1 FY2018 BUDGET PROPOSALS CAPITAL IMPROVEMENT PLAN (CIP) To review the Administration s recommendation for funding of FY2018 CIP projects To review the Council s recommendations for fund of FY2018 CIP projects The Council will review the Administration s recommendation for funding the FY Capital Improvement Plan projects and determine if changes should be made for inclusion in the final FY2018 budget. Capital investment decisions have been an important part of Ogden City government for more than 150 years. Construction of every water and sewer line, every City facility, and every roadway in the City was the result of a capital investment decision. Because these investments come with large price tags and because City resources are limited, the City Council must work with the Administration to prioritize and allocate the public funds to the projects the City finds most important. While the CIP lists and articulates needed capital improvements and provides a format for the prioritization of individual projects, the CIP also acts as a major policy document. Similar to the City s annual budget, the CIP sets the course for and highlights which investments the City feels are most important to the community. The inclusion of some projects, the exclusion of others, and the overall prioritization of how the City wishes to invest in the City s physical plant is a critical step in implementing the City s adopted goals and objectives. CIP Process Objectives The overall objectives for the CIP process are as follows: Develop a plan that reflects the values of the City Ensure the plan relates to the City s General Plan, including community plans, and adopted City policies Create an appropriate balance between capital improvements and operating budgets Provide opportunities for public input Ogden City Council Work Session: May 23,

2 Adopt a CIP plan In order to meet these objectives, the Council reviews and prioritizes potential capital projects prior to the annual budget process. Five (5) Year Planning The Capital Improvement Plan provides a projected schedule of capital improvements to be undertaken in the next budget year and within the following four (4) years. It contains projects that can be accomplished through one-year budget allocations as well as those which need to be spread over multiple years. Planning Commission Review The Planning Commission reviews the CIP to determine if the proposed capital improvements are consistent with the City s General Plan. The CIP is to be submitted to the Planning Commission concurrent with submission to the City Council. The Planning Commission reviews the proposed plan and reports its determination to the City Council within forty-five (45) days of submission. Funding Sources for Capital Projects Funding sources for capital projects include the City s general fund, federal funding, state funding, Class B&C Road funds, citizen participation, enterprise funds, bonds, and other sources like RAMP, and special assessment areas. In addition, a portion of BDO lease revenue is used for capital projects. Budget Guidelines The following Budget Guideline relating to the CIP was adopted as part of the FY2017 budget: Capital Improvement Plan. The Capital Improvement Plan (CIP) is to be submitted for Council review no later than November 1 of each year. The Mayor s priorities are to be submitted by November 1 as well. The Planning Commission s recommendations are to be provided to the Council within 45 days (December 15) after the CIP is submitted to the Council. The Council expects to adopt the CIP by March 31 each year. Ogden City Council Work Session: May 23,

3 FY CIP Process Timeline October 31, 2016 The proposed FY CIP was provided to the Council office. The plan was also submitted to the Planning Commission for review and recommendation. December 7, 2016 The Planning Commission reviewed the FY CIP. The plan was given a recommendation of approval with a vote of 6-0 with three projects recommended for exclusion from the plan. December 15, 2016 The Council office received the transmittal containing the Planning Commission s recommendation. January 17, 2017 Council Staff Overview Council Staff reviewed the proposed plan and identified issues the Council may want to consider during the plan adoption process. In previous years, the Administration would provide a cursory overview of the proposed plan prior to Council Staff s review. It was determined that Council Staff s review was an adequate introduction to the proposed plan and the initial Administrative presentation was not necessary. February 1, 2017 The Planning Commission reviewed and made a recommendation on an amendment to the CIP for project FL010, Public Services Building and Green Waste Site Fuel Tank Improvements. February 7, 2017 Council office received the transmittal containing the Planning Commission s recommendation for project FL010. February 14, 2017 Specific Projects Review Representatives from the Administration reviewed and discussed their department s projects and answered questions for the Council. The review included the proposed project FL010, Improve Public Services Building and Green Waste Site Fuel Tanks. Ogden City Council Work Session: May 23,

4 February 21, 2017 Council Discussion The Council prioritized the proposed FY2018 General Fund projects and had the opportunity to ask any final questions and propose any changes in preparation for adoption of the plan. February 28, 2017 City Council Meeting The Council set a Public Hearing for March 21, March 21, 2017 City Council Meeting Public input on FY CIP The Council adopted the FY CIP May 2, 2017 City Council Meeting Mayor presented the Administration s proposed budget for Fiscal Year 2018 containing recommendations for funding of CIP projects included in the CIP. May 16, 2017 City Council Meeting The Council set a public hearing on the Tentative FY2018 budget for June 6, The Administration is proposing approximately $8,555,000 in capital improvement projects. Projects Proposed for Funding from FY CIP CIP Fund Total for Project BDO Lease Revenue Other Funding Annual Arts Funding $100,000 $35,000 $65,000 Former Dee School Site Development $400,000 $400,000 - *Courtyard Inn Acquisition and Demo $250,000 $250,000 - *Meat Packing Bldg. Prop. Acq/Demo $1,125,000 $1,125,000 - Curb, Gutter, Sidewalk Replacement $645,000 - $645,000 Street Construction $325,000 - $325,000 Bike Master Plan Projects $25,000 - $25,000 Grant Ave. Promenade $80,000 $80,000 - General Facilities Improvements $400,000 $400,000 - Union Station Asbestos Remediation $75,000 $75,000 - Improve Fuel Tanks $200,000 $200,000 - Ogden City Council Work Session: May 23,

5 Critical Project Contingency $100,000 $100,000 - Gomer Nicholas Trust $1,500 - $1,500 General Park Improvements (Mt. Lewis) $150,000 $150,000 - Backflow Prevention Replacement $50,000 $50,000 - High Adventure Park West $240,000 $240,000 - Centennial Trail Acquisition/Const. $50,000 - $50,000 Trailhead Entry Points and Cameras $135,000 $45,000 $90,000 Enhance Scoreboards City-wide $66,725 $22,250 $44,475 Total for CIP Fund $4,418,225 $3,172,250 $1,245,975 *These projects were included in the proposed Tentative FY2018 budget presented to the Council on May 2, 2017; however, funding for these projects is proposed to be amended from a transfer to the CIP fund to a transfer to the RDA fund. It is still proposed that the funding source be BDO Lease Revenue. Because the projects are proposed to be funded from the RDA, no CIP project brief has been reviewed or adopted by the Council. Projects Proposed for Funding from FY CIP Total for Project Airport Enterprise Fund BDO Lease Revenue Other Funding Airport Master/Layout Plan $6,800 $6,800 - City Funded CIP for FAA Grant Match $100,000 - $100,000 Water Utility Enterprise Fund 46 th Street Pump Station $220,000 - $220,000 Wheeler Creek Intake $660,000 - $660,000 Pineview Well Field Prop. Acquisition $500,000 - $500,000 Sanitary Sewer Enterprise Fund Sanitary Sewer Master Plan Projects $1,150,000 - $1,150,000 Storm Sewer Utility Enterprise Fund Storm Sewer Master Plan Projects $1,500,000 - $1,500,000 Totals for Other Funds $4,136,800 $6,800 $4,130,000 Ogden City Council Work Session: May 23,

6 1. Please review the proposed uses of BDO Lease Revenue. 2. Please review the proposed sources and uses for the Active Transportation Funds (Prop 1) and the Class B & C Road Funds. 3. Please provide a brief review of the top priorities for road construction and sidewalk, curb, gutter replacement. 4. Please review the Water Utility projects proposed for FY Please provide an update on the Water Utility s plans for continued pipe replacement and distribution, fire flow, and pressure improvements. 1. Budget sections related to Capital Improvement Plan a. CIP Fund Projects List b. Airport Fund Projects List c. Water Utility Fund Projects List d. Sanitary Sewer Fund Projects List e. Storm Sewer Fund Projects List 2. BDO Lease Revenue Funds Proposed Budget 3. FY18 Proposed Transportation Funding 4. CIP Project and Funding Source Spreadsheet 5. Adopted FY CIP/Proposed FY2018 Budget comparison Council Staff Contact: Glenn Symes, AICP (801) Ogden City Council Work Session: May 23,

7 CAPITAL IMPROVEMENT PROJECTS Capital Improvement Projects Fund Capital Improvement Projects FUNCTIONS Non-general operations indicated by underlined text. The Capital Improvement Projects Fund is used to account for financial resources set aside for the acquisition, construction, or improvement of major capital facilities (other than those financed by Proprietary Funds and Trust Funds). The budgeted projects are included in the 5-year CIP Plan adopted by the Ogden City Council. 113

8 OGDEN CITY TENTATIVE BUDGET SUMMARY OF REVENUES AND EXPENDITURES CAPITAL IMPROVEMENT PROJECTS CAPITAL IMPROVEMENT PROJECTS REVENUES 2016 ACTUAL 2017 ADOPTED CHARGES FOR SERVICES 50,000 INTEREST 39,800 10,000 INTERGOVERNMENTAL REVENUE 2,466,403 83,000 OTHER FINANCING SOURCES 2,312,702 4,272, BUDGET 10, ,475 4,273,750 4,868,905 4,365,250 4,418,225 EXPENDITURES BUILDINGS 681, ,825 DEBT SERVICE 925 INTERFUND TRANSFERS 164,850 MS ADMINISTRATION 11, ,000 NONDEPT MISCELLANEOUS 185,000 OFD ADMINISTRATION 3,348,537 PARKS 1,205,789 1,177,925 RECREATION 244, ,200 STREETS 6,557,694 2,058,300 UNION STATION 600, ,000 1,475, ,500 66,725 1,475,000 75,000 12,215,202 4,365,250 4,418,

9 OGDEN CITY TENTATIVE BUDGET FISCAL YEAR REVENUE BUDGET CAPITAL IMPROVEMENT PROJECTS 2016 ACTUAL MO ACTUAL 2017 ADOPTED 2018 BUDGET CHARGES FOR SERVICES PARKS AND RECREATION 50,000 37,500 Donation revenue received for a specific capital project or group of projects. 50,000 37,500 INTEREST GENERAL 39,800 10,000 10,000 Interest earnings represents interest produced by a positive cash balance and is distributed to projects creating the balance. 39,800 10,000 10,000 INTERGOVERNMENTAL REVENUE COUNTY FUNDS 771,169 83, ,475 RAMP Grants are received from the County for specific purposes. STATE FUNDS 1,695,234 Allocations are received from the State of Utah for specific purposes. 2,466,403 83, ,475 OTHER FINANCING SOURCES DONATIONS 5,000 Donations are usually given to the City in support of a specific capital project. TRANSFERS 2,307,702 2,535,026 4,272,250 4,273,750 Transfers are from other City funds to provide for specific projects or groups of projects. 2,312,702 2,535,026 4,272,250 4,273,750 CAPITAL IMPROVEMENT PROJECTS TOTAL 4,868,905 2,572,526 4,365,250 4,418,

10 OGDEN CITY TENTATIVE BUDGET CAPITAL IMPROVEMENT PROJECTS (CIP) CIP FUND Project Title Project # Amount Annual Arts Funding TBD $ 100,000 Former Dee School Site Development CD040 $ 400,000 Courtyard Inn Acquisition & Demo CD080 $ 250,000 Meat Packing Building Property Acquisition & Demo CD081 $ 1,125,000 Curb, Gutter and Sidewalk Replacement EN004 $ 645,000 Street Construction EN006 $ 325,000 Bike Master Plan Projects EN021 $ 25,000 Grant Ave Promenade EN050 $ 80,000 General Facilities Improvements FL007 $ 400,000 Union Station Asbestos Remediation Laundry Building FL009 $ 75,000 Improve Fuel Tanks FL010 $ 200,000 Critical Project Contingency GC025 $ 100,000 Gomer Nicholas Trust PK071 $ 1,500 General Park Improvements Mt. Lewis (Community Plan) PK124 $ 150,000 Backflow Prevention Replacement PK137 $ 50,000 High Adventure Park West PK140 $ 240,000 Centennial Trails Acquisitions & Construction PY002 $ 50,000 Trailhead Entry Points and Cameras RM028 $ 135,000 Enhance Scoreboards CityWide RM035 $ 66,725 $ 4,418,

11 FIRE OGDEN CITY TENTATIVE BUDGET SUMMARY OF DEPARTMENTAL EXPENDITURES CAPITAL IMPROVEMENT PROJECTS 2016 ACTUAL MO ACTUAL 2017 ADOPTED 2018 BUDGET LAND 181,479 BUILDING 3,167,058 5,790 3,348,537 5,790 DIVISION SUMMARY FIRE OFD ADMINISTRATION 3,348,537 5,790 3,348,537 5,790 FUNDING SOURCES FIRE CARRYOVER CONTRIB OTHER FUNDS GEN FUND CONTRIBUTION 117

12 MANAGEMENT SERVICES OGDEN CITY TENTATIVE BUDGET SUMMARY OF DEPARTMENTAL EXPENDITURES CAPITAL IMPROVEMENT PROJECTS 2016 ACTUAL MO ACTUAL 2017 ADOPTED 2018 BUDGET OTHER OPERATING EXPENSES ,935 2,500 2,500 IMPROVEMENTS 10,300 25,000 97,500 97,500 11,240 67, , ,000 DIVISION SUMMARY MANAGEMENT SERVICES MS ADMINISTRATION 11,240 67, , ,000 11,240 67, , ,000 FUNDING SOURCES MANAGEMENT SERVICES CARRYOVER TRANSFERS CONTRIB OTHER FUNDS GEN FUND CONTRIBUTION MISCELLANEOUS 100, , , ,

13 NONDEPARTMENTAL OGDEN CITY TENTATIVE BUDGET SUMMARY OF DEPARTMENTAL EXPENDITURES CAPITAL IMPROVEMENT PROJECTS 2016 ACTUAL MO ACTUAL 2017 ADOPTED 2018 BUDGET CHARGES FOR SERVICES 85,000 OTHER OPERATING EXPENSE 100, ,000 DEBT SERVICE BUILDING 630,617 79, ,825 1,975,000 IMPROVEMENTS 50,962 54, ,000 OPERATING TRANSFERS 164,850 INTERAGENCY TRANSFERS 85, , , ,825 2,075,000 CHARGES FOR SERVICES OTHER OPERATING EXPENSE DEBT SERVICE BUILDING IMPROVEMENTS OPERATING TRANSFERS INTERAGENCY TRANSFERS DIVISION SUMMARY NONDEPARTMENTAL BUILDINGS 681, , , ,000 INTERFUND TRANSFERS 164,850 85,000 MISCELLANEOUS 8, ,000 1,475,000 DEBT SERVICE , , ,825 2,075,000 FUNDING SOURCES NONDEPARTMENTAL TRANSFERS CONTRIB OTHER FUNDS 743,825 2,075, ,825 2,075,

14 DIVISION SUMMARY PUBLIC SERVICES PARKS 1,205, ,286 1,177, ,500 RECREATION 244, , ,200 66,725 UNION STATION 75,000 STREETS 6,557,695 6,641,951 2,058,300 1,475,000 FUNDING SOURCES OGDEN CITY TENTATIVE BUDGET SUMMARY OF DEPARTMENTAL EXPENDITURES CAPITAL IMPROVEMENT PROJECTS 2016 ACTUAL MO ACTUAL 2017 ADOPTED 2018 BUDGET PUBLIC SERVICES BUILDING 153,875 IMPROVEMENTS 8,008,072 7,303,047 3,367,550 2,243,225 8,008,072 7,303,047 3,521,425 2,243,225 8,008,072 7,303,047 3,521,425 2,243,225 PUBLIC SERVICES CONTRIB OTHER FUNDS INTERGOVERNMENTAL GRANTS GEN FUND CONTRIBUTION INTEREST INCOME 2,356,925 1,062,250 83, ,475 1,071,500 1,036,500 10,000 10,000 3,521,425 2,243,

15 OGDEN CITY TENTATIVE BUDGET CAPITAL IMPROVEMENT PROJECTS (CIP) CIP FUND Project Title Project # Amount Annual Arts Funding TBD $ 100,000 Former Dee School Site Development CD040 $ 400,000 Courtyard Inn Acquisition & Demo CD080 $ 250,000 Meat Packing Building Property Acquisition & Demo CD081 $ 1,125,000 Curb, Gutter and Sidewalk Replacement EN004 $ 645,000 Street Construction EN006 $ 325,000 Bike Master Plan Projects EN021 $ 25,000 Grant Ave Promenade EN050 $ 80,000 General Facilities Improvements FL007 $ 400,000 Union Station Asbestos Remediation Laundry Building FL009 $ 75,000 Improve Fuel Tanks FL010 $ 200,000 Critical Project Contingency GC025 $ 100,000 Gomer Nicholas Trust PK071 $ 1,500 General Park Improvements Mt. Lewis (Community Plan) PK124 $ 150,000 Backflow Prevention Replacement PK137 $ 50,000 High Adventure Park West PK140 $ 240,000 Centennial Trails Acquisitions & Construction PY002 $ 50,000 Trailhead Entry Points and Cameras RM028 $ 135,000 Enhance Scoreboards CityWide RM035 $ 66,725 $ 4,418,225

16 OGDEN CITY TENTATIVE BUDGET CAPITAL IMPROVEMENT PROJECTS (CIP) AIRPORT FUND Project Title Project # Amount Airport Master/Layout Plan AR053 $ 6,800 City Funded CIP for Anticipated FAA Grant Match AR077 $ 100,000 $ 106,800

17 OGDEN CITY TENTATIVE BUDGET CAPITAL IMPROVEMENT PROJECTS (CIP) WATER UTILITY FUND Project Title Project # Amount Distribution, Fire Flow, & Pressure WU015 $ Pipe Replacement WU015 $ 46th Street Pump Station WU071 $ 220,000 Wheeler Creek Intake WU106 $ 660,000 Pineview Well Field Property Acquisition WU107 $ 500,000 $ 1,380,000

18 OGDEN CITY TENTATIVE BUDGET CAPITAL IMPROVEMENT PROJECTS (CIP) SANITARY SEWER UTILITY FUND Project Title Project # Amount Sanitary Sewer Master Plan Projects SA009 $ 1,150,000 $ 1,150,000

19 OGDEN CITY TENTATIVE BUDGET CAPITAL IMPROVEMENT PROJECTS (CIP) STORM SEWER UTILITY FUND Project Title Project # Amount Storm Sewer Master Plan Projects SU010 $ 1,500,000 $ 1,500,000

20 BDO LEASE REVENUE FUNDS PROPOSED BUDGET FY 2018 Budget Accumulated FullYear Fund Balance as of June 30, 2016 $ 8,810,787 Quality Neighborhoods Funding $ (1,000,000) Ordinance HELP Loan Funding $ (200,000) Ordinance Energy Audit Budget Opening $ (65,000) FY17 Budget Opening Prosecutor Software Budget Opening $ (50,000) FY17 Budget Opening Airport Budget Opening $ (1,440,000) FY17 Budget Opening Amphitheater RAMP Pending Budget Opening $ (40,000) FY17 Pending Budget Opening Funds Available $ 6,015,787 CBD Mall District for Debt Service Coverage/Reserve/Capital $ (500,000) Ordinance Annual Arts Funding $ (35,000) Ordinance Balance of Lease Revenue for Distribution $ 5,480,787 Balance for Capital or Minimum for Capital Operations Other CIP Other CIP Funding Active Funding Class Trans Funds (Prop 1) B & C Road Funds, Interest 2018 RAMP Funding Project Total 50% split of Lease Revenue for Distribution $ 2,740,394 $ 2,740,394 $ 875,000 $ 171,500 $ 134,475 $ 6,661,762 Minimum for Community Plan Projects (10%) $ 150,000 $ (150,000) $ $ $ $ $ 2,890,394 $ 2,590,394 $ 875,000 $ 171,500 $ 134,475 $ 6,661,762 Council Ranking Total Available $ 6,661,762 Balance Available $ (13) Proposed Funded PK071 Gomer Nicholas $ 1,500 $ 1,500 $ 1,500 PY002 Centennial Trails Acquisitions & Construction $ $ 50,000 $ 50,000 CD040 Former Dee School Site Development $ 500,000 $ 400,000 $ 400,000 1 CD122 East Central Projects $ 1,000,000 $ $ 2 EN004 Sidewalk, Curb, and Gutter Replacement $ 522,740 $ $ 645,000 $ $ 645,000 3 EN006 Street Construction $ 550,000 $ $ 155,000 $ 170,000 $ 325,000 4 PK142 Lester Park Improvements $ 380,000 $ $ 6 FL007 General Facilities Improvements $ 500,000 $ 400,000 $ 400,000 7 PK124 General Park Improvements (Comm Plan Mt. Lewis) $ 301,500 $ 150,000 $ 150,000 5 IT013 Disaster Recovery Location $ 175,000 $ $ 10 PK137 Backflow Prevention Replacement $ 200,000 $ 50,000 $ 50,000 9 GF032 Golf Courses Irrigation System Replacement $ 290,000 $ $ 8 AM004 Amphitheater Upgrades ($40,000 RAMP Grant FY17) $ 148,300 $ $ $ FL009 Union Station Asbestos Remediation ($75k Laundry) $ 300,000 $ 75,000 $ 75, GC025 Critical Project Contingency $ 100,000 $ 100,000 $ 100,000 EN021 Bike Master Plan Projects $ 100,000 $ $ 25,000 $ 25,000 AR077 Apron Rehabilitation (Annual Airport Allocation) $ 103,950 $ $ EN050 Grant Ave Promenade (RDA portion, Match $5.1M) $ 280,000 $ 80,000 $ 80,000 AR053 Airport Master/Layout Plan Due in 2017 (Airport) $ 6,800 $ 6,800 $ 6,800 PK140 High Adventure Park West (Year 1/3) $ 300,000 $ 240,000 $ 240,000 FL010 Improve Fuel Tanks $ 200,000 $ 200,000 $ 200,000 RM028 Trailhead Entry Points and Cameras $ 199,000 $ 45,000 $ 90,000 $ 135,000 RM035 Enhance Scoreboards CityWide $ 85,000 $ 22,250 $ 44,475 $ 66,725 RM034 Lindquist Field Enhancements FY17 Muni RAMP $ 120,000 $ $ CD081 Meat Packing Building Property Acquisition & Demo $ 1,125,000 $ 1,125,000 $ 1,125,000 CD080 Courtyard Inn Acquisition & Demo (Year 1/3) $ 750,000 $ 250,000 $ 250,000 Total $ 22,828,417 $ 3,144,050 $ $ 875,000 $ 171,500 $ 134,475 $ 4,325,025 NON CIP TrackLine Business Park Infrastructure (Year 3/4) $ 250,000 $ 250,000 $ 250,000 ERP Replacement Debt Service (Year 2/5) $ 650,000 $ 650,000 $ 650,000 Flower Foods Repayment (Year 1/5) $ 260,000 $ 260,000 $ 260,000 Trackline Incentive (Year 1/5) $ 160,000 $ 160,000 $ 160,000 Stipends Planning & Council (Even Fiscal Years) $ 10,600 $ 10,600 $ 10,600 Elections (Even Fiscal Years) $ 57,500 $ 57,500 $ 57,500 General Employee Wage Adjustment Fix $ 536,794 $ 196,175 $ 196,175 IT Contract Increases $ 130,000 $ 106,125 $ 106,125 Police Education Personnel (Encumber) FY17 $ 40,000 $ $ Microfilm Equipment Purchase Personnel FY17 $ 50,000 $ $ Airport Staffing Needs $ 250,000 $ 246,350 $ 246,350 The Market Makerspace ($2M EDA Grant Match) $ 800,000 $ 350,000 $ 350,000 State Cooperative Loan Fund Contribution ($500k) $ 100,000 $ 50,000 $ 50,000 Property Demolition Meat Packing Building $ 600,000 $ $ Property Demolition Courtyard Inn $ 150,000 $ $ Total $ 6,404,894 $ $ 2,336,750 $ $ $ $ 2,336,750 Total $ 6,661,775

21 FY18 Proposed Transportation Funding Project # Project Title Class B & C Active Trans Funds (Prop 1) Road Funds, Interest Project Total $ 1,200,000 $ 3,000,000 $ 4,200,000 General Fund Streets Employee Wages $ 1,220,450 General Fund Streets Operating $ 1,116,550 General Fund Engineering B&C Funding $ 493,000 General Fund General Fund Asphalt & Oil $ 325,000 $ $ 325,000 EN004 Sidewalk, Curb, and Gutter Replacement $ 645,000 $ $ 645,000 EN006 Street Construction $ 155,000 $ 170,000 $ 325,000 EN021 Bike Master Plan Projects $ 25,000 $ $ 25,000 Centennial Trails $ 50,000 $ $ 50,000 $ 1,200,000 $ 3,000,000 $ 4,200,000 Amount Remaining $ $ $ Notes: General Fund Asphalt & Oil $325,000 Asphalt overlays, winter potholes, general pothole repairs, mill and fill EN004 Sidewalk, Curb, and Gutter Replacement $645,000 $140,000 Precision Asphalt Grinding to fund complaints in same year they are received and work on existing complainss $400,000 Remove and Replace $30,000 Fix and lift pavers and tree grates in City right of ways and risk management issues (Washington 2425th priority) $25,000 Trim trees and replace ($ per address) $50,000 Special Project Requests EN006 Street Construction $325,000 27th Street in conjunction with the Sanitary Sewer Repairs Additional funding for 36th & Quincy Ave signal replacement project Beverly, Childs, existing Skyline south of 4600, Curb & Gutter Skyline Roundabout to 36th Street Future funding also includes 20th and 21st Street and Lincoln Ave EN021 Bike Master Plan Projects $25,000 Work on projects identified in the Bicycle Master Plan Centennial Trails Construction & Acquisition $50,000 Funding for possible future land acquisitions to further the trail system

22 FY2018 CIP Projects and Funding Sources Fund Council Top 10 Rank Project Title Project # Amount in FY18 Budget BDO Lease Revenue CIP BDO Lease Revenue non CIP Class B & C Road Funds Active Transportation Funds Enterprise Funds Other Notes GF 1 Former Dee School Site Development CD040 $ 400,000 $ 400,000 GF 3 Curb, Gutter, and Sidewalk Replacement EN004 $ 645,000 $ 645,000 GF 4 Street Construction EN006 $ 325,000 $ 170,000 $ 155,000 GF 5 General Park Improvement Mt. Lewis (Comm. Plan) PK124 $ 150,000 $ 150,000 GF 7 General Facilities Improvements FL007 $ 400,000 $ 400,000 GF 9 Backflow Prevention Replacement PK137 $ 50,000 $ 50,000 GF Annual Arts Funding TDB $ 100,000 $ 35,000 $ 65,000 $65,000 from Transfers from Utilities for Public Art GF Courtyard Inn Acquisition CD080 $ 250,000 $ 250,000 Proposed amendment Xfer to RDA, not CIP Fund GF Meat Packing Bldg. Prop. Acquisition and Demo CD081 $ 1,125,000 $ 1,125,000 Proposed amendment Xfer to RDA, not CIP Fund GF Bike Master Plan Projects EN021 $ 25,000 $ 25,000 GF Grant Avenue Promenade EN050 $ 80,000 $ 80,000 GF Union Station Asbestos Rem. Laundry Bldg. FL009 $ 75,000 $ 75,000 GF Improve Fuel Tanks FL010 $ 200,000 $ 200,000 GF Critical Project Contingency GC025 $ 100,000 $ 100,000 GF Gomer Nicholas Trust PK071 $ 1,500 $ 1,500 Gomar Nicholas Trust GF High Adventure Park West PK140 $ 240,000 $ 240,000 GF Centennial Trails Acquisition & Construction PY002 $ 50,000 $ 50,000 GF Trailhead Entry Points and Cameras RM028 $ 135,000 $ 45,000 $ 90,000 RAMP Grant GF Enhance Scoreboards Citywide RM035 $ 66,725 $ 22,250 $ 44,475 RAMP Grant Total for General Fund $ 4,418,225 Airport Airport Master/Layout Plan AR053 $ 6,800 $ 6,800 Airport City Funded CIP for Anticipated FAA Grant Match AR077 $ 100,000 $ 100,000 Contribution from GF to CIP for match Total for Airport Enterprise Fund $ 106,800 Sanitary Sanitary Sewer Master Plan Projects SA009 $ 1,150,000 $ 1,150,000 Total for Sanitary Sewer Utility Enterprise Fund $ 1,150,000 Storm Storm Sewer Master Plan Projects SU010 $ 1,500,000 $ 1,500,000 Total for Storm Sewer Utility Enterprise Fund $ 1,500,000 Water 46th Street Pump Station WU071 $ 220,000 $ 220,000 Water Wheeler Creek Intake WU106 $ 660,000 $ 660,000 Water Pineview Well Field Property Acquisition WU107 $ 500,000 $ 500,000 Total for Water Utility Enterprise Fund $ 1,380,000 Total for All CIP Projects in FY2018 Proposed Budget $ 8,555,025 Total for BDO Lease Revenue $ 3,144,050 Total for BDO NonCIP Lease Revenue $ 35,000 Total for Class B & C Road Funds $ 170,000 Total for Active Transportation (Prop 1) Funds $ 875,000 Total from Enterprise Funds $ 4,030,000 Total Other $ 300,975

23 Council Rank FY18 Adopted FY CIP/Proposed FY2018 Budget Comparison Admin Rank CIP FY Proposed FY18 Budget Proposed Amendments FY18 Project # Project Description Project Total FY2018 GF FY2018 Other Future Funding Fiscal Year(s) Total Funded Funding Diff. Total Funded Amendment Airport AR038 Seismic Proofing of Tower $55,000 $0 $0 $55,000 FY2019 $0 AR042 Northwest Access/Perimeter Road $0 AR045 Terminal Ramp $400,000 $400,000 FY2019 $0 30 AR046 Rehab 7/25 for Cargo Access $1,100,000 $186,250 $913,750 $0 ($1,100,000) AR051 Airport Perminter Fencing (West) $50,000 $50,000 FY2019 $0 34 AR053 Airport Master/layout Plan $134,300 $6,800 $127,500 $0 $6,800 ($127,500) AR054 Terminal Upgrades $103,000 $103,000 FY2020 $0 AR062 Runway 25 Hangar Area $265,000 $265,000 FY2020 $0 12 AR070 Airport West Ogden Water Line Upgrade $320,000 $320,000 ($320,000) AR071 Airport Old Fire House Remodel $30,000 $30,000 FY2021 $0 AR073 Fair Air Roof Replacement $50,000 $50,000 FY2021 $0 40 AR074 Land Acquisition $4,000,000 $800,000 $0 $3,200,000 ($800,000) AR075 Commercial Counter/Baggage Remodel $245,000 $245,000 FY2021 $0 AR076 Commercial Baggage/Equipment Protection $160,000 $160,000 FY2021 $0 18 AR077 Apron Rehabilitation $1,153,400 $103,400 $1,050,000 $0 $100,000 ($1,053,400) AR079 Construction R/W 321 Shoulder $0 AR086 Airport Commercial Terminal $8,300,000 $8,300,000 FY2022 $0 AR087 Airport Lighting & Parking for Comm. Service $218,000 $218,000 FY2022 $0 AR088 Airport/Mall Cleanup $300,000 $300,000 FY2022 $0 AR090 Airport Basement Remodel $57,000 $57,000 FY2022 $0 Undefined project for FY17 Match for Fed grant $0 Community & Economic Development 11 AM004 Amphitheater Upgrades $283,300 $40,750 $135,000 $107,550 ($175,750) 1 1 CD040 Former Dee School Development $500,000 $500,000 $0 $0 $400,000 ($100,000) CD Jefferson Infill $0 CD Quincy Infill $0 CD th Street Infill $0 CD079 Parking Analysis Study $0 CD080 Courtyard Inn Acquisition & Demo $250,000 $250,000 $250,000 Moved to RDA CD081 Meat Packing Bldg Prop. Acquisition & Demo $1,125,000 $1,125,000 $1,125,000 Moved to RDA 49 CD100 Downtown Parking Lots $46,985,000 $3,397,000 $6,000,000 $37,588,000 ($9,397,000) CD101 East Central Public Improvements $0 CD108 East Temple Project 21st and 22nd Street $0 CD112 24th Street Village $0 2 2 CD122 East Central Projects $21,324,900 $808,850 $1,584,750 $18,931,300 ($2,393,600) NonDepartmental General Fund 15 GC025 Critical Project Contingency $100,000 $100,000 $0 $0 $100,000 $0 31 GC026 Downtown Signage and Amenities $60,000 $10,000 $10,000 $40,000 ($20,000) 29 GC030 Cityowned Parking Lot Improvements $757,500 $151,500 $0 $606,000 ($151,500) US035 Union Station Renovation $15,000,000 $15,000,000 FY2022 $0 Annual Arts Funding $100,000 $100,000 Golf Course Enterprise Fund 8 10 GF032 Golf Course Irrigation System Replacement $1,450,000 $290,000 $0 $1,160,000 ($290,000) Fire FI021 Replace Fire Training Facility $1,903,350 $1,903,350 FY2022 $0 FI032 Seismic Retrofit and Remodel Station 4 $1,343,100 $1,343,100 FY2019 $0 Management Services 17 FL001 CNG Station Expansion $600,000 $300,000 $300,000 $0 ($600,000)

24 FL004 Boiler Replacement at El Monte & Mt. Ogden $0 FL005 Mt. Ogden Golf Course Elevator Replacement $0 FL006 Golden Hours Air Handler Replacement $0 7 6 FL007 General Facilities Improvements $2,500,000 $500,000 $0 $2,000,000 $400,000 ($100,000) FL009 Union Station Asbestos Remediation $300,000 $300,000 $0 $0 $75,000 ($225,000) NR FL010 Fuel Tank Improvements (PS & GW Sites) $200,000 $200,000 $200,000 IT002 Fiber Infrastructure Replacement $350,000 $350,000 FY2020 $0 IT011 Radio Infrastructure Replacement $796,800 $796,800 FY2021, 22 $0 IT012 Security & Alerting Infrastructure Replacement $380,200 $380,200 FY2019 $ IT013 Disaster Recovery Location $175,000 $175,000 $0 $0 ($175,000) Police 13 PD003 FPSB Public Safety Fitness Room Expansion $132,000 $132,000 $0 $0 ($132,000) Public Services DI008 Dino Park Trail Pavement Upgrades/Repair $31,000 $31,000 FY2022 $0 DI013 Dino Park Exterior Electrical Upgrades $45,000 $45,000 FY2020 $0 3 3 EN004 Sidewalk, Curb, and Gutter $3,800,000 $522,740 $237,260 $3,040,000 $645,000 ($115,000) 4 4 EN006 Street Construction $2,750,000 $550,000 $0 $2,200,000 $325,000 ($225,000) 16 EN021 Bike Master Plan Projects $500,000 $100,000 $0 $400,000 $25,000 ($75,000) 27 EN040 Valley Drive Roadway Improvements $5,000,000 $0 $5,000,000 $0 ($5,000,000) EN041 20th Street Washington to Monroe Reconstruction $6,518,900 $6,518,900 FY2020 $0 20 EN050 Grant Avenue Promenade $10,730,000 $0 $10,730,000 $0 $80,000 ($10,650,000) EN065 36th & Quincy Signal Replacement $0 EN066 East Central Public Improvements $779,750 $779,750 FY21 $0 EN074 North Street Improvements, MonroeWash $0 EN077 20th & Harrison Blvd. Intersection Imp. $0 32 EN085 15th St. & Grant Ave. Intersection $250,000 $175,000 $75,000 $0 ($250,000) EN095 Citywide Transportation Master Plan $0 EN096 Green Bike Share Program $784,700 $784,700 FY2019, 20, 21, 22 $0 23 EN097 26th Street, Wall to Washington $4,886,600 $0 $4,886,600 $0 ($4,886,600) EN098 21st Street, West of Wall to Washington $5,802,300 $5,802,300 FY2019 $0 EN099 2nd Street, Washington to Monroe $4,000,000 $4,000,000 FY2019 $0 EN100 17th Street, Wall to Washington $3,000,000 $3,000,000 FY2019 $0 GH009 Golden Hours Parking Lot and Lighting Imp. $0 NR PK071 Gomer Nicholas Trust Parks Improvements $1,500 $1,500 PK115 Lindquist Field Lighting Upgrades $250,000 $250,000 FY2019 $0 5 7 PK124 General Park Improvements $907,500 $301,500 $0 $606,000 $150,000 ($151,500) 9 9 PK137 Backflow Prevention Replacement $200,000 $200,000 $0 $0 $50,000 ($150,000) PK Madison & Liberty Park Improvements $0 33 PK139 High Adventure Park East $450,000 $150,000 $0 $300,000 ($150,000) 52 PK140 High Adventure Park West $1,800,000 $1,800,000 FY2022 $240,000 $240,000 PK141 Citywide Tree Inventory $125,000 $125,000 FY2019 $0 6 5 PK142 Lester Park Improvements $1,750,000 $280,000 $220,000 $1,250,000 ($500,000) 54 PK143 Weber River Restoration/Kayak Park $1,350,000 $270,000 $0 $1,080,000 ($270,000) PY002 Replenish Centennial Trails Fund $50,000 $50, PY006 Repair Asphalt Ogden River Parkway $328,250 $65,650 $0 $262,600 ($65,650) RG044 Message Board and Entrance at 4th St. Ballpark $48,750 $48,750 FY2022 $0 RG053 Recreation Maintenance $0 RG054 Renovate Lights at 4th Street Ballpark Ph. 2 $0 RG058 Basketball Courts/Shelter Marshall White Park $145,000 $145,000 FY2019 $0 50 RG060 Marshall White Center Improvements $75,000 $25,000 $0 $50,000 ($25,000) RG061 Futsal Court at MWC $0 RG068 Ball Park Infield $0 RG069 Miles Goodyear Park Complex $161,000 $161,000 FY2020 $0 RAMP RM022 Liberty Park Improvements $0 RM028 Trailhead Entry Points $199,000 $24,000 $175,000 $0 $135,000 ($64,000) RM029 Upgrade Lights at 4th Street Ballpark Ph. 2 $0

25 RM033 Serge Simmons/Weber River Restoration $0 RM034 Lindquist Field Enhancements $120,000 $0 $120,000 $0 ($120,000) RM035 Enhance Scoreboard $85,000 $0 $85,000 $0 $66,725 ($18,275) RM036 Futsal Court $85,000 $0 $85,000 $0 ($85,000) Sanitary Sewer Enterprise Fund SA009 Sanitary Sewer Master Plan Projects $8,000,000 $1,150,000 $0 $6,850,000 $1,150,000 $0 Storm Sewer Enterprise Fund SU010 Storm Sewer Master Plan Projects $9,500,000 $1,500,000 $0 $8,000,000 $1,500,000 $0 SU096 Downs and West Oaks Drive $0 Water Utility Enterprise Fund WU015 Distribution, Fire Flow, and Pressure Imp. $14,209,453 $14,209,453 FY2020, 21, 22 $0 WU036 36" Water Line $17,220,508 $300,000 $0 $16,920,508 ($300,000) WU071 46th Street Pump Station $220,000 $220,000 $0 $0 $220,000 $0 WU106 Wheeler Creek $660,000 $660,000 $0 $0 $660,000 $0 WU107 Pineview Wellfields $500,000 $500,000 $0 $0 $500,000 $0 $219,349,561 $15,115,440 $31,734,860 $172,299,261 $8,555,025 ($38,295,275) $1,375,000

AMENDMENT TO THE FISCAL YEAR CAPITAL IMPROVEMENT PLAN (CIP)

AMENDMENT TO THE FISCAL YEAR CAPITAL IMPROVEMENT PLAN (CIP) AMENDMENT TO THE FISCAL YEAR 2017-2021 CAPITAL IMPROVEMENT PLAN (CIP) Set/not set Public Hearing for May 23, 2017 Approval of the amendment (5-0) Administration is proposing an amendment to the adopted

More information

FY2017 BUDGET AMENDMENT YEAR END ADJUSTMENTS ($4,919,075)

FY2017 BUDGET AMENDMENT YEAR END ADJUSTMENTS ($4,919,075) FY2017 BUDGET AMENDMENT YEAR END ADJUSTMENTS ($4,919,075) To discuss the proposed year-end budget amendments. The City Council will receive a presentation from the Administration for the FY2017 year-end

More information

OGDEN CITY TENTATIVE BUDGET TENTATIVE LINE ITEM REVENUE BUDGET

OGDEN CITY TENTATIVE BUDGET TENTATIVE LINE ITEM REVENUE BUDGET - TENTATIVE BUDGET FY OGDEN CITY CORPORATION GENERAL FUND 10000000-411100 PROPERTY TAXES 10,616,164 10,355,829 11,747,525 11,747,525 12,082,475 334,950 10000000-411200 PR YRS TAXES-DELINQUENT 411,824 188,945

More information

FY2018 BUDGET OVERVIEW

FY2018 BUDGET OVERVIEW FY2018 BUDGET OVERVIEW Table of Contents Message from the City Council Chair..2 Budget Snapshot.3 FY2018 Legislative Priorities..4 General Fund Revenue..5 Budget Highlights 6 Capital Improvement Program

More information

Proposed Budget. Fiscal Year 2019 Ogden City

Proposed Budget. Fiscal Year 2019 Ogden City Proposed Budget Fiscal Year 2019 Ogden City Accomplishments Significant items in FY2018 ERP New insurance broker Leadership Academy Fleet enhancements Fully funded facility maintenance Police education

More information

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS TABLE OF CONTENTS ENTERPRISE FUNDS Storm Drainage Fund... 121-124 Off Street Parking Fund... 125-126 Airport Fund... 127-131 Water Service Fund... 132-145 STORM DRAINAGE FUND CURRENT OPERATIONS This fund

More information

This page intentionally left blank

This page intentionally left blank 197 This page intentionally left blank 198 Capital Improvement Program PROCEDURE Each year the Capital Improvement Program (CIP) is prepared from project requests submitted by the various departments.

More information

Neal Oldemeyer, Public Works Department, presented the Fiscal Year 2013 departmental budget and stood for questions.

Neal Oldemeyer, Public Works Department, presented the Fiscal Year 2013 departmental budget and stood for questions. 74 Neal Oldemeyer, Public Works Department, presented the Fiscal Year 2013 departmental budget and stood for questions. Mary Barker, Valley Regional Transit, presented the Fiscal Year 2013 departmental

More information

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016 City of Des Moines Citizen Engagement Capital Improvement Program November 29, 2016 Goals of Citizen Engagement Goal Focus on service levels Department definitions of adequate service and opportunities

More information

CITY OF JOPLIN FY 2018 PROPOSED BUDGET

CITY OF JOPLIN FY 2018 PROPOSED BUDGET CITY OF JOPLIN FY 2018 PROPOSED BUDGET CITY OF JOPLIN ESTIMATE OF NEEDS PROJECTED FUND BALANCES FOR FISCAL YEAR 2017-2018 Audited Projected Projected Fund Projected 2016-2017 Activity Fund Projected 2017-2018

More information

FISCAL YEAR RECOMMENDED BUDGET

FISCAL YEAR RECOMMENDED BUDGET FISCAL YEAR 2017-2018 RECOMMENDED BUDGET JUNE 6, 2017 AGENDA City Manager s Budget Status FY 2017-18 General Fund Recommended Budget FY 2017-18 Recommended Non-General Fund Budget FY 2017-18 Recommended

More information

City of Hartford Capital Improvement Program Share Total Project Cost. General Obligation Debt

City of Hartford Capital Improvement Program Share Total Project Cost. General Obligation Debt 2019 Summary of Costs ~ Governmental Funds Law Enforcement Number Priority 2019 Share Total Cost General Obligation Term Borrowings Grants & Aids Trusts & Donations Retained Earnings Police Patrol Vehicle

More information

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS SPECIAL REVENUE FUNDS

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS SPECIAL REVENUE FUNDS TABLE OF CONTENTS SPECIAL REVENUE FUNDS Public Works Fund History... 74-81 Grant Special Revenue Fund... 82-84 Hotel/Motel Tax Fund... 85-86 Street Lights and Sidewalk Fund... 87-89 Bike Trail Fund...

More information

Proposed Budget (as of September 15, 2016)

Proposed Budget (as of September 15, 2016) CITY OF ORLANDO OPERATING AND CAPITAL IMPROVEMENT BUDGETS Vision Statement: Orlando is an international city, which uses its diversity, amenities and economy to provide a high quality of life. Mission

More information

OGDEN CITY. Fiscal Year Budget

OGDEN CITY. Fiscal Year Budget OGDEN CITY Fiscal Year -2019 Budget OGDEN CITY CORPORATION State of Utah Summary and Narrative Of Line Item Budget FISCAL YEAR - 2019 The Line Item Budget may be reviewed in the Ogden City Recorder s Office

More information

CITY OF SACRAMENTO CALIFORNIA. April 27, 2012

CITY OF SACRAMENTO CALIFORNIA. April 27, 2012 OFFICE OF THE CITY MANAGER CALIFORNIA April 27, 2012 CITY HALL 5 th FLOOR 915 I STREET SACRAMENTO, CA 95814-2684 PH 916-808-5704 FAX 916-808-7618 Honorable Mayor and City Council Sacramento, California

More information

Infrastructure and Capital Projects Planning and Funding

Infrastructure and Capital Projects Planning and Funding Infrastructure and Capital Projects Planning and Funding September 6, 2018 Preview of FY 2020 2024 CIP process Why are we here? Overview Current Assets Overview and Highlights of Adopted FY 2019 2023 CIP

More information

Fiscal Year Proposed Budget

Fiscal Year Proposed Budget Fiscal Year 2017-2018 Proposed Budget GFOA Budget Presentation Award Recognizes budget documents of the very highest quality that reflect best practices for clearly communicating budget information. Recently

More information

Balanced Financial Plan Projected Changes and Assumptions

Balanced Financial Plan Projected Changes and Assumptions Appendix I Resolution Adopting the Three Year Plan Town of Castle Rock Projected Changes and Assumptions Unless otherwise noted, following is a general list of Townwide growth rates used in future years:

More information

Capital Projects CAPITAL PROJECTS CAPITAL PROJECTS

Capital Projects CAPITAL PROJECTS CAPITAL PROJECTS Capital Projects CAPITAL PROJECTS CAPITAL PROJECTS 121 REVENUE FUNDS REVENUE FUND REFERENCE NUMBERS AND DESCRIPTIONS: 01 - General Fund This fund is the primary fund for the City. In addition to Capital

More information

City of Falls Church

City of Falls Church 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Meeting Date: 10-8-14 (Work Session) City of Falls Church Title: ORDINANCE TO AMEND ORDINANCE 1918 AND ORDINANCE 1919, REGARDING

More information

2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD

2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD AGENDA ITEM NO. 2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD TO THE HONORABLE MAYOR AND COUNCIL: DATE: June 22, 2009 Subiect: ADOPTING RESOLUTION NO. 09-53, APPROVING THE CITY'S REVISED PROPOSITION

More information

CITY of NOVI CITY COUNCIL

CITY of NOVI CITY COUNCIL CITY of NOVI CITY COUNCIL Agenda Item 5 September 26,2016 SUBJECT: Approval of resolution to authorize Budget Amendment #2016-17b. SUBMITIING DEPARTMENT: Finance CITY MANAGER APPROVAL~ BACKGROUND INFORMATION:

More information

Capital Improvement Plan. Fiscal Year through Fiscal Year

Capital Improvement Plan. Fiscal Year through Fiscal Year Fiscal Year 2015-16 through Fiscal Year 2020-21 Adopted: May 20, 2015 Overview City of Jonesville 2015-16 through 2020-21 The (CIP) is a six year schedule of all proposed major capital improvement projects

More information

The City uses a 7-point prioritization scale that is represented as follows: 1. Critical Significant Important 6. 7.

The City uses a 7-point prioritization scale that is represented as follows: 1. Critical Significant Important 6. 7. CIP PRIORITIES While prioritization has always been part of the CIP process, the City implemented a formal process that standardizes priorities across functions and departments, beginning with the 2013-2017

More information

CIP. February,

CIP. February, 2018-2022 CIP February, 21 2017 Agenda Biennial Budget 2018/2019 Budget Calendar 2018-2022 CIP Process Prioritized List of Projects Biennial Budgeting Strategic Culture in Olathe Strategic Culture in Olathe

More information

CITY OF SALEM FINANCIAL SUMMARY

CITY OF SALEM FINANCIAL SUMMARY CITY OF SALEM FINANCIAL SUMMARY Through Q2 / FY 2015-16 Financial summaries through the second quarter of each year complement development of both the five-year forecast for the General Fund and the upcoming

More information

Projects Receiving New Funding by. Funding Source and Project Number

Projects Receiving New Funding by. Funding Source and Project Number 20172022 Approved Capital Improvement Program s Receiving New Funding by Funding Source and Number 1001 GENERAL FUND A04000100 A07000300 A07000400 CITY CLER AUTOMATION IT EQUIPMENT REPLACEMENT CITYWIDE

More information

City of Pittsburg Five Year Capital Improvements Plan

City of Pittsburg Five Year Capital Improvements Plan General Fund Roadways Roadways account for forty three percent of the plan total and are the largest category at over $26.8 million. Planned improvements include annual street resurfacing, Silverback Way,

More information

OGDEN CITY COUNCIL BUDGET OVERVIEW

OGDEN CITY COUNCIL BUDGET OVERVIEW OGDEN CITY COUNCIL BUDGET OVERVIEW FISCAL YEAR 2016 ADOPTED JUNE 16, 20156 The City Council is pleased to present the FY2016 Budget for Ogden City. The Mayor, CAO, department directors and administrative

More information

SALT LAKE CITY ORDINANCE No. of 2006

SALT LAKE CITY ORDINANCE No. of 2006 SALT LAKE CITY ORDINANCE No. of 2006 (Adopting the budget, excluding the budget for the Library Fund which is separately adopted, and the employment staffing document of Salt Lake City, Utah for fiscal

More information

July 25, Members of City Council City of League City, Texas

July 25, Members of City Council City of League City, Texas Mark Rohr City Manager 300 W Walker League City, TX 77573 Main: 281.554.1000 Direct: 281.554.1005 www.leaguecity.com July 25, 2016 Members of City Council City of League City, Texas Transmitted herewith

More information

Carroll County Maryland. Community Investment Plan Request Fiscal Years

Carroll County Maryland. Community Investment Plan Request Fiscal Years Carroll County Maryland Community Investment Plan Request Fiscal Years 2019-2024 PRODUCED BY The Department of Management and Budget Ted Zaleski... Director Deborah Effingham... Chief, Bureau of Budget

More information

SALT LAKE CITY COUNCIL STAFF REPORT BUDGET AMENDMENT ANALYSIS FISCAL YEAR

SALT LAKE CITY COUNCIL STAFF REPORT BUDGET AMENDMENT ANALYSIS FISCAL YEAR SALT LAKE CITY COUNCIL STAFF REPORT BUDGET AMENDMENT ANALYSIS FISCAL YEAR 2002-03 DATE: May 7, 2002 BUDGET FOR: STAFF REPORT BY: cc: DEPARTMENT OF AIRPORTS Gary Mumford Rocky Fluhart, David Nimkin, Tim

More information

Project Description & Fund Overview Account Number Fund Name *C* September 2015 Additional Appropriation Mid-Year Adjustment Adjustments Approved by Council as separate actions Proposed & Approved Adjustments

More information

Overview of the 2016 Proposed Budget

Overview of the 2016 Proposed Budget Overview of the 2016 Proposed Budget City of Burnsville November 24, 2015 2016 Budget Process Meeting Dates June 9 July 14 August 11 September 8 October 20 October 27 Discussion Topics Financial Management

More information

Capital Improvement Program Fund

Capital Improvement Program Fund Capital Improvement Program Fund The Capital Improvement Program Fund provides funding for streets, public buildings (both governmental and school facilities), land, and other capital assets. Capital Improvement

More information

CAPITAL PROJECTS FUNDS

CAPITAL PROJECTS FUNDS CAPITAL PROJECTS FUNDS Capital projects funds are used to account for and report financial resources that are restricted, committed, or assigned to expenditure for capital outlays, including the acquisition

More information

Pinellas County Capital Improvement Program, FY2011 Through FY2016 INTRODUCTION AND BACKGROUND

Pinellas County Capital Improvement Program, FY2011 Through FY2016 INTRODUCTION AND BACKGROUND Introduction to the Six-Year Capital Improvement Program (CIP) The Pinellas County Capital Improvement Program (CIP) is a comprehensive six-year plan of proposed capital projects, intended to identify

More information

Capital Budget Summary Capital Funding Summary

Capital Budget Summary Capital Funding Summary 2017-2018 Capital Summary 2017 2018 2017 + 2018 JOHN GLENN INTERNATIONAL $39,524,297 $61,796,179 $101,320,476 INDUSTRIAL DEVELOPMENT $2,724,933 $913,792 $3,638,724 RICKENBACKER $11,060,635 $12,526,122

More information

CITY OF SANTA ANA FISCAL YEAR PROPOSED BUDGET SUMMARY

CITY OF SANTA ANA FISCAL YEAR PROPOSED BUDGET SUMMARY CITY OF SANTA ANA FISCAL YEAR 2017-2018 PROPOSED BUDGET SUMMARY Work-Study Session May 16, 2017 FISCAL YEAR 2017-18 PROPOSED BUDGET SUMMARY GENERAL FUND APPROPRIATIONS FY 2017-2018 Community Safety Youth,

More information

DRAFT PROPOSED BUDGET THE GOOD, THE BAD AND THE UGLY (Part 2) City of Chico May 2, 2017

DRAFT PROPOSED BUDGET THE GOOD, THE BAD AND THE UGLY (Part 2) City of Chico May 2, 2017 DRAFT PROPOSED BUDGET 2017 18 THE GOOD, THE BAD AND THE UGLY (Part 2) City of Chico May 2, 2017 DRAFT PROPOSED BUDGET 2017 18 SCHEDULE May 2 nd Round #2 Community Development Public Works May 16 th Questions

More information

Capital Improvement Program

Capital Improvement Program June 1, 2015 EXECUTIVE SUMMARY AND ANALYSIS The proposed 2015-2017 Capital Improvement Program includes an appropriation of $101,522,000 in expenditures over a two year period for Fiscal Years 2015-2016

More information

2017 Budget & Capital Improvement Plan AUGUST 29, 2017

2017 Budget & Capital Improvement Plan AUGUST 29, 2017 2017 Budget & Capital Improvement Plan AUGUST 29, 2017 FY 2017 Budget Calendar May June July August September October November December Financial Forecast & Public Safety Staffing Priorities, Programs,

More information

Memorandum City of Lawrence City Manager s Office

Memorandum City of Lawrence City Manager s Office Memorandum City Manager s Office TO: FROM: Date: CC: Lawrence Cultural Arts Commission Diane Stoddard, Assistant City Manager September 4, 2014 David L. Corliss, City Manager Casey Toomay, Assistant City

More information

City of Alameda Mid Cycle Update to Operating and Capital Budget Fiscal Years and

City of Alameda Mid Cycle Update to Operating and Capital Budget Fiscal Years and 1 City of Alameda Mid Cycle Update to Operating and Capital Budget Fiscal Years 2013-14 and 2014-15 Budget Presentation Outline Mid-Cycle Highlights Overview of Mid Cycle Update to All Funds & General

More information

CAPITAL IMPROVEMENT PROGRAM (CIP) POLICY AND STRUCTURE

CAPITAL IMPROVEMENT PROGRAM (CIP) POLICY AND STRUCTURE CAPITAL IMPROVEMENT PROGRAM (CIP) POLICY AND STRUCTURE Purpose: One of the primary responsibilities of local governments is the creation and preservation of the community s physical infrastructure including

More information

Operating Budget Fiscal Year

Operating Budget Fiscal Year California Celebrate Healdsburg ~ May 2009 Operating Budget Fiscal Year 2009-2010 www.cityofhealdsburg.org CITY OF HEALDSBURG Adopted Budget Fiscal Year 2009-10 City Council: Eric Ziedrich, Mayor James

More information

City of Chino Five-Year Capital Improvement Program Budget Fiscal Years through

City of Chino Five-Year Capital Improvement Program Budget Fiscal Years through City of Chino Five-Year Capital Improvement Program Budget Fiscal Years 2015-16 through 2019-20 The Five-Year Capital Improvement Program budget for FY15-16 has a new look. The CIP projects have a new

More information

August 16, 2018 Budget Workshop. Fiscal Year Proposed Budget

August 16, 2018 Budget Workshop. Fiscal Year Proposed Budget August 16, 2018 Budget Workshop Fiscal Year 2018-2019 Proposed Budget Workshop Schedule Date Time Description 7/10/18 4:30 PM Adopted Tentative Millage 8/16/18 11:30 AM Preliminary Budget Presentation

More information

CITY OF PORT MOODY 2009 CAPITAL BUDGET SUMMARY

CITY OF PORT MOODY 2009 CAPITAL BUDGET SUMMARY SUMMARY ACCOUNT 4710 4711 4790 4727 4728 4724 4771 4700 4712 4774 4772 4701 TOTAL TAXATION TAXATION LIFE CYCLE MRN CAPITAL REPLACE LAND STAT. PRIVATE DEV. ASSET DEPARTMENT EXP. (Strategic) (Operating)

More information

November Financing Plan for the Capital Improvement Plan. City of Inver Grove Heights, Minnesota. Prepared By: City Staff And Ehlers

November Financing Plan for the Capital Improvement Plan. City of Inver Grove Heights, Minnesota. Prepared By: City Staff And Ehlers November 2017 Financing Plan for the 2018 2022 Capital Improvement Plan City of Inver Grove Heights, Minnesota Prepared By: City Staff And Ehlers Table of Contents Introduction and Summary 1 Funds 7 Tax

More information

Budget Summary for Public Hearing April 25, 2017

Budget Summary for Public Hearing April 25, 2017 Budget Summary for Public Hearing April 25, 2017 1 GENERAL FUND BUDGET PROPOSED $52,983,030 ($762,240, 1.46% Increase over FY2017) TOTAL ALL FUNDS BUDGET PROPOSED $113,650,448 ($1,815,884, 1.63% Increase

More information

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary The adopted FY 2017 FY 2021 CIP is $235.8 million (including prior year expenditures) and is $28 million higher than the previous CIP

More information

CITY OF KELOWNA FINANCIAL PLAN

CITY OF KELOWNA FINANCIAL PLAN CITY OF KELOWNA FINANCIAL PLAN 2014-2018 The City of Kelowna has developed a comprehensive Financial Plan that provides a five year summary of general revenues, operating expenditures and capital expenditures.

More information

UNINCORPORATED CAPITAL

UNINCORPORATED CAPITAL UNINCORPORATED CAPITAL The total funding to be appropriated for the unincorporated capital program in FY13 is $13,665,000. This reflects funds committed to drainage, pavement, sidewalk, and other infrastructure

More information

SPECIAL COUNCIL MEETING MARCH 6, Capital Improvements

SPECIAL COUNCIL MEETING MARCH 6, Capital Improvements SPECIAL COUNCIL MEETING MARCH 6, 2012 Capital Improvements 1 CAPITAL PROJECTS Review Requests from the Departments for FY 2012-13 Capital Improvements and Machinery & Equipment Discussion and Recommendations

More information

Capital Improvement Program

Capital Improvement Program Capital Improvement Program For Fiscal Year 2017-2018 City of Perris Capital Improvement Projects Summary Code Fund # Name of Project Page "Storm Drain" Projects D002 160 MASTER PLAN PERRIS VALLEY STORM

More information

ADOPTED BUDGET FOR THE FISCAL YEAR 2015/2016 CITY OF BARSTOW CALIFORNIA

ADOPTED BUDGET FOR THE FISCAL YEAR 2015/2016 CITY OF BARSTOW CALIFORNIA ADOPTED BUDGET FOR THE FISCAL YEAR 2015/2016 CITY OF BARSTOW CALIFORNIA Julie Hackbarth-McIntyre, Mayor Tim Silva, Mayor Pro Tem Merrill Gracey, Councilmember Rich Harpole, Councilmember Carmen Hernandez,

More information

Capital Improvement Program Fund

Capital Improvement Program Fund Capital Improvement Program Fund Capital Improvement Program (CIP) Overview The Capital Improvement Program provides funding for streets, public buildings (both governmental and school facilities), land,

More information

Capital Improvement Project Profile Fiscal Year

Capital Improvement Project Profile Fiscal Year Capital Improvement Projects Transportation Fund Funding Sources: Measure I TDA Federal-State-County Grants Transportation DIF Transportation Fund 237 Pine Avenue Connection Project ST061 - G7016 - C7011-8745

More information

Budget Overview. Section 2 BUDGET SUMMARIES

Budget Overview. Section 2 BUDGET SUMMARIES Budget Overview Section 2 BUDGET SUMMARIES Revenue & Expenditure Three Year History by Category Total Annual Budget Summary Budget Development Process Overview Budget Parameters & Key Assumptions General

More information

Final Budget

Final Budget 2017-2018 Final Budget INTRODUCTION Letter of Transmittal Table of Contents Budget Message 2017-2018 FINAL Budget Table of Contents I II III SUMMARY FORMS Budget Summary - Schedule S-1 1 Statistical Data

More information

BUDGET PRESENTATION DAY 2 - MAY 10, 2017

BUDGET PRESENTATION DAY 2 - MAY 10, 2017 - BUDGET PRESENTATION DAY 2 - MAY 10, STREET FUND 5,000,000 4,500,000 4,000,000 3,500,000 $4,598,812 STREET FUND REVENUES $4,179,877 REVENUES AVAILABLE CASH ON HAND TOTAL REVENUES 3,000,000 2,500,000 $2,020,035

More information

CITY OF PARKLAND ANALYSIS OF REVENUES/SOURCES AND EXPENDITURES/USES GENERAL FUND

CITY OF PARKLAND ANALYSIS OF REVENUES/SOURCES AND EXPENDITURES/USES GENERAL FUND GENERAL FUND % Change From 2018 Locally Levied Taxes Property Taxes 16,246,790 17,496,916 17,702,458 21,004,985 3,508,069 20.0% Franchise Fee - Electricity - - 398,767 1,900,000 1,900,000 n/a Franchise

More information

Fiscal Responsibility to Further Invest in the Future. Executive Committee Department of Finance May 4, 2017

Fiscal Responsibility to Further Invest in the Future. Executive Committee Department of Finance May 4, 2017 Fiscal Responsibility to Further Invest in the Future Executive Committee Department of Finance May 4, 2017 1 Asset Inventory Denver s Assets Parks and Recreation $1.8B Transportation $4.7B Buildings $1.9B

More information

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary The adopted FY 2016 FY 2020 CIP is $205.3 million (including prior year expenditures) and is $2.9 million lower than the previous CIP

More information

TOTAL GENERAL FUND REVENUES

TOTAL GENERAL FUND REVENUES General Fund Revenues Budget Actual Actual Budget Actual Actual FY 2018 12-31-2017 12-31-2016 FY 2018 12-31-2017 12-31-2016 GENERAL PROPERTY TAXES: NON-CATEGORICAL AID: Current Real Estate Taxes 10,400,000

More information

City of Mountlake Terrace. Fourth Quarter 2014 Financial Report April 2, 2015

City of Mountlake Terrace. Fourth Quarter 2014 Financial Report April 2, 2015 City of Mountlake Terrace Fourth Quarter 2014 Financial Report April 2, 2015 1 Overview Reviewing the City s finances on a regular basis, and posting the review on the City s website, highlights the City

More information

City of Prince Albert YEAR STRATEGIC PLAN

City of Prince Albert YEAR STRATEGIC PLAN 5 City of Prince Albert YEAR STRATEGIC PLAN 2015-2020 City of Prince Albert Introduction Members of City Council, along with Senior Administration, attended a two-day Strategic Planning Session for the

More information

CITY. RIALTO W w w. R I a l t o c a. g o v. Fiscal Year 2009/10 Interim Financial Report. 5 months ended November 30, 2009

CITY. RIALTO W w w. R I a l t o c a. g o v. Fiscal Year 2009/10 Interim Financial Report. 5 months ended November 30, 2009 CITY of RIALTO W w w. R I a l t o c a. g o v Fiscal Year 2009/10 Interim Financial Report 5 months ended November 30, 2009 To: The Mayor and City Council City Administrator From: Chief Financial Officer

More information

PUBLIC WORKS - ENGINEERING

PUBLIC WORKS - ENGINEERING PUBLIC WORKS - ENGINEERING 4 DIVISIONS: CAPITAL IMPROVEMENT PROGRAM (CIP) TRAFFIC ENGINEERING DEVELOPMENT ENGINEERING SEWER & STORM DRAIN ENGINEERING 18 FTE s, 2 Hourly s In FY 14/15 Expended approximately

More information

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY) Elementary & K-8 Campuses Alexander 6 8 Guttering replacement 2 $ 20,000 HVAC replacement 1 $ 800,000 Remove and replace old glass block windows 3 Total for Alexander $ - $ 20,000 $ 800,000 $ - $ - $ -

More information

Description of Fund Types and Funds

Description of Fund Types and Funds Financial activities for local government fall into three broad categories, governmental, proprietary, and fiduciary fund categories. Governmental funds are used to account for activities primarily supported

More information

City of Vacaville FY 2017/2018 CIP Budget, General Plan Consistency and CEQA Review Parks and Recreation

City of Vacaville FY 2017/2018 CIP Budget, General Plan Consistency and CEQA Review Parks and Recreation Parks and Recreation Park & Recreation Housing 14160 Grant Total Fund Balance $3,916,598 $3,916,598 Prior Budget Commitments ($2,770,788) ($2,770,788) Other Budget Commitments ($126,482) ($126,482) Other

More information

Village of Bensenville Proposed Annual Budget and Community Investment Plan

Village of Bensenville Proposed Annual Budget and Community Investment Plan Village of Bensenville 2015 Proposed Annual Budget and Community Investment Plan 2015 Proposed Annual Budget and Community Investment Plan - Overview 2 The Mission of the Village of Bensenville The Mission

More information

City of Laredo Capital Improvement Program (CIP) INTRODUCTION

City of Laredo Capital Improvement Program (CIP) INTRODUCTION City of Laredo Capital Improvement Program (CIP) INTRODUCTION The Capital Improvements Program (CIP) The following is a summary of the Capital Improvements Project (CIP) Program for fiscal years 2003-2007,

More information

PRESENTATION OF PROPOSED BUDGET

PRESENTATION OF PROPOSED BUDGET PRESENTATION OF PROPOSED BUDGET CITY COUNCIL MEETING AUGUST 7, 2018 AGENDA Budget Process Budget Drivers and Areas of Focus Budget By Funds Revenues Operating Expenditure Highlights and Variances Tax Rate

More information

MANAGEMENT S DISCUSSION & ANALYSIS

MANAGEMENT S DISCUSSION & ANALYSIS MANAGEMENT S DISCUSSION & ANALYSIS Our discussion and analysis of the City of Grand Junction s (the City) financial performance provides an overview of the City s financial activities for the fiscal year

More information

City of Cornwall 2014 Capital Report First Quarter

City of Cornwall 2014 Capital Report First Quarter C33093 '12 Nick Kaneb Dr Extension - Marleau to 10th St -2012 approved funding 75,000 55,749 19,251 0 Apr-14 notice of completion issued, final public review underway C33097 '13 Tenth St to Virginia to

More information

General Fund (001) Five-Year Outlook. Expenditures:

General Fund (001) Five-Year Outlook. Expenditures: General Fund (001) Expenditures: Health Care costs increased by 5% in FY18. Because of this increase, the City will be paying close attention to this line item in future years. The Tallahassee Police Department

More information

INDEX TO 2010 Resolutions

INDEX TO 2010 Resolutions INDEX TO 2010 Resolutions Date Number Description Location / Notes 1/11/2010 18907 1/11/2010 18908 1/11/2010 18909 2/8/2010 18910 Approving expenditures related to 2010 Annual Water Rehab Projects prior

More information

Capital Improvement Plan

Capital Improvement Plan Fiscal Year 2016-17 through Fiscal Year 2021-22 Adopted: Overview City of Jonesville 2016-17 through 2021-22 The (CIP) is a six year schedule of all proposed major capital improvement projects including

More information

Budget Public Hearing 6/16/2015

Budget Public Hearing 6/16/2015 Agenda Brea Community Benefit Financing Authority Budget FY 2014-15 Operating Budget Successor Agency Budget Brea Public Financing Authority Budget Brea Community Benefit Financing Authority Budget Midbury

More information

Capital Overview. Capital projects also include purchase of infrastructure, plant, and equipment that meet the following thresholds:

Capital Overview. Capital projects also include purchase of infrastructure, plant, and equipment that meet the following thresholds: Capital Overview The capital budget consists of capital projects, which are a set of activities that maintain or improve a city asset, often referred to as infrastructure-from buildings, to park trails,

More information

CITY OF YREKA, CALIFORNIA FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2015

CITY OF YREKA, CALIFORNIA FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2015 City of Yreka, California Financial Statements For the Year Ended June 30, 2015 CITY OF YREKA, CALIFORNIA FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2015 Table of Contents MANAGEMENT S DISCUSSION

More information

Memorandum. Mid Year Budget Review - Amended City Manager's Annual Budget Report

Memorandum. Mid Year Budget Review - Amended City Manager's Annual Budget Report Mid Year Budget Review Fiscal 2011-12 City Manager's Transmittal Memorandum TO: FROM: COPIES: SUBJECT: Mayor and City Council Bill Horne, City Manager Jill Silverboard, Assistant City Manager Rod Irwin,

More information

CITY OF NAPLES AIRPORT AUTHORITY

CITY OF NAPLES AIRPORT AUTHORITY CITY OF NAPLES AIRPORT AUTHORITY FISCAL YEAR 2014 AMENDED BUDGET OPERATING AND CAPITAL BUDGET 1 2 CITY OF NAPLES AIRPORT AUTHORITY OPERATING INCOME FISCAL YEAR 2014 ORIGINAL AMENDED ACTUAL BUDGET ACTUAL

More information

State of the City Report August 2015

State of the City Report August 2015 State of the City Report August 2015 Lindon City: An Optimistic Future The state of Lindon City is strong! We have emerged from the recession as a vibrant city that is positioned for success and prosperity.

More information

Christopher Blunk, Deputy Director Public Works/City Engineer. PRESENTER: Christopher Blunk, Deputy Director Public Works/City Engineer

Christopher Blunk, Deputy Director Public Works/City Engineer. PRESENTER: Christopher Blunk, Deputy Director Public Works/City Engineer STAFF REPORT MEETING DATE: April 10, 2018 TO: FROM: City Council Christopher Blunk, Deputy Director Public Works/City Engineer PRESENTER: Christopher Blunk, Deputy Director Public Works/City Engineer 922

More information

City of SANTA ANA. Proposed Budget Summary FY

City of SANTA ANA. Proposed Budget Summary FY City of SANTA ANA Proposed Budget Summary FY 2015-2016 June 2, 2015 City Manager s Budget Message will be made available on May 29 th, 2015. This Page Intentionally Left Blank Total Annual Budget FY 2015-2016

More information

ST. PETERSBURG ClTY COUNCIL

ST. PETERSBURG ClTY COUNCIL ST. PETERSBURG ClTY COUNCIL Meeting of November 24, 2014 TO: SUBJECT: City Council Chair and City Council Members An Ordinance Enacting Year-End Appropriation Adjustments -FY14 Operating Budget & Capital

More information

2019 BUDGET MESSAGE. September 18, Honorable Mayor and Town Council Members,

2019 BUDGET MESSAGE. September 18, Honorable Mayor and Town Council Members, 2019 BUDGET MESSAGE September 18, 2018 Honorable Mayor and Town Council Members, On behalf of Town staff, I am pleased to submit the 2019 Budget to Town Council and the community. The budget includes a

More information

Accomplishments for Administration

Accomplishments for Administration Today s Agenda A Look Back (FY 15-16) Budget Overview City Wide Outlook General Fund Public Utility Fund Beach Fund Port Commission Hotel Motel City Wide Debt What s Next? 2015-2016 Accomplishments for

More information

TOWN BOARD WORK SESSION MEETING June 13, :30-6:50 P.M. 301 Walnut Street, First Floor Conference Room Windsor, CO 80550

TOWN BOARD WORK SESSION MEETING June 13, :30-6:50 P.M. 301 Walnut Street, First Floor Conference Room Windsor, CO 80550 TOWN BOARD WORK SESSION MEETING June 13, 2016 5:30-6:50 P.M. 301 Walnut Street, First Floor Conference Room Windsor, CO 80550 The Town of Windsor will make reasonable accommodations for access to Town

More information

City of Anoka 2019 Proposed Budget

City of Anoka 2019 Proposed Budget City of Anoka 2019 Proposed Budget Schedule of Tax Levies 2014 2015 2016 2017 2018 2019 General Fund Levy $5,323,265 $5,323,680 $6,297,575 $6,641,230 $6,838,335 $7,028,564 2.78% Debt Service Levy 389,000

More information

Welcome. City of Grovetown Budget Hearing

Welcome. City of Grovetown Budget Hearing Welcome City of Grovetown 2019 Budget Hearing December 3, 2018 1 Agenda Methodology 2019 General Fund Revenue Projections 2019 General Fund Projected Expenditures SPLOST & Capital Improvement Projects

More information

City of Lake Wales 5 Year Capital Improvement Plan FY 2018/ /23. Content. City of Lake Wales

City of Lake Wales 5 Year Capital Improvement Plan FY 2018/ /23. Content. City of Lake Wales City of Lake Wales 5 Year Capital Improvement Plan FY 08/9-0/3 Content City of Lake Wales Page 0 Central Ave. W. P.O. Box 30 Summary Memo Lake Wales, FL 33859-30 Ordinance 07-7 3 Phone (863) 678-48 Cost

More information

2017 AMENDED 2018 BUDGET JULY 6, 2017

2017 AMENDED 2018 BUDGET JULY 6, 2017 2017 AMENDED 2018 BUDGET JULY 6, 2017 VISION UNIQUELY WYANDOTTE A VIBRANT INTERSECTION OF DIVERSITY, OPPORTUNITIES, AND DISTINCTIVE NEIGHBORHOODS. AN ENGAGED COMMUNITY: HEALTHY, FULFILLED, AND INSPIRED

More information

Capital Improvement Plan City of Rye, New York

Capital Improvement Plan City of Rye, New York 20182022 Capital Improvement Plan City of Rye, New York Planning and Funding For City Projects For Fiscal Years Ending December 31, 2018 through 2022 September 2017 Capital Improvement Plan 20182022 TABLE

More information