Reserve Analysis Report

Size: px
Start display at page:

Download "Reserve Analysis Report"

Transcription

1 Reserve Analysis Report Sample HOA 2663 S Oakland St Los Angeles, CA Level I Study with Site Inspection Fiscal Year End: 11/30/2016 Phone: Fax: brian@mccafferyreserveconsulting.com

2 Section Sections of This Report 1 Preface Written description of a reserve study and the figures in the report Includes glossary, preparer qualifications, and calculation description 2-7 Executive Summary 2-8 Percent Funded Summarizes key findings of the report. Includes development description and lists the projected balance and percent funded. Summarizes the funding plans Includes category breakdown pie chart Describes percent funded calculation and funding levels Includes current percent funded chart and 30 year percent funded projection chart Year Projections Includes 30 year projection charts for annual expenses and reserve balance projections for each of the 3 funding plans 2-10 Category Significance Includes category percentage column charts for fully funded balance and annual depreciation 2-11 Theoretical 30 Year Funding Plan Lists details of each of the 3 funding plans (current, recommended, and threshold) over the next 30 years Charts of the figures in this table are located in the 30 year projections 2-12 Future Percent Funded Includes table and chart of percent funded for various levels of funding over the next 15 years 3 Component Summary & Component Significance Lists all components included in the study in table form Shows Depreciation and Fully Funded Balance Significance including quick glance graph These figures are the basis for all other calculations in the study 4 Annual Expenses by Component Lists all projected expenses for each component over the next 30 years in table form 5 Component Details Lists details of each individual component Includes notes and pictures of selected components if site inspection was conducted

3 Preface A reserve study is a detailed report that assists common interest developments (CID) in planning for long-term common area repair and replacement expenses. These common areas differ for every development. They can include streets, roofs, recreational facilities and many other items. A reserve study estimates the costs of common area repairs and replacements over a 30 year period. Each component is given a useful life, remaining life, and estimated cost. A reserve study then calculates the funds necessary to cover these expenses by creating funding plans. The Big Picture - What are the significant figures to look at in the report? The Component List What are our reserve components and when will they need maintenance Every reserve study must start with a list of the components. The component summary contains the list of all the components, their useful and remaining lives, and their estimated costs. These numbers are the building blocks for most of the figures in the study. Percent Funded - What is our current financial standing Probably the most important number in a reserve study is percent funded. It s almost like a credit score for an association. It tells them the current strength of their reserve fund. Over 70% = Well Funded Between 30-70% = Fairly Funded Below 30% = Poorly Funded The lower your percent funded the higher the risk of a special assessment. A low percent funded also increases the likelihood of deferred maintenance which can cause declining property values. Funding Plans - How much do we need to save for the future The next important part of the study is the theoretical 30 year funding plans. The study contains 3 funding plans. It projects what the percent funded will be over the next 30 years if the CID follows each of these plans. Current Funding Plan This plan is based on what the association is currently contributing to its reserve fund. This information is supplied by the board or management Recommend Funding Plan This is McCaffery s recommendation, if a CID follows the recommended plan they should end up well funded and near the 100% funded level. 5% Threshold Funding Plan - The threshold funding plan is a 30 year cash flow plan that calculates the minimum amount a CID should contribute so their reserve balance won t fall below 5% funded and cause the need for a special assessment. The percent funded will at some point fall into poorly funded levels but will never drop below 5%. If a CID has a funding plan that is below this threshold plan they should also plan on a future special assessment and/or a deferred maintenance. (Following this plan does carry higher risk of a special assessment if a component fails early or costs more than expected) 1-1

4 Why Should a Reserve Study be performed? Certain states, such as California, require that reserve studies be completed and updated annually and that the board of directors inform owners of the reserve status with their annual budget. In addition, the board of directors of a common interest development (CID) has a legal and fiduciary duty to maintain the community in a good state of repair. Property Values are directly affected by the level of maintenance and upkeep of the common area components. Reserve studies create a maintenance plan, which keeps a development in good condition, therefore increasing property appreciation and value. The amount of funds in the reserve account also greatly affects property values. Reserve studies inform CID s how much they should have in their reserve account, which eliminates costly special assessments. Over time each member of a CID should contribute their fair share to the reserve account so when expenses arise the required funds are available. Reserve Studies help board members fulfill their fiduciary duty and also help avoid litigation against CID board members. Where do Component Repair/Replacement Cost Estimates Come From? The most accurate cost source is actual bids from contractors or to look at contracts from when the repair/replacement was last performed. In most cases bids or contracts are not available so unit costs for similar work done in the same local area are used. In addition, it is helpful to talk to local vendors who have knowledge of the work and can help with a cost estimate. A third source is to use construction cost estimators such as RS Means. Many times the entire quantity of a component will not need to be replaced or repaired all at once. An example of this is concrete sidewalks. All sidewalks should never have to be replaced, but some sections may experience cracking. In this case an allowance can be created for their partial replacement. The cost source number for each component is provided in the component summary and details. An explanation of each follows: 1. Local Historical Cost Cost based on bids for similar work done in same area. 2. McCaffery Estimate Estimate or Allowance made by McCaffery Staff Member. 3. Board/Manager Direction Cost estimate provided by board member or property manager. 4. Bid/Contract Bid came from actual bid or contract. 5. Cost Manual Cost came from estimating manual. 6. Previous Study Cost came from previous reserve study. 1-2

5 Glossary of Terms: Contingency An allowance for miscellaneous components, unpredictable expenses and/or costs that were higher than expected. (5% of total current cost unless directed otherwise) Current Budgeted Reserve Assessment Amount currently being deposited into reserve account. Provided by Property Manager or Board Member. Depreciation This Year Amount that should be saved for component during current year. Provided for each component and summed for all components. If the association is 100% funded this is the amount they should contribute to the reserve fund annually. =(Total Current Cost / Normal Useful Life) Depreciation Percent A components percentage of the total depreciation of all components. =(Component Depreciation/Total Depreciation of all components) Fully Funded Balance The total depreciation over the life of the component. In other words, the amount that should have been saved during the life of the component. Provided for each component and summed for all components =((Useful Life Remaining Life) * Depreciation This Year) Full Funded Balance Percent A component s percentage of the total fully funded balance of all components. =(Component FFB/Total FFB of all Components) Monthly Contribution The amount that should be allocated to each component using the recommended funding plan. =((Component Depreciation/Total Depreciation)*Recommended Monthly Funding) Life Remaining Percent The percentage of life that a component has remaining =(Remaining Live/Useful Life) Normal Useful Life Typical useable life for a component. Percent Funded The percentage of the fully funded balance that the CID has in reserve fund. (Projected Balance/ Fully Funded Balance) Projected Balance Projected balance at fiscal year end with current funding plan. Calculated using current reserve balance, remaining contributions to reserves before year-end, and planned expenses before year-end. Supplied by board or management. Recommended Reserve Contribution Recommended amount that the CID should allocate into reserves to offset future expenses. 1-3

6 Remaining Life Expected remaining useable life of component. (0 year remaining life means the component will be serviced in the upcoming fiscal year) Replacement Year Year that component is projected to be replaced or repaired. Total Cost Total cost to replace or repair component in today s dollars. =(Quantity x Unit Cost) Total Future Cost - Current cost adjusted to future cost taking into account inflation and replacement year. =(Current Cost * (1+ inflation rate)^(replacement Year-Present Year)) Threshold Reserve Contribution Reserve contribution that should be allocated into reserves to keep reserve balance above a minimum amount during the next 30 years. (Minimum amount is 5% funded unless otherwise noted) Under Funded Amount association is short of fully funded balance; also known as a deficit. =(Fully Funded Balance Projected Balance) Unit Cost Cost per Unit. Unit of Measure Unit used to measure component. (Explanations shown below) SF Square Feet SY Square Yard LF Linear Feet Each Per Single Unit Lump Sum - Total cost for component Allowance Allowance for component repair or replacement Contract Cost obtained from actual contract or bid Useful Life Time in years component is expected to last. What Procedures were used for calculation and establishment of reserves? In this study the fully funded reserve balance for a component at a given time was computed using the component method. Using the component method the fully funded reserve balance equals the current cost of replacement or repair multiplied by the number of years the component has been in service divided by the useful life of the component. For example if the cost of a boiler is $10,000, the useful life is 10 years and the remaining life is 3 years. The recommended reserve balance would be: $10,000 x ((10-3)/10) = $7,

7 Preparer Qualifications Brian McCaffery, President and founder of McCaffery Reserve Consulting, earned his Bachelor of Science Degree in Architectural Engineering from the University of Colorado in Boulder. His degree program included coursework in Building Exterior, Lighting, Electrical Systems, Heating Ventilating and Air Conditioning, Concrete and Steel Design, Civil Engineering, Structural Engineering, and Estimating. He has worked in the Building Construction/Architectural Engineering industry for 11 years and has been performing reserve studies for the past 9 years. During his professional career, Brian has worked for multiple companies that perform reserve studies. He has performed over 3,000 reserve studies throughout the state of California and the United States. Brian is a certified Reserve Specialist, designated by the Community Associations Institute (CAI). The Reserve Specialist designation is awarded to experienced, qualified reserve specialists, who through years of specialized experience, can help ensure that your community association prepares its reserve budget as accurately as possible. Brian also has a permit to perform reserve studies in the state of Nevada (Reserve study permit #9). McCaffery understands that most homeowners, board members, and property managers can have a difficult time understanding all the numbers in a reserve study. That is why we make it a priority to make our report easy for anyone to understand. The layout of this report is set up with graphs, explanations and figures to make it easy to follow. If you read though the full report you should have a good understanding of the numbers and calculations. We strive to make sure our studies are second to none in the industry. The important figures are summarized in the executive summary and the supporting graphs and figures give a full explanation of how the findings were derived. Further descriptions are provided in the descriptions section. For more useful information on reserve studies please visit: For a quick video that highlights the main sections please see: Or scan QR code below with a smart phone 1-5

8 One Page Description of how we come up with the Numbers in this Report The numbers in this report start with the components listed in the component summary. 1. Every component is given a useful life, remaining life, and an estimated cost We will use a boiler as an example. This boiler is expected to last 10 years and has been in use for 7 years. The estimated cost is $10,000. Component Useful Life Remaining Life Cost Boiler 10 3 $10, The fully funded balance is calculated Fully Funded Balance = (Useful life-remaining Life)/Useful Life * Cost (10-3)/10 * $10,000 = $7,000 The fully funded balance is then summed for all components and this is the total fully funded balance for the development. 3. Fully Funded Balance is then compared to the actual projected year-end balance that the development has saved for reserves This is called the percent funded. For our example let s say the development had $5,000 saved for their boiler. Their percent funded would be: Percent Funded = Projected Year End Reserve Balance/Fully Funded Balance $5,000/$7,000 = 71% 4. Next expenses are projected for each component for the next 30 years using the useful and remaining lives This information is shown in the annual expenses by component section. Inflation is included in these figures. 5. Using the projected expenses for the next 30 years the funding plans are created Funding plans are created so that the development has enough money to offset their projected expenses for the next 30 years. We try to create funding plans that have a uniform contribution over a 30 year period with a slight increase over time for inflation. 1-6

9 Executive Summary Sample HOA This is a Homeowners Association with 93 Condominium Units. The common area components include: asphalt, pool, and building exterior. A Full Study with an on-site inspection was performed on May 4th, 2016 Number of Units 93 Year Built 1987 Fiscal Year End November 30, % Percent Funded 100% 84.3% Poor Fair Well Reserve Fund Balance November 30, 2016 Fully Funded Reserve Balance $ 938,099 Projected Balance $ 791,058 Under Funded (Deficiency in Reserve Funding) $ 147,041 Deficiency in Reserve Funding Per Unit $ 1, Percent Funded 84.3% Funding Plans Annually Monthly Per Unit Monthly Depreciation of Components in 2016 $ 77,300 $ 6,442 $ Budgeted Reserve Contribution 2016 $ 67,200 $ 5,600 $ % Threshold Reserve Contribution for 2017 $ 62,400 $ 5,200 $ Recommended Reserve Contribution for 2017 $ 85,800 $ 7,150 $ Funding Plans $100,000 $90,000 $80,000 $70,000 $60,000 $50,000 $40,000 $30,000 $20,000 $10,000 $- $77,300 Depreciation of Components in 2016 $67,200 Budgeted Reserve Contribution 2016 $62,400 5% Threshold Reserve Contribution for 2017 $85,800 Recommended Reserve Contribution for

10 Percent Funded Percent Funded is probably the most important number in a reserve study Your current percent funded is: Year End Balance $ 791,058 = 84% Fully Funded Balance $ 938,099 Above 70% = Well Funded Between 30% and 70% = Fairly Funded Below 30% = Poorly Funded The higher your percent funded, the lower the risk of special assessments and deferred maintenance. Current Percent Funded $1,000,000 $800,000 $600,000 $400,000 $200,000 $- Well Funded > 70% Fairly Funded 30% - 70% Poorly Funded < 30% 100% Funded Actual $791,058 If you follow one of the 3 funding plans in this reserve study this is what your percent funded may look like over the next 30 years. Anytime the Current line drops below 0% a special assessment is likely. Annually Monthly Per Unit Monthly Current Reserve Contribution 2015 $ 67,200 $ 5,600 $ % Threshold Reserve Contribution for 2017 $ 62,400 $ 5,200 $ Recommended Reserve Contribution for 2017 $ 85,800 $ 7,150 $ % Percent Funded 30 Year Projection Belwo 30% Poor 30-70% Fair Above 70% Well Current Recommended Threshold 100% 80% 60% 40% 20% 0% 2-8

11 30 Year Projections Reserve expenses will vary from year to year. A reserve study predicts these expenses and offsets them by creating a uniform funding plan that increases slightly over time to keep up with inflation. $600,000 Projected Annual Expenses $500,000 $400,000 $300,000 $200,000 $100,000 $- The black 100% funded line shows the ideal balance over the next 30 years. It increases over time due to inflation and depreciation of your components. The 100% funded line will drop after years with large expenses. The recommend funding plan will keep you well funded. The threshold plan will approach $0 dollars, following this plan has a higher risk of special assessments or deferred maintenance. $2,500,000 $2,000,000 $1,500, Year Reserve Balance Projection 100% Fully Funded Current Recommended Threshold $1,000,000 $500,000 $

12 Category Significance This chart breaks down the total fully funded balance for each category Roofing Fully Funded Balance $ 497,166 = 53% Total Fully Funded Balance $ 938,099 Fully Funded Balance 60% 53% 50% 40% 30% 20% 10% 8% 12% 2% 11% 3% 5% 1% 5% 0% This chart breaks down the total annual depreciation for each category Roofing Annual Depreciation $ 20,882 = 27% Total Annual Depreciation $ 77,300 This chart may differ from the chart above because it does not account for remaining life Depreciation This Year 30% 27% 25% 23% 20% 15% 11% 12% 10% 10% 5% 3% 5% 3% 5% 0%

13 Theoretical 30 Year Funding Plans Before Tax Interest Rate 1.5% Sample HOA Annual Inflation Rate 3.0% Above 70% = Well Funded Between 30% and 70% = Fairly Funded Below 30% = Poorly Funded Annual Funding Increase 3.0% (Low Risk of Special Assessment) (Higher Risk of Special Assessment) Year Annual Fully Funded Current Funding Plan Recommended Funding Plan 5% Threshold Funding Plan End Expenses Balance Contribution Balance % Funded Contribution Balance % Funded Contribution Balance % Funded 2016 $ - $ 938,099 $ 67,200 $ 791,058 84% $ - $ 791,058 84% $ - $ 791,058 84% 2017 $ 23,360 $ 1,020,597 $ 69,216 $ 848,780 83% $ 85,800 $ 865,364 85% $ 62,400 $ 841,964 82% 2018 $ 84,939 $ 1,041,361 $ 71,292 $ 847,865 81% $ 88,374 $ 881,779 85% $ 64,272 $ 833,926 80% 2019 $ 8,355 $ 1,148,034 $ 73,431 $ 925,660 81% $ 91,025 $ 977,677 85% $ 66,200 $ 904,281 79% 2020 $ 77,256 $ 1,185,925 $ 75,634 $ 937,923 79% $ 93,756 $ 1,008,842 85% $ 68,186 $ 908,775 77% 2021 $ 164,279 $ 1,133,447 $ 77,903 $ 865,616 76% $ 96,569 $ 956,264 84% $ 70,232 $ 828,360 73% 2022 $ 170,529 $ 1,075,323 $ 80,240 $ 788,311 73% $ 99,466 $ 899,545 84% $ 72,339 $ 742,594 69% 2023 $ 192,332 $ 994,645 $ 82,648 $ 690,451 69% $ 102,450 $ 823,155 83% $ 74,509 $ 635,910 64% 2024 $ 21,984 $ 1,098,630 $ 85,127 $ 763,951 70% $ 105,523 $ 919,042 84% $ 76,744 $ 700,209 64% 2025 $ 491,456 $ 700,938 $ 87,681 $ 371,635 53% $ 108,689 $ 550,060 78% $ 79,046 $ 298,302 43% 2026 $ 32,228 $ 790,996 $ 90,311 $ 435,293 55% $ 111,950 $ 638,033 81% $ 81,418 $ 351,967 44% 2027 $ 411,776 $ 476,392 $ 93,021 $ 123,067 26% $ 115,308 $ 351,135 74% $ 83,860 $ 29,331 6% 2028 $ 81,372 $ 512,891 $ 95,811 $ 139,352 27% $ 118,767 $ 393,797 77% $ 86,376 $ 34,775 7% 2029 $ 67,774 $ 568,498 $ 98,685 $ 172,354 30% $ 122,330 $ 454,261 80% $ 88,967 $ 56,490 10% 2030 $ 54,923 $ 643,077 $ 101,646 $ 221,662 34% $ 126,000 $ 532,152 83% $ 91,637 $ 94,051 15% 2031 $ - $ 782,800 $ 104,695 $ 329,682 42% $ 129,780 $ 669,915 86% $ 94,386 $ 189,847 24% 2032 $ 115,601 $ 805,305 $ 107,836 $ 326,863 41% $ 133,674 $ 698,036 87% $ 97,217 $ 174,311 22% 2033 $ 241,244 $ 696,324 $ 111,071 $ 201,593 29% $ 137,684 $ 604,947 87% $ 100,134 $ 35,816 5% 2034 $ 13,016 $ 834,735 $ 114,404 $ 306,005 37% $ 141,814 $ 742,819 89% $ 103,138 $ 126,475 15% 2035 $ 61,628 $ 928,673 $ 117,836 $ 366,802 39% $ 146,069 $ 838,402 90% $ 106,232 $ 172,976 19% 2036 $ 17,149 $ 1,077,598 $ 121,371 $ 476,526 44% $ 150,451 $ 984,279 91% $ 109,419 $ 267,840 25% 2037 $ 72,533 $ 1,175,282 $ 125,012 $ 536,152 46% $ 154,964 $ 1,081,475 92% $ 112,701 $ 312,025 27% 2038 $ 131,458 $ 1,216,484 $ 128,762 $ 541,499 45% $ 159,613 $ 1,125,852 93% $ 116,082 $ 301,330 25% 2039 $ 48,621 $ 1,352,953 $ 132,625 $ 633,625 47% $ 164,402 $ 1,258,521 93% $ 119,565 $ 376,794 28% 2040 $ 78,943 $ 1,465,299 $ 136,604 $ 700,790 48% $ 169,334 $ 1,367,789 93% $ 123,152 $ 426,654 29% 2041 $ 80,621 $ 1,583,916 $ 140,702 $ 771,383 49% $ 174,414 $ 1,482,099 94% $ 126,846 $ 479,280 30% 2042 $ 64,907 $ 1,727,941 $ 144,923 $ 862,969 50% $ 179,646 $ 1,619,069 94% $ 130,652 $ 552,214 32% 2043 $ 266,069 $ 1,663,730 $ 149,271 $ 759,115 46% $ 185,036 $ 1,562,321 94% $ 134,571 $ 428,999 26% 2044 $ 68,804 $ 1,816,087 $ 153,749 $ 855,446 47% $ 190,587 $ 1,707,538 94% $ 138,608 $ 505,238 28% 2045 $ 69,690 $ 1,977,362 $ 158,361 $ 956,949 48% $ 196,304 $ 1,859,765 94% $ 142,767 $ 585,893 30% 2046 $ 319,315 $ 1,878,972 $ 163,112 $ 815,100 43% $ 202,193 $ 1,770,540 94% $ 147,050 $ 422,416 22% Note: All future projections are theoretical. The estimated lives and costs of components will likely change over time depending on factors such as inflation rates and levels of maintenance. Reserve analysis should be performed annually to account for these factors

14 Future Percent Funded This table and chart shows where your percent funded will be over the next 15 years starting with different levels of funding. Keep in mind all figures assume a 3% annual increase in funding to keep up with inflation. Above 70% = Well Funded Between 30% and 70% = Fairly Funded Below 30% = Poorly Funded (Low Risk of Special Assessment) (Higher Risk of Special Assessment) Reserve Funding Plan Contribution Percent Funded % Recommended $ 94,380 84% 86% 86% 88% 88% 89% 89% 90% 91% 92% 94% 98% 102% 102% 101% Recommended $ 85,800 84% 85% 85% 85% 85% 84% 84% 83% 84% 78% 81% 74% 77% 80% 83% 90% Recommended $ 77,220 84% 84% 83% 83% 82% 80% 78% 76% 76% 65% 67% 49% 51% 54% 58% 80% Recommended $ 68,640 84% 83% 81% 80% 79% 76% 73% 69% 69% 52% 54% 24% 25% 29% 33% 70% Recommended $ 60,060 84% 82% 80% 78% 76% 72% 68% 62% 62% 39% 41% -1% 0% 3% 8% 60% Recommended $ 51,480 84% 81% 78% 76% 73% 68% 62% 55% 54% 26% 28% -25% -26% -22% -16% 120% 100% 80% 60% 40% 20% 0% % -40% $94,380 $85,800 $77,220 $68,640 $60,060 $51,480 Note: All future projections are theoretical. The estimated lives and costs of components will likely change over time depending on factors such as inflation rates and levels of maintenance. Reserve analysis should be performed annually to account for these factors

15 11/30/2016 Component Summary Sample HOA Category Approx. Unit of Useful Remaining Unit Total Cost Component Quantity Measure Life Life Cost Cost Source Roofing Tile Underlayment & Repairs SF 35 8 $ 5.00 $ 350,000 1 Tile Underlayment & Repairs SF $ 5.00 $ 300,000 1 Roof Repairs/Flashings/Vents 1 Allowance $ 25,000 $ 25,000 1 Gutters & Downspouts 2300 LF 25 5 $ 7.00 $ 16,100 1 $ 691,100 Painting Stucco 93 Each 10 6 $ 750 $ 69,750 1 Wood Trim/Garages 93 Each 5 1 $ 325 $ 30,225 1 Wood Trim Repairs 1 Allowance 5 1 $ 15,000 $ 15,000 1 Metal Pole Lights 44 Each 4 0 $ $ 5,060 1 Stucco Walls Exterior SF 10 6 $ 0.60 $ 8,400 1 $ 128,435 Asphalt Slurry Seal & Repair SF 4 0 $ 0.17 $ 11,900 1 Overlay & Replace SF 25 4 $ 1.70 $ 119,000 1 Concrete Repairs 1 Allowance 10 5 $ 6,000 $ 6,000 1 $ 136,900 Fencing/Rails Vinyl Patio Fencing 360 LF $ $ 14,400 1 Wood Patio Fencing 90 LF 20 1 $ $ 2,340 1 Wood Patio Fencing 30 LF $ $ Metal Pool Fencing 400 LF 25 6 $ $ 17,600 1 Wall Repairs 1 Allowance 10 5 $ 5,000 $ 5,000 1 $ 40,120 Pool & Spa Area Pool Resurface/Tile 1 Each 12 1 $ 15,000 $ 15,000 1 Pool Heater 1 Each 10 9 $ 4,000 $ 4,000 1 Pool Filter 1 Each 10 1 $ 1,200 $ 1,200 1 Pool Pump/Motor 2 Each 7 1 $ 1,000 $ 2,000 1 Spa Resurface/Tile 1 Each 8 7 $ 5,000 $ 5,000 1 Spa Heater 1 Each 10 8 $ 3,500 $ 3,500 1 Spa Filter 1 Each 10 1 $ 1,200 $ 1,200 1 Spa Pump/Motor 2 Each 7 6 $ 1,200 $ 2,400 1 Pool Wood Trellis Replace 1500 SF 30 5 $ $ 21,000 1 Pool Wood Trellis Paint 1500 SF 6 3 $ 2.00 $ 3,000 1 Lounge Chairs 14 Each 7 1 $ 450 $ 6,300 1 Table & Chair Sets 3 Each 7 1 $ 1,400 $ 4,200 1 Deck Caulk 1 Allowance 4 0 $ 5,000 $ 5,000 1 Restroom & Shower Remodel 1 Allowance 20 3 $ 20,000 $ 20,000 1 Water Heater 1 Each 10 0 $ 1,400 $ 1,400 1 Pool Deck Replacement 4400 SF 35 5 $ 8.00 $ 35,200 1 $ 130,400 Landscaping Irrigation System Upgrade 1 Allowance 15 3 $ 15,000 $ 15,000 1 Landscape Replacements 1 Allowance 10 3 $ 15,000 $ 15,000 1 Tree Remove/Replace 1 Allowance 3 1 $ 5,000 $ 5,000 1 Tree Trimming Included in Operating Budget 3 $ 35,000 Lighting Pole Lights 44 Each 25 5 $ 1,450 $ 63,800 1 $ 63,800 Miscellaneous Mailboxes 93 Each $ 120 $ 11,160 1 Termite Treatment 3 Buildings 3 3 $ 5,900 $ 17,700 1 Utility Doors & Hardware 35 Each 5 2 $ 225 $ 7,875 1 $ 36,735 Contingency 5% 1 TOTALS $ 1,262,490 Notes: Any other items not listed are included in operating budget

16 11/30/2016 Component Significance Category Component Roofing Tile Underlayment & Repairs Tile Underlayment & Repairs Roof Repairs/Flashings/Vents Gutters & Downspouts Painting Stucco Wood Trim/Garages Wood Trim Repairs Metal Pole Lights Stucco Walls Exterior Asphalt Slurry Seal & Repair Overlay & Replace Concrete Repairs Fencing/Rails Vinyl Patio Fencing Wood Patio Fencing Wood Patio Fencing Metal Pool Fencing Wall Repairs Pool & Spa Area Pool Resurface/Tile Pool Heater Pool Filter Pool Pump/Motor Spa Resurface/Tile Spa Heater Spa Filter Spa Pump/Motor Pool Wood Trellis Replace Pool Wood Trellis Paint Lounge Chairs Table & Chair Sets Deck Caulk Restroom & Shower Remodel Water Heater Pool Deck Replacement Landscaping Irrigation System Upgrade Landscape Replacements Tree Remove/Replace Tree Trimming Lighting Pole Lights Miscellaneous Mailboxes Termite Treatment Utility Doors & Hardware Contingency 5% Fully Funded Balance Depreciation This Year Monthly $ Amount % Quick Glance Graph $ Amount % Quick Glance Graph Contribution $ 270, % $ 10, % $ $ 214, % $ 8, % $ $ % $ 1, % $ $ 12, % $ % $ $ 497, % $ 20, % $ 1, $ 27, % $ 6, % $ $ 24, % $ 6, % $ $ 12, % $ 3, % $ $ 5, % $ 1, % $ $ 3, % $ % $ $ 72, % $ 18, % $ 1, $ 11, % $ 2, % $ $ 99, % $ 4, % $ $ 3, % $ % $ $ 114, % $ 8, % $ $ 2, % $ % $ $ 2, % $ % $ $ % $ % $ 3.61 $ 13, % $ % $ $ 2, % $ % $ $ 21, % $ 1, % $ $ 13, % $ 1, % $ $ % $ % $ $ 1, % $ % $ $ 1, % $ % $ $ % $ % $ $ % $ % $ $ 1, % $ % $ $ % $ % $ $ 17, % $ % $ $ 1, % $ % $ $ 5, % $ % $ $ 3, % $ % $ $ 5, % $ 1, % $ $ 17, % $ 1, % $ $ 1, % $ % $ $ 30, % $ 1, % $ $ 101, % $ 9, % $ $ 12, % $ 1, % $ $ 10, % $ 1, % $ $ 3, % $ 1, % $ % $ 25, % $ 4, % $ $ 51, % $ 2, % $ $ 51, % $ 2, % $ $ 5, % $ % $ $ % $ 5, % $ $ 4, % $ 1, % $ $ 9, % $ 8, % $ $ 44, % $ 3, % $ $ 938, % 100% $ 77, % 100% $ 7,

17 Roofing Annual Expenses by Component Tile Underlayment & Repairs $ - $ - $ - $ - $ - $ - $ - $ - $ 443,370 $ - Tile Underlayment & Repairs $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Roof Repairs/Flashings/Vents $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Gutters & Downspouts $ - $ - $ - $ - $ - $ 18,664 $ - $ - $ - $ - Painting Stucco $ - $ - $ - $ - $ - $ - $ 83,285 $ - $ - $ - Wood Trim/Garages $ - $ 31,132 $ - $ - $ - $ - $ 36,090 $ - $ - $ - Wood Trim Repairs $ - $ 15,450 $ - $ - $ - $ - $ 17,911 $ - $ - $ - Metal Pole Lights $ 5,060 $ - $ - $ - $ 5,695 $ - $ - $ - $ 6,410 $ - Stucco Walls Exterior $ - $ - $ - $ - $ - $ - $ 10,030 $ - $ - $ - Asphalt Slurry Seal & Repair $ 11,900 $ - $ - $ - $ 13,394 $ - $ - $ - $ 15,075 $ - Overlay & Replace $ - $ - $ - $ - $ 133,936 $ - $ - $ - $ - $ - Concrete Repairs $ - $ - $ - $ - $ - $ 6,956 $ - $ - $ - $ - Fencing/Rails Vinyl Patio Fencing $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Wood Patio Fencing $ - $ 2,410 $ - $ - $ - $ - $ - $ - $ - $ - Wood Patio Fencing $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Metal Pool Fencing $ - $ - $ - $ - $ - $ - $ 21,015 $ - $ - $ - Wall Repairs $ - $ - $ - $ - $ - $ 5,796 $ - $ - $ - $

18 Annual Expenses by Component Pool & Spa Area Pool Resurface/Tile $ - $ 15,450 $ - $ - $ - $ - $ - $ - $ - $ - Pool Heater $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 5,219 Pool Filter $ - $ 1,236 $ - $ - $ - $ - $ - $ - $ - $ - Pool Pump/Motor $ - $ 2,060 $ - $ - $ - $ - $ - $ - $ 2,534 $ - Spa Resurface/Tile $ - $ - $ - $ - $ - $ - $ - $ 6,149 $ - $ - Spa Heater $ - $ - $ - $ - $ - $ - $ - $ - $ 4,434 $ - Spa Filter $ - $ 1,236 $ - $ - $ - $ - $ - $ - $ - $ - Spa Pump/Motor $ - $ - $ - $ - $ - $ - $ 2,866 $ - $ - $ - Pool Wood Trellis Replace $ - $ - $ - $ - $ - $ 24,345 $ - $ - $ - $ - Pool Wood Trellis Paint $ - $ - $ - $ 3,278 $ - $ - $ - $ - $ - $ 3,914 Lounge Chairs $ - $ 6,489 $ - $ - $ - $ - $ - $ - $ 7,981 $ - Table & Chair Sets $ - $ 4,326 $ - $ - $ - $ - $ - $ - $ 5,320 $ - Deck Caulk $ 5,000 $ - $ - $ - $ 5,628 $ - $ - $ - $ 6,334 $ - Restroom & Shower Remodel $ - $ - $ - $ 21,855 $ - $ - $ - $ - $ - $ - Water Heater $ 1,400 $ - $ - $ - $ - $ - $ - $ - $ - $ - Pool Deck Replacement $ - $ - $ - $ - $ - $ 40,806 $ - $ - $ - $ - Landscaping Irrigation System Upgrade $ - $ - $ - $ 16,391 $ - $ - $ - $ - $ - $ - Landscape Replacements $ - $ - $ - $ 16,391 $ - $ - $ - $ - $ - $ - Tree Remove/Replace $ - $ 5,150 $ - $ - $ 5,628 $ - $ - $ 6,149 $ - $ - Tree Trimming $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Lighting Pole Lights $ - $ - $ - $ - $ - $ 73,962 $ - $ - $ - $ - Miscellaneous Mailboxes $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Termite Treatment $ - $ - $ - $ 19,341 $ - $ - $ 21,135 $ - $ - $ 23,094 Utility Doors & Hardware $ - $ - $ 8,355 $ - $ - $ - $ - $ 9,685 $ - $ - Totals $ - $ 23,360 $ 84,939 $ 8,355 $ 77,256 $ 164,279 $ 170,529 $ 192,332 $ 21,984 $ 491,456 $ 32,

19 Roofing Tile Underlayment & Repair Tile Underlayment & Repair Roof Repairs/Flashings/Ven $ - $ - $ - $ - $ - $ 38,949 $ - $ - $ - $ - $ - Gutters & Downspouts Annual Expenses by Component $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 403,175 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Painting Stucco Wood Trim/Garages Wood Trim Repairs Metal Pole Lights Stucco Walls Exterior $ - $ - $ - $ - $ - $ - $ 111,928 $ - $ - $ - $ - $ - $ 41,838 $ - $ - $ - $ - $ 48,502 $ - $ - $ - $ - $ - $ 20,764 $ - $ - $ - $ - $ 24,071 $ - $ - $ - $ - $ - $ - $ 7,214 $ - $ - $ - $ 8,120 $ - $ - $ - $ 9,139 $ - $ - $ - $ - $ - $ - $ 13,480 $ - $ - $ - $ - Asphalt Slurry Seal & Repair Overlay & Replace Concrete Repairs $ - $ - $ 16,967 $ - $ - $ - $ 19,096 $ - $ - $ - $ 21,493 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 9,348 $ - $ - $ - $ - $ - Fencing/Rails Vinyl Patio Fencing Wood Patio Fencing Wood Patio Fencing Metal Pool Fencing Wall Repairs $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 26,008 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1,368 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7,790 $ - $ - $ - $ - $

20 Annual Expenses by Component Pool & Spa Area Pool Resurface/Tile Pool Heater Pool Filter Pool Pump/Motor Spa Resurface/Tile Spa Heater Spa Filter Spa Pump/Motor Pool Wood Trellis Replace Pool Wood Trellis Paint Lounge Chairs Table & Chair Sets Deck Caulk Restroom & Shower Remod $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water Heater Pool Deck Replacement $ - $ - $ - $ 22,028 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7,014 $ - $ - $ 1,661 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3,116 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7,790 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 5,959 $ - $ - $ - $ 1,661 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3,524 $ - $ - $ - $ - $ - $ - $ 4,335 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4,674 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 9,815 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 6,543 $ - $ - $ - $ - $ - $ - $ - $ 7,129 $ - $ - $ - $ 8,024 $ - $ - $ - $ 9,031 $ 1,881 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2,529 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Landscaping Irrigation System Upgrade Landscape Replacements Tree Remove/Replace Tree Trimming $ - $ - $ - $ - $ - $ - $ - $ - $ 25,536 $ - $ - $ - $ - $ - $ 22,028 $ - $ - $ - $ - $ - $ - $ - $ 6,720 $ - $ - $ 7,343 $ - $ - $ 8,024 $ - $ - $ 8,768 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Lighting Pole Lights $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Miscellaneous Mailboxes Termite Treatment Utility Doors & Hardware $ - $ 15,448 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 25,236 $ - $ - $ 27,576 $ - $ - $ 30,133 $ - $ - $ - $ - $ 11,228 $ - $ - $ - $ - $ 13,016 $ - $ - $ - Totals $ 411,776 $ 81,372 $ 67,774 $ 54,923 $ - $ 115,601 $ 241,244 $ 13,016 $ 61,628 $ 17,149 $ 72,

21 Roofing Tile Underlayment & Repair Tile Underlayment & Repair Roof Repairs/Flashings/Ven $ - $ - $ - $ - $ - $ - $ - $ - $ - Gutters & Downspouts Annual Expenses by Component $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Painting Stucco Wood Trim/Garages Wood Trim Repairs Metal Pole Lights Stucco Walls Exterior $ - $ - $ - $ - $ - $ 150,422 $ - $ - $ - $ 56,227 $ - $ - $ - $ - $ 65,183 $ - $ - $ - $ 27,904 $ - $ - $ - $ - $ 32,349 $ - $ - $ - $ - $ - $ - $ 10,286 $ - $ - $ - $ 11,577 $ - $ - $ - $ - $ - $ - $ 18,115 $ - $ - $ - Asphalt Slurry Seal & Repair Overlay & Replace Concrete Repairs $ - $ - $ - $ 24,190 $ - $ - $ - $ 27,226 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 280,431 $ - $ - $ - $ - $ 12,563 $ - $ - $ - $ - Fencing/Rails Vinyl Patio Fencing Wood Patio Fencing Wood Patio Fencing Metal Pool Fencing Wall Repairs $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4,353 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 10,469 $ - $ - $ - $

22 Annual Expenses by Component Pool & Spa Area Pool Resurface/Tile Pool Heater Pool Filter Pool Pump/Motor Spa Resurface/Tile Spa Heater Spa Filter Spa Pump/Motor Pool Wood Trellis Replace Pool Wood Trellis Paint Lounge Chairs Table & Chair Sets Deck Caulk Restroom & Shower Remod $ - $ - $ 39,472 $ - $ - $ - $ - $ - $ - Water Heater Pool Deck Replacement $ - $ - $ - $ - $ 31,407 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 9,426 $ 2,232 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3,832 $ - $ - $ - $ - $ - $ - $ 4,713 $ - $ - $ 9,868 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 8,008 $ - $ 2,232 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 5,331 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 5,581 $ - $ - $ - $ - $ - $ 6,664 $ - $ - $ - $ 12,071 $ - $ - $ - $ - $ - $ - $ 14,846 $ - $ 8,048 $ - $ - $ - $ - $ - $ - $ 9,898 $ - $ - $ - $ 10,164 $ - $ - $ - $ 11,440 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Landscaping Irrigation System Upgrade Landscape Replacements Tree Remove/Replace Tree Trimming $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 29,604 $ - $ - $ - $ - $ - $ - $ - $ 9,581 $ - $ - $ 10,469 $ - $ - $ 11,440 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Lighting Pole Lights $ - $ - $ - $ - $ - $ - $ - $ - $ - Miscellaneous Mailboxes Termite Treatment Utility Doors & Hardware $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 32,927 $ - $ - $ 35,980 $ - $ - $ 39,317 $ - $ - $ - $ 15,089 $ - $ - $ - $ - $ 17,493 $ - $ - Totals $ 131,458 $ 48,621 $ 78,943 $ 80,621 $ 64,907 $ 266,069 $ 68,804 $ 69,690 $ 319,

23 Component Details Roofing Tile Underlayment & Repairs Approximate Component Quantity Estimated Current Unit Cost $ 5.00 Unit of Measure - SF Estimated Total Current Cost $ 350,000 Normal Useful Life (Years) - 35 Estimated Total Future Cost $ 443,370 Estimated Remaining Useful Life (Years) - 8 Fully Funded Balance $ 270,000 Estimated Replacement Year Depreciation This Year $ 10,000 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 28.78% Life Remainging Percent - 23% 610 Roofing Tile Underlayment & Repairs Approximate Component Quantity Estimated Current Unit Cost $ 5.00 Unit of Measure - SF Estimated Total Current Cost $ 300,000 Normal Useful Life (Years) - 35 Estimated Total Future Cost $ 403,175 Estimated Remaining Useful Life (Years) - 10 Fully Funded Balance $ 214,286 Estimated Replacement Year Depreciation This Year $ 8,571 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 22.84% Life Remainging Percent - 29% Roof repairs were made in We have budgeted to complete this every 15 years going forward

24 Roofing Roof Repairs/Flashings/Vents Approximate Component Quantity - 1 Estimated Current Unit Cost $ 25, Unit of Measure - Allowance Estimated Total Current Cost $ 25,000 Normal Useful Life (Years) - 15 Estimated Total Future Cost $ 38,949 Estimated Remaining Useful Life (Years) - 15 Fully Funded Balance $ - Estimated Replacement Year Depreciation This Year $ 1,667 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.00% Life Remainging Percent - 100% Roof repairs were made in We have budgeted to complete this every 15 years going forward Roofing Gutters & Downspouts Approximate Component Quantity Estimated Current Unit Cost $ 7.00 Unit of Measure - LF Estimated Total Current Cost $ 16,100 Normal Useful Life (Years) - 25 Estimated Total Future Cost $ 18,664 Estimated Remaining Useful Life (Years) - 5 Fully Funded Balance $ 12,880 Estimated Replacement Year Depreciation This Year $ 644 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 1.37% Life Remainging Percent - 20% We spoke with RSO roofing and the informed us they estimate a 5 year remaining life for the gutters

25 Painting Stucco Approximate Component Quantity - 93 Estimated Current Unit Cost $ Unit of Measure - Each Estimated Total Current Cost $ 69,750 Normal Useful Life (Years) - 10 Estimated Total Future Cost $ 83,285 Estimated Remaining Useful Life (Years) - 6 Fully Funded Balance $ 27,900 Estimated Replacement Year Depreciation This Year $ 6,975 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 2.97% Life Remainging Percent - 60% 599 Painting Wood Trim/Garages Approximate Component Quantity - 93 Estimated Current Unit Cost $ Unit of Measure - Each Estimated Total Current Cost $ 30,225 Normal Useful Life (Years) - 5 Estimated Total Future Cost $ 31,132 Estimated Remaining Useful Life (Years) - 1 Fully Funded Balance $ 24,180 Estimated Replacement Year Depreciation This Year $ 6,045 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 2.58% Life Remainging Percent - 20%

26 Painting Wood Trim Repairs Approximate Component Quantity - 1 Estimated Current Unit Cost $ 15, Unit of Measure - Allowance Estimated Total Current Cost $ 15,000 Normal Useful Life (Years) - 5 Estimated Total Future Cost $ 15,450 Estimated Remaining Useful Life (Years) - 1 Fully Funded Balance $ 12,000 Estimated Replacement Year Depreciation This Year $ 3,000 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 1.28% Life Remainging Percent - 20% Painting Metal Pole Lights Approximate Component Quantity - 44 Estimated Current Unit Cost $ Unit of Measure - Each Estimated Total Current Cost $ 5,060 Normal Useful Life (Years) - 4 Estimated Total Future Cost $ 5,060 Estimated Remaining Useful Life (Years) - 0 Fully Funded Balance $ 5,060 Estimated Replacement Year Depreciation This Year $ 1,265 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.54% Life Remainging Percent - 0% Painting Stucco Walls Exterior Approximate Component Quantity Estimated Current Unit Cost $ 0.60 Unit of Measure - SF Estimated Total Current Cost $ 8,400 Normal Useful Life (Years) - 10 Estimated Total Future Cost $ 10,030 Estimated Remaining Useful Life (Years) - 6 Fully Funded Balance $ 3,360 Estimated Replacement Year Depreciation This Year $ 840 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.36% Life Remainging Percent - 60%

27 Asphalt Slurry Seal & Repair Approximate Component Quantity Estimated Current Unit Cost $ 0.17 Unit of Measure - SF Estimated Total Current Cost $ 11,900 Normal Useful Life (Years) - 4 Estimated Total Future Cost $ 11,900 Estimated Remaining Useful Life (Years) - 0 Fully Funded Balance $ 11,900 Estimated Replacement Year Depreciation This Year $ 2,975 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 1.27% Life Remainging Percent - 0% 580 Asphalt Overlay & Replace Approximate Component Quantity Estimated Current Unit Cost $ 1.70 Unit of Measure - SF Estimated Total Current Cost $ 119,000 Normal Useful Life (Years) - 25 Estimated Total Future Cost $ 133,936 Estimated Remaining Useful Life (Years) - 4 Fully Funded Balance $ 99,960 Estimated Replacement Year Depreciation This Year $ 4,760 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 10.66% Life Remainging Percent - 16% Asphalt Concrete Repairs Approximate Component Quantity - 1 Estimated Current Unit Cost $ 6, Unit of Measure - Allowance Estimated Total Current Cost $ 6,000 Normal Useful Life (Years) - 10 Estimated Total Future Cost $ 6,956 Estimated Remaining Useful Life (Years) - 5 Fully Funded Balance $ 3,000 Estimated Replacement Year Depreciation This Year $ 600 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.32% Life Remainging Percent - 50%

28 Fencing/Rails Vinyl Patio Fencing Approximate Component Quantity Estimated Current Unit Cost $ Unit of Measure - LF Estimated Total Current Cost $ 14,400 Normal Useful Life (Years) - 25 Estimated Total Future Cost $ 26,008 Estimated Remaining Useful Life (Years) - 20 Fully Funded Balance $ 2,880 Estimated Replacement Year Depreciation This Year $ 576 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.31% Life Remainging Percent - 80% 602 Fencing/Rails Wood Patio Fencing Approximate Component Quantity - 90 Estimated Current Unit Cost $ Unit of Measure - LF Estimated Total Current Cost $ 2,340 Normal Useful Life (Years) - 20 Estimated Total Future Cost $ 2,410 Estimated Remaining Useful Life (Years) - 1 Fully Funded Balance $ 2,223 Estimated Replacement Year Depreciation This Year $ 117 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.24% Life Remainging Percent - 5%

29 Fencing/Rails Wood Patio Fencing Approximate Component Quantity - 30 Estimated Current Unit Cost $ Unit of Measure - LF Estimated Total Current Cost $ 780 Normal Useful Life (Years) - 20 Estimated Total Future Cost $ 1,368 Estimated Remaining Useful Life (Years) - 19 Fully Funded Balance $ 39 Estimated Replacement Year Depreciation This Year $ 39 Cost Source - 1 Monthly Contribution $ 3.61 Depreciation Percent % Fully Funded Balance Percent 0.00% Life Remainging Percent - 95% Fencing/Rails Metal Pool Fencing Approximate Component Quantity Estimated Current Unit Cost $ Unit of Measure - LF Estimated Total Current Cost $ 17,600 Normal Useful Life (Years) - 25 Estimated Total Future Cost $ 21,015 Estimated Remaining Useful Life (Years) - 6 Fully Funded Balance $ 13,376 Estimated Replacement Year Depreciation This Year $ 704 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 1.43% Life Remainging Percent - 24% 578 Fencing/Rails Wall Repairs Approximate Component Quantity - 1 Estimated Current Unit Cost $ 5, Unit of Measure - Allowance Estimated Total Current Cost $ 5,000 Normal Useful Life (Years) - 10 Estimated Total Future Cost $ 5,796 Estimated Remaining Useful Life (Years) - 5 Fully Funded Balance $ 2,500 Estimated Replacement Year Depreciation This Year $ 500 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.27% Life Remainging Percent - 50%

30 Pool & Spa Area Pool Resurface/Tile Approximate Component Quantity - 1 Estimated Current Unit Cost $ 15, Unit of Measure - Each Estimated Total Current Cost $ 15,000 Normal Useful Life (Years) - 12 Estimated Total Future Cost $ 15,450 Estimated Remaining Useful Life (Years) - 1 Fully Funded Balance $ 13,750 Estimated Replacement Year Depreciation This Year $ 1,250 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 1.47% Life Remainging Percent - 8% 586 Pool & Spa Area Pool Heater Approximate Component Quantity - 1 Estimated Current Unit Cost $ 4, Unit of Measure - Each Estimated Total Current Cost $ 4,000 Normal Useful Life (Years) - 10 Estimated Total Future Cost $ 5,219 Estimated Remaining Useful Life (Years) - 9 Fully Funded Balance $ 400 Estimated Replacement Year Depreciation This Year $ 400 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.04% Life Remainging Percent - 90%

31 Pool & Spa Area Pool Filter Approximate Component Quantity - 1 Estimated Current Unit Cost $ 1, Unit of Measure - Each Estimated Total Current Cost $ 1,200 Normal Useful Life (Years) - 10 Estimated Total Future Cost $ 1,236 Estimated Remaining Useful Life (Years) - 1 Fully Funded Balance $ 1,080 Estimated Replacement Year Depreciation This Year $ 120 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.12% Life Remainging Percent - 10% Pool & Spa Area Pool Pump/Motor Approximate Component Quantity - 2 Estimated Current Unit Cost $ 1, Unit of Measure - Each Estimated Total Current Cost $ 2,000 Normal Useful Life (Years) - 7 Estimated Total Future Cost $ 2,060 Estimated Remaining Useful Life (Years) - 1 Fully Funded Balance $ 1,714 Estimated Replacement Year Depreciation This Year $ 286 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.18% Life Remainging Percent - 14% Pool & Spa Area Spa Resurface/Tile Approximate Component Quantity - 1 Estimated Current Unit Cost $ 5, Unit of Measure - Each Estimated Total Current Cost $ 5,000 Normal Useful Life (Years) - 8 Estimated Total Future Cost $ 6,149 Estimated Remaining Useful Life (Years) - 7 Fully Funded Balance $ 625 Estimated Replacement Year Depreciation This Year $ 625 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.07% Life Remainging Percent - 88%

32 Pool & Spa Area Spa Heater Approximate Component Quantity - 1 Estimated Current Unit Cost $ 3, Unit of Measure - Each Estimated Total Current Cost $ 3,500 Normal Useful Life (Years) - 10 Estimated Total Future Cost $ 4,434 Estimated Remaining Useful Life (Years) - 8 Fully Funded Balance $ 700 Estimated Replacement Year Depreciation This Year $ 350 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.07% Life Remainging Percent - 80% Pool & Spa Area Spa Filter Approximate Component Quantity - 1 Estimated Current Unit Cost $ 1, Unit of Measure - Each Estimated Total Current Cost $ 1,200 Normal Useful Life (Years) - 10 Estimated Total Future Cost $ 1,236 Estimated Remaining Useful Life (Years) - 1 Fully Funded Balance $ 1,080 Estimated Replacement Year Depreciation This Year $ 120 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.12% Life Remainging Percent - 10% Pool & Spa Area Spa Pump/Motor Approximate Component Quantity - 2 Estimated Current Unit Cost $ 1, Unit of Measure - Each Estimated Total Current Cost $ 2,400 Normal Useful Life (Years) - 7 Estimated Total Future Cost $ 2,866 Estimated Remaining Useful Life (Years) - 6 Fully Funded Balance $ 343 Estimated Replacement Year Depreciation This Year $ 343 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.04% Life Remainging Percent - 86%

33 Pool & Spa Area Pool Wood Trellis Replace Approximate Component Quantity Estimated Current Unit Cost $ Unit of Measure - SF Estimated Total Current Cost $ 21,000 Normal Useful Life (Years) - 30 Estimated Total Future Cost $ 24,345 Estimated Remaining Useful Life (Years) - 5 Fully Funded Balance $ 17,500 Estimated Replacement Year Depreciation This Year $ 700 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 1.87% Life Remainging Percent - 17% 593 Pool & Spa Area Pool Wood Trellis Paint Approximate Component Quantity Estimated Current Unit Cost $ 2.00 Unit of Measure - SF Estimated Total Current Cost $ 3,000 Normal Useful Life (Years) - 6 Estimated Total Future Cost $ 3,278 Estimated Remaining Useful Life (Years) - 3 Fully Funded Balance $ 1,500 Estimated Replacement Year Depreciation This Year $ 500 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.16% Life Remainging Percent - 50% Pool & Spa Area Lounge Chairs Approximate Component Quantity - 14 Estimated Current Unit Cost $ Unit of Measure - Each Estimated Total Current Cost $ 6,300 Normal Useful Life (Years) - 7 Estimated Total Future Cost $ 6,489 Estimated Remaining Useful Life (Years) - 1 Fully Funded Balance $ 5,400 Estimated Replacement Year Depreciation This Year $ 900 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.58% Life Remainging Percent - 14%

34 Pool & Spa Area Table & Chair Sets Approximate Component Quantity - 3 Estimated Current Unit Cost $ 1, Unit of Measure - Each Estimated Total Current Cost $ 4,200 Normal Useful Life (Years) - 7 Estimated Total Future Cost $ 4,326 Estimated Remaining Useful Life (Years) - 1 Fully Funded Balance $ 3,600 Estimated Replacement Year Depreciation This Year $ 600 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.38% Life Remainging Percent - 14% Pool & Spa Area Deck Caulk Approximate Component Quantity - 1 Estimated Current Unit Cost $ 5, Unit of Measure - Allowance Estimated Total Current Cost $ 5,000 Normal Useful Life (Years) - 4 Estimated Total Future Cost $ 5,000 Estimated Remaining Useful Life (Years) - 0 Fully Funded Balance $ 5,000 Estimated Replacement Year Depreciation This Year $ 1,250 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.53% Life Remainging Percent - 0% Pool & Spa Area Restroom & Shower Remodel Approximate Component Quantity - 1 Estimated Current Unit Cost $ 20, Unit of Measure - Allowance Estimated Total Current Cost $ 20,000 Normal Useful Life (Years) - 20 Estimated Total Future Cost $ 21,855 Estimated Remaining Useful Life (Years) - 3 Fully Funded Balance $ 17,000 Estimated Replacement Year Depreciation This Year $ 1,000 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 1.81% Life Remainging Percent - 15%

35 Pool & Spa Area Water Heater Approximate Component Quantity - 1 Estimated Current Unit Cost $ 1, Unit of Measure - Each Estimated Total Current Cost $ 1,400 Normal Useful Life (Years) - 10 Estimated Total Future Cost $ 1,400 Estimated Remaining Useful Life (Years) - 0 Fully Funded Balance $ 1,400 Estimated Replacement Year Depreciation This Year $ 140 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.15% Life Remainging Percent - 0% Pool & Spa Area Pool Deck Replacement Approximate Component Quantity Estimated Current Unit Cost $ 8.00 Unit of Measure - SF Estimated Total Current Cost $ 35,200 Normal Useful Life (Years) - 35 Estimated Total Future Cost $ 40,806 Estimated Remaining Useful Life (Years) - 5 Fully Funded Balance $ 30,171 Estimated Replacement Year Depreciation This Year $ 1,006 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 3.22% Life Remainging Percent - 14% Landscaping Irrigation System Upgrade Approximate Component Quantity - 1 Estimated Current Unit Cost $ 15, Unit of Measure - Allowance Estimated Total Current Cost $ 15,000 Normal Useful Life (Years) - 15 Estimated Total Future Cost $ 16,391 Estimated Remaining Useful Life (Years) - 3 Fully Funded Balance $ 12,000 Estimated Replacement Year Depreciation This Year $ 1,000 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 1.28% Life Remainging Percent - 20%

36 Landscaping Landscape Replacements Approximate Component Quantity - 1 Estimated Current Unit Cost $ 15, Unit of Measure - Allowance Estimated Total Current Cost $ 15,000 Normal Useful Life (Years) - 10 Estimated Total Future Cost $ 16,391 Estimated Remaining Useful Life (Years) - 3 Fully Funded Balance $ 10,500 Estimated Replacement Year Depreciation This Year $ 1,500 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 1.12% Life Remainging Percent - 30% Landscaping Tree Remove/Replace Approximate Component Quantity - 1 Estimated Current Unit Cost $ 5, Unit of Measure - Allowance Estimated Total Current Cost $ 5,000 Normal Useful Life (Years) - 3 Estimated Total Future Cost $ 5,150 Estimated Remaining Useful Life (Years) - 1 Fully Funded Balance $ 3,333 Estimated Replacement Year Depreciation This Year $ 1,667 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.36% Life Remainging Percent - 33% Lighting Pole Lights Approximate Component Quantity - 44 Estimated Current Unit Cost $ 1, Unit of Measure - Each Estimated Total Current Cost $ 63,800 Normal Useful Life (Years) - 25 Estimated Total Future Cost $ 73,962 Estimated Remaining Useful Life (Years) - 5 Fully Funded Balance $ 51,040 Estimated Replacement Year Depreciation This Year $ 2,552 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 5.44% Life Remainging Percent - 20%

37 Miscellaneous Mailboxes Approximate Component Quantity - 93 Estimated Current Unit Cost $ Unit of Measure - Each Estimated Total Current Cost $ 11,160 Normal Useful Life (Years) - 20 Estimated Total Future Cost $ 15,448 Estimated Remaining Useful Life (Years) - 11 Fully Funded Balance $ 5,022 Estimated Replacement Year Depreciation This Year $ 558 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.54% Life Remainging Percent - 55% 585 Miscellaneous Termite Treatment Approximate Component Quantity - 3 Estimated Current Unit Cost $ 5, Unit of Measure - Buildings Estimated Total Current Cost $ 17,700 Normal Useful Life (Years) - 3 Estimated Total Future Cost $ 19,341 Estimated Remaining Useful Life (Years) - 3 Fully Funded Balance $ - Estimated Replacement Year Depreciation This Year $ 5,900 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.00% Life Remainging Percent - 100%

38 Miscellaneous Utility Doors & Hardware Approximate Component Quantity - 35 Estimated Current Unit Cost $ Unit of Measure - Each Estimated Total Current Cost $ 7,875 Normal Useful Life (Years) - 5 Estimated Total Future Cost $ 8,355 Estimated Remaining Useful Life (Years) - 2 Fully Funded Balance $ 4,725 Estimated Replacement Year Depreciation This Year $ 1,575 Cost Source - 1 Monthly Contribution $ Depreciation Percent % Fully Funded Balance Percent 0.50% Life Remainging Percent - 40%

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Park Avenue 244 Quari St Denver, CO Level II Study with Site Inspection Fiscal Year End Date: 12/31/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Smoky Ridge 19902 E Red Fox Ln Centennial, CO Level I Study with Site Inspection Fiscal Year End Date: 12/31/2017 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

Reserve Study Executive Summary

Reserve Study Executive Summary Reserve Study Executive Summary Association Name: Location: 8550 Lynx Rd., San Diego, CA Fiscal Year Ending: June 30, 2017 No. of Units: 440 Built: 1975 Level of Study: Level III: Update with no On-Site

More information

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019.

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019. RESERVE STUDY UPDATE for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925) 831-1803

More information

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES Miramar Plaza Homeowners' Association Reserve Study Update w/o Visual Inspection July 15, 2014 Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES 2059 Camden Ave. Suite

More information

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08 Central Pointe HOA Level I Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10870 Property Type...... Mid-Rise Number of Units............ 83 Fiscal Year End....... December 31

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

RESERVE STUDY UPDATE SUMMARY

RESERVE STUDY UPDATE SUMMARY RESERVE STUDY UPDATE SUMMARY for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925)

More information

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA SCT RESERVE CONSULTANTS, INC. P.O. BOX 890129 TEMECULA, CA 92589-0129 PHONE (951) 296-3520 FAX (951) 296-5038 E-MAIL mike.g@sctreserve.com March 24, 2015 Job 2000-003-10 L3 St. Tropez Villas I, Incorporated

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Do-It-Yourself Reserve Study

Do-It-Yourself Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By Clearbrook HOA Level 1 Reserve Study Report Period 1/1/2010 12/31/2010 Client Reference Number 11775 Property Type Apartment Style Number of Units 21 Fiscal Year End 12/31 Date of Property Inspection 3/23/2010

More information

Sample Community Association

Sample Community Association Level 1 Reserve Study Report Period - 1/1/2018 to 12/31/2018 Client Reference Number 10014 Property Type Condominium Number of Units 150 Fiscal Year End 12/31 Type of Study Full Study Date of Site Visit

More information

Do-It-Yourself Reserve Study. Green Valley Resort Homes

Do-It-Yourself Reserve Study. Green Valley Resort Homes Do-It-Yourself Reserve Study Green Valley Resort Homes Green Valley, AZ Report #: 15034-2 For Period Beginning: January 1, 2018 Expires: December 31, 2018 Date Prepared: September 21, 2017 Hello, and welcome

More information

RESERVE STUDY UPDATE SUMMARY. for. Vista Tassajara HOMEOWNERS ASSOCIATION

RESERVE STUDY UPDATE SUMMARY. for. Vista Tassajara HOMEOWNERS ASSOCIATION RESERVE STUDY UPDATE SUMMARY for Vista Tassajara HOMEOWNERS ASSOCIATION Date Prepared: 10/27/2017 for fiscal year 2018 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA

More information

Sun Peak Master Association

Sun Peak Master Association Sun Peak Master Association Level 1 Reserve Study Report Period 01/01/2014 12/31/2014 Client Reference Number Property Type Fiscal Year End 17547 Master 12/31 Date of Property Inspection Prepared By Analysis

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Soda Creek Condominiums Dillon, Colorado Version 2 Monday, August 19, 2013 6860 S. Yosemite Court, Suite 2000 Centennial, CO 80112 Phone (303) 953-2078 Facsimile (303) 953-2157

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014 Shadow Ridge Level 2 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 10160 Property Type Condominium Number of Units 168 Fiscal Year End 12/31 Date of Property Inspection 8/21/2014

More information

Full Reserve Study. Nelson Farms HOA. Fort Collins, CO. Report #: For Period Beginning: May 1, 2016 Expires: April 30, 2017

Full Reserve Study. Nelson Farms HOA. Fort Collins, CO. Report #: For Period Beginning: May 1, 2016 Expires: April 30, 2017 Full Reserve Study Nelson Farms HOA Fort Collins, CO Report #: 19185-0 For Period Beginning: May 1, 2016 Expires: April 30, 2017 Date Revised: January 13, 2016 Hello, and welcome to your Reserve Study!

More information

Bridgewood Manor HOA

Bridgewood Manor HOA Bridgewood Manor HOA Level 1 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 18076 Property Type Condominium Number of Units 40 Fiscal Year End 12/31 Date of Property Inspection

More information

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC.

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. Woodburn, OR January 1, 2015 December 31, 2015 Project No: OR 11101 0006 5 Prepared By: Carson M. Horton, RS Quality Check By:

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012 Parkwood HOA Level 1 Reserve Study Report Period 1/1/2012 12/31/2012 Client Reference Number Property Type Number of Units Fiscal Year End 12784 Townhouse 8 12/31 Date of Property Inspection Prepared By

More information

RESERVE STUDY ANNUAL REPORT

RESERVE STUDY ANNUAL REPORT RESERVE STUDY ANNUAL REPORT PINELOCH SUN BEACH CLUB LEVEL III RESERVE STUDY UPDATE WITHOUT SITE VISIT Ronald, WA 98940 Report #50510500R FINANCIAL YEAR 01.2016 12.2016 701 Fifth Ave, Suite 4200, Seattle

More information

Update "With-Site-Visit" Reserve Study

Update With-Site-Visit Reserve Study Update "With-Site-Visit" Reserve Study Sample Townhouse HOA Ventura, CA Report #: For Period Beginning: Expires: Date Prepared: 99999999-0 January 1, 2019 December 31, 2019 June 27, 2018 T W Hello, and

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY Arizona Texas Nevada Utah New Mexico CAPITAL RESERVE STUDY Prepared for: Quail Creek HOA Date of Report: 6/7/2018 Capital Reserve Analysts Bringing the future into the present Capital Reserve Analysts,

More information

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association 21289 E. Lords Way Queen Creek, AZ 85142 support@azreservestudy.com Tel: (480) 840-7130 Fax: (888) 842-9319 October 27, 2012 Sample Association Regarding: 2013 - Level I Capital Replacement Reserve Study

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT 2008 NEWTON PARISH NEWTON PARISH REPLACEMENT RESERVE REPORT FY 2008 Community Management by: CAS, Inc Mr. Dan Quartermane 1930 N. Salem Street, Suite 101 Apex, NC 27523 919-367-7711

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Update With Site-Visit Reserve Study Park Place HOA Surprise, Arizona Report #: 12568-2 For Period Beginning: January 1, 2017 Expires: December 31, 2017 Date Prepared: October 4, 2016 Hello, and welcome

More information

Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY December 31, 2017

Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY December 31, 2017 Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY Section Page RESERVE STUDY EXECUTIVE SUMMARY 1-2 ASSESSMENT AND RESERVE FUNDING 3 DISCLOSURE SUMMARY (These 3 pages should be

More information

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08 The Ranches HOA Level II Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10329 Property Type..... Single Family Homes Number of Units.......... 1,750 Fiscal Year End......... December

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112

More information

Estates at River Ranch HOA

Estates at River Ranch HOA Full Reserve Study Estates at River Ranch HOA Tucson, Arizona Report #: 29634-0 For Period Beginning: January 1, 2017 Expires: December 31, 2017 Date Prepared: June 15, 2016 Hello, and welcome to your

More information

Park Rise Homeowners Association, Inc. Financial Statements and Supplementary Information. For the Year Ended December 31, 2014

Park Rise Homeowners Association, Inc. Financial Statements and Supplementary Information. For the Year Ended December 31, 2014 Financial Statements and Supplementary Information For the Year Ended December 31, 2014 Table of Contents Independent Auditor s Report..... 1 Financial Statements Balance Sheet.. 3 Statement of Revenues,

More information

Sample Reserve Study Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003

Sample Reserve Study Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003 Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003 Reserve Analyst P.O. Box 797 Vernon, AZ 85940 Phone: 800-561-0173 Fax: 928-537-3377 Prepared By Quality Check

More information

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA SCT RESERVE CONSULTANTS, INC. P.O. BOX 890129 TEMECULA, CA 92589-0129 PHONE (951) 296-3520 FAX (951) 296-5038 E-MAIL mike.g@sctreserve.com November 23, 2017 Job 2006-127-12 L3 Sunshine Villas Homeowners

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 VILLAS AT PARKWOOD ESTATES VILLAS AT PARKWOOD ESTATES REPLACEMENT RESERVE REPORT FY 2016 Community Management by: Community Management Professionals, LLC Beth Maurer

More information

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION WOODWIND ASSOCIATION REPLACEMENT RESERVE REPORT FY 2010 Community Management by: N & H Enterprises PO Box 5539 Greenville, SC 29607 864-467-1600

More information

Pemberley at Robinsons Grove

Pemberley at Robinsons Grove Pemberley at Robinsons Grove Level I Reserve Study Report Period 1/01/06 12/31/06 Client Reference Number.... 10429 Property Type...... Apartment Style Number of Units............. 160 Fiscal Year End.......

More information

Do-It-Yourself Reserve Study

Do-It-Yourself Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

November 22, Boca Rio Condominium Homeowners Association Board of Directors Blossom Valley Road El Cajon, CA Attn: Robin Clegg

November 22, Boca Rio Condominium Homeowners Association Board of Directors Blossom Valley Road El Cajon, CA Attn: Robin Clegg Sonnenberg & Company, CPAs 5190 Governor Drive, Suite 201, San Diego, California 92122 Phone: (858) 457-5252 -- (800) 464-4HOA -- Fax: (858) 457-2211 -- (800) 303-4FAX November 22, 2017 Boca Rio Condominium

More information

Full Reserve Study. Twenty Four Neighborhood TOA. Carbondale, CO

Full Reserve Study. Twenty Four Neighborhood TOA. Carbondale, CO Full Reserve Study Twenty Four Neighborhood TOA Carbondale, CO Report #: 21306-0 For Period Beginning: January 1, 2011 Ending: December 31, 2011 Revision Date (2): February, 9, 2011 Date Prepared: September

More information

2013 Reserve Study. Sea Havens Homeowners Association, Inc Florida Shores Boulevard Daytona Beach Shores, Florida Report No: 2713 Version 2

2013 Reserve Study. Sea Havens Homeowners Association, Inc Florida Shores Boulevard Daytona Beach Shores, Florida Report No: 2713 Version 2 2013 Reserve Study Sea Havens Homeowners Association, Inc Florida Shores Boulevard Daytona Beach Shores, Florida 32118 Report No: 2713 Version 2 For the Period From: January 1, 2013 To: December 31, 2013

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Jason Kozleski Board President 10790-221 st Lane NE Redmond,

More information

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

GARDEN ESTATES MAINTENANCE ASSOCIATION ("CORPORATION")

GARDEN ESTATES MAINTENANCE ASSOCIATION (CORPORATION) info@src-reservestudy.com 951-693-1721 GARDEN ESTATES MAINTENANCE ASSOCIATION ("CORPORATION") Level 3 Reserve Study Update (No Site-Visit) Prepared For Fiscal Year 2016 1/26 Contents 1 Title Page 2 Table

More information

FIR RIDGE II CONDOMINIUM

FIR RIDGE II CONDOMINIUM FIR RIDGE II CONDOMINIUM BELLINGHAM, WASHINGTON UPDATE WITHOUT SITE VISIT FEBRUARY 2014 FOR USE WITH THE FEBRUARY 2012 RESERVE STUDY PREPARED BY: DENISE DANA, RESERVE SPECIALIST M. ARCH, REGISTERED ARCHITECT

More information

What are Capital Reserves?

What are Capital Reserves? Capital Reserves What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs Stormwater pond repair, dredging and drainage improvements Fence repair, retaining

More information

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT?

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? Tom Larson, PE, RS, PRA Facility Engineering Associates, PC What is a Reserve Study? A budget planning tool which identifies the current status of the

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Heritage Park 3208-52 nd Place NE, Tacoma, WA 98422 For: Heritage Park Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions 5500 Olympic Drive,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112 th Ave NE

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

RESERVE STUDY Component Analysis and Reserve Fund Plan Annual Review Study 2016/17 For Middlefield Meadows HOA Mountain View, CA Prepared By RESERVE ANALYSIS CONSULTING, LLC 1750 Bridgeway, Suite B106

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community

More information

Ashleigh Commons Condominiums Association, Inc.

Ashleigh Commons Condominiums Association, Inc. RESERVE STUDY Full Study Ashleigh Commons Condominiums Association, Inc. Published - January 14, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

UPDATE - With Site Visit

UPDATE - With Site Visit SAMPLE Reserve Study UPDATE - With Site Visit Serving the Nation www.reservestudy.com Welcome to your Reserve Study! A Reserve Study is a valuable tool to help you budget responsibly for your property.

More information

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM WOODBRIDGE CONDOMINIUM REPLACEMENT RESERVE REPORT FY 2015 Community Management by: CHESAPEAKE BAY MANAGEMENT Ms. Kimberly Marston 100 Volvo Parkway,

More information

Calusa Point Association, Inc. Miami, Florida File #

Calusa Point Association, Inc. Miami, Florida File # A FULL RESERVE STUDY FOR Miami, Florida File # 22920-06289 FOR PERIOD: January 1, 2014 December 31, 2014 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM LINDSEY 3300 W. LAKE MARY BLVD. SUITE 350 LAKE

More information

Sunland Division 7 Condo

Sunland Division 7 Condo Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

R E S E R V E S T U D Y

R E S E R V E S T U D Y SAGUARO CANYON SUBDIVISION HOMEOWNERS ASSOCIATION R E S E R V E S T U D Y Full Study Published - May 27, 2010 B R O W N I N G R E S E R V E G R O U P ~ Emmett, ID 83617 ~ Office (208) 365-0977 Fax (208)

More information

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for: RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,

More information

Indian Peaks Townhomes 95 th Street Lafayette, CO 80026

Indian Peaks Townhomes 95 th Street Lafayette, CO 80026 Indian Peaks Townhomes 95 th Street Lafayette, CO 80026 Level 2, Premium Reserve Analysis Report Period 01/01/16 12/31/16 Client Reference Number - 4080 Property Type Townhome Development Number of Units

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

Quail Ridge THCA W. 17 th Ave Lakewood, CO 80224

Quail Ridge THCA W. 17 th Ave Lakewood, CO 80224 Quail Ridge THCA 11131-11167 W. 17 th Ave Lakewood, CO 80224 Level 1, Limited Reserve Analysis Report Period 5/01/16-4/30/17 Client Reference Number - 8173 Property Type Townhomes Number of Units 112 Fiscal

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Licorice Fern II Homeowners Association 16880 SE Licorice Way, Renton, WA 98059 For: Licorice Fern II Homeowners Association c/o Ann Hart, Property Manager Pinnacle 2801 Alaskan

More information

BUDGET APPROVED. GENERAL EXPENSES (158 Units)

BUDGET APPROVED. GENERAL EXPENSES (158 Units) TANGLEWOOD HILLS CONDOMINIUM Association name: Tanglewood Hills Condom Association number: 1457 General - Total # of Units 158 Fiscal year end: 12/31 Budget year: 2017 Budget type: M BUDGET APPROVED ACCT.

More information

TANGLEWOOD HILLS CONDOMINIUM

TANGLEWOOD HILLS CONDOMINIUM TANGLEWOOD HILLS CONDOMINIUM Association name: Tanglewood Hills Condom Association number: 1547 General - Total # of Units 158 Fiscal year end: 12/31 Budget year: 2018 Budget type: M BUDGET APPROVED ACCT.

More information

Reserve Analysis Sample HOA 1234 Colorado Blvd. Your City, CO 80010

Reserve Analysis Sample HOA 1234 Colorado Blvd. Your City, CO 80010 Reserve Analysis Sample HOA 1234 Colorado Blvd. Your City, CO 80010 Level 1 Reserve Analysis Report Period 01/01/13 12/31/13 Client Reference Number - 1001 Property Type Townhouse Style Number of Units

More information

Calusa Point Association

Calusa Point Association Full Reserve Study Calusa Point Association Miami, FL REVISION Report #: 29086-0 For Period Beginning: January 1, 2016 Expires: December 31, 2016 Date Prepared: November 11, 2015 Hello, and welcome to

More information

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES Community Management by: ROCKTOWN REALTY Bernard Hamann 218 Market Street Harrisonburg, VA 22801 40-70-7080

More information

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. Grand Firs HOA. Graham, WA

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. Grand Firs HOA. Graham, WA Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums.

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums. 1825 W. Ray Road, #1135, Chandler, AZ 85244 support@azreservestudy.com Tel: (480) 620-4757 Fax: (888) 842-9319 April 4, 2013 Summit Park Condominiums HOA Regarding: 2012 - Level I Capital Replacement Reserve

More information

Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111

Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111 Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111 Level 3 Reserve Analysis Reserve Study without Property Inspection Report Period 01/01/11 12/31/011 Date of Property Inspection Inspector Report

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY CAPITAL RESERVE STUDY FOR THE HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Number: 12-1066 W:\2012\12-1066\CORR\12-1066v1.doc Date: March 29, 2013 Table of Contents Section Page Executive Summary...

More information

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA VILLAGE GREEN HOA REPLACEMENT RESERVE REPORT FY 2011 Community Management by: Ravenel Associates, Inc. Chad Hammond, Property Manager 3690 Bohicket

More information

THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION INDEX TO REVIEWED FINANCIAL STATEMENTS December 31, 2017 and 2016

THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION INDEX TO REVIEWED FINANCIAL STATEMENTS December 31, 2017 and 2016 INDEX TO REVIEWED FINANCIAL STATEMENTS December 31, 2017 and 2016 Independent accountant s review report 1 REVIEWED FINANCIAL STATEMENTS Balance sheets 2 Statements of revenues, expenses, and changes in

More information

las Bolinas Bondominium f8f1dner'a Jtssocialion 1600 N. Wilmot Tucson, AZ Financial Report

las Bolinas Bondominium f8f1dner'a Jtssocialion 1600 N. Wilmot Tucson, AZ Financial Report las Bolinas Bondominium f8f1dner'a Jtssocialion 1600 N. Wilmot Tucson, AZ 85712 520-390-2310 2013 Financial Report 1.) Another Year in the Black- $29,000.00 2013 ended $29,000.00 over budget for revenue

More information

Floriston Property HOA

Floriston Property HOA Full Reserve Study Floriston Property HOA Floriston, CA Report #: 26862-0 For Period Beginning: April 1, 2014 Expires: March 31, 2015 Date Prepared: June 30, 2014 Hello, and welcome to your Reserve Study!

More information

CAPITAL RESERVE STUDY. Ellicott Meadows Condominium Association I. Ellicott City, Maryland

CAPITAL RESERVE STUDY. Ellicott Meadows Condominium Association I. Ellicott City, Maryland CAPITAL RESERVE STUDY FOR THE Ellicott Meadows Condominium Association I Ellicott City, Maryland Contact Name: Victor Brzozowski Date: October 3, 2017 Table of Contents Section Name Section # Executive

More information

MILL CREEK CONDOMINIUMS RESERVE STUDY

MILL CREEK CONDOMINIUMS RESERVE STUDY MILL CREEK CONDOMINIUMS RESERVE STUDY Fiscal Year 2016 Prepared by: Eric Harker, Assoc. AIA Alliance Project Engineers and Construction Consultants November 6, 2015 Project Number: OR14-017 MILL CREEK

More information

Kayscreek Estates HOA

Kayscreek Estates HOA Kayscreek Estates HOA Level I Reserve Study Report Period 1/01/09 12/31/09 Client Reference Number.... 11004 Property Type........ Single Family Homes Number of Units............. 276 Fiscal Year End.........

More information

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2 2014 Reserve Study The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee 37862 Report No: 2921 Version 2 For the Period From: January 1, 2014 To: December 31, 2014 TABLE

More information

REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2018 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: August 15, 215 To: Lorrie Olson, Caughlin Creek HOA From: Browning Reserve Group (BRG) Re: Caughlin Creek HOA; Full Study Attached, please find the reserve study

More information

Full Reserve Study. Fox Creek Farm HOA. Longmont. Report #: For Period Beginning: January 1, 2012 Expires: December 31, 2012

Full Reserve Study. Fox Creek Farm HOA. Longmont. Report #: For Period Beginning: January 1, 2012 Expires: December 31, 2012 Full Reserve Study Fox Creek Farm HOA Longmont Report #: 20796-0 For Period Beginning: January 1, 2012 Expires: December 31, 2012 Date Prepared: May 14, 2011 Hello, and welcome to your Reserve Study! T

More information

August 19, Raintree HOA Attn: Emily Bresina HOA Simple PO Box Denver, CO Regarding: Reserve Study Draft.

August 19, Raintree HOA Attn: Emily Bresina HOA Simple PO Box Denver, CO Regarding: Reserve Study Draft. August 19, 2015 Raintree HOA Attn: Emily Bresina HOA Simple PO Box 13823 Denver, CO 80201 Regarding: Reserve Study Draft Dear Emily: Please find enclosed a Draft version of the Reserve Study for Summerhill

More information

RESERVE STUDY OTHER PROPERTY TYPES. Serving the Nation.

RESERVE STUDY OTHER PROPERTY TYPES. Serving the Nation. RESERVE STUDY OTHER PROPERTY TYPES Serving the Nation www.reservestudy.com Welcome to your Reserve Study! A Reserve Study is a valuable tool to help you budget responsibly for your property. This report

More information

CAPE GEORGE COLONY CLUB MARINA RESERVES

CAPE GEORGE COLONY CLUB MARINA RESERVES CAPE GEORGE COLONY CLUB MARINA RESERVES Port Townsend, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next

More information

Sample Do-It-Yourself Reserve Study Sample Association Anywhere, USA

Sample Do-It-Yourself Reserve Study Sample Association Anywhere, USA Sample Do-It-Yourself Reserve Study Sample Association Anywhere, USA Report #: 9999-0 DIY For Period Beginning: January 1, 2014 Ending: December 31, 2014 Date Prepared: October 22, 2013 Hello, and welcome

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: October 09, 2016 To: Joleen Cline, Cline & Associates From: Browning Reserve Group (BRG) Re: Whitehawk Townhomes Association; Update w/ Site Visit Review Attached,

More information