1 Caltrain Funding 101 Prepared for: SFMTA Board Meeting Prepared by: Caltrain Staff Date: February 7, 2012
2 Caltrain Funding 101 Overview Funding contribution is guided by Joint Powers Agreement Funding for Caltrain Operations Funding for Caltrain Capital Projects 2
3 Funding for Caltrain Operations Member Agencies provide operating contributions to the JPB according to the Joint Powers Agreement (JPA) After fares and other funding sources, the JPA provides that each member subsidize the operating budget based upon each county s morning peak hour boarding In FY2006, the Members agreed to an annual increase of 3% Since FY2009, Member contributions have been frozen In FY2011, SamTrans reduced its contributions, but did fund swaps to keep its contribution near FY2010 levels for FY2011 and FY2012 3
4 Summary of FY2012 Budget (in millions) Total Revenues % Total Expenses % Fares $ % Rail Op Contract & Maint $ % Parking 3.0 3% Contract Transition Costs 4.7 4% Other Income 5.8 5% Fuel % AB434 & Grants % Other Operating Expenses % Member Agencies % Administrative % Other Sources 9.0 8% Long-term Debt 1.1 1% Total Revenue $ % Total Expenses $ % Revenue over Expenses $ 1.1 4
5 Commuter Railroads FareBox Recovery Ratio Comparison Caltrain s farebox recovery ratio is comparable with other commuter rail systems in the country. 70.0% 60.0% 50.0% 47.4% 51.2% 46.1% 58.9% 40.0% 36.7% 30.0% 20.0% 10.0% 18.4% 9.5% 14.0% 0.0% CalTrain ACE VRE LIRR Tri-Rail Coaster (NCTD) Front Runner (UTA) Rail Runner (Rio Metro RTD) Sources: FY2009 NTD Reports 5
6 Millions Member Agency Operating Contributions Historical Member Agency Operating Contributions $40 $30 $20 $10 $0 $6.6 $6.8 $7.0 $7.0 $6.2 $6.0 $15.0 $15.4 $15.9 $15.9 $14.1 $4.5 $13.5 $10.2 $15.6 $16.0 $16.5 $16.5 $14.7 $10.6 $14.0 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013* SamTrans VTA CCSF Sources: FY Financial Statement, FY2011 and FY2012 Adopted Budgets; FY2013 Preliminary Budget * Projected level of member contribution based on estimated SamTrans share of $14.0 million in FY
7 Joint Power Agreement (JPA) Boarding Formulas Per the original JPA (as amended October 3, 1996), each member agency shall subsidize the Caltrain operating budget based upon each county s morning peak hour boarding. Since 2006, the current share of Caltrain operating expenses is divided among the member agencies on the following basis: SamTrans 42% VTA 41% SFMTA 17% Based upon the Feb 2011 Caltrain passenger counts, the AM peak boardings within each county would be: SamTrans 35.1% VTA 43.8% SFMTA 21.1% Based upon the Feb 2011 Caltrain passenger counts, the total boardings within each county the breakdown would be: SamTrans 32.5% VTA 40.8% SFMTA 26.7% 7
8 Average Weekday Boardings in SF (Data source: annual passenger counts conducted each February) Year 4 th & King 22 nd St. Bayshore SF Station Total System Total SF % of Total , ,592 29, % , ,152 31, % , ,726 34, % , ,993 36, % , ,003 34, % ,897 1, ,071 37, % 8
9 Discussions for FY2014 and beyond Revision to cost sharing formulas is being considered VTA to restore payment obligations toward Gilroy service is also being considered 9
10 Funding for Caltrain Capital Programs Per JPA, outside of grants and other revenues, Member Agencies share equally on capital project costs Capital program focuses on state-of-good repair projects; and it fluctuates year-to-year due to: asset life cycles Regulatory/legal requirements Caltrain modernization 10
11 Caltrain Capital Budget by Category ($M) $200.0 $150.0 $66.0 State of Good Repair Legal Mandates and Enhancements 1 Electrification/Caltrain Modernization Capital Support and Contingency 2 $100.0 $50.0 $0.0 $81.9 $0.5 $0.5 $25.0 $120.7 $50.2 $129.0 $38.4 $25.4 $2.9 $7.3 $6.0 $2.4 $19.5 $3.4 $6.3 $8.7 $9.5 $2.2 $2.0 $2.0 '07 '08 '09 '10 '11 '12 1 This category includes safety and security improvements; FY10 includes San Bruno Grade Separation and FY12 includes Caltrain PTC 2 In 2007, $23M is for Dumbarton Rail
12 Caltrain Capital Budget by Funding Source ($M) Members $200.0 $150.0 $16.6 $86.3 Other 1 State Federal $10.7 $100.0 $5.0 $28.1 $58.8 $58.0 $50.0 $- $9.5 $67.2 $8.2 $8.3 $5.3 $31.5 $13.7 $38.8 $4.0 $45.0 $6.4 $41.5 $26.3 $17.5 $15.5 '07 '08 '09 '10 '11 '12 1 The "Other" sources include county specific local match funds
13 Caltrain Modernization Program Prepared for: SFMTA Board Meeting Prepared by: Caltrain Staff Date: February 7, 2012
14 Key Projects Advanced Signal System Caltrain Electrification HSR Coordination 14
15 Advanced Signal System CBOSS PTC Communication based overlay signal system (CBOSS) Caltrain operating needs Increase capacity Positive Train Control (PTC) FRA safety requirements Unfunded mandate Implement Project by
16 Caltrain Electrification Purpose Improve performance More service Improve air quality Decrease O/M subsidy Project Diesel to electric 5 to 6 trains / peak hour / direction Implementation TBD 16
17 HSR Coordination HSR approved by voters Caltrain corridor selected to support HSR Both systems need electrified corridor Caltrain and HSR partnership Combine resources to modernize corridor 17
18 Peninsula Vision Blended System What? Supports integrated Caltrain and HSR service Upgrade railroad from SJ to Transbay Terminal Maximize use of existing tracks Why? Minimize community impact Lower project cost Advance project delivery 18
19 Corridor Capacity Analysis Is the blended system concept feasible? Multiple considerations Operational Infrastructure Funding Strategy 19
20 Computer Simulation Existing Railway System Electric Advanced Signal System Tracks Existing Mainline Tracks 3 HSR Stations Additional Passing Tracks 20
21 Key Findings Blended system concept has merit Potential: Up to 10 trains / hour / direction # of Trains Without Passing Tracks With Passing Tracks Caltrain 6 6 HSR
22 Next Steps Finalize capacity analysis 2 new planning studies Stakeholder requested simulations Grade crossing analysis Model expansion to DTX 22
23 Overall Planning Process 23
24 Q/A 24
Caltrain Service Preparing for FY2012 Caltrain Benefits Environment, Economy, Quality of Life
Caltrain Service Preparing for FY2012 Caltrain Benefits Environment, Economy, Quality of Life If traveling via automobile, Caltrain riders would increase regional CO2 emissions by 89,850 metric tons or
More informationProposed FY2012 Operating Budget
Proposed FY2012 Operating Budget June 2, 2011 Overview Began budget discussions in January 2011 Reviewed FY2012 Preliminary Operating Budget at the May 5, 2011 JPB meeting Followed up Board member questions
More informationFY18 Final Results Budget Outlook, FY20-22
FY18 Final Results Budget Outlook, FY20-22 Objectives Provide background necessary for consideration of fiscal pressures that exist prior to electrification Service levels Ridership Member agency funding
More informationAGENDA Bacciocco Auditorium, 2 nd Floor 1250 San Carlos Avenue, San Carlos CA 94070
BOARD OF DIRECTORS 2011 SEAN ELSBERND, CHAIR OMAR AHMAD, VICE CHAIR JOSÉ CISNEROS NATHANIEL P. FORD, SR. ASH KALRA LIZ KNISS ARTHUR L. LLOYD ADRIENNE TISSIER KEN YEAGER MICHAEL J. SCANLON EXECUTIVE DIRECTOR
More informationCALTRAIN CAPITAL IMPROVEMENT PROGRAM
Item 6 Enclosure Board November 13, 2018 2019 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM CALTRAIN CAPITAL IMPROVEMENT PROGRAM Pending Board Approval: November 27, 2018 Prepared for the San Francisco County
More informationTRANSIT SYSTEM MAINTENANCE AND RENOVATION. VEHICLES - Caltrain
Item 6 Enclosure Board November 13, 2018 2019 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM TRANSIT SYSTEM MAINTENANCE AND RENOVATION VEHICLES - Caltrain Pending Board Approval: November 27, 2018 Prepared
More informationThe Future Scenarios
The Future Scenarios Developing the Scenarios Once the policy approach for each scenario was defined, the financial, service, and capital assumptions were developed further and are detailed in three supporting
More informationPeninsula Corridor Joint Powers Board San Carlos, California A Joint Exercise of Powers Agreement among:
Peninsula Corridor Joint Powers Board San Carlos, California A Joint Exercise of Powers Agreement among: City and County of San Francisco San Mateo County Transit District Santa Clara Valley Transportation
More informationState Grants (STA) Major Funding Sources (Except Sales Tax) Transit System. FY10 Adopted d Budget $0. Historically $8.5M/2% but has been as high as
Major Funding Sources (Except Sales Tax) Transit System Federal Grants FY10 Adopted Budget $51M/13% State Grants (STA) FY10 Adopted d Budget $0 Historically $8.5M/2% but has been as high as $22M Fare Revenues
More informationCHAPTER 9 FINANCIAL CONSIDERATIONS
CHAPTER 9 FINANCIAL CONSIDERATIONS 9.1 INTRODUCTION This chapter presents anticipated costs, revenues, and funding for the Berryessa Extension Project (BEP) Alternative and the Silicon Valley Rapid Transit
More informationThis Page Left Intentionally Blank
This Page Left Intentionally Blank PENINSULA CORRIDOR JOINT POWERS BOARD San Carlos, California Comprehensive Annual Financial Report Fiscal Year Ended June 30, 2015 (With Comparative Totals for 2014)
More informationThis Page Left Intentionally Blank
This Page Left Intentionally Blank PENINSULA CORRIDOR JOINT POWERS BOARD San Carlos, California Comprehensive Annual Financial Report Fiscal Years Ended June 30, 2017 and 2016 Prepared by the Finance Division
More informationTRANSIT SYSTEM MAINTEANCE AND RENOVATION. GUIDEWAYS Caltrain
2014 PROPOSITION K 5 - YEAR PRIORITIZATION PROGRAM TRANSIT SYSTEM MAINTEANCE AND RENOVATION GUIDEWAYS Caltrain Approved: July 22, 2014 Prepared for the San Francisco County Transportation Authority By
More informationChapter 9 Financial Considerations. 9.1 Introduction
9.1 Introduction Chapter 9 This chapter presents anticipated costs, revenues, and funding for the NEPA BART Extension Alternative. A summary of VTA s financial plan for the BART Extension Alternative is
More informationFinancial Report - FY 2017 Year to Date May 31, 2017
Financial Report - FY 2017 Year to Date July 19, 2017 1 Major Highlights Revenue Sales tax remittances received through YTD April 2017 are 4.2% higher than YTD April 2016 Plaza Saltillo lease income budgeted
More informationCalifornia High-Speed Rail Project
California High-Speed Rail Project Summary of Major Changes Between: Draft 2012 Business Plan (November 1, 2011) Revised 2012 Business Plan (April 2, 2012) 1 April 2, 2011 1 Subject to consideration of
More informationFY METROLINK BUDGET AND LACMTA'S COMMUTER RAIL PROGRAM
9 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2ooo Tel metro. net FINANCE, BUDGET AND AUDIT COMMITTEE JUNE 19, 2013 SUBJECT: ACTION: FY 2013-14 METROLINK BUDGET AND LACMTA'S COMMUTER RAIL PROGRAM
More informationFinancial Report Fiscal Year 2018
Financial Report Fiscal Year 2018 Year to Date July 31, 2018 Presented on September 17, 2018 1 Major Highlights Revenue FY2018 sales tax revenue budgeted at 2.5% growth over FY2017 Sales tax remittances
More informationFY 2018 PRELIMINARY BUDGET. September 16, 2016
FY 2018 PRELIMINARY BUDGET September 16, 2016 OVERVIEW Action requested: refer budget to Commissions and jurisdictions for review and comment. Purpose of presentation: Highlight major assumptions and issues
More informationFinancial Report Fiscal Year 2018
Financial Report Fiscal Year 2018 Year to Date March 31, 2018 Presented on May 21, 2018 1 Major Highlights Revenue FY2018 sales tax revenue budgeted at 2.5% growth over FY2017 Sales tax remittances received
More informationFebruary 2016 Financial Report
2016 February 2016 Financial Report Capital Metropolitan Transportation Authority 4/13/2016 Table of Contents SUMMARY REPORT Budgetary Performance - Revenue 2 - Sales Tax Revenue 5 - Operating Expenses
More informationPeninsula Corridor Joint Powers Board San Carlos, California A Joint Exercise of Powers Agreement among:
Peninsula Corridor Joint Powers Board San Carlos, California A Joint Exercise of Powers Agreement among: City and County of San Francisco San Mateo County Transit District Santa Clara Valley Transportation
More informationPeninsula Corridor Joint Powers Board (JPB) Board of Directors Meeting 1250 San Carlos Avenue, San Carlos CA Minutes April 4, 2013
Peninsula Corridor Joint Powers Board (JPB) Board of Directors Meeting 1250 San Carlos Avenue, San Carlos CA 94070 Minutes April 4, 2013 MEMBERS PRESENT: MEMBERS ABSENT: STAFF PRESENT: J. Cisneros, M.
More informationMay 31, 2016 Financial Report
2016 May 31, 2016 Financial Report Capital Metropolitan Transportation Authority 7/13/2016 Table of Contents SUMMARY REPORTS Budgetary Performance - Revenue 2 - Sales Tax Revenue 6 - Operating Expenses
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.7 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Finance and Information Technology BRIEF DESCRIPTION: Authorizing the Director of Transportation to execute
More informationGetting Metro Back on Track
NVTC Presents: Getting Metro Back on Track A discussion with Virginia members of the WMATA Board @NovaTransit This forum is sponsored by the Northern Virginia Transportation Commission. Learn more about
More informationCHAPTER 9 FINANCIAL CONSIDERATIONS
CHAPTER 9 FINANCIAL CONSIDERATIONS 9.1 INTRODUCTION This chapter presents anticipated costs, revenues, and funding for the BEP and the SVRTP. A summary evaluation of VTA s financial plan for the proposed
More informationIntroduction Project Overview How Express Lanes Work 101 Managed Lane Financial Forecast Performance Comparison Ownership Considerations Transit
Joint Board Ownership Workshop November 16, 2018 1 Introduction Project Overview How Express Lanes Work 101 Managed Lane Financial Forecast Performance Comparison Ownership Considerations Transit Equity
More informationWashington Metropolitan Area Transit Authority Metro Budget Overview
Washington Metropolitan Area Transit Authority Metro Budget Overview February 2011 Metro 10,877 Employees (10,974 budgeted) 1,491 Buses 588 Escalators and 237 Elevators 106 Miles of Track 92 Traction Power
More informationAppendix. G RTP Revenue Assumptions REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY
Appendix G RTP Revenue Assumptions REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY Exhibit G-1 2014 RTP REVENUE FORECAST ASSUMPTIONS LOCAL REVENUES Measure K Sales Tax Renewal Program: Description:
More informationBalancing the Transportation Needs of a Growing City
Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Operating Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation March 6, 2018 1 Guiding Principles: FY 2013-2018 Vision:
More informationSAN MATEO COUNTY TRANSIT DISTRICT FY2019 PROPOSED OPERATING BUDGET FY19
FY2019 OPERATING FORECAST SOURCES OF FUNDS: Operating Revenues 1 Passenger Fares 17,040,333 16,977,116 15,917,012 16,457,750 540,738 3.4% 1 2 Local TDA and STA Funds 41,352,423 42,013,473 42,013,473 47,485,688
More informationJPB CITIZENS ADVISORY COMMTTEE San Mateo County Transit District Administrative Building 1250 San Carlos Avenue San Carlos, CA 94070
DRAFT JPB CITIZENS ADVISORY COMMTTEE San Mateo County Transit District Administrative Building 1250 San Carlos Avenue San Carlos, CA 94070 MINUTES - DECEMBER 19, 2007 COMMITTEE MEMBERS PRESENT: G. Graham,
More informationNorthern Virginia Transportation Commission: 2018 Legislative and Policy Agenda
Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda Northern Virginia s economic growth and global competitiveness are directly tied to the region s transit network. Transit
More informationJP Morgan Public Finance Transportation Utility Conference
JP Morgan Public Finance Transportation Utility Conference April 18-19, 2018 Presented by: Brenden Morgan Sr. Manager of Debt & Investments Table of Contents I. Overview of the Region and RTD II. Updates
More informationContracts Administration Management Action Plan Status June 20, 2013
Related to Agenda Item W1 Contracts Administration Management Action Plan Status June 20, 2013 Background In January 2012, the Board authorized an on-call management and consulting services contract with
More informationMetra Board of Directors. Board Meeting September 16, 2011
Metra Board of Directors Board Meeting September 16, 2011 Continued Discussion on FY2012 Budget Metra Board of Directors September 16, 2011 2012 Capital Program Metra Board of Directors September 16, 2011
More informationAugust 31, 2016 Financial Report
August 31, 2016 Financial Report Capital Metropolitan Transportation Authority 10/14/2016 Table of Contents SUMMARY REPORTS Budgetary Performance - Revenue 2 - Sales Tax Revenue 6 - Operating Expenses
More informationFY 2018 PUBLIC HEARINGS PROPOSED FARE INCREASE
FY 2018 PUBLIC HEARINGS PROPOSED FARE INCREASE 1 VRE BUDGET DEVELOPMENT July August December January March April-June July Budget Key Issues and Guidelines Present Draft Budget VRE Board Budget Approval
More informationQuarterly Status Report
Capital Projects Quarterly Status Report 2nd Quarter FY2017: October 1 December 31, 2016 Prepared for the March 1, 2017 SamTrans Board Meeting San Mateo County Transit District San Mateo County Transit
More informationPalo Alto Grade Separation Financing White Paper
Palo Alto Grade Separation Financing White Paper presented to Palo Alto City Council Rail Committee Meeting presented by Economic & Planning Systems, Inc. November 29, 2017 Oakland Sacramento Denver Los
More informationTSCC Budget Review TriMet
TSCC Budget Review 2017-18 TriMet 1. Introduction to the District: The Tri-County Metropolitan Transportation District (TriMet) boundary covers about 575 square miles of the urban portions of Multnomah,
More informationBenefits of Long-Range Capital Planning
Benefits of Long-Range Capital Planning Presentation at the Transportation Research Board 9 th National Conference on Transportation Asset Management Stephen A. Berrang Director, Capital Program Management
More informationApril 30, 2016 Financial Report
2016 April 30, 2016 Financial Report Capital Metropolitan Transportation Authority 6/15/2016 Table of Contents SUMMARY REPORT Budgetary Performance - Revenue 2 - Sales Tax Revenue 6 - Operating Expenses
More informationCHAPTER 7: Financial Plan
CHAPTER 7: Financial Plan Report Prepared by: Contents 7 FINANCIAL PLAN... 7-1 7.1 Introduction... 7-1 7.2 Assumptions... 7-1 7.2.1 Operating Revenue Assumptions... 7-2 7.2.2 Operating Cost Assumptions...
More informationTEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012)
TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012) Summary Description Proposed Project: Commuter Rail 37.6 Miles, 14 Stations (12 new, two existing) Total Capital Cost ($YOE):
More informationPeninsula Corridor Joint Powers Board Board of Directors Meeting 1250 San Carlos Avenue, San Carlos CA Minutes May 6, 2010
Peninsula Corridor Joint Powers Board Board of Directors Meeting 1250 San Carlos Avenue, San Carlos CA 94070 Minutes May 6, 2010 MEMBERS PRESENT: MEMBERS ABSENT: MTC LIAISON: STAFF PRESENT: O. Ahmad, M.
More informationBOARD OF DIRECTORS WORKSHOP MEETING MINUTES
BOARD OF DIRECTORS WORKSHOP MEETING April 25, 2008 MINUTES 1. CALLED TO ORDER The Workshop Meeting of the Santa Clara Valley Transportation Authority s (VTA) Board of Directors was called to order by Chairperson
More informationTransit Subsidy. Mission Statement. Mandates
Mission Statement The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the Cities of Manassas,
More informationChairman Skinner and the VRE Operations Board. Authorization to Issue a Request for Proposals for Federal Legislative Services
Agenda Item 8-A Consent Item To: From: Chairman Skinner and the VRE Operations Board Doug Allen Date: February 19, 2016 Re: Authorization to Issue a Request for Proposals for Federal Legislative Services
More informationVRE Financial Plan Analysis Updated January 15, 2016
Attachment 10A.1 VRE Financial Plan Analysis Updated January 15, 2016 VRE and PFM have been working on the development of a long term strategic Financial Plan since February 2015. The primary objective
More informationAGENDA PENINSULA CORRIDOR JOINT POWERS BOARD Bacciocco Auditorium, 2 nd Floor 1250 San Carlos Avenue, San Carlos CA 94070
BOARD OF DIRECTORS 2017 May 4, 2017 Thursday AGENDA PENINSULA CORRIDOR JOINT POWERS BOARD Bacciocco Auditorium, 2 nd Floor 1250 San Carlos Avenue, San Carlos CA 94070 JEFF GEE, CHAIR JEANNIE BRUINS DEVORA
More informationBalancing the Transportation Needs of a Growing City
Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Operating Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation March 20, 2018 1 Revises Baselines: FY 2019-2020 ($
More informationAnnual Operating and Capital Budget Fiscal Year July 1, 2004 through June 30, 2005
Annual Operating and Capital Budget Fiscal Year July 1, 2004 through June 30, 2005 Peninsula Corridor Joint Powers Board San Carlos, California A Joint Exercise of Powers Agreement among: City and County
More informationSFMTA 2013 Revenue Bond Board of Directors
SFMTA Municipal Transportation Agency Image: Market and Geary Streets, circa 1920s, Muni Centennial logo SFMTA 2013 Revenue Bond Board of Directors 09 03 2013 SAN FRANCISCO, CALIFORNIA Background In 2007,
More informationTransit Subsidy. Mission Statement. Mandates
Mission Statement The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the Cities of Manassas,
More informationFinancial Practices and Reporting Review Committee. Committee Meeting July 15, 2011
Financial Practices and Reporting Review Committee Committee Meeting July 15, 2011 Finance Presentation Metra Financial Practices & Reporting Review Committee July 15, 2011 Presented by Jim Mickus Budget
More informationMETRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s):
METRO METRO METRO 2017 2026 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit
More informationPeninsula Corridor Joint Powers Board (JPB) Board of Directors Meeting 1250 San Carlos Avenue, San Carlos CA MINUTES OF SEPTEMBER 7, 2017
Peninsula Corridor Joint Powers Board (JPB) Board of Directors Meeting 1250 San Carlos Avenue, San Carlos CA 94070 MINUTES OF SEPTEMBER 7, 2017 MEMBERS PRESENT: MEMBERS ABSENT: STAFF PRESENT: J. Bruins,
More informationSFMTA Board Presentation January 16, 2018
SFMTA Board Presentation January 16, 2018 About the SFMTA VISION San Francisco: great city, excellent transportation choices. Our Strategic Plan: Goal 1: Create a safer transportation experience for everyone.
More informationPolicy Advisory Committee May 18, 2012, 1:30 PM Union City Council Chambers
Policy Advisory Committee May 18, 2012, 1:30 PM Union City Council Chambers City Hall (map) 34009 Alvarado Niles Rd, Union City, CA 94587 1. Call to Order 2. Roll Call 3. Chairperson Comments 4. Project
More informationFixed Guideway Transit Overview
Fixed Guideway Transit Overview March 13, 2017 House Ways and Means Committee Metropolitan Council Role in Transportation Planning 2 Serves as the region s federally required Metropolitan Planning Organization
More informationREGIONAL TRANSPORTATION DISTRICT, COLORADO
REGIONAL TRANSPORTATION DISTRICT, COLORADO Series 2004 Lease RTD Active Fleet of the District Fiscal Year Ended December 31, 2013 Fixed Route Bus Fleet Number RTD Owned Fixed Route Buses 40' Transit Coaches
More informationStrategic Plan Progress Report Goal 3 Focus. November 2016 San Francisco, California
Strategic Plan Progress Report Goal 3 Focus November 2016 San Francisco, California 1 Goal 3 focus Improve the environment and quality of life in San Francisco Objective 3.1 Reduce the Agency s and the
More informationUrban Transport Institutional and Financial Issues. International best practices
Urban Transport Institutional and Financial Issues International best practices Contents 2 I N T R O D U C T I O N S E L E C T E D F O R E I G N E X A M P L E S C O N C L U S I O N Introduction : Key issues
More informationAnalysis of the Alameda County Transportation Expenditure Plan Prepared by Alameda County Transportation Commission
Analysis of the Alameda County Transportation Expenditure Plan Prepared by Alameda County Transportation Commission Discussion: In 1986, voters approved Measure B, a 1/2 cent sales tax, to fund transportation
More informationMINUTES OF SEPTEMBER 5, 2017
CITIZENS ADVISORY COMMITTEE (CAC) SAN MATEO COUNTY TRANSPORTATION AUTHORITY (TA) 1250 San Carlos Avenue, San Carlos CA 94070 Bacciocco Auditorium, 2 nd Floor MINUTES OF SEPTEMBER 5, 2017 MEMBERS PRESENT:
More informationPeninsula Corridor Joint Powers Board (JPB) Board of Directors Meeting 1250 San Carlos Avenue, San Carlos CA MINUTES OF MAY 5, 2016
Peninsula Corridor Joint Powers Board (JPB) Board of Directors Meeting 1250 San Carlos Avenue, San Carlos CA 94070 MINUTES OF MAY 5, 2016 MEMBERS PRESENT: MEMBERS ABSENT: STAFF PRESENT: M. Cohen, J. Gee,
More informationCalifornia High-Speed Rail Peer Review Group
Lou Thompson Chairman Walter Bell Diane Eidam Stacey Mortensen The Honorable Darrell Steinberg Senate President Pro Tem State Capitol Building Room 205 Sacramento, CA 95814 April 6, 2014 The Honorable
More information2014 Prop K Strategic Plan - Amendment 7 Appendix F. Programming and Finance Costs By Expenditure Plan Line Item (YOE $'s)
2014 Prop K Strategic Plan Amendment 7 TRANSIT Percent of Available No. Line Item Total Available Funds Spent on Total Programming & Finance Costs FY2003/04 Funds Financing FY2004/05 FY2005/06 FY2006/07
More informationREGIONAL TRANSPORTATION DISTRICT, COLORADO AS OF DECEMBER 31, 2015
AS OF DECEMBER 31, RTD Active Fleet of the District Fixed Route Bus Fleet: Number RTD Owned- Fixed Route Buses 40' Transit Coaches 620 Articulated Buses 110 Intercity Coaches 175 Mall Shuttles 37 30' Transit
More informationMetropolitan Transportation Authority Proposed Capital Program
Metropolitan Transportation Authority Proposed 2008-2013 Capital Program Thomas P. DiNapoli New York State Comptroller Kenneth B. Bleiwas Deputy Comptroller Report 11-2008 March 2008 The proposed capital
More informationProp K Grouped Allocation Requests November 2018 Board Action. Table of Contents
Item 7 Enclosure Citizens Advisory Committee October 24, 2018 Prop K Grouped Allocation Requests November 2018 Board Action Table of Contents No. Fund Source Project Sponsor 1 1 Prop K PCJPB Expenditure
More informationSAN JOSE, CALIFORNIA. Comprehensive Annual Financial Report. For Fiscal Year Ended June 30, 2004
SANTA CLARA VALLEY TRANSPORTATION AUTHORITY SAN JOSE, CALIFORNIA Comprehensive Annual Financial Report For Fiscal Year Ended June 30, 2004 Prepared by: Fiscal Resources Division SANTA CLARA VALLEY TRANSPORTATION
More informationBalancing the Transportation Needs of a Growing City
Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Operating Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation February 20, 2018 1 Moving San Francisco: At a Glance
More informationPROP K INDEPENDENT ANALYSIS & OVERSIGHT
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY PROP K INDEPENDENT ANALYSIS & OVERSIGHT Presented by: Lien Luu JULY 24, 2018 1 SCOPE & OBJECTIVES 3 Focus Areas Big Questions 1. Program Delivery: How effective
More informationFACILITIES - BART DRAFT 2014 PROPOSITION K. Item 8 Enclosure D Plans and Programs Committee June 17, YEAR PRIORITIZATION PROGRAM
Item 8 Enclosure D Plans and Programs Committee June 17, 2014 DRAFT 2014 PROPOSITION K 5YEAR PRIORITIZATION PROGRAM 1 FACILITIES Approved: [DATE] Prepared for the San Francisco County Transportation Authority
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 12 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Finance and Information Technology BRIEF DESCRIPTION: Adopting the SFMTA s Fiscal Year (FY) 2019 2023 Capital
More informationGovernor s FY 2017 Revised, FY 2018 and Capital Budget Recommendations House Finance Committee April 12, 2017
Governor s FY 2017 Revised, FY 2018 and Capital Budget Recommendations House Finance Committee April 12, 2017 Quasi-public agency Established in 1964 Responsible: Fixed route bus service and Americans
More informationTRANSBAY JOINT POWERS AUTHORITY San Francisco, California. Annual Financial Report. For the Year Ended June 30, 2017
TRANSBAY JOINT POWERS AUTHORITY San Francisco, California Annual Financial Report THIS PAGE INTENTIONALLY LEFT BLANK. Table of Contents Page(s) Independent Auditor's Report... 1-2 Management s Discussion
More informationFinancial Report Fiscal Year 2018
Financial Report Fiscal Year 2018 Year to Date December 31, 2017 Presented on February 14, 2018 1 Major Highlights Revenue FY2018 sales tax revenue budgeted at 2.5% growth over FY2017 Sales tax remittances
More informationFinancial Report Fiscal Year 2018
Financial Report Fiscal Year 2018 Year to Date September 30, 2018 1 Major Highlights Revenue Sales tax remittances received in FY2018 are 6.5% higher than FY2017 Additional $20 million in operating grants
More informationUniversity Link LRT Extension
(November 2007) The Central Puget Sound Regional Transit Authority, commonly known as Sound Transit, is proposing to implement an extension of the Central Link light rail transit (LRT) Initial Segment
More informationPROPOSED FY 2015 & 2016 OPERATING BUDGET & CAPITAL BUDGET PROPOSED FY CAPITAL IMPROVEMENT PROGRAM (CIP)
PROPOSED FY 2015 & 2016 OPERATING BUDGET & CAPITAL BUDGET PROPOSED FY 2015 2019 CAPITAL IMPROVEMENT PROGRAM (CIP) February 4, 2014 SFMTA Board of Directors Workshop 1 PROPOSED FY 2015 & 2016 OPERATING
More informationRESOLUTION ALLOCATING $5,820,000 IN PROP K FUNDS, WITH CONDITIONS, FOR
BD091217 RESOLUTION NO. 18XX RESOLUTION ALLOCATING $5,820,000 IN PROP K FUNDS, WITH CONDITIONS, FOR THIRTEEN REQUESTS WHEREAS, The Transportation Authority received thirteen requests for a total of $5,820,000
More information2007 Legislative Program Northern Virginia Transportation Authority Approved: November 10, 2006
State Legislative Items: Additional Transportation Funding 2007 Legislative Program Northern Virginia Transportation Authority Approved: November 10, 2006 Position: The Northern Virginia Transportation
More informationReview of FasTracks Status and Future Strategic Direction
Review of FasTracks Status and Future Strategic Direction Regional Transportation District August 21, 2008 1 Overview RTD has experienced a dramatic increase in ridership over the past year, showing that
More informationTRANSBAY JOINT POWERS AUTHORITY
TRANSBAY JOINT POWERS AUTHORITY Independent Auditor s Reports, Management s Discussion and Analysis, Basic Financial Statements and Other Supplementary Information Table of Contents Page(s) Independent
More informationTransit Development Plan (FY ) Executive Summary
Transit Development Plan (FY 2019-2028) Executive Summary December 2018 TABLE OF CONTENTS Introduction... 1 System Profile... 2 Public Outreach... 4 Key Findings/Direction... 5 Implementation Plan... 6
More informationPeninsula Corridor Joint Powers Board
Quarterly Capital Program Status Report and DBE Status Report Prepared for the June 5, 2014 JPB Meeting 3rd Quarter FY2014: January 1, 2014 March 31, 2014 Peninsula Corridor Joint Powers Board Caltrain
More informationColumbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012)
Columbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012) Summary Description Proposed Project: Light Rail Transit 2.9 Miles, 5 Stations Total Capital Cost ($YOE):
More informationBUDGETWATCH March 2019 Flash Report
March 2019 Flash Report Overall Latest Condition (reporting on operations through February and subsidies through March): Overall, YTD preliminary net results were favorable mainly reflecting lower operating
More informationThe Potomac and Rappahannock Transportation Commission (PRTC) is a multijurisdictional agency representing Prince William, Stafford and Spotsylvania
Planning and Development Development Services, Department of Economic Development, Department of Housing and Community Development, Office of Planning Prince William County/ Manassas Convention and Visitors
More informationContents. Appendix. Cost Model Structure. Tables
Alternatives Analysis Alt ti A l i Technical Methodology Report: Operating and Cost Estimating and Results Prepared for: Washington County Regional Railroad Authority on behalf of the Gateway Corridor
More informationMemorandum. Date: RE: Plans and Programs Committee
Memorandum Date: 07.08.10 RE: Plans and Programs Committee July 13, 2010 To: From: Through: Subject: Plans and Programs Committee: Commissioners Campos (Chair), Chu (Vice Chair), Chiu, Avalos, Dufty and
More informationNORTHERN VIRGINIA TRANSPORTATION COMMISSION
NORTHERN VIRGINIA TRANSPORTATION COMMISSION Financial and Compliance Reports Year Ended June 30, 2018 ASSURANCE, TAX & ADVISORY SERVICES Table of Contents Page Independent Auditor s Report 1-3 Required
More informationFY2020 Budget Outlook
Finance and Capital Committee Information Item IV-A October 11, 2018 FY2020 Budget Outlook 35 of 60 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD
More informationTransit Subsidy. Mission Statement. Mandates
Mission Statement The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the Cities of Manassas,
More informationTransit Subsidy. Projected FY17 Transit Subsidy
Mission Statement Transit Subsidy The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the
More informationFISCAL YEAR BUDGET. Adopted June 23, 2017
SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY FISCAL YEAR 2017-18 BUDGET Including Forecast for FY2018-19 and FY2019-20 (informational purposes only) Adopted June 23, 2017 Los Angeles County Metropolitan
More information