1 Reserve Study Transmittal Letter Date: August 15, 215 To: Lorrie Olson, Caughlin Creek HOA From: Browning Reserve Group (BRG) Re: Caughlin Creek HOA; Full Study Attached, please find the reserve study for Caughlin Creek HOA. To assist in your understanding of the study, and to highlight key information you may need quickly, we have listed below some of the important information contained in the study. At BRG our goal is to bring clarity from complexity, so should you have any questions, please do not hesitate to contact us anytime. 1. Where do I find the recommended reserve contribution for next year's budget? This is found in Section III, 3 Year Reserve Funding Plan, Cash Flow Method. $ is the annual amount. Directly under the annual amount is the amount per ownership interest, per month, or other period, as applicable. $ For any other funding related issues, if any, see Section III, 3 Year Reserve Funding Plan, Cash Flow Method. 2. Where do I find the status of the reserve fund, based on the Percent Funded calculation? This is found for the 3-year term of the study in Section IV, 3 Year Reserve Funding Plan, Including Fully Funded Balance and % Funded. For the year for which the study was prepared, 216, the Association is 83.2% funded. Based on the 3 year cash flow projection, the Association's reserves appear adequately funded as the reserve fund ending balances remain positive throughout the replacement of all major components during the next 3 years. Nevada statute imposes no reserve funding level requirements nor does it address funding level adequacy, and although one or more of the reserve fund percentages expressed in this report may be less than one hundred percent, those percentages do not necessarily indicate that the Association's reserves are inadequately funded. 3. Where do I find the assumptions for interest and inflation factors? While this information is in various places in the study, it can always be found in Section III, 3 Year Reserve Funding Plan, Cash Flow Method. For this study the assumption is 1.25% for the interest rate and 2.5% for the inflation factor. Please be advised these rates estimate the values that will stand the test of time over the 3-year term of the study, not simply only next year. 12fsv :to.to P. O. Box 6125 / Sacramento, CA 9586 Office (916) Fax (916) Bob@BrowningRG.com /

2 August 15, Reserve Study Page Two 4. What pages from the reserve study get mailed to the members (homeowners)? Please see the last section of the reserve study, "Member Distribution Materials." These are the last two pages (or more) of the study which can be removed, and copied, for distribution to the membership with the budget packet. This packet includes all state mandated disclosures related to the reserves and the reserve study. This section of the study is a stand-alone packet with it's own cover and table of contents. 5. What are the next steps? This study meets the NV NRS and NAC Requirements for a site visit study every five years. New for 213, we have added a new "Section X-b" to assist the association during execution of NV Form 69. This new Section displays in Form 69 order, elements from the reserve study that must be entered on to Form 69. The next site visit study will be due in five years. For the intervening four years, BRG proposes doing an Update Without Site Visit Study, at a nominal cost, which will include the preparation of a reserve study and assistance in reviewing the study per NRS (b). Please read the two helpful sections entitled Glossary and Notes to the Auditor. The glossary explains common reserve study terms as well as BRG specific terminology. The Notes to the Auditor while intended to assist the auditor, has useful information for the casual reader on how year zero, (215) the current fiscal year is dealt with in the study. Thank you for the opportunity to work with the Caughlin Creek HOA on this study. 12fsv :to.to

3 RESERVE STUDY Full Study Caughlin Creek HOA Published - August 15, 215 Browning Reserve Group P. O. Box 6125 / Sacramento, CA 9586 Office (916) Fax (916) Bob@BrowningRG.com / Browning Reserve Group /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM

4 Table of Contents Section Report Page Section I: Summary of Association Reserves 1 Section II: 3 Year Expense Forecast Detailed 5 Section III: 3 Year Reserve Funding Plan Cash Flow Method {c} 9 Section III-a: 3 Year Reserve Funding Plan Cash Flow Method - Ending Balances Chart 1 Section IV: 3 Year Reserve Funding Plan Fully Funded Balance and % Funded 11 Section IV-a: 3 Year Reserve Funding Plan Cash Flow Method - Percent Funded Chart 12 Section V: Reserve Fund Balance Forecast Component Method 13 Section VI: Component Listing Included Components 16 Section VII: Tabular Component Listing Included Components 28 Section VII-a: Expenditures by Year - Next 5 Years 3 Section X: Auditor Notes 32 Section X-a: Supplementary Information for Auditor Section X-b: Reserve Summary Form 69 Abstract Component Method NRS Section XI: Glossary Reserve Study Terms Addendum: Member Distribution Materials See Page ii for Details /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group 215 TOC - i

5 Member Distribution Materials The following Reserve Study sections, located at the end of the report, should be provided to each member. Section Report Nevada: Member Summary /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group 215 TOC - ii

6 Section I Full Study Caughlin Creek HOA Published - August 15, 215 Reserve Study Summary A Reserve Study was conducted of Caughlin Creek HOA (the "Association"). A Full Study includes an on-site review upon where the following tasks are performed: development of a reserve component inventory; condition assessment based upon on-site visual observation; life and valuation estimates; fund status; and a funding plan. Caughlin Creek HOA is a Planned Community with a total of 178 Units. Physical Inspection Browning Reserve Group ("BRG") conducted a physical inspection of the Association. The inspection encompassed those major components that the Association is required to maintain. For this study components are determined to be major components if: 1. As of the date of the study, they have a remaining useful life of less than 3 years, and a value greater than $1,. 2. Such additional components, if any, determined by the Board of Directors. During the inspection, BRG utilized the services of our own construction cost estimator. In addition, independent contractors were retained to render opinions on selected components as indicated in Section VI, Included Component Listing. Supplemental information to the physical inspection may have been obtained from the following sources: 1. Project plans where available. 2. Maintenance records of the reserve components where available. 3. Association board members, management and staff. Summary of Reserves For the first year of the Reserve Study, the reserve contribution is based upon the existing budget unless otherwise noted in Section III, Reserve Funding Plan. In addition BRG relied on the Association to provide an accurate Beginning Reserve Balance /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group 215 P. O. Box 6125 / Sacramento, CA 9586 Office (916) Fax (916) Bob@BrowningRG.com /

7 Reserve Study - Full Study Caughlin Creek HOA 2 The status of the Association's reserves, as reflected in the following Reserve Study, is as follows: 1. The Expenditure Forecast of the following Reserve Study identifies the major components which the Association is obligated to repair, replace, restore or maintain, as determined in accordance with the criteria specified above, and specifies for each such component: a. Its current estimated replacement cost; b. Its estimated useful life; and c. Its estimated remaining useful life. 2. It is estimated that the total cash reserves necessary to repair, replace, restore or maintain such major components (in the aggregate) during and at the end of their first remaining useful life is $565,75. [For purposes of this calculation, necessary is defined as the Fully Funded Balance (FFB) (Component Current Cost X Effective Age / Useful Life, including a provision for interest and inflation in future years.)] 3. The current amount of accumulated cash reserves actually set aside to repair, replace, restore, or maintain such major components as of the fiscal year ending December 31, 216 is estimated to be $47,956, constituting 83.2% of the total expenditures anticipated for all such major components through their first end of useful life replacement. 4. Based upon the schedule of annual reserve contributions necessary to defray the cost of repairing, replacing, restoring or maintaining such major components in the years such expenditures are estimated to be required, it is estimated that annual reserve contributions in the initial amount of $ [$. per Unit per month (average)] for the fiscal year ending December 31, 216 (the first full fiscal year following first distribution of this report) will be necessary in order to meet all such reserve expenditures when they are projected to come due. Funding Assessment Based on the 3 year cash flow projection, the Association's reserves appear adequately funded as the reserve fund ending balances remain positive throughout the replacement of all major components during the next 3 years. Nevada statute imposes no reserve funding level requirements nor does it address funding level adequacy, and although one or more of the reserve fund percentages expressed in this report may be less than one hundred percent, those percentages do not necessarily indicate that the Association's reserves are inadequately funded. Percent Funded Status Based on paragraphs 1-3 above, the Association is 83.2% funded. The following scale can be used as a measure to determine the Association s financial picture whereas the lower the percentage, the higher the likelihood of the Association requiring a special assessment, or other large increases to the reserve contribution in the future. Percent Funded Poor % Fair % Strong %

8 Reserve Study - Full Study Caughlin Creek HOA 3 Methodology The above recommended reserve contribution for the next fiscal year (and future fiscal years as outlined in Section III, Reserve Fund Balance Forecast) was developed using the cash flow method. This is a method of developing a reserve funding plan where the contributions to the reserve fund are designed to offset the variable annual expenditures from the reserve fund. Different reserve funding plans are tested against the anticipated schedule of reserve expenses until the desired funding goal is achieved. Funding Goals The funding goal employed for Caughlin Creek HOA is Threshold Funding: Establishing a Reserve funding goal of keeping the Reserve balance above a specified dollar or Percent Funded amount. Depending on the threshold, this may be more or less conservative than Fully Funding. Limitations The intention of the Reserve Study is to forecast the Association's ability to repair or replace major components as they wear out in future years. The Reserve Study is not an engineering report, and no destructive testing was performed. The costs outlined in the study are for budgetary and planning purposes only, and actual bid costs would depend upon the defined scope of work at the time repairs are made. Also, any latent defects are excluded from this report. Statutory Disclosures Compliance The Reserve Study was conducted pursuant to NRS , NRS , and NAC This reserve study was produced under the responsible charge of Robert Browning who holds Professional Community Association Manager (PCAM) and Reserve Specialist (RS) designations from CAI. Pursuant to Nevada regulation R145-6, Mr. Browning is a Nevada Reserve Study Specialist (RSS #5). Life Expectancy The projected life expectancy of the major components and the funding needs of the reserves of the Association are based upon the Association performing appropriate routine and preventative maintenance for each major component. Failure to perform such maintenance can negatively impact the remaining useful life of the major components and dramatically increase the funding needs of the reserves of the Association. General: Supplemental Disclosures BRG has no other involvement(s) with the Association which could result in actual or perceived conflicts of interest.

9 Reserve Study - Full Study Caughlin Creek HOA 4 Personnel Credentials: BRG is a licensed general building contractor in California, #768851, and the owner, Robert W. Browning, holds the Reserve Specialist designation, #46 from the Community Associations Institute. Completeness: BRG has found no material issues which, if not disclosed, would cause a distortion of the Association's situation. Reliance on Client Data: Information provided by the official representative of the Association regarding financial, physical, quantity, or historical issues will be deemed reliable by BRG. Scope: This Reserve Study is a reflection of information provided to BRG and assembled for the Association's use, not for the purpose of performing an audit, quality/forensic analysis, health and safety inspection, or background checks of historical records. Reserve Balance: The actual beginning reserve fund balance in this Reserve Study is based upon information provided and was not audited. Reserve Projects: Information provided about reserve projects will be considered reliable. Any on-site inspection should not be considered a project audit, quality inspection, or health and safety review. Browning Reserve Group

10 Section II Caughlin Creek HOA 3 Year Expense Forecast - Detailed Current Replacement Life Useful / Reserve Component Cost Remaining Paving 12 - Asphalt: State Spec. Slurry 232,35 Sq. Ft. Streets 2 - Asphalt: Ongoing Repairs Streets 3 - Asphalt: Petromat Overlay 279,567 Sq. Ft. Streets 2 - Concrete Total 1 - Paving 562, Sidewalks, Curbs & Gutters 64,889 Sq. Ft. Street Side (1%) 36 - Stamped 3,691 Sq. Ft. Streets Total 2 - Concrete 65, Painting: Exterior 41 - Wrought Iron Gates 46 Lin. Ft. Community Entrance Gate 1 Total 3 - Painting: Exterior Gate Equipment 1 - Elite Swing Gate Operators 2 Community Entrance Gate Elite Swing Gate Operators 4 Community Entrance Gate DoorKing Telephone Entry System Community Entrance Gate DoorKing Telephone Entry System Community Entrance Gate Emergency Vehicle Access Device Community Entrance Gate1- Click 2 Enter 8 - Loops, Misc. Wiring Harness Community Entrance Gate Loops, Misc. Wiring Harness 7 - Community Entrance Gate Miscellaneous On-going Repairs 2 Community Entrance Gate Systems 1 & New Gate Installation Community Entrance Gate 1 Total 11 - Gate Equipment 55,8 71, ,118 8,463 91,37 2, ,563 2,627 2,692 2,76 2,829 2,899 2,972 3,46 3,122 3,2 3,28 3,362 3,446 3, , ,533 71,118 2,563 2,627 2,692 2,76 636,825 2,899 2,972 3,46 3,122 94,237 3,28 3,362 3,446 3,532 1, ,642 12,4 13,622 55, ,26 1,642 76,247 13, , ,38 8, , ,129 18,433 3, ,895 4,986 3, ,992 5,111 2, 1 6 2,319 2, ,87 3,497 2, ,942 3,584 4, 4 1 4,1 4,526 4,995 5,514 15, ,153 18,245 22,63 16,153 4,526 2,319 17,484 22,17 4,986 5,111 5, Lakes / Ponds 99 - Miscellaneous Liner & Pond- Annual Maintenance 7, ,856 8,52 8,253 8,46 8,671 8,888 9,11 9,338 9,571 9,811 1,56 1,37 1,565 1, /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group to 229 5

11 Current Replacement Life Useful / Caughlin Creek HOA 3 Year Expense Forecast - Detailed Reserve Component Cost Remaining Total Lakes / Ponds 7, Lighting 2 - Street Lights 22 Streets[se:1] 26 - Bollard Lights Bitter Creek Court 3 - Common Area 4 Community Entrance Gate Common Area 3 Community Entrance Gate Signage Total 2 - Lighting 35, Monument 2 Caughlin Pkwy & Caughlin Creek Rd- Gates 1 &2 Total 21 - Signage 4, 31 - Reserve Study 12-5 Year Update with Site Visit Reserve Study Total 31 - Reserve Study 1,6 7,856 8,52 8,253 8,46 8,671 8,888 9,11 9,338 9,571 9,811 1,56 1,37 1,565 1,829 33, ,438 4,549 4, , 2 5 1, , 2 3 4,38 4,38 1,98 4,438 4,549 4,663 1,6 5 1,6 1,81 2,48 1,6 1,81 2,48 Total Expenditures 2.5% 72,718 39,35 32,742 31,46 11, ,812 9,353 12,82 13,225 3, ,113 31,944 24,146 24,74 19,24 Total Current Replacement Cost 734, /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group to 229 6

12 3 Year Expense Forecast - Detailed Reserve Component Paving 12 - Asphalt: State Spec. Slurry 232,35 Sq. Ft. Streets 2 - Asphalt: Ongoing Repairs Streets 3 - Asphalt: Petromat Overlay 279,567 Sq. Ft. Streets Total 1 - Paving 13, 3, , ,849 3,711 3,84 3,899 3,997 4,97 4,199 4,34 4,412 4,522 4,635 4,751 4,87 4,991 5,116 16,621 3,711 3,84 3,899 3,997 12,632 4,199 4,34 4,412 4,522 1,43,511 4,751 4,87 4,991 5,116 97, Concrete 2 - Sidewalks, Curbs & Gutters 64,889 Sq. Ft. Street Side (1%) 36 - Stamped 3,691 Sq. Ft. Streets Total 2 - Concrete 3 - Painting: Exterior 41 - Wrought Iron Gates 46 Lin. Ft. Community Entrance Gate 1 Total 3 - Painting: Exterior 11 - Gate Equipment 1 - Elite Swing Gate Operators 2 Community Entrance Gate Elite Swing Gate Operators 4 Community Entrance Gate DoorKing Telephone Entry System Community Entrance Gate DoorKing Telephone Entry System Community Entrance Gate Emergency Vehicle Access Device Community Entrance Gate1- Click 2 Enter 8 - Loops, Misc. Wiring Harness Community Entrance Gate Loops, Misc. Wiring Harness 7 - Community Entrance Gate Miscellaneous On-going Repairs 2 Community Entrance Gate Systems 1 & New Gate Installation Community Entrance Gate 1 Total 11 - Gate Equipment Lakes / Ponds 99 - Miscellaneous Liner & Pond- Annual Maintenance Total Lakes / Ponds 15,412 17,438 19,729 15,412 17,438 19,729 1,24 1,131 1,248 1,378 1,24 1,131 1,248 1,378 1,956 13,348 22,459 27,364 6,382 6,542 2,969 3,81 4,261 5,191 4,367 5,321 6,86 6,718 7,416 8,186 2,969 21,33 26,826 13,11 6,542 25,955 36,486 8,186 11,1 11,377 11,662 11,953 12,252 12,558 12,872 13,194 13,524 13,862 14,29 14,564 14,928 15,31 15,684 11,1 11,377 11,662 11,953 12,252 12,558 12,872 13,194 13,524 13,862 14,29 14,564 14,928 15,31 15, Lighting 2 - Street Lights 22 Streets[se:1] 26 - Bollard Lights Bitter Creek Court 3 - Common Area 4 Community Entrance Gate 1 4,779 4,899 5,21 5,147 5,276 5,47 5,543 1,44 1, /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group to 244 7

13 3 Year Expense Forecast - Detailed Reserve Component Common Area 3 Community Entrance Gate 2 Total 2 - Lighting 4,779 4,899 5,21 6,551 5,276 5,47 5,543 3,244 1, Signage Monument 2 Caughlin Pkwy & Caughlin Creek Rd- Gates 1 &2 Total 21 - Signage 31 - Reserve Study 12-5 Year Update with Site Visit Reserve Study Total 31 - Reserve Study Total Expenditures 2.5% 7,58 7,58 2,317 2,622 2,966 2,317 2,622 2, ,817 39,393 41,79 49,229 21, ,35 53,152 24,4 24,994 19,632 1,89,886 75,529 19,797 21,67 28, /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group to 244 8

14 Section III Caughlin Creek HOA 3 Year Reserve Funding Plan Cash Flow Method Beginning Balance Inflated 2.5% Reserve Contribution 178 Percentage Increase Special Assessments / Other Interest After 1.25% Ending Balance 1) ,249 54,24 47, , ,743 65,24 85,362 83, , ,712 72,718 39,35 32,742 31,46 11, ,812 9,353 12,82 13,225 3, , 78, 81,12 84,365 87,74 88,968 9,214 91, %.% 4.% 4.% 4.% 4.% 1.4% 1.4% 1.4% 6,674 6,57 6,151 6,783 7,596 4,569 1,51 1,528 2,59 3,45 54,24 47, , ,743 65,24 85,362 83, , ,712 36,416 No 215 reserve contribution per client. BRG is recommending no contribution for 216, and then start collecting reserve contributions in 217 per this plan. Beginning Balance Inflated 2.5% Reserve Contribution 178 Percentage Increase Special Assessments / Other Interest After 1.25% Ending Balance , ,67 34,64 416, ,83 58, , , , , ,113 31,944 24,146 24,74 19,24 124,817 39,393 41,79 49,229 21,524 92,758 94,57 95,374 96,79 98,63 99,436 1,828 12,24 13,671 15, % 1.4% 1.4% 1.4% 1.4% 1.4% 1.4% 1.4% 1.4% 1.4% 3,69 3,822 4,73 5,661 6,679 7,98 7,412 8,267 9,88 1,64 274,67 34,64 416, ,83 58, , , , , ,21 Beginning Balance Inflated 2.5% Reserve Contribution 178 Percentage Increase Special Assessments / Other Interest After 1.25% Ending Balance ,21 831, , ,74 1,93,852 1,21, , , , , ,35 53,152 24,4 24,994 19,632 1,89,886 75,529 19,797 21,67 28,985 16,594 18,86 19, , , , , , ,134 12, % 1.4% 1.4% 1.4% 1.4% 1.4% 1.4% 1.4% 1.4% 1.4% 1,489 1,74 11,753 12,973 14,255 8,917 3,183 4,85 5,356 6,66 831, , ,74 1,93,852 1,21, , , , , , /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group 215 9

15 Fund Balance Section III-a Caughlin Creek HOA 3 Year Reserve Funding Plan Cash Flow Method - Ending Balances $1,4, $1,2, $1,, $8, $6, $4, $2, $ /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group Years

16 Section IV Caughlin Creek HOA 3 Year Reserve Funding Plan Including Fully Funded Balance and % Funded Year Beginning Balance Fully Funded Balance Percent Funded Inflated 2.5% Reserve Contribution Special Assessments & Other Contributions ,249 57, % 72,718 6,674 54, ,24 565, % 39,35 6,57 47, ,956 62, % 32,742 75, 6, , , , % 31,46 78, 6, , , , % 11,219 81,12 7,596 65, ,24 77, % 653,812 84,365 4,569 85, , , % 9,353 87,74 1,51 83, , , % 12,82 88,968 1, , , , % 13,225 9,214 2,59 241, ,712 33, % 3,178 91,477 3,45 36, , ,84 77.% 128,113 92,758 3,69 274, ,67 312, % 31,944 94,57 3,822 34, ,64 368, % 24,146 95,374 4,73 416, , , % 24,74 96,79 5, , ,83 55, % 19,24 98,63 6,679 58, , , % 124,817 99,436 7,98 562, ,265 56, % 39,393 1,828 7, , , , % 41,79 12,24 8, , ,829 69, % 49,229 13,671 9,88 763, , , % 21,524 15,122 1,64 857, ,21 847, % 142,35 16,594 1, , , , % 53,152 18,86 1,74 897, , , % 24,4 19,599 11, , ,74 994, % 24, ,133 12,973 1,93, ,93,852 1,12,7 19.% 19, ,689 14,255 1,21, ,21,164 1,22, % 1,89, ,267 8, , , , % 75, ,867 3, , , , % 19, ,489 4,85 379, , , % 21,67 119,134 5, , ,579 57, % 28,985 12,82 6,66 581,2 Interest Ending Balance /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

17 Percent Funded Section IV-a Caughlin Creek HOA 3 Year Reserve Funding Plan Cash Flow Method - Percent Funded Years /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

18 Section V Caughlin Creek HOA Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Life Remaining Life Estimated Future Replacement Costs Per Year 215 Fully Funded Balance 216 Fully Funded Balance % Per Year Straight Line 216 Line Item Contribution based on Cash Flow Method 1 - Paving 12 - Asphalt: State Spec. Slurry 232,35 Sq. Ft. Streets 2 - Asphalt: Ongoing Repairs Streets 3 - Asphalt: Petromat Overlay 279,567 Sq. Ft. Streets 71, ,118 14,224 71,118 14, % 2, ,563 1,281 1,25 2, % 489, ,533 27, ,932 41, % Sub-total [1 - Paving] 562,86 627,213 43, ,3 418, % 2 - Concrete 2 - Sidewalks, Curbs & Gutters 64,889 Sq. Ft. Street Side (1%) 36 - Stamped 3,691 Sq. Ft. Streets 1, ,642 2,128 8,36 1, % 55, ,26 1,65 47,6 49, % Sub-total [2 - Concrete] 65,747 74,848 3,734 55,366 6, % 3 - Painting: Exterior 41 - Wrought Iron Gates 46 Lin. Ft. Community Entrance Gate % /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

19 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Life Remaining Life Estimated Future Replacement Costs Per Year 215 Fully Funded Balance 216 Fully Funded Balance % Per Year Straight Line 216 Line Item Contribution based on Cash Flow Method 11 - Gate Equipment 1 - Elite Swing Gate Operators 2 Community Entrance Gate Elite Swing Gate Operators 4 Community Entrance Gate DoorKing Telephone Entry System Community Entrance Gate DoorKing Telephone Entry System Community Entrance Gate Emergency Vehicle Access Device Community Entrance Gate1- Click 2 Enter 8 - Loops, Misc. Wiring Harness Community Entrance Gate Loops, Misc. Wiring Harness 7 - Community Entrance Gate Miscellaneous On-going Repairs 2 Community Entrance Gate Systems 1 & New Gate Installation Community Entrance Gate 1 7, , ,3 7, % 14, ,129 1,891 1,8 12, % 3, , ,42 3,895.66% 3, , ,4 3,56.68% 2, 1 6 2, ,25.39% 2, , ,45 2,87.61% 2, , ,1 2,511.62% 4, 4 1 4,1 1,25 3, 4,1 1.74% 15, , ,875 14,66.69% Sub-total [11 - Gate Equipment] 55,8 58,781 5,99 45,785 52, % Lakes / Ponds 99 - Miscellaneous Liner & Pond- Annual Maintenance 2 - Lighting 2 - Street Lights 22 Streets[se:1] 26 - Bollard Lights Bitter Creek Court 3 - Common Area 4 Community Entrance Gate Common Area 3 Community Entrance Gate 2 7, ,856 3,928 3,832 7, % 33, ,722 1,243 19,388 2, % , % 1, 2 5 1, % % Sub-total [2 - Lighting] 35,65 53,16 1,46 2,864 22, % 21 - Signage Monument 2 Caughlin Pkwy & Caughlin Creek Rd- Gates 1 & Reserve Study 12-5 Year Update with Site Visit Reserve Study 4, 2 3 4, ,4 3,69.37% 1,6 5 1,6 32 1, % /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

20 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Life Remaining Life Estimated Future Replacement Costs Per Year 215 Fully Funded Balance 216 Fully Funded Balance % Per Year Straight Line 216 Line Item Contribution based on Cash Flow Method [A] [B] Totals 734,11 828,552 58,867 57, ,75 1.% [EndBal] [EndBal] [A] [B] Percent Funded 88.42% 83.24% /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

21 Section VI Caughlin Creek HOA Component Listing Included Components 1 - Paving 12 - Asphalt: State Spec. Slurry Useful Life 232,35 Sq. Ft. Streets Quantity 232,35 Unit of Measure Square Feet Summary 5 Cost /SqFt $.36 % Included Remaining Life 1.% Total Cost/Study $71,118 Replacement Year 215 Future Cost $71,118 This is to prepare the surface and apply a state specification slurry seal. Considering the approaching need for overlay, client should consult with a paving professional regarding application of the seal coat and whether it is warranted this close to overlay. In 215, the lower streets, units 1-3, exhibit areas of heavy raveling and on-going crack repair. The upper streets, units 4-7, appear newer and in less need of major repair. 215 $71,118 anticipated to seal Quantity amended from 279,567 to 232,35. BRG road dimensions are available on request $26,25 was expended. This picture shows heavy raveling of the paved surfaces /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

22 Component Listing Included Components 1 - Paving 2 - Asphalt: Ongoing Repairs Useful Life Streets Quantity 1 Unit of Measure Lump Sum Summary 1 Cost /LS $2,5 % Included Remaining Life 1.% Total Cost/Study $2,5 Replacement Year 216 Future Cost $2,562 This is for miscellaneous repairs including crackfill, skin patching and minor dig out & fill. Cracks 1/4" or wider should be filled when observed Percent to include reduced from 5 to 2.5% 7/1/215. Also the remaining life has been synced to expend funds with the next seal cycle, then changed to yearly 8/7/15 ad well as cost reduced per contractor/client input to $2,5/year $1, was expended for crack fill $16,2 was expended for crack fill /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

23 Component Listing Included Components 1 - Paving 3 - Asphalt: Petromat Overlay Useful Life 279,567 Sq. Ft. Streets Quantity 279,567 Unit of Measure Square Feet Summary 2 Cost /SqFt $1.75 % Included Remaining Life 1.% Total Cost/Study $489,242 Replacement Year 22 Future Cost $553,533 This is to apply an overlay on top of the existing asphalt surface along with a minimum 1-1/2" of new hot asphalt. Generally this includes edge grinding and utility box extensions. As overlay is approaching, should the association contract the services of a qualified paving professional to develop a paving plan, that plan can then be incorporated into the reserve study. It is possible this work may be able to be phased over two sealing cycles. A major consideration is whether the paved surfaces are a good candidate for overlay (approximately $2. sf) versus the more expensive alternative of removal and replacement (approximately $4.5 sf). Several determining factors are the condition of the paving to be overlayed, adequate space for heavy equipment and maintaining drainage. Although the upper and lower streets differ in condition, this component does not address a possible delay for the upper, better condition streets. This decision should be determined by a paving professional and then reflected in the reserve study Overlay cost increased from $1.6 to $1.75 per client 7/1/ Placed in service /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

24 Component Listing Included Components 2 - Concrete 2 - Sidewalks, Curbs & Gutters Useful Life 64,889 Sq. Ft. Street Side (1%) Quantity 64,889 Unit of Measure Square Feet Summary 5 Cost /SqFt $16. Qty * $/SqFt $1,38,224 % Included Remaining Life 1.% Total Cost/Study $1,382 Replacement Year 216 Future Cost $1,642 This is to repair, replace or grind concrete sidewalks, curbs and gutters to remove abrupt elevation changes and maintain functionality. The concrete useful life exceeds the scope of this study, so this component provides for repair only $1,989 was expended for entry island curb repairs Stamped Useful Life 3,691 Sq. Ft. Streets Quantity 3,691 Unit of Measure Square Feet Summary 4 Cost /SqFt $15. % Included Remaining Life 1.% Total Cost/Study $55,365 Replacement Year 221 Future Cost $64,26 This is to replace the "Bomanite" stamped concrete. Rehab of the concrete should be considered to coincide with paving overlay In 215, the stamped concrete is in fair to poor condition exhibiting cracking, areas of mismatched repairs and lack of color Cost decreased from $2 to $15 per square foot per client 7/1/ The picture shows a repair completed with asphalt in lieu of a stamped concrete patch /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

25 Component Listing Included Components 3 - Painting: Exterior 41 - Wrought Iron Gates Useful Life 46 Lin. Ft. Community Entrance Gate 1 Quantity 46 Unit of Measure Linear Feet Summary 4 Cost /l.f. $15. % Included Remaining Life 1.% Total Cost/Study $69 Replacement Year 223 Future Cost $841 This is to prepare, power wash, sand, scrape, spot prime and paint the wrought iron gates. This component assumes that a lighter gate system will be installed this fiscal year delaying the first painting of the new gates for a minimum of 4 years after installation. In 215, the gates were not operational at the time of the site review. 2-3' x 23' gates Gate Equipment 1 - Elite Swing Gate Operators Useful Life 2 Community Entrance Gate 1 Quantity 2 Unit of Measure Items Summary 8 Cost /Itm $3,6 % Included Remaining Life 1.% Total Cost/Study $7,2 Replacement Year 216 Future Cost $7,38 This is to replace the Elite gate control operators dated 23 and 26 with HySecurity operators Remaining life to 216 from 215 per client 7/1/ Refer to the Tholl Fence proposal dated 4/15/215 for information. The cost indicated is not based on the proposal as no cost breakdown is provided. New equipment will be verified at the next site review or per client provided documentation Elite Swing Gate Operators Useful Life 4 Community Entrance Gate 2 Quantity 4 Unit of Measure Items Summary 8 Cost /Itm $3,6 % Included This is to replace the Viking gate control operators all dated 28. Remaining Life 1.% Total Cost/Study $14,4 Replacement Year 217 Future Cost $15, /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group 215 2

26 Component Listing Included Components 11 - Gate Equipment 6 - DoorKing Telephone Entry System Useful Life Community Entrance Gate 1 Quantity 1 Unit of Measure Items Summary 1 Cost /Itm $3,8 % Included Remaining Life 1.% Total Cost/Study $3,8 Replacement Year 216 Future Cost $3,895 This is to replace the DKS telephone access system with a Dorking model Remaining life from 215 to 216 per client 7/1/ Refer to the Tholl Fence proposal dated 4/15/215 for information. The cost indicated is not based on the proposal as no cost breakdown is provided. New equipment will be verified at the next site review or per client provided documentation DoorKing Telephone Entry System Useful Life Community Entrance Gate 2 Quantity 1 Unit of Measure Items Summary This is to replace the DKS telephone access system. 1 Cost /Itm $3,8 % Included Remaining Life 1.% Total Cost/Study $3,8 Replacement Year 217 Future Cost $3, /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

27 Component Listing Included Components 11 - Gate Equipment Emergency Vehicle Access Device Useful Life Community Entrance Gate1- Click 2 Enter Quantity 1 Unit of Measure Items Summary 1 Cost /Itm $2, % Included This is to replace the emergency vehicle access device. Remaining Life 1.% Total Cost/Study $2, Replacement Year 221 Future Cost $2, Remaining life from 215 to 221 and cost increased from $1, to 2, per client 7/1/ Refer to the Tholl Fence proposal dated 4/15/215 for information. The cost indicated is not based on the proposal as no cost breakdown is provided. New equipment will be verified at the next site review or per client provided documentation Loops, Misc. Wiring Harness Useful Life Community Entrance Gate 1 Quantity 1 Unit of Measure Lump Sum Summary 8 Cost /LS $2,8 % Included Remaining Life 1.% Total Cost/Study $2,8 Replacement Year 216 Future Cost $2,87 This is to have funds for replacing the underground sensor loops with a new loop and vehicle detection system Refer to the Tholl Fence proposal dated 4/15/215 for information. The cost indicated is not based on the proposal as no cost breakdown is provided. New equipment will be verified at the next site review or per client provided accepted proposals /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

28 Component Listing Included Components 11 - Gate Equipment 84 - Loops, Misc. Wiring Harness Useful Life 7 - Community Entrance Gate 2 Quantity 7 Unit of Measure Items Summary 8 Cost /Itm $4 % Included Remaining Life 1.% Total Cost/Study $2,8 Replacement Year 217 Future Cost $2,942 This is for replacing the underground sensor loops with a new loop and vehicle detection system Miscellaneous On-going Repairs Useful Life 2 Community Entrance Gate Systems 1 & 2 Quantity 2 Unit of Measure Lump Sum Summary 4 Cost /LS $2, % Included This is for ongoing miscellaneous vehicle gate equipment repairs. In 215, the magnetic catches were not closing properly Cost increased from $1,5 to $2, per client 7/1/ $85 was expended for repairs 213- $1,242 was expended for repairs $2,712 was expended for unspecified work. Remaining Life 1.% Total Cost/Study $4, Replacement Year 216 Future Cost $4, /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

29 Component Listing Included Components 11 - Gate Equipment 9 - New Gate Installation Useful Life Community Entrance Gate 1 Quantity 1 Unit of Measure Lump Sum Summary This is to install new, lighter gates. 4 Cost /LS $15, % Included Remaining Life 1.% Total Cost/Study $15, Replacement Year 218 Future Cost $16, Although a priority, client has not confirmed replacement of the gates as of the date of the site observation. Final cost has not been clarified and will be dependent upon design, configuration and scope of work. Client input will further define this component Lakes / Ponds 99 - Miscellaneous Useful Life Liner & Pond- Annual Maintenance Quantity 1 Unit of Measure Lump Sum Summary This is for annual maintenance of Caughlin Pond. 1 Cost /LS $7,664 % Included Remaining Life 1.% Total Cost/Study $7,664 Replacement Year 216 Future Cost $7, $7,664 anticipated expenditure. Added as a component of the reserve study 7/1/ /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

30 Component Listing Included Components 2 - Lighting 2 - Street Lights Useful Life 22 Streets Quantity 22 Unit of Measure Items Summary 4 Cost /Itm $1,5 % Included 1.% Remaining Life 12 Treatment [se:1] Total Cost/Study $33, Replacement Year 227 Future Cost $49,722 This is to replace the street lights. Since the core light standard and fixture useful life exceeds the scope of this study, this component is for partial replacement only Deleted per client 7/1/ Bollard Lights Useful Life Bitter Creek Court Quantity 1 Unit of Measure Items Summary 22 Cost /Itm $9 % Included Remaining Life 18 1.% Total Cost/Study $9 Replacement Year 233 Future Cost $1,44 This is to replace the bollard light reusing the existing wiring and conduit /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

31 Component Listing Included Components 2 - Lighting 3 - Common Area Useful Life 4 Community Entrance Gate 1 Quantity 4 Unit of Measure Items Summary This is to replace the landscape lighting. 2 Cost /Itm $25 % Included Remaining Life 1.% Total Cost/Study $1, Replacement Year 22 Future Cost $1, Common Area Useful Life 3 Community Entrance Gate 2 Quantity 3 Unit of Measure Items Summary This is to replace the landscape lighting. 2 Cost /Itm $25 % Included Remaining Life 1.% Total Cost/Study $75 Replacement Year 22 Future Cost $ Signage Monument 2 Caughlin Pkwy & Caughlin Creek Rd- Gates 1 &2 Summary Useful Life 2 Quantity 2 Unit of Measure Items Cost /Itm $2, % Included Remaining Life 1.% Total Cost/Study $4, Replacement Year 218 Future Cost $4,38 3 This is to replace the 4' x 1' monument signs /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

32 Component Listing Included Components 31 - Reserve Study 12-5 Year Update with Site Visit Useful Life Reserve Study Quantity 1 Unit of Measure Lump Sum Summary 5 Cost /LS $1,6 % Included Remaining Life 1.% Total Cost/Study $1,6 Replacement Year 215 Future Cost $1,6 This is to have a professional reserve study prepared for the association as required by NRS. This is for the 5 year complete reserve study which includes a visual observation of the accessible reserve components the association is obligated to maintain /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

33 Section VII Caughlin Creek HOA Component Tabular Listing Included Components Component Current Replacement Cost Useful Life Remaining Life Quantity Cost/ U of M Treatment Location 1 - Paving 12 - Asphalt: State Spec. Slurry $71, ,35 $.31/SqFt Streets 2 - Asphalt: Ongoing Repairs $2, $2,5/LS Streets 3 - Asphalt: Petromat Overlay $489, ,567 $1.75/SqFt Streets 2 - Concrete 2 - Sidewalks, Curbs & Gutters $1, ,889 $16./SqFt (1%) Street Side 36 - Stamped $55, ,691 $15./SqFt Streets 3 - Painting: Exterior 41 - Wrought Iron Gates $ $15./l.f. Community Entrance Gate Gate Equipment 1 - Elite Swing Gate Operators $7, $3,6/Itm Community Entrance Gate Elite Swing Gate Operators $14, $3,6/Itm Community Entrance Gate DoorKing Telephone Entry System 64 - DoorKing Telephone Entry System Emergency Vehicle Access Device $3, $3,8/Itm Community Entrance Gate 1 $3, $3,8/Itm Community Entrance Gate 2 $2, $2,/Itm Community Entrance Gate1- Click 2 Enter 8 - Loops, Misc. Wiring Harness $2, $2,8/LS Community Entrance Gate Loops, Misc. Wiring Harness $2, $4/Itm - Community Entrance Gate Miscellaneous On-going Repairs $4, $2,/LS Community Entrance Gate Systems 1 & New Gate Installation $15, $15,/LS Community Entrance Gate Lakes / Ponds 99 - Miscellaneous $7, $7,664/LS Liner & Pond- Annual Maintenance 2 - Lighting 2 - Street Lights $33, $1,5/Itm [se:1] Streets 26 - Bollard Lights $ $9/Itm Bitter Creek Court 3 - Common Area $1, $25/Itm Community Entrance Gate Common Area $ $25/Itm Community Entrance Gate /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

34 Component Tabular Listing Component Current Replacement Cost Useful Life Remaining Life Quantity Cost/ U of M Treatment Location Included Components 21 - Signage Monument $4, $2,/Itm Caughlin Pkwy & Caughlin Creek Rd- Gates 1 & Reserve Study 12-5 Year Update with Site Visit $1,6 5 1 $1,6/LS Reserve Study /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

35 Section VII-a Caughlin Creek HOA Expenditures by Year - Next 5 Years Reserve Component Life Useful Current Replacement Cost Forecast Inflated 2.5% Paving 12 - Asphalt: State Spec. Slurry 232,35 Sq. Ft. Streets 5 71, Reserve Study 12-5 Year Update with Site Visit Reserve Study 5 1,6 Total 215: 72, Paving 2 - Asphalt: Ongoing Repairs Streets 2 - Concrete 2 - Sidewalks, Curbs & Gutters 64,889 Sq. Ft. Street Side (1%) 11 - Gate Equipment 1 - Elite Swing Gate Operators 2 Community Entrance Gate DoorKing Telephone Entry System Community Entrance Gate Loops, Misc. Wiring Harness Community Entrance Gate Miscellaneous On-going Repairs 2 Community Entrance Gate Systems 1 & Lakes / Ponds 99 - Miscellaneous Liner & Pond- Annual Maintenance Total 11 - Gate Equipment: 17,8 1 2,5 2, ,382 1, ,2 7,38 1 3,8 3, ,8 2,87 4 4, 4,1 18, ,664 7,856 Total 216: 38,346 39, Paving 2 - Asphalt: Ongoing Repairs Streets 11 - Gate Equipment 11 - Elite Swing Gate Operators 4 Community Entrance Gate DoorKing Telephone Entry System Community Entrance Gate Loops, Misc. Wiring Harness 7 - Community Entrance Gate Lakes / Ponds 99 - Miscellaneous Liner & Pond- Annual Maintenance Total 11 - Gate Equipment: 21, 1 2,5 2, ,4 15, ,8 3, ,8 2,942 22,63 1 7,664 8, /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group 215 3

36 Reserve Component 217 Life Useful Caughlin Creek HOA Expenditures by Year- Next 5 Years Current Replacement Cost Forecast Inflated 2.5% Total 217: 31,164 32, Paving 2 - Asphalt: Ongoing Repairs Streets 11 - Gate Equipment 9 - New Gate Installation Community Entrance Gate Lakes / Ponds 99 - Miscellaneous Liner & Pond- Annual Maintenance 21 - Signage Monument 2 Caughlin Pkwy & Caughlin Creek Rd- Gates 1 &2 1 2,5 2, , 16, ,664 8, , 4,38 Total 218: 29,164 31, Paving 2 - Asphalt: Ongoing Repairs Streets Lakes / Ponds 99 - Miscellaneous Liner & Pond- Annual Maintenance 1 2,5 2,76 1 7,664 8,46 Total 219: 1,164 11, /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

37 Section X Caughlin Creek HOA Notes to the Auditor This report is intended to assist the auditor while preparing the audit, review or compilation of Caughlin Creek HOA s (the "Association") financial documents. Browning Reserve Group ("BRG") prepared a reserve study for the Association during the 215 fiscal year. This was done to help determine the Association's reserve contribution for the next fiscal year (216) and future fiscal years. In addition, BRG prepared the proper statutory disclosures for distribution to the Association members. This Reserve Study is a Full Study. A Full Study includes an on-site review upon where the following tasks are performed: development of a reserve component inventory; condition assessment based upon on-site visual observation; life and valuation estimates; fund status; and a funding plan. Please note, in order to complete these study tasks, one or more visits were conducted by BRG to Caughlin Creek HOA. For BRG reserve studies, the year in which the study is being conducted, is the first year of the study. For example, this study is being prepared during 215 and is the Association s first year in the study. This enables BRG to use a starting point which ties to the last audited financial statement, December 31, 214. You will notice in Section III, Reserve Fund Balance Forecast, a Beginning Reserve Balance of $57,249 is being used which ties to the last completed audit or review of the Association s financial statements. BRG then re-builds the first year of the study, in this case 215, and estimates an ending reserve fund balance. Again, see Section III and the 215 ending reserve balance estimate of $54,24. Re-building the first year of the study as mentioned above simply means using the 215 adopted budget for the 215 reserve contribution. Finally, the 215 reserve expenses both actual and projected are estimated. We find by using the above method a more accurate reserve study is possible because the beginning reserve fund balance ties directly to the Association s audited financial statement or, in the absence of an audit or review, the year end balance sheet. There is no need to rely on others for determining mid year reserve balances or estimating current year ending reserve balances. This approach forces all involved, to look at the current year s reserve fund activities so a more accurate ending reserve fund balance can be estimated /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

38 Notes to the Auditor With respect to the reserve component Percent Funded values on the next page(s), here are the calculations: FFB = Year Cost X Year Effective Age / Useful Life % Funded = Year Estimated Ending Reserve Balance / Year FFB Please see Section V - Reserve Fund Balance Forecast. Browning Reserve Group /15/215 12fsv :to.to Version 8/7/215 1:57:25 AM Browning Reserve Group

39 Schedule of Supplementary Information for Auditor Component Method Reserve Component Current Repl. Cost Useful Life Remaining Life 215 Fully Funded Balance 216 Fully Funded Balance 216 Line Item Contribution based on Cash Flow Method 1 - Paving 12 - Asphalt: State Spec. Slurry 232,35 Sq. Ft. Streets 2 - Asphalt: Ongoing Repairs Streets 3 - Asphalt: Petromat Overlay 279,567 Sq. Ft. Streets 2 - Concrete 2 - Sidewalks, Curbs & Gutters 64,889 Sq. Ft. Street Side (1%) 36 - Stamped 3,691 Sq. Ft. Streets 3 - Painting: Exterior 41 - Wrought Iron Gates 46 Lin. Ft. Community Entrance Gate Gate Equipment 1 - Elite Swing Gate Operators 2 Community Entrance Gate Elite Swing Gate Operators 4 Community Entrance Gate DoorKing Telephone Entry System Community Entrance Gate DoorKing Telephone Entry System Community Entrance Gate Emergency Vehicle Access Device Community Entrance Gate1- Click 2 Enter 8 - Loops, Misc. Wiring Harness Community Entrance Gate Loops, Misc. Wiring Harness 7 - Community Entrance Gate Miscellaneous On-going Repairs 2 Community Entrance Gate Systems 1 & New Gate Installation Community Entrance Gate Lakes / Ponds 99 - Miscellaneous Liner & Pond- Annual Maintenance 2 - Lighting 2 - Street Lights 22 Streets[se:1] 2 - Street Lights 22 Streets[se:1] 2 - Street Lights 22 Streets[se:1] 2 - Street Lights 22 Streets[se:1] 2 - Street Lights 22 Streets[se:1] 2 - Street Lights 22 Streets[se:1] 2 - Street Lights 22 Streets[se:1] 2 - Street Lights 22 Streets[se:1] 71, ,118 14,579 2, ,25 2, , ,932 41,179 1, ,36 1,642 55, ,6 49, , ,3 7,38 14, ,8 12,915 3, ,42 3,895 3, ,4 3,56 2, ,25 2, ,45 2,87 2, ,1 2,511 4, 4 1 3, 4,1 15, ,875 14,66 7, ,832 7,856 3, ,31 2,452 3, ,228 2,368 3, ,145 2,283 3, ,63 2,199 3, ,98 2,114 3, ,898 2,3 3, ,815 1,945 3, ,733 1, /15/215 December 31 Version 8/7/215 1:57:25 AM Browning Reserve Group

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: October 09, 2016 To: Joleen Cline, Cline & Associates From: Browning Reserve Group (BRG) Re: Whitehawk Townhomes Association; Update w/ Site Visit Review Attached,

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: February 1, 215 To: Sonja Bachus, Management Alternative, The From: Browning Reserve Group (BRG) Re: ; Update w/o Site Visit Review Attached, please find the reserve

More information

Ashleigh Commons Condominiums Association, Inc.

Ashleigh Commons Condominiums Association, Inc. RESERVE STUDY Full Study Ashleigh Commons Condominiums Association, Inc. Published - January 14, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

R E S E R V E S T U D Y

R E S E R V E S T U D Y SAGUARO CANYON SUBDIVISION HOMEOWNERS ASSOCIATION R E S E R V E S T U D Y Full Study Published - May 27, 2010 B R O W N I N G R E S E R V E G R O U P ~ Emmett, ID 83617 ~ Office (208) 365-0977 Fax (208)

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

Hyde Park Place Owners' Association, Inc.

Hyde Park Place Owners' Association, Inc. RESERVE STUDY Full Study Hyde Park Place Owners' Association, Inc. Published - February 10, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: November 13, 2013 To: Rob Ross, Gateview From: Richard Avelar & Associates (RA&A) Re: Gateview; Update w/ Site Visit Review Attached, please find the reserve study

More information

Bridgewood Manor HOA

Bridgewood Manor HOA Bridgewood Manor HOA Level 1 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 18076 Property Type Condominium Number of Units 40 Fiscal Year End 12/31 Date of Property Inspection

More information

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By Clearbrook HOA Level 1 Reserve Study Report Period 1/1/2010 12/31/2010 Client Reference Number 11775 Property Type Apartment Style Number of Units 21 Fiscal Year End 12/31 Date of Property Inspection 3/23/2010

More information

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08 The Ranches HOA Level II Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10329 Property Type..... Single Family Homes Number of Units.......... 1,750 Fiscal Year End......... December

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

MILL CREEK CONDOMINIUMS RESERVE STUDY

MILL CREEK CONDOMINIUMS RESERVE STUDY MILL CREEK CONDOMINIUMS RESERVE STUDY Fiscal Year 2016 Prepared by: Eric Harker, Assoc. AIA Alliance Project Engineers and Construction Consultants November 6, 2015 Project Number: OR14-017 MILL CREEK

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

Kayscreek Estates HOA

Kayscreek Estates HOA Kayscreek Estates HOA Level I Reserve Study Report Period 1/01/09 12/31/09 Client Reference Number.... 11004 Property Type........ Single Family Homes Number of Units............. 276 Fiscal Year End.........

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Park Avenue 244 Quari St Denver, CO Level II Study with Site Inspection Fiscal Year End Date: 12/31/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community

More information

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08 Central Pointe HOA Level I Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10870 Property Type...... Mid-Rise Number of Units............ 83 Fiscal Year End....... December 31

More information

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012 Parkwood HOA Level 1 Reserve Study Report Period 1/1/2012 12/31/2012 Client Reference Number Property Type Number of Units Fiscal Year End 12784 Townhouse 8 12/31 Date of Property Inspection Prepared By

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

Arizona Nevada Texas Utah New Mexico

Arizona Nevada Texas Utah New Mexico Arizona Nevada Texas Utah New Mexico 9/12/2016 Summit Park HOA Regarding: Fiscal Year beginning 1/1/2017 Level II Capital Replacement Reserve Study We are pleased to submit this Level II Reserve Study

More information

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number:

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number: CAPITAL RESERVE STUDY DRAFT FOR THE Management Company: Sound Real Estate Services, Contact Name: Josh Parsons Date: August 22, 2016 Table of Contents Section Name Section # Executive Summary... 1 Reserve

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND Community Management by: EVANS MILL POND, HOA Evans Mill Road McLean, Virginia 22101 Consultant: 929

More information

National Reserve Study Standards

National Reserve Study Standards RS National Reserve Study Standards General Information about Reserve Studies One of the primary responsibilities of the board of directors of a community association is to protect, maintain, and enhance

More information

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums.

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums. 1825 W. Ray Road, #1135, Chandler, AZ 85244 support@azreservestudy.com Tel: (480) 620-4757 Fax: (888) 842-9319 April 4, 2013 Summit Park Condominiums HOA Regarding: 2012 - Level I Capital Replacement Reserve

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample HOA 2663 S Oakland St Los Angeles, CA Level I Study with Site Inspection Fiscal Year End: 11/30/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 OF THE CITY OF SAN JACINTO December 11, 2003 REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 CITY OF SAN JACINTO Prepared for CITY OF SAN

More information

Reserve Specialist (RS ) Designation

Reserve Specialist (RS ) Designation Reserve Specialist (RS ) Designation NATIONAL RESERVE STUDY STANDARDS General Information About Reserve Studies One of the primary responsibilities of the board of directors of a community association

More information

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association 21289 E. Lords Way Queen Creek, AZ 85142 support@azreservestudy.com Tel: (480) 840-7130 Fax: (888) 842-9319 October 27, 2012 Sample Association Regarding: 2013 - Level I Capital Replacement Reserve Study

More information

THE RETREAT AT RIVER PARK PLACE

THE RETREAT AT RIVER PARK PLACE 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY THE RETREAT AT RIVER PARK PLACE FORT WORTH, TEXAS Prepared for:

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY Arizona Texas Nevada Utah New Mexico CAPITAL RESERVE STUDY Prepared for: Quail Creek HOA Date of Report: 6/7/2018 Capital Reserve Analysts Bringing the future into the present Capital Reserve Analysts,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Licorice Fern II Homeowners Association 16880 SE Licorice Way, Renton, WA 98059 For: Licorice Fern II Homeowners Association c/o Ann Hart, Property Manager Pinnacle 2801 Alaskan

More information

Estates at River Ranch HOA

Estates at River Ranch HOA Full Reserve Study Estates at River Ranch HOA Tucson, Arizona Report #: 29634-0 For Period Beginning: January 1, 2017 Expires: December 31, 2017 Date Prepared: June 15, 2016 Hello, and welcome to your

More information

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA VILLAGE GREEN HOA REPLACEMENT RESERVE REPORT FY 2011 Community Management by: Ravenel Associates, Inc. Chad Hammond, Property Manager 3690 Bohicket

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Heritage Park 3208-52 nd Place NE, Tacoma, WA 98422 For: Heritage Park Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions 5500 Olympic Drive,

More information

CAPITAL RESERVE STUDY. Providence Corner. Upper Providence Twp.

CAPITAL RESERVE STUDY. Providence Corner. Upper Providence Twp. CAPITAL RESERVE STUDY FOR THE Providence Corner Upper Providence Twp. Management Company: The Galman Group Contact Name: Ms. Debra Lynch Date: September 28, 2016 Table of Contents Section Name Section

More information

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO RESERVE FUND STUDY NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com NOVEMBER 2013 1.0 INTRODUCTION...1

More information

Full Reserve Study For Homeowners Association (HOA) At the Starlight Cove Community Located at Fairway Drive Boynton Beach, Florida 33437

Full Reserve Study For Homeowners Association (HOA) At the Starlight Cove Community Located at Fairway Drive Boynton Beach, Florida 33437 Full Reserve Study For Homeowners Association (HOA) At the Starlight Cove Community Located at 12241 Fairway Drive Boynton Beach, Florida 33437 Prepared by Sadat Engineering, Inc. Boynton Beach, Florida

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions

More information

Sample Community Association

Sample Community Association Level 1 Reserve Study Report Period - 1/1/2018 to 12/31/2018 Client Reference Number 10014 Property Type Condominium Number of Units 150 Fiscal Year End 12/31 Type of Study Full Study Date of Site Visit

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Smoky Ridge 19902 E Red Fox Ln Centennial, CO Level I Study with Site Inspection Fiscal Year End Date: 12/31/2017 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY CAPITAL RESERVE STUDY FOR THE HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Number: 12-1066 W:\2012\12-1066\CORR\12-1066v1.doc Date: March 29, 2013 Table of Contents Section Page Executive Summary...

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Soda Creek Condominiums Dillon, Colorado Version 2 Monday, August 19, 2013 6860 S. Yosemite Court, Suite 2000 Centennial, CO 80112 Phone (303) 953-2078 Facsimile (303) 953-2157

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I QUALCHAN HILLS HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 6 AUGUST 2012 CONTENTS 1.0 INTRODUCTION...

More information

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT 2008 NEWTON PARISH NEWTON PARISH REPLACEMENT RESERVE REPORT FY 2008 Community Management by: CAS, Inc Mr. Dan Quartermane 1930 N. Salem Street, Suite 101 Apex, NC 27523 919-367-7711

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM WOODBRIDGE CONDOMINIUM REPLACEMENT RESERVE REPORT FY 2015 Community Management by: CHESAPEAKE BAY MANAGEMENT Ms. Kimberly Marston 100 Volvo Parkway,

More information

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado Reserve Study Project No. 09069 Prepared for 1771 Norwood Lane Fort Collins, Colorado Prepared by Bornengineering 1130 West 124 th Avenue, Suite 100 Westminster, Colorado 80234 January 28, 2010 1130 WEST

More information

Reserve Study. Willow Lake Homeowner's Association, Inc.

Reserve Study. Willow Lake Homeowner's Association, Inc. Reserve Study For Willow Lake Homeowner's Association, Inc. August 03, 2015 Reserve Study Prepared By The Whayland Group,LLC 30613 Sussex Highway Laurel, Delaware 19956 TABLE OF CONTENTS Willow Lake Homeowner's

More information

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST 2016 CONTENTS 1.0 INTRODUCTION...

More information

F U L L R E S E RV E S T U DY R E P O RT

F U L L R E S E RV E S T U DY R E P O RT Office: (888) 927-7865 Fax: (813) 200-8448 Contact@customreserves.com 5470 E Busch Blvd., Unit 171 Tampa, FL 33617 Hawks Point Community Development District F U L L R E S E RV E S T U DY R E P O RT For

More information

Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111

Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111 Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111 Level 3 Reserve Analysis Reserve Study without Property Inspection Report Period 01/01/11 12/31/011 Date of Property Inspection Inspector Report

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112

More information

Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina

Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina Prepared for FY 2016 Report Date: November 27, 2015 Southeast Region 10459 Hunters Creek Court Jacksonville, FL 32256 (904)

More information

The Ranches HOA. Level 2 Reserve Study. Report Period 1/1/ /31/2012. Report prepared on Monday, September 19, 2011

The Ranches HOA. Level 2 Reserve Study. Report Period 1/1/ /31/2012. Report prepared on Monday, September 19, 2011 The Ranches HOA Level 2 Reserve Study Report Period 1/1/2012 12/31/2012 Client Reference Number Property Type Number of Units Fiscal Year End 10329 Single Family Homes 2800 12/31 Date of Property Inspection

More information

LEVEL 2 RESERVE STUDY UPDATE POINTE WOODWORTH HOMEOWNERS ASSOCIATION

LEVEL 2 RESERVE STUDY UPDATE POINTE WOODWORTH HOMEOWNERS ASSOCIATION LEVEL 2 RESERVE STUDY UPDATE POINTE WOODWORTH HOMEOWNERS ASSOCIATION Tacoma, WA January 1, 2014 December 31, 2014 Prepared By: Carson M. Horton, RS Quality Check By: L. Law Broili Date: July 20, 2013 Copyright

More information

SURFSIDE HOMEOWNERS ASSOCIATION RESERVE STUDY LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION 2016

SURFSIDE HOMEOWNERS ASSOCIATION RESERVE STUDY LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION 2016 SURFSIDE HOMEOWNERS ASSOCIATION RESERVE STUDY LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION 2016 www.schwindtco.com 503.227.1165 PAGE 1 of 57 SURFSIDE HOMEOWNERS ASSOCIATION Executive Summary Year of

More information

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC.

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. Woodburn, OR January 1, 2015 December 31, 2015 Project No: OR 11101 0006 5 Prepared By: Carson M. Horton, RS Quality Check By:

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 VILLAS AT PARKWOOD ESTATES VILLAS AT PARKWOOD ESTATES REPLACEMENT RESERVE REPORT FY 2016 Community Management by: Community Management Professionals, LLC Beth Maurer

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cascara at Redmond Ridge NE 112 th Place & Eastridge Drive NE, Redmond, WA 98052 For: Cascara at Redmond Ridge Homeowners Association c/o Luiza Limona Morris Management 325-118

More information

Calusa Point Association, Inc. Miami, Florida File #

Calusa Point Association, Inc. Miami, Florida File # A FULL RESERVE STUDY FOR Miami, Florida File # 22920-06289 FOR PERIOD: January 1, 2014 December 31, 2014 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM LINDSEY 3300 W. LAKE MARY BLVD. SUITE 350 LAKE

More information

Country Club Townhomes

Country Club Townhomes Full Reserve Study Country Club Townhomes Dewey, Arizona Report #: 9621-0 For Period Beginning: January 1, 2016 Expires: December 31, 2016 Date Prepared: March 4, 2016 Hello, and welcome to your Reserve

More information

FIR RIDGE II CONDOMINIUM

FIR RIDGE II CONDOMINIUM FIR RIDGE II CONDOMINIUM BELLINGHAM, WASHINGTON UPDATE WITHOUT SITE VISIT FEBRUARY 2014 FOR USE WITH THE FEBRUARY 2012 RESERVE STUDY PREPARED BY: DENISE DANA, RESERVE SPECIALIST M. ARCH, REGISTERED ARCHITECT

More information

LEVEL 3 RESERVE STUDY UPDATE For IRONWOOD AT TUKWILA HOMEOWNERS ASSOCIATION, INC.

LEVEL 3 RESERVE STUDY UPDATE For IRONWOOD AT TUKWILA HOMEOWNERS ASSOCIATION, INC. LEVEL 3 RESERVE STUDY UPDATE For IRONWOOD AT TUKWILA HOMEOWNERS ASSOCIATION, INC. Woodburn, OR January 1, 2016 December 31, 2016 Project No: OR 11101 0006 U17 Prepared By: Carson M. Horton, RS Quality

More information

FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017

FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017 FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017 This Report contains intellectual property developed by Reserve Advisors, Inc. and cannot be reproduced or distributed

More information

2013 Reserve Study. Sea Havens Homeowners Association, Inc Florida Shores Boulevard Daytona Beach Shores, Florida Report No: 2713 Version 2

2013 Reserve Study. Sea Havens Homeowners Association, Inc Florida Shores Boulevard Daytona Beach Shores, Florida Report No: 2713 Version 2 2013 Reserve Study Sea Havens Homeowners Association, Inc Florida Shores Boulevard Daytona Beach Shores, Florida 32118 Report No: 2713 Version 2 For the Period From: January 1, 2013 To: December 31, 2013

More information

TIMBERLAKE COMMUNITY ASSOCIATION

TIMBERLAKE COMMUNITY ASSOCIATION TIMBERLAKE COMMUNITY ASSOCIATION REPLACEMENT RESERVE REPORT FY 2014 TIMBERLAKE COMMUNITY ASSOCIATION REPLACEMENT RESERVE REPORT FY 2014 Community Management by: Mr. Phil Massa, AMS, PCAM 933 Windsor Oaks

More information

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2 2014 Reserve Study The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee 37862 Report No: 2921 Version 2 For the Period From: January 1, 2014 To: December 31, 2014 TABLE

More information

Your Homeowners Association

Your Homeowners Association 30 Year Report FULL RESERVE STUDY (With On Site Observation) OF: COMMUNITY ASSOCIATION COMMON ELEMENT MAJOR COMPONENTS Completed: Date 00, 0000 Your Homeowners Association Prepared by: Nevada Reserve Studies,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Raft Island Homeowners Association 200 Raft Island Drive Northwest, Gig Harbor, WA 98335 For: Raft Island Homeowners Association c/o Juanita Carbaugh, Property Manager P.O. Box

More information

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES Community Management by: ROCKTOWN REALTY Bernard Hamann 218 Market Street Harrisonburg, VA 22801 40-70-7080

More information

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of:

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of: Pebble Shores Drive Naples, FL 34410 A Service of: 5036 Dr. Phillips Blvd, Suite 207, Orlando FL 32819 www.lcamresources.com October 31, 2018 Pebble Shores Condominium Pebble Shores Drive Naples, FL 34410

More information

SOMERSET VILLAGE DRAFT HOA RESERVE STUDY. Beginning Period: January 1, 2011 Ending: December 31, Prepared By:

SOMERSET VILLAGE DRAFT HOA RESERVE STUDY. Beginning Period: January 1, 2011 Ending: December 31, Prepared By: SOMERSET VILLAGE HOA RESERVE STUDY Beginning Period: January 1, 2011 Ending: December 31, 2011 Prepared By: Report Number: 10-003 Site Inspection Date: September 14, 2010 Report Submittal Date: October

More information

Report Dated November 17, Updates November 26, 2012 Reserve Study for Fiscal Year Prepared By WALLA SERVICES

Report Dated November 17, Updates November 26, 2012 Reserve Study for Fiscal Year Prepared By WALLA SERVICES RESERVE STUDY ANALYSIS COMPONENT CALCULATION UPDATE Bakersfield, California A Planned Master Association Report Dated November 17, 2014 Updates November 26, 2012 Reserve Study for Fiscal Year 2015 Prepared

More information

GARDEN ESTATES MAINTENANCE ASSOCIATION ("CORPORATION")

GARDEN ESTATES MAINTENANCE ASSOCIATION (CORPORATION) info@src-reservestudy.com 951-693-1721 GARDEN ESTATES MAINTENANCE ASSOCIATION ("CORPORATION") Level 3 Reserve Study Update (No Site-Visit) Prepared For Fiscal Year 2016 1/26 Contents 1 Title Page 2 Table

More information

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA SCT RESERVE CONSULTANTS, INC. P.O. BOX 890129 TEMECULA, CA 92589-0129 PHONE (951) 296-3520 FAX (951) 296-5038 E-MAIL mike.g@sctreserve.com March 24, 2015 Job 2000-003-10 L3 St. Tropez Villas I, Incorporated

More information

CAPITAL RESERVE STUDY. Ellicott Meadows Condominium Association I. Ellicott City, Maryland

CAPITAL RESERVE STUDY. Ellicott Meadows Condominium Association I. Ellicott City, Maryland CAPITAL RESERVE STUDY FOR THE Ellicott Meadows Condominium Association I Ellicott City, Maryland Contact Name: Victor Brzozowski Date: October 3, 2017 Table of Contents Section Name Section # Executive

More information

East Town Village Townhomes

East Town Village Townhomes East Town Village Townhomes CAPITAL RESERVE STUDY Beginning Period: January 1 st, 2017 Ending: December 31 st, 2046 Prepared By: Report Number: 16-04 Site Inspection Date: August 27 th, 2016 Report Submittal

More information

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager REPLACEMENT RESERVE REPORT FY 2017 OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 Community Management by: POSTON & COMPANY Melissa Blocker,

More information

Sun Peak Master Association

Sun Peak Master Association Sun Peak Master Association Level 1 Reserve Study Report Period 01/01/2014 12/31/2014 Client Reference Number Property Type Fiscal Year End 17547 Master 12/31 Date of Property Inspection Prepared By Analysis

More information

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA SCT RESERVE CONSULTANTS, INC. P.O. BOX 890129 TEMECULA, CA 92589-0129 PHONE (951) 296-3520 FAX (951) 296-5038 E-MAIL mike.g@sctreserve.com November 23, 2017 Job 2006-127-12 L3 Sunshine Villas Homeowners

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

The Ford Plantation - POA Revised August 17, THE FORD10 EXECUTIVE SUMMARY

The Ford Plantation - POA Revised August 17, THE FORD10 EXECUTIVE SUMMARY Replacement Reserve Analysis - Page A1 EXECUTIVE SUMMARY The Ford Plantation - POA Replacement Reserve Inventory identifies 77 Projected Replacements for funding from Replacement Reserves, with an estimated

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cambridge Court 9512-1 st Avenue Northeast, Seattle, WA 98115 For: Cambridge Court Homeowners Association c/o Tim Kammer, Property Manager Condo Managements, Inc. 1661 Harbor

More information

East Lake Woodlands Community Association, Inc. Olsdmar, Florida File #

East Lake Woodlands Community Association, Inc. Olsdmar, Florida File # A RESERVE STUDY UPDATE FOR East Lake Woodlands Community Association, Inc. Olsdmar, Florida File #22920-04874 FOR PERIOD: January 1, 2018 December 31, 2018 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES Miramar Plaza Homeowners' Association Reserve Study Update w/o Visual Inspection July 15, 2014 Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES 2059 Camden Ave. Suite

More information

City of Sonoma 2015 Pavement Management Program Update (P-TAP 16) Final Report February 25, 2016 TABLE OF CONTENTS

City of Sonoma 2015 Pavement Management Program Update (P-TAP 16) Final Report February 25, 2016 TABLE OF CONTENTS City of Sonoma I. Introduction TABLE OF CONTENTS II. Methodology III. Pavement Condition Index (PCI) / Remaining Service Life (RSL) Report IV. Budget Analysis Reports A. Budget Needs Report Five Year B.

More information

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents

More information

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. Steven's Cove HOA.

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. Steven's Cove HOA. Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

WYLIE, TX. Date of Investigation: February 6, 2018 Investigator: Phillip Nieman, P.E. Reviewed By: David H. Dotson, P.E., R.S.

WYLIE, TX. Date of Investigation: February 6, 2018 Investigator: Phillip Nieman, P.E. Reviewed By: David H. Dotson, P.E., R.S. 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY RIVERCHASE AT WYLIE WYLIE, TX Prepared for: RIVERCHASE AT WYLIE HOMEOWNERS ASSOCIATION

More information

Pinewood, A Condominium Sample Policy Resolution # Reserve Study & Funding

Pinewood, A Condominium Sample Policy Resolution # Reserve Study & Funding Reserve Study & Funding Policy Planning for future repairs and replacements is one of the most critical things a homeowner association should do. A Reserve Study is a long range planning tool that identifies

More information

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT?

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? Tom Larson, PE, RS, PRA Facility Engineering Associates, PC What is a Reserve Study? A budget planning tool which identifies the current status of the

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Jason Kozleski Board President 10790-221 st Lane NE Redmond,

More information