1 Engineers Ireland Annual Conference MANAGING FLOOD RISK AND BUILDING SUSTAINABLE COMMUNITIES Mark Adamson Office of Public Works 15 th May, 2015
2 FLOOD RISK IN IRELAND RECENT FLOODS November 2009: >1,600 Properties, Insured Losses Circa 250m October 2011: Nearly 1,700 Properties, Insured Losses Circa 130m NATIONAL PFRA (2011) Appx. 70,000 Homes at Risk (in Undefended Floodplains) NATIONAL RISK ASSESSMENT (OEP / GTF) Flooding: No. 1 National Risk
3 IMPACTS OF CLIMATE CHANGE SEA LEVEL RISE : Rise of 190mm Current Rate of Rise: 3.2mm/yr 500mm Rise in MSL (MRFS): Risk nearly Doubles in Existing Coastal Risk Areas FLUVIAL, PLUVIAL & GROUNDWATER No Significant Signal for Change in Annual Rainfall Projected Wetter Winters / Warmer Summers Potential for Increase in Flooding: Uncertain!
4 FLOOD RISK IS A SIGNIFICANT ISSUE! LIKELY TO GET WORSE! WHAT ARE WE DOING TO UNDERSTAND AND MANAGE FLOOD RISK?
5 HISTORIC & POLICY CONTEXT HISTORICAL CONTEXT Land Commission Embankments (1800 s) Drainage Districts (Acts 1925, 1929) Minor Drainage Schemes Arterial Drainage Act, 1945 River-basin Arterial Drainage / Embankment Schemes A.D. (Amendment) Act, 1995 Local, Urban Flood Protection Schemes
6 HISTORIC & POLICY CONTEXT NATIONAL FLOOD POLICY REVIEW: 2004 OPW: Lead Agency Proactive, Catchment-based Approach Flood Mapping Flood Risk Management Plans Flood Risk Management, rather than just Flood Protection (Flood Relief Schemes): Prevention Protection Preparedness (Resilience)
7 EU FLOODS DIRECTIVE 2007 TRANSPOSED: SI No. 122 of 2010 KEY REQUIREMENTS Preliminary Flood Risk Assessment Flood Maps Flood Risk Management Plans OTHER PROVISIONS Co-ordination with WFD implementation Trans-boundary co-operation Public dissemination / engagement
8 PFRA BASED ON: Historical Records Predictive Assessment (Fluvial, Pluvial Coastal, Groundwater Indicative Mapping + FRI Analysis) Stakeholder Consultation PUBLIC CONSULTATION COMPLETED 2011: 300 AFAs
9 PFRA
10 CFRAM STUDIES CFRAM PROGRAMME Outcome of National Flood Policy Review, 2004 Compatible with FD Requirements, 2007 Flood Maps FRMPs Pilot Studies: Lee, Dodder, Fingal East Meath: National Programme:
11 SCOPE OF WORK Survey 10,000km2 LiDAR-based DTM Appx. 7,000km Channel (topo) Survey Data Collection Hydrology FSU Web-Portal (On-line Flood Estimation Tool) Hydraulics / Flood Mapping
12 CFRAM STUDIES FLOOD MAPS 300 AFAs m X-Section Spacing LiDAR Floodplain Surveys 1D-2D Dynamically-Linked Models 2,500 kms of MPWs 500m X-Section Spacing IFSAR Floodplain Surveys 1D Models
13 FLOOD MAPS Communities, Incl 90 Coastal Communities - Appx. 4,000 kms Detailed Flood Mapping - Appx. 2,500 kms Other Mapped River - Inform Sustainable Planning, Emergency Response Planning & Resilience
14 CFRAM STUDIES FLOOD MAPS Current Scenario Mapping 8 Probabilities Extent, Depth, Velocity, Risk-to-Life, Flood Zone, Risk Maps
15
16
17
18
19
20
21 CFRAM STUDIES FLOOD MAPS Current Scenario Mapping 8 Probabilities Extent, Depth, Velocity, Risk-to-Life, Flood Zone, Risk Maps Future Scenario Mapping Representative Climate Futures MRFS / HEFS (+20/30% Qp, 500/1000mm MSL Rise) Public Consultation >200 PCDs (Completed) Formal SI Consultation
22 CFRAM PROGRAMME Flood Maps Risk Analysis FRMPs Flood Risk Management Options SEA / Appropriate (Habitats) Assessment Flood Risk Management Plan
23
24 PROTECTION MINOR WORKS: 29m Approved for 430 Projects since 2009 Delivery of CFRAM Outcomes (< 0.5m) MAJOR SCHEMES: 32 Schemes Completed 8 Schemes In Construction & 23 Schemes In Design / Planning Schemes as Outcomes of CFRAM Programme Capital Programme: 250m++?
25 PREPAREDNESS (RESILIENCE) FLOOD WARNING Local Flood Warning Systems (Clonmel, Mallow, Fermoy) National Tidal & Storm Surge Forecasting Alert System Waterlevel.ie (real-time water level data) Radar-based Flood Forecasting
26 PREPAREDNESS (RESILIENCE) FLOOD WARNING FLOOD EVENT EMERGENCY RESPONSE Guidance & Template Plans (MEM Framework) AWARENESS, PREPAREDNESS & RESILIENCE 2005: National Plan, Prepare, Protect Campaign & Floodmaps.ie Updated 2014 Bring down to Local Level with CFRAM Mapping
27 THE CFRAM PROGRAMME WILL HELP US UNDERSTAND CURRENT & POTENTIAL FUTURE FLOODING AND FLOOD RISK AND HELP REDUCE EXISTING FLOOD RISK HOW CAN WE MAINTAIN AND DEVELOP SUSTAINABLE COMMUNITIES INTO THE FUTURE?
28 CFRAM STUDIES CLIMATE CHANGE Future Scenario Mapping Representative Climate Futures Optioneering Risk-based, Using MRFS/HEFS Change in Risk Low: Design for Now Check for Adaptability Medium: Adaptive Management Approach - Qualitative High: Adaptive Management Approach - Quantitative Influence Choice and Design of Measures & Management Strategies
29 FRM SECTORAL ADAPTATION PLAN SCOPE Adaptation within FRM Activities CFRAM Programme & Flood Relief Schemes Arterial Drainage Maintenance Programme Reservoirs, Raised Canals, Urban Drainage Outline of Work-Streams & Actions Research Requirements Assessments, Design Approaches & Operational Requirements Coordination & Capacity Building Monitoring & Review
30 PREVENTION PLANNING GUIDELINES OPW DoECLG Initiative Launched: November 2009 Framework For Sustainable Planning Principles Sequential Approach Flood Zones (Based on FRA, Undefended) Land Use Vulnerability Appropriate Development Justification Test
31 PREVENTION PLANNING GUIDELINES Framework For Sustainable Planning Sustainable Planning is Critical for Sustainable FRM and Sustainable Communities Avoids Creation of New Risks Reduces Future Demands for Resources for FRM Lot of Work Required to Solve Existing Problems Let s Not Create New Ones!
32 PREVENTION CLIMATE CHANGE Flood Zones based on Current Risk Precautionary Approach Req d re Climate Change Assumptive Approach Leave future floodplains clear of development Define minimum floor levels with CC allowance Adaptive Approach Allow space for flood protection measures Ensure land-use / development is adaptable
33 BUILDING SUSTAINABLE COMMUNITIES Floods are Here and are Going to Stay and will Probably Get Worse! We Need to Live with the Floods HOW?
34 BUILDING SUSTAINABLE COMMUNITIES Understanding Flood Risk CFRAM Programme Delivering Flood Maps Further Development in Future Cycles Existing Flood Risk Areas Existing Capital Works & FRM Programme CFRAM Programme Delivering FRMPs Strategic, Catchment-Based Long-Term Plans Capital Works (FRS, Minor Works), Preparedness Consideration of Climate Change
35 BUILDING SUSTAINABLE COMMUNITIES Integrated Planning Flooding is not a Barrier to Building Sustainable Communities Building Sustainable Communities must account for Flood Risk FRM should be Designed to Enhance Places Greater Engagement between Planning and FRM Sectors Thinking Beyond Water Quality, Biodiversity,
36 BUILDING SUSTAINABLE COMMUNITIES MEANS BUILDING SAFE, QUALITY PLACES PLACES WE WOULD BE HAPPY FOR OUR CHILDREN TO LIVE, WORK AND PLAY IN PLACES WHERE THE FLOOD RISK IS UNDERSTOOD AND MANAGED
37 Engineers Ireland Annual Conference MANAGING FLOOD RISK AND BUILDING SUSTAINABLE COMMUNITIES Mark Adamson Office of Public Works 15 th May, 2015
Flood Risk Management in Ireland. The National CFRAM Programme & overview of the Capital Works Programme. Click to add text
Flood Risk Management in Ireland The National CFRAM Programme & overview of the Capital Works Programme Click to add text Dr. John Martin Office of Public Works Engineers Ireland's Local Government Seminar
More information2018 PREPARING FOR A CHANGING CLIMATE AND MANAGING THE RISING FLOOD RISK
Ireland Water 2018 PREPARING FOR A CHANGING CLIMATE AND MANAGING THE RISING FLOOD RISK Mark Adamson Office of Public Works 25 th April, 2018 FLOOD RISK IN IRELAND NATIONAL RISK ASSESSMENT, OEP 2012 & 2017
More informationFLOOD RISK MANAGEMENT IN IRELAND
National Flood Management Conference 2018 FLOOD RISK MANAGEMENT IN IRELAND Mark Adamson Office of Public Works 15 th March, 2018 FLOOD RISK IN IRELAND NATIONAL RISK ASSESSMENT, OEP 2012 Flooding: Joint
More informationNational Flood Risk Management Plan. CFRAM Programme
National Flood Risk Management Plan AND THE CFRAM Programme Gerard O Connell, Engineer-in-Charge, Regional Projects & Flood Advisory Office Environmental SPC, 27 th June, 2018 HISTORIC & POLICY CONTEXT
More informationPLANNING FOR SAFE AND SUSTAINABLE COMMUNITIES
Flood Risk Management Protecting and Planning for our Communities PLANNING FOR SAFE AND SUSTAINABLE COMMUNITIES Mark Adamson Office of Public Works 12 th February, 2014 A WET START TO THE YEAR! STORM CHRISTINE
More informationDRAFT APPROPRIATE ASSESSMENT SCREENING REPORT
DRAFT APPROPRIATE ASSESSMENT SCREENING REPORT Climate Change Sectoral Adaptation Plan for Flood Risk Management (2014-2019) 2538_RP/003/C FRAM Section Office of Public Works 2538_RP/003/D CONTENTS 1.0
More informationDRAFT STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT. Climate Change Sectoral Adaptation Plan for Flood Risk Management ( )
Office of Public Works DRAFT STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT Climate Change Sectoral Adaptation Plan for Flood Risk Management (2014-2019) Determination of the need for strategic environmental
More informationTHE EU FLOODS DIRECTIVE:
Sixth Bulgarian Austrian Seminar THE EU FLOODS DIRECTIVE: EUROPEAN PRACTICE AND RESEARCH IN FLOOD RISK MANAGEMENT Mark Adamson Co-Chair, Working Group F Office of Public Works, IE 7 th November, 2013 PRESENTATION
More informationPlanning and Flood Risk
Planning and Flood Risk Patricia Calleary BE MEngSc MSc CEng MIEI After the Beast from the East Patricia Calleary Flood Risk and Planning Flooding in Ireland» Floods are a natural and inevitable part of
More informationIRISH FLOOD PREVENTION PROGRAMME Example of integrating climate change adaptation into projects
IRISH FLOOD PREVENTION PROGRAMME Example of integrating climate change adaptation into projects JASPERS Networking Platform Event Climate Change Adaptation: Vulnerability and Risk Assessment and the Resilience
More informationCLIMATE CHANGE SECTORAL ADAPTATION PLAN FLOOD RISK MANAGEMENT
CLIMATE CHANGE SECTORAL ADAPTATION PLAN FLOOD RISK MANAGEMENT (2015-2019) 2538_RP/002/E FRAM Section Office of Public Works PROJECT Climate Change Adaptation Plan PROJECT No. 2538 PROJECT ENGINEER: CLIENT:
More informationBroad-Scale Assessment of Urban Flood Risk Mark G. E. Adamson 1
Broad-Scale Assessment of Urban Flood Risk Mark G. E. Adamson 1 1 Office of Public Works, Trim, Co. Meath, Ireland Abstract The Directive on the assessment and management of flood risks (2007/60/EC The
More informationDOCUMENT CONTROL SHEET
Final Report Unit of Management 08 DOCUMENT CONTROL SHEET Client Project Title Document Title Document No. This Document Comprises The OPW IBE0600Rp0079 F02 IBE0600Rp0079 DCS TOC Text List of Tables List
More informationLaois County Council Comhairle Chontae Laoise STRATEGIC FLOOD RISK ASSESSMENT PORTLAOISE DRAFT LOCAL AREA PLAN
Laois County Council Comhairle Chontae Laoise STRATEGIC FLOOD RISK ASSESSMENT PORTLAOISE DRAFT LOCAL AREA PLAN 2018 2024 CONTENTS PORTLAOISE... 0 DRAFT LOCAL AREA PLAN... 0 2018 2024... 0 LIST OF FIGURES...
More informationEast Meath Local Area Plan
East Meath Local Area Plan 2014-2020 Bettystown / Laytown / Mornington East / Donacarney / Mornington Volume 3 Appendix C Strategic Flood Risk Assessment Copyright JBA Consulting Engineers and Scientists
More informationSTRATEGIC FLOOD RISK ASSESSMENT
STRATEGIC FLOOD RISK ASSESSMENT UNDERTAKEN AS PART OF THE PREPARATION OF PROPOSED VARIATION NO. 2 (A) TO THE GALWAY COUNTY DEVELOPMENT PLAN 2015-2021 BEARNA PLAN for: Galway County Council Áras an Chontae
More informationFOR TO THE GAELTACHT LOCAL AREA PLAN MARCH 2013
APPENDIX II TO THE SEA ENVIRONMENTAL REPORT STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT FOR PROPOSED AMENDMENT TO THE GAELTACHT LOCAL AREA PLAN 2008-2014 for: Galway County Council County Buildings Prospect
More informationComptroller and Auditor General Special Report. Strategic Planning for Flood Risk Management
Comptroller and Auditor General Special Report Strategic Planning for Flood Risk Management Report number 92 December 2015 2 Strategic Planning for Flood Risk Management Report of the Comptroller and Auditor
More informationA vibrant community offering a new way of living. Clonburris Strategic Development Zone (SDZ) Draft Planning Scheme. Strategic Flood Risk Assessment
A vibrant community offering a new way of living Clonburris Strategic Development Zone (SDZ) Draft Planning Scheme Strategic Flood Risk Assessment September 2017 Contents 1 Introduction... 1 1.1 Terms
More informationWG F 20 Workshop - Berlin
WG F 20 Workshop - Berlin THE PLUVIAL PFRA IN IRELAND Mark Adamson Office of Public Works 4 th October, 2016 OVERALL APPROACH TO PFRA OVERALL APPROACH Risk Assessment Three-String Approach Historic FRA
More informationSTAGE 2 STRATEGIC FLOOD RISK ASSESSMENT (AS AMENDED)
STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT (AS AMENDED) FOR PROPOSED AMENDMENTS TO THE CLIFDEN LOCAL AREA PLAN 2009-2015 for: Galway County Council County Buildings Prospect Hill Galway by: CAAS Ltd. 2 nd
More informationStrategic Flood Risk Assessment. SFRA Report
Strategic Flood Risk Assessment SFRA Report on Strandhill Mini-Plan Variation No.1 of the Sligo County Development Plan 2011-2017 Prepared by Contents 1. The context for the Flood Risk Assessment 1 2.
More informationSTRATEGIC FLOOD RISK ASSESSMENT
STRATEGIC FLOOD RISK ASSESSMENT FOR PROPOSED VARIATION NO. 1 (CORE STRATEGY) TO THE LONGFORD TOWN DEVELOPMENT PLAN 2009-2015 for: Longford Local Authorities Great Water Street, Longford, Co. Longford by:
More informationThe Planning System and Flood Risk Management Guidelines for Planning Authorities
Technical Appendices November 2009 Contents PAGE A. Identification and Assessment of Flood Risk 1 B. Addressing Flood Risk Management in Design of Development 35 A Appendix A: Identification and Assessment
More informationVolume. 10c. Clare County Development Plan Strategic Flood Risk Assessment
Volume 10c Clare County Development Plan 2017 2023 Strategic Flood Risk Assessment Elizabeth Russell 24 Grove Island Corbally Limerick Ireland This report describes work commissioned by Brian McCarthy,
More informationSTAGE 2 STRATEGIC FLOOD RISK ASSESSMENT
STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT FOR THE GORT LOCAL AREA PLAN2013-2019 for: Galway County Council County Buildings Prospect Hill Galway by: CAAS Ltd. 2 nd Floor, The Courtyard 25 Great Strand Street
More informationObjectives of this Briefing
Eastern CFRAM Study (Catchment Flood Risk Assessment & Management) Stakeholders Briefing Poddle & Camac Watercourses Overview Grace Glasgow July 2013 Burns Beach near Brighton, Western Australia RPS has
More informationStrategic Flood Risk Assessment January 2018
January 2018 As part of the preparation of the Proposed Variation No. 6, Limerick County Development Plan 2010-2016 (as extended) Proposed Variation No. 6 to the Limerick County Development Plan 2010-2016
More informationAppendix 12.3 Flood Risk Assessment
Appendix 12.3 Flood Risk Assessment Contents A12.3-1.1 Scope of Work 1 A12.3-1.2 Summary of Data Used 1 A12.3-1.3 Proposed Project 2 A12.3-2.1 The Planning System and Flood Risk Management Guidelines 2
More informationLower Lee (Cork City) Flood Relief Scheme (Including Blackpool and Ballyvolane)
STUDY AREA MAP N LEGEND: Study Area (for which flood alleviation measures are to be identified) Additional Environmental Study Area (assessment area of environmental affects from proposed flood alleviation
More informationNavan Development Plan
Navan Development Plan 2013-2019 Flood Risk Assessment and Management Plan Adopted Report June 2014 County Hall Navan Meath 2013s7163 Navan DP SFRA v1 4 tracked changes accepted.docx JBA Consulting 24
More informationDraft Regional Spatial & Economic Strategy
Eastern & Midland Regional Assembly Draft Regional Spatial & Economic Strategy Regional Flood Risk Appraisal Report Tionól Reigiúnach Oirthir agus Lár-Tíre Eastern and Midland Regional Assembly TABLE OF
More informationSFRA for Variation 6a of the Limerick City Development Plan
SFRA for Variation 6a of the Limerick City Development Plan 2010-2016 Strategic Flood Risk Assessment February 2017 Economic Development & Strategic Planning Limerick City & County Council 7-8 Patrick
More informationCelbridge, Co Kildare
Celbridge, Co Kildare Flood Risk Assessment December 2018 Oldtown, Celbridge, Co. Kildare. JBA Project Manager David Casey Unit 3, Block 660 Greenogue Business Plaza, Greenogue Rathcoole, Dublin Revision
More informationConsider the risks to your own business as well as to your operations
Hayley Bowman Flood and Coastal Risk Management Mapping, Modelling and Data 07919 544 551 Hayley.bowman@environment-agency.gov.uk DataInfo@environment-agency.gov.uk EA covers England only. Wales covered
More informationComhairle Baile Cheanntair~ Nás na Ríogh
Comhairle Baile Cheanntair~ Nás na Ríogh DRAFT STRATEGIC FLOOD RISK ASSESSMENT NAAS TOWN DEVELOPMENT PLAN 2011 ~ 2017 Kildare County Council Water Services Department Aras Chill Dara Devoy Park Naas County
More information[Type the document. title] subtitle] GUIDANCE DOCUMENT 11 A GUIDE TO FLOOD EMERGENCIES
[Type the document title] [Type the document subtitle] GUIDANCE DOCUMENT 11 A GUIDE TO FLOOD EMERGENCIES JULY 2013 INTRODUCTION TO A GUIDE TO FLOOD EMERGENCIES A Framework for Major Emergency Management
More informationFlood Risk Management Business Plan 2013
Flood Risk Management Business Plan 2013 SECTION 1: OVERVIEW Vision To minimise the impacts of flooding on society, households and businesses, through sustainable planning, guidance, information and effective
More informationMapping flood risk its role in improving flood resilience in England
Mapping flood risk its role in improving flood resilience in England Catherine Wright Director of Digital and Skills Flood and Coastal Risk Management Environment Agency 6 October 2017 The Environment
More informationDocument Control Sheet
Strategic Flood Risk Assessment of the Maynooth Local Area Plan 2013-2019 Proposed Amendment No. 1 Document Control Sheet Client: Project Title: Document Title: Document No: Kildare County Council Strategic
More informationInterim Report to Government. Interdepartmental Flood Policy Co-ordination Group. 8 November 2016.
Interim Report to Government Interdepartmental Flood Policy Co-ordination Group 8 November 2016. Table of Contents INTRODUCTION... 3 ABBREVIATIONS... 5 EXECUTIVE SUMMARY... 7 1. GOVERNMENT S FLOOD RISK
More informationSTRATEGIC FLOOD RISK ASSESSMENT
STRATEGIC FLOOD RISK ASSESSMENT UNDERTAKEN AS PART OF THE PREPARATION OF PROPOSED VARIATION NO. 2 (B) TO THE GALWAY COUNTY DEVELOPMENT PLAN 2015-2021 GAELTACHT PLAN (INCLUDING SETTLEMENTS OF AN CHEATHRÚ
More informationAcknowledgements. Legal Disclaimer. Copyright
SUMMARY REPORT 2018 Acknowledgements The Office of Public Works (OPW) gratefully acknowledges the assistance, input and provision of data by a large number of organisations towards the implementation
More informationMONAGHAN COUNTY COUNCIL. Strategic Flood Risk Assessment for County Monaghan
MONAGHAN COUNTY COUNCIL Strategic Flood Risk Assessment for County Monaghan November2017 Table of Contents 1.0: Introduction Page: 5 1.1: Objectives Page: 5 1.2: Study Area Page: 5 1.3: EU Floods Directive
More informationFlood Risk Management Planning in Scotland: Arrangements for February 2012
Flood Risk Management Planning in Scotland: Arrangements for 2012 2016 February 2012 Flood Risk Management (Scotland) Act 2009 1 Contents Forewords 1. Introduction to this document... 5 2. Sustainable
More informationSolway Local Plan District 1 Flood risk management in Scotland 1.1 What is a Flood Risk Management Strategy? Flood Risk Management Strategies have bee
Flood Risk Management Strategy Solway Local Plan District Section 1: Flood Risk Management in Scotland 1.1 What is a Flood Risk Management Strategy?... 1 1.2 How to read this Strategy... 1 1.3 Managing
More informationImplementation of Water Framework and Flood Directive in Finland. Markku Maunula Finnish Environment Institute
Implementation of Water Framework and Flood Directive in Finland Markku Maunula Finnish Environment Institute Finland is rich in freshwater About 11 % of surface is covered by water The number of lakes
More informationFlood Risk Assessment and Management Plan for proposed Variation 3 to the Meath CDP
Flood Risk Assessment and Management Plan for proposed Variation 3 to the Meath CDP 2013-2019 SFRA Report December 2015 County Hall Navan Meath JBA Project Manager Ross Bryant BSc MSc CEnv MCIWEM C.WEM
More informationFlood Risk Management Plan for the BALLYTEIGUE BANNOW River Basin (UoM13)
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 2015 Flood Risk Management Plan for the BALLYTEIGUE BANNOW
More informationCYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September Flood Risk Management Plan (FRMP)
CYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September 2018 REPORT AUTHOR: SUBJECT: County Councillor Phyl Davies Portfolio Holder for Highways, Recycling and Assets Flood Risk Management Plan
More informationFlood Risk Management Plan for the NORTH WESTERN River Basin (UoM01)
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 2015 Flood Risk Management Plan for the NORTH WESTERN
More informationCelbridge. Local Area Plan STRATEGIC FLOOD RISK ASSESSMENT
Celbridge Local Area Plan 2017-2023 Dréachtphlean Ceantair Áitiúil Cill Droichid STRATEGIC FLOOD RISK ASSESSMENT Planning Department Kildare County Council September 2017 Strategic Flood Risk Assessment
More informationStrategic Flood Risk Assessment
Strategic Flood Risk Assessment Draft Claremorris Local Area Plan 2012 2018 Prepared by Forward Planning Section Mayo County Council 1 Table of Contents Section 1: Overview of the Guidelines... 4 1.1 Introduction...
More informationFlood Risk Assessment Appendix 1 to Strategic Environmental Assessment Screening of Amendment No. 1 to Ferrybank/Belview Local Area Plan
Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment Screening of Amendment No. 1 to Ferrybank/Belview Local Area Plan Forward Planning Kilkenny County Council 18/8/2011 1 Introduction
More informationFlood Risk Management in the EU and the Floods Directive's 1 st Cycle of Implementation ( )
COMMON IMPLEMENTATION STRATEGY FOR THE WATER FRAMEWORK DIRECTIVE AND THE FLOODS DIRECTIVE Flood Risk Management in the EU and the Floods Directive's 1 st Cycle of Implementation (2009-15) A questionnaire
More informationStrategic Flood Risk Assessment for County Meath
Strategic Flood Risk Assessment for County Meath Draft Meath County Development Plan 2013-2019 May 2012 Meath County Council County Hall Navan County Meath JBA Consulting 24 Grove Island Corbally Limerick
More informationUnique ID: (from PFRA database) Location: Bridgetown, Co. Clare. Stage 1: Desktop Review
Location:, Co. Clare Unique ID: 250412 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 164500 Northing: 168500 River / Catchment / Sub-catchment Black River / Shannon Type
More informationBilateral screening: Chapter 27 PRESENTATION OF THE REPUBLIC OF SERBIA
REPUBLIC OF SERBIA Negotiating Group for the Chapter 27, Environment and Climate Change Bilateral screening: Chapter 27 PRESENTATION OF THE REPUBLIC OF SERBIA Directive 2007/60/EC of the European Parliament
More informationStrategic Flood Risk Assessment
Strategic Flood Risk Assessment Ireland West Airport Knock Local Area Plan 2012 2018 Prepared by Forward Planning Section Mayo County Council 0 1 Table of Contents Section 1: Overview of the Guidelines...
More informationPRESENTATION BY OPW TO JOINT OIREACHTAS COMMITTEE ON CULTURE, HERITAGE, AND THE GAELTACHT
PRESENTATION BY OPW TO JOINT OIREACHTAS COMMITTEE ON CULTURE, HERITAGE, AND THE GAELTACHT THE LOWER LEE (CORK CITY) FLOOD RELIEF SCHEME The first image shown here is the proposed view at Merchant s Quay
More informationUnique ID: (from PFRA database) Location: Nenagh, Co. Tipperary. Stage 1: Desktop Review
Location: Nenagh, Co. Tipperary Unique ID: 250432 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 186604 Northing: 178781 River / Catchment / Sub-catchment Nenagh River
More informationBackground to the PFRA European Overview - UC9810.5b
Background to the PFRA European Overview - UC9810.5b The individual Member State Reports reflect the situation as reported by the Member States to the European Commission in 2012 The situation in the MSs
More informationFlood Risk Assessment Cobh Town Plan Cobh Town Development Plan Volume 2: Strategic Flood Risk Assessment
Flood Risk Assessment Cobh Town Plan 2013 Cobh Town Development Plan 2013 Volume 2: Strategic Flood Risk Assessment Cobh Town Plan 2013 Flood Risk Assessment Document Verification Page 1 of 1 Job Title:
More informationCanada s exposure to flood risk. Who is affected, where are they located, and what is at stake
Canada s exposure to flood risk Who is affected, where are they located, and what is at stake Why a flood model for Canada? Catastrophic losses Insurance industry Federal government Average industry CAT
More informationChelmsford City Council. Level 1 and Level 2 Strategic Flood Risk Assessment. Final Report
Chelmsford City Council Level 1 and Level 2 Strategic Flood Risk Assessment Final Report October 2017 This page has been left intentionally blank 2015s3715 Chelmsford SFRA L1 and L2 Final Report v1.0.docx
More informationFlood Risk Management Strategy. Shetland
Flood Risk Management Strategy Shetland Publication date: 14 December 2015 Terms and conditions Ownership: All intellectual property rights for Flood Risk Management Strategies are owned by SEPA or its
More informationWhat can be done to minimise future economic and social harm caused by flooding and improve resilience. Flood Warning and Informing
What can be done to minimise future economic and social harm caused by flooding and improve resilience Flood Warning and Informing Marc Becker SEPA Flood Risk Manager (Hydrology) 16 th September 2016 The
More informationFlood Risk Management
Flood Risk Management COUNTY SUMMARY COUNTY: MONAGHAN (Information correct as of 31/12/2017) CONTENTS: 1. OPW Capital Investment to 31 December 2017 a. Major Flood Relief Schemes 1995 2017 b. Minor Flood
More informationVulnerability and Risk Assessment for the PFRA in Ireland
Vulnerability and Risk Assessment for the PFRA in Ireland Mark Adamson 1, Anthony Badcock 2 1 Office of Public Works, Ireland 2 Mott MacDonald Group, U.K. Abstract The Preliminary Flood Risk Assessment
More informationDerry City & Strabane District Council 17th July 2015, 3pm.
Derry City & Strabane District Council 17th July 2015, 3pm Malcolm Calvert, (Principal Engineer, Mapping & Modelling Unit) Sean O Neill, (Regional Engineer - Western) Flood Hazard & Risk Mapping www.riversagencyni.gov.uk
More informationCzech Republic 2007/60/EC
Czech Republic 2007/60/EC Methodology & Results of the Flood Risk Mapping Budapest, 16.11.2009 V4 on Flood Protection Ing. Vaclav Jirasek Ing. Petr Brezina Present situation overview Legislation status
More informationAssessing future flood risk across the UK
Climate Change Risk Assessment: 2017 Assessing future flood risk across the UK (England, Wales, Scotland and Northern Ireland) Presentation to the FoRUM Workshop Paul Sayers and Matt Horritt 17 March 2015
More informationStrategic Flood Risk Assessment Report. Ireland 2040 Our Plan Draft National Planning Framework
Strategic Flood Risk Assessment Report Ireland 2040 Our Plan Draft National Planning Framework TABLE OF CONTENTS 1 INTRODUCTION... 1 1.1 OBJECTIVE... 1 1.2 SFRA INTEGRATION WITH THE DRAFT NPF... 1 1.3
More informationCHAPTER 10 FLOOD RISK
CHAPTER 10 FLOOD RISK 10.1 Introduction and Key Issues 10.1.1 This chapter describes the likely effects that the construction and operation of the Upgrade will have on flood risk. The potential effects
More informationDanube Flood Risk Management Plan. Igor Liska & Raimund Mair ICPDR Secretariat
Danube Flood Risk Management Plan Igor Liska & Raimund Mair ICPDR Secretariat 800.000 km 2 80 Mio. people 19 countries Most international River Basin in the World Danube River Protection Convention signed
More informationVolume Three. Pluvial Flood Risk Management
EU Interreg IVB FloodResilienCity Project Final Report Dublin Volume Three Pluvial Flood Risk Management Document control sheet BPP 04 F8 Client: Project: Document Title: Dublin City Council Job No: 32102500
More informationGuildford Borough Level 1 Strategic Flood Risk Assessment Summary Report. January 2016
Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report January 2016 What is this document? This document provides a summary of Guildford Borough Strategic Flood Risk Assessment (SFRA,
More informationWoodbrook - Shanganagh
Strategic Flood Risk Assessment (SFRA) Woodbrook - Shanganagh Local Area Plan 2017-2023 Appendix 7 Strategic Flood Risk Assessment (SFRA) Woodbrook-Shanganagh Local Area Plan 2017-2023 August 2017 Appendix
More informationSTATUTORY INSTRUMENTS. S.I. No. 122 of EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010.
STATUTORY INSTRUMENTS. S.I. No. 122 of 2010. EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010. (Prn. A10/0432) 2 [122] S.I. No. 122 of 2010. EUROPEAN COMMUNITIES (ASSESSMENT
More informationStrategic Flood Risk Assessment
Gorey Town and Environs Local Area Plan 207-2023 Appendix 4 Strategic Flood Risk Assessment April 207 Table of Contents Introduction and Context.... Introduction....2 Legislative and Planning context....2.
More informationResilience to Flooding of Grid and Primary Substations
PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Technical Report 138 Resilience to Flooding of Grid and Primary Substations www.energynetworks.org PUBLISHING AND COPYRIGHT
More informationA brief introduction to the Flood (Risk) Directive. Jan Verkade, M.A. Delft Hydraulics
A brief introduction to the Flood (Risk) Directive Jan Verkade, M.A. Delft Hydraulics Flood Risk Directive s full name: Directive 2007/60/EC of the European Parliament and of the Council on the assessment
More informationStrategic Flood Risk Assessment (SFRA)
Draft Sligo County Development Plan 2017-2023 for public consultation September 2016 Strategic Flood Risk Assessment (SFRA) Strategic Flood Risk Assessment (SFRA) of the Draft Sligo County Development
More informationFlood Risk Management
Flood Risk Management COUNTY SUMMARY COUNTY: CAVAN (Information correct as of 31/12/2017) CONTENTS: 1. OPW Capital Investment to 31 December 2017 a. Major Flood Relief Schemes 1995 2017 b. Minor Flood
More informationStrategic Flood Risk Assessment for SDCC Development Plan
Strategic Flood Risk Assessment for SDCC Development Plan Detailed Report on Flood Risk in the Baldonnell Area 8 th May 2015 rpsgroup.com/ireland Strategic Flood Risk Assessment for SDCC Development Plan
More informationEnvironment Agency pre-application advice incorporating Local Flood Risk Standing Advice from East Lindsey District Council
Environment Agency pre-application advice incorporating Local Flood Risk Standing Advice from East Lindsey District Council Version 1 UNCLASSIFIED We are the Environment Agency. We protect and improve
More informationStrategic Flood Risk Assessment: A Local Authority Perspective. Karyn Punchard, Weymouth & Portland Borough Council
Strategic Flood Risk Assessment: A Local Authority Perspective Karyn Punchard, Weymouth & Portland Borough Council Workshop Flooding issues in Weymouth & Portland SFRA Level 1 2005/6 SFRA Level 2 2008/9
More informationBackground to the PFRA European Overview UC10508
Background to the PFRA European Overview UC10508 The individual Member State Reports reflect the situation as reported by the Member States to the European Commission in 2014 The situation in the MSs may
More informationFlood Risk Assessment Appendix 1 to Strategic Environmental Assessment of Ferrybank/Belview Local Area Plan 2017
Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment of Ferrybank/Belview Local Area Plan 2017 Forward Planning Kilkenny County Council June 2017 Contents 1 Introduction... 1 1.1 Disclaimer...
More informationSOUTH GALWAY GORT LOWLANDS
SOUTH GALWAY GORT LOWLANDS FLOOD RELIEF SCHEME TENDER DOCUMENTS: PROJECT BRIEF AUGUST 2017 GALWAY COUNTY COUNCIL ROADS, TRANSPORTATION, MARINE AND GENERAL SERVICES TABLE OF CONTENTS 1 BACKGROUND AND SCOPE
More informationFederal Floodplain Mapping Guideline Series. CRHNet 2017 Symposium Halifax, Nova Scotia October 25, 2017
Federal Floodplain Mapping Guideline Series CRHNet 2017 Symposium Halifax, Nova Scotia October 25, 2017 Overview 1. Introduction to Floodplain Maps 2. Federal Floodplain Mapping Guidelines Series 3. Stakeholder
More informationLOCAL FLOOD RISK MANAGEMENT STRATEGY FOR HERTFORDSHIRE. STRATEGY (Vision) Part 1 of 4
LOCAL FLOOD RISK MANAGEMENT STRATEGY FOR HERTFORDSHIRE STRATEGY (Vision) Part 1 of 4 Geoperspectives 2011 Contents Executive Summary... 1 E1. Background... 1 E2. Relevance... 1 E3. Strategy Content...
More informationPrepared by... Ross Bryant BSc MSc CEnv MCIWEM C.WEM Chartered Senior Analyst
JBA Project Manager Ross Bryant 24 Grove Island Corbally Limerick Ireland Revision History Revision Ref / Date Issued Amendments Issued to V1.0 February 2017 First Issue Clare County Council V2.0 March
More informationFlood risk management plans the interlink between Floods Directive and Water Framework Directive a creative approach to authorities work
Flood risk management plans the interlink between Floods Directive and Water Framework Directive a creative approach to authorities work Gimo, 11.06.2014 Iveta Teibe, iveta.teibe@varam.gov.lv What s explicitly
More informationDevelopment and Flood Risk - the Environment Agency s approach to PPS25. scrutinised before planning decisions are made
Development and Flood Risk - the Environment Agency s approach to PPS25 Steve Cook Flood Risk Policy Advisor Stephen.cook@environment-agency.gov.uk Our role in PPS25 h Providing advice and information
More informationFlood issues in the Danube RBD. Igor Liska ICPDR Secretariat
Flood issues in the Danube RBD Igor Liska ICPDR Secretariat PFRA report Introduction; Overall approach and methodology of PFRA; Historical floods in the Danube River Basin; Potential adverse consequences
More informationBackground to the PFRA European Overview UC10508
Background to the PFRA European Overview UC10508 The individual Member State Reports reflect the situation as reported by the Member States to the European Commission in 2014 The situation in the MSs may
More informationSTAGE 2 STRATEGIC FLOOD RISK ASSESSMENT LONGFORD COUNTY DEVELOPMENT PLAN FEBRUARY 2015 FOR THE. Longford County Council. CAAS Ltd.
STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT FOR THE LONGFORD COUNTY DEVELOPMENT PLAN 2015-2021 for: Longford County Council Great Water Street Longford County Longford by: CAAS Ltd. 2 nd Floor, The Courtyard
More informationLOCAL FLOOD RISK STRATEGY EMYR WILLIAMS PEMBROKESHIRE COUNTY COUNCIL
LOCAL FLOOD RISK STRATEGY EMYR WILLIAMS PEMBROKESHIRE COUNTY COUNCIL Flood Risk Management We can only manage flood risk. It is not possible to prevent all flooding even if we had the money. There will
More informationBLESSINGTON LOCAL AREA PLAN FLOOD RISK ASSESSMENT
BLESSINGTON LOCAL AREA PLAN 2013-2019 FLOOD RISK ASSESSMENT Table of Contents Page Number 1.0 INTRODUCTION 1 1.1 Definition of Flooding 2 1.2 Policy Framework 2 1.3 Flood Risk Identification 3 1.4 Mapping
More information