1 Stormwater Management Summary Proposed Restaurant Burlington, Massachusetts Prepared for ND Burlington South Avenue LLC C/O National Development 2310 Washington Street Newton, MA Prepared by /Vanasse Hangen Brustlin, Inc. Transportation, Land Development, Environmental Services 101 Walnut Street P.O. Box 9151 Watertown, Massachusetts Date: March 13, 2015
2 March 13, 2015 Ref: Mr. Larry Cohen, Chair Burlington Conservation Commission Conservation Department 25 Center Street Burlington, MA Re: Stormwater Management Summary 15 South Avenue Proposed Restaurant MassDEP File # Dear Mr. Cohen and Commissioners, VHB is providing this letter in support of the request for an amended Order of Conditions (OOC) for the above referenced Notice of Intent (NOI) filing to document the revisions to the proposed stormwater management design for the 15 South Avenue site (the Site). The previously proposed stormwater management design for the restaurant parcel was prepared in accordance with the DEP Stormwater Regulations. The revised design, presented in the March 13, 2015 plans and the attached supporting documentation (the Revised Design), includes the same water quality and quantity BMPs as the approved plan, and will function in a consistent manner to the approved design and will continue to comply with the DEP Stormwater Management Regulations. The project will also continue to remove more than half of an acre of impervious coverage as compared to the existing conditions. Proposed Stormwater Design With the Revised Design, the building is located closer to South Avenue, and the adjacent parking area is consolidated into a more efficient layout on two sides of the building. The entry drive from South Avenue is realigned and an adjacent sidewalk added to respond to Planning Board comments and requirements of the Site Plan Approval in Because the parking area adjacent to the building is more efficient, fewer parking spaces are proposed on the outer parking lot to achieve the previously approved parking count. As shown on the attached Figure 3 (revised), Proposed Drainage Areas, stormwater from the entry drive, building and adjacent parking area will continue to be collected in deep sump catch basins with hoods, routed through a water quality unit and discharged to an extended detention basin (Detention Basin 3P). This detention basin (Pond 3P in the figure) is larger in footprint than the previously approved design, and is constructed with more gentle slopes. Access for maintenance to Detention Basin 3P is \\Vhb\proj\Wat-LD\ \docs\letters\Stormwater-BWW\ Revised Stormwater Analysis Letter.docx
3 Larry Cohen, Chair Ref: March 13, 2015 Page 2 provided via a gentle 5:1 slope adjacent to the retaining wall and is accessed by a gate along the main entry drive and upper parking lot drive. Runoff from the upper parking lot is tributary to the proposed bioretention basin. No changes are made to the proposed bioretention basin, except that the water will enter the basin s forebay via overland flow through a channel rather than through a catch basin / piped connection. The bioretention basin has not changed in size because the design includes capacity for a potential future parking expansion of nine spaces in the location shown on Figure 3 (Revised). The drainage system design and hydrologic rate tables presented herein include the impervious coverage associated with these nine potential future parking spaces, however should the tenant or owner desire to expand this parking area in the future, approvals would be required from both the Planning Board and the Conservation Commission. A total suspended solids (TSS) removal of 80% or more will continue to be achieved in compliance with the DEP Stormwater Regulations. Updated TSS removal calculations, water quality volume calculations for the stormwater BMPs, and closed drainage calculations are provided as attachments. Cinema Drainage The one new element in the drainage design which was not part of the 2013 Order of Conditions is the partial relocation of the existing subsurface detention system which serves only the Cinema parcel but is actually located on the Restaurant parcel. The system is labeled as Cinema Subsurface Detention System on the plans. The existing system is comprised of two 12 perforated HDPE pipes in a 20 ft wide x 175 ft long x 18 inch deep filter stone trench with non-woven filter fabric which takes stormwater from the basin on the Cinema side of South Ave, provides some additional detention, and discharges the water to the South Ave drainage system. In its reconfigured form, half of the existing system will remain in place. The half that is to be removed will be replicated immediately adjacent to the existing stone trench to remain on either side. The resulting relocation will provide a new system that is 90 feet long x 40 feet wide x 18 inches deep. There will be new header pipes installed on the upstream and downstream ends of the system. The volume will be the same or greater than the existing system and will continue to function as it does presently. It will remain entirely separate from the restaurant parcel stormwater management system and will discharge from the site in the same location it does today. Hydrologic Analysis From a hydrologic standpoint the Revised Design is consistent with the approved design and in many cases the peak rates are further reduced. The approved design included dramatically reducing overland flow across an adjacent parking lot to Existing Basin 2 by routing the detention basin discharge to the Existing Basin 1A/Wetland 1 outfall. The revised design retains this configuration and due to the \\Vhb\proj\Wat-LD\ \docs\letters\Stormwater-BWW\ Revised Stormwater Analysis Letter.docx
4 Larry Cohen, Chair Ref: March 13, 2015 Page 3 increased size of Detention Basin 3P, the rate of stormwater tributary to this location is further reduced, as is the rate of discharge to Wetland 1. The following table presents the results of the existing, previously proposed and currently proposed hydrologic analysis. Table 1 Peak Discharge Rates (cfs*) Design Point 2-year 10-year 25-year 100-year Design Point: Design Point 1 (Basin 1A) Existing Previously Proposed Currently Proposed Design Point: Design Point 2 (South Property Boundary) Existing Previously Proposed Currently Proposed Design Point: Design Point 3 (Southeast Property Boundary) Existing Previously Proposed Currently Proposed Design Point: Design Point 4 (Northeast Property Boundary) Existing Previously Proposed Currently Proposed Design Point: Design Point 5 (DP 1 and DP2 Combined Wetland 1) Existing Previously Proposed Currently Proposed We trust you find that the information presented herein adequately documents the project s consistency with the approved design, and that the project will continue to comply with the DEP Stormwater Management Regulations. \\Vhb\proj\Wat-LD\ \docs\letters\Stormwater-BWW\ Revised Stormwater Analysis Letter.docx
5
6
7
8
9 \\vhb\proj\wat-ld\ \cad\ld\eng\stormwater\12313-drainage-pr_ dwg SOUTH AVE. Vanasse Hangen Brustlin, Inc. Figure 3 03/13/2015 Proposed Conditions Drainage Areas Proposed Restaurant Feet
10 TSS Removal Calculation Worksheet Project Name: AMC Renovations + Restaura Sheet: 1 of 2 Project Number: Date: 17-Sep-2013 Location: Burlington, MA Computed by: MAC Discharge Point: Checked by: KFS Drainage Area(s): 1C+1D A B C D E Vanasse Hangen Brustlin, Inc. Consulting Engineers and Planners 101 Walnut Street Watertown, MA (617) BMP* TSS Removal Rate* Starting TSS Load** Amount Removed (B*C) Remaining Load (D-E) Deep Sump and Hooded Catch Basin 25% Stormceptor - STC % Extended Dry Detention Basin 50% % % * BMP and TSS Removal Rate Values from the MassDEP Stormwater Handbook Vol. 1. Removal rates for proprietary devices are from approved studies and/or manufacturer data (attach study or data source, or remove this sentence if not applicable). ** Equals remaining load from previous BMP (E) *** Stormceptor sizing calculation gives a TSS removal rate of 87%. To be conservative, 50% removal is used for this calculation based upon the NJCAT study provided on the MA STEP website. Backup documentation to support TSS removal rate from the MA STEP website has been provided. Treatment Train TSS Removal = 81% \\Vhb\proj\Wat-LD\ \docs\letters\Stormwater-BWW\attachments\TSS Removal Worksheet.xls
11 TSS Removal Calculation Worksheet Project Name: AMC Renovations + Restaura Sheet: 2 of 2 Project Number: Date: 17-Sep-2013 Location: Burlington, MA Computed by: MAC Discharge Point: 1A Checked by: KFS Drainage Area(s): 1 A B C D E Vanasse Hangen Brustlin, Inc. Consulting Engineers and Planners 101 Walnut Street Watertown, MA (617) BMP* TSS Removal Rate* Starting TSS Load** Amount Removed (B*C) Remaining Load (D-E) Bioretention Area 90% % % % % * BMP and TSS Removal Rate Values from the MassDEP Stormwater Handbook Vol. ** Equals remaining load from previous BMP (E) Treatment Train TSS Removal = 90% \\Vhb\proj\Wat-LD\ \docs\letters\Stormwater-BWW\attachments\TSS Removal Worksheet.xls
12
13
14
15
16 VHB Water Quality Volume Calculations Project Name: Outparcel Restaurant Proj. No.: Project Location: Burlington, MA Date: 3/12/2015 Calculated by: RPM Bioretention Basin (Runoff from Area PR-1A) Total Impervious Area = 0.33 Acres Required: Runoff Depth to be Treated (in.) Required Volume (c.f.) Forebay Volume Water Quality Volume 1 1,198 Provided: Sediment Forebay Elevation Area (s.f.) Cumulative Volume (c.f.) Cumulative Bioretention Basin Elevation Area (s.f.) Volume (c.f.) , ,990 1,434 Bioretention Basin Summary Sediment Forebay Storage Volume Required (c.f.) = 120 Sediment Forebay Storage Volume Provided (c.f.) = 978 Water Quality Storage Volume Required (c.f.) = 1,198 Water Quality Storage Volume Provided (c.f.) = 1,434 Extended Dry Detention Basin (Runoff from PR-1C) *Pretreatment provided with Stormceptor Unit Total Impervious Area = 1.30 Required: Runoff Depth to be Treated (in.) Required Volume (c.f.) Forebay Volume Water Quality Volume 1 4,724 Provided: Sediment Forebay Elevation Area (s.f.) Cumulative Volume (c.f.) Cumulative Extended Detention Basin Elevation Area (s.f.) Volume (c.f.) , ,650 5, ,700 5, ,008 8,231 Detention Basin Summary Sediment Forebay Storage Volume Required (c.f.) = 472 Sediment Forebay Storage Volume Provided (c.f.) = 500 Water Quality Storage Volume Required (c.f.) = 4,724 Water Quality Storage Volume Provided (c.f.) = 8,231 Sheet1\\Vhb\proj\Wat-LD\ \docs\letters\Stormwater-BWW\attachments\Water Quality Volume Analysis.xls
17
18 1A Wetlands Area DP1 Basin 1A 5 2R CB 1P 1B Analysis Point #5 (Wetland 1) EX piping 2 Bio-retention West Parking 3P 1C DP2 2P South PR Detention East Parking & Building S Property Boundary South EX Detention 2B South Landscape 2A South Pond Area 3A 4A SE Property Boundary NE Property Boundary DP3 DP4 SE Property Boundary NE Property Boundary Subcat Reach Pond Link Routing Diagram for PR_HydroCAD,
19 Type III 24-hr 2-Year Rainfall=3.10" Page 2 Summary for Subcatchment 1A: Wetlands Area Runoff = hrs, Volume= af, Depth= 1.60" Type III 24-hr 2-Year Rainfall=3.10" 25, % Grass cover, Fair, HSG D 25, % Pervious Area Summary for Subcatchment 1B: West Parking Runoff = hrs, Volume= af, Depth= 2.26" Type III 24-hr 2-Year Rainfall=3.10" 9, % Grass cover, Fair, HSG D 13, Paved parking, HSG D 23, Weighted Average 9, % Pervious Area 13, % Impervious Area Summary for Subcatchment 1C: East Parking & Building Runoff = hrs, Volume= af, Depth= 2.26" Type III 24-hr 2-Year Rainfall=3.10" 54, Paved parking, HSG D 35, % Grass cover, Fair, HSG D 90, Weighted Average 35, % Pervious Area 54, % Impervious Area
20 Type III 24-hr 2-Year Rainfall=3.10" Page 3 Summary for Subcatchment 2A: South Pond Area Runoff = hrs, Volume= af, Depth= 1.60" Type III 24-hr 2-Year Rainfall=3.10" 6, % Grass cover, Fair, HSG D 6, % Pervious Area Summary for Subcatchment 2B: South Landscape Runoff = hrs, Volume= af, Depth= 1.60" Type III 24-hr 2-Year Rainfall=3.10" 3, % Grass cover, Fair, HSG D 3, % Pervious Area Summary for Subcatchment 3A: SE Property Boundary Runoff = hrs, Volume= af, Depth= 1.60" Type III 24-hr 2-Year Rainfall=3.10" 2, % Grass cover, Fair, HSG D 2, % Pervious Area
21 Type III 24-hr 2-Year Rainfall=3.10" Page 4 Summary for Subcatchment 4A: NE Property Boundary Runoff = hrs, Volume= af, Depth= 1.60" Type III 24-hr 2-Year Rainfall=3.10" 1, % Grass cover, Fair, HSG D 1, % Pervious Area Summary for Pond 1P: Bio-retention Inflow Area = ac, 58.06% Impervious, Inflow Depth = 2.26" for 2-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 7%, Lag= 1.9 min Primary = hrs, Volume= af Secondary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Surf.Area= 2,280 sf Storage= 1,622 cf Plug-Flow detention time= min calculated for af (65% of inflow) Center-of-Mass det. time= 72.3 min ( ) Volume Invert Avail.Storage Storage Description # ' 4,821 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) , , , ,995 1,995 4, , ,826 4,821 6,080 Device Routing Invert Outlet Devices #1 Primary ' 6.0" Round Culvert L= 60.0' CPP, square edge headwall, Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= PVC, smooth interior, Flow Area= 0.20 sf #2 Device ' 2.3" x 2.3" Horiz. Orifice/Grate X 8.00 columns X 8 rows C= Limited to weir flow at low heads #3 Secondary ' 15.0' long x 5.0' breadth Broad-Crested Rectangular Weir
22 Type III 24-hr 2-Year Rainfall=3.10" Page 5 Head (feet) Coef. (English) Primary OutFlow Max= hrs HW=182.84' TW=170.24' (Dynamic Tailwater) 1=Culvert (Passes 1.34 cfs of 1.51 cfs potential flow) 2=Orifice/Grate (Weir Controls fps) Secondary OutFlow Max= hrs HW=182.00' TW=0.00' (Dynamic Tailwater) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Pond 2P: South EX Detention Inflow Area = ac, 0.00% Impervious, Inflow Depth > 5.62" for 2-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 76%, Lag= 28.9 min Discarded = hrs, Volume= af Primary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Surf.Area= 994 sf Storage= 371 cf Plug-Flow detention time= 42.4 min calculated for af (98% of inflow) Center-of-Mass det. time= 31.4 min ( 1, ,053.8 ) Volume Invert Avail.Storage Storage Description # ' 997 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , , Device Routing Invert Outlet Devices #1 Primary ' 50.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) #2 Discarded ' in/hr Exfiltration over Surface area Discarded OutFlow Max= hrs HW=166.72' (Free Discharge) 2=Exfiltration (Exfiltration Controls 0.08 cfs) Primary OutFlow Max= hrs HW=166.00' TW=0.00' (Dynamic Tailwater) 1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
23 Type III 24-hr 2-Year Rainfall=3.10" Page 6 Summary for Pond 2R: EX piping 2 Inflow Area = ac, 59.74% Impervious, Inflow Depth = 0.99" for 2-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Device Routing Invert Outlet Devices #1 Primary ' 18.0" Round Culvert L= 30.0' Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= 0.013, Flow Area= 1.77 sf Primary OutFlow Max= hrs HW=170.24' TW=0.00' (Dynamic Tailwater) 1=Culvert (Barrel Controls fps) Summary for Pond 3P: South PR Detention Inflow Area = ac, 60.17% Impervious, Inflow Depth = 2.26" for 2-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 92%, Lag= 57.6 min Primary = hrs, Volume= af Secondary = hrs, Volume= af Tertiary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Surf.Area= 6,373 sf Storage= 10,125 cf Plug-Flow detention time= min calculated for af (52% of inflow) Center-of-Mass det. time= min ( 1, ) Volume Invert Avail.Storage Storage Description # ' 30,031 cf Detention pond 1 (Prismatic)Listed below (Recalc) #2A ' 128 cf 2.58'W x 62.00'L x 2.08'H Field A 334 cf Overall - 15 cf Embedded = 319 cf x 40.0% Voids #3A ' 15 cf CPP 6 x 3 Inside #2 Inside= 6.0"W x 6.0"H => 0.24 sf x 20.00'L = 4.8 cf Outside= 7.0"W x 7.0"H => 0.24 sf x 20.00'L = 4.8 cf 30,173 cf Total Available Storage Storage Group A created with Chamber Wizard
24 Type III 24-hr 2-Year Rainfall=3.10" Page 7 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , ,650 5,322 5, ,366 6,008 11, ,118 6,742 18, ,075 7,597 25, ,376 4,363 30,031 Device Routing Invert Outlet Devices #1 Primary ' 18.0" Round Culvert L= 215.0' RCP, sq.cut end projecting, Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= 0.013, Flow Area= 1.77 sf #2 Secondary ' 6.0" Round Culvert L= 47.0' CPP, square edge headwall, Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= Concrete pipe, straight & clean, Flow Area= 0.20 sf #3 Device ' 18.0" Vert. Orifice/Grate C= #4 Device ' 0.8" Vert. Orifice/Grate C= #5 Tertiary ' 20.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) #6 Device ' 24.0" Horiz. Orifice/Grate C= Limited to weir flow at low heads Primary OutFlow Max= hrs HW=172.79' TW=169.99' (Dynamic Tailwater) 1=Culvert (Passes 0.43 cfs of 0.76 cfs potential flow) 3=Orifice/Grate (Orifice Controls fps) 6=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max= hrs HW=172.79' TW=166.70' (Dynamic Tailwater) 2=Culvert (Passes 0.03 cfs of 1.87 cfs potential flow) 4=Orifice/Grate (Orifice Controls fps) Tertiary OutFlow Max= hrs HW=169.00' TW=166.00' (Dynamic Tailwater) 5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Link 5: Analysis Point #5 (Wetland 1) Inflow Area = ac, 45.42% Impervious, Inflow Depth = 1.07" for 2-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs
25 Type III 24-hr 2-Year Rainfall=3.10" Page 8 Summary for Link DP1: Basin 1A Inflow Area = ac, 48.76% Impervious, Inflow Depth = 1.10" for 2-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs Summary for Link DP2: S Property Boundary Inflow Area = ac, 0.00% Impervious, Inflow Depth = 0.53" for 2-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs Summary for Link DP3: SE Property Boundary Inflow Area = ac, 0.00% Impervious, Inflow Depth = 1.60" for 2-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs Summary for Link DP4: NE Property Boundary Inflow Area = ac, 0.00% Impervious, Inflow Depth = 1.60" for 2-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs
26 Type III 24-hr 10-Year Rainfall=4.50" Page 9 Summary for Subcatchment 1A: Wetlands Area Runoff = hrs, Volume= af, Depth= 2.82" Type III 24-hr 10-Year Rainfall=4.50" 25, % Grass cover, Fair, HSG D 25, % Pervious Area Summary for Subcatchment 1B: West Parking Runoff = hrs, Volume= af, Depth= 3.60" Type III 24-hr 10-Year Rainfall=4.50" 9, % Grass cover, Fair, HSG D 13, Paved parking, HSG D 23, Weighted Average 9, % Pervious Area 13, % Impervious Area Summary for Subcatchment 1C: East Parking & Building Runoff = hrs, Volume= af, Depth= 3.60" Type III 24-hr 10-Year Rainfall=4.50" 54, Paved parking, HSG D 35, % Grass cover, Fair, HSG D 90, Weighted Average 35, % Pervious Area 54, % Impervious Area
27 Type III 24-hr 10-Year Rainfall=4.50" Page 10 Summary for Subcatchment 2A: South Pond Area Runoff = hrs, Volume= af, Depth= 2.82" Type III 24-hr 10-Year Rainfall=4.50" 6, % Grass cover, Fair, HSG D 6, % Pervious Area Summary for Subcatchment 2B: South Landscape Runoff = hrs, Volume= af, Depth= 2.82" Type III 24-hr 10-Year Rainfall=4.50" 3, % Grass cover, Fair, HSG D 3, % Pervious Area Summary for Subcatchment 3A: SE Property Boundary Runoff = hrs, Volume= af, Depth= 2.82" Type III 24-hr 10-Year Rainfall=4.50" 2, % Grass cover, Fair, HSG D 2, % Pervious Area
28 Type III 24-hr 10-Year Rainfall=4.50" Page 11 Summary for Subcatchment 4A: NE Property Boundary Runoff = hrs, Volume= af, Depth= 2.82" Type III 24-hr 10-Year Rainfall=4.50" 1, % Grass cover, Fair, HSG D 1, % Pervious Area Summary for Pond 1P: Bio-retention Inflow Area = ac, 58.06% Impervious, Inflow Depth = 3.60" for 10-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 32%, Lag= 4.7 min Primary = hrs, Volume= af Secondary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Surf.Area= 2,373 sf Storage= 1,864 cf Plug-Flow detention time= min calculated for af (78% of inflow) Center-of-Mass det. time= 52.0 min ( ) Volume Invert Avail.Storage Storage Description # ' 4,821 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) , , , ,995 1,995 4, , ,826 4,821 6,080 Device Routing Invert Outlet Devices #1 Primary ' 6.0" Round Culvert L= 60.0' CPP, square edge headwall, Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= PVC, smooth interior, Flow Area= 0.20 sf #2 Device ' 2.3" x 2.3" Horiz. Orifice/Grate X 8.00 columns X 8 rows C= Limited to weir flow at low heads #3 Secondary ' 15.0' long x 5.0' breadth Broad-Crested Rectangular Weir
29 Type III 24-hr 10-Year Rainfall=4.50" Page 12 Head (feet) Coef. (English) Primary OutFlow Max= hrs HW=182.95' TW=170.65' (Dynamic Tailwater) 1=Culvert (Barrel Controls fps) 2=Orifice/Grate (Passes 1.53 cfs of 4.32 cfs potential flow) Secondary OutFlow Max= hrs HW=182.00' TW=0.00' (Dynamic Tailwater) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Pond 2P: South EX Detention Inflow Area = ac, 0.00% Impervious, Inflow Depth > 7.12" for 10-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 81%, Lag= 30.2 min Discarded = hrs, Volume= af Primary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Surf.Area= 1,350 sf Storage= 685 cf Plug-Flow detention time= 56.0 min calculated for af (99% of inflow) Center-of-Mass det. time= 46.6 min ( 1, ) Volume Invert Avail.Storage Storage Description # ' 997 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , , Device Routing Invert Outlet Devices #1 Primary ' 50.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) #2 Discarded ' in/hr Exfiltration over Surface area Discarded OutFlow Max= hrs HW=166.99' (Free Discharge) 2=Exfiltration (Exfiltration Controls 0.11 cfs) Primary OutFlow Max= hrs HW=166.00' TW=0.00' (Dynamic Tailwater) 1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
30 Type III 24-hr 10-Year Rainfall=4.50" Page 13 Summary for Pond 2R: EX piping 2 Inflow Area = ac, 59.74% Impervious, Inflow Depth = 2.32" for 10-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Device Routing Invert Outlet Devices #1 Primary ' 18.0" Round Culvert L= 30.0' Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= 0.013, Flow Area= 1.77 sf Primary OutFlow Max= hrs HW=170.81' TW=0.00' (Dynamic Tailwater) 1=Culvert (Barrel Controls fps) Summary for Pond 3P: South PR Detention Inflow Area = ac, 60.17% Impervious, Inflow Depth = 3.60" for 10-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 69%, Lag= 17.8 min Primary = hrs, Volume= af Secondary = hrs, Volume= af Tertiary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Surf.Area= 6,719 sf Storage= 13,131 cf Plug-Flow detention time= min calculated for af (70% of inflow) Center-of-Mass det. time= min ( ) Volume Invert Avail.Storage Storage Description # ' 30,031 cf Detention pond 1 (Prismatic)Listed below (Recalc) #2A ' 128 cf 2.58'W x 62.00'L x 2.08'H Field A 334 cf Overall - 15 cf Embedded = 319 cf x 40.0% Voids #3A ' 15 cf CPP 6 x 3 Inside #2 Inside= 6.0"W x 6.0"H => 0.24 sf x 20.00'L = 4.8 cf Outside= 7.0"W x 7.0"H => 0.24 sf x 20.00'L = 4.8 cf 30,173 cf Total Available Storage Storage Group A created with Chamber Wizard
31 Type III 24-hr 10-Year Rainfall=4.50" Page 14 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , ,650 5,322 5, ,366 6,008 11, ,118 6,742 18, ,075 7,597 25, ,376 4,363 30,031 Device Routing Invert Outlet Devices #1 Primary ' 18.0" Round Culvert L= 215.0' RCP, sq.cut end projecting, Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= 0.013, Flow Area= 1.77 sf #2 Secondary ' 6.0" Round Culvert L= 47.0' CPP, square edge headwall, Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= Concrete pipe, straight & clean, Flow Area= 0.20 sf #3 Device ' 18.0" Vert. Orifice/Grate C= #4 Device ' 0.8" Vert. Orifice/Grate C= #5 Tertiary ' 20.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) #6 Device ' 24.0" Horiz. Orifice/Grate C= Limited to weir flow at low heads Primary OutFlow Max= hrs HW=173.26' TW=170.68' (Dynamic Tailwater) 1=Culvert (Passes 2.65 cfs of 3.29 cfs potential flow) 3=Orifice/Grate (Orifice Controls fps) 6=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max= hrs HW=173.26' TW=166.96' (Dynamic Tailwater) 2=Culvert (Passes 0.03 cfs of 1.94 cfs potential flow) 4=Orifice/Grate (Orifice Controls fps) Tertiary OutFlow Max= hrs HW=169.00' TW=166.00' (Dynamic Tailwater) 5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Link 5: Analysis Point #5 (Wetland 1) Inflow Area = ac, 45.42% Impervious, Inflow Depth = 2.31" for 10-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs
32 Type III 24-hr 10-Year Rainfall=4.50" Page 15 Summary for Link DP1: Basin 1A Inflow Area = ac, 48.76% Impervious, Inflow Depth = 2.41" for 10-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs Summary for Link DP2: S Property Boundary Inflow Area = ac, 0.00% Impervious, Inflow Depth = 0.94" for 10-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs Summary for Link DP3: SE Property Boundary Inflow Area = ac, 0.00% Impervious, Inflow Depth = 2.82" for 10-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs Summary for Link DP4: NE Property Boundary Inflow Area = ac, 0.00% Impervious, Inflow Depth = 2.82" for 10-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs
33 Type III 24-hr 25-Year Rainfall=5.30" Page 16 Summary for Subcatchment 1A: Wetlands Area Runoff = hrs, Volume= af, Depth= 3.55" Type III 24-hr 25-Year Rainfall=5.30" 25, % Grass cover, Fair, HSG D 25, % Pervious Area Summary for Subcatchment 1B: West Parking Runoff = hrs, Volume= af, Depth= 4.38" Type III 24-hr 25-Year Rainfall=5.30" 9, % Grass cover, Fair, HSG D 13, Paved parking, HSG D 23, Weighted Average 9, % Pervious Area 13, % Impervious Area Summary for Subcatchment 1C: East Parking & Building Runoff = hrs, Volume= af, Depth= 4.38" Type III 24-hr 25-Year Rainfall=5.30" 54, Paved parking, HSG D 35, % Grass cover, Fair, HSG D 90, Weighted Average 35, % Pervious Area 54, % Impervious Area
34 Type III 24-hr 25-Year Rainfall=5.30" Page 17 Summary for Subcatchment 2A: South Pond Area Runoff = hrs, Volume= af, Depth= 3.55" Type III 24-hr 25-Year Rainfall=5.30" 6, % Grass cover, Fair, HSG D 6, % Pervious Area Summary for Subcatchment 2B: South Landscape Runoff = hrs, Volume= af, Depth= 3.55" Type III 24-hr 25-Year Rainfall=5.30" 3, % Grass cover, Fair, HSG D 3, % Pervious Area Summary for Subcatchment 3A: SE Property Boundary Runoff = hrs, Volume= af, Depth= 3.55" Type III 24-hr 25-Year Rainfall=5.30" 2, % Grass cover, Fair, HSG D 2, % Pervious Area
35 Type III 24-hr 25-Year Rainfall=5.30" Page 18 Summary for Subcatchment 4A: NE Property Boundary Runoff = hrs, Volume= af, Depth= 3.55" Type III 24-hr 25-Year Rainfall=5.30" 1, % Grass cover, Fair, HSG D 1, % Pervious Area Summary for Pond 1P: Bio-retention Inflow Area = ac, 58.06% Impervious, Inflow Depth = 4.38" for 25-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 43%, Lag= 6.2 min Primary = hrs, Volume= af Secondary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Surf.Area= 2,455 sf Storage= 2,096 cf Plug-Flow detention time= min calculated for af (82% of inflow) Center-of-Mass det. time= 48.1 min ( ) Volume Invert Avail.Storage Storage Description # ' 4,821 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) , , , ,995 1,995 4, , ,826 4,821 6,080 Device Routing Invert Outlet Devices #1 Primary ' 6.0" Round Culvert L= 60.0' CPP, square edge headwall, Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= PVC, smooth interior, Flow Area= 0.20 sf #2 Device ' 2.3" x 2.3" Horiz. Orifice/Grate X 8.00 columns X 8 rows C= Limited to weir flow at low heads #3 Secondary ' 15.0' long x 5.0' breadth Broad-Crested Rectangular Weir
36 Type III 24-hr 25-Year Rainfall=5.30" Page 19 Head (feet) Coef. (English) Primary OutFlow Max= hrs HW=183.04' TW=171.08' (Dynamic Tailwater) 1=Culvert (Barrel Controls fps) 2=Orifice/Grate (Passes 1.54 cfs of 5.56 cfs potential flow) Secondary OutFlow Max= hrs HW=182.00' TW=0.00' (Dynamic Tailwater) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Pond 2P: South EX Detention Inflow Area = ac, 0.00% Impervious, Inflow Depth > 7.97" for 25-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 52%, Lag= 10.1 min Discarded = hrs, Volume= af Primary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Surf.Area= 1,382 sf Storage= 721 cf Plug-Flow detention time= 56.5 min calculated for af (99% of inflow) Center-of-Mass det. time= 47.7 min ( 1, ) Volume Invert Avail.Storage Storage Description # ' 997 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , , Device Routing Invert Outlet Devices #1 Primary ' 50.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) #2 Discarded ' in/hr Exfiltration over Surface area Discarded OutFlow Max= hrs HW=167.01' (Free Discharge) 2=Exfiltration (Exfiltration Controls 0.11 cfs) Primary OutFlow Max= hrs HW=167.01' TW=0.00' (Dynamic Tailwater) 1=Broad-Crested Rectangular Weir (Weir Controls fps)
37 Type III 24-hr 25-Year Rainfall=5.30" Page 20 Summary for Pond 2R: EX piping 2 Inflow Area = ac, 59.74% Impervious, Inflow Depth = 3.09" for 25-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Device Routing Invert Outlet Devices #1 Primary ' 18.0" Round Culvert L= 30.0' Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= 0.013, Flow Area= 1.77 sf Primary OutFlow Max= hrs HW=171.12' TW=0.00' (Dynamic Tailwater) 1=Culvert (Barrel Controls fps) Summary for Pond 3P: South PR Detention Inflow Area = ac, 60.17% Impervious, Inflow Depth = 4.38" for 25-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 59%, Lag= 11.5 min Primary = hrs, Volume= af Secondary = hrs, Volume= af Tertiary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Surf.Area= 6,896 sf Storage= 14,698 cf Plug-Flow detention time= min calculated for af (75% of inflow) Center-of-Mass det. time= min ( ) Volume Invert Avail.Storage Storage Description # ' 30,031 cf Detention pond 1 (Prismatic)Listed below (Recalc) #2A ' 128 cf 2.58'W x 62.00'L x 2.08'H Field A 334 cf Overall - 15 cf Embedded = 319 cf x 40.0% Voids #3A ' 15 cf CPP 6 x 3 Inside #2 Inside= 6.0"W x 6.0"H => 0.24 sf x 20.00'L = 4.8 cf Outside= 7.0"W x 7.0"H => 0.24 sf x 20.00'L = 4.8 cf 30,173 cf Total Available Storage Storage Group A created with Chamber Wizard
38 Type III 24-hr 25-Year Rainfall=5.30" Page 21 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , ,650 5,322 5, ,366 6,008 11, ,118 6,742 18, ,075 7,597 25, ,376 4,363 30,031 Device Routing Invert Outlet Devices #1 Primary ' 18.0" Round Culvert L= 215.0' RCP, sq.cut end projecting, Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= 0.013, Flow Area= 1.77 sf #2 Secondary ' 6.0" Round Culvert L= 47.0' CPP, square edge headwall, Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= Concrete pipe, straight & clean, Flow Area= 0.20 sf #3 Device ' 18.0" Vert. Orifice/Grate C= #4 Device ' 0.8" Vert. Orifice/Grate C= #5 Tertiary ' 20.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) #6 Device ' 24.0" Horiz. Orifice/Grate C= Limited to weir flow at low heads Primary OutFlow Max= hrs HW=173.49' TW=171.12' (Dynamic Tailwater) 1=Culvert (Passes 4.21 cfs of 4.91 cfs potential flow) 3=Orifice/Grate (Orifice Controls fps) 6=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max= hrs HW=173.49' TW=167.01' (Dynamic Tailwater) 2=Culvert (Passes 0.03 cfs of 1.97 cfs potential flow) 4=Orifice/Grate (Orifice Controls fps) Tertiary OutFlow Max= hrs HW=169.00' TW=166.00' (Dynamic Tailwater) 5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Link 5: Analysis Point #5 (Wetland 1) Inflow Area = ac, 45.42% Impervious, Inflow Depth = 3.05" for 25-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs
39 Type III 24-hr 25-Year Rainfall=5.30" Page 22 Summary for Link DP1: Basin 1A Inflow Area = ac, 48.76% Impervious, Inflow Depth = 3.17" for 25-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs Summary for Link DP2: S Property Boundary Inflow Area = ac, 0.00% Impervious, Inflow Depth = 1.41" for 25-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs Summary for Link DP3: SE Property Boundary Inflow Area = ac, 0.00% Impervious, Inflow Depth = 3.55" for 25-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs Summary for Link DP4: NE Property Boundary Inflow Area = ac, 0.00% Impervious, Inflow Depth = 3.55" for 25-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs
40 Type III 24-hr 100-Year Rainfall=6.50" Page 23 Summary for Subcatchment 1A: Wetlands Area Runoff = hrs, Volume= af, Depth= 4.67" Type III 24-hr 100-Year Rainfall=6.50" 25, % Grass cover, Fair, HSG D 25, % Pervious Area Summary for Subcatchment 1B: West Parking Runoff = hrs, Volume= af, Depth= 5.56" Type III 24-hr 100-Year Rainfall=6.50" 9, % Grass cover, Fair, HSG D 13, Paved parking, HSG D 23, Weighted Average 9, % Pervious Area 13, % Impervious Area Summary for Subcatchment 1C: East Parking & Building Runoff = hrs, Volume= af, Depth= 5.56" Type III 24-hr 100-Year Rainfall=6.50" 54, Paved parking, HSG D 35, % Grass cover, Fair, HSG D 90, Weighted Average 35, % Pervious Area 54, % Impervious Area
41 Type III 24-hr 100-Year Rainfall=6.50" Page 24 Summary for Subcatchment 2A: South Pond Area Runoff = hrs, Volume= af, Depth= 4.67" Type III 24-hr 100-Year Rainfall=6.50" 6, % Grass cover, Fair, HSG D 6, % Pervious Area Summary for Subcatchment 2B: South Landscape Runoff = hrs, Volume= af, Depth= 4.67" Type III 24-hr 100-Year Rainfall=6.50" 3, % Grass cover, Fair, HSG D 3, % Pervious Area Summary for Subcatchment 3A: SE Property Boundary Runoff = hrs, Volume= af, Depth= 4.67" Type III 24-hr 100-Year Rainfall=6.50" 2, % Grass cover, Fair, HSG D 2, % Pervious Area
42 Type III 24-hr 100-Year Rainfall=6.50" Page 25 Summary for Subcatchment 4A: NE Property Boundary Runoff = hrs, Volume= af, Depth= 4.67" Type III 24-hr 100-Year Rainfall=6.50" 1, % Grass cover, Fair, HSG D 1, % Pervious Area Summary for Pond 1P: Bio-retention Inflow Area = ac, 58.06% Impervious, Inflow Depth = 5.56" for 100-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 54%, Lag= 8.8 min Primary = hrs, Volume= af Secondary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Surf.Area= 2,585 sf Storage= 2,517 cf Plug-Flow detention time= min calculated for af (86% of inflow) Center-of-Mass det. time= 44.8 min ( ) Volume Invert Avail.Storage Storage Description # ' 4,821 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) , , , ,995 1,995 4, , ,826 4,821 6,080 Device Routing Invert Outlet Devices #1 Primary ' 6.0" Round Culvert L= 60.0' CPP, square edge headwall, Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= PVC, smooth interior, Flow Area= 0.20 sf #2 Device ' 2.3" x 2.3" Horiz. Orifice/Grate X 8.00 columns X 8 rows C= Limited to weir flow at low heads #3 Secondary ' 15.0' long x 5.0' breadth Broad-Crested Rectangular Weir
43 Type III 24-hr 100-Year Rainfall=6.50" Page 26 Head (feet) Coef. (English) Primary OutFlow Max= hrs HW=183.21' TW=171.65' (Dynamic Tailwater) 1=Culvert (Barrel Controls fps) 2=Orifice/Grate (Passes 1.58 cfs of 7.23 cfs potential flow) Secondary OutFlow Max= hrs HW=182.00' TW=0.00' (Dynamic Tailwater) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Pond 2P: South EX Detention Inflow Area = ac, 0.00% Impervious, Inflow Depth > 9.24" for 100-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 11%, Lag= 2.4 min Discarded = hrs, Volume= af Primary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Surf.Area= 1,402 sf Storage= 745 cf Plug-Flow detention time= 55.6 min calculated for af (99% of inflow) Center-of-Mass det. time= 47.8 min ( ) Volume Invert Avail.Storage Storage Description # ' 997 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , , Device Routing Invert Outlet Devices #1 Primary ' 50.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) #2 Discarded ' in/hr Exfiltration over Surface area Discarded OutFlow Max= hrs HW=167.03' (Free Discharge) 2=Exfiltration (Exfiltration Controls 0.11 cfs) Primary OutFlow Max= hrs HW=167.03' TW=0.00' (Dynamic Tailwater) 1=Broad-Crested Rectangular Weir (Weir Controls fps)
44 Type III 24-hr 100-Year Rainfall=6.50" Page 27 Summary for Pond 2R: EX piping 2 Inflow Area = ac, 59.74% Impervious, Inflow Depth = 4.25" for 100-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Device Routing Invert Outlet Devices #1 Primary ' 18.0" Round Culvert L= 30.0' Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= 0.013, Flow Area= 1.77 sf Primary OutFlow Max= hrs HW=171.65' TW=0.00' (Dynamic Tailwater) 1=Culvert (Barrel Controls fps) Summary for Pond 3P: South PR Detention Inflow Area = ac, 60.17% Impervious, Inflow Depth = 5.56" for 100-Year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 51%, Lag= 7.8 min Primary = hrs, Volume= af Secondary = hrs, Volume= af Tertiary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span= hrs, dt= 0.01 hrs Peak Elev= hrs Surf.Area= 7,138 sf Storage= 16,896 cf Plug-Flow detention time= min calculated for af (80% of inflow) Center-of-Mass det. time= 96.3 min ( ) Volume Invert Avail.Storage Storage Description # ' 30,031 cf Detention pond 1 (Prismatic)Listed below (Recalc) #2A ' 128 cf 2.58'W x 62.00'L x 2.08'H Field A 334 cf Overall - 15 cf Embedded = 319 cf x 40.0% Voids #3A ' 15 cf CPP 6 x 3 Inside #2 Inside= 6.0"W x 6.0"H => 0.24 sf x 20.00'L = 4.8 cf Outside= 7.0"W x 7.0"H => 0.24 sf x 20.00'L = 4.8 cf 30,173 cf Total Available Storage Storage Group A created with Chamber Wizard
45 Type III 24-hr 100-Year Rainfall=6.50" Page 28 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , ,650 5,322 5, ,366 6,008 11, ,118 6,742 18, ,075 7,597 25, ,376 4,363 30,031 Device Routing Invert Outlet Devices #1 Primary ' 18.0" Round Culvert L= 215.0' RCP, sq.cut end projecting, Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= 0.013, Flow Area= 1.77 sf #2 Secondary ' 6.0" Round Culvert L= 47.0' CPP, square edge headwall, Ke= Inlet / Outlet Invert= ' / ' S= '/' Cc= n= Concrete pipe, straight & clean, Flow Area= 0.20 sf #3 Device ' 18.0" Vert. Orifice/Grate C= #4 Device ' 0.8" Vert. Orifice/Grate C= #5 Tertiary ' 20.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) #6 Device ' 24.0" Horiz. Orifice/Grate C= Limited to weir flow at low heads Primary OutFlow Max= hrs HW=173.81' TW=171.65' (Dynamic Tailwater) 1=Culvert (Passes 6.40 cfs of 6.99 cfs potential flow) 3=Orifice/Grate (Orifice Controls fps) 6=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max= hrs HW=173.81' TW=167.02' (Dynamic Tailwater) 2=Culvert (Passes 0.03 cfs of 2.01 cfs potential flow) 4=Orifice/Grate (Orifice Controls fps) Tertiary OutFlow Max= hrs HW=169.00' TW=166.00' (Dynamic Tailwater) 5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Link 5: Analysis Point #5 (Wetland 1) Inflow Area = ac, 45.42% Impervious, Inflow Depth = 4.18" for 100-Year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= hrs, dt= 0.01 hrs
APPENDIX K Drainage Study
APPENDIX K Drainage Study Storm Drainage Study For Project 65 Sacramento, California Prepared for: Capital Station 65, LLC Prepared by: Nolte Associates, Inc. 2495 Natomas Park Drive, Fourth Floor Sacramento,
More informationCity of Galesburg Stormwater Utility Credits and Incentives Policy
Stormwater Utility Credits and Incentives Policy December, 2014 Table of Contents 1 Background... 2 2 Applicability of Incentives and Credits... 2 3 Incentives... 3 3.1.1 Rain Barrels... 3 3.1.2 Other
More informationDRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY
DRAFT Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY JANUARY 2019 Table of Contents Introduction 3 Definitions 3
More informationCity of Lebanon, Tennessee Stormwater Utility Credit Manual for Stormwater Fees
City of Lebanon, Tennessee Stormwater Utility Credit Manual for Stormwater Fees Prepared by: Jeff Baines, P.E. Commissioner of Public Services Lebanon, Tennessee May 25, 2018 Instruction Revisions June
More informationCity of Maryville, Tennessee STORMWATER UTILITY Credit Manual for Stormwater Fees
City of Maryville, Tennessee STORMWATER UTILITY Credit Manual for Stormwater Fees Prepared By: AMEC Earth and Environmental, Inc. Knoxville, Tennessee June 17, 2005 TABLE OF CONTENTS 1 INTRODUCTION...
More informationChicopee River CSO Project Springfield Water & Sewer Commission. APWA Congress September 9, CSO Control Plan. CSO Control
Chicopee River CSO Project Springfield Water & Sewer Commission APWA Congress September 9, 2007 CSO Control Plan Typical Approach Different Thinking on Controlling Costs Case Example Springfield MA CSO
More informationSTORMWATER MANAGEMENT FUND Department of Environmental Services
Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More informationSTORM WATER UTILITY CREDIT AND ADJUSTMENT POLICY MANUAL
STORM WATER UTILITY CREDIT AND ADJUSTMENT POLICY MANUAL Adopted by the Board of Mayor and Aldermen of the City of Spring Hill on December 21, 2009 TABLE OF CONTENTS STORM WATER UTILITY CREDIT AND ADJUSTMENT
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationLake County Stormwater Utility Fee
County of Lake Stormwater Management Department 550 Blackbrook Road Painesville, OH 44077 Phone: (440) 350-2770 Fax: (440) 352-8133 www.lakecountyohio.org/smd Lake County Stormwater Utility Fee Credit
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More informationExhibit A. City of Roswell Stormwater Utility. Stormwater Utility Credit Manual. December 27, 2010
Exhibit A City of Roswell Stormwater Utility Stormwater Utility Credit Manual December 27, 2010 Section 1 Introduction and Overview Stormwater utility credits recognize efforts by private and public entities
More informationStormwater System Development Charges
Methodology Report Stormwater System Development Charges Prepared For City of Springfield April 20, 2009 GALARDI CONSULTING, LLC PAGE 1 OF 9 SECTION 1 Introduction Oregon legislation establishes guidelines
More informationCity of Kinston. Stormwater Utility Credit Manual
City of Kinston Stormwater Utility Credit Manual Effective Date: July 1, 2008 Table of Contents 1.0 INTRODUCTION...3 2.0 DEFINITIONS...4 3.0 GENERAL CREDIT POLICIES...4 4.0 STORMWATER BMP CREDIT POLICY.......................
More informationCity of Brunswick Stormwater Utility
City of Brunswick Stormwater Utility Stormwater User Fee Credit Manual JUNE 2018 TABLE OF CONTENTS SECTION 1 GENERAL INFORMATION... 1 DEFINITIONS... 1 SUMMARY OF STORMWATER USER FEE CREDITS... 3 STORMWATER
More informationBID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00
More informationSugar Hill Stormwater Utility Credit Technical Manual
CITY OF SUGAR HILL. Sugar Hill Stormwater Utility Credit Technical Manual.......... Amended January 14, 2010 Table of Contents City of Sugar Hill Stormwater Utility Credit Technical Manual DEFINITIONS...
More informationMARION COUNTY GROWTH SERVICES
MARION COUNTY GROWTH SERVICES Date: 6/27/2017 1 st PH - P&Z (LPA): 6/26/2017 2 nd PH - BCC: 7/18/2017 Application No: 2017-DT3 Type of Application: Developer s Agreement Termination Developer s Agreement:
More informationFINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012
FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...
More informationGreen Stormwater. Flood Risk Reduction. Infrastructure for. June Presented by: Kari Mackenbach, CFM ms consultants Lynn Mayo, PE, CFM AECOM
Green Stormwater Infrastructure for Flood Risk Reduction June 2016 Presented by: Kari Mackenbach, CFM ms consultants Lynn Mayo, PE, CFM AECOM Topics 1. Proposed ASFPM Policy Paper 2. Background Why is
More informationCity of Duluth Stormwater Utility
City of Duluth Stormwater Utility Stormwater Utility User Fee Credit Manual JUNE 13, 2011 TABLE OF CONTENTS SECTION 1 GENERAL INFORMATION... 1 DEFINITIONS... 1 SUMMARY OF STORMWATER USER FEE CREDITS...
More informationNotice of Termination General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10)
Notice of Termination General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10) 1. Construction Activity Operator: Contact: Mailing Address: (Please Type or Print All Information)
More informationPeachtree City Public Works Department. Peachtree City Stormwater Utility. Stormwater Utility Credit Technical Manual ...
. Peachtree City Public Works Department Peachtree City Stormwater Utility Stormwater Utility Credit Technical Manual.......... January 31, 2013 Section 1. Overview This manual outlines the methodology
More informationPasco County, Florida
Pasco County, Florida 1 Stormwater Utility Fee Policies and Procedures Manual July 2007 Contents Section 1. Introduction 1.1 Definitions... 1-1 1.2 Responsibility... 1-5 1.3 Stormwater Management... 1-5
More informationPROJECT DATA Project Title: Modena Union Street Bridge Project File : unionst.prj Run Date and Time: 9/6/03 7:47:22 AM. Project in English units
HEC-RAS Version 3.1 November 2002 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street, Suite D Davis, California 95616-4687 (916) 756-1104 X X XXXXXX XXXX XXXX XX XXXX X X X X X
More informationBaltimore Gas and Electric Company Gas Extensions
Baltimore Gas and Electric Company Gas 15 8. Extensions 8.1 General 8.11 General Statement Regarding Extensions: The Company extends its gas lines in accordance with the general practice described in these
More informationPlan Title: Proposed(24x48 beam) Plan File : h:\padot 8-0\SR York\Str\Design\H&H\2002\SR4017.p05
HEC-RAS September 1998 Version 2.2 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street, Suite D Davis, California 95616-4687 (916) 756-1104 X X XXXXXX XXXX XXXX XX XXXX X X X X
More informationProposed FY Storm Drainage Management Fund Budget. Presented to the Dallas City Council August 19, 2009
Proposed FY2009 10 Storm Drainage Management Fund Budget Presented to the Dallas City Council August 19, 2009 Purpose Storm Drainage Management (SDM) Fund background Current rate structure Proposed rates
More informationSR-210 MIXED FLOW LANE ADDITION PROJECT EA NO. 0C7000 FROM HIGHLAND AVENUE TO SAN BERNARDINO AVENUE. Prepared for. December 2012.
S A N T A A N A R I V E R L O C A T I O N H Y D R A U L I C S T U D Y SR-210 MIXED FLOW LANE ADDITION PROJECT FROM HIGHLAND AVENUE TO SAN BERNARDINO AVENUE EA NO. 0C7000 Prepared for San Bernardino Associated
More informationFREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality
FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial
More informationDRAFT Memorandum. Background
Barr Engineering Company 4700 West 77th Street Minneapolis, MN 55435-4803 Phone: 952-832-2600 Fax: 952-832-2601 www.barr.com An EEO Employer Minneapolis, MN Hibbing, MN Duluth, MN Ann Arbor, MI Jefferson
More informationa) Ensure public safety through reducing the threats to life and personal injury.
SECTION VII: FLOODPLAIN DISTRICT 7-1 Statement Of Purpose The purposes of the Floodplain District are to: a) Ensure public safety through reducing the threats to life and personal injury. b) Eliminate
More informationAPPROVED 9 LOT TENTATIVE TRACT MAP - NEAR FINAL MAP
Rare Development Opportunity in Carlsbad, West of El Camino Real Owner Will Deliver Property with Final Map Ready to Record at Closing Surrounded by 12 Acres of Open Space 8,002-11,173 SF Lot Sizes Area
More informationAlso Present: Malcolm O Hara, Attorney for the Town and Joe Patricke, Building Inspector.
Acting Chairman Bergman called the meeting to order at 7:00 p.m. Present: Erik Bergman Keith Oborne Chris Barden John Arnold David Paska Linda Riggi Ronald Zimmerman Tricia Andrews Acting Chairman Alternate
More informationStormwater Management Utility Fee Reduction Credit Application
Stormwater Management Utility City of Dubuque, IA Winter 2003 Stormwater Management Utility Stormwater Management Utility Introduction The City of Dubuque established a Stormwater Management Utility on
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationTechnical Memorandum 3.4 E Avenue NW Watershed Drainage Study. Appendix E Floodplain Impacts and Implications Memo
Technical Memorandum 3.4 E Avenue NW Watershed Drainage Study Appendix E Floodplain Impacts and Implications Memo September 8, 2017 City of Cedar Rapids E Avenue Watershed Drainage Study Memo Date: Tuesday,
More informationAPPENDIX to the PROGRESS REPORTS to the INTERNATIONAL JOINT COMMISSION. by the INTERNATIONAL ST. LAWRENCE RIVER BOARD OF CONTROL
APPENDIX to the PROGRESS REPORTS to the INTERNATIONAL JOINT COMMISSION by the INTERNATIONAL ST. LAWRENCE RIVER BOARD OF CONTROL Covering the Periods after MARCH 2010 International St. Lawrence River Board
More informationArticle 23-6 FLOODPLAIN DISTRICT
AMENDING THE CODE OF THE CITY OF PITTSFIELD CHAPTER 23, ZONING ORDINANCE SECTION I That the Code of the City of Pittsfield, Chapter 23, Article 23-6 Floodplain District, shall be replaced with the following:
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More information33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.
CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler
More informationChapter 5 Floodplain Management
Chapter 5 Floodplain Management Contents 1.0 Introduction... 1 2.0 Floodplain Management and Regulation... 1 2.1 City Code... 1 2.2 Floodplain Management... 1 2.3 Level of Flood Protection... 2 2.3.1 Standard
More informationStormwater Management Program
Derry Township Municipal Authority Stormwater Management Program Stormwater Stakeholder Advisory Committee Meeting #6 July 27, 2016 Agenda 1. Where did we leave off? 2. What progress have we made? 3. What
More informationFLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association
Replacement Reserve Study REPLACEMENT RESERVE STUDY Oakton, Virginia Property Management: Flint Hill Manor Townhouse Association Jamie Critchfield Vice President Email: tommie0200@aol.com Consultant: RICHARD
More informationThe City of El Paso APPENDIX D DAM RISK INVENTORY ASSESSMENT
APPENDIX D DAM RISK INVENTORY ASSESSMENT March 2009 Appendix D - Dam Risk Inventory Assessment Section Table of Contents Page D.1.0 DAM RISK INVENTORY ASSESSMENT... 1 D.1.1 Methodology... 1 D.1.2 Dam
More informationSTORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES
DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More informationSTORMWATER UTILITY FEE CREDIT MANUAL
Single-Family Residential Properties STORMWATER UTILITY FEE CREDIT MANUAL Department of Public Works Stormwater Management Program 941 Fir Street Waynesboro, Virginia 22980 (540) 942-6624 waynesboro.va.us/291/stormwateradministration
More informationADMINISTRATIVE APPEAL DECISION CLEAN WATER ACT Mendenhall PROPERTY Tenedor, LLC Utah County, Utah SACRAMENTO DISTRICT FILE NUMBER SPK
ADMINISTRATIVE APPEAL DECISION CLEAN WATER ACT Mendenhall PROPERTY Tenedor, LLC Utah County, Utah SACRAMENTO DISTRICT FILE NUMBER SPK-2006-50413 DATE: March 28, 2008 Review Officer: Thomas J. Cavanaugh,
More informationCITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018
CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00
More informationRANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price
2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF
More informationRight of Way Permits. Contact Information:
Right of Way Permits A Right-of-Way Use Permit is required for any work performed in the public right-of-way (including but not limited to sewer or water extensions, franchise utility work, storm drainage,
More informationRegular Meeting Minutes. I. Call to Order at 6:03p.m. (Vice President Mary Texer)
Approved March 6, 2013 Meeting Minutes of the Capitol Region Watershed District (CRWD) Board of Managers, for Wednesday, February 20, 2013, 6:00 p.m.at the office of the CRWD, 1410 Energy Park Dr., Suite
More informationCity of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach
i City of Centerville s Table of Contents Minimum Control Measure 1. Public Education and Outreach Best Management Practice Page 1-1: Outreach Publications...1 1-2: 30-day Public Notice for Annual Storm
More informationChapter 6 - Floodplains
Chapter 6 - Floodplains 6.1 Overview The goal of floodplain management is to reduce the potential risks to both existing and future developments, and infrastructure, in the 100-year floodplain. Over the
More informationThe maximum allowable valley storage decrease for the 100-year flood and Standard Project Flood are 0.0% and 5.0%, respectively.
2.1.1.2 HYDRAULIC IMPACTS VALLEY The maximum allowable valley storage decrease for the 100-year flood and Standard Project Flood are 0.0% and 5.0%, respectively. General. The computation of valley storage
More informationWetland. Streams. Floodplains
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERWAYS ENGINEERING AND WETLANDS CHAPTER 105 FEE(S) CALCULATION WORKSHEET Additional information can be found at 25 PA Code
More informationStaff Responses to Council Questions December 13, 2016
Staff Responses to Council Questions December 13, 2016 Consent Agenda Item G (Nelson Meadow) Removed from Consent Agenda - At the request of Commissioner Earl, Consent Agenda Item G. Resolution: Authorize
More informationCITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST
CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST Applicant shall provide three (3) copies of the following attachments: Geotechnical Report (Soils Report with grading specifications and
More informationAs outlined in Memo #2, a number of alternatives are being considered for the development of the stormwater credit program and are listed below.
MEMORANDUM City of Kitchener City Hall, 200 King St. West P.O. Box 1118 Kitchener, ON N2G 4G7 Date: September 20, 2011 To: From: cc: Steering Committee Members Nick Gollan and Nancy Corbett Project Team
More informationForterra Investor Presentation. November 2018
1 Forterra Investor Presentation November 2018 Disclaimer 2 Forward Looking Statements This presentation contains forward looking statements within the meaning of Section 27A of the Securities Act of 1933,
More informationPlanning Commission Work Meeting Minutes Thursday, August 4, 2016 City Council Chambers 220 East Morris Avenue Time 6:30 p.m.
Planning Commission Work Meeting Minutes Thursday, City Council Chambers 220 East Morris Avenue Time 6:30 p.m. Commission Members Present: Staff Members Present: Jeremy Carter, Presiding Holly Carson Laura
More informationMSD Rules and Regulations and Engineering Design Requirements February Chapter 16 - Amendments
MSD Rules and Regulations and Engineering Design Requirements February 2006 Chapter 16 - Amendments Page Topic 16-2 Amendment No. 1, issued September 26, 2007 16-5 Amendment No. 2, issued July 1, 2010
More informationThe Commonwealth of Massachusetts. Town of Northborough. Board of Health. Horse and Stable Regulations
The Commonwealth of Massachusetts Town of Northborough Board of Health Horse and Stable Regulations A) Authority The Board of Health, Town of Northborough, Massachusetts, acting under the authority of
More informationReplacement Reserve Study Report
Replacement Reserve Study Report for Landscaping and Lighting Assessment District (Zone 1: La Vigne) For the Napa County, California August 6, 2012 (Revised March 5, 2014) Page i August 6, 2012 (revised
More informationTITLE 18. ENVIRONMENTAL QUALITY CHAPTER 14. DEPARTMENT OF ENVIRONMENTAL QUALITY PERMIT AND COMPLIANCE FEES ARTICLE 1. WATER QUALITY PROTECTION FEES
Section R18-14-101. R18-14-102. Table 1. R18-14-103. R18-14-104. Table 2. Table 3. R18-14-105. R18-14-106. R18-14-107. R18-14-108. Table 4. Table 5. R18-14-109. Table 6. R18-14-110. Table 7. R18-14-111.
More informationStorm Water Mitigation Services ITB SEMINOLE TRIBE OF FLORIDA INVITATION TO BID
SEMINOLE TRIBE OF FLORIDA INVITATION TO BID Solicitation #: ITB 58-2018 Title: Description: Storm Water Mitigation Services The Seminole Tribe of Florida ( Tribe or STOF ) is requesting proposals from
More informationSTORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office 1294 Chestnut Street, Clarkston 5:30-7:30 p.m.
County of Asotin Regional Stormwater Program P.O. Box 160 135 2 nd Street Asotin, WA 99402 509-243-2071 Fax 509-243-2003 STORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office
More informationGAINESVILLE REGIONAL UTILITIES PLAN REVIEW APPLICATION
GAINESVILLE REGIONAL UTILITIES PLAN REVIEW APPLICATION 1 Proposed Development Name: Street Address or Detailed Location: Proposed Type of Development: Project Meeting Date: Approx. Construction Start Date:
More informationDetailed Resilience Pledge
Resilience Pledge 10% Resilience Pledge Proposal One objective of the City Leaders Summit is to generate concrete outcomes that City Leaders can take away from their time spent at the Summit. To meet this
More informationStrategic Flood Risk Assessment for SDCC Development Plan
Strategic Flood Risk Assessment for SDCC Development Plan Detailed Report on Flood Risk in the Baldonnell Area 8 th May 2015 rpsgroup.com/ireland Strategic Flood Risk Assessment for SDCC Development Plan
More informationYear 2014 Engineer s Report regarding the Status of ownership, Working order and Condition of the Public Infrastructure.
Year 2014 Engineer s Report regarding the Status of ownership, Working order and Condition of the Public Infrastructure. Project: MEADOW PINES (AKA COBBLESTONE) PEMBROKE PINES, FL Prepared for: MEADOW
More informationDelaware River Basin Commission s Role in Flood Loss Reduction Efforts
Delaware River Basin Commission s Role in Flood Loss Reduction Efforts There is a strong need to reduce flood vulnerability and damages in the Delaware River Basin. This paper presents the ongoing role
More informationSPILLWAY ADEQUACY ANALYSIS ROUGH RIVER LAKE LOUISVILLE DISTRICT
SPILLWAY ADEQUACY ANALYSIS OF ROUGH RIVER LAKE LOUISVILLE DISTRICT RICHARD PRUITT (502) 315-6380 Louisville District COE richard.l.pruitt@lrl02.usace.army.mil Spillway ROUGH RIVER LAKE PERTINENT DATA Construction
More information***EXPEDITED REVIEW***
***EXPEDITED REVIEW*** Application for Erosion and Sediment Pollution Control Plan Adequacy Review General NPDES Plan Review This application must be completed and accompanied by the required fees, plans,
More informationCITY OF CITRUS HEIGHTS Planning Department 6237 Fountain Square Drive Citrus Heights, CA (916)
CITY OF CITRUS HEIGHTS Planning Department 6237 Fountain Square Drive Citrus Heights, CA 95621 (916) 725-2448 Date: October 23, 2008 To: Mr. John Steitz 8310 Sunrise Boulevard Citrus Heights CA, 95610
More informationWater and Wastewater Utility Rates
Water and Wastewater Utility Rates March 1, 2016 Presented By: Diana Langley Public Works Director 1 OVERVIEW 2 Uses of Funds Capital Investment Debt Service Operating Cost = Revenue Requirement 3 Source
More informationREVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO
REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 OF THE CITY OF SAN JACINTO December 11, 2003 REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 CITY OF SAN JACINTO Prepared for CITY OF SAN
More informationExhibit 4 Page 1 of 8
Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:
More informationCITY OF NORTH RIDGEVILLE STORMWATER UTILITY
CITY OF NORTH RIDGEVILLE STORMWATER UTILITY NON-RESIDENTIAL CREDIT MANUAL January 2019 City of North Ridgeville, 7307 Avon Belden Road, North Ridgeville, Ohio 44039 www.nridgeville.org, 440-353-0819 (office),
More informationBOROUGH OF EAST RUTHERFORD ZONING BOARD OF ADJUSTMENT SPECIAL MEETING MINUTES FEBRUARY 16, 2017
A special meeting of the East Rutherford Zoning Board of Adjustment was held on February 16, 2017 at 7:00pm at the Borough Hall, located at 1 Everett Place, East Rutherford. The purpose of this special
More informationDERBY INLAND WETLANDS AGENCY DERBY, CONNECTICUT 06418
DERBY INLAND WETLANDS AGENCY DERBY, CONNECTICUT 06418 Frederick J. Columbo, Jr. Chairman Philip Marcucio 68 Seymour Avenue Paul Dinice, Jr. Derby, Connecticut 06418 Paul Padilla David Barboza II David
More informationAddendum 1 Downtown North CRA Sidewalks
Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationCITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS
1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating
More informationDERBY INLAND WETLANDS AGENCY DERBY, CONNECTICUT 06418
DERBY INLAND WETLANDS AGENCY DERBY, CONNECTICUT 06418 Frederick J. Columbo, Jr. Chairman Philip Marcucio 68 Seymour Avenue Paul Dinice, Jr. Derby, Connecticut 06418 Paul Padilla David Barboza II David
More informationUnit Quiz Answer Key
Modern Real Estate Practice in North Carolina Ninth Edition Unit Quiz Answer Key Unit 1 3-d 4-c 5-d Unit 2 1-d 2-a 4-d 5-a 6-d 7-a 8-c 10-a 1 1 14-b 1 18-a 19-a 21-c Unit 3 2-d 4-c 5-a 10-c 11-d 7-d 8-a
More informationADMINISTRATIVE APPEAL DECISION APPROVED JURISDICTIONAL DETERMINATION FOR GOLDEN STATE DEVELOPERS FILE NO SACRAMENTO DISTRICT
ADMINISTRATIVE APPEAL DECISION APPROVED JURISDICTIONAL DETERMINATION FOR GOLDEN STATE DEVELOPERS FILE NO. 200100023 SACRAMENTO DISTRICT October 25, 2001 Review Officer: Douglas R. Pomeroy, U.S. Army Corps
More informationTrinity River Restoration Program
Trinity River Restoration Program Trinity River Bridges: Hydraulic, Scour, and Riprap Sizing Analysis US DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION TECHNICAL SERVICE CENTER Prepared by Kent L. Collins
More informationSubject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122
Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot
More informationMINUTES OF BUSINESS MEETING HELD BY THE PLANNING AND ZONING COMMISSION JULY 16, Teresa Ike. Andy Kidd, Vice Chairman
MINUTES OF BUSINESS MEETING HELD BY THE PLANNING AND ZONING COMMISSION JULY 16, 2018 ROLL CALL: Members Present: Alternate Member Sitting: Alternates: Absent: Also Present: Eric Prause, Chairman Michael
More informationMINUTES OF BUSINESS MEETING HELD BY THE PLANNING AND ZONING COMMISSION JULY 16, Jessica Scorso. Timothy Bergin. Teresa Ike
MINUTES OF BUSINESS MEETING DRAFT HELD BY THE PLANNING AND ZONING COMMISSION JULY 16, 2018 ROLL CALL: Members Present: Eric Prause, Chairman Michael Stebe, Secretary Jessica Scorso Timothy Bergin Alternate
More informationCITY OF TACOMA. Wastewater, Surface Water, and Solid Waste Cost of Service Rate Study December 31, 2016
CITY OF TACOMA Wastewater, Surface Water, and Solid Waste Cost of Service Rate Study December 31, 2016 TABLE OF CONTENTS SECTION ES EXECUTIVE SUMMARY... 1 Background... 1 Objectives... 1 Rate Development
More informationIndiana LTAP Road School 2007 Purdue University West Lafayette, Indiana March 7, 2007
Review of GASB Statement No. 34 capital asset provisions and discussion of the Indiana LTAP and Government Fixed Asset Services, Inc. Procedure Manual for Implementation of GASB Statement No. 34 Indiana
More informationA Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative
A Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative June 3, 2015 Ellie Baker Horsley Witten Group, Inc. What will we cover today? Introduction
More informationPublic Meeting Impact of Hurricane Irma on Central Beach
Public Meeting Impact of Hurricane Irma on Central Beach CITY OF NEW SMYRNA BEACH October 11, 2017 at 6:00 pm Presentation Outline Hurricane Irma Impacts Flooding Caused by Hurricane Irma Original Goals
More informationINSTRUCTIONS FOR COMPLETING THE APPLICATION FORMS FOR CONDITIONAL LETTERS OF MAP REVISION AND LETTERS OF MAP REVISION
INSTRUCTIONS FOR COMPLETING THE APPLICATION FORMS FOR CONDITIONAL LETTERS OF MAP REVISION AND LETTERS OF MAP REVISION GENERAL In 1968, the U.S. Congress passed the National Flood Insurance Act, which created
More informationDevelopment Fee Program: Comparative risk analysis
Development Fee Program: Comparative risk analysis January 2008 Sacramento Area Flood Control Agency David Ford Consulting Engineers, Inc. 2015 J Street, Suite 200 Sacramento, CA 95811 Ph. 916.447.8779
More informationFlood Resilience Study Findings
Services of the San Francisco Public Utilities Commission Flood Resilience Study Findings Presentation to Citizens Advisory Committee Special Session May 17, 2016 Stefani Harrison, Project Manager 1 Agenda
More informationSTORMWATER MANAGEMENT FUND Department of Environmental Services
Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More informationLocated at the corner of Weddington Road and Pitts School Road Concord
6.71 ACRES RETAIL/OFFICE LAND FOR SALE Located at the corner of Weddington Road and Pitts School Road Concord BANK OWNED Property Highlights 6.71 Acres Zoned C 2, Conditional Water and sewage are nearby
More informationRequest for Proposals (RFP): Lake Avondale Stormwater Mitigation Facility Design and Construction Documents
Request for Proposals (RFP): Lake Avondale Stormwater Mitigation Facility Design and Construction Documents Issuing Agency: City of Avondale Estates 21 North Avondale Plaza Avondale Estates, GA 30002 Phone:
More information