 Kurt Stephenson and Leonard Shabman 1 Abstract The Clean Water Act Section 404 requires that permits be obtained by parties discharging
More informationUNIVERSAL PRINCIPLES OF COMPENSATORY MITIGATION
UNIVERSAL PRINCIPLES OF COMPENSATORY MITIGATION Authors: Michael Sprague, Don Ross, George Mannina & Wayne White 2015 Contents Preface Introduction to Contents The Seven Universal Principles Equivalency
More informationWV Streams and Wetlands March 3, 2010
Public Notice U S Army Corps In reply refer to Public Notice No. Issuance Date: of Engineers LRH-2009-WV IRT INITIATIVES February I, 2010 Huntington District Regulatory Branch Stream: Closing Date: WV
More informationIn-Lieu Fee Program Instrument Outline For Proposed In-Lieu Fee Programs in the States of Kansas and Missouri
In-Lieu Fee Program Instrument Outline For Proposed In-Lieu Fee Programs in the States of Kansas and Missouri The U.S. Army Corps of Engineers (Corps) and U.S. Environmental Protection Agency joint regulation
More informationNorth Carolina Department of Transportation Wetland and Stream Mitigation
North Carolina Department of Transportation Wetland and Stream Mitigation Why does NCDOT need mitigation? NCDOT Mission Statement Connecting people and places safely and efficiently, with accountability
More informationWest Virginia Stream and Wetland Valuation Metric v2.0 (February 2011)
West Virginia Stream and Wetland Valuation Metric v2.0 (February 2011) The SWVM is composed of six tabs including the following: Instructions, Stream Parts I-II, Stream Parts III-VI, Multiple Site Unit
More informationGulf Coast Wetland Mitigation Answers, LLC Information Profile: Mitigation Banking
Gulf Coast Wetland Mitigation Answers, LLC Information Profile: Mitigation Banking The Brief History of Mitigation Banking In the past 40 years in the United States and, indeed, throughout the world, we
More informationPublic Notice. Number: CESWF-12-MITB Activity: Fort Worth District Mitigation Banks Date: June 27, 2016
Public Notice Number: CESWF-12-MITB Activity: Fort Worth District Mitigation Banks Date: June 27, 2016 Purpose The purpose of this Public Notice is to inform you of mitigation banking guidelines being
More informationNATIONAL WETLAND MITIGATION BANKING STUDY Model Banking Instrument
NATIONAL WETLAND MITIGATION BANKING STUDY Model Banking Instrument Institute for Water Resources Water Resources Support Center U.S. Army Corps of Engineers Alexandria, Virginia 22315 May 1996 IWR Technical
More informationState of Mitigation In Texas Clean Water Act Mitigation. Sonny Kaiser Ecosystem Planning and Restoration
State of Mitigation In Texas Clean Water Act Mitigation Sonny Kaiser Ecosystem Planning and Restoration October 2018 Compensatory Mitigation Driven by the Clean Water Act: to restore and maintain the chemical,
More informationPUBLIC NOTICE. Date: April 19, 2016 File Number: NAE In Reply Refer To: Michael S. Adams Or by
696 696 Virginia Road Concord, MA 01742-2751 PUBLIC NOTICE Date: April 19, 2016 File Number: NAE-2009-1349 In Reply Refer To: Michael S. Adams Or by e-mail: michael.s.adams@usace.army.mil This public notice
More informationImplementing Financial Assurance for Mitigation Project Success. June 2011
Implementing Financial Assurance for Mitigation Project Success June 2011 Implementing financial assurances for mitigation project success can be challenging and place demands on regulators outside their
More informationDucks Unlimited Vermont In-Lieu Fee Program 2014 Annual Report March 30, 2015 Revised May 11, 2015
Ducks Unlimited Vermont In-Lieu Fee Program 2014 Annual Report March 30, 2015 Revised May 11, 2015 Ducks Unlimited Vermont In-Lieu Fee Program Annual Report January 1, 2014-December 31, 2014 1. INTRODUCTION
More informationJACKSONVILLE DISTRICT. DATE: September 13, Appellant's Representative: Douglas Rillstone, Attorney, Broad and Cassel
AD~INISTRA TIVE APPEAL DECISION A~DREW CONLYN, FILE NO. 200001477 (IP-TWM) JACKSONVILLE DISTRICT DATE: September 13, 2005 Review Officer: Mores Bergman, US Army Corps of Engineers Appellant: Andrew Conlyn
More informationHOOD CANAL COORDINATING COUNCIL IN LIEU FEE PROGRAM INSTRUMENT
HOOD CANAL COORDINATING COUNCIL IN LIEU FEE PROGRAM INSTRUMENT Basic Agreement Final Submitted by: Hood Canal Coordinating Council With Technical Assistance from: Environmental Science Associates June,
More informationINTERAGENCY COORDINATION AGREEMENT ON WETLAND MITIGATION BANKING WITHIN THE REGULATORY BOUNDARIES OF CHICAGO DISTRICT, CORPS OF ENGINEERS January 1997
INTERAGENCY COORDINATION AGREEMENT ON WETLAND MITIGATION BANKING WITHIN THE REGULATORY BOUNDARIES OF CHICAGO DISTRICT, CORPS OF ENGINEERS January 1997 SECTION 1, PURPOSE The Chicago District of the U.S.
More informationMitigation Banking Factsheet
EXHIBIT 57 Page 1 of 5 Wetlands You are here: EPA Home Office of Water Wetlands, Oceans, and Watersheds Wetlands Wetlands Fact Sheet Mitigation Banking Mitigation Banking Factsheet Compensating for Impacts
More informationMitigation Banks & In-lieu Fee Programs
Mitigation Banks & In-lieu Fee Programs Leah Fisher Senior Regulatory Project Manager Sacramento District, Regulatory Workshop June 27, 2014 US Army Corps of Engineers Benefits Reduces risk & uncertainty
More informationFinancial Assurances/Long Term Maintenance for Mitigation Projects. US Army Corps of Engineers BUILDING STRONG
Financial Assurances/Long Term Maintenance for Mitigation Projects US Army Corps of Engineers What are Financial Assurances and Long Term Maintenance? Mechanisms for ensuring resources are available to
More informationPublic Notice. Activity: Fort Worth District Mitigation Banks. Date: January 24, 2019
Public Notice Number: CESWF-18-MITB Activity: Fort Worth District Mitigation Banks Date: January 24, 2019 Purpose The purpose of this Public Notice is to inform you of mitigation banking guidelines being
More informationAppendix III SWG IRT - Draft Mitigation Banking Instrument Template. DO NOT include this page when submitting MBI.
Appendix III SWG IRT - Draft Mitigation Banking Instrument Template DO NOT include this page when submitting MBI. INSTRUCTIONS: All mitigation banks require a banking instrument as documentation of agency
More informationAPPENDIX I. Memorandum of Agreement Between The Department of the Army and The Environmental Protection Agency
APPENDIX I Memorandum of Agreement Between The Department of the Army and The Environmental Protection Agency 47 Draft May 19, 1999 U.S. Environmental Protection Agency MEMORANDUM OF AGREEMENT BETWEEN
More informationEXHIBIT C. Credits. Credit Establishment and Tracking. Credit Transfer Agreement. Credit Ledgers
EXHIBIT C Credits Credit Establishment and Tracking Credit Transfer Agreement Credit Ledgers Exhibit C Credit Establishment and Tracking Credit Types The ILF Program offers two credit types: (1) Aquatic
More informationECO-ASSET MANAGEMENT, LLC INTRODUCTION TO MITIGATION BANKING IN MONTANA
ECO-ASSET MANAGEMENT, LLC INTRODUCTION TO MITIGATION BANKING IN MONTANA I NTRODUCTION TO MITIGATION BANKING Mitigation overview Mitigation process, options and results Mitigation costs sources of costs
More informationPROGRAM AUDIT OF VIRGINIA AQUATIC RESOURCES TRUST FUND
PROGRAM AUDIT OF VIRGINIA AQUATIC RESOURCES TRUST FUND ENVIRONMENTAL LAW INSTITUTE 4/29/2016 Program audit of 2011-2015 operations of the Fund under the requirements of 33 U.S.C. 332.8(i), Virginia Code
More information[Bank Name] Mitigation Bank CA BEI template_pdt FINAL Draft dot
MITIGATION BANK ENABLING INSTRUMENT Table of Contents RECITALS... 1 AGREEMENT...2 Section I: Purpose and Authorities... 2 A. Purpose...2 B. Authorities... 2 Section II: Definitions... 4 Section III: Stipulations...
More informationBenefits and Challenges of Port-Sponsored Mitigation Banks
Benefits and Challenges of Port-Sponsored Mitigation Banks Presented by Dan Berlin, PWS October 10, 2018 1 Presentation Outline Mitigation Overview Mitigation Banking Process Port-Led Mitigation Banking
More informationTHIRD-PARTY COMPENSATORY MITIGATION UPDATE
THIRD-PARTY COMPENSATORY MITIGATION UPDATE 1 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130
More informationMITIGATION BANK ENABLING INSTRUMENT Table of Contents
MITIGATION BANK ENABLING INSTRUMENT Table of Contents RECITALS... 1 AGREEMENT... 3 Section I: Purpose and Authorities... 3 A. Purpose... 3 B. Authorities... 3 Section II: Definitions... 5 Section III:
More informationU.S. Army Corps of Engineers (USACE) Fort Worth District
U.S. Army Corps of Engineers (USACE) Fort Worth District Financial Assurances Guidance Document This document discusses the requirements for financial assurances within the USACE Regulatory Program as
More informationGeorge Casey U.S. Army Corps of Engineers, New York District 26 Federal Plaza New York, New York June 2017
The Wetland Trust, 4729 State Route 414, Burdett, NY 14818 607-765-4780 www.thewetlandtrust.org Peter J. Krakowiak U.S. Army Corps of Engineers, Buffalo District Biologist, Regulatory Branch 1776 Niagara
More informationNew York State s Environmental Protection Fund: A Financial History
New York State s Environmental Protection Fund: A Financial History March 2018 Message from the Comptroller March 2018 This year marks the 25 th anniversary of the legislation that created New York State
More informationNAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter
Agenda Date: 6/7/2016 Agenda Placement: 8A Set Time: 1:30 PM PUBLIC HEARING Estimated Report Time: 20 Minutes NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter TO: FROM: Board
More informationFinancial Assurances for Compensatory Mitigation
Financial Assurances for Compensatory Mitigation Steven Martin, PWS Environmental Planner Institute for Water Resources US Army Corps of Engineers What are Financial Assurances? Mechanism to ensure that:
More informationDepartment of Defense
Thursday, April 10, 2008 Part II Department of Defense Department of the Army, Corps of Engineers 33 CFR Parts 325 and 332 Environmental Protection Agency 40 CFR Part 230 Compensatory Mitigation for Losses
More informationADMINISTRATIVE APPEAL DECISION PRIME DEVELOPERS, S.E. FILE NO. SAJ JACKSONVILLE DISTRICT. 9 March 2015
ADMINISTRATIVE APPEAL DECISION PRIME DEVELOPERS, S.E. FILE NO. SAJ-1996-04379 JACKSONVILLE DISTRICT 9 March 2015 Review Officer: Mike Vissichelli, U.S. Army Corps of Engineers, North Atlantic Division
More informationEAST CONTRA COSTA COUNTY HCP / NCCP MITIGATION FEE AUDIT DRAFT REPORT AND NEXUS STUDY. Prepared For: Prepared By:
EAST CONTRA COSTA COUNTY HCP / NCCP MITIGATION FEE AUDIT AND NEXUS STUDY DRAFT REPORT Prepared For: East Contra Costa County Habitat Conservancy Prepared By: Robert D. Spencer, Urban Economics Sally E.
More informationAPPENDIX 1 PROSPECTUS STATEWIDE UMBRELLA MITIGATION BANK INSTRUMENT FOR NORTH DAKOTA. North Central Mitigation, LLC PO Box 2009 Sioux Falls, SD 57101
4/20/2018 APPENDIX 1 STATEWIDE UMBRELLA MITIGATION BANK INSTRUMENT FOR NORTH DAKOTA PROSPECTUS North Central Mitigation, LLC PO Box 2009 Sioux Falls, SD 57101 This page intentionally left blank TABLE OF
More informationTo: NAWG Officers, Directors, State Executives From: NAWG Staff Date: December 11, 2018 Re: NAWG 2018 Farm Bill Conference Report Summary
To: NAWG Officers, Directors, State Executives From: NAWG Staff Date: December 11, 2018 Re: NAWG 2018 Farm Bill Conference Report Summary On Monday, December 10, 2018, the leaders of the House and Senate
More informationGeneral State/Federal Application/Mitigation Bank Review Process in Minnesota
General State/Federal Application/Mitigation Bank Review Process in Minnesota 2015 BWSR/St. Paul District Wetland BankTraining May 28, 2015 US Army Corps of Engineers BUILDING STRONG Presentation Outline
More informationE n v i r o n m e n t a l l a w i n s t i t u t e. In-Lieu Fee Mitigation: Model Instrument Language and Resources
E n v i r o n m e n t a l l a w i n s t i t u t e In-Lieu Fee Mitigation: Model Instrument Language and Resources December 2009 In-Lieu Fee Mitigation: Model Instrument Language and Resources December
More informationSection moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert:
1.1... moves to amend H.F. No. 3120 as follows: 1.2 Delete everything after the enacting clause and insert: 1.3 "Section 1. Minnesota Statutes 2016, section 103B.101, subdivision 9, is amended to read:
More informationDEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C AUG 2339
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C. 20314-1000 8 1 AUG 2339 CECW-PC MEMORANDUM FOR COMMANDERS, MAJOR SUBORDINATE COMMANDS SUBJECT: Implementation Guidance
More informationSTATEWIDE AGRICULTURAL WETLAND MITIGATION BANKING FRAMEWORK FOR SOUTH DAKOTA Framework Draft v. 1
STATEWIDE AGRICULTURAL WETLAND MITIGATION BANKING FRAMEWORK FOR SOUTH DAKOTA Framework Draft v. 1 Administrative Framework and Operational Guidance for the establishment and operation of wetland mitigation
More informationLOST PINES GROUNDWATER CONSERVATION DISTRICT OPERATING PERMIT
LOST PINES GROUNDWATER CONSERVATION DISTRICT OPERATING PERMIT District Well Number: 58-55-5-0032 Permit Approved: Permittee: Lower Colorado River Authority P.O. Box 220 Austin, Texas 78767-0220 Location
More informationKing County Flood Control District 2015 Work Program
Attachment A 2015 Work Plan 10-24-14 King County Flood Control District 2015 Work Program The District work program is comprised of three categories: district oversight and policy development, operations,
More informationIMPLEMENTING AGREEMENT. for the BAY DELTA CONSERVATION PLAN. by and among THE UNITED STATES FISH AND WILDLIFE SERVICE
IMPLEMENTING AGREEMENT for the BAY DELTA CONSERVATION PLAN by and among THE UNITED STATES FISH AND WILDLIFE SERVICE THE NATIONAL MARINE FISHERIES SERVICE THE CALIFORNIA DEPARTMENT OF WATER RESOURCES THE
More informationDEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C
.t DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 REPLY TO A TTENTION OF: CECW-PE (l0-1-7a) 1 3 OCT 199B SUBJECT: Tampa Harbor, Big Bend Channel, Florida THE SECRETARY
More informationPuyallup Shoreline Master Program FINAL, JAN
CHAPTER 1 INTRODUCTION A. PURPOSE AND INTENT 1. The purposes of this Shoreline Master Program are: a. To guide the future development of shorelines in the City of Puyallup in a positive, effective, and
More informationFlorida Senate SB 718 By Senator Sebesta
By Senator Sebesta 1 A bill to be entitled 2 An act relating to the Department of 3 Transportation; amending s. 337.251, F.S.; 4 authorizing the department to adopt rules 5 governing the leasing of property
More informationNatureVest & EKO Asset Management Partners (2014) Investing in Conservation, A landscape assessment of an emerging market
Impact Investing The impactdeals Forum Impact Investing in Conservation Finance The impactdeals Forum, co- hosted by i2 Capital ( i2 ) and the Aspen Institute, brought together impact investors from the
More informationFINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT ADDENDUM
FINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT BREVARD COUNTY, FLORIDA HURRICANE AND STORM DAMAGE REDUCTION PROJECT MARCH 2014 U.S. Army Corps of Engineers
More informationPublic Notice. Proposed anchor structures, dredging, and discharge at the Enbridge Line 5 pipeline in the Straits of Mackinac, Michigan
US Army Corps of Engineers Detroit District Public Notice Applicant: Enbridge Pipelines (Lakehead), LLC In Reply Refer To: Corps File No. LRE-2010-00463-56-N18 Date: January 29, 2019 Expires: February
More informationADMINISTRATIVE APPEAL DECISION JAMES JOHNSON, PERMIT NUMBER (IP-MN) JACKSONVILLE DISTRICT
ADMINISTRATIVE APPEAL DECISION JAMES JOHNSON, PERMIT NUMBER 199601445(IP-MN) JACKSONVILLE DISTRICT Review Officer: Arthur L. Middleton, U.S. Army Corps of Engineers (USACE), South Atlantic Division, Atlanta
More informationGov's Planning Estimates Project Title Rank Fund Project Requests for State Funds
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Water and Soil Resources
More informationDAEN SUBJECT: Lower San Joaquin River Feasibility Study Report, California
1.33 miles of new setback levee along the Delta Front to eliminate the eastern portions of the Fourteenmile Slough levee in North Stockton. 0.59 miles of height improvements between 1.8 and 2.7 feet on
More informationDO THE MITIGATION REGULATIONS SATISFY THE LAW? WAIT AND SEE.
DO THE MITIGATION REGULATIONS SATISFY THE LAW? WAIT AND SEE. Margaret Peggy Strand I. INTRODUCTION While we are now lauding and analyzing the new mitigation regulations, 1 we should not forget that they
More informationSTORMWATER MANAGEMENT FUND Department of Environmental Services
Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More informationADMINISTRA TIVE APPEAL DECISION RUDOLPH AND ROSEANN KRAUSE FILE NUMBER (LP-CR) JACKSONVILLE DISTRICT
ADMINISTRA TIVE APPEAL DECISION RUDOLPH AND ROSEANN KRAUSE FILE NUMBER 2002 8023 (LP-CR) JACKSONVILLE DISTRICT Review Officer: Arthur L. Middleton, US Army Corps of Engineers (USACE), South Atlantic Division
More informationSTATE OF OHIO WATER MANAGEMENT PROGRAM REPORT December 8, 2014
STATE OF OHIO WATER MANAGEMENT PROGRAM REPORT December 8, 2014 The following Water Management Program Report is submitted by the State of Ohio to the Compact Council pursuant to the requirements contained
More informationWetland Mitigation Banking: Status and Prospects Summary Wetland protection is controversial because the federal government regulates activities on pr
97-849 ENR CRS Report for Congress Received through the CRS Web Wetland Mitigation Banking: Status and Prospects September 12, 1997 Jeffrey Zinn Senior Analyst in Natural Resources Policy Environment and
More informationEROSION & SEDIMENT POLLUTION CONTROL (E&SPC) PLAN REVIEW APPLICATION
325 Smiths Pond Road Shavertown, PA 18708 Phone: (570) 674-7991 Fax: (570) 674-7989 www.luzernecd.org EROSION & SEDIMENT POLLUTION CONTROL (E&SPC) PLAN REVIEW APPLICATION Project Name: Applicant s Name:
More informationRECOMMENDATION: Staff recommends the Board adopt Resolution No approving SAFCA s Fiscal Year Final Budget.
ITEM 5 Agenda of August 18, 2016 TO: FROM: SUBJECT: Sacramento Area Flood Control Agency Board of Directors Jason D. Campbell, Deputy Executive Director (916) 874-7606 APPROVING FINAL FISCAL YEAR 2016-17
More informationAPPENDIX C COOPERATION AGREEMENTS, REHABILITATION OF FEDERAL AND NON-FEDERAL FLOOD CONTROL WORKS
APPENDIX C COOPERATION AGREEMENTS, REHABILITATION OF FEDERAL AND NON-FEDERAL FLOOD CONTROL WORKS EP 500-1-1 C-1. Purpose. This Appendix provides the format for Cooperation Agreements for rehabilitation
More informationGovernmental Laws, Rules and Policies, Are They Keeping Up With Restoration Objectives? INTERCOL 9 June 6, 2012
Governmental Laws, Rules and Policies, Are They Keeping Up With Restoration Objectives? INTERCOL 9 June 6, 2012 Kenneth G. Ammon, P.E. Senior Vice President WRScompass Presentation Overview Background
More informationADMINISTRATIVE APPEAL DECISION CROSSROADS COMMERCE CENTER SITE FILE NO. SAJ JACKSONVILLE DISTRICT 29 JUNE 2009
ADMINISTRATIVE APPEAL DECISION CROSSROADS COMMERCE CENTER SITE FILE NO. SAJ-2007-2127 JACKSONVILLE DISTRICT 29 JUNE 2009 Review Officer: Mike Vissichelli, U.S. Army Corps of Engineers, North Atlantic Division,
More informationOctober 9, Kimberly D Bose, Secretary Federal Energy Regulatory Commission 888 1st Street, N.E., Washington, DC 20426
Kimberly D Bose, Secretary Federal Energy Regulatory Commission 888 1st Street, N.E., Washington, DC 20426 Re: INGAA Comments Regarding Federal Energy Regulatory Commission Upland Erosion Control, Revegetation
More information1. What are the approved revisions to the DRBC project review fees and water supply charges?
Frequently Asked Questions (FAQs) DRBC Project Review Fee and Water Supply Charge Revisions Approved on December 14, 2016 1. What are the approved revisions to the DRBC project review fees and water supply
More informationSustaining the Civil Works Program
Sustaining the Civil Works Program Presentation to Planning Community of Practice Meeting Steven L. Stockton, P.E. Director of Civil Works 2 June 2015 US Army Corps of Engineers 1 A society grows great
More informationu.s. ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION
u.s. ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION ADMINSTRATIVE APPEAL DECISION NEILL GRADING & CONSTRUCTION COMPANY, INC. WILMINGTON DISTRICT FILE NO. 200101147 Review Officer: James W. Haggerty, US
More informationADMINISTRATIVE APPEAL DECISION BARBARA MOORE FILE NUMBER (LP-VA) JACKSONVILLE DISTRICT
" I, ADMINISTRATIVE APPEAL DECISION BARBARA MOORE FILE NUMBER 200004449 (LP-VA) JACKSONVILLE DISTRICT Review Officer: Arthur L. Middleton, US Anny Corps of Engineers (USACE), South Atlantic Division, Atlanta,
More informationMinnesota Section 404 Assumption Feasibility Study
Minnesota Section 404 Assumption Feasibility Study Prepared by: Minnesota Department of Natural Resources and the Minnesota Board of Water and Soil Resources January 17, 2017 Complete report available
More informationSTORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES
DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More informationCatchMark Timber Trust NYSE: CTT
Dawsonville Acquisition and Joint Venture April 2017 CatchMark Timber Trust NYSE: CTT May 2016 1 FORWARD- LOOKING STATEMENTS This presentation contains certain forward-looking statements within the meaning
More informationDEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C
DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20310-2600 REPLY TO ATTENTION OF CECW-P (1105-2-10a) 0 2 JUN 2003 THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress
More informationTECHNICAL BRIEF PAY FOR PERFORMANCE STRATEGIES FOR WESTERN STATES
TECHNICAL BRIEF PAY FOR PERFORMANCE STRATEGIES FOR WESTERN STATES PAY FOR PERFORMANCE STRATEGIES FOR WESTERN STATES TECHNICAL BRIEF V1.0 The Pay for Performance Strategies for Western States project is
More informationMEASURE J: CHARTER AMENDMENT REGARDING USE OF LEASE REVENUE FROM MISSION BAY PARK October 2016
MEASURE J: CHARTER AMENDMENT REGARDING USE OF LEASE REVENUE FROM MISSION BAY PARK October 2016 SDCTA Position: OPPOSE Rationale for Position: SDCTA has historically opposed ballot box budgeting, and Measure
More information[Docket No. FWS HQ ES ]; [FXHC FF09E33000]
This document is scheduled to be published in the Federal Register on 07/30/2018 and available online at https://federalregister.gov/d/2018-16172, and on govinfo.gov DEPARTMENT OF THE INTERIOR Fish and
More informationPosition Statement on a 2018 Water Resources Development Act (WRDA)
Position Statement on a 2018 Water Resources Development Act (WRDA) In order to maintain the safety and resilience of our nation s coastlines, Congress must continue a twoyear cycle for passing Water Resource
More informationDelaware River Basin Commission s Role in Flood Loss Reduction Efforts
Delaware River Basin Commission s Role in Flood Loss Reduction Efforts There is a strong need to reduce flood vulnerability and damages in the Delaware River Basin. This paper presents the ongoing role
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PennEast Pipeline Company, LLC ) Docket Nos. CP15-558-000 and CP15-558-001 MOTION FOR A STAY PENDING REHEARING SUBMITTED BY THE
More informationDAEN SUBJECT: South San Francisco Bay Shoreline, Santa Clara County, California
opportunities would be significant with the restoration of the tidal marsh areas. Recreational features in the recommended plan include two pedestrian bridges, viewing platforms, and benches. The new levees
More informationMaryland Crop Insurance Workshop
Maryland Crop Insurance Workshop Linda Slacum Maryland Farm Service Agency September 9, 2014 Farm Service Agency Agricultural Act of 2014 (2014 Farm Bill) Specific procedures for program implementation
More informationThe La Paz County Endangered Species Fund 290 In Lieu Fee Agreement
6 The La Paz County Endangered Species Fund 290 In Lieu Fee Agreement CONSERVATION BANKING July 19-23, 2010 CASE STUDY SERIES La Paz County Endangered Species Fund 290 In Lieu Fee Agreement (Arizona) I.
More informationDistribution Restriction Statement Approved for public release; distribution is unlimited.
CECW-PA Engineer Regulation 1165-2-122 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Water Resource Policies and Authorities STUDIES OF HARBOR OR INLAND HARBOR PROJECTS
More informationADMINISTRATIVE APPEAL DECISION TAMPA ELECTRIC COMPANY FILE NO. SAJ JACKSONVILLE DISTRICT. 21 JULY20iO
ADMINISTRATIVE APPEAL DECISION TAMPA ELECTRIC COMPANY FILE NO. SAJ 2009 03096 JACKSONVILLE DISTRICT 21 JULY20iO Review Officer: Mike Vissichelli, U.S. Army Corps of Engineers, North Atlantic Division,
More informationRESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No Applicant Name:
RESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No. 1505-0250 Applicant Name: Manatee County 1. MULTIYEAR PLAN VERSION (INITIAL OR AMENDMENT NUMBER): Initial
More informationGreen Bond Guidelines for the Real Estate Sector
Green Bond Guidelines for the Real Estate Sector October 2016 Introduction The Green Bond Principles ( Principles ) provide the basis for capital market participants to originate Green Bonds; specifically,
More informationThe Conservation Foundation
Independent Auditor s Report and Financial Statements Contents Independent Auditor s Report... 1 Financial Statements Statements of Financial Position... 3 Statements of Activities and Changes in Net Assets...
More informationMinnesota Wetland Conservation Act Notice of Decision
Minnesota Wetland Conservation Act Notice of Decision Local Government Unit (LGU) Bassett Creek Watershed Management Commission (BCWMC) Address 7800 Golden Valley Road Golden Valley, MN 55427 Applicant
More informationSpinifex Ridge Molybdenum Project
Spinifex Ridge Molybdenum Project MOLY MINES LIMITED Annual Environmental Report Ministerial Statement 772 (5 th August 2008) Ministerial Statement 948 (2 nd September 2013) June 2017 Document history
More informationSTATE OF MINNESOTA AGRICULTURAL WATER QUALITY CERTIFICATION AGREEMENT
Certification Number STATE OF MINNESOTA AGRICULTURAL WATER QUALITY CERTIFICATION AGREEMENT This agreement is between ( Producer ) and the Minnesota Department of Agriculture ( MDA ), which is authorized
More informationDEPARTMENT OF TH E ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC MAY
DEPARTMENT OF TH E ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC 20314-1000 MAY 11 2018 The Honorable Bill Shuster Chairman, Committee on Transportation and Infrastructure United States
More informationSUBJECT: Amite River and Tributaries, Louisiana, East Baton Rouge Parish Watershed
DEPARTMENi OF THE ARMY OFFICE OF 'rhe CHIEF OF ENGINEERS WASHINGTON. D.C. 20314-1000 REPLY TO AT1'~NTIQN OF: (lo-1-7a) THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report on East
More informationAREAWIDE WATER QUALITY MANAGEMENT PLAN AMENDMENT PROCESS
AREAWIDE WATER QUALITY MANAGEMENT PLAN AMENDMENT PROCESS (Revised and Approved June 28, 2007) The Areawide Water Quality Management Plan (Regional Plan) adopted by the North Front Range Water Quality Planning
More information*** DRAFT - NOT YET FILED ***
3745-39-03 Ohio EPA NPDES requirements for small MS4s. [Comment: For dates of non-regulatory government publications, publications of recognized organizations and associations, federal rules and federal
More informationGreen Stormwater. Flood Risk Reduction. Infrastructure for. June Presented by: Kari Mackenbach, CFM ms consultants Lynn Mayo, PE, CFM AECOM
Green Stormwater Infrastructure for Flood Risk Reduction June 2016 Presented by: Kari Mackenbach, CFM ms consultants Lynn Mayo, PE, CFM AECOM Topics 1. Proposed ASFPM Policy Paper 2. Background Why is
More informationSouth Carolina NPDES GENERAL PERMIT FOR STORM WATER DISCHARGES FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES
www.scdhec.gov/water South Carolina NPDES GENERAL PERMIT FOR STORM WATER DISCHARGES FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES In compliance with the provisions of the SC Pollution Control Act (S.C.
More information