1 Strategic Flood Risk Assessment: A Local Authority Perspective Karyn Punchard, Weymouth & Portland Borough Council

2 Workshop Flooding issues in Weymouth & Portland SFRA Level /6 SFRA Level /9 Flood Risk Management Strategy 2009/10 Discussion

3 Flooding Issues in Weymouth & Portland Tidal : Chiswell, Portland Osprey Quay Town Centre/Weymouth Harbour Lodmoor/Preston Sea Wall Fluvial: River Wey Preston Stream River Jordan Urban Drainage : Park District.

4 RIVER WEY FLOOD JULY 1955

5 Tidal Flooding, Chiswell 1979

6 Overland flooding 1993, Upwey

7 SFRA OBJECTIVES To inform Local Development Documents To meet requirements of PPS25 Development and Flood Risk and the Practice Guide To provide the information needed to apply the sequential approach To provide a reference for the public and developers. To use as a tool to assess site specific FRA s

8 SFRA1 From EA WPBC Flood zone maps(2006) OS mapping 1/10,000 Historic flood maps Aerial photographs Recorded flood incidents Historic flood incidents Tidal flood extent 2052 Known flooding issues NFCDD flood defences WPBC defences. Lidar DTM data. Flood warning/watch areas Chiswell Flood Zone Data

9 SFRA 1 Outputs Level 1 SFRA delivered July Met objectives at the time. Baseline document. Live GIS based flood risk maps

10 SFRA1 live GIS based mapping

11 Level 1 - In hindsight Very much based on EA data Broad brush approach Only tidal and fluvial flooding shown. Depth of flooding, speed of flow not determined or shown Inconsistencies with more recent EA flood zone mapping which relate to existing risk and not climate change Confusion for developers using the EA mapping and period of inconsistent advice on planning applications

12 Level 2 SFRA Specific development options tested To help assess whether it is appropriate for development to take place in areas of high flood risk, subject to further detailed FRA (the exception test) Existing defences and climate change modelled to 2126 (100 years) Town centre sites FZ 2 and 3 - impact, speed of onset, depth and velocity variance modelled.

13

14 Mapped flood depths without defences (1 in 200 year) Key SFRA Level 2 Study Area Depth (m)

15 Mapped flood depths without defences (1 in 200 year + climate change (2086)) Key SFRA Level 2 Study Area Depth (m)

16 Impact of Climate Change: Weymouth Town Centre Dramatic changes in inundation in flat areas Increased frequency at which potential flood levels will be reached Increased storminess and waves By 2126 non of the town centre sites display safe access and egress

17 Mapped flood depths without defences (1 in 200 year + climate change (2126)) Key SFRA Level 2 Study Area Depth (m)

18 Practical Applications Critical part of evidence base for LDF Assisting in assessing whether potential housing sites achievable as part of Strategic Housing Land Availability Assessment (SHLAA) Used as basis for consulting EA on planning applications EA using as basis for responding on planning applications Used as basis for site specific FRAs when required

19 Flood Risk Management Strategy EA request as part of LDF evidence base Options to provide flood defence strategy, schemes and means of escape/egress Lifetime of Core Strategy yrs Costs of schemes and maintenance (on and off-site) Phasing and construction programme Funding mechanism (CIL, S106, other) Inform infrastructure/delivery DPD

20 EA objection to all residential development in Weymouth Town Centre Important that differences between EA mapping (existing risk) and SFRA s (with climate change) are made clear to developers EA developing opportunities for Planning Protocols to be agreed as part of new standing advice. Ongoing Issues

21 Weymouth Town Centre AAP regeneration for housing, retail and commercial in FZ 2 and 3 Portland Osprey Quay regeneration for employment and 2012 olympic/paralymic sailing events in FZ 2 and 3. Further Work

22 Workshop Flooding issues in Weymouth & Portland SFRA Level /6 SFRA Level /9 Flood Risk Management Strategy 2009/10 Discussion

Development and Flood Risk - the Environment Agency s approach to PPS25. scrutinised before planning decisions are made

Development and Flood Risk - the Environment Agency s approach to PPS25. scrutinised before planning decisions are made Development and Flood Risk - the Environment Agency s approach to PPS25 Steve Cook Flood Risk Policy Advisor Stephen.cook@environment-agency.gov.uk Our role in PPS25 h Providing advice and information

More information

Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report. January 2016

Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report. January 2016 Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report January 2016 What is this document? This document provides a summary of Guildford Borough Strategic Flood Risk Assessment (SFRA,

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment Strategic Flood Risk Assessment Draft Claremorris Local Area Plan 2012 2018 Prepared by Forward Planning Section Mayo County Council 1 Table of Contents Section 1: Overview of the Guidelines... 4 1.1 Introduction...

More information

Strategic Flood Risk Assessment (SFRA)

Strategic Flood Risk Assessment (SFRA) Strategic Flood Risk Assessment (SFRA) July 2007 (Final) London Borough of Hounslow The Civic Centre Lampton Road Hounslow TW3 4DN July 2007 (Final) EXECUTIVE SUMMARY Introduction 1. The London Borough

More information

Good Practice Guide. GPG 101 Document Owner: Steve Cook. Page 1 of 7.

Good Practice Guide. GPG 101 Document Owner: Steve Cook. Page 1 of 7. Good Practice Guide Producing flood risk hydraulic models and flood consequence assessments for development planning purposes Date Published: September 2015 GPG 101 Document Owner: Steve Cook Page 1 of

More information

Engineers Ireland Annual Conference

Engineers Ireland Annual Conference Engineers Ireland Annual Conference MANAGING FLOOD RISK AND BUILDING SUSTAINABLE COMMUNITIES Mark Adamson Office of Public Works 15 th May, 2015 FLOOD RISK IN IRELAND RECENT FLOODS November 2009: >1,600

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment Strategic Flood Risk Assessment Ireland West Airport Knock Local Area Plan 2012 2018 Prepared by Forward Planning Section Mayo County Council 0 1 Table of Contents Section 1: Overview of the Guidelines...

More information

Comhairle Baile Cheanntair~ Nás na Ríogh

Comhairle Baile Cheanntair~ Nás na Ríogh Comhairle Baile Cheanntair~ Nás na Ríogh DRAFT STRATEGIC FLOOD RISK ASSESSMENT NAAS TOWN DEVELOPMENT PLAN 2011 ~ 2017 Kildare County Council Water Services Department Aras Chill Dara Devoy Park Naas County

More information

Lake District National Park Authority Strategic Flood Risk Assessment (SFRA)

Lake District National Park Authority Strategic Flood Risk Assessment (SFRA) Strategic Flood Risk Assessment (SFRA) September 2007 (Final) The Lake District National Park Authority Murley Moss Oxenholme Road Kendal Cumbria LA9 7RL September 2007 i EXECUTIVE SUMMARY Introduction

More information

Planning and Flood Risk

Planning and Flood Risk Planning and Flood Risk Patricia Calleary BE MEngSc MSc CEng MIEI After the Beast from the East Patricia Calleary Flood Risk and Planning Flooding in Ireland» Floods are a natural and inevitable part of

More information

Environment Agency pre-application advice incorporating Local Flood Risk Standing Advice from East Lindsey District Council

Environment Agency pre-application advice incorporating Local Flood Risk Standing Advice from East Lindsey District Council Environment Agency pre-application advice incorporating Local Flood Risk Standing Advice from East Lindsey District Council Version 1 UNCLASSIFIED We are the Environment Agency. We protect and improve

More information

Canada s exposure to flood risk. Who is affected, where are they located, and what is at stake

Canada s exposure to flood risk. Who is affected, where are they located, and what is at stake Canada s exposure to flood risk Who is affected, where are they located, and what is at stake Why a flood model for Canada? Catastrophic losses Insurance industry Federal government Average industry CAT

More information

Doncaster Strategic Flood Risk Assessment. Level 2. March 2010 FINAL REPORT

Doncaster Strategic Flood Risk Assessment. Level 2. March 2010 FINAL REPORT Doncaster Strategic Flood Risk Assessment Level 2 March 2010 FINAL REPORT South Barn Broughton Hall SKIPTON North Yorkshire BD23 3AE UK t: +44 (0)1756 799 919 f: +44 (0)1756 799 449 Environmental Planning

More information

Resilience to Flooding of Grid and Primary Substations

Resilience to Flooding of Grid and Primary Substations PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Technical Report 138 Resilience to Flooding of Grid and Primary Substations www.energynetworks.org PUBLISHING AND COPYRIGHT

More information

LLDC Flood Risk Review Summary Report. Issue 2 13 January 2017

LLDC Flood Risk Review Summary Report. Issue 2 13 January 2017 Issue 2 13 January 2017 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility

More information

Consider the risks to your own business as well as to your operations

Consider the risks to your own business as well as to your operations Hayley Bowman Flood and Coastal Risk Management Mapping, Modelling and Data 07919 544 551 Hayley.bowman@environment-agency.gov.uk DataInfo@environment-agency.gov.uk EA covers England only. Wales covered

More information

The Planning System and Flood Risk Management Guidelines for Planning Authorities

The Planning System and Flood Risk Management Guidelines for Planning Authorities Technical Appendices November 2009 Contents PAGE A. Identification and Assessment of Flood Risk 1 B. Addressing Flood Risk Management in Design of Development 35 A Appendix A: Identification and Assessment

More information

Chelmsford City Council. Level 1 and Level 2 Strategic Flood Risk Assessment. Final Report

Chelmsford City Council. Level 1 and Level 2 Strategic Flood Risk Assessment. Final Report Chelmsford City Council Level 1 and Level 2 Strategic Flood Risk Assessment Final Report October 2017 This page has been left intentionally blank 2015s3715 Chelmsford SFRA L1 and L2 Final Report v1.0.docx

More information

Flood Risk Assessment for Planning

Flood Risk Assessment for Planning Flood Risk Assessment for Planning Report on: Sample Property, Sample Town, Sample Postcode Report prepared for: Report Reference: Report Date: Sample AEL-XXXX-FRA-XXXX 28 th October 2016 Client Reference:

More information

Climate Change and Flood Risk. Tim Reeder Regional Climate Change Programme Manager

Climate Change and Flood Risk. Tim Reeder Regional Climate Change Programme Manager Climate Cange and Flood Risk Tim Reeder Regional Climate Cange Programme Manager Structure of talk Callenges of flood risk management in London & climate cange issues Te TE 2100 Project - Climate Cange

More information

City of Bradford Metropolitan District Council Strategic Flood Risk Assessment. Level 1. February 2011 (amended February 2014) FINAL DRAFT REPORT

City of Bradford Metropolitan District Council Strategic Flood Risk Assessment. Level 1. February 2011 (amended February 2014) FINAL DRAFT REPORT City of Bradford Metropolitan District Council Strategic Flood Risk Assessment Level 1 February 2011 (amended February 2014) FINAL DRAFT REPORT South Barn Broughton Hall SKIPTON North Yorkshire BD23 3AE

More information

Derry City & Strabane District Council 17th July 2015, 3pm.

Derry City & Strabane District Council 17th July 2015, 3pm. Derry City & Strabane District Council 17th July 2015, 3pm Malcolm Calvert, (Principal Engineer, Mapping & Modelling Unit) Sean O Neill, (Regional Engineer - Western) Flood Hazard & Risk Mapping www.riversagencyni.gov.uk

More information

Appendix C Additional Information to support the Flood Risk Assessment

Appendix C Additional Information to support the Flood Risk Assessment Appendix C Additional Information to support the Flood Risk Assessment Appendix C Part A Agreement to scope of sequential and exception tests C-1 From: David Tate [mailto:david.tate@n-somerset.gov.uk]

More information

FOR TO THE GAELTACHT LOCAL AREA PLAN MARCH 2013

FOR TO THE GAELTACHT LOCAL AREA PLAN MARCH 2013 APPENDIX II TO THE SEA ENVIRONMENTAL REPORT STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT FOR PROPOSED AMENDMENT TO THE GAELTACHT LOCAL AREA PLAN 2008-2014 for: Galway County Council County Buildings Prospect

More information

SFRA for Variation 6a of the Limerick City Development Plan

SFRA for Variation 6a of the Limerick City Development Plan SFRA for Variation 6a of the Limerick City Development Plan 2010-2016 Strategic Flood Risk Assessment February 2017 Economic Development & Strategic Planning Limerick City & County Council 7-8 Patrick

More information

STRATEGIC FLOOD RISK ASSESSMENT

STRATEGIC FLOOD RISK ASSESSMENT STRATEGIC FLOOD RISK ASSESSMENT FOR PROPOSED VARIATION NO. 1 (CORE STRATEGY) TO THE LONGFORD TOWN DEVELOPMENT PLAN 2009-2015 for: Longford Local Authorities Great Water Street, Longford, Co. Longford by:

More information

Strategic Flood Risk Assessment Level 1. Volume II Stockton on Tees SFRA Technical Report. June 2010 FINAL REPORT

Strategic Flood Risk Assessment Level 1. Volume II Stockton on Tees SFRA Technical Report. June 2010 FINAL REPORT Strategic Flood Risk Assessment Level 1 Volume II Stockton on Tees SFRA Technical Report June 2010 FINAL REPORT JBA Consulting The Brew House Wilderspool Park Greenhall's Avenue WARRINGTON WA4 6HL UK t:

More information

Assessing future flood risk across the UK

Assessing future flood risk across the UK Climate Change Risk Assessment: 2017 Assessing future flood risk across the UK (England, Wales, Scotland and Northern Ireland) Presentation to the FoRUM Workshop Paul Sayers and Matt Horritt 17 March 2015

More information

Hartlepool Borough Council

Hartlepool Borough Council Hartlepool Borough Council Strategic Flood Risk Assessment Level 1 Volume 1 - SFRA understanding the SFRA process May 2010 Tom Britcliffe Principal Planning Officer Department of Regeneration & Planning

More information

Chapter Flood Consequences

Chapter Flood Consequences Chapter 2.16. Flood Consequences 438 16. Flood Consequences 16.1. Introduction and Scope of Topic 16.1.1. This chapter identifies and describes the existing flood risk features along the route of the Scheme

More information

STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT (AS AMENDED)

STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT (AS AMENDED) STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT (AS AMENDED) FOR PROPOSED AMENDMENTS TO THE CLIFDEN LOCAL AREA PLAN 2009-2015 for: Galway County Council County Buildings Prospect Hill Galway by: CAAS Ltd. 2 nd

More information

Product 4 (Detailed Flood Risk) for Our Ref: OX_0748_01. Mill Lane, Somerford Keynes

Product 4 (Detailed Flood Risk) for Our Ref: OX_0748_01. Mill Lane, Somerford Keynes Product 4 (Detailed Flood Risk) for Our Ref: OX_0748_01 Mill Lane, Somerford Keynes Product 4 is designed for developers where Flood Risk Standing Advice FRA (Flood Risk Assessment) Guidance Note 3 Applies.

More information

Flood Risk Management in Ireland. The National CFRAM Programme & overview of the Capital Works Programme. Click to add text

Flood Risk Management in Ireland. The National CFRAM Programme & overview of the Capital Works Programme. Click to add text Flood Risk Management in Ireland The National CFRAM Programme & overview of the Capital Works Programme Click to add text Dr. John Martin Office of Public Works Engineers Ireland's Local Government Seminar

More information

Flood Risk Sequential Test

Flood Risk Sequential Test Flood Risk Sequential Test Assessment of Proposed Development Sites Stroud District Council Evidence Base (December 2013) Development and Flood Risk Sequential Test 1.0 Introduction 1.1 This document considers

More information

Britannia Village Flood Control Project

Britannia Village Flood Control Project Britannia Village Flood Control Project Summary of Background Information February 2011 Contents 1) Flood Risks in the Village 2) Alternative Flood Risk Management Approaches Status Quo The Proposed Remedial

More information

IRISH FLOOD PREVENTION PROGRAMME Example of integrating climate change adaptation into projects

IRISH FLOOD PREVENTION PROGRAMME Example of integrating climate change adaptation into projects IRISH FLOOD PREVENTION PROGRAMME Example of integrating climate change adaptation into projects JASPERS Networking Platform Event Climate Change Adaptation: Vulnerability and Risk Assessment and the Resilience

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment PLANNING DEPARTMENT, KILKENNY COUNTY COUNCIL Strategic Flood Risk Assessment Proposed Amendment No. 2 of Callan Local Area Plan 2009-2020 Forward Planning January 2016 This Strategic Flood Risk Assessment

More information

Broad-Scale Assessment of Urban Flood Risk Mark G. E. Adamson 1

Broad-Scale Assessment of Urban Flood Risk Mark G. E. Adamson 1 Broad-Scale Assessment of Urban Flood Risk Mark G. E. Adamson 1 1 Office of Public Works, Trim, Co. Meath, Ireland Abstract The Directive on the assessment and management of flood risks (2007/60/EC The

More information

2018 PREPARING FOR A CHANGING CLIMATE AND MANAGING THE RISING FLOOD RISK

2018 PREPARING FOR A CHANGING CLIMATE AND MANAGING THE RISING FLOOD RISK Ireland Water 2018 PREPARING FOR A CHANGING CLIMATE AND MANAGING THE RISING FLOOD RISK Mark Adamson Office of Public Works 25 th April, 2018 FLOOD RISK IN IRELAND NATIONAL RISK ASSESSMENT, OEP 2012 & 2017

More information

Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Local authority Main catchment Clyde and Loch Lomond Glasgow City Council

Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Local authority Main catchment Clyde and Loch Lomond Glasgow City Council Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Clyde and Loch Lomond Local authority Glasgow City Council Main catchment River Clyde Summary of flooding impacts At risk of

More information

10526 Bermuda Isle Dr. Tampa, FL 33647

10526 Bermuda Isle Dr. Tampa, FL 33647 Flood Analysis Memo Property Address In Partnership with: ** This property is NOT within a high-risk flood zone ** This property is located in a FEMA low-risk zone designated as Zone X - an area of minimal

More information

Greater Nottingham Strategic Flood Risk Assessment. Summary of Key Findings for Nottingham City Council

Greater Nottingham Strategic Flood Risk Assessment. Summary of Key Findings for Nottingham City Council Greater Nottingham Strategic Flood Risk Assessment Summary of Key Findings for Nottingham City Council July 2008 This page is intentionally left blank. GREATER NOTTINGHAM STRATEGIC FLOOD RISK ASSESSMENT

More information

Ryedale DC, Scarborough BC and North York Moors NPA North East Yorkshire SFRA SFRA (PPS25 Update)

Ryedale DC, Scarborough BC and North York Moors NPA North East Yorkshire SFRA SFRA (PPS25 Update) Ryedale DC, Scarborough BC and North York Moors NPA North East Yorkshire SFRA Ryedale DC, Scarborough BC and North York Moors NPA North East Yorkshire SFRA February 2010 This report takes into account

More information

10526 Bermuda Isle Dr. Tampa, FL 33647

10526 Bermuda Isle Dr. Tampa, FL 33647 Flood Analysis Memo Property Address 10526 Bermuda Isle Dr. In Partnership with: ** This property is NOT within a high-risk flood zone ** 10526 Bermuda Isle Dr. BFE = 35 ft This property is located in

More information

STRATEGIC FLOOD RISK ASSESSMENT

STRATEGIC FLOOD RISK ASSESSMENT STRATEGIC FLOOD RISK ASSESSMENT UNDERTAKEN AS PART OF THE PREPARATION OF PROPOSED VARIATION NO. 2 (A) TO THE GALWAY COUNTY DEVELOPMENT PLAN 2015-2021 BEARNA PLAN for: Galway County Council Áras an Chontae

More information

Non Regulatory Risk MAP Products Flood Depth and Probability Grids

Non Regulatory Risk MAP Products Flood Depth and Probability Grids Non Regulatory Risk MAP Products Flood Depth and Probability Grids Virginia Floodplain Management Association 2015 Floodplain Management Workshop October 29th, 2015 Nabil Ghalayini, P.E., PMP, D.WRE, CFM

More information

Flood Risk Management: Modelling blockage and breach scenarios February 2015

Flood Risk Management: Modelling blockage and breach scenarios February 2015 Flood Risk Management: Modelling blockage and breach scenarios February 2015 OGN100 Document Owner: Mark Pugh Page 1 of 6 Version History: Document Date Summary of Changes Version Published 1.0 DEC-2014

More information

Volume. 10c. Clare County Development Plan Strategic Flood Risk Assessment

Volume. 10c. Clare County Development Plan Strategic Flood Risk Assessment Volume 10c Clare County Development Plan 2017 2023 Strategic Flood Risk Assessment Elizabeth Russell 24 Grove Island Corbally Limerick Ireland This report describes work commissioned by Brian McCarthy,

More information

East Meath Local Area Plan

East Meath Local Area Plan East Meath Local Area Plan 2014-2020 Bettystown / Laytown / Mornington East / Donacarney / Mornington Volume 3 Appendix C Strategic Flood Risk Assessment Copyright JBA Consulting Engineers and Scientists

More information

WG F 20 Workshop - Berlin

WG F 20 Workshop - Berlin WG F 20 Workshop - Berlin THE PLUVIAL PFRA IN IRELAND Mark Adamson Office of Public Works 4 th October, 2016 OVERALL APPROACH TO PFRA OVERALL APPROACH Risk Assessment Three-String Approach Historic FRA

More information

Strategic Flood Risk Assessment. SFRA Report

Strategic Flood Risk Assessment. SFRA Report Strategic Flood Risk Assessment SFRA Report on Strandhill Mini-Plan Variation No.1 of the Sligo County Development Plan 2011-2017 Prepared by Contents 1. The context for the Flood Risk Assessment 1 2.

More information

FLOOD RISK MANAGEMENT IN IRELAND

FLOOD RISK MANAGEMENT IN IRELAND National Flood Management Conference 2018 FLOOD RISK MANAGEMENT IN IRELAND Mark Adamson Office of Public Works 15 th March, 2018 FLOOD RISK IN IRELAND NATIONAL RISK ASSESSMENT, OEP 2012 Flooding: Joint

More information

LOW. Overall Flood risk. Flood considerations. Specimen Address, Specimen Town. Rivers and the Sea Low page 4. Historic Flood.

LOW. Overall Flood risk. Flood considerations. Specimen Address, Specimen Town. Rivers and the Sea Low page 4. Historic Flood. Specimen Address, Specimen Town Overall Flood risk LOW Crown copyright and database rights 2018. Ordnance Survey licence 100035207 Groundsure Floodview complies with relevant Law Society practice notes

More information

FLOODING INFORMATION SHEET YOUR QUESTIONS ANSWERED

FLOODING INFORMATION SHEET YOUR QUESTIONS ANSWERED The information in this document has been written in partnership by the Association of British Insurers and the Environment Agency 1. Flood risk and insurance Q1. How can I find out the flood risk affecting

More information

Flood Risk Assessment Cobh Town Plan Cobh Town Development Plan Volume 2: Strategic Flood Risk Assessment

Flood Risk Assessment Cobh Town Plan Cobh Town Development Plan Volume 2: Strategic Flood Risk Assessment Flood Risk Assessment Cobh Town Plan 2013 Cobh Town Development Plan 2013 Volume 2: Strategic Flood Risk Assessment Cobh Town Plan 2013 Flood Risk Assessment Document Verification Page 1 of 1 Job Title:

More information

FLOOD SOLUTIONS Residence

FLOOD SOLUTIONS Residence FLOOD SOLUTIONS Residence Report prepared on 22 Knighton Road, Liverpool, L4 9RD Report reference AEL028FLR022381 National grid reference 337815, 394462 Report prepared for Specimen Client Client reference

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment Gorey Town and Environs Local Area Plan 207-2023 Appendix 4 Strategic Flood Risk Assessment April 207 Table of Contents Introduction and Context.... Introduction....2 Legislative and Planning context....2.

More information

Broadland District Council

Broadland District Council Broadland District Council Broadland, North Norfolk, and South Norfolk District Councils, Norwich City Council and the Broads Authority Strategic Flood Risk Assessment Stage 1 Inception and Terms of Reference

More information

Sample Site, Sample Street, Sample Town

Sample Site, Sample Street, Sample Town Telephone: 2 7261 191 Email: SitecheckFlood@rpsgroup.com Sample Site, Sample Street, Sample Town Prepared for: L And1 Landmark1 Account Landmark(Test Account) 6-7 Abbey Court, Sowton Ind Estate Exeter

More information

Lowestoft. Summary 2016 FLOOD RISK MANAGEMENT. Mike Page

Lowestoft. Summary 2016 FLOOD RISK MANAGEMENT. Mike Page Mike Page Lowestoft FLOOD RISK MANAGEMENT Strategy Summary 2016 Introduction This Strategy Summary Document is a brief overview of the Strategy for managing the risk of flooding to Lowestoft from the sea,

More information

Lowestoft Flood Risk Management Project

Lowestoft Flood Risk Management Project Volume 1, Issue 1 Winter 2017 Lowestoft Flood Risk Management Project I N S I D E T H I S I S S U E : Welcome 1 Background to the project 2 What are we considering 2 and how has the project progressed?

More information

Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment Screening of Amendment No. 1 to Ferrybank/Belview Local Area Plan

Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment Screening of Amendment No. 1 to Ferrybank/Belview Local Area Plan Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment Screening of Amendment No. 1 to Ferrybank/Belview Local Area Plan Forward Planning Kilkenny County Council 18/8/2011 1 Introduction

More information

The COAST Approach to Adaptation Action for Sea Level Rise and Storm Surge. Samuel B. Merrill, PhD May 20, 2014

The COAST Approach to Adaptation Action for Sea Level Rise and Storm Surge. Samuel B. Merrill, PhD May 20, 2014 The COAST Approach to Adaptation Action for Sea Level Rise and Storm Surge Samuel B. Merrill, PhD May 20, 2014 Fig. 3c-City of Portland: Commercial Street EastCOAST Model Results, 100 Year Storm in 2100

More information

210 W Canal Dr Palm Harbor, FL 34684

210 W Canal Dr Palm Harbor, FL 34684 Flood Analysis Memo Property Address In Partnership with: ** This property is within a high risk flood zone ** BFE = 6 ft This property is located in the FEMA designated high-risk zone, Zone AE - an area

More information

BLESSINGTON LOCAL AREA PLAN FLOOD RISK ASSESSMENT

BLESSINGTON LOCAL AREA PLAN FLOOD RISK ASSESSMENT BLESSINGTON LOCAL AREA PLAN 2013-2019 FLOOD RISK ASSESSMENT Table of Contents Page Number 1.0 INTRODUCTION 1 1.1 Definition of Flooding 2 1.2 Policy Framework 2 1.3 Flood Risk Identification 3 1.4 Mapping

More information

National Flood Risk Management Plan. CFRAM Programme

National Flood Risk Management Plan. CFRAM Programme National Flood Risk Management Plan AND THE CFRAM Programme Gerard O Connell, Engineer-in-Charge, Regional Projects & Flood Advisory Office Environmental SPC, 27 th June, 2018 HISTORIC & POLICY CONTEXT

More information

Local Flood Risk Management Strategy

Local Flood Risk Management Strategy Local Flood Risk Management Strategy 2017 2019 Contents Section Pages Executive Summary 3 1.0 Introduction 4 2.0 Aims 5 3.0 Flood Risk in Poole 6 4.0 Drainage 10 5.0 Surface Water Management Plans 12 6.0

More information

STRATEGIC FLOOD RISK ASSESSMENT

STRATEGIC FLOOD RISK ASSESSMENT STRATEGIC FLOOD RISK ASSESSMENT UNDERTAKEN AS PART OF THE PREPARATION OF PROPOSED VARIATION NO. 2 (B) TO THE GALWAY COUNTY DEVELOPMENT PLAN 2015-2021 GAELTACHT PLAN (INCLUDING SETTLEMENTS OF AN CHEATHRÚ

More information

15-17 Unwins Bridge Road St Peters NSW September 2013

15-17 Unwins Bridge Road St Peters NSW September 2013 Marrickville Council j:\jobs\112010\propertytagging\letter020813.docx 15-17 Unwins Bridge Road St Peters NSW 2044 18 September 2013 Review of Marrickville Council s Property Flood Tagging INTRODUCTION

More information

G318 Local Mitigation Planning Workshop. Module 2: Risk Assessment. Visual 2.0

G318 Local Mitigation Planning Workshop. Module 2: Risk Assessment. Visual 2.0 G318 Local Mitigation Planning Workshop Module 2: Risk Assessment Visual 2.0 Unit 1 Risk Assessment Visual 2.1 Risk Assessment Process that collects information and assigns values to risks to: Identify

More information

DERBYSHIRE - LEAD LOCAL FLOOD AUTHORITY

DERBYSHIRE - LEAD LOCAL FLOOD AUTHORITY DERBYSHIRE - LEAD LOCAL FLOOD AUTHORITY The Duty to Investigate Flooding Incidents, Section 19 - Flood and Water Management Act 2010 1. Introduction In his review of the Summer 2007 floods, Sir Michael

More information

Flood Risk Management New legislation New Duties!

Flood Risk Management New legislation New Duties! Flood Risk Management New legislation New Duties! Andy Cameron Lancashire County Council Senior Engineer Strategic Flood Risk Iwan Lawton Environment Agency Technical Specialist Development & Flood Risk

More information

A vibrant community offering a new way of living. Clonburris Strategic Development Zone (SDZ) Draft Planning Scheme. Strategic Flood Risk Assessment

A vibrant community offering a new way of living. Clonburris Strategic Development Zone (SDZ) Draft Planning Scheme. Strategic Flood Risk Assessment A vibrant community offering a new way of living Clonburris Strategic Development Zone (SDZ) Draft Planning Scheme Strategic Flood Risk Assessment September 2017 Contents 1 Introduction... 1 1.1 Terms

More information

STANDARDS FOR MODELLING OF FLOODING IN OPEN COASTS AND LARGE ESTUARIES

STANDARDS FOR MODELLING OF FLOODING IN OPEN COASTS AND LARGE ESTUARIES STANDARDS FOR MODELLING OF FLOODING IN OPEN COASTS AND LARGE ESTUARIES HAKEEM JOHNSON CH2M, UK ASGHAR AKHONDI-ASL, IAIN ANDREWS Environment Agency, UK Flood & Coast 2017 Conference Outline of presentation

More information

Y Bwthyn Palliative Care Unit, Pontyclun Response to Natural Resources Wales

Y Bwthyn Palliative Care Unit, Pontyclun Response to Natural Resources Wales SUMMARY OF FRA RESPONSES Y Bwthyn Palliative Care Unit, Pontyclun Response to Natural Resources Wales This document summarises the resolution of the comments issued by Natural Resources Wales (NRW) on

More information

Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment of Ferrybank/Belview Local Area Plan 2017

Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment of Ferrybank/Belview Local Area Plan 2017 Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment of Ferrybank/Belview Local Area Plan 2017 Forward Planning Kilkenny County Council June 2017 Contents 1 Introduction... 1 1.1 Disclaimer...

More information

DONCASTER LOCAL DEVELOPMENT FRAMEWORK. Development & Flood Risk Supplementary Planning Document. STATEMENT OF REPRESENTATIONS (Regulation 18(4))

DONCASTER LOCAL DEVELOPMENT FRAMEWORK. Development & Flood Risk Supplementary Planning Document. STATEMENT OF REPRESENTATIONS (Regulation 18(4)) DONCASTER LOCAL DEVELOPMENT FRAMEWORK Development & Flood Risk Supplementary Planning Document STATEMENT OF REPRESENTATIONS (Regulation 18(4)) October 2010 DONCASTER LOCAL DEVELOPMENT FRAMEWORK Development

More information

REPORT. Increased Flooding Vulnerability: Properties with a greater increase in flooding vulnerability in higher frequency flooding events

REPORT. Increased Flooding Vulnerability: Properties with a greater increase in flooding vulnerability in higher frequency flooding events REPORT Increased Flooding Vulnerability: Properties with a greater increase in flooding vulnerability in higher Prepared for Chapman Tripp on behalf of Earthquake Commission Prepared by Date Job Number

More information

THE EU FLOODS DIRECTIVE:

THE EU FLOODS DIRECTIVE: Sixth Bulgarian Austrian Seminar THE EU FLOODS DIRECTIVE: EUROPEAN PRACTICE AND RESEARCH IN FLOOD RISK MANAGEMENT Mark Adamson Co-Chair, Working Group F Office of Public Works, IE 7 th November, 2013 PRESENTATION

More information

Celbridge, Co Kildare

Celbridge, Co Kildare Celbridge, Co Kildare Flood Risk Assessment December 2018 Oldtown, Celbridge, Co. Kildare. JBA Project Manager David Casey Unit 3, Block 660 Greenogue Business Plaza, Greenogue Rathcoole, Dublin Revision

More information

Celbridge. Local Area Plan STRATEGIC FLOOD RISK ASSESSMENT

Celbridge. Local Area Plan STRATEGIC FLOOD RISK ASSESSMENT Celbridge Local Area Plan 2017-2023 Dréachtphlean Ceantair Áitiúil Cill Droichid STRATEGIC FLOOD RISK ASSESSMENT Planning Department Kildare County Council September 2017 Strategic Flood Risk Assessment

More information

Laois County Council Comhairle Chontae Laoise STRATEGIC FLOOD RISK ASSESSMENT PORTLAOISE DRAFT LOCAL AREA PLAN

Laois County Council Comhairle Chontae Laoise STRATEGIC FLOOD RISK ASSESSMENT PORTLAOISE DRAFT LOCAL AREA PLAN Laois County Council Comhairle Chontae Laoise STRATEGIC FLOOD RISK ASSESSMENT PORTLAOISE DRAFT LOCAL AREA PLAN 2018 2024 CONTENTS PORTLAOISE... 0 DRAFT LOCAL AREA PLAN... 0 2018 2024... 0 LIST OF FIGURES...

More information

Contents Amendment Record

Contents Amendment Record Contents Amendment Record This report has been issued and amended as follows: Issue Revision Description Date Approved by 1 1 0 1 Draft for CSG review Consultation Draft 30 April 2010 30 July 2010 M Phillips

More information

Mapping flood risk its role in improving flood resilience in England

Mapping flood risk its role in improving flood resilience in England Mapping flood risk its role in improving flood resilience in England Catherine Wright Director of Digital and Skills Flood and Coastal Risk Management Environment Agency 6 October 2017 The Environment

More information

STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT

STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT FOR THE GORT LOCAL AREA PLAN2013-2019 for: Galway County Council County Buildings Prospect Hill Galway by: CAAS Ltd. 2 nd Floor, The Courtyard 25 Great Strand Street

More information

To Cede or Not to Cede

To Cede or Not to Cede To Cede or Not to Cede Copyright Ambiental 2015 A Recurring Phenomenon the new normal 2007 2008 2009 2010 2012 2013-14 2015 UK Northumberland Cumbria Cornwall UK & Ireland UK UK 55,000 homes flooded. 13

More information

Flood Analysis Memo. 629 Orangewood Dr. Dunedin, FL BFE = 21 ft

Flood Analysis Memo. 629 Orangewood Dr. Dunedin, FL BFE = 21 ft Flood Analysis Memo Property Address 629 Orangewood Dr. In Partnership with: ** This property is NOT within a high-risk flood zone ** 629 Orangewood Dr. BFE = 21 ft This property is located in the FEMA

More information

Strategic Flood Risk Assessment Report. Ireland 2040 Our Plan Draft National Planning Framework

Strategic Flood Risk Assessment Report. Ireland 2040 Our Plan Draft National Planning Framework Strategic Flood Risk Assessment Report Ireland 2040 Our Plan Draft National Planning Framework TABLE OF CONTENTS 1 INTRODUCTION... 1 1.1 OBJECTIVE... 1 1.2 SFRA INTEGRATION WITH THE DRAFT NPF... 1 1.3

More information

Oban (Potentially Vulnerable Area 01/31) Local authority Main catchment Argyll and Bute Council Knapdale coastal Background This Potentially Vulnerabl

Oban (Potentially Vulnerable Area 01/31) Local authority Main catchment Argyll and Bute Council Knapdale coastal Background This Potentially Vulnerabl Oban (Potentially Vulnerable Area 01/31) Local authority Argyll and Bute Council Main catchment Knapdale coastal Summary of flooding impacts 320 residential properties 310 non-residential properties 1.8

More information

Document Control Sheet

Document Control Sheet Strategic Flood Risk Assessment of the Maynooth Local Area Plan 2013-2019 Proposed Amendment No. 1 Document Control Sheet Client: Project Title: Document Title: Document No: Kildare County Council Strategic

More information

LOCAL FLOOD RISK STRATEGY EMYR WILLIAMS PEMBROKESHIRE COUNTY COUNCIL

LOCAL FLOOD RISK STRATEGY EMYR WILLIAMS PEMBROKESHIRE COUNTY COUNCIL LOCAL FLOOD RISK STRATEGY EMYR WILLIAMS PEMBROKESHIRE COUNTY COUNCIL Flood Risk Management We can only manage flood risk. It is not possible to prevent all flooding even if we had the money. There will

More information

Local Flood Risk Management Strategy

Local Flood Risk Management Strategy of London Local Flood Risk Management Strategy 2014-2020 September 2014 of London Local Flood Risk Management Strategy 2014-2020 Sept 2014 1 Contents 1 Introduction... 4 2 Flood Risk Management Strategy

More information

DES MOINES CITY OF TWO RIVERS. Flooding Risk & Impact to Development

DES MOINES CITY OF TWO RIVERS. Flooding Risk & Impact to Development DES MOINES CITY OF TWO RIVERS Flooding Risk & Impact to Development River System Des Moines Flood Protection Des Moines Flood Protection cont. Infrastructure Over 24 miles of levees 21stormwater pump stations

More information

Unique ID: (from PFRA database) Location: Bridgetown, Co. Clare. Stage 1: Desktop Review

Unique ID: (from PFRA database) Location: Bridgetown, Co. Clare. Stage 1: Desktop Review Location:, Co. Clare Unique ID: 250412 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 164500 Northing: 168500 River / Catchment / Sub-catchment Black River / Shannon Type

More information

Objectives of this Briefing

Objectives of this Briefing Eastern CFRAM Study (Catchment Flood Risk Assessment & Management) Stakeholders Briefing Poddle & Camac Watercourses Overview Grace Glasgow July 2013 Burns Beach near Brighton, Western Australia RPS has

More information

Flood Risk Assessment. Approved by RECOMMENDATIONS. Professional Opinion

Flood Risk Assessment. Approved by RECOMMENDATIONS. Professional Opinion Flood Report Flood Risk Assessment Professional Opinion RECOMMENDATIONS 1. A prudent purchaser may wish to consider further assessment of the property to identify appropriate flood protection measures.

More information

North Northamptonshire Flood Risk Management Study

North Northamptonshire Flood Risk Management Study North Northamptonshire Flood Risk Management Study Environment Agency June 2007 Final Report 9S1244 Rightwell House Bretton Peterborough PE3 8DW United Kingdom +44 (0)1733 334455 Telephone 01733 333538

More information

Draft River Hull Flood Risk Management Strategy. May River Hull Flood Risk Management Strategy Report

Draft River Hull Flood Risk Management Strategy. May River Hull Flood Risk Management Strategy Report Draft River Hull Flood Risk Management Strategy May 2010 River Hull Flood Risk Management Strategy Report River Hull Flood Risk Management Strategy Report Draft River Hull Flood Risk Management Strategy

More information

Sequential Flood Risk Test for Mid Sussex Neighbourhood Plans

Sequential Flood Risk Test for Mid Sussex Neighbourhood Plans Sequential Flood Risk Test for Mid Sussex Neighbourhood Plans Introduction This Sequential Test has been prepared to assess the flood risk of sites within the parish that have been identified as suitable,

More information

MONAGHAN COUNTY COUNCIL. Strategic Flood Risk Assessment for County Monaghan

MONAGHAN COUNTY COUNCIL. Strategic Flood Risk Assessment for County Monaghan MONAGHAN COUNTY COUNCIL Strategic Flood Risk Assessment for County Monaghan November2017 Table of Contents 1.0: Introduction Page: 5 1.1: Objectives Page: 5 1.2: Study Area Page: 5 1.3: EU Floods Directive

More information