1 Quarterly Capital Program Status Report and DBE Status Report Prepared for the March 6, 214 JPB Meeting 2nd Quarter FY214: October 1, 213 December 31, 213 Peninsula Corridor Joint Powers Board

2

3 Caltrain QUARTERLY CAPITAL PRORAM STATUS REPORT Status Date: December 31, 213 TABLE OF CONTENTS Capital Program - Budget Status Summary... 1 Traffic Light Report... 3 Atherton Station Improvements (Project On-hold)... 4 Broadway Station Improvements (Project On-hold)... 6 CBOSS/PTC Project... 8 Dumbarton Rail Corridor Project... 1 Peninsula Corridor Electrification Project Los atos Creek Bridge Replacement Project Quint Street Bridge Project Railroad Communications System (SOR) Project Real Time Transit Information Project... 2 San Bruno rade Separation Project San Francisco Roadway Bridges Replacement Project San Mateo Bridges Replacement Project - Design Signal Pre-emption Improvement Project Systemwide Signal System Rehabilitation Project FY Systemwide Station Rehab Program FY Systemwide Track Rehab Program FY Train Dispatch Voice Communication System Project Upgrade of PA & VMS Systems at 4 Stations Project Wayside Power at Diridon Station Project... 4 DBE Status Report Definition of Terms Performance Status (Traffic Light) Criteria... 45

4 This page is intentionally left blank.

5 Caltrain - Capital Program - Budget Status Summary Q2 FY214 - October 1 to December 31, 213 All Costs in $1,'s Programs FY29 FY21 FY211 FY212 FY213 FY Station and Intermodal Access $75,482 $5,225 $5 $4 $71 $3, Right of Way / Signal & Communications $58,172 $52,575 $15,49 $29,653 $23,54 $46, Rolling Stock $1,6 $6,423 $7,62 $8,299 $7, $2, Operational Improvements/Enhancements $3,52 $8,371 $2,7 $1,535 $4,37 $4, Others $8,299 $2,29 $1,99 $1,99 $1,99 $2,69 6. Caltrain Modification Program $4,5 $8,651 $9,46 $19,6 $2,32 $2,62 7. Legal Mandates & Required Enhancements - CBOSS/ PTC $117, Electrification $1,72 Total Board Approved Budget by FY (1) $151,15 $83,535 $36,626 $61,477 $39,93 $19,565 Total Audited Expenditures by FY (2) $76,917 $72,626 $92,126 $81,375 $87,385 (3) $36,674 (4) Some of the major projects completed include, but are not limited to the following: Tunnel Rehabilitation Project Hillsdale Station Outboard Platform Improvements Bridge Seismic Retrofit and Deck Replacement Project Centralized Equipment Maintenance & Operations Facility (CEMOF) North Terminal Operations Improvements Project Burlingame Station Platform & Track Improvements Project Diridon Station Improvements uadalupe River Bridge Interim Repair Project Cal Ave Station Improvements / Palo Alto Ped Underpass & Platform Improvements / Bridge Deck Repair Project San Bruno / South Linden Interim Safety Improvement Project Procurement of Eight Caltrain Passenger Cars San Mateo County rade Crossing Improvement Program South San Francisco Station Parking Lot Project South Terminal and Santa Clara Stations Improvements Project San Mateo Bridges Rehabilitation Project Jerrold Avenue Bridge Replacement Project System Station Rehab Project - FY212 Narrow Banding Project Rail Operation Control System (ROCS) Project Real Time Transit Information Project - Predictive Arrival/Departure System (PADS) Note: (1) The "Total Board Approved Budget by FY" reflects the annual budget approved by the JPB at the beginning of each fiscal year. This authorizes the amount that could be spent on projects. Unspent budget in a fiscal year will be carried forward to subsequent budget years. (2) "Total Audited Expenditures by FY" reflects total cost expended in the fiscal year; funding source for the expenditures could be from prior fiscal years. (3) Expenditures shown for FY213 through June 3, 213 have been audited. (4) Expenditures shown for FY214 through December 31, 213 are unaudited. Page 1

6 This page is intentionally left blank. Page 2

7 October 1, December 31, 213 Caltrain QUARTERLY REPORT Active Capital Projects TRAFFIC LIHT REPORT The following projects represent a sub-set of the total Capital Program and have been selected for inclusion into the Quarterly Report due to project value, operational significance, and/or impact on customers. SCOPE SCHEDULE BUDET / COST HSR IMPACT Q1 FY14 Q2 FY14 Q1 FY14 Q2 FY14 Q1 FY14 Q2 FY14 Q1 FY14 Q2 FY14 Atherton Station Improvements (Project On hold) W W W W W W R R 4 Page Broadway Station Improvements (Project On hold) W W W W W W R R 6 CBOSS/PTC Project 8 Dumbarton Rail Corridor Project R R N/A N/A 1 Peninsula Corridor Electrification Project 12 Los atos Creek Bridge Replacement Project R R 14 Quint Street Bridge Project Y Y R R Y Y 16 Railroad Communications System (SOR) Project Y R N/A N/A 18 Real Time Transit Information Project R R N/A N/A 2 San Bruno rade Separation Project 22 San Francisco Roadway Bridges Replacement Project Y 24 San Mateo Bridges Replacement Project - Design N/A N/A 26 Signal Pre-emption Improvement Project 28 Systemwide Signal System Rehabilitation Project - FY213 Y Y N/A N/A 3 Systemwide Station Rehab Program - FY213 Y Y N/A N/A 32 Systemwide Track Rehab Program - FY213 Y Y N/A N/A 34 Train Dispatch Voice Communication System Project Y 36 Upgrade of PA & VMS Systems at 4 Stations Project 38 Wayside Power at Diridon Station Project R R 4 Page 3

8 Oct. 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Capital Projects SCOPE ATHERTON STATION IMPROVEMENTS SCHEDULE BUDET/COST HSR IMPACT W W W R SCOPE: W This project provides for the design and construction of new station facilities at Atherton Station (MP 27.8) to eliminate the "hold out rule". The scope of the project includes demolishing the center platform and providing outboard boarding platforms with a center inter-track fence and a signalized/gated pedestrian crossing at the northern end of the platforms. Design has been completed; project was placed on hold for further efforts (see note in "Other" section). Scope of project is on hold; Caltrain capital program management team is reviewing the impacts of other improvements in the vicinity of the station to determine the appropriate scope definition for the Atherton Station project. SCHEDULE: W Progress: Project is on hold. Oct - Dec 213 Future Activities: Jan - Mar 214 Project is on hold. Project is on hold; schedule needs to be redefined and re-baselined. Page 4

9 Oct. 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Capital Projects ATHERTON STATION IMPROVEMENTS BUDET: (a) (b) (c) (d) (e) = (a - d) W Segment roup Current Board Approved Budget Expended to Date Committed To Date Estimate at Variance at Planning & Engineering $239,4 $339,639 $339,642 $365, ($125,6) Right of Way Construction $1,296,25 $22,696 $28,96 $2,557,527 ($1,261,277) Construction Management $2, $29,525 ($9,525) $143,64 $16,625 $16,625 $687,36 ($543,396) $12,71 $385,712 ($265,2) Total $2,, $522,96 $529,173 $4,285,8 ($2,285,8) Project Budget / Cost Status $3,, Current Board Approved Budget Estimate at Expended to Date $2,5, Amount in $ $2,, $1,5, $1,, $5, Planning & Engineering Right of Way Construction Construction Management Segment roups The project was put on hold for any further design efforts. Estimate at will be re-evaluated when project is re-activated. HSR IMPACT: Project scope, budget and delivery schedule will likely be impacted by High Speed Rail development along the Caltrain corridor. R OTHERS: W Project has been placed on hold; Capital Program Management team is currently reviewing the impact of capital improvements (incl. Dumbarton Rail Extension) in the vicinity of Atherton Station. Page 5

10 Oct. 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Capital Projects BROADWAY STATION IMPROVEMENTS SCOPE SCHEDULE BUDET/COST W W W HSR IMPACT R SCOPE: W This project is to eliminate the "hold out rule", reduce gate down time and provide pedestrian/patron safety by providing outboard boarding platforms at the Broadway Station (MP 15.2). The platforms are to be staggered, the Northbound platform north of Broadway Avenue and the Southbound platforms remaining south of Broadway Avenue. Scope includes track work, signal work, pedestrian active warning devices, lighting and general construction work on platforms and associated amenities. This work shall eliminate the hold out rule and reduce gate downtime. Most of the track rehab work in the vicinity of the Broadway station has been transferred to the Burlingame Outboard Platform Project. The project was put on hold for any further design efforts. Scope of project is on hold; Caltrain capital program management team is reviewing the impacts of other improvements in the vicinity of the station to determine the appropriate scope definition for the Broadway Station project. SCHEDULE: W Progress: Project is on hold. Oct - Dec 213 Future Activities: Jan - Mar 214 Project is on hold. Project is on hold; schedule needs to be redefined and re-baselined. Page 6

11 Oct. 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Capital Projects BROADWAY STATION IMPROVEMENTS BUDET: (a) (b) (c) (d) (e) = (a - d) W Segment roup Current Board Approved Budget Expended to Date Committed To Date Estimate at Variance at Planning & Engineering $243,196 $1,59,935 $1,59,935 $1,265, ($1,21,84) Right of Way Construction $1,864,5 $23,854 $3,96 $4,174,947 ($2,31,447) Construction Management $162,13 $46,959 ($298,829) $194,557 $326,493 $326,493 $98,39 ($785,482) $324,958 $616,155 ($291,197) Total $2,789,341 $1,41,282 $1,417,334 $7,497,1 ($4,77,759) Project Budget / Cost Status Current Board Approved Budget Estimate at Expended to Date $4,5, $4,, $3,5, $3,, Amount in $ $2,5, $2,, $1,5, $1,, $5, Planning & Engineering Right of Way Construction Construction Management Segment roups The project was put on hold for any further design efforts. Estimate at will be re-evaluated when project is re-activated. HSR IMPACT: R Project scope, budget and delivery schedule will likely be impacted by High Speed Rail development along the Caltrain corridor. OTHER: W Project has been placed on hold; Capital Program Management team is currently reviewing the impact of future capital improvements in the vicinity of the Broadway station. Page 7

12 Oct 1, Dec 31, 213 Active Capital Projects CBOSS PTC Project SCOPE SCHEDULE BUDET / COST HSR IMPACT SCOPE: This project includes design of a Communications Based Overlay Signal System Positive Train Control (CBOSS PTC), which will improve rail safety, provide enhanced operational benefits for passenger rail service, and fulfill federally mandated positive train control safety improvements along the Caltrain/ California High Speed Train (CAHST) San Francisco to San Jose corridor. The CBOSS PTC communication system has been specified to provide a reliable means for PTC information exchange at speeds up to 125 mph between the CBOSS PTC-equipped trains, wayside devices, employees-in-charge handheld devices, and the operations control center in San Jose. The CBOSS PTC Project will be implemented in three phases: Phase 1 - Project Administrative Planning, Preliminary Design and Critical Design of CBOSS PTC system. Phase 2 with fiber optic backbone - Activities including acceptance of CBOSS PTC Final Design and the Factory Acceptance Test, as well as installation of the data communications subsystem including fiber optic backbone. Phase 3 with fiber optic backbone - Activities including all remaining CBOSS PTC subsystem installation, all sub-system and system testing, Focus of the project during phase 1 was as follows: 1) Project administrative planning; 2) Federal Railroad (FRA) documentation deliverables such as the PTC Development Plan (PTCDP), PTC Implementation Plan (PTCIP) updates and the PTC Safety Plan (PTCSP) outline; 3) PTC database management plan; 4) CBOSS PTC Preliminary Design and Critical Design for all sub-system hardware and software. Focus of the project during phase 2 is as follows: 1) CBOSS PTC Final Design for all sub-system hardware and software. 2) of Factory Integrated Subsystem/system Demonstration. 3) Commence Installation of Data Communication System (including Fiber Optic). 4) Complete Installation and Verification of Data Communication System (including Fiber Optic). Focus of the project during phase 3 / 4 is as follows: 1) Complete remaining CBOSS PTC subsystem installation activities, including the BCCF. 2) Complete remaining sub-system testing, verification, training, and commissioning. 3) Complete safety certification, system acceptance, and the one year warranty. SCHEDULE: 1 - Final design completion is forecasted later than original plan due to FRA FDR comments. 2 - Fiber optic installation production rate is lower than the oringal plan due to existing field conditions that boring crew has encountered. The project is in the process of reforecasting effort to implement the schedule recovery plan in order to support CBOSS PTC field testing schedule. Page 8

13 Oct 1, Dec 31, 213 Active Capital Projects CBOSS PTC Project Progress: This Period: Oct - Dec 213 1) Completed Final Design Reviews and presented Final Design to the FRA and UPRR; 2) Continued field coordination effort to complete installation activities of the Fiber Optic Backbone Segment 3 and Segment 2; 3) Completed BCCF design, commenced BCCF construction permit process to support starting the BCCF facility Buildout; 4) Commenced DCS and Fiber Optic Backbone subsystem installation; 5) Issued Notice to Proceed for Phase 3, including FDR, FAT and Data Communications Installation & Verification; 6) Commenced Wayside subsystem installation on the WIUs and the existing circuitry. Addressed Signal Plan revision control items identified during field activities; 7) Awarded the ROCs Modification subcontract; 8) Continued development of the Interoperability Coordination plan; 9) Continued interoperability coordination effort with Tenant RR's; Future Activities: Jan - Mar 214 1) Continue installation activities for DCS and Fiber Optic Backbone, including commencement of Segment 1; 2) Continue Wayside subsystem installation on the WIUs and existing circuitry. Commence installation on track transponders; 3) Commence On-Board installation activities; 4) Progress RF Spectrum activities; 5) Continue to address Signal Plan revision control items identified during field activities; 6) Continue deep dive on identified potential Level 2 interoperability gaps and coordinate technical working groups with UPRR; 7) Continued development of the Interoperability Coordination plan; 8) Continue interoperability coordination effort with Tenant RR's; BUDET: Phase 1, 2, & 3 / 4 Cost Analysis (a) (b) (c) (d) (e) = (a - d) Current Board Approved Budget Expended to Date Committed to Date Estimate at Variance at Owner's Cost $49,726,798 $19,6,65 $25,535,59 $55,655,853 ($5,929,55) Design Build Contract $138,135,673 $51,671,649 $15,327,746 $138,135,673 Options/ Allowance $35,647,734 $33,373,67 $2,274,127 $7,489,795 $3,834,867 $3,654,928 Total $231,, $7,731,714 $13,862,85 $231,, Project Budget / Cost Status Owner's Cost Estimate at Expended to Date $16,, $14,, $12,, Amount in $ $1,, $8,, $6,, $4,, $2,, Owner's Cost Design Build Contract Segment roups Options/ Allowance The Current Board Approved Budget was updated for the JPB Q4FY13 (June213) report to include all Phases. The Estimate at was also updated in the June213 report to include all Phases. Phase 1 NTP was on 27-Jan-212(A), Phase 2 NTP was on 3-Apr-213(A) and Phase 3 NTP was on 27-Nov-13(A). : None HSR IMPACT Page 9

14 Oct 1, Dec 31, 213 Caltrain Quarterly Report Active Capital Projects DUMBARTON RAIL CORRIDOR PROJECT BUDET: (a) (b) (c) (d) (e) = (a - d) Segment roup Current Board Approved Budget Expended to Date Committed To Date Estimate at Variance at Planning & Engineering $9,156,128 $8,548,64 $8,756,354 $9,156,128 Right of Way Construction $38,72 $38,72 $38,72 $38,72 Construction Management $3,68 $2,28 $2,28 $3,68 $6,171,8 $6,98,763 $6,126,38 $6,171,8 $98,932 $98,932 Total $15,468, $14,686,927 $14,922,762 $15,468, Project Budget / Cost Status Current Board Approved Budget Estimate at Expended to Date $1,, Amount in $ $8,, $6,, $4,, $2,, Planning & Engineering Right of Way Construction Construction Management Segment roups (1) The recent defeat of the Alameda County Measure B1 could impact the ability to build the DRC project. Measure B1 included more than $2 Million for the project. The PCJPB, as designated PM for the project, is in discussion with MTC and the various funding parties on the future of the project. OTHER: Page 11

15 Oct 1, Dec 31, 213 Caltrain Quarterly Report Active Capital Projects DUMBARTON RAIL CORRIDOR PROJECT Project Sponsor: SMCTA Project Management: Caltrain SCOPE SCHEDULE BUDET / COST OTHER R SCOPE: The Dumbarton Rail Corridor (DRC) Project will extend commuter rail service across the Bay between the Peninsula and the East Bay by rehabilitating and reconstructing rail facilities on the existing railroad alignment and right of way. Three new passenger rail stations in Menlo Park/ East Palo Alto, Newark, Union City, and a new layover facility in the East Bay will be constructed, as well as upgrading the Fremont Centerville Station. The proposed Dumbarton train service will consist of six trains crossing the bridge during the morning commute and six during the evening commute. Morning trains will originate at the Union City Intermodal Station, cross the bay to Redwood City, and then three trains will travel north to San Francisco and three will travel south to San Jose. In the evening, all trains will reverse pattern and travel back to Union City. (1) The NEPA and CEQA environmental clearance of the DRC project is being accomplished through the preparation of a combined EIS/EIR document. Through this process, significant coordination with communities and other impacted agencies such as the Union Pacific Railroad and the Capitol Corridor will be required for which could result in additional studies, schedule delays or project costs. (2) This project is put on-hold until further notice. SCHEDULE: R The schedule is being updated Progress: Oct - Dec 213 (1) Conducted meetings with peninsula cities and ACTC. (2) Conducted committee meetings with PAC. (3) Selected short term projects for submittal to MTC. (4) Began work on funding agreements. (5) Project put on hold. This will be the last quarterly report for the project until further notice. Future Activities: Jan - Mar 214 (1) Project is on hold. CAP = Citizen Advisory Panel MTC = Metropolitan Transportation Commission PAC = Policy Advisory Committee PDT = Project Development Team DBROC = Dumbarton Bridge Regional Operations Consortium ACTC = Alameda County Transportation Commission Project experienced significant coordination with communities and other impacted agencies which resulted in performing additional studies and encountering schedule delays. Page 1

16 Oct 1, Dec 31, 213 CALTRAIN QUARTERLY REPORT Active Capital Projects SCOPE PENINSULA CORRIDOR ELECTRIFICATION PROJECT SCHEDULE BUDET/ COST HSR IMPACT SCOPE: The Peninsula Corridor Electrification Project will electrify the 51 mile Caltrain Commuter line from San Francisco to Tamien. The project budget includes activities associated with: (1) Preparing and completing the environmental assessment and clearance. (2) Technical refresh of previous 35% design. The Federal Transit (FTA) completed their National Environmental Policy Act (NEPA) Environmental Assessment (EA) of Corridor Electrification in 29 with the adoption of a Finding of No Significant Impact (FONSI). FTA has identified to Caltrain that since the project description of the electrification project is the same as FTA analyzed in their 29 EA, that there is no need to do a NEPA revaluation for this project. Under FTA s direction, staff will be preparing a state-only environmental clearance document: the Peninsula Corridor Electrification Project EIR. The budget reflects all efforts associated with processing a new environmental document and environmental planning. Project public outreach, operations, project controls and engineering supporting during the environmental clearance phase. The FY14 budget also includes the 35% design updates to be performed by Owner's technical team and procurement planning for the future design construction contract. SCHEDULE: Progress: Oct- Dec 213 Continued to confirm project elements including previously completed 35% engineering design, operations assumptions, financials and environmental impact analysis. There is continued coordination with the CHRSA on defining the scope of the Corridor Electrification Project in relation to the blended system. Continued with Electrification Owner's Representative RFP (Request for Proposal) effort. Future Activities: Jan - Mar 213 Finalize the environmental impact analysis for the input to the PCEP Draft EIR (DEIR). The project team will prepare for the public release of the DEIR targeted for the end of February. Obtain public comments on the DEIR through public meetings planned for March and April. Continue with Owner s Representative Request for Proposal (RFP) effort. Begin Design Build RFQ/RFP efforts. Page 12

17 Oct 1, Dec 31, 213 CALTRAIN QUARTERLY REPORT Active Capital Projects PENINSULA CORRIDOR ELECTRIFICATION PROJECT BUDET: (a) (b) (c) (d) (e) = (a - d) Segment roup Current Board Approved Budget Expended to Date Committed To Date Estimate at Variance at Consultant EIR $3,448,75 $1,826,16 $2,145,27 $3,448,75 Consultant Other Consultant Support $1,812,91 $665,72 $769,886 $1,812,91 Agency Staff EIR $1,593,293 $839,233 $839,233 $1,727,473 ($134,18) Agency Staff - 35% Design Update $398,487 $287,94 $287,94 $398,487 Consultant - 35% Design Update $3,591,798 $593,4 $768,83 $3,487,314 $14,484 TASI Operator Support EIR $61,13 $19,546 $16,33 $61,13 ODC and Legal EIR 252, , , ,851 Sub-Total $11,157,698 $4,353,858 $4,949,654 $11,187,394 ($29,696) $265,756 $236,6 $29,696 Total $11,423,454 $4,353,858 $4,949,654 $11,423,454 Project Budget / Cost Status Current Board Approved Budget Estimate at Expended to Date $4,, $3,, Amount in $ $2,, $1,, Consultant EIR Consultant Other Agency Staff EIR Agency Staff 35% Consultant 35% Support Design Update Design Update TASI Operator Support OCD and Legal Segment roups HSR IMPACT: None OTHER: Page 13

18 Oct. 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Active Capital Projects LOS ATOS CREEK BRIDE REPLACEMENT PROJECT SCOPE SCHEDULE BUDET / COST HSR IMPACT R SCOPE: Scope of the Los atos Creek Bridge Replacement Project includes: Preliminary Design, Environmental Document, Final Design and Construction for the removal and replacement of the existing MT-1 and MT-2 bridges crossing the Los atos Creek. As recommended in the PSR, the new replacement structure is to be a pre-stressed / pre-cast concrete bridge with new foundations and a new widened bridge deck that allows construction for a permanent tail track and signal work. The permanent tail track and signal work is being covered under the South Terminal Phase 3 project. Environmental Clearance is being obtained through the National Environmental Policy Act (NEPA) and California Environmental Quality Act (CEQA) process. The CEQA process requires public input and Board approval of a Mitigated Negative Declaration. The project cost and schedule will also be revisited. SCHEDULE: R The project schedule will be updated once the operational and capacity analysis study is complete. The study will properly respond to FTA requirements of having a finalized project scope, purpose and needs for environmental clearance. Progress: Oct - Dec 213 (1) Continued environmental clearance process. (2) Continued public outreach effort. (3) Continued negotiating with the City of San Jose. Future Activities: Jan - Mar 214 (1) Continue to prepare and revise draft environmental document. (2) Continue public outreach effort. (3) Continue negotiating with the City of San Jose. (4) Present the project to the JPB Board. As Federal funds are involved in the 35% design phase, the project will be on-hold at 35% design until environmental clearance from the FTA is obtained. Page 14

19 Oct. 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Active Capital Projects LOS ATOS CREEK BRIDE REPLACEMENT PROJECT BUDET: (a) (b) (c) (d) (e) = (a - d) Segment roup Current Board Approved Budget Expended to Date Committed to Date Estimate at Variance at Planning & Engineering $2,243,657 $2,76,426 $2,313,36 $2,243,657 Right of Way $5, $5, Construction $3,85,794 $13,138 $9,48 $3,85,794 Construction Management $1,42,6 $4,828 $4,828 $1,42,6 $1,83,21 $1,755,755 $1,755,755 $1,83,21 $952,343 $952,343 Total $1,32,415 $3,85,147 $4,83,423 $1,32,415 Project Budget / Cost Status $4,5, Current Board Approved Budget Estimate at Expended to Date $4,, $3,5, Amount in $ $3,, $2,5, $2,, $1,5, $1,, $5, Planning & Engineering Right of Way Construction Construction Management Segment roups The current Board approved Budget and the Estimate at of about $1.3 million is for the environmental and design phases plus partial construction. Estimated cost for construction will not be known until the completion of preliminary design. Once the scope is refined, the Budget and Estimate at will be updated and reflected in the report. HSR IMPACT: Page 15

20 Oct. 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Active Capital Projects QUINT STREET BRIDE PROJECT SCOPE SCHEDULE BUDET / COST HSR IMPACT Y R Y SCOPE: Y Proposed Scope: (1) Close Quint Street crossing permanently to vehicular traffic. Remove the Quint Street Bridge, fill the bridge opening with an embankment and construct new tracks on the embankment. (2) Perform other related work such as utility protection, trackwork and street utilities. The Quint Street bridge replacement with tracks on embankment will enable completion of the project within the approved budget without compromising the JPB goals on seismic vulnerability, state of good repair and safety and will not preclude the potential construction of a station in the vicinity. (1) In July 213, the San Francisco County Transportation Commission selected Option 1(Close Quint Street permanently to vehicular traffic and replace Quint Street bridge with an embankment) as the preferred alternative. (2) Street closure which is necessary for berm construction is awaiting approval from San Francisco Board of Supervisors. SCHEDULE: R The project schedule will be updated and re-baselined following discussions with the San Francisco County Transportation Authority (SFCTA). Progress: Oct - Dec 213 (1) Completed legal review of street closure application by SF City attorneys. (2) Delivered the street closure application package to SF Real Estate Department. Future Activities: Jan - Mar 214 (1) Begin legislative process of street closure ordinance. The schedule delay was due to ongoing negotiations with SF on the scope of the project. Page 16

21 Oct. 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Active Capital Projects QUINT STREET BRIDE PROJECT BUDET: (a) (b) (c) (d) (e) = (a - d) Y Segment roup Planning & Engineering Current Board Approved Budget $2,49,11 Expended to Date $826,743 Committed to Date $826,77 Estimate at $2,35,684 Variance at $139,417 Right of Way $3,153 $5,988 $5,988 $2,976 $177 Construction $12,223,514 $6,88 $6,88 $11,539,138 $684,376 Construction Management $2,489,155 $658 $658 $2,349,791 $139,364 $2,724,158 $1,267,332 $1,267,332 $2,571,637 $152,521 $8,238,44 $1,697,914 $6,54,49 Total $28,168,485 $2,17,529 $2,17,556 $2,512,14 $7,656,345 Project Budget / Approved Funding / Cost Status Current Board Approved Budget Estimate at Expended to Date $12,, $1,, Amount in $ $8,, $6,, $4,, $2,, Planning & Engineering Right of Way Construction Construction Management Segment roups (1) Out of the $28.2M Board approved budget, only $2.7M is available at this time. HSR IMPACT: Page 17

22 October 1, December 31, 213 Caltrain Quarterly Report Active Capital Projects Railroad Communication System (SOR) Project SCOPE SCHEDULE BUDET/COST OTHER R SCOPE: The State of ood Repair (SOR) project includes seven upgrades / replacement tasks of Caltrain's communication systems or subsystems. The seven upgrades / replacement tasks are: Task 1. Assessment of Back Office Train Control Systems at Central Control Facility (CCF). Task 2. Assessment of Advance Train Control System (ATCS) Radio Network System. Task 3. Assessment and Optimization of Caltrain's Telephone Lines used for Communication and Signal (C&S) functions. Task 4. Increase voice radio coverage around Mountain View area. Task 5. Remote reboot capability of channel 5 radio at Monument Peak. Task 6. Develop standardized drawings and configuration management for railroad communication system. Task 7. Implementation of a Communication System for Track Department's Weather Sensors. SCHEDULE: R Progress: Oct - Dec 213 Future Activities: Jan - Mar 214 (1) Begun assessment of ATCS Hardware, ATCS Data network, and C&S Telco lines (Task #2) (2) Completed about 95% of design work for Mountain View/Sunnyvale area radio base station (Task #4). (3) Completed about 95% of design for remote radio reboot (Task #5). (4) Completed about 95% of physical work including surveying and inventory (Task #6). (5) Begun design of communication system for weather sensors (Task #7). (1) Continue assessment of ATCS Hardware, ATCS Data network and C&S Telco lines (Task #'s 1, 2 and 3). (2) Continue design of communication system for weather sensors (Task #7). (3) Bring design for Mountain View area and design for remote radio reboot to IFB status (Tasks #4 and 5). (4) Receive final drawings from CCF in March 214 (Task #6). The project schedule was extended by another three months this quarter due to additional time needed to evaluate overall district communications and compatibility with the CBOSS/PTC design. Page 18

23 October 1, December 31, 213 Caltrain Quarterly Report Active Capital Projects Railroad Communication System (SOR) Project BUDET: Segment roup Current Board Approved Budget Expended to Date Committed to Date Estimate at Variance at Planning & Engineering $12, $13,42 $12, Right of Way Construction $581, $1, $1, $581, Construction Management $136, $8,812 $136, $196, $12,872 $12,872 $196, $112,5 $112,5 Total $1,127,5 $112,872 $252,14 $1,127,5 Project Budget / Cost Status Current Board Approved Budget Estimate at Expended to Date $7, $6, $5, Amount in $ $4, $3, $2, $1, Planning & Engineering Right of Way Construction Construction Management Segment roups OTHER: Page 19

24 Oct. 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Active Capital Projects REAL TIME TRANSIT INFORMATION PROJECT (Caltrain PADS) SCOPE SCHEDULE BUDET/COST OTHER R SCOPE: The Real Time Transit Information Project includes design and implementaion of a Predictive Arrival/Departure System (PADS) for all Caltrain trains. The real time predictive data will be provided to MTC s 511 system to be disseminated to the public. The train predictive arrival/departure times will be displayed on the Visual Message Signs (VMS) at the San Francisco 4th & King, Millbrae, San Mateo, Redwood City, Palo Alto, Mountain View, Sunnyvale, and the San Jose Diridon stations. ARINC is the selected contractor. Final System Acceptance was issued on 9/26/213. This will be the last report for the project. SCHEDULE: R Progress: Oct - Dec 213 (1) Processed the final invoices. (2) Continued close out process. Future Activities: Jan - Mar 214 (1) Continue close out process. Final System Acceptance was issued on 9/26/213. Page 2

25 Oct. 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Active Capital Projects REAL TIME TRANSIT INFORMATION PROJECT (Caltrain PADS) BUDET: (a) (b) (c) (d) (e) = (a - d) Segment roup Current Board Approved Budget Expended to Date Committed To Date Estimate at Variance at Planning & Engineering $35,933 $35,933 $35,933 $35,933 Right of Way Construction $2,75,467 $1,558,36 $1,617,82 $2,45,252 $3,215 Construction Management $178,58 $173,141 $173,141 $173,141 $4,917 $2,251,57 $2,291,657 $2,291,657 $2,34,58 ($53,1) $26,267 $8,398 $17,869 Total $4,567,232 $4,59,91 $4,118,533 $4,567,232 Project Budget / Cost Status Current Board Approved Budget Estimate at Expended to Date $2,5, $2,, Amount in $ $1,5, $1,, $5, Planning & Engineering Right of Way Construction Construction Management Segment roups An Estimate to Complete amount of $487K was included in Construction for Warranty and System Technology Refresh. OTHER: Page 21

26 Oct 1, Dec. 31, 213 Caltrain Quarterly Report Active Capital Projects SAN BRUNO RADE SEPARATION PROJECT SCOPE SCHEDULE BUDET / COST HSR IMPACT SCOPE: The project will raise the railroad in a retained embankment and lower roadways crossing the railroad right of way from just south of the I-38 flyover to approximately San Felipe Road (MP 12.) in San Bruno. The project will eliminate at-grade vehicular crossings at San Bruno Avenue, San Mateo Avenue and Angus Avenue and replace them with grade separated vehicular access. Pedestrian undercrossings will be constructed at Euclid and Sylvan Avenues in San Bruno. The existing San Bruno station will be relocated onto an elevated structure at San Bruno and San Mateo Avenues. The former site of the San Bruno Lumber will become a surface parking lot for the new San Bruno station. A BART vent structure will be retrofitted to support Caltrain track loading. Construction contract Option 1 has been exercised and includes: a new at-grade parking lot and transit center, northbound platform at San Bruno station, roadway improvements along First Avenue, construction of three pedestrian under crossings and the demolition of the San Bruno temporary station. Current EAC reflects the inclusion of Option 1. SCHEDULE: Progress: Oct - Dec 213 (1) Completed installation of utilities for the new station. (2) Continued construction of water feature. (3) Continued construction of stairs and ramp for the new station. (4) Continued construction of pedestrian underpass tie-in. (5) Began installation of utilities at north bound platform. (6) Began final grading at station area. (7) Began construction at east side of elevator tower. (8) Began final grading at Transit Center. (9) Began construction of north bound platform. Future Activities Jan - Mar 214 (1) Complete construction of stairs and ramp for the new station. (2) Complete construction of pedestrian underpass tie-in. (3) Complete installation of utilities at north bound platform. (4) Complete construction of north bound platform. (5) Complete construction of water feature. (6) Complete final grading at station area. ( 7) Complete construction at east side of elevator tower. ( 8) Complete final grading at Transit Center. ( 9) Complete final paving of street. (1) Complete cut-in of traffic signals. (11) Begin installation of platform amenities. Page 22

27 Oct 1, Dec. 31, 213 Caltrain Quarterly Report SAN BRUNO RADE SEPARATION PROJECT Active Capital Projects BUDET: (a) (b) (c) (d) (e) = (a - d) Segment roup Current Board Approved Budget Expended to Date Committed to Date Estimate at Variance at Planning & Engineering $2,588,265 $2,588,265 $2,588,868 $2,588,265 Right of Way $556,8 $511,322 $511,322 $556,8 Construction $15,34,52 $94,1,67 $98,813,27 $15,34,52 Construction Management $16,62,838 $15,728,174 $17,496,741 $16,62,838 $12,173, $11,183,224 $11,395,384 $12,173, $44,595 $44,595 Total $155,, $142,21,592 $148,85,342 $155,, Project Budget / Cost Status Current Board Approved Budget Estimate at Expended to Date $12,, $1,, Amount in $ $8,, $6,, $4,, $2,, Planning & Engineering Right of Way Construction Construction Management Segment roups HSR IMPACT: Page 23

28 Oct 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Active Capital Projects SAN FRANCISCO ROADWAY BRIDES REPLACEMENT PROJECT SCOPE SCHEDULE BUDET / COST HSR IMPACT Y SCOPE: The San Francisco Roadway Bridges Replacement project upgrades the Caltrain owned vehicular bridges located at 22nd Street, 23rd Street and Paul Avenue and includes: (1) Remove and replace the existing two-span steel-through girder superstructures as the bridges have reached the end of their useful lives, allowing sufficient vertical clearance to accommodate future projects such as electrification. (2) Remove and reconstruct the existing utility lines attached to the bridges. Provide temporary supports until the bridges are reconstructed. SCHEDULE: Y Progress: Oct - Dec 213 Future Activities: Jan - Mar 214 (1) Relocated overhead line at Paul Avenue by the City. (2) Updated design per City comments on fire protection system and Paul Avenue closure due to fire. (3) Received Utility Reimbursement agreements from P&E. (4) Continued waiting for the Utility Reimbursement agreements from AT&T and Comcast. (5) Reviewed plans and specifications. (1) Receive Utility Reimbursement agreements from AT&T and Comcast. (2) Receive Invitation for Bid (IFB) for Plans, Specifications and Estimates (PS&E) package. (3) Issue Purchase Order (PO) to investigate abandoned utilities. (4) Receive drawings from San Francisco Fire Department Auxiliary Water Supply System (AWSS) to be added as an addendum to the IFB package for the 22nd Street bridge. (1) Utility Agreements with private utilities and the City and County of San Francisco for utility relocation, cost sharing, betterments and methods of payments is ongoing and needs to be finalized prior to completion of design. (2) Pending finalization of the above agreements continue to impact the project schedule. Page 24

29 Oct 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Active Capital Projects SAN FRANCISCO ROADWAY BRIDES REPLACEMENT PROJECT BUDET: (a) (b) (c) (d) (e) = (a - d) Segment roup Current Board Approved Budget Expended to Date Committed to Date Estimate at Variance at Planning & Engineering $1,86,18 $1,61,487 $1,767,188 $1,9, ($39,82) Right of Way $195, $24,588 $24,588 $195, Construction $11,635,442 $35,71 $35,716 $11,7, ($64,558) Construction Management $2,1, $28,39 $28,39 $2,1, $2,287,95 $1,82,82 $1,82,82 $2,325, ($37,5) $2,393,215 $1,98, $413,215 Total $2,471,788 $3,491,96 $3,657,613 $2,2, $271,787 Project Budget / Cost Status Amount in $ 2,, 1,8, 1,6, 1,4, 1,2, 1,, 8, 6, 4, 2, Current Board Approved Budget Estimate at Expended to Date Planning & Engineering Right of Way Construction Construction Management Segment roups (1) Out of the $2.4M Board approved budget, only $4.3M is available at this time. Additional available fund is needed immediately. HSR IMPACT: Page 25

30 Oct 1, Dec. 31, 213 Caltrain Quarterly Report Active Capital Projects SAN MATEO BRIDES REPLACEMENT PROJECT - DESIN SCOPE SCHEDULE BUDET/COST OTHER SCOPE: The project will improve structural integrity and improve roadway clearances of four railroad bridges that are approximately 1-years old. The project consists of the following phases: Phase I: Foundation Improvements to strengthen the existing foundations and construct new abutments for the future replacement of the bridge spans. Phase I was completed in 211 (Project 1755). Phase II: Utility relocation - relocate all utilities that have potential impact to the bridge construction. Phase II and Phase III will be performed at the same time. Phase III: Bridge Replacement - remove and replace of the existing steel girder superstructure and timber deck spans for the four San Mateo bridges (Poplar Avenue, Santa Inez Avenue, Monte Diablo Avenue and Tilton Avenue); raising the track level and establishing 15 track centers through the project limits; install associated utility work; and increase clearance between the railroad bridge and the street below. The current scope is for the design of Phase II & III and the Advanced Site Preparation (ASP) package only. A work plan was prepared, submitted and approved for construction in December 213. The project budget, schedule and estimate at completion will be updated in the next quarterly report. SCHEDULE: Being updated. Progress: Oct - Dec 213 (1) The PCJPB Board authorized the Advanced Site Preparation (ASP) package for award. (2) Issued Limited Notice to Proceed (LNTP) for ASP. (3) Continued design of Phase II & III package. (4) Continued public outreach. (5) Continued utility coordination. (6) Began review of submittals and RFI's for ASP. Future Activities: Jan - Mar 214 (1) Issue NTP for ASP. (2) Continue design of Phase II & III. (3) Continue public outreach. (4) Continue utility coordination. (5) Continue review of submittals and RFI's for ASP. The current schedule reflects the Design of Phase II & III only. Page 26

31 Oct 1, Dec. 31, 213 Caltrain Quarterly Report Active Capital Projects SAN MATEO BRIDES REPLACEMENT PROJECT - DESIN BUDET: Segment roup Current Board Approved Budget Expended to Date Committed to Date Estimate at Variance at Planning & Engineering $97, $795,21 $1,2,662 $97, Right of Way $55, $45,5 $55, Construction $423, $375,231 $423, Construction Management $48, $18,234 $42,234 $48, $529,83 $524,585 $524,585 $529,83 Total $2,25,83 $1,383,34 $1,962,712 $2,25,83 Project Budget / Cost Status Current Board Approved Budget Estimate at Expended to Date $1,2, $1,, $8, Amount in $ $6, $4, $2, Planning & Engineering Right of Way Construction Construction Management Segment roups 1) The Board has approved the total funding for the design of Phase II, Phase III and the ASP package. 2) The Board Approved Budget and Estimate at (EAC) is for the design of Phase II, Phase III and the ASP package only. OTHER: Page 27

32 Oct 1, Dec 31, 213 Caltrain Quarterly Report Active Capital Projects SINAL PRE-EMPTION IMPROVEMENT PROJECT SCOPE SCHEDULE BUDET / COST HSR IMPACT SCOPE: The purpose of this project is to improve the safety of signalized traffic intersections adjacent to at-grade highway-rail crossings. The proposed improvements include backup batteries and train detection upgrades. The project will achieve a minimum of six to 14 seconds of advanced pre-emption for the following signalized traffic intersections: (1) Brewster Avenue, Redwood City (2) Churchill Avenue, Palo Alto (3) East Meadow Avenue, Palo Alto (4) Rengstorff Avenue, Mountain View (5) Castro Street, Mountain View (6) Improved phasing improvements at Brewster, Castro and Rengstorff was added in May 212. EAC indicates a potential overrun of $114K from the current budget. The Project Manager is monitoring all project costs closely to mitigate any potential overruns. SCHEDULE: The schedule is being updated. Progress: Oct - Dec 213 Future Jan - Mar 214 (1) Issued progress report to Caltrans. (2) Recieved a 9-day project extension from Caltrans. (3) Completed cut over Meadow/Castro & Rengstorff shunts. (4) Completed cut-over Brewster traffic signal. (5) Continued construction progress meetings. (6) Continued meeting with agency partners on contract administration issues. (7) Continued processing submittals and RFI's. (8) Continued construction at Rengstorff, Brewster Avenues and Castro Street. (1) Issue progress report to Caltrans. (2) Hold construction progress meetings. (3) Complete construction at Rengstorff, Castro, Brewster, Meadow and Churchill. (4) Complete cut-over Castro and Rengstorff traffic signals. (5) Complete meeting with Caltrans in providing progress information. (6) Comlete meeting with agency partners on contract administration issues. (7) Complete processing submittals and RFI's. Page 28

33 Oct 1, Dec 31, 213 Caltrain Quarterly Report Active Capital Projects SINAL PRE-EMPTION IMPROVEMENT PROJECT BUDET: (a) (b) (c) (d) (e) = (a - d) Segment roup Current Board Approved Budget Expended to Date Committed to Date Estimate at Variance at Planning & Engineering $65,946 $659,923 $718,213 $659,923 ($8,977) Right of Way Construction $1,959,5 $1,441,287 $1,957,32 $2,15, ($55,5) Construction Management $12, $12,964 $122,32 $13, ($1,) $1,18, $772,45 $772,45 $957, $61, $1,577 ($1,577) Total $3,748,446 $2,976,579 $3,569,952 $3,862,5 ($114,54) Project Budget / Cost Status $2,5, Current Board Approved Budget Estimate at Expended to Date $2,, Amount in $ $1,5, $1,, $5, Planning & Engineering Right of Way Construction Construction Management Segment roups 1) Current Estimate at cost (EAC) is $114K more than the Approved Budget. The Project Manager is monitoring all project costs closely to mitigate any potential overruns. HSR IMPACT: Page 29

34 Oct 1, Dec 31, 213 Caltrain Quarterly Report Active Capital Projects SYSTEMWIDE SINAL REHABILITATION PROJECT - FY213 SCOPE SCHEDULE BUDET/COST OTHER Y SCOPE: This project provides for the maintenance oversight by Caltrain to ensure that the signal system is maintained in a State of ood Repair (SOR) and complies with all required regulations. Design and construction components are as follows: Design: 1) Design to retrofit the signal bridge at South San Francisco with safety improvements. 2) Design to retrofit all railroad signal lights (including replacement of the current outdated unilense signal lights) with LEDs. 3) Design to rehab Control Point (CP) Stockton signal house, update equipment & replace low speed switch machines with high speed machines. Construction: 1) Procure LED signal light retrofit kits. 2) Retrofit all incandescent railroad signal lights with LEDs. (By TASI). 1) TASI forces have been retrofitting signal lights with LED's, however TASI forces are being redeployed to support the Communication Based Overlay Signal System/Positive Train Control (CBOSS/PTC) project, the LED signal light retrofitting schedule has been impacted. 2) The design of CP Stockton is on hold in order to determine whether the design should be performed under the CBOSS/PTC contract. 3) The design of the signal bridge at South San Francisco is on hold pending decision to include the retrofit of the bridge structure. SCHEDULE: Y The schedule is being updated. Progress: Oct - Dec 213 (1) Held construction progress meetings. (2) Continued retrofitting LED's. Subject to availability of TASI forces. (3) Provided final design to CBOSS/PTC Contractor for rehab of CPs Stockton, Delmas, and Mack. (4) Design of the South San Francisco signal bridge was placed on hold. Future Activities: Jan - Mar 214 (1) Hold construction progress meetings. (2) Continue retrofitting LED's. Subject to availability of TASI forces. (3) Receive quotation from the CBOSS/PTC Contractor for rehab of CPs Stockton, Delmas, and Mack. Construction was extended by five months due to lack of TASI forces to install LED retrofit kits. Page 3

35 Oct 1, Dec 31, 213 Caltrain Quarterly Report Active Capital Projects SYSTEMWIDE SINAL REHABILITATION PROJECT - FY213 BUDET: Segment roup Current Board Approved Budget Expended to Date Committed to Date Estimate at Variance at Planning & Engineering $17, $61,788 $159,687 $17, Right of Way Construction $95, $563, $59, $95, Construction Management $1, $1,226 $1,226 $1, $254, $167,718 $167,718 $254, $137, $17, $3, Total $1,611, $793,732 $918,631 $1,581, $3, Project Budget / Cost Status Current Board Approved Budget Estimate at Expended to Date $1,, $9, $8, $7, Amount in $ $6, $5, $4, $3, $2, $1, Planning & Engineering Right of Way Construction Construction Management Segment roups OTHER: Page 31

36 Oct 1, Dec 31, 213 Caltrain Quarterly Report Active Capital Projects SYSTEMWIDE STATION REHABILITATION PROJECT - FY213 SCOPE SCHEDULE BUDET/COST OTHER Y SCOPE: This project provides improvements at various passenger stations along the Caltrain right of way. The project is divided into six modules which will allow more timely contracting and construction, the modules are: 1. Module 41 Purchase and replace shelters Bayshore & Sunnyvale. 2. Module 42 Replace shelter metal panels with glass panels Mountain View. 3. Module 43 Purchase and replace Information Display Cases Continue with priority list. 4. Module 44 Signage Rehab/Upgrade (ID Signs / Directional Signs) will be included in the Basic Service Plan ( BSP). 5. Module 45 Center track fence replacement. 6. Module 46 Replace Windows at Redwood City Shelter Building & Menlo Park Shelter Building. SCHEDULE: Y The schedule is being updated. Progress: Oct - Dec 213 (1) Began processing Work Directive (WD) for Module 45. Future Activities: Jan - Mar 214 (1) Review WD for Module 45 by TASI. (2) Issue WD for Module 45. (3) Complete work on Module 45. Project schedule has been extended by six months due to TASI's delay in submitting a proposal for performing the station rehabilitation work. Page 32

37 Oct 1, Dec 31, 213 Caltrain Quarterly Report Active Capital Projects SYSTEMWIDE STATION REHABILITATION PROJECT - FY213 BUDET: Segment roup Current Board Approved Budget Expended to Date Committed to Date Estimate at Variance at Planning & Engineering Right of Way Construction $33, $3, $33, Construction Management $17, $124,199 $124,199 $17, Total $5, $124,199 $127,199 $5, Project Budget / Cost Status Current Board Approved Budget Estimate at Expended to Date $35, $3, $25, Amount in $ $2, $15, $1, $5, Planning & Engineering Right of Way Construction Construction Management Segment roups OTHER: Page 33

38 Oct 1, Dec 31, 213 Caltrain Quarterly Report Active Capital Projects SYSTEM WIDE TRACK REHABILITATION PROJECT - FY213 SCOPE SCHEDULE BUDET/COST OTHER SCOPE: The systemwide track rehabilitation program covers the work required to keep the Caltrain railroad in a state of good repair. The type and scope of work scheduled for each fiscal year is based upon the condition of the railroad as reflected in Caltrain's State of ood Repair database. The scope of work proposed for FY213 includes the following: 1) Replace stock rails and points at ends of #2 passing tracks on an as-needed basis. 2) Production rail joint replacement at approximately 5 locations. 3) Remove old or bonded over insulated (Allegheny) joints at approximately 5 locations (1 welds). 4) Production ties and surfacing, 3 miles of surfacing, 25 turnouts and 1, main line ties at various locations. 5) Upgrade rail lubricators. 6) Purchase of small tools and equipment required for track maintenance activities. 7) Work in South San Francisco yard, billable to Union Pacific (UP). 8) Drainage optimization. 9) San Francisco yard reconfiguration. 1) Upgrades to track geometry car. SCHEDULE: The schedule is being updated. Progress: Oct - Dec 213 (1) Completed construction of the San Francisco Yard Reconfiguration. (2) Surfaced 8.2 miles of main line track. (3) Stabilized 8.2 miles of track. (4) Regulated 8.2 miles of ballast. (5) Surfaced 12 turnouts. (6) round 28 switches. (7) Performed 11 thermite welds. (8) Built up 31 frog inserts. (9) Changed out three frogs. (1) Performed one switch point changeout. (11) Replaced 22 cross ties. (12) Replaced 122 switch ties. (13) Performed 11 ultrasonic tests. (14) Performed weed spraying. (15) Performed bridge inspection. (16) Held FRA visit. Note 1: A frog is a mechanical device to allow trains to cross over rails in turnouts and crossings. Future Activities: Jan - Mar 214 (1) Continue ongoing maintenance work. Page 34

39 Oct 1, Dec 31, 213 Caltrain Quarterly Report Active Capital Projects SYSTEMWIDE TRACK REHABILITATION PROJECT - FY213 BUDET: Segment roup Current Board Approved Budget Expended to Date Committed to Date Estimate at Variance at Planning & Engineering $1, $7,3 $7,726 $1, Right of Way $2, Construction $5,668, Construction Management Total $96 $96 $2, $5,31,69 $5,58,48 $5,668, $144, $134,844 $134,844 $144, $1,86, $734,577 $754,421 $1,86, $7,, $5,99,29 $5,956,359 $7,, Project Budget / Cost Status Current Board Approved Budget Estimate at Expended to Date $6,, $5,, $4,, Amount in $ $3,, $2,, $1,, Planning & Engineering Right of Way Construction Construction Management Segment roups 1) Approved invoices from TASI have not been received, an estimated monthly expenditure for the work that TASI has performed has been accrued. OTHER: Page 35

40 Oct 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Active Capital Projects SCOPE TRAIN DISPATCH VOICE COMMUNICATION SYSTEM PROJECT SCHEDULE BUDET / COST HSR IMPACT Y SCOPE: Train Dispatch Voice Communication System Project will replace the obsolete Digital Touch Exchange (DTX) system in the Central Control Facility (CCF) in San Jose and the DTX system in the San Francisco 4th & King station. The project consists of the following tasks: (1) Design and specify the requirements of a new DTX system; (2) Develop an Invitation for Bid (IFB) to procure and install the new system at CCF; (3) Test and validate the new system; (4) Train the dispatchers on the new system; (5) Cutover to the new system and perform an acceptance test; (6) Remove and dispose the old DTX system. This equipment is mission critical to effectively operate the railroad for communications between the dispatcher and the train and for post incident investigations. SCHEDULE: Y Progress: Oct - Dec 213 Future Activities: Jan - Mar 214 Note: The schedule will be updated next quarter after the decision on the approach of the Request for Proposal (RFP) is finalized. (1) Continued negotiations with selected vendor (Day Wireless) but still could not come to an agreement. (2) Developed staff report to recommend to the Board in regard to the rejection of all proposals for the procurement and installation of the DTX system at Central Control Facility (CCF). (3) Developed an options matrix to determine the best option to procure new DTX system. (4) Requested a proposal from the Caltrain Communications Based Overlay Signal System (CBOSS) contractor (PT) to procure and install the DTX system at CCF. (1) Present recommendation to the Board to reject all proposals from the RFP. (2) Receive and evaluate the proposal from PT. Negotiations with the vendor stalled and JPB recommended rejecting all proposals from the RFP. A Change Request was issued to PT for a proposal to procure and install the DTX system at CCF. Page 36

41 Oct 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Active Capital Projects TRAIN DISPATCH VOICE COMMUNICATION SYSTEM PROJECT BUDET: (a) (b) (c) (d) (e) = (a - d) Segment roup Current Board Approved Budget Expended to Date Committed to Date Estimate at Variance at Planning & Engineering $131,178 $155,512 $155,512 $155,512 ($24,334) Right of Way Construction $89, $1,436 $25, $1,3, ($14,) Construction Management $51,15 $4, $11,15 $38,582 $133,58 $133,58 $367,682 $12,9 $275,9 $134,86 $14,284 Total $1,728, $29,6 $313,57 $1,728, Project Budget / Cost Status Amount in $ 1,, 9, 8, 7, 6, 5, 4, 3, 2, 1, Current Board Approved Budget Estimate at Expended to Date Planning & Engineering Right of Way Construction Construction Management Segment roups HSR IMPACT: None Page 37

42 Oct 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Active Capital Projects UPRADE OF PA/VMS SYSTEMS AT 4 STATIONS PROJECT SCOPE SCHEDULE BUDET / COST HSR IMPACT SCOPE: The Upgrade of PA/VMS Systems at 4 Stations Project will upgrade the Public Address (PA) systems at 22nd Street, South San Francisco, Sunnyvale and San Jose Diridon stations to bring the stations up to the Caltrain standard and a State of ood Repair. Visual Message Signs (VMS) will also be installed at the 22nd Street Station. The scope of the project includes design, procurement, installation and testing of the new PA and VMS equipment according to the current Caltrain Engineering Standards. All of the upgrades will also be compatible with the new Predictive Arrival/Departure System (PADS). SCHEDULE: Progress: Oct - Dec 213 Future Activities: Jan - Mar 214 (1) Received 1% design from the designer, Stantec. (2) Comments from the 1% design review were incorporated into the Invitation For Bid (IFB) document. (3) Conducted Phase ate meeting and was approved to proceed to IFB on 11/4/213. (4) Provided technical specifications and drawings for the IFB package to Contracts & Procurement (C&P). (5) Finalized the IFB package. (6) Sent the IFB package to Legal department for review. (1) Incorporate comments (if any) from the Legal department review. (2) Advertise the IFB. Page 38

43 Oct 1, Dec. 31, 213 Caltrain QUARTERLY REPORT Active Capital Projects UPRADE OF PA/VMS SYSTEMS AT 4 STATIONS PROJECT BUDET: (a) (b) (c) (d) (e) = (a - d) Segment roup Current Board Approved Budget Expended to Date Committed to Date Estimate at Variance at Planning & Engineering $25, $238,117 $238,117 $25, Right of Way Construction $87, $7,959 $2, $87, Construction Management $56,4 $5,247 $5,247 $56,4 $321,955 $99,698 $99,698 $321,955 $14,5 $14,5 Total $1,638, $351,21 $363,62 $1,638, Project Budget / Cost Status Amount in $ 9, 8, 7, 6, 5, 4, 3, 2, 1, Current Board Approved Budget Estimate at Expended to Date Planning & Engineering Right of Way Construction Construction Management Segment roups HSR IMPACT: Page 39

44 Oct 1, Dec. 31, 214 Caltrain QUARTERLY REPORT Active Capital Projects SCOPE WAYSIDE POWER AT DIRIDON STATION PROJECT SCHEDULE BUDET / COST R HSR IMPACT SCOPE: The Wayside Power at Diridon Station will replace the existing substation with a new substation and provide new wayside power cabinets on both the two existing and two new platforms for the San Jose Diridon Station. Project design was completed under the South Terminal Project, this project covers construction only. Wayside Power will provide electrical power to the train for maintenance needs while the diesel engines are turned-off. This will preclude the need for the diesel engines to be running, saving fuel, and fulfilling our commitment to the community to reduce noise and diesel exhausts. Scope includes: (1) Remove and replace the existing substation at Diridon Station main platform. (2) Remove and replace the existing nonfunctional wayside cabinets on the existing platforms. (3) Provide new wayside cabinets on the new platforms. SCHEDULE: Progress: Oct - Dec 213 Future Activities: Jan - Mar 214 (1) Continued to receive and review submittals and Request for Information (RFI)s from the contractor. (2) Issued Notice to Proceed (NTP) to the contractor. (3) Installed temporary construction fence and initiated demolition and substation removal. (4) Completed demolition of unit substation. (5) Initiated demolition of existing site (concrete, tanks). (1) Place new Wayside cabinets on platforms. (2) Excavate foundation for the placement of the new electrical vault; Install the new electrical vault. (3) Install conduits into the electrical vault. (4) Conduct factory inspection to evaluate the electrical equipment (transformer and substations). (5) Install electrical equipment. Page 4

Peninsula Corridor Joint Powers Board

Peninsula Corridor Joint Powers Board Quarterly Capital Program Status Report and DBE Status Report Prepared for the June 5, 2014 JPB Meeting 3rd Quarter FY2014: January 1, 2014 March 31, 2014 Peninsula Corridor Joint Powers Board Caltrain

More information

Peninsula Corridor Joint Powers Board

Peninsula Corridor Joint Powers Board Quarterly Capital Program Status Report and DBE Status Report Prepared for the June 6, 213 JPB Meeting 3rd Quarter FY213: January 1, 213 March 31, 213 Peninsula Corridor Joint Powers Board Caltrain QUARTERLY

More information

Peninsula Corridor Joint Powers Board

Peninsula Corridor Joint Powers Board Quarterly Capital Program Status Report and DBE Status Report Prepared for the September 1, 2016 JPB Meeting 4th Quarter FY2016: April 1, 2016 June 30, 2016 Peninsula Corridor Joint Powers Board Caltrain

More information

Peninsula Corridor Joint Powers Board

Peninsula Corridor Joint Powers Board Quarterly Capital Program Status Report and DBE Status Report Prepared for the September 07, 2017 Caltrain Board Meeting 4th Quarter FY2017: April 01, 2017 June 30, 2017 Peninsula Corridor Joint Powers

More information

Peninsula Corridor Joint Powers Board

Peninsula Corridor Joint Powers Board Quarterly Capital Program Status eport and DBE Status eport Prepared for the March 2, 2017 Caltrain Board Meeting 2nd Quarter FY2017: October 1, 2016 December 31, 2016 Peninsula Corridor Joint Powers Board

More information

Peninsula Corridor Joint Powers Board

Peninsula Corridor Joint Powers Board Quarterly Capital Program Status eport and DBE Status eport Prepared for the June 1, 2017 Caltrain Board Meeting 3rd Quarter FY2017: January 1, 2017 March 31, 2017 Peninsula Corridor Joint Powers Board

More information

Quarterly Status Report

Quarterly Status Report Capital Projects Quarterly Status Report 3rd Quarter FY2016 : January 1 - March 31, 2016 Report prepared for the June 2, 2016 TA Board Meeting SAN MATEO COUNTY TRANSPORTATION AUTHORITY QUARTERLY CAPITAL

More information

TRANSIT SYSTEM MAINTEANCE AND RENOVATION. GUIDEWAYS Caltrain

TRANSIT SYSTEM MAINTEANCE AND RENOVATION. GUIDEWAYS Caltrain 2014 PROPOSITION K 5 - YEAR PRIORITIZATION PROGRAM TRANSIT SYSTEM MAINTEANCE AND RENOVATION GUIDEWAYS Caltrain Approved: July 22, 2014 Prepared for the San Francisco County Transportation Authority By

More information

Prop K Grouped Allocation Requests November 2018 Board Action. Table of Contents

Prop K Grouped Allocation Requests November 2018 Board Action. Table of Contents Item 7 Enclosure Citizens Advisory Committee October 24, 2018 Prop K Grouped Allocation Requests November 2018 Board Action Table of Contents No. Fund Source Project Sponsor 1 1 Prop K PCJPB Expenditure

More information

FY18 Final Results Budget Outlook, FY20-22

FY18 Final Results Budget Outlook, FY20-22 FY18 Final Results Budget Outlook, FY20-22 Objectives Provide background necessary for consideration of fiscal pressures that exist prior to electrification Service levels Ridership Member agency funding

More information

Quarterly Status Report

Quarterly Status Report Capital Projects Quarterly Status Report 2nd Quarter FY2017 : October 1 - December 31, 2016 Report prepared for the March 02, 2017 TA Board Meeting SAN MATEO COUNTY TRANSPORTATION AUTHORITY QUARTERLY

More information

CALTRAIN CAPITAL IMPROVEMENT PROGRAM

CALTRAIN CAPITAL IMPROVEMENT PROGRAM Item 6 Enclosure Board November 13, 2018 2019 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM CALTRAIN CAPITAL IMPROVEMENT PROGRAM Pending Board Approval: November 27, 2018 Prepared for the San Francisco County

More information

Peninsula Corridor Joint Powers Board San Carlos, California A Joint Exercise of Powers Agreement among:

Peninsula Corridor Joint Powers Board San Carlos, California A Joint Exercise of Powers Agreement among: Peninsula Corridor Joint Powers Board San Carlos, California A Joint Exercise of Powers Agreement among: City and County of San Francisco San Mateo County Transit District Santa Clara Valley Transportation

More information

Quarterly Status Report

Quarterly Status Report Capital Projects Quarterly Status Report 2nd Quarter FY2018: October 01 December 31, 2017 Prepared for the March 07, 2018 SamTrans Board Meeting San Mateo County Transit District San Mateo County Transit

More information

Quarterly Status Report

Quarterly Status Report Capital Projects Quarterly Status Report 2nd Quarter FY2017: October 1 December 31, 2016 Prepared for the March 1, 2017 SamTrans Board Meeting San Mateo County Transit District San Mateo County Transit

More information

Quarterly Status Report

Quarterly Status Report Capital Projects Quarterly Status Report 2nd Quarter FY2018 : October 01 - December 31, 2017 Report prepared for the March 01, 2018 TA Board Meeting SAN MATEO COUNTY TRANSPORTATION AUTHORITY QUARTERLY

More information

Quarterly Status Report

Quarterly Status Report Capital Projects Quarterly Status Report 3rd Quarter FY2017: January 1 March 31, 2017 Prepared for the June 7, 2017 SamTrans Board Meeting San Mateo County Transit District San Mateo County Transit District

More information

Quarterly Status Report

Quarterly Status Report Capital Projects Quarterly Status Report 4th Quarter FY2017 : April 01 - June 30, 2017 Report prepared for the September 07, 2017 TA Board Meeting SAN MATEO COUNTY TRANSPORTATION AUTHORITY QUARTERLY CAPITAL

More information

MINUTES OF SEPTEMBER 5, 2017

MINUTES OF SEPTEMBER 5, 2017 CITIZENS ADVISORY COMMITTEE (CAC) SAN MATEO COUNTY TRANSPORTATION AUTHORITY (TA) 1250 San Carlos Avenue, San Carlos CA 94070 Bacciocco Auditorium, 2 nd Floor MINUTES OF SEPTEMBER 5, 2017 MEMBERS PRESENT:

More information

RESOLUTION ALLOCATING $5,820,000 IN PROP K FUNDS, WITH CONDITIONS, FOR

RESOLUTION ALLOCATING $5,820,000 IN PROP K FUNDS, WITH CONDITIONS, FOR BD091217 RESOLUTION NO. 18XX RESOLUTION ALLOCATING $5,820,000 IN PROP K FUNDS, WITH CONDITIONS, FOR THIRTEEN REQUESTS WHEREAS, The Transportation Authority received thirteen requests for a total of $5,820,000

More information

Quarterly Status Report

Quarterly Status Report Capital s Quarterly Status Report d Quarter FY2016: 1 31, 201 Prepared for the, 2016 SamTrans Board Meeting San Mateo County Transit District San Mateo County Transit District QUARTERLY CAPITAL PROGRAM

More information

The Future Scenarios

The Future Scenarios The Future Scenarios Developing the Scenarios Once the policy approach for each scenario was defined, the financial, service, and capital assumptions were developed further and are detailed in three supporting

More information

Caltrain Funding 101

Caltrain Funding 101 Caltrain Funding 101 Prepared for: SFMTA Board Meeting Prepared by: Caltrain Staff Date: February 7, 2012 Caltrain Funding 101 Overview Funding contribution is guided by Joint Powers Agreement Funding

More information

AGENDA Bacciocco Auditorium, 2 nd Floor 1250 San Carlos Avenue, San Carlos CA 94070

AGENDA Bacciocco Auditorium, 2 nd Floor 1250 San Carlos Avenue, San Carlos CA 94070 BOARD OF DIRECTORS 2011 SEAN ELSBERND, CHAIR OMAR AHMAD, VICE CHAIR JOSÉ CISNEROS NATHANIEL P. FORD, SR. ASH KALRA LIZ KNISS ARTHUR L. LLOYD ADRIENNE TISSIER KEN YEAGER MICHAEL J. SCANLON EXECUTIVE DIRECTOR

More information

This Page Left Intentionally Blank

This Page Left Intentionally Blank This Page Left Intentionally Blank PENINSULA CORRIDOR JOINT POWERS BOARD San Carlos, California Comprehensive Annual Financial Report Fiscal Years Ended June 30, 2017 and 2016 Prepared by the Finance Division

More information

CHAPTER 9 FINANCIAL CONSIDERATIONS

CHAPTER 9 FINANCIAL CONSIDERATIONS CHAPTER 9 FINANCIAL CONSIDERATIONS 9.1 INTRODUCTION This chapter presents anticipated costs, revenues, and funding for the Berryessa Extension Project (BEP) Alternative and the Silicon Valley Rapid Transit

More information

Caltrain Service Preparing for FY2012 Caltrain Benefits Environment, Economy, Quality of Life

Caltrain Service Preparing for FY2012 Caltrain Benefits Environment, Economy, Quality of Life Caltrain Service Preparing for FY2012 Caltrain Benefits Environment, Economy, Quality of Life If traveling via automobile, Caltrain riders would increase regional CO2 emissions by 89,850 metric tons or

More information

Policy Advisory Committee May 18, 2012, 1:30 PM Union City Council Chambers

Policy Advisory Committee May 18, 2012, 1:30 PM Union City Council Chambers Policy Advisory Committee May 18, 2012, 1:30 PM Union City Council Chambers City Hall (map) 34009 Alvarado Niles Rd, Union City, CA 94587 1. Call to Order 2. Roll Call 3. Chairperson Comments 4. Project

More information

Peninsula Corridor Joint Powers Board (JPB) Board of Directors Meeting 1250 San Carlos Avenue, San Carlos CA Minutes April 4, 2013

Peninsula Corridor Joint Powers Board (JPB) Board of Directors Meeting 1250 San Carlos Avenue, San Carlos CA Minutes April 4, 2013 Peninsula Corridor Joint Powers Board (JPB) Board of Directors Meeting 1250 San Carlos Avenue, San Carlos CA 94070 Minutes April 4, 2013 MEMBERS PRESENT: MEMBERS ABSENT: STAFF PRESENT: J. Cisneros, M.

More information

TRANSIT SYSTEM MAINTENANCE AND RENOVATION. VEHICLES - Caltrain

TRANSIT SYSTEM MAINTENANCE AND RENOVATION. VEHICLES - Caltrain Item 6 Enclosure Board November 13, 2018 2019 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM TRANSIT SYSTEM MAINTENANCE AND RENOVATION VEHICLES - Caltrain Pending Board Approval: November 27, 2018 Prepared

More information

Chapter 9 Financial Considerations. 9.1 Introduction

Chapter 9 Financial Considerations. 9.1 Introduction 9.1 Introduction Chapter 9 This chapter presents anticipated costs, revenues, and funding for the NEPA BART Extension Alternative. A summary of VTA s financial plan for the BART Extension Alternative is

More information

Introduction Project Overview How Express Lanes Work 101 Managed Lane Financial Forecast Performance Comparison Ownership Considerations Transit

Introduction Project Overview How Express Lanes Work 101 Managed Lane Financial Forecast Performance Comparison Ownership Considerations Transit Joint Board Ownership Workshop November 16, 2018 1 Introduction Project Overview How Express Lanes Work 101 Managed Lane Financial Forecast Performance Comparison Ownership Considerations Transit Equity

More information

TRANSBAY JOINT POWERS AUTHORITY San Francisco, California. Annual Financial Report. For the Year Ended June 30, 2017

TRANSBAY JOINT POWERS AUTHORITY San Francisco, California. Annual Financial Report. For the Year Ended June 30, 2017 TRANSBAY JOINT POWERS AUTHORITY San Francisco, California Annual Financial Report THIS PAGE INTENTIONALLY LEFT BLANK. Table of Contents Page(s) Independent Auditor's Report... 1-2 Management s Discussion

More information

Memorandum. Date: RE: Plans and Programs Committee

Memorandum. Date: RE: Plans and Programs Committee Memorandum Date: 11.09.09 RE: Plans and Programs Committee November 17, 2009 To: From: Through: Subject: Plans and Programs Committee: Commissioners Chu (Chair), Campos (Vice Chair), Chiu, Elsbernd, Maxwell

More information

Enclosure Table of Contents

Enclosure Table of Contents Item 8 Enclosure Citizens Advisory Committee September 25, 2013 Prop K/AA Grouped Allocation Requests October 2013 Board Action Enclosure Table of Contents No. Fund Source Project Sponsor 1 1 Prop K TJPA

More information

This Page Left Intentionally Blank

This Page Left Intentionally Blank This Page Left Intentionally Blank PENINSULA CORRIDOR JOINT POWERS BOARD San Carlos, California Comprehensive Annual Financial Report Fiscal Year Ended June 30, 2015 (With Comparative Totals for 2014)

More information

For the Fiscal Year Ended June 30, 2015

For the Fiscal Year Ended June 30, 2015 SANTA CLARA VALLEY TRANSPORTATION AUTHORITY 2000 Measure A Transit Improvement Program [A Fund of the Santa Clara Valley Transportation Authority] Independent Accountant s Report on Compliance Examination

More information

TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures

TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures Alameda CTC Programs Annual Compliance Report 00 Reporting Year TABLE BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and DATE : Revised /0/ Column A Column B Column C Column D Column E Column F Column

More information

Alameda Corridor Maintenance Services RFP. Pre-Proposal Meeting

Alameda Corridor Maintenance Services RFP. Pre-Proposal Meeting Alameda Corridor Maintenance Services RFP Pre-Proposal Meeting September 5, 2018 Disclaimer: If there is any conflict between the information contained in the presentation and that contained in the RFP,

More information

SOUND TRANSIT STAFF REPORT MOTION NO. M D Street-to-M Street Track & Signal Project Preferred Alternative

SOUND TRANSIT STAFF REPORT MOTION NO. M D Street-to-M Street Track & Signal Project Preferred Alternative SOUND TRANSIT STAFF REPORT MOTION NO. M2007-126 D Street-to-M Street Track & Signal Project Preferred Alternative Meeting: Date: Type of Action: Staff Contact: Phone: Board 12/13/07 Discussion/Possible

More information

Measure B Expenditures Across All Programs FY Report Card

Measure B Expenditures Across All Programs FY Report Card Measure B Across All Programs Report Card Altamont Commuter Express Projects Program Actual Mass Transit 2,820,948 2,824,169 (3,221) Totals: 2,820,948 2,824,169 (3,221) Capital Fund Reserve (FY 1316 Capital

More information

Peninsula Corridor Joint Powers Board San Carlos, California A Joint Exercise of Powers Agreement among:

Peninsula Corridor Joint Powers Board San Carlos, California A Joint Exercise of Powers Agreement among: Peninsula Corridor Joint Powers Board San Carlos, California A Joint Exercise of Powers Agreement among: City and County of San Francisco San Mateo County Transit District Santa Clara Valley Transportation

More information

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Environmental Analysis, Chapter 4 Consequences, and Mitigation Environmental Analysis, Chapter 4 4.14 Economic and Fiscal Impacts This section evaluates potential impacts to local and regional economies during construction and operation of each project alternative.

More information

Executive Change Control Board. January 15, 2016

Executive Change Control Board. January 15, 2016 Executive Change Control Board January 15, 2016 1 Today s Topics Review In Kind Land Transfer (Action) Review Project Schedule Review Project Cost Estimate at 60% Design Review Project Scope (Action) Next

More information

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project Dulles Corridor Metrorail Project MONTHLY COST AND SCHEDULE UPDATE FOR PHASES 1 AND 2 AS OF NOVEMBER 30, 2014 JANUARY 2015 0 Phase 1 Cost Summary November Expenditures $ 1.6 Million Total Expenditures

More information

Metropolitan Transportation Authority: East Side Access Cost Overruns

Metropolitan Transportation Authority: East Side Access Cost Overruns Metropolitan Transportation Authority: East Side Access Cost Overruns Thomas P. DiNapoli New York State Comptroller Kenneth B. Bleiwas Deputy Comptroller Report 12-2013 March 2013 Highlights East Side

More information

Capital Metropolitan Transportation Authority Monthly Financial Report For Period Ending November 30, 2013

Capital Metropolitan Transportation Authority Monthly Financial Report For Period Ending November 30, 2013 Capital Metropolitan Transportation Authority Monthly Financial Report For Period Ending November 30, 2013 Table of Contents SUMMARY REPORT Financial Performance -Sales Tax Revenue 3 -Other Revenue 4 -Operating

More information

2000 Measure A Transit Improvement Program

2000 Measure A Transit Improvement Program 2000 Measure A Transit Improvement Program Citizens Watchdog Committee Report on Fiscal Year 2015 COMPREHENSIVE ANNUAL REPORT The Citizen Watchdog Committee (CWC) provides this report to inform the community

More information

JPB CITIZENS ADVISORY COMMTTEE San Mateo County Transit District Administrative Building 1250 San Carlos Avenue San Carlos, CA 94070

JPB CITIZENS ADVISORY COMMTTEE San Mateo County Transit District Administrative Building 1250 San Carlos Avenue San Carlos, CA 94070 DRAFT JPB CITIZENS ADVISORY COMMTTEE San Mateo County Transit District Administrative Building 1250 San Carlos Avenue San Carlos, CA 94070 MINUTES - DECEMBER 19, 2007 COMMITTEE MEMBERS PRESENT: G. Graham,

More information

Public Health & Safety Bond Program 2016

Public Health & Safety Bond Program 2016 Public Health & Safety Bond Program 2016 Quarterly Status Report Presented to the Citizens General Obligation Bond Oversight Committee as of March 2018 1 Public Health & Safety Bond Program 2016 Overview

More information

Memorandum. Date: RE: Plans and Programs Committee

Memorandum. Date: RE: Plans and Programs Committee Memorandum Date: 03.16.10 RE: Plans and Programs Committee March 23, 2010 To: From: Through: Subject: Plans and Programs Committee: Commissioners Campos (Chair), Chu (Vice Chair), Chiu, Avalos, Dufty and

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

FY METROLINK BUDGET AND LACMTA'S COMMUTER RAIL PROGRAM

FY METROLINK BUDGET AND LACMTA'S COMMUTER RAIL PROGRAM 9 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2ooo Tel metro. net FINANCE, BUDGET AND AUDIT COMMITTEE JUNE 19, 2013 SUBJECT: ACTION: FY 2013-14 METROLINK BUDGET AND LACMTA'S COMMUTER RAIL PROGRAM

More information

North Fair Oaks Zoning Workgroup Fair Oaks Community Center February 15, 2017

North Fair Oaks Zoning Workgroup Fair Oaks Community Center February 15, 2017 North Fair Oaks Zoning Workgroup Fair Oaks Community Center February 15, 2017 1 M e e t i n g P u r p o s e a n d O b j e c t i v e s PURPOSE: Present project timeline and next steps Present Proposed Improvements

More information

PPC RESOLUTION NO RESOLUTION ALLOCATING $510,526 IN PROP K FUNDS, WITH CONDITIONS, TO

PPC RESOLUTION NO RESOLUTION ALLOCATING $510,526 IN PROP K FUNDS, WITH CONDITIONS, TO PPC041613 RESOLUTION NO. 13-47 RESOLUTION ALLOCATING $510,526 IN PROP K FUNDS, WITH CONDITIONS, TO THE SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY FOR FIVE REQUESTS AND $831,100 IN PROP K FUNDS, WITH

More information

SONOMA MARIN AREA RAIL TRANSIT DISTRICT PROPOSED BUDGET: FISCAL YEAR and Fiscal Year Year End Report

SONOMA MARIN AREA RAIL TRANSIT DISTRICT PROPOSED BUDGET: FISCAL YEAR and Fiscal Year Year End Report SONOMA MARIN AREA RAIL TRANSIT DISTRICT PROPOSED BUDGET: FISCAL YEAR 2017 18 and Fiscal Year 2016 17 Year End Report JUNE 21, 2017 PROPOSED BUDGET: FISCAL YEAR 2017 18 and Fiscal Year 2016 17 Year End

More information

Quarterly Status Report

Quarterly Status Report Capital s Quarterly Status Report 3rd Quarter FY2013: January 1 March 31, 2013 Prepared for the June 05, 2013 SamTrans Board Meeting San Mateo County Transit District San Mateo County Transit District

More information

TRANSBAY JOINT POWERS AUTHORITY

TRANSBAY JOINT POWERS AUTHORITY TRANSBAY JOINT POWERS AUTHORITY Independent Auditor s Reports, Management s Discussion and Analysis, Basic Financial Statements and Other Supplementary Information Table of Contents Page(s) Independent

More information

B. Resolution P Administration and Projects Committee STAFF REPORT October 1, 2015 Page 2 of 2 Changes from Committee Background MTC committed a

B. Resolution P Administration and Projects Committee STAFF REPORT October 1, 2015 Page 2 of 2 Changes from Committee Background MTC committed a Administration and Projects Committee STAFF REPORT Meeting Date: October 1, 2015 Subject Summary of Issues State Route 4 (SR4) East Widening Project Loveridge Road to SR160 (Projects 1406/3001) Request

More information

CITY AND COUNTY OF SAN FRANCISCO TRANSBAY TRANSIT CENTER VERIFICATION LETTER FOR THE CLIMATE BONDS STANDARD LOW CARBON LAND TRANSPORT

CITY AND COUNTY OF SAN FRANCISCO TRANSBAY TRANSIT CENTER VERIFICATION LETTER FOR THE CLIMATE BONDS STANDARD LOW CARBON LAND TRANSPORT CITY AND COUNTY OF SAN FRANCISCO TRANSBAY TRANSIT CENTER VERIFICATION LETTER FOR THE CLIMATE BONDS STANDARD LOW CARBON LAND TRANSPORT Issuing entity: City and County of San Francisco for its City and County

More information

SALINAS RAIL EXTENSION PROJECT CONSTRUCTION MANAGEMENT SERVICES

SALINAS RAIL EXTENSION PROJECT CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR PROPOSALS THE TRANSPORTATION AGENCY FOR MONTEREY COUNTY (TAMC) INVITES CONSULTANTS TO SUBMIT THEIR PROPOSALS FOR THE: SALINAS RAIL EXTENSION PROJECT CONSTRUCTION MANAGEMENT SERVICES You are

More information

Recommendation to the Board Final Action

Recommendation to the Board Final Action MOTION NO. M2015-78 Construction Services for the Point Defiance Bypass Project MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 8/13/15 8/27/15 Recommendation to the

More information

2000 Measure A Transit Improvement Program Citizens Watchdog Committee Annual Report On Fiscal Year 2014

2000 Measure A Transit Improvement Program Citizens Watchdog Committee Annual Report On Fiscal Year 2014 2000 Measure A Transit Improvement Program Citizens Watchdog Committee Annual Report On Fiscal Year 2014 Comprehensive Annual Report The Citizen Watchdog Committee (CWC) provides this report to inform

More information

Peninsula Corridor Joint Powers Board (JPB) Board of Directors Meeting 1250 San Carlos Avenue, San Carlos CA MINUTES OF SEPTEMBER 7, 2017

Peninsula Corridor Joint Powers Board (JPB) Board of Directors Meeting 1250 San Carlos Avenue, San Carlos CA MINUTES OF SEPTEMBER 7, 2017 Peninsula Corridor Joint Powers Board (JPB) Board of Directors Meeting 1250 San Carlos Avenue, San Carlos CA 94070 MINUTES OF SEPTEMBER 7, 2017 MEMBERS PRESENT: MEMBERS ABSENT: STAFF PRESENT: J. Bruins,

More information

CHAPTER 9 FINANCIAL CONSIDERATIONS

CHAPTER 9 FINANCIAL CONSIDERATIONS CHAPTER 9 FINANCIAL CONSIDERATIONS 9.1 INTRODUCTION This chapter presents anticipated costs, revenues, and funding for the BEP and the SVRTP. A summary evaluation of VTA s financial plan for the proposed

More information

Date: Plans and. Committee. To: From: Through: Subject: Summary. BACKGROUND We have. Program (CIP) Prop K Guideways

Date: Plans and. Committee. To: From: Through: Subject: Summary. BACKGROUND We have. Program (CIP) Prop K Guideways Memorandum Date: To: From: Through: Subject: 10.03.13 RE: Plans and Programs Committee October 8, 2013 Plans and Programs Committee: Commissioners Mar (Chair), Kim (Vice Chair) ), Breed, Campos, Yee and

More information

SFMTA 2013 Revenue Bond Board of Directors

SFMTA 2013 Revenue Bond Board of Directors SFMTA Municipal Transportation Agency Image: Market and Geary Streets, circa 1920s, Muni Centennial logo SFMTA 2013 Revenue Bond Board of Directors 09 03 2013 SAN FRANCISCO, CALIFORNIA Background In 2007,

More information

Quarterly Status Report

Quarterly Status Report Capital s Quarterly Status Report 4th Quarter FY2018: April 01 June 30, 2018 Prepared for the September 05, 2018 SamTrans Board Meeting San Mateo County Transit District San Mateo County Transit District

More information

RAC Capital Presentatition May 5, 2010

RAC Capital Presentatition May 5, 2010 RAC Capital Presentation ti May 5, 2010 Flexible Six-Year Agreement Flexible Six-Year Agreement minimum funding commitment to match Federal funds, and to annually assess availability of additional funds

More information

Memorandum. Date: June 14, 2018 To: From:

Memorandum. Date: June 14, 2018 To: From: Agenda Item 4 Memorandum Date: June 14, 2018 To: From: Subject: Treasure Island Mobility Management Agency Committee Cynthia Fong Deputy Director for Finance & Administration Eric Cordoba Deputy Director

More information

RE: Citizens Advisory Committee October 1, 2014

RE: Citizens Advisory Committee October 1, 2014 09.26.14 RE: Citizens Advisory Committee October 1, 2014 Citizens Advisory Committee Maria Lombardo Chief Deputy Director Anna LaForte Deputy Director for Policy and Programming Adopt a Motion of Support

More information

Region 5 Upcoming Projects for Summer/Fall 2018

Region 5 Upcoming Projects for Summer/Fall 2018 Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The

More information

a GAO GAO INTERCITY PASSENGER RAIL Amtrak s Management of Northeast Corridor Improvements Demonstrates Need for Applying Best Practices

a GAO GAO INTERCITY PASSENGER RAIL Amtrak s Management of Northeast Corridor Improvements Demonstrates Need for Applying Best Practices GAO United States General Accounting Office Report to the Chairman, Committee on Commerce, Science, and Transportation, U.S. Senate February 2004 INTERCITY PASSENGER RAIL Amtrak s Management of Northeast

More information

Arlington County, Virginia

Arlington County, Virginia Arlington County, Virginia METRO METRO 2015 2024 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed

More information

TRANSBAY JOINT POWERS AUTHORITY

TRANSBAY JOINT POWERS AUTHORITY THIS STAFF REPORT COVERS CALENDAR ITEM NO.: 8 FOR THE MEETING OF: January 13, 2011 BRIEF DESCRIPTION: TRANSBAY JOINT POWERS AUTHORITY Presentation of the audited Financial Statements of the Transbay Joint

More information

Regional Connector Transit Corridor Draft Environmental Impact Statement/ Draft Environmental Impact Report APPENDIX HH FINANCIAL ANALYSIS REPORT

Regional Connector Transit Corridor Draft Environmental Impact Statement/ Draft Environmental Impact Report APPENDIX HH FINANCIAL ANALYSIS REPORT Draft Environmental Impact Statement/ Draft Environmental Impact Report APPENDIX HH FINANCIAL ANALYSIS REPORT State Clearinghouse Number: 2009031043 April 2010 Prepared for Los Angeles County Metropolitan

More information

8. Current Residential Water Bills

8. Current Residential Water Bills 8. Current Residential Water Bills BAWSCA Figure 8A: Single Family Water Bills Based on Average Monthly Use Using Rates in Effect for FY 2017-18 Brisbane/GVMID Daly City Westborough WD Hayward San Bruno

More information

MARCH 12, 2014 FINAL AGENDA PUBLIC COMMENTS ON AGENDA ITEMS AND OTHER MATTERS

MARCH 12, 2014 FINAL AGENDA PUBLIC COMMENTS ON AGENDA ITEMS AND OTHER MATTERS NEW JERSEY TRANSIT CORPORATION NJ TRANSIT BUS OPERATIONS, INC. NJ TRANSIT RAIL OPERATIONS, INC. NJ TRANSIT MERCER, INC. NJ TRANSIT MORRIS, INC. REGULARLY SCHEDULED BOARD OF DIRECTORS MEETINGS CALL TO ORDER

More information

Memorandum. Date: RE: Citizens Advisory Committee

Memorandum. Date: RE: Citizens Advisory Committee Memorandum Date: 03.04.2010 RE: Citizens Advisory Committee March 10, 2010 To: From: Subject: Summary Citizens Advisory Committee Maria Lombardo Chief Deputy Director for Policy and Programming Lee Saage

More information

Alameda County Water District Community Meetings Proposed 2019 Rates & Charges

Alameda County Water District Community Meetings Proposed 2019 Rates & Charges Alameda County Water District Community Meetings Proposed 2019 Rates & Charges Los Cerritos Community Center, January Month, 30, 2019 Day, Year Presentation Overview ACWD Rate Setting Process Why are Water

More information

Citizens Advisory Committee April 24, 2013

Citizens Advisory Committee April 24, 2013 04.19.13 Citizens Advisory Committee April 24, 2013 Citizens Advisory Committee Cynthia Fong Deputy Director for Finance and Administration Preliminary Fiscal Year 2013/14 Annual Budget and Work Program

More information

TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION CAPITAL PROGRAM TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily

More information

ANNUAL PROCUREMENT PLAN ANNUAL Q Q 2015

ANNUAL PROCUREMENT PLAN ANNUAL Q Q 2015 ANNUAL PROCUREMENT PLAN 1Q ANNUAL 2019-4Q 2019 3Q 2015 THIS PAGE INTENTIONALLY LEFT BLANK 2 TABLE OF CONTENTS INTRODUCTION 4 ENGINEERING DESIGN 7 PROFESSIONAL SERVICES 8 CONSTRUCTION 9 MATERIAL 11 OTHER

More information

Board Policy No. 18 Railroad Crossing Quiet Zones and Wayside Horn Systems

Board Policy No. 18 Railroad Crossing Quiet Zones and Wayside Horn Systems Board Policy No. 18 Railroad Crossing Quiet Zones and Wayside Horn Systems Summary This policy addresses accountability and liability for specific areas of quiet zones and wayside horn systems implementation.

More information

CITY OF EAST PALO ALTO. US 101/University Avenue Interchange Improvements. MANDATORY PRE-PROPOSAL MEETING: May 15, 2014

CITY OF EAST PALO ALTO. US 101/University Avenue Interchange Improvements. MANDATORY PRE-PROPOSAL MEETING: May 15, 2014 P a g e 1 CITY OF EAST PALO ALTO COMMUNITY DEVELOPMENT DEPARTMENT ENGINEERING DIVISION REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES US 101/University Avenue Interchange Improvements HPLUL-5438 (015)

More information

Metro. Board Report. Fare revenue projections, based on preliminary assumptions for ridership

Metro. Board Report. Fare revenue projections, based on preliminary assumptions for ridership Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA SUBJECT: FY18 BUDGET DEVELOPMENT UPDATE ACTION: RECEIVE AND FILE RECOMMENDATION

More information

RESOLUTION NO. R Baseline Budget and Schedule, and Approve Gates 5 and 6 for the East Link Extension

RESOLUTION NO. R Baseline Budget and Schedule, and Approve Gates 5 and 6 for the East Link Extension RESOLUTION NO. R2015-04 Baseline and Schedule, and Approve Gates 5 and 6 for the East Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Board 04/23/15 Final Action Ahmad Fazel, DECM Executive

More information

Financial Report Fiscal Year 2018

Financial Report Fiscal Year 2018 Financial Report Fiscal Year 2018 Year to Date September 30, 2018 1 Major Highlights Revenue Sales tax remittances received in FY2018 are 6.5% higher than FY2017 Additional $20 million in operating grants

More information

2014 Prop K Strategic Plan - Amendment 6 Appendix F. Programming and Finance Costs By Expenditure Plan Line Item (YOE $'s)

2014 Prop K Strategic Plan - Amendment 6 Appendix F. Programming and Finance Costs By Expenditure Plan Line Item (YOE $'s) 2014 Prop K Strategic Plan Amendment 6 TRANSIT Percent of Available No. Line Item Total Available Funds Spent on Total Programming & Finance Costs FY2003/04 Funds Financing FY2004/05 FY2005/06 FY2006/07

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Chief of Staff BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Resolution urging the Board of Supervisors to place the $500 million Transportation

More information

GENERAL PROVISIONS I. WORK REQUIREMENTS

GENERAL PROVISIONS I. WORK REQUIREMENTS GENERAL PROVISIONS I. WORK REQUIREMENTS 1. Inspection The Permittee shall request initial inspection from the County at 408-573-2429 a minimum of twenty-four (24) hours prior to any work being performed.

More information

University Link LRT Extension

University Link LRT Extension (November 2007) The Central Puget Sound Regional Transit Authority, commonly known as Sound Transit, is proposing to implement an extension of the Central Link light rail transit (LRT) Initial Segment

More information

Final Report June 1, 2012 San Francisco Municipal Transportation Agency (SFMTA) 2012 Budget Balancing Panel

Final Report June 1, 2012 San Francisco Municipal Transportation Agency (SFMTA) 2012 Budget Balancing Panel Panel Deliverables Final Report June 1, 2012 1. Develop a priority list of recommendations to address the balancing of the FY 2013 and FY 2014 Operating Budget. 2. Developed a priority list of recommendations

More information

Memorandum. Date: February 21, 2018 To: From: Subject:

Memorandum. Date: February 21, 2018 To: From: Subject: Agenda Item 6 Memorandum Date: February 21, 2018 To: From: Subject: Transportation Authority Board Anna LaForte Deputy Director for Policy and Programming 3/13/2018 Board Meeting: Allocation of $8,795,721

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates. , Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...

More information

ANNUAL PROCUREMENT PLAN ANNUAL Q Q 2015

ANNUAL PROCUREMENT PLAN ANNUAL Q Q 2015 ANNUAL PROCUREMENT PLAN 2Q ANNUAL 2018-1Q 2019 3Q 2015 THIS PAGE INTENTIONALLY LEFT BLANK 2 TABLE OF CONTENTS INTRODUCTION 4 PROFESSIONAL SERVICES 7 CONSTRUCTION 9 MATERIAL 11 OTHER 15 3 ANNUAL PROCUREMENT

More information

San Francisco County Transportation Authority Prop K/Prop AA Allocation Request Form. Light Rail Vehicle Procurement

San Francisco County Transportation Authority Prop K/Prop AA Allocation Request Form. Light Rail Vehicle Procurement Item 5 Enclosure B Plans and Programs Committee October 7, 2014 FY of Allocation Action: 2014/15 San Francisco County Transportation Authority E5B-1 Project Name: Implementing Agency: Prop K Category:

More information

DULLES CORRIDOR METRORAIL PROJECT MONTHLY COST AND SCHEDULE UPDATE FOR PHASES 1 AND 2 AS OF MAY 31, 2014 JULY 2014

DULLES CORRIDOR METRORAIL PROJECT MONTHLY COST AND SCHEDULE UPDATE FOR PHASES 1 AND 2 AS OF MAY 31, 2014 JULY 2014 DULLES CORRIDOR METRORAIL PROJECT MONTHLY COST AND SCHEDULE UPDATE FOR PHASES 1 AND 2 AS OF MAY 31, 2014 JULY 2014 0 Phase 1 Cost Summary May Expenditures $ 13.3 Million Total Expenditures $ 2.691 Billion

More information

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project Dulles Corridor Metrorail Project PHASE 1 QUARTERLY COST AND SCHEDULE UPDATE AS OF OCTOBER 31, 2018 DECEMBER 2018 Phase 1 Cost Summary Quarter Expenditures (Aug, Sep, Oct) Total Expenditures (Thru Oct

More information

TRANSBAY JOINT POWERS AUTHORITY

TRANSBAY JOINT POWERS AUTHORITY STAFF REPORT FOR CALENDAR ITEM NO.: 10 FOR THE MEETING OF: June 9, 2016 BRIEF DESCRIPTION: TRANSBAY JOINT POWERS AUTHORITY Adoption of a Final Revised Baseline for Phase 1 of the Transbay Transit Center

More information