1 Alternatives Analysis Alt ti A l i Technical Methodology Report: Operating and Cost Estimating and Results Prepared for: Washington County Regional Railroad Authority on behalf of the Gateway Corridor Commission Submitted by August 2012

2 Contents Alternatives Analysis Executive Summary... 1 Results Introduction Key Assumptions Methodology for Leveraging Previous AA Studies Bus Rapid Transit Alternatives Light Rail Transit Alternatives Commuter Rail Alternative Bus 2008 O&M Cost Estimate Roll Up Commuter Rail 2010 O&M Cost Estimate Roll Up Supply Variables by Mode by Alternative Summary O&M Cost Results Appendix A Tables Cost Model Structure ES O&M Cost Estimates (in millions) in Excess of No-Build by Alternative... 1 ES O&M Cost Estimates (in millions) in Excess of No-Build by Alternative Key Anticipated BRT Variable Cost Drivers Cost Item Detail based on the Northstar Commuter Rail O&M Costs O&M Costs for Bus Operations O&M Costs for Commuter Rail Operations Supply Variables in Excess of the No-Build Scenario O&M Cost Estimates (in millions) in Excess of No-Build by Alternative O&M Cost Estimates (in millions) in Excess of No-Build by Alternative Figure 1 O&M Cost Based on Fixed Cost and Variable Cost Factor... 4 REVISED OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY REPORT PAGE III

3 Executive Summary This technical memorandum summarizes the methodology for estimating operating and maintenance costs for the Gateway Corridor AA Study. Estimates of operating and maintenance (O&M) costs are an important part of the Federal Transit Administration s (FTA) New Starts planning projects. Annual O&M costs consist of ongoing costs to operate and maintain each Gateway Corridor alternative, including operating, maintaining, and managing a transit system. These costs typically consist of: Labor costs Fuel and electricity Parts and materials Non-labor operating costs to maintain support facilities (stations, bus stops, transit centers, maintenance facilities, etc.) Administrative costs, including labor, supplies, building operating, communications, etc. Insurance O&M costs for each alternative are compared against the Transportation System Management (TSM) baseline to determine each alternative s relative costs and benefits. Results Based on the assumptions and approach outlined in the previous sections, the estimated operating and maintenance costs in years 2020 and 2030 are shown in the tables below for each alternative. TABLE ES O&M Cost Estimates (in millions) in Excess of No-Build by Alternative Alternative 1 (No Build) 2 (TSM) 3 (BRT) 4 (BRT) 5 (LRT) 6 (LRT) 7 (CR) 8 (BRT/ML) Bus $0.0 $5.8 $3.0 $3.0 $4.6 $5.1 ($0.3) $3.0 Light Rail $0.0 $11.5 $16.0 Commuter Rail $0.0 $33.3 Bus Rapid Transit $0.0 $8.5 $10.0 $7.8 TOTAL $0.0 $5.8 $11.5 $13.0 $16.0 $21.0 $33.0 $10.8 REVISED OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY REPORT PAGE 1

4 TABLE ES O&M Cost Estimates (in millions) in Excess of No-Build by Alternative Alternative 1 (No Build) 2 (TSM) 3 (BRT) 4 (BRT) 5 (LRT) 6 (LRT) 7 (CR) 8 (BRT/ML) Bus $0.0 $13.3 $8.6 $8.6 $12.5 $13.6 ($0.6) $8.6 Light Rail $0.0 $15.6 $21.8 Commuter Rail $0.0 $53.5 Bus Rapid Transit $0.0 $15.0 $18.1 $13.3 TOTAL $0.0 $13.3 $23.6 $26.7 $28.1 $35.4 $53.0 $ Introduction The alternatives considered in the Gateway AA would potentially affect O&M costs for Metro Transit (bus and rail). The FTA New Starts program requires an O&M cost analysis for the following two reasons: Cost Effectiveness Projection of design year O&M costs is a key input in determining the cost effectiveness of New Starts Projects. Financial Planning Annual O&M cost projections are key to developing financial plans that cover multiple years of construction and operation of New Starts projects. The FTA requires the development of a resource-driven, allocated cost model for O&M costing of New Starts projects. This means that specific costs are assigned to specific service characteristics (e.g., LRT operator costs are assigned to annual revenue LRThours). Costs for that item (e.g., LRT operators) are then determined by each alternative s service characteristics (e.g., annual revenue LRT-hours). According to FTA guidance (Chapter 4, Estimation of Operating and Maintenance Costs included in the Procedures and Technical Methods for Transit Project Planning Manual available on the FTA website at it is important that the cost model reflect the current operating characteristics of the transit agency. The most current operating statement is the best source of expense data for the current operations of the transit system since it includes line-item detail of the expenses for the management centers for different modes, including wages, salaries, materials and supplies, and fringe benefits. Another source of cost data is the National Transit Database (NTD) which is the FTA's primary database for statistics on the transit industry. Therefore a recently completed AA study within the Twin Cities Metropolitan region for the Bottineau Transitway, which contains detailed Metro Transit bus and LRT O&M costs, will be leveraged for estimating most costs for the Gateway AA. The Bottineau Transitway Operating and Maintenance Cost Methodology Memo (February 2009) was transmitted to the FTA, as was the follow-up Bottineau Transitway Operating and Maintenance Cost Report in January Receipt of both reports was acknowledged by the FTA. (Source: HCRRA Bottineau Corridor Project PAGE 2 OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY REPORT

5 Manager, December 15, 2011). This technical memorandum describes how the results of the 2009 Bottineau AA study were leveraged and how the National Transit Database for 2010 Northstar Commuter Rail O&M costs was used to complete the Gateway AA O&M cost study. 2. Key Assumptions The cost structure, allocations, productivity factors and cost results of the 2009 Bottineau AA study are still valid. The bus service profile reflected in the Bottineau AA study operating costs is similar to those of the Gateway alternatives. The commuter rail service profile reflected in National Transit Database operating costs is similar to those of Gateway Alternative 7. Pre-2011 O&M costs were inflated to determine future year costs using a compounded annual escalation rate of 3.15 percent, as directed by Metro Transit for the Central Corridor LRT project on October 12, The relationship between O&M cost and its corresponding cost driver is linear. In other words, the equation O&M Cost = Fixed Cost + (Variable Cost) (Cost Driver) is applicable for all department expense line items. Examples of cost drivers include Annual Revenue Bus-Miles and Annual Revenue Train-Hours. Department expense line items include rail operator regular pay and garage building maintenance mechanics regular pay. Cost drivers for the Gateway no-build alternative (Alternative #1) are based on operational metrics for 2010 obtained from the National Transit Database The annual operating and maintenance cost estimates for the Gateway Corridor AA assume all service identified in the Metropolitan Council s 2030 regional transportation network is operational. A component of the Council s Transportation Policy Plan (TPP), the 2030 Transit Plan includes an assumed goal that transit ridership will double through a combination of improved bus service and the implementation of numerous transitways. The TPP assumes that several additional transitways could be built and operating as part of the regional transit system. These potential corridors include Cedar Avenue, I- 35W and Bottineau Boulevard BRT lines, Red Rock Commuter Rail, and Rush Line Commuter Rail lines. While several corridors are within the 2030 regional network, Bottineau, Rush Line and Red Rock are not part of the 2030 No Build system. Year 2021 will be considered the year of opening. O&M costs differentials with respect to the No-Build alternative for each alternative will be calculated for that year and for 10 years after, specifically Year Methodology for Leveraging Previous AA Studies The O&M Gateway Corridor cost estimates for bus and BRT alternatives (Alternatives 3, 4, and 8) were built on the results of the 2009 Bottineau AA study. The analysis followed the steps listed below: Step 1: Start with the 2008 fixed and total variable O&M baseline costs by department expense line item from the Bottineau AA study. OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY & RESULTS PAGE 3

6 Step 2: Identify the 2008 values for each cost driver (e.g., Annual Revenue Bus-Miles ). Step 3: Determine whether each expense line item is fixed or variable. For Year 2030 analysis, all costs become variable as suggested by the FTA 1. Step 4: Determine 2008 variable cost slope for each department expense line item (i.e., the slope in the O&M Cost = Fixed Cost + (Variable Cost) (Cost Driver) equation). The figure below conceptually illustrates how the O&M Cost line will be updated and used to calculate future O&M costs (dashed line) based on inflated 2008 costs (solid line). Fixed cost from 2009 Bottineau Transitway AA Study Typical O&M Cost ( Fixed + Variable) O&M Cost Based on Fixed Cost and Variable Cost Factor 2009 Bottineau Transitway Study Future Year Gateway Study total future year O&M cost is this total 2008 O&M cost is this O&M Cost = Fixed Cost + (Variable Cost) (Cost Driver) Increase in fixed cost from 2008 to future year Typical O&M Cost Driver For these O&M cost driver values Slope = Variable cost from 2009 Bottineau Transitway AA Study Updated Slope = Inflated variable cost for future year from 2009 Bottineau Transitway AA Study FIGURE 1 O&M Cost Based on Fixed Cost and Variable Cost Factor Step 5: Determine how the 2008 O&M costs apply to each of the Gateway alternatives under consideration. Step 6: Identify the key cost drivers and their values for each Gateway alternative. This will come from the forecasted service and operating statistics such as peak vehicles or revenue miles. Step 7: Identify O&M costs by alternative by using the applicable O&M Cost = Fixed Cost + (Variable Cost) (Cost Driver) equation by department expense line item. Step 8: Inflate fixed and total variable O&M costs to the years of comparison (2020 and 2030) by expense line item. 4. Bus Rapid Transit Alternatives The O&M cost estimates for the Bottineau AA Study alternatives were based on a resource build-up structure and based upon Metro Transit s bus and rail costs for the Central Corridor LRT project. In the Bottineau AA Study, BRT Bus, Stations and Busway/Bus Lane Maintenance O&M costs were derived from available Bus and Rail O&M costs by relating 1 Fully allocated operating cost analysis is based on the assumption that, in the long-term, all costs, including fixed administrative and overhead costs are variable and directly related to the quantity of service provided. This assumption is strongly supported by the cost experience of transit properties that have implemented new fixed guideway systems. PAGE 4 OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY REPORT

7 BRT Bus, BRT station costs results by making the following adjustments to known 2008 Metro Transit costs: BRT Buses. The Metro Transit bus O&M cost model used reflects a total of $78.1 million in expenses for Metro Transit bus maintenance and fuel. This figure accounts for adjustments to diesel fuel costs. Approximately 70.4 percent of this cost was assigned to annual revenue bus-miles as a cost driver, equating to a cost of $2.27 per annual revenue bus-mile. This portion of costs for bus maintenance was adjusted to account for possible unique features of BRT buses. Until more is known about those unique features, bus maintenance and fuel line item unit costs that are driven by bus-miles was increased by 25%, or $2.84 per annual revenue bus-mile therefore an additional $0.57 per revenue BRT bus-mile is added to reflect potential higher vehicle maintenance costs for unique BRT components on the bus and for possible higher fuel costs for larger BRT buses. BRT Stations. The Metro Transit O&M cost model does not specifically identify costs related to BRT station maintenance. However, the cost model does assign $1.1 million in LRT costs to LRT station maintenance, which equates to $64,763 per station. For Gateway, BRT station maintenance costs were estimated on the basis of this estimate. Until more is known about possible BRT station features, BRT station maintenance costs are assumed to be equivalent to costs assigned for Metro Transit LRT stations, or $64,763 a year per BRT station. Busway/Bus Lane Maintenance Costs. An additional $15,000 per lane mile was added for BRT alternatives, all of which include exclusive bus lanes. Shoulder Bus Lane Maintenance Costs. It is assumed that MnDOT will fund shoulder bus lane maintenance costs, as the agency does currently. Similar adjustments were made for the Gateway analysis and inflation is factored from 2008 to 2020 and Each Gateway BRT Alternative includes a detailed definition of the BRT service plan, which identifies the estimated BRT run time, and proposed service frequencies by time period and day of week. Vehicle requirements are based on required cycle times needed to accommodate proposed service frequencies, while still providing enough time to accommodate the estimated run times and required layover/recovery time. BRT bus frequencies will be adjusted if necessary based on a review of travel demand ridership forecast results (peak period line loads). The approach described here is also applicable to estimate O&M costs for the BRT/Managed Lane Alternative. The key anticipated BRT variable cost drivers are shown below. TABLE 1 Key Anticipated BRT Variable Cost Drivers Cost Drivers Bus Rapid Transit Peak BRT buses Annual Revenue Bus-miles Annual Revenue Bus-hours BRT stations OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY & RESULTS PAGE 5

8 5. Light Rail Transit Alternatives The O&M costs for LRT Gateway Corridor alternatives were not estimated using the Bottineau AA Study methodology. Rather, LRT alternative costs were based on guidance from Metro Transit O&M personnel during the ongoing coordination process, the method to calculate LRT O&M costs was modified from the methodology used to estimate costs for other modes. The updated methodology relies on annual Light Rail platform hours (72,216 hours in 2010) and annual O&M costs ($25.7 million in 2010) to develop an O&M per platform hour unit cost ($356 in O&M expenses per Light Rail platform hour). The calculated unit cost was then used to estimate LRT O&M costs for 2020 and 2030 using appropriate inflation factors and anticipated Light Rail platform hours for 2020 and 2030.Commuter Rail Alternative. 6. Commuter Rail Alternative O&M cost estimates for the commuter rail alternative were modeled on the actual performance of the Northstar commuter rail service, which is now operating in the Twin Cities. This cost model is broken down into the following five steps: Step 1: Assemble recent cost and operational data The cost and operations data were compiled from the 2010 National Transit Database. The main source of costs was the Operating Expense table which included salaries & wages, fringe benefits, service costs, fuel costs, tire costs, other material costs, utility costs, insurance costs, transit provider payments, miscellaneous expenses and transfer expenses. These costs were mapped to the categories Vehicle Operations, Vehicle Maintenance, Non-Vehicle Maintenance and General Administration. The costs shown on the NTD are based on actual Northstar Commuter Rail O&M costs. Step 2: Select key driving supply variables O&M costs are related to or are driven by different supply variables. These supply variables can be considered causal in that increases in the supply variables will drive increases in the related expense items. Step 3: Assign a key driving supply variable to each expense line item. The primary assumption of a fully allocated cost model is that expense line item is logically linked or driven by one of the key supply variables. For example, Mechanics Wages will be linked to a measure of revenue miles. The table below shows an example of the cost item detail based on the Northstar Commuter Rail O&M costs with cost items mapped to key supply variables. TABLE 2 Cost Item Detail based on the Northstar Commuter Rail O&M Costs Expense Line Item General Administration Annual Expense (2010) Cost Drivers Revenue Hours Revenue Miles Peak Vehicles Operator Salaries & Wages $0 X Other Salaries & Wages $386,492 X PAGE 6 OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY REPORT

9 TABLE 2 Cost Item Detail based on the Northstar Commuter Rail O&M Costs Expense Line Item Annual Expense (2010) Cost Drivers Revenue Hours Revenue Miles Peak Vehicles Fringe Benefits $259,263 X Service Costs $300,812 X Fuel Costs $0 X Tire Costs $0 X Other Material Costs $102,009 X Utility Costs $594,658 X Casualty Liability Costs $2,577,771 X Taxes $160 X Purchased Transportation Expenses Purchased Transportation Expenses (Separate) $495,590 X $0 X Miscellaneous Expenses $542,762 X Expense Transfers $1,694,540 X ADA Related Costs $0 X Non-Vehicle Maintenance Operator Salaries & Wages $0 X Other Salaries & Wages $202,090 X Fringe Benefits $135,564 X Service Costs $69,654 X Fuel Costs $0 X Tire Costs $0 X Other Material Costs $100,094 X Utility Costs $0 X Casualty Liability Costs $13,797 X Taxes $0 X Purchased Transportation Expenses $1,357,922 Purchased Transportation Expenses (Separate) $0 X X Miscellaneous Expenses $0 X Expense Transfers $0 X OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY & RESULTS PAGE 7

10 TABLE 2 Cost Item Detail based on the Northstar Commuter Rail O&M Costs Expense Line Item Annual Expense (2010) Cost Drivers Revenue Hours Revenue Miles Peak Vehicles ADA Related Costs $0 X Vehicle Maintenance Operator Salaries & Wages $0 X Other Salaries & Wages $1,357,883 X Fringe Benefits $910,882 X Service Costs $0 X Fuel Costs $17,556 X Tire Costs $0 X Other Material Costs $34,201 X Utility Costs $0 X Casualty Liability Costs $122,475 X Taxes $0 X Purchased Transportation Expenses $0 Purchased Transportation Expenses (Separate) $0 X X Miscellaneous Expenses $0 X Expense Transfers $0 X ADA Related Costs $0 X Vehicle Operations Operator Salaries & Wages $0 X Other Salaries & Wages $0 X Fringe Benefits $0 X Service Costs $47,121 X Fuel Costs $888,326 X Tire Costs $0 X Other Material Costs $893 X Utility Costs $0 X Casualty Liability Costs $0 X Taxes $0 X Purchased Transportation Expenses $3,378,700 X PAGE 8 OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY REPORT

11 TABLE 2 Cost Item Detail based on the Northstar Commuter Rail O&M Costs Expense Line Item Annual Expense (2010) Cost Drivers Revenue Hours Revenue Miles Peak Vehicles Purchased Transportation Expenses (Separate) $0 X Miscellaneous Expenses $0 X Expense Transfers $0 X ADA Related Costs $0 X Step 4 Determine whether each expense line item is fixed or variable. For Year 2030 analysis, all costs become variable as suggested by the FTA 2. Step 5 Determine 2010 variable cost slope for each expense line item (i.e., the slope in the O&M Cost = Fixed Cost + (Variable Cost) (Cost Driver) equation). This is similar to the bus, light rail variable cost calculation described in Section 3, Step 3. Step 6 Apply the key cost drivers and their values for Gateway Alternative #7. This will come from the forecasted service and operating statistics such as vehicles available for maximum service and vehicle revenue miles. Step 7 Identify O&M costs for Alternative # 7by using the applicable O&M Cost = Fixed Cost + (Variable Cost) (Cost Driver) equation by expense line item. Step 8 Inflate fixed and total variable O&M costs to the years of comparison (2020 and 2030) by expense line item. Metro Transit is assumed to function as the operation and maintenance agency for commuter rail service in the Gateway Corridor. Actual train operations and track maintenance is assumed to be contracted to one of the applicable railroads: Union Pacific (UP), Canadian Pacific (CP) or Burlington Northern Santa Fe (BNSF). 7. Bus 2008 O&M Cost Estimate Roll Up The table below shows the 2008 O&M costs for bus operations that were used as the basis for estimates for Alternatives 3, 4, and 8. 2 Fully allocated operating cost analysis is based on the assumption that, in the long-term, all costs, including fixed administrative and overhead costs are variable and directly related to the quantity of service provided. This assumption is strongly supported by the cost experience of transit properties that have implemented new fixed guideway systems. OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY & RESULTS PAGE 9

12 TABLE O&M Costs for Bus Operations PAGE 10 OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY REPORT

13 8. Commuter Rail 2010 O&M Cost Estimate Roll Up Alternatives Analysis The table below shows the 2010 O&M costs for commuter rail operations which are the basis for the O&M costs calculations for Gateway Alternative 7. TABLE O&M Costs for Commuter Rail Operations The O&M expense line items shown in the table above are defined as follows: Ada_Related_Amt: American with Disabilities Act related expenses Casuality_Liability_Amt: Casualty and liability expenses Expense_Transfer_Amt: Expense transfers Fringe_Benefit_Amt: Fringe benefits expenses Fuel_Lubricant_Amt: Fuel and lubricants expenses In_Report_Amt: Purchased Transportation In-Report expenses Misc_Expense_Amt: Miscellaneous expenses Op_Sal_Wage_Amt: Operators salaries and wages expenses Other_Mat_Sup_Amt: Other materials and supplies expenses Other_Sal_Wage_Amt: Other salaries and wages expenses Sep_Report_Amt: Purchased Transportation filing Separate Report expenses Service_Costs_Amt: Services expenses Tax_Amt: Taxes expenses Tire_Tube_Amt: Tire and tubes expenses Utility_Amt: Utilities expenses 9. Supply Variables by Mode by Alternative The table below summarizes the supply variables in excess of the No-Build scenario (Alternative 1) for each alternative for each mode. These supply variables drive costs for line items as described in Sections 3 through 6. OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY & RESULTS

14 TABLE 5 Supply Variables in Excess of the No-Build Scenario PAGE 12 OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY REPORT

15 10. Summary O&M Cost Results Based on the assumptions and approach outlined in the previous sections, the estimated operating and maintenance costs for 2020 and 2030 are shown below. TABLE O&M Cost Estimates (in millions) in Excess of No-Build by Alternative Alternative Bus $0.0 $5.8 $3.0 $3.0 $4.6 $5.1 ($0.3) $3.0 Light Rail $0.0 $11.5 $16.0 Commuter Rail $0.0 $33.3 Bus Rapid Transit $0.0 $8.5 $10.0 $7.8 TOTAL $0.0 $5.8 $11.5 $13.0 $16.0 $21.0 $33.0 $10.8 TABLE O&M Cost Estimates (in millions) in Excess of No-Build by Alternative Alternative Bus $0.0 $13.3 $8.6 $8.6 $12.5 $13.6 ($0.6) $8.6 Light Rail $0.0 $15.6 $21.8 Commuter Rail $0.0 $53.5 Bus Rapid Transit $0.0 $15.0 $18.1 $13.3 TOTAL $0.0 $13.3 $23.6 $26.7 $28.1 $35.4 $53.0 $21.9 OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY & RESULTS

16 APPENDIX A COST MODEL STRUCTURE

17 Appendix A: Cost Model Structure Based on the analysis detailed in the 2009 Bottineau AA Study, the cost element structure identifies costs by category (e.g., labor, services, etc.) for cost centers. These cost centers were grouped into the following five functional areas: Executive, Administration, Engineering & Facilities, Bus Operations, and Rail Operations. In addition, two other cost centers were combined in the model and categorized as Indirect. The table below presents the grouping of Metro Transit Cost Centers used in the Gateway Corridor cost model. TABLE A-1 Grouping of Metro Transit Cost Centers Division/Department Function Grouping Department # Department Name 1. Executive Internal Audit Internal Audit Executive Executive/Office of Gen. Mgr AGM/Admin Grants Business Development Tax Base Admin AGM Bus Ops Workforce Diversity Police/Security Patrol Services Police Admin & Investig Police Training Safety Safety Facility & Asset Security Services 2. Administration Customer Relations Customer Relations Transit Information Center Transit Info. Center/Schedule Dist. Marketing Mktg., Mcs., Grfaphics & Mailroom Service Development Route & System Planning Service Analysis Service Scheduling Service Data Collection Finance Finance Admin Revenue Admin. OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY & RESULTS PAGE A-1

18 TABLE A-1 Grouping of Metro Transit Cost Centers Division/Department Function Grouping Department # Department Name Budget Accounts Payable & Receivable Revenue/Ridership Analysis Sales Operations Revenue Collection Financial Reporting Money Counting Farebox Repair Payroll Central Stores Purchasing Purchasing Human Resources Human Resources Admin Staffing & Compensation Information Services Information Services 3. Engineering & Facilities Eng. & Fac. Admn Eng. & Fac. Admin. System Facilities Engineer System Facilities Engineer Garage Bldg. Maint Nicollet Bldg. Maint./Janitors Ruter Bldg. Maint./Janitors South Bldg. Maint./Janitors East Metro Bldg. Maint./Janitors Janitorial/Bldg. Maint. Floaters Other Facilities Maintenance Public Facilities Maint th Garage bldg. Maint./Janitors th Office Bldg. Maint./Janitors Policy Bldg. Maint./Janitors OSC (M&M) Bldg. Maint./Janitors Control Ctr. Bldg. Maint./Janitors Fac. Landscaping & Phone Admin Facilities Landscaping/Phone Admin. PAGE A-2 OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY REPORT

19 TABLE A-1 Grouping of Metro Transit Cost Centers Function Division/Department Grouping Department # Department Name 4. Bus Operations Bus Transp. Admin Bus Transp. Admin. Bus Transportation Operating Division (Garages) Nicollet Bus Transp Ruter Bus Transp Heywood Bus Transp South Bus Transp East Metro Bus Transp. District Street Supervision District Street Supervision Transit Control Center Transit Control Center Operator Instruct. & Dev Operator Instruction & Dev. Ctr. Bus Maintenance Parts Warranty Admin Bus Maint. Parts Warranty Admin. Maintenance Garage Divisions Nicollet Bus Maint Ruter Bus Maint Heywood Bus Maint South Bus Maint East Metro Bus Maint. Non-Rev. Vehicles Non-revenue vehicles Heavy Maint. Functions Unit Overhaul Brake Shop Body/Paint Shop Electronics Shop Risk Management Risk Mgmt. Admin. & Gen. Liability Workers Compensation 5. Rail Operations AGM Rail Operations AGM-Rail Operations Rail Transp. Admin Transp. Admin. of Rail Ops. Rail Operators Transp. Rail Operators HLRT Vehicle Maint HLRT Vehicle Maint. HLRT System Maintenance HLRT System Maint. Stores Stores Rail Ops. Rail Facility Maint. Admin Fac. Maint. Admin. of Rail Ops. Janitors Janitors Rail Ops OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY & RESULTS PAGE A-3

20 TABLE A-1 Grouping of Metro Transit Cost Centers Division/Department Function Grouping Department # Department Name Indirect Metro Transit Agency Indirect Services PAGE A-4 OPERATING AND MAINTENANCE COST ESTIMATING METHODOLOGY REPORT

Fixed Guideway Transit Overview

Fixed Guideway Transit Overview Fixed Guideway Transit Overview March 13, 2017 House Ways and Means Committee Metropolitan Council Role in Transportation Planning 2 Serves as the region s federally required Metropolitan Planning Organization

More information

Transportation Committee Meeting date: July 24, 2017 For the Metropolitan Council meeting of July 26, 2017

Transportation Committee Meeting date: July 24, 2017 For the Metropolitan Council meeting of July 26, 2017 Business Item No. 2017159 SW JT Transportation Committee Meeting date: July 24, 2017 For the Metropolitan Council meeting of July 26, 2017 Subject: Authorization to Amend the 2017 Unified Budget District(s),

More information

Transportation Committee Meeting date: January 23, 2017 For the Metropolitan Council meeting of February 8, 2017

Transportation Committee Meeting date: January 23, 2017 For the Metropolitan Council meeting of February 8, 2017 Business Item No. 201735 JT Transportation Committee Meeting date: January 23, 2017 For the Metropolitan Council meeting of February 8, 2017 Subject: 2017 Unified Budget Amendment District(s), Member(s):

More information

Metropolitan Council Budget Overview: State Fiscal Year

Metropolitan Council Budget Overview: State Fiscal Year February 1, 2017 Metropolitan Council Budget Overview: State Fiscal Year 2018-2019 Presentation to the Senate Transportation Finance and Policy Committee Transportation for a growing region 2 Regional

More information

Management Committee Meeting date: March 8, 2017 For the Metropolitan Council meeting of March 22, 2017

Management Committee Meeting date: March 8, 2017 For the Metropolitan Council meeting of March 22, 2017 Business Item No. 2017-42 JT Management Committee Meeting date: March 8, 2017 For the Metropolitan Council meeting of March 22, 2017 Subject: 2017 Unified Budget Amendment Carryforward Amendment District(s),

More information

10 Financial Analysis

10 Financial Analysis 10 Financial Analysis This chapter summarizes the financial analysis for the No-Build Alternative and the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project. This chapter also describes

More information

Washington Metropolitan Area Transit Authority Metro Budget Overview

Washington Metropolitan Area Transit Authority Metro Budget Overview Washington Metropolitan Area Transit Authority Metro Budget Overview February 2011 Metro 10,877 Employees (10,974 budgeted) 1,491 Buses 588 Escalators and 237 Elevators 106 Miles of Track 92 Traction Power

More information

Guideway Status Report

Guideway Status Report Guideway Status Report November 2017 2017 Guideway Status Report 1 Prepared by: The Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-296-3000

More information

Transportation Committee

Transportation Committee Business Item: 201880 JT Transportation Committee Meeting date: April 9, 2018 For the Metropolitan Council meeting of April 25, 2018 Subject: 2018 Budget Amendment 1 st Quarter District(s), Member(s):

More information

8.0 FINANCIAL ANALYSIS

8.0 FINANCIAL ANALYSIS Chapter 8 Financial Analysis 8.0 FINANCIAL ANALYSIS This chapter presents a summary of the financial analysis for the Central Corridor Light Rail Transit (LRT) Project, a description of the Project Sponsor

More information

8. FINANCIAL ANALYSIS

8. FINANCIAL ANALYSIS 8. FINANCIAL ANALYSIS This chapter presents the financial analysis conducted for the Locally Preferred Alternative (LPA) selected by the Metropolitan Transit Authority of Harris County (METRO) for the.

More information

Mass Transit Return on Investment

Mass Transit Return on Investment Mass Transit Return on Investment Twin Cities Case Study presented to presented to: ITED 2014 presented by by: Cambridge Systematics, Inc. Paula Dowell, Ph.D. Cambridge Systematics, Inc. April 2014 2030

More information

Chapter 3: Regional Transportation Finance

Chapter 3: Regional Transportation Finance Chapter 3: Regional Transportation Finance This chapter examines the sources of funding for transportation investments in the coming years. It describes recent legislative actions that have changed the

More information

Transit Asset Management Initial Performance Targets

Transit Asset Management Initial Performance Targets Item #7 TPB Technical Committee January 6, 2017 Transit Asset Management Initial Performance Targets January 6, 2017 Background Federal TAM Law MAP-21 required that every transit operator receiving federal

More information

Transportation Finance Overview. Presentation Contents

Transportation Finance Overview. Presentation Contents Transportation Finance Overview Matt Burress House Research Department matt.burress@house.mn Andy Lee House Fiscal Analysis andrew.lee@house.mn January 5 th & 10 th, 2017 Presentation Contents 2 Part 1:

More information

Amend the 2010 Authorized Capital Program (multi-year authorization) by adding spending authority as follows:

Amend the 2010 Authorized Capital Program (multi-year authorization) by adding spending authority as follows: M Management Committee Community Development Comm. January 19, 2010 (2010-36) Transportation Committee March 8, 2010 Metropolitan Council: March 24, 2010 Meeting date: March 24, 2010 ADVISORY INFORMATION

More information

Honolulu High-Capacity Transit Corridor Project Alternatives Analysis

Honolulu High-Capacity Transit Corridor Project Alternatives Analysis Alternatives Analysis Financial Feasibility Report November 30, 2006 Prepared for: City and County of Honolulu Prepared by: PB Consult Inc. Under Subcontract to: Parsons Brinckerhoff Quade & Douglas, Inc.

More information

Chapter 4: Regional Transportation Finance

Chapter 4: Regional Transportation Finance 4.1 Chapter 4: Regional Transportation Finance 2040 4.2 CONTENTS Chapter 4: Transportation Finance Overview 4.3 Two Funding Scenarios 4.4 Current Revenue Scenario Assumptions 4.5 State Highway Revenues

More information

Chapter 9 Financial Considerations. 9.1 Introduction

Chapter 9 Financial Considerations. 9.1 Introduction 9.1 Introduction Chapter 9 This chapter presents anticipated costs, revenues, and funding for the NEPA BART Extension Alternative. A summary of VTA s financial plan for the BART Extension Alternative is

More information

Overview of Minnesota Highway and Transit Finance. Metropolitan Council Transportation Committee June 22, 2015 and July 13, 2015

Overview of Minnesota Highway and Transit Finance. Metropolitan Council Transportation Committee June 22, 2015 and July 13, 2015 Overview of Minnesota Highway and Transit Finance Metropolitan Council Transportation Committee June 22, 2015 and July 13, 2015 Today s topics MN and Metro Area transportation revenues and expenditures

More information

Program Evaluation and Audit COUNTY CONTRACTOR ADA COST REVIEW DARTS AND SCOTT COUNTY

Program Evaluation and Audit COUNTY CONTRACTOR ADA COST REVIEW DARTS AND SCOTT COUNTY Program Evaluation and Audit COUNTY CONTRACTOR ADA COST REVIEW DARTS AND SCOTT COUNTY October 27, 2006 Background INTRODUCTION The Metropolitan Council contracts with four County governments (Anoka, Dakota,

More information

FY2018 Third Quarter Financial Update

FY2018 Third Quarter Financial Update Finance and Committee Information Item IV-A May 10, 2018 Third Quarter Financial Update Page 30 of 53 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

REGIONAL TRANSPORTATION DISTRICT, COLORADO

REGIONAL TRANSPORTATION DISTRICT, COLORADO REGIONAL TRANSPORTATION DISTRICT, COLORADO Series 2004 Lease RTD Active Fleet of the District Fiscal Year Ended December 31, 2013 Fixed Route Bus Fleet Number RTD Owned Fixed Route Buses 40' Transit Coaches

More information

Metropolitan Council 2013 Operating Budget and Capital Program

Metropolitan Council 2013 Operating Budget and Capital Program Metropolitan Council 2013 Operating Budget and Capital Program Legislative Commission on Metropolitan Government December 17, 2012 Changes from Public Comment Drafts 2 2013 Unified Operating Budget ($1

More information

REGIONAL TRANSPORTATION DISTRICT, COLORADO AS OF DECEMBER 31, 2015

REGIONAL TRANSPORTATION DISTRICT, COLORADO AS OF DECEMBER 31, 2015 AS OF DECEMBER 31, RTD Active Fleet of the District Fixed Route Bus Fleet: Number RTD Owned- Fixed Route Buses 40' Transit Coaches 620 Articulated Buses 110 Intercity Coaches 175 Mall Shuttles 37 30' Transit

More information

CHAPTER 9 FINANCIAL CONSIDERATIONS

CHAPTER 9 FINANCIAL CONSIDERATIONS CHAPTER 9 FINANCIAL CONSIDERATIONS 9.1 INTRODUCTION This chapter presents anticipated costs, revenues, and funding for the Berryessa Extension Project (BEP) Alternative and the Silicon Valley Rapid Transit

More information

MEMORANDUM. Santa Clara Valley Transportation Authority Board of Directors. Michael T. Burns General Manager. DATE: August 4, 2008

MEMORANDUM. Santa Clara Valley Transportation Authority Board of Directors. Michael T. Burns General Manager. DATE: August 4, 2008 MEMORANDUM TO: FROM: Santa Clara Valley Transportation Authority Board of Directors Michael T. Burns General Manager DATE: August 4, 2008 SUBJECT: BART Operating Subsidy This memorandum summarizes and

More information

FY2017 Year-End Financial Update

FY2017 Year-End Financial Update Finance Committee Information Item III-A September 14, 2017 FY2017 Year-End Financial Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda

Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda Northern Virginia s economic growth and global competitiveness are directly tied to the region s transit network. Transit

More information

Travel Forecasting for Corridor Alternatives Analysis

Travel Forecasting for Corridor Alternatives Analysis Travel Forecasting for Corridor Alternatives Analysis Purple Line Functional Master Plan Advisory Group January 22, 2008 1 Purpose of Travel Forecasting Problem Definition Market Analysis Current Future

More information

JP Morgan Public Finance Transportation Utility Conference

JP Morgan Public Finance Transportation Utility Conference JP Morgan Public Finance Transportation Utility Conference April 18-19, 2018 Presented by: Brenden Morgan Sr. Manager of Debt & Investments Table of Contents I. Overview of the Region and RTD II. Updates

More information

FY17 FY16 Valley Metro RPTA Sources of Funds FY17 vs FY16

FY17 FY16 Valley Metro RPTA Sources of Funds FY17 vs FY16 FY17 ADOPTED ANNUAL OPERATING AND CAPITAL BUDGET Valley Metro Regional Public Transportation Authority (RPTA) provides public transportation services for Maricopa County located in the metro Phoenix, Arizona.

More information

Transit Subsidy. Mission Statement. Mandates

Transit Subsidy. Mission Statement. Mandates Mission Statement The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the Cities of Manassas,

More information

CHAPTER 7: Financial Plan

CHAPTER 7: Financial Plan CHAPTER 7: Financial Plan Report Prepared by: Contents 7 FINANCIAL PLAN... 7-1 7.1 Introduction... 7-1 7.2 Assumptions... 7-1 7.2.1 Operating Revenue Assumptions... 7-2 7.2.2 Operating Cost Assumptions...

More information

METRO. Fiscal Year Monthly Performance Report. Revenue Expense Ridership Performance. November 2018 (Third Quarter Fiscal Year-to Date)

METRO. Fiscal Year Monthly Performance Report. Revenue Expense Ridership Performance. November 2018 (Third Quarter Fiscal Year-to Date) METRO Fiscal Year 2019 Monthly Performance Report Revenue Expense Ridership Performance (Third Quarter Fiscal Year-to Date) 12/12/2018 Table of Contents Section A Section B Section C Section D Section

More information

VALLEY METRO RPTA FY18 Budget EXECUTIVE SUMMARY

VALLEY METRO RPTA FY18 Budget EXECUTIVE SUMMARY VALLEY METRO RPTA FY18 Budget EXECUTIVE SUMMARY FY18 ADOPTED ANNUAL OPERATING AND CAPITAL BUDGET Valley Metro Regional Public Transportation Authority (RPTA) provides public transportation services for

More information

Disclaimer. This online document has been formatted for two-sided printing.

Disclaimer. This online document has been formatted for two-sided printing. Disclaimer This Comprehensive Annual Financial Report (CAFR) of the Hennepin County Regional Railroad Authority (HCRRA) contained on the County's web pages is historical information as of December 31,

More information

Executive Summary - Fiscal Year 2016 Valley Metro Rail Preliminary Annual Operating and Capital Budget

Executive Summary - Fiscal Year 2016 Valley Metro Rail Preliminary Annual Operating and Capital Budget Executive Summary - Fiscal Year 2016 Valley Metro Rail Preliminary Annual Operating and Capital Budget Valley Metro Rail, Inc. (VMR) is a public non-profit corporation whose members are the cities of Chandler,

More information

FY06 Operating Budget. FY2006 Proposed Operating Budget. Final Summary for Board Referral

FY06 Operating Budget. FY2006 Proposed Operating Budget. Final Summary for Board Referral FY2006 Proposed Operating Budget Final Summary for Board Referral 1 Operating Statements Subsidy nearly $10M lower than December proposal Dec Base Other Subtot Mar Prop$ Adj Adj Changes Prop$ Revenues

More information

Transit Subsidy. Mission Statement. Mandates

Transit Subsidy. Mission Statement. Mandates Mission Statement The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the Cities of Manassas,

More information

METRO. Fiscal Year Monthly Performance Report. Revenue Expense Ridership Performance. May 2018 (Second Quarter Fiscal Year-to Date)

METRO. Fiscal Year Monthly Performance Report. Revenue Expense Ridership Performance. May 2018 (Second Quarter Fiscal Year-to Date) METRO Fiscal Year 2018 Monthly Performance Report Revenue Expense Ridership Performance (Second Quarter Fiscal Year-to Date) 6/12/2018 Table of Contents Section A Section B Section C Section D Section

More information

Disclaimer. This online document has been formatted for two-sided printing.

Disclaimer. This online document has been formatted for two-sided printing. Disclaimer This Comprehensive Annual Financial Report (CAFR) of the Hennepin County Regional Railroad Authority (HCRRA) contained on the County's web pages is historical information as of December 31,

More information

Providers of Public Transportation Individual Targets

Providers of Public Transportation Individual Targets APPENDIX Providers of Public Transportation Individual Targets The following letters, presentation slides, and other data were provided by the individual reporting entities, and are posted on the MWCOG

More information

4 Cost Estimation Assumptions

4 Cost Estimation Assumptions 4 Cost Estimation Assumptions The Proposed Action would include the relocation of the existing commuter rail lines; construction of approximately four miles of new light rail track and systems; relocation

More information

Report of Independent Accountants on Applying Agreed-Upon Procedures

Report of Independent Accountants on Applying Agreed-Upon Procedures KPMG LLP 2001 M Street, NW Washington, DC 20036 Report of Independent Accountants on Applying Agreed-Upon Procedures Board of Directors Washington Metropolitan Area Transit Authority: We have performed

More information

TSCC Budget Review TriMet

TSCC Budget Review TriMet TSCC Budget Review 2017-18 TriMet 1. Introduction to the District: The Tri-County Metropolitan Transportation District (TriMet) boundary covers about 575 square miles of the urban portions of Multnomah,

More information

METRO. Fiscal Year 2014 Monthly Board Report. May 2014

METRO. Fiscal Year 2014 Monthly Board Report. May 2014 METRO Fiscal Year 2014 Monthly Board Report Revenue Expense Ridership Performance 7/11/2014 Table of Contents Section A Section B Section C Section D Section E Section F Section G Section H Section I Section

More information

To: Administration and Finance Committee Date: February 3, SUBJECT: Independent Auditor s Report on National Transit Database Report Form FFA-10

To: Administration and Finance Committee Date: February 3, SUBJECT: Independent Auditor s Report on National Transit Database Report Form FFA-10 To: Administration and Finance Committee Date: February 3, 2016 From: Erick Cheung Reviewed By: Director of Finance SUBJECT: Independent Auditor s Report on National Transit Database Report Form FFA-10

More information

METROPOLITAN COUNCIL SUMMARY BUDGET-BY FUND TYPE TRANSPORTATION DIVISION 2007

METROPOLITAN COUNCIL SUMMARY BUDGET-BY FUND TYPE TRANSPORTATION DIVISION 2007 METROPOLITAN COUNCIL SUMMARY BUDGET-BY FUND TYPE TRANSPORTATION DIVISION 2007 Governmental Fund Types Special Revenue Funds Proprietary Fund Types Enterprise Fund Transportatio n Planning & TDM Activity

More information

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s):

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s): METRO METRO METRO 2017 2026 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit

More information

FISCAL YEAR 2014 BUSINESS PLAN & BUDGET

FISCAL YEAR 2014 BUSINESS PLAN & BUDGET M E TROPOLITAN TRANS IT AU THO RITY O F HARRIS C O U N TY, TEX AS FISCAL YEAR 2014 BUSINESS PLAN & BUDGET GROWING RIDERSHIP FINAL 09/27/13 1:38 PM September 12, 2013 Gilbert Andrew Garcia Chairman of the

More information

Management Committee Meeting date: October 25, 2017 For the Metropolitan Council meeting of November 8, 2017

Management Committee Meeting date: October 25, 2017 For the Metropolitan Council meeting of November 8, 2017 Business Item No. 2017-214 JT Management Committee Meeting date: October 25, 2017 For the Metropolitan Council meeting of November 8, 2017 Subject: 2017 Unified Budget Amendment Fourth Quarter Amendment

More information

Responses to Committee Requests

Responses to Committee Requests Finance, Administration and Oversight Committee Information Item III-E April 10, 2008 Responses to Committee Requests Washington Metropolitan Area Transportation Authority Board Action/Information Summary

More information

FY 2007 Cost Allocation PMB O&M Cost Full METRO Solutions 2030

FY 2007 Cost Allocation PMB O&M Cost Full METRO Solutions 2030 Appendix H FY 2007 Cost Allocation PMB O&M Cost Full METRO Solutions 2030 METROPOLITAN TRANSIT AUTHORITY COST ALLOCATION MODEL FY 2007 Structure May 1, 2008 I. CONCEPT The cost allocation model is designed

More information

Management Committee Meeting date: April 11, 2018 For the Metropolitan Council meeting of April 25, 2018

Management Committee Meeting date: April 11, 2018 For the Metropolitan Council meeting of April 25, 2018 Business Item: 2018-80 JT Management Committee Meeting date: April 11, 2018 For the Metropolitan Council meeting of April 25, 2018 Subject: 2018 Budget Amendment 1 st Quarter District(s), Member(s): All

More information

Financial Report - FY 2017 Year to Date May 31, 2017

Financial Report - FY 2017 Year to Date May 31, 2017 Financial Report - FY 2017 Year to Date July 19, 2017 1 Major Highlights Revenue Sales tax remittances received through YTD April 2017 are 4.2% higher than YTD April 2016 Plaza Saltillo lease income budgeted

More information

2.0 PROJECT FINANCIAL PLAN...

2.0 PROJECT FINANCIAL PLAN... Table of Contents Table of Contents 1.0 INTRODUCTION... 1-1 1.1 Purpose of Financial Plan... 1-1 1.2 Key Changes Since 2010 Financial Plan... 1-2 1.3 Project Description... 1-4 1.4 Project Sponsor: Los

More information

METROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY, TEXAS. Independent Accountants Report on Applying Agreed-Upon Procedures

METROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY, TEXAS. Independent Accountants Report on Applying Agreed-Upon Procedures METROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY, TEXAS Independent Accountants Report on Applying Agreed-Upon Procedures Year ended September 30, 2017 KPMG LLP 811 Main Street Houston, TX 77002 Independent

More information

Disclaimer. This online document has been formatted for two-sided printing.

Disclaimer. This online document has been formatted for two-sided printing. Disclaimer This Comprehensive Annual Financial Report (CAFR) of the Hennepin County Regional Railroad Authority (HCRRA) contained on the County's web pages is historical information as of December 31,

More information

CHAPTER 6: COST ESTIMATES

CHAPTER 6: COST ESTIMATES CHAPTER 6: COST ESTIMATES 115 116 UNION STATION GEORGETOWN: ALTERNATIVES ANALYSIS for PREMIUM TRANSIT SERVICE The Recommended Alternative could be designed and constructed under a number of financing options.

More information

VALLEY METRO RAIL FY18 Budget EXECUTIVE SUMMARY

VALLEY METRO RAIL FY18 Budget EXECUTIVE SUMMARY VALLEY METRO RAIL FY18 Budget EXECUTIVE SUMMARY FY18 ADOPTED ANNUAL OPERATING AND CAPITAL BUDGET Valley Metro Rail, Inc. (VMR) is a public non-profit corporation whose members are the cities of Chandler,

More information

Engineering & Project Management Division

Engineering & Project Management Division Division Summary Michael Schipper, Deputy General Manager The Engineering and Project Management Division is responsible for RTA s planning, real estate, and capital project design and construction administrative

More information

Transportation Committee Meeting date: October 23, 2017 For the Metropolitan Council meeting of November 8, 2017

Transportation Committee Meeting date: October 23, 2017 For the Metropolitan Council meeting of November 8, 2017 Business Item No. 20172014 JT Transportation Committee Meeting date: October 23, 2017 For the Metropolitan Council meeting of November 8, 2017 Subject: Authorization to Amend the 2017 Unified Budget District(s),

More information

University Link LRT Extension

University Link LRT Extension (November 2007) The Central Puget Sound Regional Transit Authority, commonly known as Sound Transit, is proposing to implement an extension of the Central Link light rail transit (LRT) Initial Segment

More information

CHAPTER 2 BACKGROUND. Update of Previous Planning Work. Plan Development Process. Public Involvement and Review Process

CHAPTER 2 BACKGROUND. Update of Previous Planning Work. Plan Development Process. Public Involvement and Review Process CHAPTER 2 BACKGROUND What Is the 2030 TSP? Update of Previous Planning Work Plan Development Process Public Involvement and Review Process Hennepin County Transportation Systems Plan (HC-TSP) Chapter 2

More information

Columbia Pike Transit Initiative: Comparative Return on Investment Study

Columbia Pike Transit Initiative: Comparative Return on Investment Study Columbia Pike Transit Initiative: Comparative Return on Investment Study Presentation to the Arlington County Housing Commission May 1, 2014 Arlington County retained HR&A to update the 2012 Return on

More information

THE. ATLANTA REGION S Transit Programs Of Projects

THE. ATLANTA REGION S Transit Programs Of Projects THE ATLANTA REGION S Transit Programs Of Projects Table of Contents Introduction... 1 Transit Routes... 2 Fixing America s Surface Transportation Act (FAST Act)... 3 Transit Operators and Recipients of

More information

TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012)

TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012) TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012) Summary Description Proposed Project: Commuter Rail 37.6 Miles, 14 Stations (12 new, two existing) Total Capital Cost ($YOE):

More information

SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement

SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement Quarterly Report No. 9 (June 1, 2018 August 31, 2018) Prepared by: Minnesota Department of Transportation

More information

SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement

SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement Quarterly Report No. 6 (September 1 November 30, 2017) Prepared by: Minnesota Department of Transportation

More information

CHAPTER 9 FINANCIAL CONSIDERATIONS

CHAPTER 9 FINANCIAL CONSIDERATIONS CHAPTER 9 FINANCIAL CONSIDERATIONS 9.1 INTRODUCTION This chapter presents anticipated costs, revenues, and funding for the BEP and the SVRTP. A summary evaluation of VTA s financial plan for the proposed

More information

That the Metropolitan Council authorize the amendment of the 2013 Unified Capital Program as indicated and in accordance with the attached tables.

That the Metropolitan Council authorize the amendment of the 2013 Unified Capital Program as indicated and in accordance with the attached tables. Management Committee Business Item No. SW 2013-80 Meeting date: April 10, 2013 For the Metropolitan Council meeting of April 10, 2013 Subject: Authorization to Amend the 2013 Unified Capital Program District(s),

More information

THE. ATLANTA REGION S Transit Programs Of Projects

THE. ATLANTA REGION S Transit Programs Of Projects THE ATLANTA REGION S Transit Programs Of Projects Table of Contents Introduction... 1 Transit Routes... 2 Fixing America s Surface Transportation Act (FAST Act)... 3 Transit Operators and Recipients of

More information

Total Operating Activities for FY17 are $56.9 million, an increase of $5.1M or 9.8% from FY16.

Total Operating Activities for FY17 are $56.9 million, an increase of $5.1M or 9.8% from FY16. FY17 ADOPTED ANNUAL OPERATING AND CAPITAL BUDGET Valley Metro Rail, Inc. (VMR) is a public non-profit corporation whose members are the cities of Chandler, Glendale, Mesa, Phoenix, and Tempe. VMR plans,

More information

Capital Cost Estimation Methodology

Capital Cost Estimation Methodology West Broadway Transit Study Capital Cost Estimation Methodology 7/6/2015 Prepared by the SRF Consulting Group Team for Capital Cost Estimation Methodology Page i Introduction... 1 1. Capital Costs... 1

More information

Central Puget Sound Regional Transit Authority

Central Puget Sound Regional Transit Authority Central Puget Sound Regional Transit Authority Single Audit Reports for the Year Ended December 31, 2013 TABLE OF CONTENTS Audited Financial Statements Management s Discussion and Analysis...1 Independent

More information

METRO. Fiscal Year Monthly Performance Report. Revenue Expense Ridership Performance. February 2018 (First Quarter Fiscal Year-to Date)

METRO. Fiscal Year Monthly Performance Report. Revenue Expense Ridership Performance. February 2018 (First Quarter Fiscal Year-to Date) METRO Fiscal Year 2018 Monthly Performance Report Revenue Expense Ridership Performance (First Quarter Fiscal Year-to Date) 3/12/2018 Table of Contents Section A Section B Section C Section D Section E

More information

Benefits of Long-Range Capital Planning

Benefits of Long-Range Capital Planning Benefits of Long-Range Capital Planning Presentation at the Transportation Research Board 9 th National Conference on Transportation Asset Management Stephen A. Berrang Director, Capital Program Management

More information

Memphis Urban Area- Metropolitan Planning Organization Transportation Policy Board Meeting. August 23, 2018

Memphis Urban Area- Metropolitan Planning Organization Transportation Policy Board Meeting. August 23, 2018 Memphis Urban Area- Metropolitan Planning Organization Transportation Policy Board Meeting August 23, 2018. 1 Transit Asset Management (TAM) is a business model that prioritizes funding based on the condition

More information

METRO MONTHLY BOARD REPORT

METRO MONTHLY BOARD REPORT METRO Revenue Expenses Service Performance Fiscal Year FY2011 Table of Contents Section A Section B Section C Section D Section E Section F Section G Section H Summary Sales Tax Revenue Fare Revenue Operating

More information

STATE OF MINNESOTA Office of the State Auditor

STATE OF MINNESOTA Office of the State Auditor STATE OF MINNESOTA Office of the State Auditor Rebecca Otto State Auditor METROPOLITAN COUNCIL METRO MOBILITY TWIN CITIES AREA, MINNESOTA AGREED-UPON PROCEDURES YEAR ENDED DECEMBER 31, 2016 Description

More information

METRO BLUE LINE EXTENSION LIGHT RAIL TRANSIT PROJECT Section 106 Memorandum of Agreement. Quarterly Report No. 1 (August 24 November 30, 2016)

METRO BLUE LINE EXTENSION LIGHT RAIL TRANSIT PROJECT Section 106 Memorandum of Agreement. Quarterly Report No. 1 (August 24 November 30, 2016) METRO BLUE LINE EXTENSION LIGHT RAIL TRANSIT PROJECT Section 106 Memorandum of Agreement Quarterly Report No. 1 (August 24 November 30, 2016) Prepared by: Minnesota Department of Transportation 395 John

More information

Financial Report Fiscal Year 2018

Financial Report Fiscal Year 2018 Financial Report Fiscal Year 2018 Year to Date March 31, 2018 Presented on May 21, 2018 1 Major Highlights Revenue FY2018 sales tax revenue budgeted at 2.5% growth over FY2017 Sales tax remittances received

More information

Arlington County, Virginia

Arlington County, Virginia Arlington County, Virginia METRO METRO 2015 2024 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed

More information

TABLE OF CONTENTS. Page. Page

TABLE OF CONTENTS. Page. Page TABLE OF CONTENTS Page Overview Board of Directors... Overview-1 TriMet Officials... Overview-1 Budget Message... Overview-2 2017-2018 TriMet Organization Chart... Overview-10 Financial Summary General

More information

Priority: Increase investment in regional transit. William Schroeer

Priority: Increase investment in regional transit. William Schroeer Priority: Increase investment in regional transit William Schroeer 1 Would the investment be worth it here? Regional Transit System: Return on Investment Assessment 2 Itasca asked 3 questions about regional

More information

Financial Report Fiscal Year 2018

Financial Report Fiscal Year 2018 Financial Report Fiscal Year 2018 Year to Date July 31, 2018 Presented on September 17, 2018 1 Major Highlights Revenue FY2018 sales tax revenue budgeted at 2.5% growth over FY2017 Sales tax remittances

More information

MODULE 1: FUNDING TRANSIT IN TEXAS MODULE 1 1

MODULE 1: FUNDING TRANSIT IN TEXAS MODULE 1 1 MODULE 1: FUNDING TRANSIT IN TEXAS MODULE 1 1 LEARNING OBJECTIVES By the end of this module, you should be able to: Explain the categories of public transportation systems in Texas. Recall the state laws

More information

Technical Memorandum #1: Baseline Conditions. This section provides an overview of the main services operated and assets maintained by PRTC.

Technical Memorandum #1: Baseline Conditions. This section provides an overview of the main services operated and assets maintained by PRTC. Technical Memorandum #1: Baseline Conditions INTRODUCTION This Baseline Conditions Technical Memorandum provides a summary of the key services provided by the Potomac and Rappahannock Transportation Commission

More information

Whatcom Transportation Authority. Annual Budget. WTA Draft Budget 1

Whatcom Transportation Authority. Annual Budget. WTA Draft Budget 1 Whatcom Transportation Authority Annual Budget 2010 WTA Draft Budget 1 Table of Contents Executive Memorandum... 1 WTA Mission... 2 WTA Vision Destination 2010... 3 Key Objectives... 4 Budget Initiatives...

More information

METRO. Fiscal Year 2013 Monthly Board Report. January 2013

METRO. Fiscal Year 2013 Monthly Board Report. January 2013 METRO Fiscal Year 2013 Monthly Board Report Revenue Expense Ridership Performance 2/14/2013 Table of Contents Section A Section B Section C Section D Section E Section F Section G Section H Section I Section

More information

METRO. Fiscal Year 2012 Monthly Board Report. September 2012 (Fourth Quarter Fiscal Year-to-Date)

METRO. Fiscal Year 2012 Monthly Board Report. September 2012 (Fourth Quarter Fiscal Year-to-Date) METRO Fiscal Year 2012 Monthly Board Report Revenue Expense Ridership Performance (Fourth Quarter Fiscal Year-to-Date) This report is based on a preliminary closing of the year-end financials for FY2012

More information

2017 RISK ASSESSMENT AND PROGRAM EVALUATION AND AUDIT PLAN

2017 RISK ASSESSMENT AND PROGRAM EVALUATION AND AUDIT PLAN 2017 RISK ASSESSMENT AND PROGRAM EVALUATION AND AUDIT PLAN Requirements of the Standards In the Institute of Internal Auditors Standards for the Professional Practice of Internal Auditing, standard 2010

More information

METRO. Fiscal Year 2015 Monthly Board Report. February 2015

METRO. Fiscal Year 2015 Monthly Board Report. February 2015 METRO Fiscal Year 2015 Monthly Board Report Revenue Expense Ridership Performance 4/2/2015 Table of Contents Section A Section B Section C Section D Section E Section F Section G Section H Section I Section

More information

Disclaimer. This online document has been formatted for two-sided printing.

Disclaimer. This online document has been formatted for two-sided printing. Disclaimer This Comprehensive Annual Financial Report (CAFR) of the Hennepin County Regional Railroad Authority (HCRRA) contained on the County's web pages is historical information as of December 31,

More information

MARYLAND DEPARTMENT OF TRANSPORTATION MARYLAND TRANSIT ADMINISTRATION

MARYLAND DEPARTMENT OF TRANSPORTATION MARYLAND TRANSIT ADMINISTRATION MARYLAND DEPARTMENT OF TRANSPORTATION MARYLAND TRANSIT ADMINISTRATION Report of Independent Public Accountants on Applying Agreed-Upon Procedures for Federal Funding Allocation Data (IAS-FFA) For the Year

More information

METRO. Fiscal Year 2013 Monthly Board Report. November 2012

METRO. Fiscal Year 2013 Monthly Board Report. November 2012 METRO Fiscal Year 2013 Monthly Board Report Revenue Expense Ridership Performance 12/13/2012 Table of Contents Section A Section B Section C Section D Section E Section F Section G Section H Section I

More information

bg 2017 lacmta. Metro

bg 2017 lacmta. Metro Economic and Fiscal Impacts Report for the East San Fernando Valley Transit Corridor September 2015 Prepared by the U.S. Department of Transportation Federal Transit Administration and the Los Angeles

More information

Transit Subsidy. Mission Statement. Mandates

Transit Subsidy. Mission Statement. Mandates Mission Statement The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the Cities of Manassas,

More information

Regional Connector Transit Corridor Draft Environmental Impact Statement/ Draft Environmental Impact Report APPENDIX HH FINANCIAL ANALYSIS REPORT

Regional Connector Transit Corridor Draft Environmental Impact Statement/ Draft Environmental Impact Report APPENDIX HH FINANCIAL ANALYSIS REPORT Draft Environmental Impact Statement/ Draft Environmental Impact Report APPENDIX HH FINANCIAL ANALYSIS REPORT State Clearinghouse Number: 2009031043 April 2010 Prepared for Los Angeles County Metropolitan

More information