EXHIBIT A DONATIONS Cullen Blvd, An Individual Series of Forefunders Partners, LLC. Houston District

Size: px
Start display at page:

Download "EXHIBIT A DONATIONS Cullen Blvd, An Individual Series of Forefunders Partners, LLC. Houston District"

Transcription

1

2 EXHIBIT A DONATIONS NO. DONOR D/D/O COUNTY DESCRIPTION Cullen Blvd, An Individual Series of Forefunders Partners, LLC 2 Apache Corporation Houston District Harris The donor is donating the design and construction of a left turn lane with median cut from southbound FM 865 into the Cullen Food Mart development in Houston, Harris County, Texas. All design and construction work will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $26,340. Odessa District Reeves The donor is donating the design, construction and construction engineering and inspections (CEI) of highway improvements (addition of acceleration lanes, deceleration lanes, improvements to surface drainage and installation of small roadside warning signs) on FM 2903 located approximately 3 miles northeast of the intersection of FM 2903 and IH 10 in Reeves County, Texas. All design, construction, and CEI work will be provided by the donor, its consultant or its contractor. The donation includes a sum of $5,000 for the State's direct and indirect costs for reviewing proposed construction plans, specifications and estimates, and performing limited quality assurance inspection/testing and inspection of the work that is on the state right of way. The Donor will be responsible for the State's costs, providing needed real estate (if applicable), acceptable design of highway improvements, roadway construction, construction materials, and CEI for both material testing and construction inspection. The estimated value of the donation is $1,260,000. $26,340 8/24/2017 $1,260,000 9/05/2017 September 28, 2017 Commission Meeting Page 1 Exhibit A - Donations

3 3 Atlas Sand Company, LLC 4 Black Mountain Sand LLC Odessa District Winkler The donor is donating the design, construction and construction engineering and inspections (CEI) of highway improvements (addition of acceleration lanes, deceleration lanes, improvements to surface drainage and installation of small roadside warning signs) on FM 874 approximately 1.69 miles west of SH 115 in Winkler County, Texas. All design, construction, and CEI work will be provided by the donor, its consultant or its contractor. The donation includes a sum of $3,000 for the State's direct and indirect costs for reviewing proposed construction plans, specifications and estimates, and performing limited quality assurance inspection/testing and inspection of the work that is on the state right of way. The Donor will be responsible for the State's costs, providing needed real estate (if applicable), acceptable design of highway improvements, roadway construction, construction materials, and CEI for both material testing and construction inspection. The estimated value of the donation is $3,003,000. Odessa District Winkler The donor is donating the design, construction and construction engineering inspections (CEI) of highway improvements (addition of acceleration lanes, deceleration lanes, and installation of roadside warning signs) on SH 302 to access El Dorado Commercial Plant in Winkler County, Texas. All design, construction, and CEI work will be provided by the donor, its consultant, or its contractor. The donation includes a sum of $2,000 for the State's direct and indirect costs for reviewing proposed construction plans, specifications and estimates of the work that is on the state right of way. The Donor will be responsible for the State's costs, providing needed real estate (if applicable), acceptable design of highway improvements, roadway construction, construction materials, and CEI for both material testing and construction inspection. The estimated value of the donation is $2,002,000. $3,003,000 9/05/2017 $2,002,000 9/06/2017 September 28, 2017 Commission Meeting Page 2 Exhibit A - Donations

4 5 Black Mountain Sand LLC Odessa District Winkler The donor is donating the design, construction and construction engineering inspections (CEI) of highway improvements (addition of acceleration lanes, deceleration lanes, and installation of roadside warning signs) on SH 302 to access Vest Commercial Plant in Winkler County, Texas. All design, construction, and CEI work will be provided by the donor, its consultant, or its contractor. The donation includes a sum of $2,000 for the State's direct and indirect costs for reviewing proposed construction plans, specifications and estimates of the work that is on the state right of way. The Donor will be responsible for the State's costs, providing needed real estate (if applicable), acceptable design of highway improvements, roadway construction, construction materials, and CEI for both material testing and construction inspection. The estimated value of the donation is $2,002, Circle C Land, LP Austin District Hays The donor is donating the design and construction of re-striping a portion of FM 1826 in Hays County to provide a dedicated left turn lane for access to a new CVS Pharmacy development. All design and construction work will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $4,007, which includes payments for all State direct and indirect costs associated with the review, oversight, and inspection of the work that is on the state right of way. $2,002,000 9/06/2017 $4,007 8/09/2017 September 28, 2017 Commission Meeting Page 3 Exhibit A - Donations

5 7 College Station 1892 Properties, L.L.C. 8 Fluvanna Wind Energy, LLC 9 HM Parten Ranch Development, Inc. Bryan District Brazos The donor is donating the design and construction on FM 2154 (Wellborn Road) to include a median cut, turning lane improvements and signalizing the intersection in College Station, Brazos County, Texas. The turning lane improvements on FM 2154 are as follows: 1) Remove section of existing median; 2) Construct northbound U-turn lane; 3) Construct southbound left turn lane; 4) Install traffic signals and pedestrian elements. All design and construction work will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $720,000, which includes payments for all State direct and indirect costs associated with the review, oversight, and inspection of the work that is on the state right of way. [The donation replaces one previously acknowledged in July 2017 due to a correction in the estimated value from $734,000 to $720,000.] Abilene District Scurry The donor is donating a fixed amount of $4,207 towards the State s cost to repair roadway damage and maintain roads in a passable condition on FM 1269 and FM 612 in Fluvanna, Scurry County, Texas during and after the donor s construction of the wind farm. Austin District Hays The donor is donating the design and construction of a left turn lane and deceleration lane on RM 1826 east of Hays CR 162 for a proposed residential development located in Dripping Springs, Hays County, Texas. All design and construction work will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $509,839, which includes payments for all State direct and indirect costs associated with the review, oversight, and inspection of the work that is on the state right of way. $720,000 8/28/2017 $4,207 8/22/2017 $509,839 8/03/2017 September 28, 2017 Commission Meeting Page 4 Exhibit A - Donations

6 10 Howard Land & Cattle, Ltd. 11 Hwy 21 RV Park and Storage, LLC 12 Leslie Easterwood, DVM 13 Lidl US Operations, LLC Austin District Hays The donor is donating the design and construction of left turn and right turn lanes on RM 12 to Trebled Waters Trail for a proposed residential development located in Dripping Springs, Hays County, Texas. All design and construction work will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $234,532, which includes payments for all State direct and indirect costs associated with the review, oversight, and inspection of the work that is on the state right of way. Austin District Bastrop The donor is donating the design and construction of a continuous left turn lane on SH 21 from S. Old Potato Rd. to east of S Old Potato Rd. in Paige, Bastrop County, Texas. All design and construction will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $21,623, which includes payments for all State direct and indirect costs associated with the review, oversight, and inspection of the work that is on the state right of way. Traffic Operations Houston District Brazoria Harris The donor is donating a fixed amount of funds towards the State s cost to design, fabricate, and install two memorial highway designation signs on the portion of FM 1462, between SH 288 and SH 35, designated as the Lieutenant Colonel Roy Lin Tisdale Memorial Highway within Brazoria County, Texas. The design, fabrication, and installation of the signs will be performed by the State. The estimated value of the donation is $3,657. The donor is donating the design and construction of a right turn lane from westbound FM 2920 into the Lidl Grocery Store development in Spring, Harris County, Texas. All design and construction work will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $25,000. $234,532 8/08/2017 $21,623 8/28/2017 $3,657 8/2/2017 $25,000 8/10/2017 September 28, 2017 Commission Meeting Page 5 Exhibit A - Donations

7 14 Lockhart 130 North/South Ltd. 15 Lonestar Prospects, LTD 16 Love's Travel Stops & Country Stores, Inc. Austin District Caldwell The donor is donating the design and installation of sidewalks within TxDOT's right of way on the frontage road of SH 130 in Lockhart, Caldwell County, Texas. All design and construction work will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $48,647, which includes payments for all State direct and indirect costs associated with the review, oversight, and inspection of the work that is on the state right of way. Odessa District Winkler The donor is donating the design, construction and construction engineering inspections (CEI) of highway improvements (addition of acceleration lanes, deceleration lanes, and installation of roadside warning signs) on SH 18 at the intersection of CR 404 in Winkler County, Texas. All design and construction, and CEI work will be provided by the donor, its consultant, or its contractor. The donation includes a sum of $5,000 for the State's direct and indirect costs for reviewing proposed construction plans, specifications and estimates, and performing limited quality assurance inspection/testing and inspection of the work that is on the state right of way. The donor will be responsible for the State's costs, providing needed real estate (if applicable), acceptable design of highway improvements, roadway construction, construction materials, CEI for both material testing and construction inspection. The estimated value of the donation is $2,005,000. Lufkin District Angelina The donor is donating the design and construction of a left turn lane into the proposed Love's Travel Stops & Country Store on FM 2021 near the intersection of US59, in Angelina County. All design and construction work will be provided by the donor, its consultant or its contractor. The estimated value of the donation is $720,000. $48,647 8/22/2017 $2,005,000 9/06/2017 $720,000 8/17/2017 September 28, 2017 Commission Meeting Page 6 Exhibit A - Donations

8 17 Mary Border Traffic Operations 18 Michael A. Furrh Traffic Operations 19 Midland Development Corporation 20 Midland Development Corporation 21 Pagosa Partners IV, LTD Dallas Lavaca The donor is donating a fixed amount of funds towards the State s cost to design, fabricate, and install two memorial highway designation signs on the portion of SH 352 designated as the Staff Sergeant Jeremie S. Border Memorial Highway in Mesquite, Dallas County, Texas. The design, fabrication, and installation of the signs will be performed by the State. The estimated value of the donation is $2,412. The donor is donating a fixed amount of funds towards the State s cost to design, fabricate, and install two memorial highway designation signs on the portion of SH 95 between the northern municipal limits of Shiner to the southern municipal limits of Moulton, designated as the Sergeant David M. Furrh Memorial Highway in Lavaca County, Texas. The design, fabrication, and installation of the signs will be performed by the State. The estimated value of the donation is $2,038. Odessa District Midland The donor is donating a fixed amount of funds towards the State's cost of improvements to the intersection of Midkiff Road and Interstate 20 in Midland County, Texas. The funds can be used at any phase of the project development at the State's discretion under project (CSJ # ). The donor will contribute a fixed amount of $2,000,000. Odessa District Midland The donor is donating a fixed amount of funds towards the State's cost of constructing an overpass at the intersection of SL 250 and County Road 1140 in Midland County, Texas. The funds can be used at any phase of the project development at the State's discretion under project (CSJ # ). The donor will contribute a fixed amount of $3,000,000. Lubbock District Lubbock The donor is donating the installation of an 86.4 Linear Foot of white curbed delineators, traffic control and raised pavement markers on SL 289 frontage road in Lubbock, Texas. All design and construction work will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $13, $2,412 8/10/2017 $2,038 8/16/2017 $2,000,000 9/06/2017 $3,000,000 9/06/2017 $13, /22/2017 September 28, 2017 Commission Meeting Page 7 Exhibit A - Donations

9 22 Preferred Sands of Monahans, LLC 23 Robin Branecky Traffic Operations Odessa District Crane The donor is donating the design, construction and construction engineering and inspections (CEI) of highway improvements (reconstruction of highway to increase pavement structure, widening roadway for shoulders and turn lanes, construct surface drainage improvements and installation of small roadside warning signs) on IH 20 North Frontage Road in Crane County, Texas. All design, construction, and CEI work will be provided by the donor, its consultant or its contractor. The donation includes a sum of $5,000 for the State's direct and indirect costs for reviewing proposed construction plans, specifications and estimates, and performing limited quality assurance inspection/testing and inspection of the work that is on the state right of way. The Donor will be responsible for the State's costs, providing needed real0020estate (if applicable), acceptable design of highway improvements, roadway construction, construction materials, and CEI for both material testing and construction inspection. The estimated value of the donation is $1,005,000. Lavaca The donor is donating a fixed amount of funds towards the State s cost to design fabricate, and install two memorial highway designation signs on the portion of Alt US 90 between the eastern municipal limits of Shiner to the western municipal limits of Hallettsville, designated as the Sheriff Ronnie Dodds Memorial Highway in Lavaca County, Texas. The design, fabrication, and installation of the signs will be performed by the State. The estimated value of the donation is $3,657. $1,005,000 9/08/2017 $3,657 8/14/2017 September 28, 2017 Commission Meeting Page 8 Exhibit A - Donations

10 24 U.S. Silica Company 25 WH Bastrop ER, LP Odessa District Crane The donor is donating the design, construction and construction engineering and inspections (CEI) of highway improvements (reconstruction on highway to increase pavement structure, widening roadway for shoulders and turn lanes, construct surface drainage improvements and installation of small roadside warning signs and safety lighting) on FM 1053 approximately 5 miles South of IH 20 in Crane County, Texas. All design, construction, and CEI work will be provided by the donor, its consultant or its contractor. The donation includes a sum of $5,000 for the State's direct and indirect costs for reviewing proposed construction plans, specifications and estimates, and performing limited quality assurance inspection/testing and inspection of the work that is on the state right of way. The Donor will be responsible for the State's costs, providing needed real estate (if applicable), acceptable design of highway improvements, roadway construction, construction materials, and CEI for both material testing and construction inspection. The estimated value of the donation is $1,505,000. Austin District Bastrop The donor is donating the design and installation of sidewalks within State right of way on SH 21 in Bastrop, Bastrop County, Texas. All design and construction work will be provided by the donor, its consultant, or its contractor. The estimated value of the donation is $5,066, which includes payments for all State direct and indirect costs associated with the review, oversight, and inspection of the work that is on the state right of way. $1,505,000 9/05/2017 $5,066 8/25/2017 September 28, 2017 Commission Meeting Page 9 Exhibit A - Donations

EXHIBIT A DONATIONS April 26, 2018

EXHIBIT A DONATIONS April 26, 2018 EXHIBIT A DONATIONS April 26, 2018 1 830 Investors, Ltd. 2 AASA Holdings Humble The donor is donating the design and construction of a traffic signal from SH 99 at Imperial Promenade/Townsen Blvd into

More information

EXHIBIT A DONATIONS December 13, 2018

EXHIBIT A DONATIONS December 13, 2018 EXHIBIT A DONATIONS December 13, 2018 1. 59 Fuel Inc Houston 2. Community Health 1st Realty, LLC 3. D.R. Horton - Texas, Ltd. 4. HRS Operating, LLC Houston Houston Montgomery Harris Fort Bend The donor

More information

L.zu? V fl1i. VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts

L.zu? V fl1i. VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts Transportation Code, 201.206, authorizes the Texas Department of Transportation VARIOUS Counties MINUTE ORDER Page 1 of 1 VARIOUS s Number Passed Submitted and reviewed by: Recommended by: Minute Date

More information

30C VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts

30C VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts d TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 1 VARIOUS s Transportation Code, 201.206, authorizes the Texas Department of Transportation (department) to accept a donation in

More information

TEXAS TRANSPORTATION COMMISSION MEETING ATTACHED LISTS February 26, 2015 HIGHWAY MAINTENANCE AND BUILDING CONSTRUCTION CONTRACTS-STATE LET

TEXAS TRANSPORTATION COMMISSION MEETING ATTACHED LISTS February 26, 2015 HIGHWAY MAINTENANCE AND BUILDING CONSTRUCTION CONTRACTS-STATE LET TEXAS TRANSPORTATION COMMISSION MEETING ATTACHED LISTS February 26, 2015 HIGHWAY MAINTENANCE AND BUILDING CONSTRUCTION CONTRACTS-STATE LET DIST COUNTY NAME HIGHWAY NUMBER CONTROLLING PROJECT NO. LOW BID

More information

Appendix D Total Project Cost and Year of Expenditure Breakdown

Appendix D Total Project Cost and Year of Expenditure Breakdown Total Project Cost and Year of Expenditure Breakdown p. D -1 Total Project Cost and Year of Expenditure Breakdown Financial Constraint Methodology using Total Project Cost and Year of Expenditure Dollars

More information

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0 UTP November Update - Funding Adjustments Summary (Amounts in millions) District/Division//TMA Fiscal Year Adjusted Amount Post Public Meeting Adjustments Austin 3 SH 130 Concession FY $6,500,000 3 SH

More information

Region 5 Upcoming Projects for Summer/Fall 2018

Region 5 Upcoming Projects for Summer/Fall 2018 Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

How to Read the Project Modification Listings Roadway Section

How to Read the Project Modification Listings Roadway Section How to Read the Project Modification Listings Roadway Section The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation Improvement

More information

UNIFIED TRANSPORTATION PROGRAM

UNIFIED TRANSPORTATION PROGRAM 2002 UNIFIED TRANSPORTATION PROGRAM Blank Page SUMMARY OF CATEGORIES CATEGORIES NUMBER, NAME AND YEAR ESTABLISHED PROGRAMMING AUTHORITY FUNDING BANK BALANCE (Yes/) RESPONSIBLE ENTITY RANKING INDEX OR ALLOCATION

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013 BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013 Total Uncommitted Funds FY 2013 A + B = C C + D = E E - F = G A B C D E F G Balance Carryover from FY 12 FY (includes all adjustments) Total Available Total Obligations

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

April 24, Subject: Amendments to the FY Transportation Improvement Program

April 24, Subject: Amendments to the FY Transportation Improvement Program CAMPO Capital Area Metropolitan Planning Organization April 24, 2006 Mr. Robert Daigh District Engineer Texas Department of Transportation - Austin District PO Drawer 15426 Austin, TX 78761 Subject: Amendments

More information

FY STIP. Lufkin District. February 2012 Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Lufkin District. February 2012 Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Lufkin District February 2012 Quarterly Revisions February 2012 FRIDAY, JANUARY 06, 2012 9:37:23 AM STATEWIDE TRANSPORTATION IMPROVEMENT

More information

FOREWORD. There are five sections to this document:

FOREWORD. There are five sections to this document: 9/2/2016 @ 2:38:38 PM FOREWORD * This document contains candidate projects which have been identified by districts as ready for letting or obligation of funds in fiscal year 2017 by TxDOT. There are five

More information

How to Read the Project Modification Listings - Roadway Section

How to Read the Project Modification Listings - Roadway Section How to Read the Project Modification Listings - Roadway Section Sa m pl e The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation

More information

Transportation Improvement Program Page 39

Transportation Improvement Program Page 39 Fiscal Year CSJ Project # Facility From To 1 - Preventive Maintenance 2019 2022 Transportation Improvement Program Page 39 2U - Urban Mobility 3LC - Local Contribution 4 - Congestion, Connectivity, Corridor

More information

December Update of 2018 UTP Category 2 and Category 10 CBI. Requested Amount

December Update of 2018 UTP Category 2 and Category 10 CBI. Requested Amount Exhibit A December Update of 2018 UTP Category 2 and Category 10 CBI Produced on: 12/13/2017 CSJ District County Hwy Dist Let FY Project Length Category Requested Amount Estimated Construction Cost Description

More information

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION 2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION Texas Transportation Commission Workshop 06/29/16 Commission Workshop Outline Introduction of performance-based planning and programming processes.

More information

FOREWORD. There are five sections to this document:

FOREWORD. There are five sections to this document: 1 FOREWORD * This document contains candidate projects which have been identified by districts as ready for letting or obligation of funds in fiscal year 2018 by TxDOT. There are five sections to this

More information

How to Read the Project Modification Listings Roadway Section

How to Read the Project Modification Listings Roadway Section How to Read the Project Modification Listings Roadway Section The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation Improvement

More information

TEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P

TEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P TEXAS DEPARTMENT OF TRANSPORTATION S T A T E W I D E T R A N S P O R T A T I O N I M P R O V E M E N T P R O G R A M S T I P 2 015201 8 BRYAN DISTRICT 2 0 1 5 2 0 1 8 T I P H I G H W AY I n i t i a l 2015

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET CITY OF PLACERVILLE ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET 2012/2013 1 2 CAPITAL IMPROVEMENT PROGRAM POLICY Each year the City faces the challenge of meeting infrastructure and equipment needs with

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates. , Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...

More information

Route Route Z Intersection Realignment

Route Route Z Intersection Realignment Route N @ Route Z Intersection Realignment Sponsor County Highway Project No. RB18-000016 Project Type Traffic Flow TOTAL FUNDING Total County Sponsor Federal $3,310,000 $1,776,000 $0 $1,534,000 Project

More information

Debt Service FunDS & Debt ScheDuleS

Debt Service FunDS & Debt ScheDuleS Debt Service Funds & Debt Schedules The City issues general obligation bonds, certificates of obligation, combination tax and revenue certificates of obligation and tax notes to provide for the acquisition

More information

125 EAST 11 TH STREET AUSTIN, TEXAS 78701-2483 (512) 463-8588 WWW.TXDOT.GOV Mrs. Barbara C. Maley, AICP Env/Tranp Plan Coord & Air Quality Specialist Barbara.Maley@dot.gov December 27, 2016 Transmitted

More information

Public Hearing Tarrant County. April 14, 2009

Public Hearing Tarrant County. April 14, 2009 Public Hearing Tarrant County April 14, 2009 Public Hearing Agenda Welcome and Project Overview Ms. Maribel P. Chavez, P.E. District Engineer Texas Department of Transportation Fort Worth District 2 Public

More information

DEBT SERVICE FUNDS & DEBT SCHEDULES

DEBT SERVICE FUNDS & DEBT SCHEDULES DEBT SERVICE FUNDS & DEBT SCHEDULES INTEGRITY INNOVATION ACCOUNTABILITY COMMITMENT TO EXCELLENCE TEAMWORK This section provides a summary of the annual principal and interest payments for all outstanding

More information

The widening gap between home price and household

The widening gap between home price and household Still Affordable James P. Gaines and Clare Losey August 17, 2017 Publication 2176 The widening gap between home price and household income has recently sparked concerns over housing affordability. The

More information

Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION

Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION Funding Allocations Routine State $ 166 Million Resurfacing Federal $ 260 Million

More information

Grand Parkway Transportation Corporation M E M O R A N D U M

Grand Parkway Transportation Corporation M E M O R A N D U M Grand Parkway Transportation Corporation 125 East 11 th Street, Austin, Texas 78701 M E M O R A N D U M DATE: February 25, 2016 RE: Segments F-1, F-2 & G of Grand Parkway Project SUBSEQUENT EVENTS - Segments

More information

FY February Quarterly Revision. Bryan DISTRICT

FY February Quarterly Revision. Bryan DISTRICT FY 20132016 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM February Quarterly Revision Bryan DISTRICT TRANSIT Administrative Amendment February 2013 BCSMPO, Final FY 20132016 TIP, FY 2013 2016 Transportation

More information

RAS PROJECTS THE GOOD, THE BAD, AND THE UGLY. Ryan Barborak, P.E. CST Flexible Pavements Branch

RAS PROJECTS THE GOOD, THE BAD, AND THE UGLY. Ryan Barborak, P.E. CST Flexible Pavements Branch RAS PROJECTS THE GOOD, THE BAD, AND THE UGLY Ryan Barborak, P.E. CST Flexible Pavements Branch The Good, The Bad and The Ugly Every gun makes its own tune. http://www.ranker.com/list/the-good-the-bad-and-the-ugly-movie-quotes/movie-and-tv-quotes?page=2

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM TIP FY 2006-2008 METROPOLITAN PLANNING ORGANIZATIONS - FY 2006 FEDERAL STATE LOCAL OTHER PART TOTAL FUNDING ESTIMATED COST BROWNSVILLE HARLINGEN-SAN BENITO

More information

TESTIMONY. The Texas Transportation Challenge. Testimony Before the Study Commission on Transportation Financing

TESTIMONY. The Texas Transportation Challenge. Testimony Before the Study Commission on Transportation Financing TESTIMONY The Texas Transportation Challenge Testimony Before the Study Commission on Transportation Financing Ric Williamson Chairman Texas Transportation Commission April 19, 2006 Texas Department of

More information

FY TRANSPORTATION IMPROVEMENT PROGRAM

FY TRANSPORTATION IMPROVEMENT PROGRAM FY 2019 2022 TRANSPORTATION IMPROVEMENT PROGRAM Approved for Public Review and Comment: April 16, 2018 Approved by the Policy Board: May 21, 2018 Table of Contents Permian Basin MPO Membership and Structure...

More information

Appendix B Example Project Designs and Engineers Opinion of Costs

Appendix B Example Project Designs and Engineers Opinion of Costs Appendix B Example Project Designs and Engineers Opinion of Costs 32 nd Street from E. 2 nd to Main Avenue CR 251 and CR 250 9 th Street Sidewalk Improvements 15 th Street Improvements Intermodal Facility

More information

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary The adopted FY 2017 FY 2021 CIP is $235.8 million (including prior year expenditures) and is $28 million higher than the previous CIP

More information

Chapter 4: Plan Implementation

Chapter 4: Plan Implementation This chapter discusses the financial and regulatory needs associated with the implementation of this Transportation System Plan. Projected Funding for Transportation Improvements Projecting the revenue

More information

TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION CAPITAL PROGRAM TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily

More information

PUBLIC WORKS CIP SUPPORT

PUBLIC WORKS CIP SUPPORT PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm water management, and

More information

Debt Service Funds

Debt Service Funds Debt Service Funds & Debt Schedules 327 The City issues general obligation bonds, certificates of obligation, combination tax and revenue certificates of obligation and tax notes to provide for the acquisition

More information

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis Attachment B Project Cost Estimates for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA

More information

15,790. Bryan Waco Region. Do you own or lease a personal vehicle? What is your primary means of transportation?

15,790. Bryan Waco Region. Do you own or lease a personal vehicle? What is your primary means of transportation? Bryan Waco Region 1 Houston 2 Dallas 3 Fort Worth 4 San Antonio 5 Austin 6 Laredo Pharr 7 Corpus Christi Yoakum 8 Bryan Waco 9 Atlanta Beaumont Lufkin Paris Tyler 10 Amarillo Childress Lubbock Wichita

More information

Regional Toll Revenue Annual Financial Report

Regional Toll Revenue Annual Financial Report Regional Toll Revenue Annual Financial Report North Central As of September 30, 2011 Texas Council of Governments NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS REGIONAL TOLL REVENUE FINANCIAL REPORT As of

More information

MAINTENANCE DEPARTMENT

MAINTENANCE DEPARTMENT MAINTENANCE DEPARTMENT E-78 City of Mercer Island 2007-2008 Budget Department: Maintenance The Maintenance Department consists of the following functions: 1) administration, 2) capital projects engineering,

More information

17,321 13,351. Overall Statewide Results. How was the survey taken? Do you own or lease a personal vehicle?

17,321 13,351. Overall Statewide Results. How was the survey taken? Do you own or lease a personal vehicle? 10 Overall Statewide Results 3 2 How was the survey taken? 1 Houston 2 Dallas 3 Fort Worth 4 San Antonio 5 Austin 6 Laredo / Pharr 7 Corpus Christi / Yoakum 12 11 5 4 7 8 1 9 Internet Mail Phone 35% 61%

More information

Funding Update. House Transportation Subcommittee on Long-Term Infrastructure Planning September 10, 2015, 9:00 A.M. Capitol Extension E2.

Funding Update. House Transportation Subcommittee on Long-Term Infrastructure Planning September 10, 2015, 9:00 A.M. Capitol Extension E2. Funding Update House Transportation Subcommittee on Long-Term Infrastructure Planning September 10, 2015, 9:00 A.M. Capitol Extension E2.012 Transportation Funding Sources for the FY 2016-2017 Biennium

More information

Intersection Between Oregon s System of Highway Funding and Potential Carbon Policies

Intersection Between Oregon s System of Highway Funding and Potential Carbon Policies Intersection Between Oregon s System of Highway Funding and Potential Carbon Policies Prepared for: Joint Committee on Transportation February 25, 2019 Mark McMullen Oregon State Economist Why We Care:

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements

Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements Resurfacing projects are among the most common and routine types of projects regularly conducted by highway agencies. When resurfacing projects

More information

Unified Planning Work Program

Unified Planning Work Program Unified Planning Work Program New Orleans, Mandeville Covington, Slidell, and Tangipahoa Parish Urbanized Areas ADDENDA FY 2016 2 P a g e Unified Planning Work Program Fiscal Year 2016 Urbanized Areas

More information

... TEXPERS. The Texas Association of Public Employee Retirement Systems

... TEXPERS. The Texas Association of Public Employee Retirement Systems . TEXPERS TEXPERS One Riverway, Suite 1401 Houston, TX 77056-1904 Phone (713) 622-8018 Fax (713) 622-7022 Report on the Asset Allocation and Investment Performance of Texas Public Employee Retirement Systems..........

More information

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway

More information

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP) HINDS Project: 480001 Responsible Agency: CITY OF CLINTON Total Project Cost: $6,068,000 Route: PINEHAVEN/NORTHSIDE DR Fund Source: EARMARK Project Length: 1.25 Pinehaven Dr from Northside Dr to 400' N

More information

TUMF TRANSPORTATION UNIFORM MITIGATION FEE NEXUS REPORT

TUMF TRANSPORTATION UNIFORM MITIGATION FEE NEXUS REPORT TRANSPORTATION UNIFORM MITIGATION FEE NEXUS REPORT TUMF Prepared by: Economic & Planning Systems, Inc. One Kaiser Plaza, Suite 1410, Oakland, CA 94612 510.841.9190 www.epsys.com Nexus Report Transportation

More information

FOREWORD. There are five sections to this document:

FOREWORD. There are five sections to this document: 4/1/2019 @ 4:41:41 PM FOREWORD * This document contains candidate projects which have been identified by districts as ready for letting or obligation of funds in fiscal year 2019 by TxDOT. There are five

More information

COUNTY ADMINISTRATOR PUBLIC WORKS

COUNTY ADMINISTRATOR PUBLIC WORKS COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm

More information

Index of Projects CS 602/CS 650/GRANGE ROAD FROM SR 21 TO E OF SR 25 Z001 GDOT

Index of Projects CS 602/CS 650/GRANGE ROAD FROM SR 21 TO E OF SR 25 Z001 GDOT 0002923 Index of Projects PI # DESCRIPTION FUNDING SR 25 CONN/BAY STREET FROM I-516 TO THE BAY STREET VIADUCT CURRENT SPONSOR FY CST PAGE Z001, Z230 Chatham County 2016 3 0007885 CS 602/CS 650/GRANGE ROAD

More information

... TEXPERS. The Texas Association of Public Employee Retirement Systems

... TEXPERS. The Texas Association of Public Employee Retirement Systems . TEXPERS TEXPERS One Riverway, Suite 1401 Houston, TX 77056-1904 Phone (713) 622-8018 Fax (713) 622-7022 Report on the Asset Allocation and Investment Performance of Texas Public Employee Retirement Systems..........

More information

TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE

TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE Presentation for Texas Transportation Commission March 28, 2018 Purposes of the Workshop The Texas Transportation

More information

Chapter 5: Cost and Revenues Assumptions

Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions INTRODUCTION This chapter documents the assumptions that were used to develop unit costs and revenue estimates for the

More information

NOTICE OF ELECTION 2021 $10,000, $10,000, $10,000, $10,000,000

NOTICE OF ELECTION 2021 $10,000, $10,000, $10,000, $10,000,000 NOTICE OF ELECTION TO THE QUALIFIED VOTERS OF DEKALB COUNTY, GEORGIA NOTICE IS HEREBY GIVEN that on the 7 th day of November, 2017, an election will be held at the regular polling places in all of the

More information

CRS State Profile: Texas

CRS State Profile: Texas CRS State Profile: Texas This is a profile for communities in your state that are participating in the Community Rating System (CRS). This profile is intended to provide information to the State NFIP Coordinator

More information

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade. Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding

More information

TEXAS DEPARTMENT OF TRANSPORTATION

TEXAS DEPARTMENT OF TRANSPORTATION TEXAS DEPARTMENT OF TRANSPORTATION FY 2013-2016 2016 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HOUSTON DISTRICT AUGUST 2014 Quarterly Revision HIGHWAY August 2014 . HOUSTON-GALVESTON AREA COUNCIL

More information

Public Works Maintenance STORMWATER AND

Public Works Maintenance STORMWATER AND Public Works Maintenance STORMWATER AND TRANSPORTATION Mission Statement T H E P U B L I C W O R K S M A I N T E N A N C E D I V I S I O N I S T H E M A I N C U S T O D I A N A N D P R I N C I P A L C

More information

Capital Improvements Program (CIP)

Capital Improvements Program (CIP) Capital Improvements Program (CIP) 373 CAPITAL IMPROVEMENTS PROGRAM Introduction In accordance with the Texas Local Government Code and the Charter of the City of Southlake, the proposed FY 2017 to FY

More information

Transportation Improvement Program

Transportation Improvement Program Houston-Galveston Area Council 2015-2018 Transportation Improvement Program AS ADOPTED May 23, 2014 2015-2018 Transportation Improvement Program () for the Houston-Galveston Transportation Management Area

More information

Transportation Funding

Transportation Funding Transportation Funding TABLE OF CONTENTS Introduction... 3 Background... 3 Current Transportation Funding... 4 Funding Sources... 4 Expenditures... 5 Case Studies... 6 Washington, D.C... 6 Chicago... 8

More information

GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34 the basics

GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34 the basics GASB Statement No. 34 Indiana LTAP Annual Road School Conference Purdue University West Lafayette, Indiana March 11, 2004 GASB Statement No. 34 Summary of Capital Asset and General Infrastructure Accounting

More information

ABILENE MPO TRANSPORTATION POLICY BOARD MEETING

ABILENE MPO TRANSPORTATION POLICY BOARD MEETING ABILENE MPO TRANSPORTATION POLICY BOARD MEETING Tuesday, October 16, 2018 at 1:30 pm City Council Chambers Abilene City Hall 555 Walnut Street, Abilene, Texas 1. Call to Order. Public comment may be taken

More information

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary The adopted FY 2016 FY 2020 CIP is $205.3 million (including prior year expenditures) and is $2.9 million lower than the previous CIP

More information

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6 C ITY OF G EORGETOWN, TEXAS C APITAL I MPROVEMENT P LAN S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6 Georgetown Transportation Advisory Board April 10, 2015 Table of Contents Introduction... 1 Transportation

More information

IMPACT FEE CREDIT APPLICATION & GUIDELINES

IMPACT FEE CREDIT APPLICATION & GUIDELINES IMPACT FEE CREDIT APPLICATION & GUIDELINES Land Development Division City of Kansas City, Missouri Updated on January 2009 TABLE OF CONTENTS I. Introduction II. III. IV. Defined terms Formulas Items Not

More information

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION Amendment # 2 FY 2017-2020 Transportation Improvement Program Amendment Summary: The Transportation Improvement Program (TIP)

More information

Hot Springs Bypass Extension TIGER 2017 Application. Benefit-Cost Analysis Methodology Summary

Hot Springs Bypass Extension TIGER 2017 Application. Benefit-Cost Analysis Methodology Summary TIGER 2017 Application Overview This project proposes to extend the Hot Springs Bypass (US 70/US 270) from US 70 to State Highway 7 in Garland County, Arkansas. The 5.5 mile facility will initially consist

More information

Overview of Funding Sources

Overview of Funding Sources Overview of Funding Sources 0 Transportation 0 Transportation Sales Tax 0 License Tax 0 G.O. Bonds 0 CIP Sales Tax 0 General Fund 0 Public Safety, Facilities, Buildings 0 G.O. Bonds 0 General Fund 0 Stormwater

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five DISTICT FIVE POJECT OVEVIE Florida s Turnpike Enterprise continues to make significant project investments in District Five. In FY 2017 and FY 2018, current Turnpike projects total over $419 million within

More information

Right-of-Way Construction Permit Application

Right-of-Way Construction Permit Application Address Permit # Date Approved: Right-of-Way Construction Permit Application APPLICANT INFORMATION Company s Legal Name (Owner of Facilities) Address City State Zip (Area Code) Telephone # 24-Hour Emergency

More information

BROWNSVILLE METROPOLITAN PLANNING ORGANIZATION F.Y F.Y METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

BROWNSVILLE METROPOLITAN PLANNING ORGANIZATION F.Y F.Y METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM (TIP) BROWNSVILLE METROPOLITAN PLANNING ORGANIZATION F.Y. 2017-F.Y. 2020 METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM (TIP) By: Brownsville MPO Staff City Plaza 1034 E. Levee St., 2 nd floor Brownsville,

More information

Instructions for Completing the Annual Road and Street Finance Report

Instructions for Completing the Annual Road and Street Finance Report Instructions for Completing the Annual Road and Street Finance Report Additional information you wish to submit may be attached to the report on 8.5" by 11" paper. Please round all amounts up or down to

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five DISTICT FIVE POJECT OVEVIE Florida s Turnpike Enterprise continues to make significant project investments in District Five. In FY 2017 and FY 2018, current Turnpike projects total over $419 million within

More information

CAPITAL IMPROVEMENTS PROGRAM (CIP)

CAPITAL IMPROVEMENTS PROGRAM (CIP) CAPITAL IMPROVEMENTS PROGRAM (CIP) A CIP is for the purchase, construction or replacement of the physical assets of the City. This section includes a listing of proposed projects for FY 2014 as well as

More information

Transportation Planning FAQ s

Transportation Planning FAQ s Transportation Planning FAQ s 1. What is the Master Thoroughfare Plan (MTP)? The Master Thoroughfare Plan defines the network of existing and future roads deemed appropriate to accommodate the various

More information

Selected Economic Data for Texas Cooperative Extension, Central Texas District (8)

Selected Economic Data for Texas Cooperative Extension, Central Texas District (8) Panhandle (1) Selected Economic Data for Texas Cooperative Extension, Central Texas District (8) Dennis U. Fisher February 14, 2002 South Plains (2) Rolling Plains (3) North Texas (4) West Central (7)

More information

TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY

TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY Texas Transportation Commission September 26, 2018 Governor s Charge for Congestion Relief Initiative The State of Texas is spurring

More information

FY Annual Budget: Mobility Solutions, Infrastructure, & Sustainability

FY Annual Budget: Mobility Solutions, Infrastructure, & Sustainability FY 2018-19 Annual Budget: Mobility Solutions, Infrastructure, & Sustainability City Council Briefing August 15, 2018 Majed Al-Ghafry, Assistant City Manager Overview FY 2018-19 Budget by Strategic Priority

More information

CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION. Local Option Sales Tax Funds $ 500,000

CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION. Local Option Sales Tax Funds $ 500,000 CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION On-Going Pavement Management Program: In 2009/2010 the city completed the initial 3-year plan

More information

Capital Improvements Program FY FY2020

Capital Improvements Program FY FY2020 FY2016 - FY2020 CITY OF MANVEL, TEXAS April 25, 2016 prepared for: City of Manvel Mayor and Council 20025 Morris Avenue Manvel, Texas 77578 prepared by: 19701 Morris Avenue, Manvel, Texas 77578 TBPE F-9827

More information

Merced County Transportation Sales Tax Expenditure Plan

Merced County Transportation Sales Tax Expenditure Plan Merced County Transportation Sales Tax Expenditure Plan November 2005 Prepared by Merced County Association of Governments 369 West 18 th Street Merced, CA 95340 209-723-3153 http://mcag.cog.ca.us Summary

More information

CAPITAL PROJECTS Department Expenditures By Cost Center FY03 Actual FY04 Budget FY05 Request

CAPITAL PROJECTS Department Expenditures By Cost Center FY03 Actual FY04 Budget FY05 Request CAPITAL PROJECTS Capital Projects encompass governmental projects including transportation, criminal courts and jail facilities, law enforcement communications, drainage improvements, park additions, beach

More information

A Citizen s Guide to Transportation in Missouri. Patrick K. McKenna, Director Missouri Department of Transportation January 2017

A Citizen s Guide to Transportation in Missouri. Patrick K. McKenna, Director Missouri Department of Transportation January 2017 A Citizen s Guide to Transportation in Missouri Patrick K. McKenna, Director Missouri Department of Transportation January 2017 Citizens and policy makers need answers to several questions: What is

More information

COUNTY COUNCIL FOR MONTGOMERY COUNTY, MARYLAND

COUNTY COUNCIL FOR MONTGOMERY COUNTY, MARYLAND Bill No. 31-03 Concerning: Transportation Impact Tax - Amendments Revised: 10-27-03 Draft No. 4 Introduced: September 9, 2003 Enacted: October 28, 2003 Executive: Effective: March 1, 2004 Sunset Date:

More information

Review and Update of Year 2035 Regional Transportation Plan

Review and Update of Year 2035 Regional Transportation Plan Review and Update of Year 2035 Regional Transportation Plan #217752 1 Background Every four years, the Year 2035 Plan is reviewed Elements of review Validity of Plan Year 2035 forecasts Transportation

More information

2012 Ballot Initiatives Report

2012 Ballot Initiatives Report 2012 Ballot Initiatives Report Voters on November 6 showed once again the importance of transportation by approving 68 percent of the measures to or extend funding for highways, bridges and transit. This

More information

Year 2014 Engineer s Report regarding the Status of ownership, Working order and Condition of the Public Infrastructure.

Year 2014 Engineer s Report regarding the Status of ownership, Working order and Condition of the Public Infrastructure. Year 2014 Engineer s Report regarding the Status of ownership, Working order and Condition of the Public Infrastructure. Project: MEADOW PINES (AKA COBBLESTONE) PEMBROKE PINES, FL Prepared for: MEADOW

More information