City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Bicycle/Pedestrian Safety Grants CIP Fund (3004)

Size: px
Start display at page:

Download "City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Bicycle/Pedestrian Safety Grants CIP Fund (3004)"

Transcription

1 City of St. Petersburg FY15 Adopted Fiscal Plan Fiscal Year 2015 R-1 CIP Other Funds City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Bicycle/Pedestrian Safety Grants CIP Fund (3004) This fund was established in FY06 to account for grant appropriations funded specifically for bicycle and pedestrian safety projects. FY15 Summary Projected Resources 1,353,000 Projected Requirements 1,353,000 Projected Resources less Projected Requirements 0 Beginning Fund Balance 309,625 Projected Fund Balance at Year End 309,625 Project Descriptions Bicycle Facilities-Priority Projects Phase II 674,000 This project includes funding for the administration, design, construction and construction inspection of 4.59 miles of onstreet bicycle lanes along six separate arterial roadways. Pedestrian Crosswalk Enhancements 36,000 This project provides for the administration, design, construction, and construction inspection of up to 45 Rectangular Rapid Flashing Beacon (RRFB)/Enhancer crosswalks at existing prioritized mid-block pedestrian crosswalks throughout the city. This will compliment the existing 38 locations where RRFB's are installed to date. Treasure Island Trail 643,000 This project includes funding for the administration, design, construction and construction inspection of a shared use path along the south side of the right-of-way.

2 FY15 Adopted Fiscal Plan City of St. Petersburg CIP Other Funds R-2 Fiscal Year 2015 BICYCLE/PEDESTRIAN SAFETY GRANTS CAPITAL PROJECTS FUND (Fund 3004) CAPITAL IMPROVEMENT PROGRAM PLAN RESOURCES Prior Year Carryforward Actual Budget Change BUDGET Estimate Total (000s omitted) Beginning Balance Earnings on Investments Grants: Bayway Trail North - Phase II , ,413 Bicycle Facility - 30th Ave N: 34th to 58th St , ,701 Bicycle Lanes - Priority Projects Phase II Clam Bayou Phase II CMAQ-Bike Ped/Path FDOT LAP - Pedestrian Crosswalk Enhancements , ,911 FDOT LAP - Walter Fuller Park Trail FDOT LAP - Treasure Island Trail Pinellas Trail Extension Landscaping TOTAL RESOURCES 1, ,815 1,353 2, ,502 REQUIREMENTS Bicycle/Pedestrian Improvements: Bayway Trail North - Phase II Bicycle Facility - 30th Ave N: MLK to 58th St Bicycle Facilities - Priority Projects Phase II Bicycle Ped Facilities FY07 Clam Bayou Phase II CMAQ 37th St. Side Path FDOT LAP - 54th Avenue South Side Path FDOT LAP - Booker Creek Bicycle/Ped Trail FDOT LAP - North Bay Trail (1st St Bike Trail) FDOT LAP Pedestrian Crosswalk Enhancements Pinellas Trail Extension Landscaping Walter Fuller Park Trail Treasure Island Trail Appropriation as of 9/30/ , , , , , , (3) , , (137) ,297 0 (14) , , , Projects Closed in FY13 8,387 8,387 Prior Expended Requirements (13,356) (13,356) Cancelled Appropriations (1,511) (1,511) TOTAL REQUIREMENTS 1, ,484 1,353 2, ,892 Increase/(Decrease) in Fund Balance 0 1, Beginning Balance (721) (721) UNAPPROPRIATED BALANCE 9/30 (721) (721)

3 City of St. Petersburg FY15 Adopted Fiscal Plan Fiscal Year 2015 R-3 CIP Other Funds City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Weeki Wachee Capital Projects Fund (3041) This capital project fund was established in FY06. Prior to that, all projects and transfers from the Weeki Wachee Operating Fund for capital improvement projects were in the General Capital Improvement Fund. All investment earnings in the Weeki Wachee Operating Fund are available to be transferred to capital improvement projects as approved by the Mayor and City Council. FY15 Summary Projected Resources 0 Projected Requirements 0 Projected Resources less Projected Requirements 0 Beginning Fund Balance 515 Projected Fund Balance at Year End 515

4 FY15 Adopted Fiscal Plan City of St. Petersburg CIP Other Funds R-4 Fiscal Year 2015 WEEKI WACHEE CAPITAL PROJECTS FUND (3041) CAPITAL IMPROVEMENT PROGRAM PLAN RESOURCES Prior Year Carryforward Actual Budget Change BUDGET Estimate Total (000s omitted) Beginning Balance 2,094 2,094 Transfer from Operating , ,272 Earnings on Investments TOTAL RESOURCES 2, , ,370 REQUIREMENTS Appropriation as of 9/30/13 City-wide Athletic Field Shade Structure Gizella Kosick Palm Arboretum Collection Rahall Property Purchase Rio Vista Park Improvements 1, ,682 Twin Brooks Gofl Course Renovation 0 0 1, ,465 Prior Expended Requirements (99) (99) TOTAL REQUIREMENTS 2, , ,855 Increase/(Decrease) in Fund Balance Beginning Balance UNAPPROPRIATED BALANCE 9/ Notes: 1) On June 21, 2001, City Council authorized the sale of the Weeki Wachee property to the Southwest Florida Water Management District. The sale proceeds were deposited in the Weeki Wachee Operating Fund to allow tracking in accordance with the purposes stated in the referendum. 2) This capital project fund was established in FY06. Prior to that, all projects and transfers from the Weeki Wachee Operating Fund for capital improvement projects were in the General Capital Improvement Fund. Future specific uses of the proceeds, and any accumulated interest earnings, will be determined by the Mayor and City Council.

5 City of St. Petersburg FY15 Adopted Fiscal Plan Fiscal Year 2015 R-5 CIP Other Funds City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Transportation Impact Fees CIP Fund (3071) This fund was established in 1988 to account for transportation projects funded from impact fees approved by the Pinellas County Commission and implemented in July Projects in this fund must meet criteria related to location and growth management issues included in the enabling legislation. Also, in 1990, City Council adopted by ordinance (2012-F) the collection of a Gateway Area Transportation Improvements Special Assessment Fee (GATISAF). This fee replaces transportation impact fees in the Gateway Area with revenues generated from the fee to be used for the design and construction of roadway projects in the area. FY15 Summary Projected Resources 1,201,000 Projected Requirements 2,125,000 Projected Resources less Projected Requirements (924,000) Beginning Fund Balance 7,920,360 Projected Fund Balance at Year End 6,996,360 Project Descriptions GATISAF Projects - Gateway Area wide DRI Mitigation Program 100,000 This project funds future road projects required to mitigate impacts of the Gateway Area wide Development of Regional Impact (DRI) as required by the Development Order, Ordinance 1172-F. These may include intersection modifications and link projects. I-175 On Ramp/4th S. Two-Way (also in 3001) 500,000 This project is funded to improve access and egress from the developing University, Marina, and Hospital districts by providing a northbound to westbound connection from 4th Street South to I-175. This project is an important element of the overall improvement of traffic circulation in the area and will provide traffic capacity for expected expansion in these districts. City Trails - Bicycle Trails 950,000 This project will provide for bicycle lanes, shared use paths and trails that will complete major and minor connections from existing routes into neighborhoods. It will also allow for the completion of major bicycle routes by completing connections currently not covered under existing funding sources. Project scope includes planning, design, engineering, inspection, and construction. Facilities are a part of the Bicycle Pedestrian Master Plan routes, as approved by City Council in Downtown Intersection & Pedestrian Facilities 125,000 This project is the continuation of an ongoing program to address pedestrian safety in the downtown area. Included in the program are features such as countdown pedestrian signals, enhanced crosswalk signs and markings, and intersection narrowings. Sidewalks 200,000 This project will fund the administration, design, inspection, and construction of new sidewalks on city collector and arterial roadways, as designated by the city's Comprehensive Plan, and prioritized by the Bicycle Pedestrian Master Plan, as approved by City Council in Traffic Safety Program 250,000 Based on city-wide review and analysis, various counter measures are identified to address severe traffic safety concerns at locations that have been identified within neighborhood traffic planning, bicycle and pedestrian planning, and safety planning activities of the city.

6 FY15 Adopted Fiscal Plan City of St. Petersburg CIP Other Funds R-6 Fiscal Year 2015 TRANSPORTATION IMPACT FEES CAPITAL PROJECTS FUND (FUND 3071) CAPITAL IMPROVEMENT PROGRAM PLAN RESOURCES Prior Year Carryforward Actual Budget Change BUDGET Estimate Total (000s omitted) Beginning Balance 17,943 17,943 Earnings on Investments ,440 Transportation Impact Fee: GATISAF (177) Transfer: District 8 (Not within Subdistrict) District 10 (Not within Subdistrict) District 11 (Not within Subdistrict) (52) ,018 Intown (District 11) ,886 Carillon (District 8) Settlement Uncollectible Charges TOTAL RESOURCES 19,099 1,295 (229) 1,201 1,688 1, ,052 REQUIREMENTS Appropriation as of 9/30/13 GATISAF Projects: Gandy Blvd Widen/16th St Realignment 8,336 0 (2,101) ,235 Gateway Areawide DRI Mitigation Pro I-175 On Ramp/4th S. Two-Way (also in 3001) ,430 Bicycle & Pedestrian Plan/Facilities (3) Bus Rapid Transit Downtown City Trails - Bicycle Trails 3, ,920 Dwtwn Inter. & Pedestrian Facilities ,141 Intersection Improvements (3) Intersection Modification Intown ADRI Capacity Increase (300) Traffic Signal Mast Arm Program 3,600 1, ,800 Sidewalks (2) ,998 Traffic Safety Program 1, ,165 Traffic Signal Control Software Ulmerton Egret Carillon Project Projects Closed in FY13 1,106 1,106 Prior Expended Requirements (10,070) (10,070) Cancelled Appropriations (213) (213) Inflation Contingency TOTAL REQUIREMENTS 11,296 3,055 (2,106) 2,125 2,024 1,339 1, ,523 Increase/(Decrease) in Fund Balance (1,760) 1,877 (924) (336) (287) (75) 231 Beginning Balance 7,803 6,043 7,920 6,996 6,660 6,373 6,298 UNAPPROPRIATED BALANCE 9/30 7,803 6,043 7,920 6,996 6,660 6,373 6,298 6,529

City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Housing Capital Improvement Fund (3000)

City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Housing Capital Improvement Fund (3000) Fiscal Year 2015 O-1 CIP Housing & General Fund City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Housing Capital Improvement Fund (3000) This fund was established

More information

CITY OF ST. PETERSBURG FISCAL YEAR 2013 ADOPTED OPERATING BUDGET & CAPITAL IMPROVEMENT PROGRAM

CITY OF ST. PETERSBURG FISCAL YEAR 2013 ADOPTED OPERATING BUDGET & CAPITAL IMPROVEMENT PROGRAM CITY OF ST. PETERSBURG FISCAL YEAR 2013 ADOPTED OPERATING BUDGET & CAPITAL IMPROVEMENT PROGRAM City of St. Petersburg Budget I. FUND SUMMARIES General Fund (0001) 1 Preservation Fund (0002) 4 Industrial

More information

FUND DESCRIPTIONS GOVERNMENTAL FUNDS

FUND DESCRIPTIONS GOVERNMENTAL FUNDS FUND DESCRIPTIONS The city of St. Petersburg uses funds and account groups to account for its resources as required by the Charter, State Statutes, and the accounting profession. Each of the city funds

More information

Chapter 5: Cost and Revenues Assumptions

Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions INTRODUCTION This chapter documents the assumptions that were used to develop unit costs and revenue estimates for the

More information

City of St. Petersburg FY 2017 Recommended Operating & CIP Budget Table of Contents

City of St. Petersburg FY 2017 Recommended Operating & CIP Budget Table of Contents City of St. Petersburg FY 2017 Recommended Operating & CIP Budget Table of Contents INTRODUCTION Executive Summary I. FUND SUMMARIES All Funds Summary... 1 General Fund (0001)... 3 Preservation Fund (0002)...

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 217218 AGENCY CONTACT INFORMATION Agency Name: City of San Leandro Date: 12/14/218 Primary Point of Contact Name: Norite

More information

TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION CAPITAL PROGRAM TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

Budget In Brief Overview

Budget In Brief Overview Budget In Brief Overview Second Public Hearing -- Fiscal Year 2015 Budget This Budget in Brief presents a condensed overview of the fiscal year 2015 budget for the city of St. Petersburg, Florida as recommended

More information

A. Executive Summary

A. Executive Summary A. Executive Summary Introduction Our Vision, Our Budget... A-1 Applying the Vision to the FY15 Budget... A-1 Key Strategic Initiatives for Developing the Budget...A-2 Key Long-term Strategic Initiatives...

More information

Chapter Ten, Capital Improvements Element City of St. Petersburg Comprehensive Plan

Chapter Ten, Capital Improvements Element City of St. Petersburg Comprehensive Plan CAPITAL IMPROVEMENTS ELEMENT Sections: 10.1 INTRODUCTION 10. 2 GOALS, OBJECTIVES AND POLICIES ISSUE: Construction of needed improvements ISSUE: Adequate provision of public facilities ISSUE: Public expenditure

More information

FY 2016 CAPITAL IMPROVEMENT PROGRAM WORKBOOK

FY 2016 CAPITAL IMPROVEMENT PROGRAM WORKBOOK City of St. Petersburg CAPITAL IMPROVEMENT PROGRAM WORKBOOK City Council Workshop April 30, 2015 City of St. Petersburg MEMORANDUM To: From: Thru: Honorable Charlie Gerdes, Chair, and Members of City Council

More information

This page intentionally left blank

This page intentionally left blank 197 This page intentionally left blank 198 Capital Improvement Program PROCEDURE Each year the Capital Improvement Program (CIP) is prepared from project requests submitted by the various departments.

More information

Technical Report No. 4. Revenue and Costs

Technical Report No. 4. Revenue and Costs Technical Report No. 4 Revenue and Costs Technical Report No. 4 REVENUE AND COSTS PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 8731 Citizens Drive New Port Richey, FL 34654 Ph (727) 847-8140, fax (727)

More information

ST. PETERSBURG ClTY COUNCIL

ST. PETERSBURG ClTY COUNCIL ST. PETERSBURG ClTY COUNCIL Meeting of November 24, 2014 TO: SUBJECT: City Council Chair and City Council Members An Ordinance Enacting Year-End Appropriation Adjustments -FY14 Operating Budget & Capital

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 20172018 AGENCY CONTACT INFORMATION Agency Name: City of Alameda Date: 11/29/2018 Primary Point of Contact Name: Scott Wikstrom

More information

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Adopted August 22, 2013 This report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, the Florida

More information

GOVERNMENTAL CAPITAL

GOVERNMENTAL CAPITAL GOVERNMENTAL CAPITAL Governmental Capital refers to that portion of the six year Capital Improvement Program which is not funded by the County's Enterprise Operations. Funding sources include: Transportation

More information

Capital Investment Program (CIP) About CIP

Capital Investment Program (CIP) About CIP Capital Investment Program (CIP) About CIP The Capital Investment Program (CIP) is a multi-year program aimed at upgrading and expanding City facilities, buildings, grounds, streets, parks and roads. The

More information

Development of the Cost Feasible Plan

Development of the Cost Feasible Plan March 15, 2012 TPO Board and Advisory Committee Meetings Development of the Cost Feasible Plan Transportation Outlook 2035 LRTP Update Atkins Development of the Cost Feasible Plan P a g e 1 Development

More information

Capital Improvement Projects

Capital Improvement Projects Capital Improvement Projects This section highlights the Capital Improvement Program (CIP) projects proposed for FY 2017-2018. Capital projects are designed to enhance the City s infrastructure, extend

More information

System Development Charge Methodology

System Development Charge Methodology City of Springfield System Development Charge Methodology Stormwater Local Wastewater Transportation Prepared By City of Springfield Public Works Department 225 Fifth Street Springfield, OR 97477 November

More information

GOVERNMENTAL CAPITAL

GOVERNMENTAL CAPITAL GOVERNMENTAL CAPITAL Governmental Capital refers to that portion of the six year Capital Improvement Program which is not funded by the County's Enterprise Operations. Funding sources include: Transportation

More information

Column A Column B Column C Column D Column E Column F Column G Column H Column I Column J Column K Column L Column M Column N

Column A Column B Column C Column D Column E Column F Column G Column H Column I Column J Column K Column L Column M Column N Alameda CTC Programs Annual Compliance Report 20112012 Reporting Year Table 1: Measure B Revenues and BICYCLE AND PEDESTRIAN AGENCY NAME : City of Albany 12/19/2012 Column A Column B Column C Column D

More information

NEIGHBORHOOD TRAFFIC MANAGEMENT CITY COUNCIL WORKSHOP JUNE 12, 2018

NEIGHBORHOOD TRAFFIC MANAGEMENT CITY COUNCIL WORKSHOP JUNE 12, 2018 NEIGHBORHOOD TRAFFIC MANAGEMENT CITY COUNCIL WORKSHOP JUNE 12, 2018 Agenda Purpose Neighborhood Traffic Management Policy Speed Volume Application Process Budget Considerations Next Steps City Council

More information

PRESENTER: Christopher Blunk, Deputy Public Works Director/City Engineer

PRESENTER: Christopher Blunk, Deputy Public Works Director/City Engineer G-6 STAFF REPORT MEETING DATE: June 12, 2018 TO: FROM: City Council Petr Skala, Assistant Engineer 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213 www.novato.org PRESENTER: Christopher

More information

PUBLIC WORKS - ENGINEERING

PUBLIC WORKS - ENGINEERING PUBLIC WORKS - ENGINEERING 4 DIVISIONS: CAPITAL IMPROVEMENT PROGRAM (CIP) TRAFFIC ENGINEERING DEVELOPMENT ENGINEERING SEWER & STORM DRAIN ENGINEERING 18 FTE s, 2 Hourly s In FY 14/15 Expended approximately

More information

CAPITAL PROJECTS BUDGET TAB 5

CAPITAL PROJECTS BUDGET TAB 5 CAPITAL PROJECTS BUDGET TAB 5 This page intentionally left blank. 2016-2018 CAPITAL BUDGET 5-1 This page intentionally left blank. City of Walnut Creek 2016-2018 Capital Budget Table of Contents Introduction

More information

Removed Projects TR th Way SE (Snake Hill) Improvements o Will be completed in TR th Ave SE Gap Project

Removed Projects TR th Way SE (Snake Hill) Improvements o Will be completed in TR th Ave SE Gap Project Agenda Bill City Council Regular Meeting June 19, 2018 SUBJECT: 2019-2024 Six-Year Transportation Improvement Plan (TIP) DATE SUBMITTED: June 12, 2018 DEPARTMENT: Public Works NEEDED FROM COUNCIL: Action

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 20172018 AGENCY CONTACT INFORMATION Agency Name: City of Fremont Date: 12/21/2018 Primary Point of Contact Name: Tish Saini

More information

Budget In Brief Overview

Budget In Brief Overview Budget In Brief Overview Mayor s Recommended Fiscal Year 2016 Budget This Budget in Brief presents a condensed overview of the fiscal year 2016 budget for the city of St. Petersburg, Florida as presented

More information

CITY OF ALAMEDA, CALIFORNIA ALAMEDA COUNTY TRANSPORTATION COMMISSION MEASURE BB PROGRAM FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2018

CITY OF ALAMEDA, CALIFORNIA ALAMEDA COUNTY TRANSPORTATION COMMISSION MEASURE BB PROGRAM FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2018 CITY OF ALAMEDA, CALIFORNIA ALAMEDA COUNTY TRANSPORTATION COMMISSION MEASURE BB PROGRAM FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2018 This Page Left Intentionally Blank CITY OF ALAMEDA, CALIFORNIA

More information

City of St. Petersburg. FY 2018 Recommended Budget

City of St. Petersburg. FY 2018 Recommended Budget City of St. Petersburg FY 218 Recommended Budget City of St. Petersburg MEMORANDUM To: From: Honorable Darden Rice, Chair & Members of City Council Mayor Rick Kriseman Date: July 12, 217 Subject: RECOMMENDED

More information

TOWN OF JUPITER Community Redevelopment Agency

TOWN OF JUPITER Community Redevelopment Agency TOWN OF JUPITER Community Redevelopment Agency DATE: September 14, 2012 TO: THRU: FROM: Honorable Chair and Commissioners of the Community Redevelopment Agency Andrew D. Lukasik, Executive Director Brenda

More information

Chapter 4: Plan Implementation

Chapter 4: Plan Implementation This chapter discusses the financial and regulatory needs associated with the implementation of this Transportation System Plan. Projected Funding for Transportation Improvements Projecting the revenue

More information

TABLE OF CONTENTS LIST OF TABLES

TABLE OF CONTENTS LIST OF TABLES TABLE OF CONTENTS A. GOALS, OBJECTIVES, AND POLICIES... 3 B. SUMMARY... 17 LIST OF TABLES Table IX 1: City of Winter Springs Five-Year Schedule of Capital Improvements (SCI) FY 2013/14-2017/18... 11 Table

More information

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016 City of Des Moines Citizen Engagement Capital Improvement Program November 29, 2016 Goals of Citizen Engagement Goal Focus on service levels Department definitions of adequate service and opportunities

More information

1. identifies the required capacity of capital improvements to serve existing and future development based on level-of-service (LOS) standards;

1. identifies the required capacity of capital improvements to serve existing and future development based on level-of-service (LOS) standards; DIVISION 4.200 CAPITAL IMPROVEMENTS ELEMENT SECTION 4.201 INTRODUCTION The purpose of the Capital Improvements Element (CIE) is to tie the capital improvement needs identified in the other elements to

More information

PENNY FOR PINELLAS 10-YEAR PLANNING STRATEGY

PENNY FOR PINELLAS 10-YEAR PLANNING STRATEGY P. CIP Penny Funds Penny for Pinellas 10-Year Planning Strategy... P-1 Public Safety Capital Improvement (Fund 3025)... P-2 Neighborhood & Citywide Infrastructure Improvement (Fund 3027)... P-4 Recreation

More information

Governmental Capital Projects Organization Department Summary

Governmental Capital Projects Organization Department Summary Organization Department Summary refers to that portion of the multi-year Capital Improvement Program ( C I P ) which is not funded by the Countys Enterprise Operations. Examples are roads, bridges, park

More information

Addendum to Environmental Impact Report

Addendum to Environmental Impact Report Lead Agency: Staff Contact: Addendum to Environmental Impact Report Addendum Date: Case No.: 2011.0558E Project Title:, EIR: 2011.0558E, certified March 27, 2014 Project Sponsor: Sean Kennedy, San Francisco

More information

BOND FUNDING ALLOCATED [B] REVISED AMOUNT 1 [A] BONDS PAID June 2017 [C] 126, , Bicycle Parking

BOND FUNDING ALLOCATED [B] REVISED AMOUNT 1 [A] BONDS PAID June 2017 [C] 126, , Bicycle Parking Bond Summary - June 2017 Expenditures (pending expenditures of interest accruals) The purpose of this monthly report is to update the Bond Oversight Committee (BOC) on SFMTA Revenue Bond monthly expenditures.

More information

Report Accompanying the Diamond Lake Urban Renewal Plan

Report Accompanying the Diamond Lake Urban Renewal Plan Report Accompanying the Diamond Lake Urban Renewal Plan Adopted by the City of Roseburg July 9, 2018 Ordinance No. 3502 Diamond Lake Urban Renewal Area Consultant Team Elaine Howard Consulting, LLC Elaine

More information

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS - COST FEASIBLE PROJECTS TABLE 1 - STATE PROJECTS (STRATEGIC INTERMODAL SYSTEM / FLORIDA'S TURNPIKE / CENTRAL FLORIDA EXPRESSWAY AUTHORITY) Facility From To Project Current Year Cost Estimates M-SIS M-SIS

More information

Transportation Funding

Transportation Funding Transportation Funding TABLE OF CONTENTS Introduction... 3 Background... 3 Current Transportation Funding... 4 Funding Sources... 4 Expenditures... 5 Case Studies... 6 Washington, D.C... 6 Chicago... 8

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures

TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures Alameda CTC Programs Annual Compliance Report 00 Reporting Year TABLE BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and DATE : Revised /0/ Column A Column B Column C Column D Column E Column F Column

More information

RESOLUTION NO. R Baseline Budget and Schedule, and Approve Gates 5 and 6 for the East Link Extension

RESOLUTION NO. R Baseline Budget and Schedule, and Approve Gates 5 and 6 for the East Link Extension RESOLUTION NO. R2015-04 Baseline and Schedule, and Approve Gates 5 and 6 for the East Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Board 04/23/15 Final Action Ahmad Fazel, DECM Executive

More information

CITY OF ALAMEDA, CALIFORNIA ALAMEDA COUNTY TRANSPORTATION COMMISSION MEASURE B PROGRAM FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2018

CITY OF ALAMEDA, CALIFORNIA ALAMEDA COUNTY TRANSPORTATION COMMISSION MEASURE B PROGRAM FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2018 CITY OF ALAMEDA, CALIFORNIA ALAMEDA COUNTY TRANSPORTATION COMMISSION MEASURE B PROGRAM FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2018 This Page Left Intentionally Blank CITY OF ALAMEDA ALAMEDA COUNTY

More information

The $1.620 million Commercial Container Acquisition CIP project is planned through Solid Waste funds.

The $1.620 million Commercial Container Acquisition CIP project is planned through Solid Waste funds. I. CAPITAL IMPROVEMENTS ELEMENT INTRODUCTION The intent of the capital improvements element is to provide a component that outlines principles for construction, extension, or increase in capacity of public

More information

INVESTING STRATEGICALLY

INVESTING STRATEGICALLY 11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program

More information

2 nd Draft. Board of County Commissioners Workshop

2 nd Draft. Board of County Commissioners Workshop 2 nd Draft Board of County Commissioners Workshop 6.21.16 1 Review Board Accomplishments Review 2 nd Draft of Proposed FY16-17 Budget Changes / Input for 3 rd Draft 2. Balanced Budget 6th Lowest Aggregate

More information

Municipal Transportation Agency FY Capital Improvement Program Balboa Park. Balboa Park Citizen s Advisory Committee April 22, 2014

Municipal Transportation Agency FY Capital Improvement Program Balboa Park. Balboa Park Citizen s Advisory Committee April 22, 2014 Municipal Transportation Agency FY 2015 2019 Capital Improvement Program Balboa Park Balboa Park Citizen s Advisory Committee April 22, 2014 Presentation Outline Overview of the MTA s 5-Year CIP Proposal

More information

CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES. Goal 1: [CI] (EFF. 7/16/90)

CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES. Goal 1: [CI] (EFF. 7/16/90) CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES Goal 1: [CI] (EFF. 7/16/90) To use sound fiscal policies to provide adequate public facilities concurrent with, or prior to development in order

More information

FY10 Proposed Budget. First Public Hearing September 8, 2009

FY10 Proposed Budget. First Public Hearing September 8, 2009 FY10 Proposed Budget First Public Hearing September 8, 2009 Outline Budget Overview Budget Challenges & Strategy General Fund Forecast Budget Targets Reductions Overview Capital Improvement Program Next

More information

Administration and Projects Committee STAFF REPORT March 1, 2018 Page 2 of 9 Below is a summary of the FY adopted budget and the proposed midy

Administration and Projects Committee STAFF REPORT March 1, 2018 Page 2 of 9 Below is a summary of the FY adopted budget and the proposed midy Administration and Projects Committee STAFF REPORT Meeting Date: March 1, 2018 Subject Summary of Issues Recommendations Financial Implications Options Approval of FY 2017 18 Midyear Budget for the Contra

More information

CITY OF BOCA RATON ACTION AGENDA Update March 31, 2017

CITY OF BOCA RATON ACTION AGENDA Update March 31, 2017 CITY OF BOCA RATON ACTION AGENDA 2016 2017 Update March 31, 2017 TOP PRIORITIES TARGET: City Campus Condition Assessment and Master Plan Staff will retain a consultant who will assist with a physical assessment

More information

Oakland Park Transportation Improvement Program (TIP) Projects. Mobility. Oakland Park Blvd. Total Funding Amounts ($):

Oakland Park Transportation Improvement Program (TIP) Projects. Mobility. Oakland Park Blvd. Total Funding Amounts ($): Oakland Park 2016-2020 Transportation Improvement Program (TIP) Projects 4358081 4346971 4359251 4360971 4366851 4331651 4368751 4316721 4316721 4260161 4387321 Legend Projects Interstates Roadway Mobility

More information

ADOPTED OPERATING & CAPITAL IMPROVEMENT BUDGET FISCAL YEAR 2007 OCTOBER 1, 2006 SEPTEMBER 30, 2007

ADOPTED OPERATING & CAPITAL IMPROVEMENT BUDGET FISCAL YEAR 2007 OCTOBER 1, 2006 SEPTEMBER 30, 2007 CITY OF ST. PETERSBURG ADOPTED OPERATING & CAPITAL IMPROVEMENT BUDGET FISCAL YEAR 2007 OCTOBER 1, 2006 SEPTEMBER 30, 2007 Rick Baker, Mayor David W. Bill Foster, Esq. Council Chair, District 5 Re!e Flowers

More information

COUNTY ADMINISTRATOR PUBLIC WORKS

COUNTY ADMINISTRATOR PUBLIC WORKS COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm

More information

Agenda. Background Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement

Agenda. Background Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement 1 Agenda Background 2013-2014 Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement Sustainable Transportation Funding Dedicated Revenues Potential Rate Impact Clarification Proposed

More information

How to Read the Project Modification Listings Roadway Section

How to Read the Project Modification Listings Roadway Section How to Read the Project Modification Listings Roadway Section The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation Improvement

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 21, 2013

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 21, 2013 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 21, 2013 DATE: September 4, 2013 SUBJECT: Fiscal Year 2014 HB 2313 (House Bill 2313) Local Share Funding Allocations and Priorities

More information

SAMPLE BALLOT NOT FOR OFFICIAL USE

SAMPLE BALLOT NOT FOR OFFICIAL USE 3 in 1! Bike Lanes for Safety and Convenience! $ 117,000 Increase striping and marking of bicycle lanes and routes along selected streets. LOCATIONS: Various locations throughout Vallejo determined by

More information

St. Petersburg City Council BUDGET, FINANCE & TAXATION COMMITTEE AGENDA. Meeting of NOVEMBER 18, :30 AM City Hall Room 100

St. Petersburg City Council BUDGET, FINANCE & TAXATION COMMITTEE AGENDA. Meeting of NOVEMBER 18, :30 AM City Hall Room 100 St. Petersburg City Council, FINANCE & TAXATION COMMITTEE AGENDA Meeting of NOVEMBER 18, 2013 9:30 AM City Hall Room 100 Members & Alternate: Support Staff: Chair James R. Jim Kennedy, Jr.; ViceChair Charles

More information

CAPITAL PROJECTS Department Expenditures By Cost Center FY03 Actual FY04 Budget FY05 Request

CAPITAL PROJECTS Department Expenditures By Cost Center FY03 Actual FY04 Budget FY05 Request CAPITAL PROJECTS Capital Projects encompass governmental projects including transportation, criminal courts and jail facilities, law enforcement communications, drainage improvements, park additions, beach

More information

Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability.

Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability. Department of Environmental Services Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability. Transportation Capital

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET CITY OF PLACERVILLE ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET 2012/2013 1 2 CAPITAL IMPROVEMENT PROGRAM POLICY Each year the City faces the challenge of meeting infrastructure and equipment needs with

More information

Transit Development Plan (FY ) Executive Summary

Transit Development Plan (FY ) Executive Summary Transit Development Plan (FY 2019-2028) Executive Summary December 2018 TABLE OF CONTENTS Introduction... 1 System Profile... 2 Public Outreach... 4 Key Findings/Direction... 5 Implementation Plan... 6

More information

Public Works and Development Services

Public Works and Development Services City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement

More information

Memorandum. Date: RE: Plans and Programs Committee

Memorandum. Date: RE: Plans and Programs Committee Memorandum Date: 11.09.09 RE: Plans and Programs Committee November 17, 2009 To: From: Through: Subject: Plans and Programs Committee: Commissioners Chu (Chair), Campos (Vice Chair), Chiu, Elsbernd, Maxwell

More information

PLANNING DEPARTMENT. Town Goals. Goal: Ensure that infrastructure exists for current and future needs identified in the comprehensive plan.

PLANNING DEPARTMENT. Town Goals. Goal: Ensure that infrastructure exists for current and future needs identified in the comprehensive plan. PLANNING DEPARTMENT Additional information about the Planning Department may be obtained by calling Jeff Ulma, Planning Director, at (919) 319-4580, through email at jeff.ulma@townofcary.org or by visiting

More information

Memorandum. Date: RE: Plans and Programs Committee

Memorandum. Date: RE: Plans and Programs Committee Memorandum Date: 03.16.10 RE: Plans and Programs Committee March 23, 2010 To: From: Through: Subject: Plans and Programs Committee: Commissioners Campos (Chair), Chu (Vice Chair), Chiu, Avalos, Dufty and

More information

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis Attachment B Project Cost Estimates for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA

More information

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC J-17 STAFF REPORT MEETING DATE: October 24, 2017 TO: City Council FROM: Russ Thompson, Public Works Director PRESENTER: Russ Thompson, Public Works Director SUBJECT: RECEIVE A REPORT AND APPROVE PROPOSED

More information

VOLUSIA COUNTY COUNCIL IMPACT FEE DISCUSSION

VOLUSIA COUNTY COUNCIL IMPACT FEE DISCUSSION VOLUSIA COUNTY COUNCIL IMPACT FEE DISCUSSION J U N E 5, 2 0 1 8 05-2 CRITICAL POINTS May 1, 2018, the County Council directed staff to bring forward a discussion on the county thoroughfare road impact

More information

Page 2 of 9 project costs are included in the budget consistent with the adopted Measure C and Measure J Strategic Plans. Below is a summary of the FY

Page 2 of 9 project costs are included in the budget consistent with the adopted Measure C and Measure J Strategic Plans. Below is a summary of the FY Meeting Date: Subject Summary of Issues Recommendations Financial Implications Options Attachments (See APC Packet dated 3/1/18) Changes from Committee Approval of FY 2017-18 Midyear Budget for the Contra

More information

Overview of Funding Sources

Overview of Funding Sources Overview of Funding Sources 0 Transportation 0 Transportation Sales Tax 0 License Tax 0 G.O. Bonds 0 CIP Sales Tax 0 General Fund 0 Public Safety, Facilities, Buildings 0 G.O. Bonds 0 General Fund 0 Stormwater

More information

CIP. PUBLIC WORKS DEPARTMENT Timm Borden, Director

CIP. PUBLIC WORKS DEPARTMENT Timm Borden, Director PUBLIC WORKS DEPARTMENT Timm Borden, Director CITY HALL 10300 TORRE AVENUE ~ CUPERTINO, CA 95014-3266 (408) 777-3354 ~ FAX (408) 777-3333 CIP 2015-2016 Budget report of the Capital Improvement Program

More information

Planning Board Worksession No.6: Transportation and Staging

Planning Board Worksession No.6: Transportation and Staging Planning Board Worksession No.6: Transportation and Staging Prior Worksessions January 27: Focused on transportation analysis and staging recommendations in the Draft Plan. February 9: Reviewed the Executive

More information

Traffic. Municipal Manager. Traffic Administration. Transportation Planning. Traffic Engineering. Communications. Data. Paint and Signs.

Traffic. Municipal Manager. Traffic Administration. Transportation Planning. Traffic Engineering. Communications. Data. Paint and Signs. Municipal Manager Administration Transportation Planning Engineering Communications Data Paint and Signs Signals Safety and Signals Signal Operations / General Government Operating Budget Lance R. Wilber,

More information

Memorandum. Date: February 21, 2018 To: From: Subject:

Memorandum. Date: February 21, 2018 To: From: Subject: Agenda Item 6 Memorandum Date: February 21, 2018 To: From: Subject: Transportation Authority Board Anna LaForte Deputy Director for Policy and Programming 3/13/2018 Board Meeting: Allocation of $8,795,721

More information

BUDGET WORKSHOP CIP PRESENTATION

BUDGET WORKSHOP CIP PRESENTATION BUDGET WORKSHOP CIP PRESENTATION FISCAL YEAR 2016-17 FISCAL YEAR 2017-18 May 23, 2016 1 PRESENTATION OVERVIEW 1)CIP Development Process 2)Funding 3)Recent & Current CIP 4)7-Year proposal 5)Year 1 & 2 proposals

More information

Alameda County Public Works Agency

Alameda County Public Works Agency MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: Alameda County Public Works Agency Date: 12/22/2017 Primary Point of Contact

More information

AGENDA REPORT. DATE: November 27, City Commission. Kim D. Leinbach, Interim City Manager

AGENDA REPORT. DATE: November 27, City Commission. Kim D. Leinbach, Interim City Manager AGENDA REPORT DATE: November 27, 2017 TO: FROM: SUBJECT: City Commission Kim D. Leinbach, Interim City Manager Set a public hearing to consider the adoption of the annual update of the 5-Year Schedule

More information

FISCAL YEAR RECOMMENDED BUDGET

FISCAL YEAR RECOMMENDED BUDGET FISCAL YEAR 2017-2018 RECOMMENDED BUDGET JUNE 6, 2017 AGENDA City Manager s Budget Status FY 2017-18 General Fund Recommended Budget FY 2017-18 Recommended Non-General Fund Budget FY 2017-18 Recommended

More information

ADOPTED OPERATING & CAPITAL IMPROVEMENT BUDGET FISCAL YEAR 2007 OCTOBER 1, 2006 SEPTEMBER 30, 2007

ADOPTED OPERATING & CAPITAL IMPROVEMENT BUDGET FISCAL YEAR 2007 OCTOBER 1, 2006 SEPTEMBER 30, 2007 CITY OF ST. PETERSBURG ADOPTED OPERATING & CAPITAL IMPROVEMENT BUDGET FISCAL YEAR 2007 OCTOBER 1, 2006 SEPTEMBER 30, 2007 Rick Baker, Mayor David W. Bill Foster, Esq. Council Chair, District 5 Re!e Flowers

More information

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6 C ITY OF G EORGETOWN, TEXAS C APITAL I MPROVEMENT P LAN S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6 Georgetown Transportation Advisory Board April 10, 2015 Table of Contents Introduction... 1 Transportation

More information

Pinellas County Capital Improvement Program, FY2011 Through FY2016 INTRODUCTION AND BACKGROUND

Pinellas County Capital Improvement Program, FY2011 Through FY2016 INTRODUCTION AND BACKGROUND Introduction to the Six-Year Capital Improvement Program (CIP) The Pinellas County Capital Improvement Program (CIP) is a comprehensive six-year plan of proposed capital projects, intended to identify

More information

PUBLIC WORKS & FACILITIES DEPARTMENT

PUBLIC WORKS & FACILITIES DEPARTMENT PUBLIC WORKS & FACILITIES DEPARTMENT FY13 Budget Workshop July 24, 2012 1 1 Public Works & Facilities Department Mission Statement To provide courteous and quality service, while designing, inspecting

More information

A. Executive Summary

A. Executive Summary A. Executive Summary Introduction The Local Economy... A-1 Goals... A-3 Key Strategic Initiatives for 2014... A-4 Key Long-term Initiatives... A-5 Adoption Process... A-7 Fiscal Year 2014 Adopted Budget...

More information

CAPITAL IMPROVEMENTS ELEMENT

CAPITAL IMPROVEMENTS ELEMENT CAPITAL IMPROVEMENTS ELEMENT INTRODUCTION The purpose of the Capital Improvements Element is to consider the need for and the location of public facilities in order to encourage the efficient use of such

More information

2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD

2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD AGENDA ITEM NO. 2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD TO THE HONORABLE MAYOR AND COUNCIL: DATE: June 22, 2009 Subiect: ADOPTING RESOLUTION NO. 09-53, APPROVING THE CITY'S REVISED PROPOSITION

More information

Rule #1: Procedure for Distribution of Revenues for Transportation Services for Seniors and the Disabled

Rule #1: Procedure for Distribution of Revenues for Transportation Services for Seniors and the Disabled BOARD POLICY NO. 031 TransNet ORDINANCE AND EXPENDITURE PLAN RULES The following rules have been adopted and amended by the SANDAG Board of Directors in its role as the San Diego County Regional Transportation

More information

SAN FRANCISCO PLANNING DEPARTMENT

SAN FRANCISCO PLANNING DEPARTMENT REMARKS Addendum #2 to Environmental Impact Report Addendum Date: June 11, 2015 Case No.: 2011.0558E Project Title: Transit Effectiveness Project, Modified TTRP.5 Moderate Alternative, McAllister Street

More information

Pinellas County Metropolitan Planning Organization

Pinellas County Metropolitan Planning Organization Pinellas County Metropolitan Planning Organization 2015 Level of Service Report Adopted September 9, 2015 Councilmember Jim Kennedy Chair Commissioner John Morroni Vice Chair Commissioner Joanne Cookie

More information

September 5, Mr. Michael Merrill County Administrator Hillsborough County, Florida 601 E. Kennedy Blvd., 26 th Floor Tampa, Florida 33602

September 5, Mr. Michael Merrill County Administrator Hillsborough County, Florida 601 E. Kennedy Blvd., 26 th Floor Tampa, Florida 33602 September 5, 2018 Mr. Michael Merrill County Administrator Hillsborough County, Florida 601 E. Kennedy Blvd., 26 th Floor Tampa, Florida 33602 Mr. Jeffrey Seward Interim Chief Executive Officer Hillsborough

More information

Capital District Transportation Committee March 3, Amendments to the TIP

Capital District Transportation Committee March 3, Amendments to the TIP Capital District Transportation Committee March 3, 2017 Amendments to the 2016-21 TIP At its March 1, 2017 and March 2, 2017 meetings, CDTC made the following amendments to the Transportation Improvement

More information

Twin Cities Area Transportation Study (TwinCATS) Adopted:

Twin Cities Area Transportation Study (TwinCATS) Adopted: Introduction Twin Cities Area Transportation Study (TwinCATS) Transportation Improvement Program Administrative Modification & Amendment Policy Adopted: This document provides guidance that defines the

More information

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION Amendment # 2 FY 2017-2020 Transportation Improvement Program Amendment Summary: The Transportation Improvement Program (TIP)

More information