EXHIBIT A DONATIONS April 26, 2018

Size: px
Start display at page:

Download "EXHIBIT A DONATIONS April 26, 2018"

Transcription

1

2 EXHIBIT A DONATIONS April 26, Investors, Ltd. 2 AASA Holdings Humble The donor is donating the design and construction of a traffic signal from SH 99 at Imperial Promenade/Townsen Blvd into the Imperial Promenade development in Humble, County, Texas. All design and construction work will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $500,000. Bryan Brazos The donor is donating the design and construction of a raised median gore at SH 6 on-ramp on SH 6 northbound frontage road between SH 30 (Harvey Road) and FM 60 (University Drive) in College Station, Brazos County, Texas. All design and construction work will be provided by the donor, its consultant or its contractor. The estimated value of the donation is $28,000, which includes payment for all state direct costs associated with the review, oversight, and inspection of the work that is on the state right of way. $500,000 3/27/2018 $28,000 3/21/2018 April 26, 2018 Commission Meeting Page 1 Exhibit A - Donations

3 3 Badger Mining Corporation Odessa Winkler The donor is donating the design, construction and construction engineering inspections (CEI) of highway improvements to include addition of acceleration and deceleration lanes, improvements to surface drainage and the installation of small roadside warning signs along SH 18 in Winkler County, Texas. All design, construction, and CEI work will be provided by the donor, its consultant or its contractor. The donation includes a sum of $2,000 for the state's direct and indirect costs for reviewing proposed construction plans, specifications and estimates, and performing limited quality assurance inspection/testing and inspection of the work that is on the state right of way. The donor will be responsible for the state's costs, providing needed real estate (if applicable), acceptable design of highway improvements, roadway construction, construction materials, and CEI for both material testing and construction inspection. The estimated value of the donation is $2,000, Brazos Queen, Inc. Waco McLennan The donor is donating the design and construction of a reinforced concrete sidewalk, five feet in width and approximately 25 feet in length, within the IH 35 right of way west of the Brazos River in Waco, McLennan County, Texas. All design and construction work will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $1, Camillo Properties Ltd. The donor is donating the design and construction of a left turn lane from northbound SH 75 into the North Meadows development in Willis, County, Texas. All design and construction work will be provided by the donor, its is $120,000. $2,000,000 3/09/2018 $1,300 3/26/2018 $120,000 3/29/2018 April 26, 2018 Commission Meeting Page 2 Exhibit A - Donations

4 6 Clay Road 628 Development, L.P. 7 Formosa Plastics Corporation, Texas 8 Harmony Public Schools 9 Lake Park Pearland, Ltd. Yoakum Harris Jackson Fort Bend Brazoria The donor is donating the design and construction of an extension to an existing deceleration lane and right turn only driveway from the southbound frontage road of Grand Parkway into the donor's development in Katy, Harris County, Texas. All design and construction work will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $90,000. The donor is donating the design and construction of a left turn lane and temporary traffic signal at the driveway of the donor s facility on FM 1593 in Point Comfort, Jackson County, Texas for use during the plant s construction. The donor is also responsible for major maintenance (i.e., damaged components) of the traffic signal while in operation, and removal of the temporary traffic signal within one month after construction is completed. All design and construction will be provided by the donor, its is $750,000. The donor is donating the design and construction of a right turn lane from northbound FM 1876 into the donor's development in Sugarland, Fort Bend County, Texas. All design and construction work will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $60,000. The donor is donating the design and construction of a left turn lane from southbound FM 865 into the Lake Park development in Pearland, Brazoria County, Texas. All design and construction work will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $190,000. $90,000 3/27/2018 $750,000 4/03/2018 $60,000 3/09/2018 $190,000 3/09/2018 April 26, 2018 Commission Meeting Page 3 Exhibit A - Donations

5 10 McNay Art Museum 11 Poarch/Swinbank 12 Toll TX 13 Traff Data & Associates, Inc. San Antonio Bexar Brazoria The donor is donating the engineering for the intersection improvements at Austin Highway (Loop 368) and North New Braunfels Avenue in San Antonio, Bexar County, Texas. The improvements include: 1) adding a right turn deceleration lane on Austin Highway (Loop 368), 2) widening of the north leg of New Braunfels Avenue for two northbound lanes, 3) right turn deceleration lane on New Braunfels at McNay Driveway, 4) restriping northbound approach of New Braunfels at Austin Highway (Loop 368), and 5) signal modification and adjust the signal timing at Austin Highway (Loop 368) at N. New Braunfels Avenue. The engineering shall be provided by the donor, its consultant, or its contractor. The state will let and construct the project as part of a current project of Austin Highway (Loop 368). The estimated value of the donation is $150,000. The donor is donating the design and construction of a traffic signal and roadway modification and improvements from northbound and southbound FM 521 at Fenn Road into the donor's development in Alcola, Brazoria County, Texas. All design and construction work will be performed by the donor, its consultant or its contractor. The estimated value of the donation is $380,000. The donor is donating the design and construction of a deceleration lane from eastbound SH 99 into the Woodson's Reserve Development in Spring, County, Texas. All design and construction work will be provided by the donor, its is $50,000. The donor is donating the design and construction of a flashing signal from westbound US 59/ Interstate 69 frontage road into the donor's development in Splendora, County, Texas. All design and construction work will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $41,000. $150,000 4/03/2018 $380,000 4/03/2018 $50,000 3/23/2018 $41,000 4/03/2018 April 26, 2018 Commission Meeting Page 4 Exhibit A - Donations

6 14 Tristar/Parkside Harpers Preserve 15 Vanbrooke, Fort Bend The donor is donating the design and construction of a right turn deceleration lane from eastbound Highway 242 and a hooded left turn lane from westbound Highway 242 into the donor's development in Conroe, County, Texas. All design and construction work will be provided by the donor, its is $120,000. The donor is donating the design and construction of a northbound left turn lane and southbound right turn lane on FM 359 into the Vanbrooke development in, Fort Bend County, Texas. All design and construction work will be provided by the donor its is $470,000. [This donation replaces one previously acknowledged in November 2017 due to a correction in the estimated value from $620,000 to $470,000.] $120,000 3/27/2018 $470,000 4/03/2018 April 26, 2018 Commission Meeting Page 5 Exhibit A - Donations

7 EXHIBIT B ROW ACQUISITION BY DONATION April 26, Galveston County Drainage #2 Galveston Donation of acres of land from N of FM 517 to S of FM The property being donated will be used for drainage improvements associated with the widening of the adjacent frontage road for the subject property. VALUE ROW CSJ NO./Parcel No. $1, Parcel 330 DATE APPROVED 03/16/2018 April 26, 2018 Commission Meeting Page 1 Exhibit B ROW Donations

EXHIBIT A DONATIONS December 13, 2018

EXHIBIT A DONATIONS December 13, 2018 EXHIBIT A DONATIONS December 13, 2018 1. 59 Fuel Inc Houston 2. Community Health 1st Realty, LLC 3. D.R. Horton - Texas, Ltd. 4. HRS Operating, LLC Houston Houston Montgomery Harris Fort Bend The donor

More information

EXHIBIT A DONATIONS Cullen Blvd, An Individual Series of Forefunders Partners, LLC. Houston District

EXHIBIT A DONATIONS Cullen Blvd, An Individual Series of Forefunders Partners, LLC. Houston District EXHIBIT A DONATIONS NO. DONOR D/D/O COUNTY DESCRIPTION 1 9607 Cullen Blvd, An Individual Series of Forefunders Partners, LLC 2 Apache Corporation Houston District Harris The donor is donating the design

More information

30C VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts

30C VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts d TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 1 VARIOUS s Transportation Code, 201.206, authorizes the Texas Department of Transportation (department) to accept a donation in

More information

L.zu? V fl1i. VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts

L.zu? V fl1i. VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts Transportation Code, 201.206, authorizes the Texas Department of Transportation VARIOUS Counties MINUTE ORDER Page 1 of 1 VARIOUS s Number Passed Submitted and reviewed by: Recommended by: Minute Date

More information

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0 UTP November Update - Funding Adjustments Summary (Amounts in millions) District/Division//TMA Fiscal Year Adjusted Amount Post Public Meeting Adjustments Austin 3 SH 130 Concession FY $6,500,000 3 SH

More information

Grand Parkway Transportation Corporation M E M O R A N D U M

Grand Parkway Transportation Corporation M E M O R A N D U M Grand Parkway Transportation Corporation 125 East 11 th Street, Austin, Texas 78701 M E M O R A N D U M DATE: February 25, 2016 RE: Segments F-1, F-2 & G of Grand Parkway Project SUBSEQUENT EVENTS - Segments

More information

TEXAS TRANSPORTATION COMMISSION MEETING ATTACHED LISTS February 26, 2015 HIGHWAY MAINTENANCE AND BUILDING CONSTRUCTION CONTRACTS-STATE LET

TEXAS TRANSPORTATION COMMISSION MEETING ATTACHED LISTS February 26, 2015 HIGHWAY MAINTENANCE AND BUILDING CONSTRUCTION CONTRACTS-STATE LET TEXAS TRANSPORTATION COMMISSION MEETING ATTACHED LISTS February 26, 2015 HIGHWAY MAINTENANCE AND BUILDING CONSTRUCTION CONTRACTS-STATE LET DIST COUNTY NAME HIGHWAY NUMBER CONTROLLING PROJECT NO. LOW BID

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates. , Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...

More information

Year 2014 Engineer s Report regarding the Status of ownership, Working order and Condition of the Public Infrastructure.

Year 2014 Engineer s Report regarding the Status of ownership, Working order and Condition of the Public Infrastructure. Year 2014 Engineer s Report regarding the Status of ownership, Working order and Condition of the Public Infrastructure. Project: MEADOW PINES (AKA COBBLESTONE) PEMBROKE PINES, FL Prepared for: MEADOW

More information

Appendix D Total Project Cost and Year of Expenditure Breakdown

Appendix D Total Project Cost and Year of Expenditure Breakdown Total Project Cost and Year of Expenditure Breakdown p. D -1 Total Project Cost and Year of Expenditure Breakdown Financial Constraint Methodology using Total Project Cost and Year of Expenditure Dollars

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

How to Read the Project Modification Listings Roadway Section

How to Read the Project Modification Listings Roadway Section How to Read the Project Modification Listings Roadway Section The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation Improvement

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013 BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013 Total Uncommitted Funds FY 2013 A + B = C C + D = E E - F = G A B C D E F G Balance Carryover from FY 12 FY (includes all adjustments) Total Available Total Obligations

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM TIP FY 2006-2008 METROPOLITAN PLANNING ORGANIZATIONS - FY 2006 FEDERAL STATE LOCAL OTHER PART TOTAL FUNDING ESTIMATED COST BROWNSVILLE HARLINGEN-SAN BENITO

More information

How to Read the Project Modification Listings Roadway Section

How to Read the Project Modification Listings Roadway Section How to Read the Project Modification Listings Roadway Section The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation Improvement

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five DISTICT FIVE POJECT OVEVIE Florida s Turnpike Enterprise continues to make significant project investments in District Five. In FY 2017 and FY 2018, current Turnpike projects total over $419 million within

More information

The widening gap between home price and household

The widening gap between home price and household Still Affordable James P. Gaines and Clare Losey August 17, 2017 Publication 2176 The widening gap between home price and household income has recently sparked concerns over housing affordability. The

More information

Transportation Improvement Program

Transportation Improvement Program Houston-Galveston Area Council 2015-2018 Transportation Improvement Program AS ADOPTED May 23, 2014 2015-2018 Transportation Improvement Program () for the Houston-Galveston Transportation Management Area

More information

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis Attachment B Project Cost Estimates for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five DISTICT FIVE POJECT OVEVIE Florida s Turnpike Enterprise continues to make significant project investments in District Five. In FY 2017 and FY 2018, current Turnpike projects total over $419 million within

More information

How to Read the Project Modification Listings - Roadway Section

How to Read the Project Modification Listings - Roadway Section How to Read the Project Modification Listings - Roadway Section Sa m pl e The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation

More information

COUNTY OF BEXAR PUBLIC WORKS DEPARTMENT. 233 N. Pecos La Trinidad, Suite 420 San Antonio, Texas Main Fax

COUNTY OF BEXAR PUBLIC WORKS DEPARTMENT. 233 N. Pecos La Trinidad, Suite 420 San Antonio, Texas Main Fax COUNTY OF BEXAR PUBLIC WORKS DEPARTMENT 233 N. Pecos La Trinidad, Suite 420 San Antonio, Texas 78207-3188 Main 210-335-6700 Fax 210-335-6713 TEMPORARY USE OF COUNTY ROADWAYS FOR CIVIC EVENTS ADMINISTRATIVE

More information

TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY

TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY Texas Transportation Commission September 26, 2018 Governor s Charge for Congestion Relief Initiative The State of Texas is spurring

More information

TESTIMONY. The Texas Transportation Challenge. Testimony Before the Study Commission on Transportation Financing

TESTIMONY. The Texas Transportation Challenge. Testimony Before the Study Commission on Transportation Financing TESTIMONY The Texas Transportation Challenge Testimony Before the Study Commission on Transportation Financing Ric Williamson Chairman Texas Transportation Commission April 19, 2006 Texas Department of

More information

RESOLUTION NO. WHEREAS, the City of Bryan intends to issue new debt to fund the projects listed in Fiscal Year 2018, and

RESOLUTION NO. WHEREAS, the City of Bryan intends to issue new debt to fund the projects listed in Fiscal Year 2018, and RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRYAN, TEXAS APPROVING THE FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEARS 2018 THROUGH 2022; WHEREAS, the City of Bryan has an annual

More information

TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE

TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE Presentation for Texas Transportation Commission March 28, 2018 Purposes of the Workshop The Texas Transportation

More information

Presentation by Joseph R. Krier Greater SA Chamber President/CEO

Presentation by Joseph R. Krier Greater SA Chamber President/CEO Texas Transportation Forum Future of Transportation Financing Presentation by Joseph R. Krier Greater SA Chamber President/CEO June 9, 2006 San Antonio Congestion: Contributing Factors 1 million new residents

More information

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP) HINDS Project: 480001 Responsible Agency: CITY OF CLINTON Total Project Cost: $6,068,000 Route: PINEHAVEN/NORTHSIDE DR Fund Source: EARMARK Project Length: 1.25 Pinehaven Dr from Northside Dr to 400' N

More information

Region 5 Upcoming Projects for Summer/Fall 2018

Region 5 Upcoming Projects for Summer/Fall 2018 Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The

More information

REQUEST FOR COUNCIL ACTION

REQUEST FOR COUNCIL ACTION REQUEST FOR COUNCIL ACTION Date: 12/03/12 Item No.: 12.g Department Approval City Manager Approval Item Description: Approve Contract for Engineering Services to develop Twin Lakes Area Public Improvements

More information

UNIFIED TRANSPORTATION PROGRAM

UNIFIED TRANSPORTATION PROGRAM 2002 UNIFIED TRANSPORTATION PROGRAM Blank Page SUMMARY OF CATEGORIES CATEGORIES NUMBER, NAME AND YEAR ESTABLISHED PROGRAMMING AUTHORITY FUNDING BANK BALANCE (Yes/) RESPONSIBLE ENTITY RANKING INDEX OR ALLOCATION

More information

125 EAST 11 TH STREET AUSTIN, TEXAS 78701-2483 (512) 463-8588 WWW.TXDOT.GOV Mrs. Barbara C. Maley, AICP Env/Tranp Plan Coord & Air Quality Specialist Barbara.Maley@dot.gov December 27, 2016 Transmitted

More information

GRAND PARKWAY TRANSPORTATION CORPORATION MONTHLY TRAFFIC AND OPERATING REPORT* For the Period Ending: September 30, 2017

GRAND PARKWAY TRANSPORTATION CORPORATION MONTHLY TRAFFIC AND OPERATING REPORT* For the Period Ending: September 30, 2017 TABLE OF CONTENTS SYSTEM REVENUE AND EXPENSES SYSTEM TRANSACTIONS PROCEEDS FROM SALE OF SYSTEM ASSETS FOOTNOTES TO PAGE 3 4 TOLL RATE SCHEDULE 6 OUTSTANDING OBLIGATIONS 7 TRUST ACCOUNT BALANCES & ACTIVITY

More information

Public Hearing Tarrant County. April 14, 2009

Public Hearing Tarrant County. April 14, 2009 Public Hearing Tarrant County April 14, 2009 Public Hearing Agenda Welcome and Project Overview Ms. Maribel P. Chavez, P.E. District Engineer Texas Department of Transportation Fort Worth District 2 Public

More information

GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34 the basics

GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34 the basics GASB Statement No. 34 Indiana LTAP Annual Road School Conference Purdue University West Lafayette, Indiana March 11, 2004 GASB Statement No. 34 Summary of Capital Asset and General Infrastructure Accounting

More information

Capital Improvements Program (CIP)

Capital Improvements Program (CIP) Capital Improvements Program (CIP) 373 CAPITAL IMPROVEMENTS PROGRAM Introduction In accordance with the Texas Local Government Code and the Charter of the City of Southlake, the proposed FY 2017 to FY

More information

Index of Projects CS 602/CS 650/GRANGE ROAD FROM SR 21 TO E OF SR 25 Z001 GDOT

Index of Projects CS 602/CS 650/GRANGE ROAD FROM SR 21 TO E OF SR 25 Z001 GDOT 0002923 Index of Projects PI # DESCRIPTION FUNDING SR 25 CONN/BAY STREET FROM I-516 TO THE BAY STREET VIADUCT CURRENT SPONSOR FY CST PAGE Z001, Z230 Chatham County 2016 3 0007885 CS 602/CS 650/GRANGE ROAD

More information

TYSONS CORNER. Neighborhood Traffic Impact Study. Traffic Analysis Report. Task Order No Prepared by: Prepared for:

TYSONS CORNER. Neighborhood Traffic Impact Study. Traffic Analysis Report. Task Order No Prepared by: Prepared for: TYSONS CORNER Neighborhood Traffic Impact Study Traffic Analysis Report Task Order No. 07 077 03 Prepared by: Prepared for: December 2010 Tysons Corner Neighborhood Impact Study Page 2 TABLE OF CONTENTS

More information

Regional Toll Revenue Annual Financial Report

Regional Toll Revenue Annual Financial Report Regional Toll Revenue Annual Financial Report North Central As of September 30, 2011 Texas Council of Governments NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS REGIONAL TOLL REVENUE FINANCIAL REPORT As of

More information

CAPITAL IMPROVEMENTS PROGRAM (CIP)

CAPITAL IMPROVEMENTS PROGRAM (CIP) CAPITAL IMPROVEMENTS PROGRAM (CIP) A CIP is for the purchase, construction or replacement of the physical assets of the City. This section includes a listing of proposed projects for FY 2014 as well as

More information

I-80 Corridor Unsolicited Proposal Transportation Board Meeting December 3, 2018

I-80 Corridor Unsolicited Proposal Transportation Board Meeting December 3, 2018 I-80 Corridor Unsolicited Proposal Transportation Board Meeting December 3, 2018 UNSOLICITED PROPOSAL NDOT is actively addressing issues on I-80 Reno-Sparks Traffic Study (Completed Spring 2018) o Identified

More information

City of Portsmouth Portsmouth, New Hampshire Department of Public Works

City of Portsmouth Portsmouth, New Hampshire Department of Public Works RFP# 10-07 City of Portsmouth Portsmouth, New Hampshire Department of Public Works MARKET STREET BICYCLE AND PEDESTRIAN PATH BETWEEN MICHAEL SUCCI DRIVE AND THE NH PORT AUTHORITY REQUEST FOR PROPOSAL Sealed

More information

Development of the Cost Feasible Plan

Development of the Cost Feasible Plan March 15, 2012 TPO Board and Advisory Committee Meetings Development of the Cost Feasible Plan Transportation Outlook 2035 LRTP Update Atkins Development of the Cost Feasible Plan P a g e 1 Development

More information

Kelly E. Templin, AICP 1634 Old Orchard Lane Seabrook, TX /

Kelly E. Templin, AICP 1634 Old Orchard Lane Seabrook, TX / Kelly E. Templin, AICP 1634 Old Orchard Lane Seabrook, TX 77586 832.578.7749 / kelly@templin.us E D U C A T I O N P R O F E S S I O N A L E X P E R I E N C E Bachelor of Environmental Design, 1987, Texas

More information

Route Route Z Intersection Realignment

Route Route Z Intersection Realignment Route N @ Route Z Intersection Realignment Sponsor County Highway Project No. RB18-000016 Project Type Traffic Flow TOTAL FUNDING Total County Sponsor Federal $3,310,000 $1,776,000 $0 $1,534,000 Project

More information

RMTA FY2016 Annual Traffic and Toll Revenue Report

RMTA FY2016 Annual Traffic and Toll Revenue Report RMTA Richmond Metropolitan Transportation Authority RMTA RMTA FY216 Annual Traffic and Report Richmond Metropolitan Transportation Authority August 216 Final Report RMTA FY216 Annual Traffic and Report

More information

April 24, Subject: Amendments to the FY Transportation Improvement Program

April 24, Subject: Amendments to the FY Transportation Improvement Program CAMPO Capital Area Metropolitan Planning Organization April 24, 2006 Mr. Robert Daigh District Engineer Texas Department of Transportation - Austin District PO Drawer 15426 Austin, TX 78761 Subject: Amendments

More information

METRO INVESTMENT REPORT ALL FUNDS

METRO INVESTMENT REPORT ALL FUNDS METRO INVESTMENT REPORT ALL FUNDS DECEMBER 2012 Metropolitan Transit Authority of Harris County Investment Report Portfolio Summary Management Report The following is a summary of METRO's Investment Portfolios:

More information

RMTA FY2017 Annual Traffic and Toll Revenue Report

RMTA FY2017 Annual Traffic and Toll Revenue Report Richmond Metropolitan Transportation Authority RMTA FY217 Annual Traffic and Report Richmond Metropolitan Transportation Authority uary 218 Final Report RMTA FY217 Annual Traffic and Report Project No:

More information

North Fair Oaks Zoning Workgroup Fair Oaks Community Center February 15, 2017

North Fair Oaks Zoning Workgroup Fair Oaks Community Center February 15, 2017 North Fair Oaks Zoning Workgroup Fair Oaks Community Center February 15, 2017 1 M e e t i n g P u r p o s e a n d O b j e c t i v e s PURPOSE: Present project timeline and next steps Present Proposed Improvements

More information

Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates

Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates 2005-30 Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates The Federal Transportation bill, the Safe Accountable, Flexible, Efficient Transportation

More information

TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION CAPITAL PROGRAM TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily

More information

Economic Development Incentives

Economic Development Incentives Economic Development Incentives A range of economic incentives are available to qualifying companies in the Houston area to support new, expanding, and relocating companies. State Incentives TEXAS ENTERPRISE

More information

Unified Planning Work Program

Unified Planning Work Program Unified Planning Work Program New Orleans, Mandeville Covington, Slidell, and Tangipahoa Parish Urbanized Areas ADDENDA FY 2016 2 P a g e Unified Planning Work Program Fiscal Year 2016 Urbanized Areas

More information

Chapter 4: Plan Implementation

Chapter 4: Plan Implementation This chapter discusses the financial and regulatory needs associated with the implementation of this Transportation System Plan. Projected Funding for Transportation Improvements Projecting the revenue

More information

IMPACT FEE CREDIT APPLICATION & GUIDELINES

IMPACT FEE CREDIT APPLICATION & GUIDELINES IMPACT FEE CREDIT APPLICATION & GUIDELINES Land Development Division City of Kansas City, Missouri Updated on January 2009 TABLE OF CONTENTS I. Introduction II. III. IV. Defined terms Formulas Items Not

More information

GRAND PARKWAY TRANSPORTATION CORPORATION MONTHLY TRAFFIC AND OPERATING REPORT* For the Period Ending: August 31, 2017

GRAND PARKWAY TRANSPORTATION CORPORATION MONTHLY TRAFFIC AND OPERATING REPORT* For the Period Ending: August 31, 2017 TABLE OF CONTENTS SYSTEM REVENUE AND EXPENSES SYSTEM TRANSACTIONS PROCEEDS FROM SALE OF SYSTEM ASSETS FOOTNOTES TO PAGE 3 4 TOLL RATE SCHEDULE 6 OUTSTANDING OBLIGATIONS 7 TRUST ACCOUNT BALANCES & ACTIVITY

More information

FOR SALE ALL OR PART

FOR SALE ALL OR PART FOR SALE ALL OR PART 194 ± ACRES FOSTER RIDGE INDUSTRIAL PARK BEXAR COUNTY, TEXAS Presented By: Joe Carroll 900 Isom Road, Suite 306 San Antonio, Texas 78216 Tel. 210/349-0900 Fax 210/349-0931 Email: jcarroll@cavenderhill.com

More information

Fiscal Year th Quarter Report Quarterly Report of Actual Traffic and Revenue For period ending August 31, 2017

Fiscal Year th Quarter Report Quarterly Report of Actual Traffic and Revenue For period ending August 31, 2017 Fiscal Year 2017 4 th Quarter Report Quarterly Report of Actual Traffic and Revenue For period ending August 31, 2017 Footer Text Date Table of Contents Section Page Number Notes and Observations 3-4 Significant

More information

FY February Quarterly Revision. Bryan DISTRICT

FY February Quarterly Revision. Bryan DISTRICT FY 20132016 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM February Quarterly Revision Bryan DISTRICT TRANSIT Administrative Amendment February 2013 BCSMPO, Final FY 20132016 TIP, FY 2013 2016 Transportation

More information

TXDOT CONGESTION RELIEF INITIATIVE, INCLUDING

TXDOT CONGESTION RELIEF INITIATIVE, INCLUDING TXDOT CONGESTION RELIEF INITIATIVE, INCLUDING TEXASCLEARLANES Commissioner J. Bruce Bugg, Jr. February 6, 2017 Highway transportation in Texas: Today and our future 2 Highway transportation in Texas: Today

More information

Professional and Program Development Activities - Southeast Extension District 9

Professional and Program Development Activities - Southeast Extension District 9 2014-2015 Professional and Program Development Activities - Southeast Extension District 9 October, 2014 Sept 29-2 C o u n t y J u d g e s a n d Commissioners Association of Texas Conference, Lubbock 3

More information

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION Amendment # 2 FY 2017-2020 Transportation Improvement Program Amendment Summary: The Transportation Improvement Program (TIP)

More information

FY TRANSPORTATION IMPROVEMENT PROGRAM

FY TRANSPORTATION IMPROVEMENT PROGRAM FY 2019 2022 TRANSPORTATION IMPROVEMENT PROGRAM Approved for Public Review and Comment: April 16, 2018 Approved by the Policy Board: May 21, 2018 Table of Contents Permian Basin MPO Membership and Structure...

More information

FOREWORD. There are five sections to this document:

FOREWORD. There are five sections to this document: 4/1/2019 @ 4:41:41 PM FOREWORD * This document contains candidate projects which have been identified by districts as ready for letting or obligation of funds in fiscal year 2019 by TxDOT. There are five

More information

Selected Economic Data for Texas Cooperative Extension, Central Texas District (8)

Selected Economic Data for Texas Cooperative Extension, Central Texas District (8) Panhandle (1) Selected Economic Data for Texas Cooperative Extension, Central Texas District (8) Dennis U. Fisher February 14, 2002 South Plains (2) Rolling Plains (3) North Texas (4) West Central (7)

More information

TEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P

TEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P TEXAS DEPARTMENT OF TRANSPORTATION S T A T E W I D E T R A N S P O R T A T I O N I M P R O V E M E N T P R O G R A M S T I P 2 015201 8 BRYAN DISTRICT 2 0 1 5 2 0 1 8 T I P H I G H W AY I n i t i a l 2015

More information

CRS State Profile: Texas

CRS State Profile: Texas CRS State Profile: Texas This is a profile for communities in your state that are participating in the Community Rating System (CRS). This profile is intended to provide information to the State NFIP Coordinator

More information

I-64 Capacity Improvements Segment III Initial Financial Plan

I-64 Capacity Improvements Segment III Initial Financial Plan I-64 Capacity Improvements Segment III Initial Financial Plan State Project # 0064-965-229/0064-099-229 P101, R201, C501, B638, B639, B640, B641, B642, B643, D609, D610, D611 Federal # NHPP-064-3(498)/

More information

ABILENE MPO TRANSPORTATION POLICY BOARD MEETING

ABILENE MPO TRANSPORTATION POLICY BOARD MEETING ABILENE MPO TRANSPORTATION POLICY BOARD MEETING Tuesday, October 16, 2018 at 1:30 pm City Council Chambers Abilene City Hall 555 Walnut Street, Abilene, Texas 1. Call to Order. Public comment may be taken

More information

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM TOTAL PROJECT ESTIMATE ($) STATE ALLOCATION CODE (SAC) FUND TYPE ENCUMBERED FROM BEFORE FY 2011 PE/RW PRIOR TO FY 2016 LOCAL MATCH LOCAL LABOR STATE LABOR FED LABOR & TSKF LINE ITEM # ST. LINE ITEM

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

Allen Road Individual Environmental Assessment (EA)

Allen Road Individual Environmental Assessment (EA) STAFF REPORT ACTION REQUIRED PW14.8 Allen Road Individual Environmental Assessment (EA) Date: June 3, 2016 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager,

More information

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Adopted August 22, 2013 This report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, the Florida

More information

CURB CUTS SPECIFICATIONS AND STANDARDS

CURB CUTS SPECIFICATIONS AND STANDARDS City of Elmira, New York CURB CUTS SPECIFICATIONS AND STANDARDS Just a click away Effective Date: April 1992 This document, the Curb Cut Permit Application, and other specifications and standar ds are

More information

~ FINANCIAL ACTION SUMMARY / Expenditure Required Amount Budgeted/Approved (Over)/Under Approved Amount

~ FINANCIAL ACTION SUMMARY / Expenditure Required Amount Budgeted/Approved (Over)/Under Approved Amount CITYOFWOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rct Avenue NE, Woodinville, WA 98072 WWW.Cl.WOODINVILLE.WA.US To: Honorable City Council Date: April 5, 2016 By Thomas E Hansen P E., Public Works

More information

RAS PROJECTS THE GOOD, THE BAD, AND THE UGLY. Ryan Barborak, P.E. CST Flexible Pavements Branch

RAS PROJECTS THE GOOD, THE BAD, AND THE UGLY. Ryan Barborak, P.E. CST Flexible Pavements Branch RAS PROJECTS THE GOOD, THE BAD, AND THE UGLY Ryan Barborak, P.E. CST Flexible Pavements Branch The Good, The Bad and The Ugly Every gun makes its own tune. http://www.ranker.com/list/the-good-the-bad-and-the-ugly-movie-quotes/movie-and-tv-quotes?page=2

More information

Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements

Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements Resurfacing projects are among the most common and routine types of projects regularly conducted by highway agencies. When resurfacing projects

More information

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2012

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2012 FY A + B = C D + E = F C + F = G G - H = I A B C D E F G H I Balance Carryover from FY 11 FY (includes all adjustments) CATEGORY 7 RECAP FY 2012 Total Available FTA Transfer of Funds Funds Obligated On

More information

FOREWORD. There are five sections to this document:

FOREWORD. There are five sections to this document: 9/2/2016 @ 2:38:38 PM FOREWORD * This document contains candidate projects which have been identified by districts as ready for letting or obligation of funds in fiscal year 2017 by TxDOT. There are five

More information

KENDALL BREEZE WEST COMMUNITY DEVELOPMENT DISTRICT MIAMI-DADE COUNTY REGULAR BOARD MEETING APRIL 20, :00 P.M.

KENDALL BREEZE WEST COMMUNITY DEVELOPMENT DISTRICT MIAMI-DADE COUNTY REGULAR BOARD MEETING APRIL 20, :00 P.M. KENDALL BREEZE WEST COMMUNITY DEVELOPMENT DISTRICT MIAMI-DADE COUNTY REGULAR BOARD MEETING APRIL 20, 2016 7:00 P.M. Special District Services, Inc. 6625 Miami Lakes Drive, Suite 374 Miami Lakes, FL 33014

More information

Fiscal Year nd Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending February 28, 2018

Fiscal Year nd Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending February 28, 2018 Fiscal Year 2018 2 nd Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending February 28, 2018 Footer Text Date Table of Contents Section Page Number Disclaimer 3 Notes and

More information

Budget Process. Mayor and City Council adopt a final Budget (09/19/16)

Budget Process. Mayor and City Council adopt a final Budget (09/19/16) Budget Process Mayor and City Council adopt a final Budget (09/19/16) The Mayor considers staff recommendations as he prepares his Budget City Council discusses and holds Public Hearings on the proposed

More information

July 25, Members of City Council City of League City, Texas

July 25, Members of City Council City of League City, Texas Mark Rohr City Manager 300 W Walker League City, TX 77573 Main: 281.554.1000 Direct: 281.554.1005 www.leaguecity.com July 25, 2016 Members of City Council City of League City, Texas Transmitted herewith

More information

FORM G-37. Name of Regulated Entity: FTN Financial Capital Markets. Report Period: Third Quarter of 2017

FORM G-37. Name of Regulated Entity: FTN Financial Capital Markets. Report Period: Third Quarter of 2017 Name of Regulated Entity: FTN Financial Capital Markets Report Period: Third Quarter of 2017 I. CONTRIBUTIONS made to officials of a municipal entity (list by state) Complete name, title (including any

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET CITY OF PLACERVILLE ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET 2012/2013 1 2 CAPITAL IMPROVEMENT PROGRAM POLICY Each year the City faces the challenge of meeting infrastructure and equipment needs with

More information

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS - COST FEASIBLE PROJECTS TABLE 1 - STATE PROJECTS (STRATEGIC INTERMODAL SYSTEM / FLORIDA'S TURNPIKE / CENTRAL FLORIDA EXPRESSWAY AUTHORITY) Facility From To Project Current Year Cost Estimates M-SIS M-SIS

More information

PRESENTER: Christopher Blunk, Deputy Public Works Director/City Engineer

PRESENTER: Christopher Blunk, Deputy Public Works Director/City Engineer G-6 STAFF REPORT MEETING DATE: June 12, 2018 TO: FROM: City Council Petr Skala, Assistant Engineer 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213 www.novato.org PRESENTER: Christopher

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six DISTRICT SIX PROJECT OVERVIE Florida s Turnpike Enterprise continues to make project investments in District Six. In FY 2017 and FY 2018, current Turnpike projects total over $109 million within Miami-Dade

More information

Debt Service FunDS & Debt ScheDuleS

Debt Service FunDS & Debt ScheDuleS Debt Service Funds & Debt Schedules The City issues general obligation bonds, certificates of obligation, combination tax and revenue certificates of obligation and tax notes to provide for the acquisition

More information

Capital Improvements Program FY FY2020

Capital Improvements Program FY FY2020 FY2016 - FY2020 CITY OF MANVEL, TEXAS April 25, 2016 prepared for: City of Manvel Mayor and Council 20025 Morris Avenue Manvel, Texas 77578 prepared by: 19701 Morris Avenue, Manvel, Texas 77578 TBPE F-9827

More information

This page intentionally left blank

This page intentionally left blank 197 This page intentionally left blank 198 Capital Improvement Program PROCEDURE Each year the Capital Improvement Program (CIP) is prepared from project requests submitted by the various departments.

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One DISTRICT ONE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make project investments in District One. In FY 2017 and FY 2018, current Turnpike projects total over $105 million within Okeechobee

More information

Exhibit A General Fund Revenues Total Revenue Expenditures Total Expenditures

Exhibit A General Fund Revenues Total Revenue Expenditures Total Expenditures Exhibit A General Fund Local Option Sales Tax 20,250,000 Real and Personal Property Tax 17,100,000 Franchise Fees 4,100,000 Insurance Premium Tax 4,300,000 Building Permits and Inspection Fees 1,650,000

More information

... TEXPERS. The Texas Association of Public Employee Retirement Systems

... TEXPERS. The Texas Association of Public Employee Retirement Systems . TEXPERS TEXPERS One Riverway, Suite 1401 Houston, TX 77056-1904 Phone (713) 622-8018 Fax (713) 622-7022 Report on the Asset Allocation and Investment Performance of Texas Public Employee Retirement Systems..........

More information

BROWNSVILLE METROPOLITAN PLANNING ORGANIZATION F.Y F.Y METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

BROWNSVILLE METROPOLITAN PLANNING ORGANIZATION F.Y F.Y METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM (TIP) BROWNSVILLE METROPOLITAN PLANNING ORGANIZATION F.Y. 2017-F.Y. 2020 METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM (TIP) By: Brownsville MPO Staff City Plaza 1034 E. Levee St., 2 nd floor Brownsville,

More information

Transportation Planning FAQ s

Transportation Planning FAQ s Transportation Planning FAQ s 1. What is the Master Thoroughfare Plan (MTP)? The Master Thoroughfare Plan defines the network of existing and future roads deemed appropriate to accommodate the various

More information

CITY OF GRAND PRAIRIE, TEXAS

CITY OF GRAND PRAIRIE, TEXAS UNIFORM GRANT MANAGEMENT STANDARDS REPORT YEAR ENDED SEPTEMBER 30, 2013 C O N T E N T S Page Independent Auditor's Report on Internal Control over Financial Reporting and on Compliance and Other Matters