1 March 15, 2012 TPO Board and Advisory Committee Meetings Development of the Cost Feasible Plan Transportation Outlook 2035 LRTP Update Atkins Development of the Cost Feasible Plan

2 P a g e 1 Development of the Draft Cost Feasible Plan The development of the Cost Feasible Plan for the Okaloosa- Walton TPO requires an evaluation of overall transportation system needs within the context of available financial resources for mobility projects. This is consistent with SAFETEA-LU requirements for the development of long-range transportation plan (LRTPs), which requires that transportation plans developed for urbanized areas be financially constrained and as of December 11, 2007, that the Cost Feasible Plan reflect the Year of Expenditure for each project. This requirement calls for the Cost Feasible Plan to identify revenue in five-year increments as well as the development of project costs to reflect future year costs. This has caused the Cost Feasible Plan to be developed in a way that creates five-year funding stages. Project Costs are then budgeted against forecasted revenues for each period while matching the mobility demands of the periods. Therefore, the Cost Feasible Plan typically matches the highest priority needs with the anticipated revenue. The Cost Feasible Plan establishes the priorities for needed mobility projects and underscores the value the community places on investments in various modes of travel. How an area chooses to spend its limited financial resources present the clearest picture of its priorities for long-range mobility improvements as a means to achieve community objectives, such as quality of life, economic development, and protecting the environment. The Okaloosa-Walton TPO, its advisory committees, the LRTP Steering Committee, along with members of the general public, participated in the development of the Cost Feasible Plan through several public workshops, numerous Focus Group meetings, and advisory committee meetings. The first step in the development of the Cost Feasible Plan is to develop project cost estimates for all projects included in the adopted Needs Plan. This task was completed by Atkins with assistance from the TPO staff, FDOT staff and local government staff. Project costs were developed through the use of various forms of information including the following: FDOT District Three general transportation costs Specific project costs from completed PD&E studies Specific project costs from local government design plans Project cost estimates were developed for each phase of the project where applicable. These typical phases include the following: The first phase is the Project Development and Environmental (PD&E)* study, which must be completed for transportation projects to evaluate corridor alternatives, solicit public input, and receive concept approvals. The second phase is Final Design*, which is the development of a complete set of detailed design drawings of the selected corridor concept. (Final Design also is referred to as Preliminary Engineering (P.E.)

3 P a g e 2 The third phase is Right-of-Way (ROW), which involves purchasing needed land and easements for construction and wetland or drainage mitigation. The fourth phase is Construction, which involves the actual construction of the mobility project. A parallel phase is Construction Engineering and Inspection (CEI), which involves inspection of the construction project to insure compliance with the final design specifications. * Funding for the PD&E and Final Design phases are from project development set-a-sides which are over and above the $192.6 million available. The total estimated cost of the 2035 Needs Plan (in 2011 dollars) is just over $6 Billion. Capacity Programs SIS Highways /FIHS Construction / ROW Other Arterial Construction /ROW Transit Funds Capacity Programs FYs Subtotal FYs Subtotal FYs Subtotal FYs Subtotal 22 Year $6,530,000 $49,490,000 $13,600,000 $2,520,000 $72,140,000 $41,600,000 $46,700,000 $50,000,000 $54,300,000 $192,600,000 $13,300,000 $14,900,000 $16,600,000 $18,200,000 $63,000,000 $61,430,000 $111,090,000 $80,200,000 $75,020,000 $327,740,000 In order to determine how many of these projects can be included in the Cost Feasible Plan we first needed to estimate how much revenue we would have to work with. The Florida Department of Transportation provided funding forecasts for State and Federal transportation revenues for Fiscal Year 2016 through The following table summarizes the revenues available to the Okaloosa-Walton TPO for the purposes of developing the 2035 Cost Feasible Plan. Based on this information, the TPO has approximately $327 Million to develop the 2035 Cost Feasible Plan. This equates to the ability to fund approximately 5% of the mobility needs of the region.

4 P a g e 3 DRAFT 2035 COST FEASIBLE SCERIO LIST OF PROJECTS Projects with Construction Funding US331 (SR83) South of SR20 to Owl s Head Road (construction phase partially funded) US331 (SR83) Owl s Head Road to North Nokuse Plantation US331 (SR83) North Nokuse Plantation to Edgewood Circle US331 (SR85) South of Bay Grove Road to South of SR20 US331 (SR85) Construction of bridge structure over Choctawhatchee Bay (funded with non SIS state and federal funds & will require $75 million of local funds to construct) SR123 North of Turkey Creek to SR85 North SR123 North of SR85 South to North of Toms Creek US98 (SR30) at the entrance to Hurlburt Field Construct grade separated interchange (Department of Defense Funds and other federal and state funds are currently being sought to implement project) SR85 at the entrance to Duke Field Construct grade separated interchange (Defense Access Funds currently committed to project) Destin Crosstown Connector provide 2 lanes of enhanced Advanced Traffic Management System Enhancements (Equipment Upgrades) Projects with Funding through Purchase of Right-of-Way Only US331 (SR83) Edgewood Circle to I-10 (SR8) (ROW only partially funded) SR123 North of Tom s Creek to North of Turkey Creek - US98 (SR30) at Stahlman Avenue Major intersection improvement US98 (SR30) Okaloosa County Line to Tang-O-Mar Drive Provide 6 lanes of PJ Adams/Antioch Road SR85 South to US90 (SR10) Crestview Bypass US90 (SR10) to SR85 North Projects with Funding for Planning and Engineering Only Hollywood Boulevard extension Provide 2 lane connection to US98 US98 (SR30) SR87 to Hurlburt Field Entrance Provide 6 lanes of High Capacity Transit Projects Express transit service from DeFuniak Sprigs to South Walton County via US331 Express transit service from Niceville to Destin via SR20 and the Mid-Bay Bridge Express transit service from Fort Walton Beach to Destin via US98 (SR30) Park-and-Ride Projects SR285 and US90 (SR10) at Mossy Head Construct park-and-ride lot SR85 and Commerce Drive in the Crestview Community Center parking lot designate park-and-ride spaces Rattlesnake Bluff and SR85 Construct park-and-ride lot SR20 and East Bay Loop Road (City of Freeport) Construct park-and-ride lot US331 (SR83) and Rockhill Road Construct park-and-ride lot Other Projects Areawide Traffic Signal System Operations and Maintenance - $600,000 Funded Annually for Okaloosa and Walton Counties Traffic signal synchronization systems enhancements - $300,000 Funded annually for Okaloosa and Walton Counties

5 P a g e 4 Corridor Management Studies - $125,000 Funded Annually for Corridor Studies Corridor Management Plan Improvements - $1,625,000 Funded Annually to Implement Projects from Corridor Management Studies Bicycle & Pedestrian Master Plan Projects - $400,000 Funded annually to Implement Projects from the Bicycle & Pedestrian Master Plan Transit Operations and Maintenance - $63,000,000 Funded between 2016 and 2035 for operations and maintenance of existing transit services Enhancement Program - $14,900,000 funded between 2016 and 2035 for bicycle and pedestrian enhancement projects Mid-Bay Bridge South approach to north approach Add new 2 lane bridge span over Choctawhatchee Bay Northwest Florida Transportation Corridor Authority Airport Connector - SR85 to SR123 study of potential toll facility. Intelligent Transportation System (ITS) Master Plan Projects Traffic Operations Center - $500,000 Traffic signal equipment upgrades - $40,000 Intersection detection systems - $600,000 Potential Toll Projects Mid-Bay Bridge Road Range Road to SR85 widen to 4 lanes Locally Funded Projects Local share of the US331 Bridge - $75,000,000

6 Intersection Needs Interchange Needs Park N Ride Lots Cost Feasible Plan- Preferred 4 Lane 6 Lane Enhanced 2 Lane New 2 Lane New 4 Lane OKALOOSA Crestview BOX FUNDS: Areawide Traffic Signal System Operations & Maintenance Walton County $200,000 Annually Areawide Traffic Signal System Operations & Maintenance Okaloosa County $400,000 Annually Traffic Signal Synchronization System Enhancements - $300,000 Annually Corridor Management Plan Development - $125,000 Annually Corridor Management Improvement Projects - $1,625,000 Annually Bicycle and Pedestrian Projects - $400,000 Annually Enhancement Program - $14,900,000 from De Funiak Springs Transportation Outlook 2035 February 2012 Transit NWFTCA Projects 16 MPO Boundary EGLIN AIR FORCE BASE A Niceville Valparaiso Freeport Preferred Cost Feasible Plan 75 Eglin AFB 105 Wright Ocean City Lake Lorraine Fort Walton Beach Destin 7 Miramar Beach 98

7 P a g e 6 Draft Preferred 2035 Cost Feasible Plan Scenario Strategic Intermodal System/Florida Intrastate Highway System Cost Feasible Plan Projects Map ID Improvement PD&E Design ROW CST/CEI Partial Funding Complete FY11 16 US331 (SR83) - Edgewood Circle to I-10 FY16 Unfunded 99 US331 (SR83) North of Nokuse Plantation to Edgewood Circle 104 US331 (SR83) - Owl's Head Rd to North of Nokuse Plantation 15 US331 (SR83) - South of SR20 to Owl's Head Road 100 US331 (SR83) - South of Bay Grove Rd to S of SR20 14 US331 (SR83) - South end of Bridge to North end of Bridge 1,3 29 SR123 - North of Turkey Creek to SR85N 2,3 28 SR123 - North of Toms Creek to North of Turkey Creek 27 SR123 - North of SR85S to North of Toms Creek (Construction phase funded with Other Arterial Funds) 7 US98 (SR30) - Okaloosa County Line to Tang O Mar Drive 103 SR85 a Duke Field Entrance (Design/Build project with Defense Access Funds) Provide 6 lanes of Construct grade separated interchange Complete Underway Underway FY12 Complete Complete Underway FY11 Complete FY13 Complete Partial Funding FY26-30 Complete Complete Underway FY12 Complete FY13 FY13 FY13 Complete FY12 FY12 FY14 Complete FY12 FY12 Unfunded Complete FY12 FY12 FY26-30 Complete Underway FY21-25 Unfunded Complete FY11 FY11 FY11

8 P a g e 7 Other Arterial Cost Feasible Plan Projects Map ID Improvement PD&E Design ROW CST/CEI Areawide Signal System Upgrade Okaloosa Areawide Signal System Upgrade Walton Operation and Maintenance Operation and Maintenance FY11 FY11 FY11 FY11 Advanced traffic management system enhancements Equipment Upgrades 86 SR285 and US90 (SR10) at Mossy Head Build Park and Ride Lot 87 SR85 and Commerce Drive Build Park and Ride Lot 89 Rattlesnake Bluff Road Build Park and Ride Lot 91 SR20 and East Bay Loop Road (Freeport) Build Park and Ride Lot 92 US331 (SR83) and Rockhill Road Build Park and Ride Lot FY15 FY15 FY16-20 FY16-20 FY16-20 FY16-20 FY16-20

9 P a g e 8 Other Arterial Cost Feasible Plan Projects, Continued Map ID Improvement PD&E Design ROW CST/CEI 2 US98 (SR30) - SR87 to the Hurlburt Field Entrance Provide 6 lanes of 3 US98 (SR30) - at the Hurlburt Field Entrance Construct interchange 55 Crestview Bypass - PJ Adams/Antioch - SR85 to US A Northwest Florida Transportation Corridor Authority Airport Connector from SR85 to SR123 Study of potential new toll corridor 42 Crestview Bypass - US90 to SR85 North FY21-25 FY26-30 Unfunded Unfunded Partial Funding Complete FY16-20 FY16-20 FY16-20 Underway Underway FY31-35 Unfunded FY16-20 Unfunded Unfunded Unfunded FY16-20 FY16-20 FY31-35 Unfunded 52 Hollywood Blvd Ext - US98 to Hollywood Blvd Provide for 2 lane connection FY26-30 FY31-35 Unfunded Unfunded 27 SR123 - North of SR85S to North of Toms Creek (PD&E, Design & ROW phases funded with SIS funds) Complete FY12 FY12 FY Destin Crosstown Connector 1 US98 - at Stahlman Ave Provide 2 lanes of enhanced Major intersection improvement Complete FY16-20 FY26-30 FY31-35 FY21-25 FY21-25 FY26-30 Unfunded

10 P a g e 9 Other Arterial Cost Feasible Plan Transit Projects Map ID Improvement Feasibility/Route Study Capital Purchases 74 Express Transit Service - DeFuniak Springs to S Walton County 75 Express Transit Service - Niceville to Destin 72 Express Transit Service - Fort Walton Beach to Destin Funding for transit projects does not include operation or maintenance funding Provide express transit service Provide express transit service Provide express transit service FY16-20 FY16-20 FY16-20 FY31-35 FY31-35 FY31-35

11 P a g e 10 Box Funds Map ID Improvement PD&E Design ROW CST/CEI Areawide Traffic Signal System - Operations and Maintenance Walton Areawide Traffic Signal System - Operations and Maintenance - Okaloosa Traffic signal synchronization system enhancements Corridor Management Plan Development Corridor Management Improvement Projects Bicycle and Pedestrian Projects Enhancement Program

12 P a g e 11 ITS Master Plan Projects Map ID Improvement PD&E Design ROW CST/CEI Traffic Operations Center Equipment Upgrades Intersection Detection Systems

13 P a g e 12 Toll Funded Cost Feasible Plan Projects Map ID Improvement PD&E Design ROW CST/CEI 39 5 Mid-Bay Bridge Road - Range Rd to SR Mid-Bay Bridge Road - Mid-Bay Bridge to Range Road Construct new 2 lane facility Construct new 4 lane facility Complete Complete Complete Underway Complete Complete Complete Underway 39 Mid-Bay Bridge Road - Range Road to SR85 Widen to 4 lanes FY16-20 FY16-20 FY Mid-Bay Bridge Construct second 2 lane bridge span FY16-20 FY16-20 FY21-25 FY A Northwest Florida Transportation Corridor Authority Airport Connector from SR85 to SR123 Study of potential new toll corridor FY16-20 Unfunded Unfunded Unfunded 1 $102 Million of non SIS state and federal funds; $75 Million of local funds 2 Construction funded with Other Arterial Funds 3 Funded in Tentative FDOT FY Work Program 4 LAP FY 2011 / TRIP Reimbursement in FY14 5 Currently constructing a 2 lane facility that can be expanded to a 4 lane facility

14 Transportation Outlook 2035 Proposed Cost Feasible Plan - Preferred Highway Project Roadway Project of Current Length Project Grand ID Corridor From To Description County Commerce Priority (miles) Cost (2010 $) PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST Strategic Intermodal System (SIS)/Florida Intrastate Highway System (FIHS) Cost Feasible Plan Projects 16 US331 (SR83) Edgewood Circle I-10 (SR8) Walton Yes Yes $ 314,442 $ 20,000,000 $ 20,314,442 $ 20,314, US331 (SR83) Owl's Head Road North Nokuse Plantation Walton Yes Yes 2.26 $ 7,866,000 $ 7,866,000 $ 7,866, US331 (SR83) North Nokuse Plantation Edgewood Circle Walton Yes Yes $ 14,820,000 $ 14,820,000 $ 14,820,000 $ 14,820, US331 (SR83) South of SR20 Owl's Head Road Walton Yes Yes $ 531,165 $ 531,165 $ 531, US331 (SR83) South of Bay Grove Rd South of SR20 Walton Yes Yes $ 28,520,167 $ 28,520,167 $ 28,520,167 $ 28,520, US331 (SR83) South end of Bridge North end of Bridge Walton Yes Yes 3.7 $ 176,700,999 $ 102,700,000 $ 102,700,000 $ 102,700, SR123 North of SR85 South North of Toms Creek Okaloosa No Yes 2 $ 1,617,180 $ 227,490 $ 1,844,670 $ 1,844, SR123 North of Toms Creek North of Turkey Creek Okaloosa No Yes $ 1,700,000 $ 227,490 $ 1,927,490 $ 1,927, SR123 North of Turkey Creek SR85 North Okaloosa No Yes $ 1,312,011 $ 227,490 $ 13,800,000 $ 15,339,501 $ 15,339,501 7 US98 (SR30) Okaloosa County Line Tang O Mar Drive Provide 6 lanes of Walton Yes Yes 3.33 $ 35,845,508 $ 49,500,000 $ 49,500,000 $ 49,500,000 Construct grade separated 103 SR85 at Duke Field Entrance interchange Okaloosa Yes Yes $ 15,000,000 $ 15,000,000 $ 15,000,000 $ 15,000,000 s $ 270,886,674 $ 4,943,633 $ 21,213,635 $ 182,706,167 $ 208,863,435 $ - $ 49,500,000 $ - $ 49,500,000 $ - $ - $ - $ - $ - $ - $ - $ - $ 258,363,435 Highway Project Roadway Project of Current Length Project Grand ID Corridor From To Description County Commerce Priority (miles) Cost (2010 $) PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST Other Arterial Cost Feasible Plan Projects 98 Areawide Signal System Upgrade Advance Traffic Management System (TMS) FWB No Yes $ 600,000 $ 600,000 $ 600,000 $ 600, Areawide Signal System Upgrade Areawide computerized traffic signal system Okaloosa No Yes $ 1,400,000 $ 1,400,000 $ 1,400,000 $ 1,400, Areawide Signal System Upgrade Areawide computerized traffic signal system Walton No Yes $ 400,000 $ 400,000 $ 400,000 $ 400, SR285 and US90 (SR10) at Mossy Head Build Park and Ride Lot Walton No - $ 150,000 $ 189,000 $ 189,000 $ 189, SR85 and Commerce Drive in the Crestview Community Center parking lot Build Park and Ride Lot Okaloosa No - $ 150,000 $ 189,000 $ 189,000 $ 189, Rattlesnake Bluff Road and SR85 Build Park and Ride Lot Okaloosa No - $ 150,000 $ 189,000 $ 189,000 $ 189, SR20 and East Bay Loop Road (Freeport) Build Park and Ride Lot Walton No - $ 150,000 $ 189,000 $ 189,000 $ 189, US331 (SR83) and Rockhill Road Build Park and Ride Lot Walton No - $ 150,000 $ 189,000 $ 189,000 $ 189, Express Transit Service DeFuniak Springs South Walton County Provide express transit service Walton No 22 $ 2,537,500 $ 441,000 $ 441,000 $ 358,750 $ 3,587,500 $ 3,946,250 $ 4,387, Express Transit Service Niceville Destin Provide express transit service Okaloosa No 12 $ 2,610,000 $ 453,600 $ 453,600 $ 369,000 $ 3,690,000 $ 4,059,000 $ 4,512, Express Transit Service Fort Walton Beach Destin Provide express transit service Okaloosa No 7 $ 2,537,500 $ 441,000 $ 441,000 $ 358,750 $ 3,587,500 $ 3,946,250 $ 4,387,250 2 US98 (SR30) SR87 (Santa Rosa County) Hurlburt Field Entrance Provide 6 lanes of Okaloosa Yes Yes 11.2 $ 131,829,953 $ 5,762,693 $ 5,762,693 $ 14,517,982 $ 14,517,982 $ 20,280, Crestview Bypass (west) US90 (SR10) SR85 North Okaloosa No Yes 4.35 $ 29,894,505 $ 2,973,717 $ 2,973,717 $ 19,352,759 $ 19,352,759 $ 22,326, PJ Adams/Antioch Road SR85 (Ferdon Boulevard) US90 (SR10) Okaloosa Yes Yes $ 98,900,000 $ 4,433,000 $ 4,433,000 $ 21,496,021 $ 21,496,021 $ 25,929, Hollywood Blvd. Extension US98 (SR30) Hill Avenue Provide 2 lanes of Okaloosa No Yes 1.02 $ 15,933,083 $ 818,839 $ 818,839 $ 964,725 $ 964,725 $ 1,783,564 Provide 2 lanes of enhanced 51 Destin Cross Town Connector Stahlman Avenue Main Street Okaloosa No Yes 1.67 $ 5,936,850 $ 694,386 $ 694,386 $ 4,358,700 $ 4,358,700 $ 5,905,538 $ 5,905,538 $ 10,958,624 1 US98 (SR30) at Stahlman Avenue Major intersection improvement Okaloosa Yes No $ 2,844,000 $ 390,720 $ 390,720 $ 2,088,000 $ 2,088,000 $ 2,478, SR123 North of SR85 South North of Toms Creek Okaloosa Yes Yes 2 $ 21,660,000 $ 37,688,400 $ 37,688,400 $ 37,688, US331 (SR83) South of SR20 Owl's Head Road Walton Yes Yes $ 25,976,390 $ 10,200,000 $ 10,200,000 $ 10,200,000 s $ 343,809,781 $ 4,433,000 $ - $ 2,400,000 $ 6,833,000 $ 5,003,703 $ - $ 945,000 $ 5,948,703 $ 6,153,413 $ - $ - $ 6,153,413 $ 15,336,822 $ 6,446,700 $ 47,888,400 $ 69,671,922 $ 964,725 $ 41,935,280 $ 16,770,538 $ 59,670,542 $ 148,277,579 Highway Project Roadway Project of Current Length Project Cost Grand ID Corridor From To Description County Commerce Priority (miles) (2010 $) Per Yr PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST Box Funds Areawide Traffic Signal System - Operations and Maintenance Okaloosa Yes $ 400,000 $ 2,000,000 $ 2,000,000 $ 2,000,000 $ 2,000,000 $ 2,000,000 $ 2,000,000 $ 2,000,000 $ 2,000,000 $ 8,000,000 Areawide Traffic Signal System - Operations and Maintenance Walton Yes $ 200,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 4,000,000 Traffic signal synchronization system enhancements Both Yes $ 300,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 6,000,000 Corridor Management Plan Development Both Yes $ 125,000 $ 625,000 $ 625,000 $ 625,000 $ 625,000 $ 625,000 $ 625,000 $ 625,000 $ 625,000 $ 2,500,000 Corridor Management Improvement Projects Both Yes $ 1,625,000 $ 8,125,000 $ 8,125,000 $ 8,125,000 $ 8,125,000 $ 8,125,000 $ 8,125,000 $ 8,125,000 $ 8,125,000 $ 32,500,000 Bicycle and Pedestrian Projects Both Yes $ 400,000 $ 2,000,000 $ 2,000,000 $ 2,000,000 $ 2,000,000 $ 2,000,000 $ 2,000,000 $ 2,000,000 $ 2,000,000 $ 8,000,000 Enhancement Program Both Yes $ 14,900,000 $ 3,500,000 $ 3,500,000 $ 3,700,000 $ 3,700,000 $ 3,800,000 $ 3,800,000 $ 3,900,000 $ 3,900,000 $ 14,900,000 s $ 17,950,000 $ - $ 18,750,000 $ 18,750,000 $ 18,950,000 $ 18,950,000 $ 19,050,000 $ 19,050,000 $ 19,150,000 $ 19,150,000 $ 75,900,000 Highway Project Roadway Project of Current Length Project Grand ID Corridor From To Description County Commerce Priority (miles) Cost (2010 $) PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST Transit Projects Transit Maintenance Funding of the existing transit services and routes Okaloosa Yes $ 13,300,000 $ 13,300,000 $ 14,900,000 $ 14,900,000 $ 16,600,000 $ 16,600,000 $ 18,200,000 $ 18,200,000 $ 63,000,000 Combination of FTA funds and State funds s $ - $ - $ - $ - $ - $ - $ - $ 13,300,000 $ 13,300,000 $ - $ - $ 14,900,000 $ 14,900,000 $ - $ - $ 16,600,000 $ 16,600,000 $ - $ - $ 18,200,000 $ 18,200,000 $ 63,000,000 Highway Project Roadway Project of Current Length Project Grand ID Corridor From To Description County Commerce Priority (miles) Cost (2010 $) PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST ITS Master Plan Projects Traffic Operations Center Both Yes $ 500,000 $ 630,000 $ 630,000 $ 630,000 Equipment Upgrades Both Yes $ 40,000 $ 50,400 $ 50,400 $ 50,400 Intersection Detection Systems Both Yes $ 600,000 $ 189,000 $ 189,000 $ 222,000 $ 222,000 $ 261,000 $ 261,000 $ 307,500 $ 307,500 $ 979,500 s $ 1,140,000 $ - $ - $ - $ - $ - $ - $ 869,400 $ 869,400 $ - $ - $ 222,000 $ 222,000 $ - $ - $ 261,000 $ 261,000 $ - $ - $ 307,500 $ 307,500 $ 1,659,900 Highway Project Roadway Project of Current Length Project Grand ID Corridor From To Description County Commerce Priority (miles) Cost (2010 $) PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST Toll Funded Cost Feasible Plan Projects Mid-Bay Bridge Road Range Road SR85 Construct new 2 lane facility Okaloosa Yes 8.1 Under CST $ - Mid-Bay Bridge Road Mid-Bay Bridge Range Road Construct new 4 lane facility Okaloosa Yes 2.8 Under CST $ - 39 Mid-Bay Bridge Road Range Road SR85 Widen to 4 lanes Okaloosa Yes 8.1 $ 59,683,728 $ 2,159,400 $ 2,159,400 $ 22,862,215 $ 22,862,215 $ 25,021, Mid-Bay Bridge South Approach North Approach Add new 2 lane bridge span Okaloosa Yes 3.6 $ 195,400,000 $ 23,940,000 $ 23,940,000 $ 46,620,000 $ 46,620,000 $ 144,900,000 $ 144,900,000 $ 215,460,000 82A NWFTCA - Airport Connector SR123 SR85 new Okaloosa No No $ 600,000 $ 600,000 s $ 255,683,728 $ 26,099,400 $ 46,620,000 $ 46,620,000 $ 167,762,215 $ 167,762,215 $ 240,481,

15 Highway Project Roadway Project of Current Length Project Grand ID Corridor From To Description County Commerce Priority (miles) Cost (2010 $) PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST Local Funded Cost Feasible Plan Projects 14 US331 (SR83) South end of Bridge North end of Bridge Provide 6 lanes of Walton Yes Yes 3.7 $ 75,000,000 $ 75,000,000 $ 75,000,000 $ 75,000,000 s $ 75,000,000 $ 75,000,000 $ 75,000,000 $ 75,000,000 Highway Project Project Description of Current Length Project ID County Commerce Priority (miles) Cost (2010 $) PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST PE/PDE ROW CST Source Other Projects 3 US98 (SR30) at the Hurlburt Field Entrance Construct grade separated interchange at Hurlburt Field Entrance Okaloosa Yes Yes $ 21,000,000 $ 1,000,000 $ 30,429,000 $ 31,429,000 $ - $ 31,429,000 Department of Defense funds and other federal and state funds currently being sought to implement project s $ 21,000,000 $ 1,000,000 $ 30,429,000 $ 31,429,000 $ 31,429,000 Other Arterial Sub $ 192,545,817 Fiscal Year Sub s $ 9,376,633 $ 21,213,635 $ 260,106,167 $ 290,696,435 $ 5,003,703 $ 1,000,000 $ 64,293,400 $ 96,396,502 $ 6,153,413 $ 46,620,000 $ 34,072,000 $ 86,845,413 $ 15,336,822 $ 6,446,700 $ 251,561,615 $ 273,345,137 $ 964,725 $ 41,935,280 $ 54,428,038 $ 97,328,042 $ 554,788,

16 P a g e 15 For More Information The Okaloosa-Walton TPO welcomes your input, comments, and questions on the Long Range Transportation Plan (known as Transportation Outlook 2035) or other TPO planning activities. Contact Christy Johnson, AICP, LRTP Project Manager or Rhonda Grice, Public Involvement Coordinator for more information or to provide feedback, let us know your needs and priorities, submit comments, ask questions, and sign up to receive newsletters. Website Visit tinyurl.com/ow-lrtp to learn more about the plan, scheduled events, and projects under consideration. Presentations To date, there have been over 15 presentations to community and civic groups exposing over 200 people to the 2035 Long Range Plan Update. Ms. Christy Johnson, AICP LRTP Project Manager Christy.Johnson@wfrpc.org (850) x x 203 Public Workshops At various points throughout the Long Range Plan Update process, public workshops have been held. Thus far four have been held at various times and locations around the study area. Ms. Rhonda Grice Public Involvement Coordinator Rhonda.Grice@wfrpc.org (850) x x 214 Mr. Wiley Page, AICP Atkins Project Manager Wiley.page@atkinsglobal.com (904) Newsletters Transportation Outlook 2035 newsletters are distributed and posted on the website before the public workshops. They contain the latest happenings and information on upcoming workshops. Thus far, 4 have been published.

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Adopted August 22, 2013 This report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, the Florida

More information

Cost Feasible Plan Technical Report TRANSPORTATION OUTLOOK 2035 OKALOOSA-WALTON 2035 LONG RANGE TRANSPORTATION PLAN UPDATE.

Cost Feasible Plan Technical Report TRANSPORTATION OUTLOOK 2035 OKALOOSA-WALTON 2035 LONG RANGE TRANSPORTATION PLAN UPDATE. Cost Feasible Plan Technical Report TRANSPORTATION OUTLOOK 2035 OKALOOSA-WALTON 2035 LONG RANGE TRANSPORTATION PLAN UPDATE Prepared for the Okaloosa-Walton Transportation Planning Organization and The

More information

Transportation Outlook 2040

Transportation Outlook 2040 Technical Report Prepared for: Okaloosa-Walton Transportation Planning Organization and The Florida Department of Transportation, District Three Prepared by: West Florida Regional Planning Council Staff

More information

AGENDA ITEM 1: Call to Order Chairman Hofstad called the meeting to order. AGENDA ITEM 2: Public Forum There were no speakers for the public forum.

AGENDA ITEM 1: Call to Order Chairman Hofstad called the meeting to order. AGENDA ITEM 2: Public Forum There were no speakers for the public forum. OKALOOSA-WALTON TRANSPORTATION PLANNING ORGANIZATION (TPO) TECHNICAL COORDINATING COMMITTEE (TCC) MEETING MINUTES WEST FLORIDA REGIONAL PLANNING COUNCIL (Designated Staff) NICEVILLE COMMUNITY CENTER, 204

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

C. CONSENT AGENDA Approval of Consent Agenda: Chairperson Czonstka called for action on the consent agenda.

C. CONSENT AGENDA Approval of Consent Agenda: Chairperson Czonstka called for action on the consent agenda. WEST FLORIDA REGIONAL PLANNING COUNCIL (Designated Staff) NICEVILLE COMMUNITY CENTER, 204 North Partin Drive; Niceville, FL AUGUST 16, 2012 Members Attending: Steven Czonstka, Chairman Dale Blanchard Tony

More information

Chapter 5: Cost and Revenues Assumptions

Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions INTRODUCTION This chapter documents the assumptions that were used to develop unit costs and revenue estimates for the

More information

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS - COST FEASIBLE PROJECTS TABLE 1 - STATE PROJECTS (STRATEGIC INTERMODAL SYSTEM / FLORIDA'S TURNPIKE / CENTRAL FLORIDA EXPRESSWAY AUTHORITY) Facility From To Project Current Year Cost Estimates M-SIS M-SIS

More information

UPWP. Unified Planning Work Program. Okaloosa-Walton Transportation Planning Organization

UPWP. Unified Planning Work Program. Okaloosa-Walton Transportation Planning Organization (July 1, 2018 June 30, 2020) UPWP Unified Planning Work Program Okaloosa-Walton Transportation Planning Organization Staffed by: West Florida Regional Planning Council 4081 East Olive Road Ste. A Pensacola,

More information

Technical Report No. 4. Revenue and Costs

Technical Report No. 4. Revenue and Costs Technical Report No. 4 Revenue and Costs Technical Report No. 4 REVENUE AND COSTS PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 8731 Citizens Drive New Port Richey, FL 34654 Ph (727) 847-8140, fax (727)

More information

Members Attending: Mary Lou Franzoni. Pensacola International Airport City Traffic Engineering. Advisory Members Attending: Jim DeVries

Members Attending: Mary Lou Franzoni. Pensacola International Airport City Traffic Engineering. Advisory Members Attending: Jim DeVries WEST FLORIDA REGIONAL PLANNING COUNCIL (Designated Staff) WEST FLORIDA REGIONAL PLANNING COUNCIL (WFRPC) MAIN CONFERENCE ROOM 4081 E. Olive Road, Suite A, Pensacola, Florida April 9, 2012 Members Attending:

More information

APPENDIX FOR THE METROPOLITAN LONG RANGE TRANSPORTATION PLAN Forecast of State and Federal Revenues for Statewide and Metropolitan Plans

APPENDIX FOR THE METROPOLITAN LONG RANGE TRANSPORTATION PLAN Forecast of State and Federal Revenues for Statewide and Metropolitan Plans APPENDIX FOR THE METROPOLITAN LONG RANGE TRANSPORTATION PLAN 2035 Forecast of State and Federal Revenues for Statewide and Metropolitan Plans Overview This appendix documents the current Florida Department

More information

NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY

NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 Amendment Conformity Report for August 20, 2008 Amendments (Amendment # 2008-028 thru 2008-030) On August 20, 2008 the Executive Board

More information

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis Attachment B Project Cost Estimates for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA

More information

Technical Appendix. FDOT 2040 Revenue Forecast

Technical Appendix. FDOT 2040 Revenue Forecast Technical Appendix FDOT 040 Revenue Forecast This page was left blank intentionally. APPENDIX FOR THE METROPOLITAN LONG RANGE PLAN 040 Forecast of State and Federal Revenues for Statewide and Metropolitan

More information

Oakland Park Transportation Improvement Program (TIP) Projects. Mobility. Oakland Park Blvd. Total Funding Amounts ($):

Oakland Park Transportation Improvement Program (TIP) Projects. Mobility. Oakland Park Blvd. Total Funding Amounts ($): Oakland Park 2016-2020 Transportation Improvement Program (TIP) Projects 4358081 4346971 4359251 4360971 4366851 4331651 4368751 4316721 4316721 4260161 4387321 Legend Projects Interstates Roadway Mobility

More information

INVESTING STRATEGICALLY

INVESTING STRATEGICALLY 11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One DISTRICT ONE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make project investments in District One. In FY 2017 and FY 2018, current Turnpike projects total over $105 million within Okeechobee

More information

Chapter 6 Transportation Improvements & Financial Plan

Chapter 6 Transportation Improvements & Financial Plan Chapter 6 Transportation Improvements & Financial Plan Introduction Up to this point, this plan has provided a regional profile (the population, employment, and commuting patterns) of the RTPO and MPO

More information

YEAR 2035 LONG RANGE TRANSPORTATION PLAN FINAL TECHNICAL REPORT NO. 2: DATA COLLECTION, MAPPING AND DATA DEVELOPMENT

YEAR 2035 LONG RANGE TRANSPORTATION PLAN FINAL TECHNICAL REPORT NO. 2: DATA COLLECTION, MAPPING AND DATA DEVELOPMENT YEAR 2035 LONG RANGE TRANSPORTATION PLAN FINAL TECHNICAL REPORT NO. 2: DATA COLLECTION, MAPPING AND DATA DEVELOPMENT Prepared for: METROPOLITAN TRANSPORTATION PLANNING ORGANIZATION FOR THE GAINESVILLE

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six DISTRICT SIX PROJECT OVERVIE Florida s Turnpike Enterprise continues to make project investments in District Six. In FY 2017 and FY 2018, current Turnpike projects total over $109 million within Miami-Dade

More information

TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION CAPITAL PROGRAM TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily

More information

2040 Long Range Transportation Plan. Financial Summary

2040 Long Range Transportation Plan. Financial Summary 2040 Long Range Transportation Plan Financial Summary FINANCIAL OUTLOOK Establishing MPO Transportation Plan fiscal forecasts for a twenty year planning horizon in today s transportation environment is

More information

Texas Department of Transportation Corpus Christi District

Texas Department of Transportation Corpus Christi District Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens Advisory Committee Meeting January 11, 2012 Welcome

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Four

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Four DISTICT FOU POJECT OVEVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In FY 2017 and FY 2018, current Turnpike projects total over $490 million within

More information

TEXAS METROPOLITAN MOBILITY PLAN: FUNDING NEW OPPORTUNITIES

TEXAS METROPOLITAN MOBILITY PLAN: FUNDING NEW OPPORTUNITIES TEXAS METROPOLITAN MOBILITY PLAN: FUNDING NEW OPPORTUNITIES Public Meetings June 12 and 13, 2006 Michael Morris, P.E. Director of Transportation Michael Burbank, AICP Principal Transportation Planner FOCUS

More information

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP) HINDS Project: 480001 Responsible Agency: CITY OF CLINTON Total Project Cost: $6,068,000 Route: PINEHAVEN/NORTHSIDE DR Fund Source: EARMARK Project Length: 1.25 Pinehaven Dr from Northside Dr to 400' N

More information

2040 Long Range Transportation Plan - Needs Assessment: System Preservation Pavement, Bridges, and Transit Costs and Benefits

2040 Long Range Transportation Plan - Needs Assessment: System Preservation Pavement, Bridges, and Transit Costs and Benefits 2040 Long Range Transportation Plan - Needs Assessment: System Preservation Pavement, Bridges, and Transit Costs and Benefits Prepared For: 601 East Kennedy Boulevard Tampa, FL 33602 Prepared by: Jacobs

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 MANATEE COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide

More information

FY17 Budget Discussion

FY17 Budget Discussion FY17 Budget Discussion Metro is Everywhere Metro is a lot more than buses and trains. Anyone who has boarded a bus or a train, driven on the freeway, used the toll roads, stopped at a traffic signal, or

More information

Congestion Management Process. Prepared by: Ghyabi & Associates, Inc.

Congestion Management Process. Prepared by: Ghyabi & Associates, Inc. Congestion Management Process Prepared by: Ghyabi & Associates, Inc. August 26, 2015 Congestion Management Process (as adopted by R2CTPO Board) August 26, 2015 EXECUTIVE SUMMARY The River to Sea Transportation

More information

SOUND TRANSIT STAFF REPORT MOTION NO. M D Street-to-M Street Track & Signal Project Preferred Alternative

SOUND TRANSIT STAFF REPORT MOTION NO. M D Street-to-M Street Track & Signal Project Preferred Alternative SOUND TRANSIT STAFF REPORT MOTION NO. M2007-126 D Street-to-M Street Track & Signal Project Preferred Alternative Meeting: Date: Type of Action: Staff Contact: Phone: Board 12/13/07 Discussion/Possible

More information

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0 UTP November Update - Funding Adjustments Summary (Amounts in millions) District/Division//TMA Fiscal Year Adjusted Amount Post Public Meeting Adjustments Austin 3 SH 130 Concession FY $6,500,000 3 SH

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Four

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Four DISTICT FOU POJECT OVEVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In FY 2017 and FY 2018, current Turnpike projects total over $490 million within

More information

SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION

SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION EXHIBIT A SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION US 301/US 98/SR 35/SR 700/Clinton Avenue Intersection Realignment Study District Seven Pasco County This Scope of Services is an Exhibit

More information

Transportation Funding in the Charlotte Region

Transportation Funding in the Charlotte Region Transportation Funding in the Charlotte Region Andy Grzymski, Charlotte DOT August 21, 2007 Charlotte Region HOV/HOT/ Managed Lanes Study Workshop Background The Charlotte Region One of the South s s

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 CHARLOTTE COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide

More information

Countywide Dialogue on Transportation

Countywide Dialogue on Transportation Countywide Dialogue on Transportation Fairfax Federation November 15, 2012 Fairfax County Background Fairfax County s economic health depends on an efficient transportation system. The County strives to

More information

Prioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016

Prioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016 Prioritization and Programming Process NCDOT Division of Planning and Programming November 16, 2016 Today s Roadmap 1. Planning and Programming Division Overview 2. Strategic Investments (STI) Law 3. Prioritization

More information

Transportation Improvement Program Fiscal Years to

Transportation Improvement Program Fiscal Years to Transportation Improvement Program Fiscal Years 2018-19 to 2022-23 (October 1, 2018 to September 30 2019; October 1, 2019 to September 30 2020; October 1, 2020 to September 30 2021; October 1, 2021 to

More information

Fiscal Year VDOT Annual Budget June 2011

Fiscal Year VDOT Annual Budget June 2011 Fiscal Year 2011-2012 VDOT Annual Budget June 2011 For Further Information Contact: Virginia Department of Transportation Financial Planning Division 1221 E. Broad Street, 4th Floor Richmond, VA 23219

More information

Review and Update of Year 2035 Regional Transportation Plan

Review and Update of Year 2035 Regional Transportation Plan Review and Update of Year 2035 Regional Transportation Plan #217752 1 Background Every four years, the Year 2035 Plan is reviewed Elements of review Validity of Plan Year 2035 forecasts Transportation

More information

Financial Resources Report BAY COUNTY DIRECTION 2035 SHAPING OUR FUTURE LONG RANGE TRANSPORTATION PLAN. Prepared for

Financial Resources Report BAY COUNTY DIRECTION 2035 SHAPING OUR FUTURE LONG RANGE TRANSPORTATION PLAN. Prepared for Financial Resources Report BAY COUNTY DIRECTION 2035 SHAPING OUR FUTURE LONG RANGE TRANSPORTATION PLAN Prepared for Bay County Transportation Planning Organization and The Florida Department of Transportation,

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

Long Range Transportation Plan Update

Long Range Transportation Plan Update Hendry County Long Range Transportation Plan Update Prepared by: David Plummer & Associates, Inc. May 2008 DPA Project #06646 TABLE OF CONTENTS Page List of Exhibits... iii EXECUTIVE SUMMARY... iv 1.0

More information

1. identifies the required capacity of capital improvements to serve existing and future development based on level-of-service (LOS) standards;

1. identifies the required capacity of capital improvements to serve existing and future development based on level-of-service (LOS) standards; DIVISION 4.200 CAPITAL IMPROVEMENTS ELEMENT SECTION 4.201 INTRODUCTION The purpose of the Capital Improvements Element (CIE) is to tie the capital improvement needs identified in the other elements to

More information

2035 Long Range Transportation Plan Update

2035 Long Range Transportation Plan Update Broward MPO 2035 Long Range Transportation Plan Update Technical Report # 6 Prepared by: In association with: December 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Purpose... 1 1.2 Methodology and

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five DISTICT FIVE POJECT OVEVIE Florida s Turnpike Enterprise continues to make significant project investments in District Five. In FY 2017 and FY 2018, current Turnpike projects total over $419 million within

More information

Transit Development Plan (FY ) Executive Summary

Transit Development Plan (FY ) Executive Summary Transit Development Plan (FY 2019-2028) Executive Summary December 2018 TABLE OF CONTENTS Introduction... 1 System Profile... 2 Public Outreach... 4 Key Findings/Direction... 5 Implementation Plan... 6

More information

Central Florida Regional Planning Model 2045 Socio-Economic Data Development

Central Florida Regional Planning Model 2045 Socio-Economic Data Development Central Florida Regional Planning Model 2045 Socio-Economic Data Development Flagler County 2045 Population and Employment s Volusia County A: BEBR Population B: Woods & Poole Employment C: Population

More information

Dominion Boulevard Improvements with Toll System VDOT Initial Financial Plan February 1, 2012

Dominion Boulevard Improvements with Toll System VDOT Initial Financial Plan February 1, 2012 VDOT February 1, 2012 Table of Contents Section 1 Summary.2 Project Description. 2 Project Background 2 Current Activities.3 Project Schedule.4 Section 2 Project Cost Estimate..4 Section 3 Project Financing..5

More information

STUDY SCHEDULE STUDY PURPOSE

STUDY SCHEDULE STUDY PURPOSE STUDY SCHEDULE This Open House is the last of three public meetings for the Route Centennial Bridge Study. The material presented previously at the second Open House in July 2015 focused upon Corridor

More information

Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability.

Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability. Department of Environmental Services Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability. Transportation Capital

More information

SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION

SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION EXHIBIT A SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION SR 56 EXTENSION FROM US 301/SR 41 TO US 98/SR 35/SR 700 District Seven Pasco County This Scope of Services is an Exhibit which is incorporated

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five DISTICT FIVE POJECT OVEVIE Florida s Turnpike Enterprise continues to make significant project investments in District Five. In FY 2017 and FY 2018, current Turnpike projects total over $419 million within

More information

Working with Proportionate Fair-Share

Working with Proportionate Fair-Share Working with Proportionate Fair-Share Final Volume 1, December 2006 Presented by the Florida Department of Transportation Table of Contents MPO RSI Metropolitan Planning Organization Roadway Segment Improvement

More information

AGENDA CENTRAL FLORIDA EXPRESSWAY AUTHORITY BOARD WORKSHOP April 11, 2019 Immediately following the 9:00 a.m. board meeting

AGENDA CENTRAL FLORIDA EXPRESSWAY AUTHORITY BOARD WORKSHOP April 11, 2019 Immediately following the 9:00 a.m. board meeting AGENDA CENTRAL FLORIDA EXPRESSWAY AUTHORITY BOARD WORKSHOP April 11, 2019 Immediately following the 9:00 a.m. board meeting Meeting location: Pelican Conference Room 4974 ORL Tower Road Orlando, FL 32807

More information

draft report FTC Study of Cost Savings for Expressway Authorities Florida Transportation Commission Cambridge Systematics, Inc.

draft report FTC Study of Cost Savings for Expressway Authorities Florida Transportation Commission Cambridge Systematics, Inc. FTC Study of Cost Savings for Expressway Authorities draft report prepared for Florida Transportation Commission prepared by Cambridge Systematics, Inc. October 2012 www.camsys.com draft report FTC Study

More information

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION City of Staunton County of Augusta City of Waynesboro 112 MTANLY PLE STAUNTON, VIRGINIA 24401 PHONE (540) 885-5174 FAX (540) 885-2687 July

More information

SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania

SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania January 2013 Table of Contents... 1 Introduction... 2 Project

More information

Technical Report #2: Financial Resources Final Adopted Plan January 2016

Technical Report #2: Financial Resources Final Adopted Plan January 2016 2040 Long Range Transportation Plan Technical Report #2: Financial Resources Final Adopted Plan January 2016 250 South Orange Avenue, Suite 200, Orlando, FL 32801 407-481-5672 www.metroplanorlando.com

More information

Fiscal Year VDOT Annual Budget June 2017

Fiscal Year VDOT Annual Budget June 2017 Fiscal Year 2018 VDOT Annual Budget June 2017 This Page Intentionally Left Blank Annual Budget FY 2018 2 Virginia Department of Transportation Table of Contents Overview.. 5 Revenues.. 7 Highway Maintenance

More information

Financial Capacity Analysis

Financial Capacity Analysis FINANCIAL CAPACITY ANALYSIS Introduction Federal transportation planning rules require that metropolitan area transportation plans include a financial capacity analysis to demonstrate that the plan is

More information

ALL Counties. ALL Districts

ALL Counties. ALL Districts TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation

More information

Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates

Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates 2005-30 Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates The Federal Transportation bill, the Safe Accountable, Flexible, Efficient Transportation

More information

FY TRANSPORTATION IMPROVEMENT PROGRAM

FY TRANSPORTATION IMPROVEMENT PROGRAM FY 2017 2020 TRANSPORTATION IMPROVEMENT PROGRAM Approved for Public Review and Comment: April 18, 2016 Table of Contents Permian Basin MPO Membership and Structure... 3 Mission Statement... 3 Vision Statement...

More information

Appendix D Total Project Cost and Year of Expenditure Breakdown

Appendix D Total Project Cost and Year of Expenditure Breakdown Total Project Cost and Year of Expenditure Breakdown p. D -1 Total Project Cost and Year of Expenditure Breakdown Financial Constraint Methodology using Total Project Cost and Year of Expenditure Dollars

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

Planning Board Worksession No.6: Transportation and Staging

Planning Board Worksession No.6: Transportation and Staging Planning Board Worksession No.6: Transportation and Staging Prior Worksessions January 27: Focused on transportation analysis and staging recommendations in the Draft Plan. February 9: Reviewed the Executive

More information

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT Project Type: GDOT District: Federal Route Number: State Route Number: P.I. Number: County: MPO ID Number: Project Description (provide

More information

1 R E G I O N A L M O B I L I T Y P L A N

1 R E G I O N A L M O B I L I T Y P L A N 1 R E G I O N A L M O B I L I T Y P L A N 2 0 4 0 The Connections 2040 Regional Mobility Plan has been prepared to satisfy federal, state, and local needs. In order to demonstrate how the RMP addresses

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 SARASOTA COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide

More information

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade. Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 SARASOTA COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide

More information

Administration and Projects Committee STAFF REPORT March 1, 2018 Page 2 of 9 Below is a summary of the FY adopted budget and the proposed midy

Administration and Projects Committee STAFF REPORT March 1, 2018 Page 2 of 9 Below is a summary of the FY adopted budget and the proposed midy Administration and Projects Committee STAFF REPORT Meeting Date: March 1, 2018 Subject Summary of Issues Recommendations Financial Implications Options Approval of FY 2017 18 Midyear Budget for the Contra

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

NASHVILLE AREA MPO. ADJUSTMENT to The Fiscal Years Transportation Improvement Program. Adjustment Number: TIP Number:

NASHVILLE AREA MPO. ADJUSTMENT to The Fiscal Years Transportation Improvement Program. Adjustment Number: TIP Number: NASHVILLE AREA MPO ADJUSTMENT to The Fiscal Years 20082011 Transportation Improvement Program Adjustment Number: 2009019 TIP Number: 200852034 FROM: TIP# 200852034 Jurisdiction: Hendersonville Project:

More information

Military Highway Continuous Flow Intersection (CFI) Initial Financial Plan

Military Highway Continuous Flow Intersection (CFI) Initial Financial Plan Military Highway Continuous Flow Intersection (CFI) Initial Financial Plan State Project Number(s): 0013-122-V03, 0165-122-V04, 0165-122-181 UPC(s): 9783, 1765, 84243 1 Table of Contents 1. Project Description...

More information

How to Read the Project Modification Listings - Roadway Section

How to Read the Project Modification Listings - Roadway Section How to Read the Project Modification Listings - Roadway Section Sa m pl e The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation

More information

Transportation CIP Prioritization Criteria. Lee County Board of County Commissioners Work Session

Transportation CIP Prioritization Criteria. Lee County Board of County Commissioners Work Session Transportation CIP Prioritization Criteria Lee County Board of County Commissioners Work Session 12.1.2015 1 GOALS CRITERIA Ranking Tool Will Look at Various Options Seeking Consensus on Criteria for CIP

More information

RIDOA STATEWIDE PLANNING PROGRAM Transportation Planning

RIDOA STATEWIDE PLANNING PROGRAM Transportation Planning RIDOA STATEWIDE PLANNING PROGRAM Transportation Planning Land & Water Conservation Summit March 10, 2012 Statewide Planning Framework Department of Administration Statewide Planning Program State Planning

More information

Transportation Planning FAQ s

Transportation Planning FAQ s Transportation Planning FAQ s 1. What is the Master Thoroughfare Plan (MTP)? The Master Thoroughfare Plan defines the network of existing and future roads deemed appropriate to accommodate the various

More information

2045 Long Range Transportation

2045 Long Range Transportation The Jackson Area Comprehensive Transportation Study 2045 Long Range Transportation June 2018 Jackson Area Comprehensive Transportation Study 2045 Long Range Transportation Plan Jackson County, Michigan

More information

WAKULLA COUNTY PROJECTS

WAKULLA COUNTY PROJECTS DRAFT WAKULLA COUNTY PROJECTS PROGRAM ADOPTED: AMENDED: ADOPTED: AMENDED: FISCAL YEAR 2019 FISCAL YEAR 2023 TRANSPORTATION IMPROVEMENT PROGRAM Page 1 of 9 SR 30 (US 98) COASTAL HWY FROM CR 372 SURF RD

More information

Chapter 3: Regional Transportation Finance

Chapter 3: Regional Transportation Finance Chapter 3: Regional Transportation Finance This chapter examines the sources of funding for transportation investments in the coming years. It describes recent legislative actions that have changed the

More information

UNIFIED TRANSPORTATION PROGRAM

UNIFIED TRANSPORTATION PROGRAM 2002 UNIFIED TRANSPORTATION PROGRAM Blank Page SUMMARY OF CATEGORIES CATEGORIES NUMBER, NAME AND YEAR ESTABLISHED PROGRAMMING AUTHORITY FUNDING BANK BALANCE (Yes/) RESPONSIBLE ENTITY RANKING INDEX OR ALLOCATION

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Committee of the Whole November 28, 2016 City Council December 5, 2016 Agenda Item: Federal Transportation Funding Request Urban Roads Program Submitted by: Engineering

More information

City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Bicycle/Pedestrian Safety Grants CIP Fund (3004)

City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Bicycle/Pedestrian Safety Grants CIP Fund (3004) City of St. Petersburg FY15 Adopted Fiscal Plan Fiscal Year 2015 R-1 CIP Other Funds City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Bicycle/Pedestrian

More information

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer March 15, 2016

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer March 15, 2016 Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer March 15, 2016 Northern Virginia District Construction Performance Bill Cuttler, P.E. District Construction Engineer

More information

FY19 Budget - Discussion. April 2018

FY19 Budget - Discussion. April 2018 FY19 Budget - Discussion April 2018 FY19 Proposed Budget: $6.6 Billion General Planning & Programs 3% Identify regional mobility needs and solutions Debt Service 6% Obligations from current and past projects

More information

QUALITY TRANSPORTATION SUMMARY

QUALITY TRANSPORTATION SUMMARY QUALITY TRANSPORTATION SUMMARY Quality Transportation Overview... 126 Department of Transportation... 127 Traffic Field Operations... 129 Winston-Salem Transit Authority... 131 Quality Transportation Non-Departmental...

More information

Tentative Work Program Fiscal Year 2004/ /09

Tentative Work Program Fiscal Year 2004/ /09 Tentative Work Program Fiscal Year 2004/05-2008/09 Florida Transportation Commission Statewide Public Hearing March 2, 2004 Work Program Section 339.135(3)(b) states, The tentative and adopted work programs

More information

I-64 Capacity Improvements Segment III Initial Financial Plan

I-64 Capacity Improvements Segment III Initial Financial Plan I-64 Capacity Improvements Segment III Initial Financial Plan State Project # 0064-965-229/0064-099-229 P101, R201, C501, B638, B639, B640, B641, B642, B643, D609, D610, D611 Federal # NHPP-064-3(498)/

More information

AGENDA ITEM 3 A MINUTES

AGENDA ITEM 3 A MINUTES June 19, 2017 AGENDA ITEM 3 A MINUTES TYPE OF ITEM: Consent The minutes and voting sheet from the March 21, 2017 CRTPA meeting are provided as Attachment 1. RECOMMENDED ACTION Option 1: Approve the minutes

More information

Route 228 Corridor. Beaver and Butler Counties: Partnering to Impact the Region's Infrastructure

Route 228 Corridor. Beaver and Butler Counties: Partnering to Impact the Region's Infrastructure Enclosure 4 Route 228 Corridor Beaver and Butler Counties: Partnering to Impact the Region's Infrastructure This intersection safety and mobility improvement project will enhance travel on the vital Route

More information

This page intentionally left blank

This page intentionally left blank 197 This page intentionally left blank 198 Capital Improvement Program PROCEDURE Each year the Capital Improvement Program (CIP) is prepared from project requests submitted by the various departments.

More information

PUBLIC WORKS - ENGINEERING

PUBLIC WORKS - ENGINEERING PUBLIC WORKS - ENGINEERING 4 DIVISIONS: CAPITAL IMPROVEMENT PROGRAM (CIP) TRAFFIC ENGINEERING DEVELOPMENT ENGINEERING SEWER & STORM DRAIN ENGINEERING 18 FTE s, 2 Hourly s In FY 14/15 Expended approximately

More information

Transportation Funding and Improving Roadway Services Delivery

Transportation Funding and Improving Roadway Services Delivery Transportation Funding and Improving Roadway Services Delivery Transportation Advisory Commission October 5, 2010 1 STUDY PROGRESS Finalize project scope, perform initial data collection, and gather input

More information

ACTION ELEMENT CONCLUSIONS

ACTION ELEMENT CONCLUSIONS ACTION ELEMENT CONCLUSIONS The Action Element identifies all transportation projects within the horizon of the RTP/SCS and are financially constrained. This Action Element implements the Policy Element

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information