1 Central Pointe HOA Level I Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number Property Type Mid-Rise Number of Units Fiscal Year End December 31 Date of Property Inspection..... June 27th, 2007 Inspector Robert Forney Report prepared on Tuesday, September 04, 2007

2 Table of Contents Introduction Executive Summary page 1 Introduction page 2 General Information and Frequently Asked Questions page 3-4 Reserve Analysis Funding Summary page 5 Percent Funded Graph page 6 Component Inventory page 7 Significant Components page 8 Significant Components Graph page 9 Yearly Summary page 10 Yearly Reserve Contributions Graph page 11 Component Funding Information page 12 Yearly Cash Flow page 13 Yearly Reserve Expenditures Graph page 14 Projected Reserve Expenditures by Year page Component Evaluation Component Evaluation page 1-28 Glossary of Commonly used Words and Phrases

3 Executive Summary Central Pointe HOA - ID # Information to complete this Reserve Study was gathered on June 27th, 2007 by performing an on-site inspection of the common area elements. In addition, we also obtained information by contacting any vendors and/or contractors that have worked on the property recently, as well as communicating with the property representative (BOD Member and/or Community Manager). To the best of our knowledge, the conclusions and recommendations of this report are considered reliable and accurate insofar as the information obtained from these sources. Projected Starting Balance as of January 1, 2008 $15,000 Ideal Reserve Balance as of January 1, 2008 $90,975 Percent Funded as of January 1, % Recommended Reserve Contribution (per month) $4,500 Minimum Reserve Contribution (per month) $4,125 Recommended Special Assessment $0 Minimum Recommended Special Assessment $0 Central Pointe HOA is an 83-unit mid-rise community. The property offers a lobby as well as a parking garage and a large patio area on the second floor. Construction on the community was completed in Currently Programmed Projects There are no projects programmed to occur this year. (See page 15) Major Reserve Expenditures The first major reserve expenditure is programmed to occur in fiscal year Projects programmed to occur in fiscal year 2011 include repainting the building trim and railings (Comp# 202), and slurry sealing the asphalt parking areas (Comp# 402). We have programmed approximately $63,569 in reserve funds or approximately 35% of fiscal year 2011 s recommended starting balance towards the completion of these projects (see page 10). Significant Reserve Projects The association s significant reserve projects include repainting the building trim/railings (Comp# 202), repainting the building stucco surfaces (Comp# 201), replacing the roofs (Comp# 103), and modernizing the elevators (Comp# 707). The fiscal significance of these components is approximately 24%, 18%, 14%, and 10% respectively (see page 8). A component s significance is calculated by dividing its replacement cost by its useful life. In this way, not only is a component s replacement cost considered but also the frequency of occurrence. These components most significantly contribute to the total monthly reserve contribution. As these components have a high level of fiscal significance the association should properly maintain them to ensure they reach their full useful lives. Reserve Funding In comparing the projected starting reserve balance of $15,000 versus the ideal reserve balance of $90,975 we find the association s reserve fund to be approximately 16% funded. This indicates a relatively weak reserve fund position. In order to continue to strengthen the account fund, we suggest adopting a monthly reserve contribution of $4,500 ($56.96/unit) per month. We have also included a minimum reserve contribution of $4,125 ($52.22/unit) per month. If the contribution falls below this rate, then the reserve fund may fall into a situation where special assessments, deferred maintenance, and lower property values are likely at some point in the future. 1

4 Introduction Reserve Study Purpose The purpose of this Reserve Study is to provide an educated estimate of the necessary reserve allocation. The detailed schedules will serve as an advanced warning that major projects will need to be addressed in the future. This will allow the Board of Directors to have ample time to obtain competitive estimates and bids that will result in cost savings to the individual homeowners. It will also ensure the physical well-being of the property and ultimately enhance each owner s investment, while limiting the possibility of unexpected major projects that may lead to special assessments. Preparer s Credentials Mr. Forney has been conducting reserve studies for the past five years. After working for a notable national reserve study provider Mr. Forney started Complex Solutions Ltd. in Complex Solutions provides reserve study consulting services to clients primarily in Nevada, California and Utah. Mr. Forney holds a Bachelor of Science degree in Business Administration from Pepperdine University. Conducted over 300 reserve studies in the last five years. Created the proprietary software and databases used to prepare Complex Solutions reserve studies. This proprietary software gives Complex Solutions the freedom and ability to create reports tailored to the individual clients needs. Projects have ranged in size from small apartment-style condominium communities to Planned Unit Communities (PUD). Clients have ranged from developers interested in setting initial reserve accounts for communities under construction to high-rise communities, even an aero park (small airport). Active member of three local chapters of CAI (Nevada, Utah, and Channel Islands, CA). (2) Articles published in Community Interests. Budget Breakdown Every association conducts their business within a budget. There are typically two main parts to this budget, operating and reserves. The operating budget includes all expenses that are fixed on an annual basis. These would include management fees, maintenance fees, utilities, etc. The reserves is primarily made up of capital replacement items such as roofing, fencing, mechanical equipment, etc., that do not normally occur on an annual basis. Typically, the reserve contribution makes up 15% - 40% of the association s total budget. Therefore, reserves are considered to be a major part of the overall monthly association payment. Report Sections The Reserve Analysis Section contains the evaluation of the association s reserve balance, income, and expenses. It includes a finding of the client s current reserve fund status (measured as percent funded) and a recommendation for an appropriate reserve allocation rate (also known as the funding plan). The Component Evaluation Section contains information regarding the physical status and replacement cost of major common area components the association is responsible to maintain. It is important to understand that while the component inventory will remain relatively stable from year to year, the condition assessment and life estimates will most likely vary from year to year. 2

5 General Information and Frequently Asked Questions Why is it important to perform a Reserve Study? As previously mentioned, the reserve allocation makes up a significant portion of the total monthly dues. This report provides the essential information that is needed to guide the Board of Directors in establishing the budget in order to run the daily operations of your association. It is suggested that a third party professionally prepare the Reserve Study since there is no vested interest in the property. Also, a professional knows what to look for and how to properly develop an accurate and reliable component list. After we have a Reserve Study completed, what do we do with it? Hopefully, you will not look at this report and think it is too cumbersome to understand. Our intention is to make this Reserve Study easy to read and understand. Please take the time to review it carefully and make sure the main ingredients (component information) are complete and accurate. If there are any inaccuracies, please inform us immediately so we may revise the report. Once you feel the report is an accurate tool to work from, use it to help establish your budget for the upcoming fiscal year. The reserve allocation makes up a large portion of the total monthly dues and this report should help you determine the correct amount of money to go into the reserve fund. Additionally, the Reserve Study should act as a guide to obtain proposals in advance of pending projects. This will give you an opportunity to shop around for the best price available. The Reserve Study should be readily available for real estate agents, brokerage firms, and lending institutions for potential future homeowners. As the importance of reserves becomes more of a household term, people are requesting homeowners associations reveal the strength of the reserve fund prior to purchasing a condominium, town home, or any property that belongs to an association. How often do we update or review the Reserve Study? Unfortunately, there is a misconception that these reports are good for an extended period of time since the report has projections for the next 30 years. Just like any major line item in the budget, the Reserve Study should be reviewed each year before the budget is established. Invariably, some assumptions have to be made during the compilation of this analysis. Anticipated events may not materialize and unpredictable circumstances could occur. Deterioration rates and repair/replacement costs will vary from causes that are unforeseen. Earned interest rates may vary from year to year. These variations could alter the content of the Reserve Study. Therefore, this analysis should be reviewed annually, and a property inspection should be conducted at least once every three years. Is it the law to have a Reserve Study conducted? The Government requires reserve analyses in approximately 20 States. Even if it is not currently governed by your State, the chances are very good that the documents of the association require the association to have a reserve fund established. This doesn t mean a Reserve Study is required, but how are you going to know you have enough funds in the account if you don t have the proper information? Some associations look at the Reserve fund and think that $50,000 is a lot of money and they are in good shape. What they don t know is that the roof is going to need to be replaced within 5 years, and the cost of the roof is going to exceed $75,000. So while $50,000 sounds like a lot of money, in reality it won t even cover the cost of a roof, let alone all the other amenities the association is responsible to maintain. What is a Reserve Component versus an Operating Component? A Reserve component is an item that is the responsibility of the association to maintain, has a limited useful life, predictable remaining useful life, typically occurs on a cyclical basis that exceeds 1 year, and costs above a minimum threshold amount. An Operating expense is typically a fixed expense that occurs on an annual basis. For instance, minor repairs to a roof for damage caused by high winds or other weather elements would be considered an Operating expense. However, if the entire roof needs to be replaced because it has reached the end of its life expectancy, then the replacement would be considered a reserve expense. What are the GREY areas of maintenance items that are often seen in a Reserve Study? One of the most popular questions revolves around major maintenance items, such as painting the buildings or seal coating the asphalt. You may hear from your accountant that since painting or seal coating is not replacing a capital 3

6 item, then it cannot be considered a Reserve issue. However, it is the opinion of several major Reserve Study providers that these items are considered to be major expenses that occur on a cyclical basis. Therefore, it makes it very difficult to ignore a major expense that meets the criteria to be considered a reserve component. Once explained in this context, many accountants tend to agree and will include any expenses, such as these examples, as a reserve component. What happens during the Property Inspection? The Property Inspection was conducted following a review of the documents that were established by the developer identifying all common area assets. In some cases, the Board of Directors at some point may have revised the documents. In either case, the most current set of documents was reviewed prior to inspecting the property. In addition, common area assets may have been reported to Complex Solutions by the client, or by other parties. Estimated life expectancies and life cycles are based upon conditions that were readily accessible and visible at the time of the inspection. We did not destroy any landscape work, building walls, or perform any methods of intrusive investigation during the inspection. In these cases, information may have been obtained by contacting the contractor or vendor that has worked on the property. What is the Financial Analysis? We projected the starting balance by taking the most recent balance statement, adding expected reserve contributions for the rest of the fiscal year, and subtracting any pending projects that will be paid for before the end of the current fiscal year. We compared this number to the ideal reserve balance and arrived at the percent funded level. Measures of strength are as follows: 0% - 30% Funded is considered to be a weak financial position. Associations that fall into this category are subject to special assessments and deferred maintenance, which could lead to lower property values. If the association is in this position, actions should be taken to improve the financial strength of the reserve fund. 31% - 69% Funded is considered a fair financial position. The majority of associations fall into this category. While this doesn t represent financial strength and stability, the likelihood of special assessments and deferred maintenance is diminished. Effort should be taken to continue strengthening the financial position of the reserve fund. 70% - 99% Funded is considered a strong financial position. This indicates financial strength of a reserve fund and every attempt to maintain this level should be a goal of the association. 100% Funded is considered an ideal financial position. This means that the association has the exact amount of funds in the reserve account. 4

7 Funding Summary Beginning Assumptions # of units 83 Fiscal Year End 31-Dec Projected Starting Reserve Balance $15,000 Ideal Starting Reserve Balance $90,975 Economic Assumptions Current Inflation Rate 3.00% Reported After-Tax Interest Rate 2.00% Current Reserve Status Current Balance as a % of Ideal Balance 16% Recommendations Recommended Monthly Reserve Allocation $4,500 Per Unit $54.22 Future Annual Increases 3.00% For number of years: 12 Increases thereafter: 2.25% Minimum Recommended Monthly Reserve Allocation $4,125 Per Unit $49.70 Future Annual Increases 3.00% For number of years: 12 Increases thereafter: 2.25% 5

8 Percent Funded - Graph 120% 100% % Level of Funding 80% 60% 40% 20% 0% Recommended Year Minimum 6

9 Category ID # Component Name Component Inventory Useful Life (yrs.) Remaining Useful Life (yrs.) Best Cost Worst Cost Roofing 103 Flat Roof - EPDM - Replace $112,400 $129, Carport Roof - Repair 6 4 $1,150 $1,450 Painted Surfaces 201 Stucco Surfaces - Repaint 10 8 $70,700 $92, Trim/Railings - Repaint 5 3 $50,000 $60, Wrought Iron Fencing - Repaint 4 2 $4,600 $5, Wood Fencing - Seal N/A $0 $0 216 Interior Surfaces - Repaint 9 7 $4,200 $6,150 Drive Materials 401 Asphalt - Overlay $20,000 $22, Asphalt - Slurry Seal 5 3 $2,700 $3,650 Property Access 502 Garage Doors - Replace $4,000 $5,000 Decking 602 Concrete Pavers/Brick - Repair $0 $0 604 Elastomeric Deck - Resurface $64,500 $68,500 Mechanical Equip. 704 Garage Heaters - Replace $3,500 $4, HVAC Condenser/Furnace - Replace $3,500 $4, Elevators - Modernize $80,000 $100, Emergency Generator - Replace $30,000 $40,000 Prop. Identification 801 Monument Sign - Replace $3,000 $5, Mailboxes - Replace $8,100 $9,300 Security 905 Phone Entry Systems - Replace $8,000 $10, Vehicle Gate Operators - Replace 8 9 $6,000 $7,000 Fencing 1001 Wood Fencing - Replace $10,600 $12, Wrought Iron Fencing - Replace $17,900 $23,000 Recreation Equip Drinking Fountains - Replace 7 5 $1,400 $1,800 Interiors 1405 Furniture - Replace 10 8 $4,000 $6, Ceiling Tile - Replace $900 $1,150 Flooring 1501 Carpeting - Replace 9 7 $2,400 $3,000 Light Fixtures 1608 Can Lights - Replace $2,100 $2, Ceiling Lights - Replace $25,200 $31,500 7

10 Significant Components ID # Component Name Useful Life (yrs.) Remaining Useful Life (yrs.) Average Current Cost Significance: (Curr Cost/UL) As $ As % 103 Flat Roof - EPDM - Replace $121,050 $6, % 123 Carport Roof - Repair 6 4 $1,300 $ % 201 Stucco Surfaces - Repaint 10 8 $81,838 $8, % 202 Trim/Railings - Repaint 5 3 $55,000 $11, % 207 Wrought Iron Fencing - Repaint 4 2 $5,100 $1, % 216 Interior Surfaces - Repaint 9 7 $5,175 $ % 401 Asphalt - Overlay $21,350 $1, % 402 Asphalt - Slurry Seal 5 3 $3,175 $ % 502 Garage Doors - Replace $4,500 $ % 604 Elastomeric Deck - Resurface $66,500 $3, % 704 Garage Heaters - Replace $4,000 $ % 705 HVAC Condenser/Furnace - Replace $3,750 $ % 707 Elevators - Modernize $90,000 $4, % 710 Emergency Generator - Replace $35,000 $1, % 801 Monument Sign - Replace $4,000 $ % 803 Mailboxes - Replace $8,700 $ % 905 Phone Entry Systems - Replace $9,000 $ % 906 Vehicle Gate Operators - Replace 8 9 $6,500 $ % 1001 Wood Fencing - Replace $11,450 $ % 1002 Wrought Iron Fencing - Replace $20,450 $1, % 1304 Drinking Fountains - Replace 7 5 $1,600 $ % 1405 Furniture - Replace 10 8 $5,000 $ % 1490 Ceiling Tile - Replace $1,025 $ % 1501 Carpeting - Replace 9 7 $2,700 $ % 1608 Can Lights - Replace $2,363 $ % 1608 Ceiling Lights - Replace $28,350 $1, % 8

11 Significant Components - Graph 202 Trim/Railings - Repaint 201 Stucco Surfaces - Repaint 103 Flat Roof - EPDM - Replace 707 Elevators - Modernize All Other 34% 24% 10% 14% 18% Useful Life (yrs.) Remaining Useful Life (yrs.) Average Current Cost Significance: ID # Component Name (Curr Cost/UL) As $ As % 202 Trim/Railings - Repaint 5 3 $55,000 $11,000 24% 201 Stucco Surfaces - Repaint 10 8 $81,838 $8,184 18% 103 Flat Roof - EPDM - Replace $121,050 $6,725 14% 707 Elevators - Modernize $90,000 $4,500 10% All Other See Expanded Table For Breakdown $16,298 35% 9

12 Yearly Summary Year Fully Funded Balance Starting Reserve Balance Percent Funded Reserve Contributions Interest Income Reserve Expenses 2008 $90,975 $15,000 16% $54,000 $848 $ $141,812 $69,848 49% $55,620 $1,971 $ $195,617 $127,439 65% $57,289 $3,096 $5, $246,950 $182,413 74% $59,007 $3,636 $63, $241,450 $181,486 75% $60,777 $4,262 $1, $301,332 $245,063 81% $62,601 $5,559 $1, $364,231 $311,368 85% $64,479 $6,874 $6, $426,328 $376,631 88% $66,413 $8,175 $9, $488,309 $441,534 90% $68,406 $7,749 $183, $374,691 $333,990 89% $70,458 $7,367 $8, $439,965 $403,334 92% $72,571 $8,665 $20, $496,499 $463,874 93% $74,749 $10,117 $ $577,986 $548,740 95% $76,991 $11,830 $2, $661,566 $635,279 96% $78,723 $12,570 $103, $645,196 $622,821 97% $80,495 $13,187 $19, $717,299 $697,066 97% $82,306 $14,900 $ $813,768 $794,273 98% $84,158 $13,378 $347, $557,889 $544,731 98% $86,051 $11,755 $10, $643,074 $631,794 98% $87,987 $8,310 $528, $200,219 $199, % $89,967 $4,914 $2, $287,692 $291, % $91,991 $6,822 $ $383,210 $390, % $94,061 $8,837 $ $484,201 $493, % $96,178 $10,637 $29, $560,512 $570, % $98,342 $10,662 $183, $482,866 $496, % $100,554 $11,028 $ $595,145 $607, % $102,817 $13,000 $30, $682,725 $693, % $105,130 $14,911 $14, $792,072 $798, % $107,495 $17,212 $ $922,695 $923, % $109,914 $16,087 $363, $686,249 $686, % $112,387 $14,989 $0 10

13 Reserve Contributions - Graph Monthly Reserve Contributions $12,000 $10,000 $8,000 $6,000 $4,000 $2,000 $ Recommended Year Minimum 11

14 Component Funding Information ID Component Name Average Current Cost Future Cost Ideal Balance Current Fund Balance Monthly 103 Flat Roof - EPDM - Replace $121,050 $194,250 $13,450 $0 $ Carport Roof - Repair $1,300 $1,463 $433 $0 $ Stucco Surfaces - Repaint $81,838 $103,669 $16,368 $0 $ Trim/Railings - Repaint $55,000 $60,100 $22,000 $12,450 $1, Wrought Iron Fencing - Repaint $5,100 $5,411 $2,550 $2,550 $ Interior Surfaces - Repaint $5,175 $6,365 $1,150 $0 $ Asphalt - Overlay $21,350 $36,347 $2,135 $0 $ Asphalt - Slurry Seal $3,175 $3,469 $1,270 $0 $ Garage Doors - Replace $4,500 $7,221 $500 $0 $ Elastomeric Deck - Resurface $66,500 $106,713 $7,389 $0 $ Garage Heaters - Replace $4,000 $6,050 $500 $0 $ HVAC Condenser/Furnace - Replace $3,750 $5,672 $469 $0 $ Elevators - Modernize $90,000 $153,219 $9,000 $0 $ Emergency Generator - Replace $35,000 $69,076 $2,800 $0 $ Monument Sign - Replace $4,000 $6,419 $444 $0 $ Mailboxes - Replace $8,700 $13,961 $967 $0 $ Phone Entry Systems - Replace $9,000 $12,095 $1,500 $0 $ Vehicle Gate Operators - Replace $6,500 $8,481 $0 $0 $ Wood Fencing - Replace $11,450 $16,815 $1,527 $0 $ Wrought Iron Fencing - Replace $20,450 $34,815 $2,045 $0 $ Drinking Fountains - Replace $1,600 $1,855 $457 $0 $ Furniture - Replace $5,000 $6,334 $1,000 $0 $ Ceiling Tile - Replace $1,025 $1,505 $137 $0 $ Carpeting - Replace $2,700 $3,321 $600 $0 $ Can Lights - Replace $2,363 $3,791 $263 $0 $ Ceiling Lights - Replace $28,350 $48,264 $2,835 $0 $ $91,788 $15,000 $4,500 Current Fund Balance as a percentage of Ideal Balance: 16% 12

15 Yearly Cash Flow Year Starting Balance $15,000 $69,848 $127,439 $182,413 $181,486 Reserve Income $54,000 $55,620 $57,289 $59,007 $60,777 Interest Earnings $848 $1,971 $3,096 $3,636 $4,262 Special Assessments $0 $0 $0 $0 $0 Funds Available $69,848 $127,439 $187,823 $245,056 $246,526 Reserve Expenditures $0 $0 $5,411 $63,569 $1,463 Ending Balance $69,848 $127,439 $182,413 $181,486 $245,063 Year Starting Balance $245,063 $311,368 $376,631 $441,534 $333,990 Reserve Income $62,601 $64,479 $66,413 $68,406 $70,458 Interest Earnings $5,559 $6,874 $8,175 $7,749 $7,367 Special Assessments $0 $0 $0 $0 $0 Funds Available $313,223 $382,721 $451,219 $517,688 $411,815 Reserve Expenditures $1,855 $6,090 $9,685 $183,697 $8,481 Ending Balance $311,368 $376,631 $441,534 $333,990 $403,334 Year Starting Balance $403,334 $463,874 $548,740 $635,279 $622,821 Reserve Income $72,571 $74,749 $76,991 $78,723 $80,495 Interest Earnings $8,665 $10,117 $11,830 $12,570 $13,187 Special Assessments $0 $0 $0 $0 $0 Funds Available $484,570 $548,740 $637,561 $726,573 $716,503 Reserve Expenditures $20,696 $0 $2,281 $103,752 $19,437 Ending Balance $463,874 $548,740 $635,279 $622,821 $697,066 Year Starting Balance $697,066 $794,273 $544,731 $631,794 $199,889 Reserve Income $82,306 $84,158 $86,051 $87,987 $89,967 Interest Earnings $14,900 $13,378 $11,755 $8,310 $4,914 Special Assessments $0 $0 $0 $0 $0 Funds Available $794,273 $891,809 $642,537 $728,091 $294,771 Reserve Expenditures $0 $347,078 $10,744 $528,201 $2,806 Ending Balance $794,273 $544,731 $631,794 $199,889 $291,965 Year Starting Balance $291,965 $390,778 $493,676 $570,983 $496,097 Reserve Income $91,991 $94,061 $96,178 $98,342 $100,554 Interest Earnings $6,822 $8,837 $10,637 $10,662 $11,028 Special Assessments $0 $0 $0 $0 $0 Funds Available $390,778 $493,676 $600,491 $679,986 $607,680 Reserve Expenditures $0 $0 $29,508 $183,889 $0 Ending Balance $390,778 $493,676 $570,983 $496,097 $607,680 Year Starting Balance $607,680 $693,398 $798,990 $923,697 $686,404 Reserve Income $102,817 $105,130 $107,495 $109,914 $112,387 Interest Earnings $13,000 $14,911 $17,212 $16,087 $14,989 Special Assessments $0 $0 $0 $0 $0 Funds Available $723,496 $813,439 $923,697 $1,049,698 $813,780 Reserve Expenditures $30,098 $14,449 $0 $363,294 $0 Ending Balance $693,398 $798,990 $923,697 $686,404 $813,780 13

16 Yearly Reserve Expenditures - Graph $600,000 $500,000 $400,000 Annual Totals $300,000 $200,000 $100,000 $ Year

17 Projected Reserve Expenditures by Year Year ID # Component Name Projected Cost Total Per Annum 2008 No Expenditures Projected $ No Expenditures Projected $ Wrought Iron Fencing - Repaint $5,411 $5, Trim/Railings - Repaint $60, Asphalt - Slurry Seal $3,469 $63, Carport Roof - Repair $1,463 $1, Drinking Fountains - Replace $1,855 $1, Wrought Iron Fencing - Repaint $6,090 $6, Interior Surfaces - Repaint $6, Carpeting - Replace $3,321 $9, Stucco Surfaces - Repaint $103, Trim/Railings - Repaint $69, Asphalt - Slurry Seal $4, Furniture - Replace $6,334 $183, Vehicle Gate Operators - Replace $8,481 $8, Carport Roof - Repair $1, Wrought Iron Fencing - Repaint $6, Phone Entry Systems - Replace $12,095 $20, No Expenditures Projected $ Drinking Fountains - Replace $2,281 $2, Trim/Railings - Repaint $80, Asphalt - Slurry Seal $4, Wood Fencing - Replace $16, Ceiling Tile - Replace $1,505 $103, Wrought Iron Fencing - Repaint $7, Garage Heaters - Replace $6, HVAC Condenser/Furnace - Replace $5,672 $19, No Expenditures Projected $ Flat Roof - EPDM - Replace $194, Carport Roof - Repair $2, Interior Surfaces - Repaint $8, Garage Doors - Replace $7, Elastomeric Deck - Resurface $106, Monument Sign - Replace $6, Mailboxes - Replace $13, Carpeting - Replace $4, Can Lights - Replace $3,791 $347, Vehicle Gate Operators - Replace $10,744 $10, Stucco Surfaces - Repaint $139, Trim/Railings - Repaint $93, Wrought Iron Fencing - Repaint $8, Asphalt - Overlay $36, Asphalt - Slurry Seal $5, Elevators - Modernize $153, Wrought Iron Fencing - Replace $34,815 15

18 Year Comp ID Component Name Projected Cost Total Per Annum 1405 Furniture - Replace $8, Ceiling Lights - Replace $48,264 $528, Drinking Fountains - Replace $2,806 $2, No Expenditures Projected $ No Expenditures Projected $ Carport Roof - Repair $2, Wrought Iron Fencing - Repaint $9, Phone Entry Systems - Replace $17,245 $29, Trim/Railings - Repaint $108, Asphalt - Slurry Seal $6, Emergency Generator - Replace $69,076 $183, No Expenditures Projected $ Interior Surfaces - Repaint $10, Vehicle Gate Operators - Replace $13, Carpeting - Replace $5,653 $30, Wrought Iron Fencing - Repaint $10, Drinking Fountains - Replace $3,451 $14, No Expenditures Projected $ Carport Roof - Repair $2, Stucco Surfaces - Repaint $187, Trim/Railings - Repaint $125, Asphalt - Slurry Seal $7, Wood Fencing - Replace $26, Furniture - Replace $11, Ceiling Tile - Replace $2,345 $363, No Expenditures Projected $ Wrought Iron Fencing - Repaint $12, Garage Heaters - Replace $9, HVAC Condenser/Furnace - Replace $9,102 $31,190 16

19 Component Evaluation Comp #: 103 Flat Roof - EPDM - Replace Building roofs Approx 34,575 Sq.ft. Quantity breakdown: Life Expectancy: 18 Remaining Life: 16 Best Cost: $112,400 $3.25/Sq.ft.; Estimate to replace roof 27,450 Sq.ft. - Building roofs 7,125 Sq.ft. - Second floor patio/common area 34,575 Sq.ft. - Total Worst Cost: $129,700 $3.75/Sq.ft.; Higher estimate for more labor costs Roof is in good condition. No problems noted at the time of inspection. This type of roof has a typical useful life of approximately 18 years. Remaining life based on current age. Page 1 of 28

20 Comp #: 123 Carport Roof - Repair Parking area Approx 7,700 Sq.ft. Life Expectancy: 6 Remaining Life: 4 Best Cost: $1,150 $1.00/Sq.ft.; Estimate to repair approx 15% of roofs Worst Cost: $1,450 $1.25/Sq.ft.; Higher estimate for more repairs No damage noted at the time of inspection. No expectation to completely replace carport roofs. We recommend funding to make periodic repairs. Page 2 of 28

21 Comp #: 201 Stucco Surfaces - Repaint Exterior stucco surfaces Approx 74,380 Sq.ft. Life Expectancy: 10 Remaining Life: 8 Best Cost: $70,700 $0.95/Sq.ft.; Estimate to repaint stucco surfaces Worst Cost: $92,975 $1.25/Sq.ft.; Higher estimate for more prep costs Painted stucco surfaces are generally in good condition, no significant staining or discoloration noted. Stucco surfaces should typically be repainted approximately every 10 to 12 years to protect stucco surface and maintain appearance. Page 3 of 28

22 Comp #: 202 Trim/Railings - Repaint Building trim surfaces See general notes Quantity breakdown: Life Expectancy: 5 Remaining Life: 3 Best Cost: $50,000 Estimate to repaint 2,500 Linear ft. of metal railings 22,275 Sq.ft. of painted metal surfaces Worst Cost: $60,000 Higher estimate No fading or paint loss noted at the time of inspection. We recommend painting these surfaces approximately every 5 years to maintain appearance and protect metal. Remaining life based on current age. Page 4 of 28

23 Comp #: 207 Wrought Iron Fencing - Repaint Perimeter fence Approx 510 Linear ft. Quantity breakdown: Life Expectancy: 4 Remaining Life: 2 Best Cost: $4,600 $9.00/Linear ft.; Estimate to repaint iron fence 200 Linear ft. - North perimeter 150 Linear ft. - South perimeter 160 Linear ft. - Patio deck 510 Linear ft. - Total Worst Cost: $5,600 $11.00/Linear ft; Higher estimate for additional prep work No rusting or paint loss noted. Expect to repaint this fencing approximately every 4 years to maintain appearance and protect metal. Page 5 of 28

24 Comp #: 209 Wood Fencing - Seal Perimeter fence Approx 425 Linear ft. Quantity breakdown: Life Expectancy: N/A Remaining Life: Best Cost: $0 100 Linear ft. - North perimeter 175 Linear ft. - South perimeter 150 Linear ft. - West perimeter 425 Linear ft. - Total Worst Cost: $0 Source of Information: Due to minimal cost we recommend sealing this fencing as necessary as an operating expense. No reserve funding necessary. Page 6 of 28

25 Comp #: 216 Interior Surfaces - Repaint Interior surfaces Approx 6,475 Sq.ft. Quantity breakdown: Life Expectancy: 9 Remaining Life: 7 Best Cost: $4,200 $.65/Sq.ft.; Estimate to repaint Worst Cost: $6,150 $.95/Sq.ft.; Higher estimate 2,925 Sq.ft. - Lobby 650 Sq.ft. - Mailbox area 1,725 Sq.ft. - North commercial hall 1,175 Sq.ft. - South commercial hall 6,475 Sq.ft. - Total Interior painted surfaces are in good condition. No significant marking noted or appearance concerns observed. Expect to repaint these surfaces approximately every 9 years to maintain appearance. Page 7 of 28

26 Comp #: 401 Asphalt - Overlay Parking area Approx 18,150 Sq.ft. Life Expectancy: 20 Remaining Life: 18 Best Cost: $20,000 $1.10/Sq.ft.; Estimate for overlay Worst Cost: $22,700 $1.25/Sq.ft.; Higher estimate for local repairs Asphalt surfaces are in good condition. No cracking or structural problems noted at the time of inspection. Seal these surfaces regularly (see Comp# 402 Asphalt - Slurry Seal) to protect surface and ensure full life. Page 8 of 28

27 Comp #: 402 Asphalt - Slurry Seal Parking area Approx 18,150 Sq.ft. Life Expectancy: 5 Remaining Life: 3 Best Cost: $2,700 $0.15/Sq.ft.; Estimate for seal coat only Worst Cost: $3,650 $0.20/Sq.ft.; Higher estimate for local repairs Asphalt seal coat is in good condition. No drying noted or significant cracking observed. Seal asphalt surfaces regularly to prevent premature overlay (see Comp# 401 Asphalt - Overlay). Remaining life based on current condition. Page 9 of 28

28 Comp #: 502 Garage Doors - Replace Garage (2) 25 X 10 ft. doors Life Expectancy: 18 Remaining Life: 16 Best Cost: $4,000 $2,000/Door; Estimate to replace doors Worst Cost: $5,000 $2,500/Door; Higher estimate for better quality No damage noted. We recommend funding to replace these doors approximately every 18 years to ensure proper function and appearance. Page 10 of 28

29 Comp #: 602 Concrete Pavers/Brick - Repair Patio deck Approx 7,125 Sq.ft. Life Expectancy: Best Cost: $0 Remaining Life: Worst Cost: $0 Source of Information: These pavers hold down the membrane roofing on the second floor. We recommend funding to make replacements to cracked pavers at the same time as the roof replacement (see Comp# 103 Flat Roof - EPDM - Replace). No separate reserve funding necessary. Page 11 of 28

30 Comp #: 604 Elastomeric Deck - Resurface Balcony decks Approx 4,030 Sq.ft. Life Expectancy: 18 Remaining Life: 16 Best Cost: $64,500 $16/Sq.ft.; Estimate to replace flat roof Worst Cost: $68,500 $17/Sq.ft.; Higher estimate for more installation costs Reported that the maintenance of these decks is the responsibility of the association. We recommend funding to resurface these decks approximately every 18 years. Page 12 of 28

31 Comp #: 704 Garage Heaters - Replace Garage (3) Heaters Life Expectancy: 16 Remaining Life: 14 Best Cost: $3,500 $1,750/Heater; Estimate to replace Worst Cost: $4,500 $2,250/Heater; Higher estimate Expect a useful life of approximately 16 years from this heater. Make repairs as necessary to ensure full life. Page 13 of 28

32 Comp #: 705 HVAC Condenser/Furnace - Replace Garage location, lobby (1) Condenser, (1) Furnace Life Expectancy: 16 Remaining Life: 14 Best Cost: $3,500 Estimate to replace Worst Cost: $4,000 Higher estimate for more installation costs Expect to replace condenser and furnace approximately every 16 years. Remaining life based on current age. Page 14 of 28

33 Comp #: 707 Elevators - Modernize Garage area (2) Elevators Life Expectancy: 20 Remaining Life: 18 Best Cost: $80,000 $40,000/Elevator; Estimate to modernize elevators Worst Cost: $100,000 $50/Elevator; Higher estimate for more upgrades No problems noted or reported at the time of inspection. Approximately every 20 to 25 years expect to make significant upgrades and replacements to elevator controllers and door packages. Remaining life based on current age. Page 15 of 28

34 Comp #: 710 Emergency Generator - Replace Adjacent to building (1) Generator Olympian D100P4 Life Expectancy: 25 Remaining Life: 23 Best Cost: $30,000 Estimate to replace Worst Cost: $40,000 Higher estimate Due to minimal use this component has a relatively long life. However we recommend funding to replace this generator approximately every 25 to 30 years to ensure the availability of parts and to keep up with modern technology. Page 16 of 28

35 Comp #: 801 Monument Sign - Replace Front of building (1) 13-Letter sign Life Expectancy: 18 Remaining Life: 16 Best Cost: $3,000 Estimate to replace Worst Cost: $5,000 Higher estimate Sign is comprised of (13) aluminum backlit letters. Sign is in good condition. Expect to replace this sign approximately every 18 years to maintain appearance. Page 17 of 28

36 Comp #: 803 Mailboxes - Replace Mailbox area (6) Clusters Quantity breakdown: Life Expectancy: 18 Remaining Life: 16 Best Cost: $8,100 $1,350/Cluster; Estimate to replace mailbox clusters (4) 21-Box clusters (2) 6-Parcel box clusters (6) Clusters Worst Cost: $9,300 $1,550/Cluster; Higher estimate for more installation costs We recommend funding to replace these clusters approximately every 18 years to maintain appearance and ensure proper function. Page 18 of 28

37 Comp #: 905 Phone Entry Systems - Replace Entrance to building, entry to parking area (2) Systems Life Expectancy: 12 Remaining Life: 10 Best Cost: $8,000 $4,000/System; Estimate to replace system Worst Cost: $10,000 $5,000/System; Higher estimate for more installation costs System at parking area had not been installed at the time of inspection. No problems noted with building entry system. Expect a useful life of approximately 12 years from this component. Page 19 of 28

38 Comp #: 906 Vehicle Gate Operators - Replace Entry to parking area (2) Operators Life Expectancy: 8 Remaining Life: 9 Best Cost: $6,000 $3,000/Operator; Estimate to replace operators Worst Cost: $7,000 $3,500/Operator; Higher estimate for more installaton cost Gate operators had not been installed at the time of inspection. Once installed we recommend funding to replace these operators approximately every 8 years. Page 20 of 28

39 Comp #: 1001 Wood Fencing - Replace Perimeter fence Approx 425 Linear ft. Quantity breakdown: Life Expectancy: 15 Remaining Life: 13 Best Cost: $10,600 $25/Linear ft.; Estimate to replace fence 100 Linear ft. - North perimeter 175 Linear ft. - South perimeter 150 Linear ft. - West perimeter 425 Linear ft. - Total Worst Cost: $12,300 $29/Linear ft.; Higher estimate for more installation costs Expect a useful life of approximately 15 years from this type of fence. Seal fence regularly to protect fence and ensure full life. Page 21 of 28

40 Comp #: 1002 Wrought Iron Fencing - Replace Perimeter fence Approx 510 Linear ft. Quantity breakdown: Life Expectancy: 20 Remaining Life: 18 Best Cost: $17,900 $35/Linear ft.; Estimate to replace fence 200 Linear ft. - North perimeter 150 Linear ft. - South perimeter 160 Linear ft. - Patio deck 510 Linear ft. - Total Worst Cost: $23,000 $45/Linear ft.; Higher estimate for more labor Fencing is in good condition. No significant rusting or structural problems noted at the time of inspection. With regular painting and maintenance, expect a useful life of 20 to 25 years from this component. Remaining life based on current age. Page 22 of 28

41 Comp #: 1304 Drinking Fountains - Replace Lobby (2) Fountains Life Expectancy: 7 Remaining Life: 5 Best Cost: $1,400 $700/Fountain; Estimate to replace drinking fountain Worst Cost: $1,800 $900/Fountain; Higher estimate for more installation costs Drinking fountains are in good condition. No corrosion or damage noted. No signs of significant wear. Expect to replace these fountains approximately every 7 years. Page 23 of 28

42 Comp #: 1405 Furniture - Replace Lobby See general notes Quantity breakdown: Life Expectancy: 10 Remaining Life: 8 Best Cost: $4,000 Estimate to replace (3) Padded chairs (2) Arm chairs (2) Love seats (2) Tables (4) Potted plants Worst Cost: $6,000 Higher estimate We recommend funding to replace this furniture approximately every 8 years to maintain appearance in the lobby area. Remaining life based on current age. Page 24 of 28

43 Comp #: 1490 Ceiling Tile - Replace Commercial hallways Approx 900 Sq.ft. Life Expectancy: 15 Remaining Life: 13 Best Cost: $900 $1.00/Sq.ft.; Estimate to replace ceiling tile Worst Cost: $1,150 $1.25/Sq.ft.; Estimate to replace ceiling tile We recommend funding to replace the ceiling tiles approximately every 15 years to maintain appearance. Page 25 of 28

44 Comp #: 1501 Carpeting - Replace Lobby Approx 775 Sq.ft. Quantity breakdown: Life Expectancy: 9 Remaining Life: 7 Best Cost: $2,400 $3.10/Sq.ft.; Estimate to replace 525 Sq.ft. - Lobby 250 Sq.ft. - Mailbox area 775 Sq.ft. - Total Worst Cost: $3,000 $3.90/Sq.ft.; Higher estimate for better quality Carpeting is in good condition. We recommend funding to replace this carpeting approximately every 9 years. Page 26 of 28

45 Comp #: 1608 Can Lights - Replace Lobby and hallways (35) Can lights Quantity breakdown: Life Expectancy: 18 Remaining Life: 16 Best Cost: $2,100 $60/Light; Estimate to replace Worst Cost: $2,625 $75/Light; Higher estimate (20) Lights - Lobby (3) Lights - Mailbox area (7) Lights - North commercial hall (5) Lights - South commercial hall (35) Lights - Total Lights are in good condition. Expect to replace these lights approximately every 18 years to maintain appearance and function. Page 27 of 28

46 Comp #: 1608 Ceiling Lights - Replace See general notes Approx 126 Lights Quantity breakdown: Life Expectancy: 20 Remaining Life: 18 Best Cost: $25,200 $200/Light; Estimate to replace (42) Lights - 3rd Floor (42) Lights - 4th Floor (42) Lights - 5th Floor (126) Lights - Total Worst Cost: $31,500 $250/Light; Higher estimate Lights are in good condition. Expect a typical useful life of approximately 20 years from this type of fixture. Page 28 of 28

47 Glossary of Commonly Used Words And Phrases (Provided by the National Reserve Study Standards of the Community Associations Institute) Cash Flow Method A method of developing a reserve funding plan where contributions to the reserve fund are designed to offset the variable annual expenditures from the reserve fund. Different reserve funding plans are tested against the anticipated schedule of reserve expenses until the desired funding goal is achieved. Component Also referred to as an Asset. Individual line items in the Reserve Study developed or updated in the physical analysis. These elements form the building blocks for the Reserve Study. Components typically are: 1) Association responsibility, 2) with limited useful life expectancies, 3) have predictable remaining life expectancies, 4) above a minimum threshold cost, and 5) required by local codes. Component Full Funding When the actual (or projected) cumulative reserve balance for all components is equal to the fully funded balance. Component Inventory The task of selecting and quantifying reserve components. This task can be accomplished through on-site visual observations, review of association design and organizational documents, a review of established association precedents, and discussion with appropriate association representatives. Deficit An actual (or projected reserve balance), which is less than the fully funded balance. Effective Age The difference between useful life and remaining useful life (UL - RUL). Financial Analysis The portion of the Reserve Study where current status of the reserves (measured as cash or percent funded) and a recommended reserve contribution rate (reserve funding plan) are derived, and the projected reserve income and expenses over time is presented. The financial analysis is one of the two parts of the Reserve Study. Fully Funded Balance An indicator against which the actual (or projected) reserve balance can be compared. The reserve balance that is in direct proportion to the fraction of life used up of the current repair or replacement cost of a reserve component. This number is calculated for each component, and then summed together for an association total. FFB = Current Cost * Effective Age / Useful Life Fund Status The status of the reserve fund as compared to an established benchmark, such as percent funded. Funding Goals Independent of calculation methodology utilized, the following represent the basic categories of funding plan goals: Baseline Funding: Establishing a reserve-funding goal of keeping the reserve balance above zero. Component Full Funding: Setting a reserve funding goal of attaining and maintaining cumulative reserves at or near 100% funded. Threshold Funding: Establishing a reserve funding goal of keeping the reserve balance above a specified dollar or percent funded amount. Funding Plan An association s plan to provide income to a reserve fund to offset anticipated expenditures from that fund.

48 Funding Principles Sufficient funds when required Stable contributions through the year Evenly distributed contributions over the years Fiscally responsible GSF - Gross Square Feet Life and Valuation Estimates The task of estimating useful life, remaining useful life, and repair or replacement costs for the reserve components. LF - Linear Feet Percent Funded The ratio, at a particular point in time (typically the beginning of the fiscal year), of the actual (or projected) reserve balance to the ideal fund balance, expressed as a percentage. Physical Analysis The portion of the Reserve Study where the component evaluation, condition assessment, and life and valuation estimate tasks are performed. This represents one of the two parts of the Reserve Study. Remaining Useful Life (RUL) Also referred to as remaining life (RL). The estimated time, in years, that a reserve component can be expected to continue to serve its intended function. Projects anticipated to occur in the current fiscal year have a 0 remaining useful life. Replacement Cost The cost of replacing, repairing, or restoring a reserve component to its original functional condition. The current replacement cost would be the cost to replace, repair, or restore the component during that particular year. Reserve Balance Actual or projected funds as of a particular point in time (typically the beginning of the fiscal year) that the association has identified for use to defray the future repair or replacement of those major components that the association is obligated to maintain. Also known as reserves, reserve accounts, or cash reserves. In this report the reserve balance is based upon information provided and is not audited. Reserve Study A budget-planning tool, which identifies the current status of the reserve fund and a stable and equitable funding plan to offset the anticipated future major common area expenditures. The Reserve Study consists of two parts: The Physical Analysis and the Financial Analysis. Special Assessment An assessment levied on the members of an association in addition to regular assessments. Governing documents or local statutes often regulate special assessments. Surplus An actual (or projected) reserve balance that is greater than the fully funded balance. Useful Life (UL) Also known as life expectancy. The estimated time, in years, that a reserve component can be expected to serve its intended function if properly constructed and maintained in its present application of installation.

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By Clearbrook HOA Level 1 Reserve Study Report Period 1/1/2010 12/31/2010 Client Reference Number 11775 Property Type Apartment Style Number of Units 21 Fiscal Year End 12/31 Date of Property Inspection 3/23/2010

More information

Kayscreek Estates HOA

Kayscreek Estates HOA Kayscreek Estates HOA Level I Reserve Study Report Period 1/01/09 12/31/09 Client Reference Number.... 11004 Property Type........ Single Family Homes Number of Units............. 276 Fiscal Year End.........

More information

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08 The Ranches HOA Level II Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10329 Property Type..... Single Family Homes Number of Units.......... 1,750 Fiscal Year End......... December

More information

Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111

Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111 Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111 Level 3 Reserve Analysis Reserve Study without Property Inspection Report Period 01/01/11 12/31/011 Date of Property Inspection Inspector Report

More information

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012 Parkwood HOA Level 1 Reserve Study Report Period 1/1/2012 12/31/2012 Client Reference Number Property Type Number of Units Fiscal Year End 12784 Townhouse 8 12/31 Date of Property Inspection Prepared By

More information

Bridgewood Manor HOA

Bridgewood Manor HOA Bridgewood Manor HOA Level 1 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 18076 Property Type Condominium Number of Units 40 Fiscal Year End 12/31 Date of Property Inspection

More information

Sun Peak Master Association

Sun Peak Master Association Sun Peak Master Association Level 1 Reserve Study Report Period 01/01/2014 12/31/2014 Client Reference Number Property Type Fiscal Year End 17547 Master 12/31 Date of Property Inspection Prepared By Analysis

More information

Sample Community Association

Sample Community Association Level 1 Reserve Study Report Period - 1/1/2018 to 12/31/2018 Client Reference Number 10014 Property Type Condominium Number of Units 150 Fiscal Year End 12/31 Type of Study Full Study Date of Site Visit

More information

Pemberley at Robinsons Grove

Pemberley at Robinsons Grove Pemberley at Robinsons Grove Level I Reserve Study Report Period 1/01/06 12/31/06 Client Reference Number.... 10429 Property Type...... Apartment Style Number of Units............. 160 Fiscal Year End.......

More information

August 19, Raintree HOA Attn: Emily Bresina HOA Simple PO Box Denver, CO Regarding: Reserve Study Draft.

August 19, Raintree HOA Attn: Emily Bresina HOA Simple PO Box Denver, CO Regarding: Reserve Study Draft. August 19, 2015 Raintree HOA Attn: Emily Bresina HOA Simple PO Box 13823 Denver, CO 80201 Regarding: Reserve Study Draft Dear Emily: Please find enclosed a Draft version of the Reserve Study for Summerhill

More information

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014 Shadow Ridge Level 2 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 10160 Property Type Condominium Number of Units 168 Fiscal Year End 12/31 Date of Property Inspection 8/21/2014

More information

Indian Peaks Townhomes 95 th Street Lafayette, CO 80026

Indian Peaks Townhomes 95 th Street Lafayette, CO 80026 Indian Peaks Townhomes 95 th Street Lafayette, CO 80026 Level 2, Premium Reserve Analysis Report Period 01/01/16 12/31/16 Client Reference Number - 4080 Property Type Townhome Development Number of Units

More information

The Ranches HOA. Level 2 Reserve Study. Report Period 1/1/ /31/2012. Report prepared on Monday, September 19, 2011

The Ranches HOA. Level 2 Reserve Study. Report Period 1/1/ /31/2012. Report prepared on Monday, September 19, 2011 The Ranches HOA Level 2 Reserve Study Report Period 1/1/2012 12/31/2012 Client Reference Number Property Type Number of Units Fiscal Year End 10329 Single Family Homes 2800 12/31 Date of Property Inspection

More information

Estates at River Ranch HOA

Estates at River Ranch HOA Full Reserve Study Estates at River Ranch HOA Tucson, Arizona Report #: 29634-0 For Period Beginning: January 1, 2017 Expires: December 31, 2017 Date Prepared: June 15, 2016 Hello, and welcome to your

More information

Arizona Nevada Texas Utah New Mexico

Arizona Nevada Texas Utah New Mexico Arizona Nevada Texas Utah New Mexico 9/12/2016 Summit Park HOA Regarding: Fiscal Year beginning 1/1/2017 Level II Capital Replacement Reserve Study We are pleased to submit this Level II Reserve Study

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY Arizona Texas Nevada Utah New Mexico CAPITAL RESERVE STUDY Prepared for: Quail Creek HOA Date of Report: 6/7/2018 Capital Reserve Analysts Bringing the future into the present Capital Reserve Analysts,

More information

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums.

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums. 1825 W. Ray Road, #1135, Chandler, AZ 85244 support@azreservestudy.com Tel: (480) 620-4757 Fax: (888) 842-9319 April 4, 2013 Summit Park Condominiums HOA Regarding: 2012 - Level I Capital Replacement Reserve

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association 21289 E. Lords Way Queen Creek, AZ 85142 support@azreservestudy.com Tel: (480) 840-7130 Fax: (888) 842-9319 October 27, 2012 Sample Association Regarding: 2013 - Level I Capital Replacement Reserve Study

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

Aspens Townhomes Arizona & Sable Blvd. Aurora, CO

Aspens Townhomes Arizona & Sable Blvd. Aurora, CO Aspens Townhomes Arizona & Sable Blvd. Aurora, CO. 80012 Level 1, Platinum Reserve Analysis Report Period 01/01/19-12/31/19 Client Reference Number - 3047 Property Type Townhomes FINAL Version Fiscal Year

More information

Quail Ridge THCA W. 17 th Ave Lakewood, CO 80224

Quail Ridge THCA W. 17 th Ave Lakewood, CO 80224 Quail Ridge THCA 11131-11167 W. 17 th Ave Lakewood, CO 80224 Level 1, Limited Reserve Analysis Report Period 5/01/16-4/30/17 Client Reference Number - 8173 Property Type Townhomes Number of Units 112 Fiscal

More information

Reserve Analysis Sample HOA 1234 Colorado Blvd. Your City, CO 80010

Reserve Analysis Sample HOA 1234 Colorado Blvd. Your City, CO 80010 Reserve Analysis Sample HOA 1234 Colorado Blvd. Your City, CO 80010 Level 1 Reserve Analysis Report Period 01/01/13 12/31/13 Client Reference Number - 1001 Property Type Townhouse Style Number of Units

More information

Crested Butte South POA 61 Teocalli Rd. Crested Butte, CO

Crested Butte South POA 61 Teocalli Rd. Crested Butte, CO Crested Butte South POA 61 Teocalli Rd. Crested Butte, CO. 81224 Level 2, Limited Reserve Analysis Report Period 01/01/18 12/31/18 Client Reference Number - 8363 Property Type Master Association FINAL

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Update With Site-Visit Reserve Study Park Place HOA Surprise, Arizona Report #: 12568-2 For Period Beginning: January 1, 2017 Expires: December 31, 2017 Date Prepared: October 4, 2016 Hello, and welcome

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample HOA 2663 S Oakland St Los Angeles, CA Level I Study with Site Inspection Fiscal Year End: 11/30/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: October 09, 2016 To: Joleen Cline, Cline & Associates From: Browning Reserve Group (BRG) Re: Whitehawk Townhomes Association; Update w/ Site Visit Review Attached,

More information

UPDATE - With Site Visit

UPDATE - With Site Visit SAMPLE Reserve Study UPDATE - With Site Visit Serving the Nation www.reservestudy.com Welcome to your Reserve Study! A Reserve Study is a valuable tool to help you budget responsibly for your property.

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

Country Club Townhomes

Country Club Townhomes Full Reserve Study Country Club Townhomes Dewey, Arizona Report #: 9621-0 For Period Beginning: January 1, 2016 Expires: December 31, 2016 Date Prepared: March 4, 2016 Hello, and welcome to your Reserve

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Park Avenue 244 Quari St Denver, CO Level II Study with Site Inspection Fiscal Year End Date: 12/31/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

RESERVE STUDY OTHER PROPERTY TYPES. Serving the Nation.

RESERVE STUDY OTHER PROPERTY TYPES. Serving the Nation. RESERVE STUDY OTHER PROPERTY TYPES Serving the Nation www.reservestudy.com Welcome to your Reserve Study! A Reserve Study is a valuable tool to help you budget responsibly for your property. This report

More information

Full Reserve Study. Nelson Farms HOA. Fort Collins, CO. Report #: For Period Beginning: May 1, 2016 Expires: April 30, 2017

Full Reserve Study. Nelson Farms HOA. Fort Collins, CO. Report #: For Period Beginning: May 1, 2016 Expires: April 30, 2017 Full Reserve Study Nelson Farms HOA Fort Collins, CO Report #: 19185-0 For Period Beginning: May 1, 2016 Expires: April 30, 2017 Date Revised: January 13, 2016 Hello, and welcome to your Reserve Study!

More information

Update "With-Site-Visit" Reserve Study

Update With-Site-Visit Reserve Study Update "With-Site-Visit" Reserve Study Sample Townhouse HOA Ventura, CA Report #: For Period Beginning: Expires: Date Prepared: 99999999-0 January 1, 2019 December 31, 2019 June 27, 2018 T W Hello, and

More information

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. Grand Firs HOA. Graham, WA

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. Grand Firs HOA. Graham, WA Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Full Reserve Study. Twenty Four Neighborhood TOA. Carbondale, CO

Full Reserve Study. Twenty Four Neighborhood TOA. Carbondale, CO Full Reserve Study Twenty Four Neighborhood TOA Carbondale, CO Report #: 21306-0 For Period Beginning: January 1, 2011 Ending: December 31, 2011 Revision Date (2): February, 9, 2011 Date Prepared: September

More information

Sunland Division 7 Condo

Sunland Division 7 Condo Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Full Reserve Study For Homeowners Association (HOA) At the Starlight Cove Community Located at Fairway Drive Boynton Beach, Florida 33437

Full Reserve Study For Homeowners Association (HOA) At the Starlight Cove Community Located at Fairway Drive Boynton Beach, Florida 33437 Full Reserve Study For Homeowners Association (HOA) At the Starlight Cove Community Located at 12241 Fairway Drive Boynton Beach, Florida 33437 Prepared by Sadat Engineering, Inc. Boynton Beach, Florida

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

Do-It-Yourself Reserve Study. Green Valley Resort Homes

Do-It-Yourself Reserve Study. Green Valley Resort Homes Do-It-Yourself Reserve Study Green Valley Resort Homes Green Valley, AZ Report #: 15034-2 For Period Beginning: January 1, 2018 Expires: December 31, 2018 Date Prepared: September 21, 2017 Hello, and welcome

More information

Floriston Property HOA

Floriston Property HOA Full Reserve Study Floriston Property HOA Floriston, CA Report #: 26862-0 For Period Beginning: April 1, 2014 Expires: March 31, 2015 Date Prepared: June 30, 2014 Hello, and welcome to your Reserve Study!

More information

SOMERSET VILLAGE DRAFT HOA RESERVE STUDY. Beginning Period: January 1, 2011 Ending: December 31, Prepared By:

SOMERSET VILLAGE DRAFT HOA RESERVE STUDY. Beginning Period: January 1, 2011 Ending: December 31, Prepared By: SOMERSET VILLAGE HOA RESERVE STUDY Beginning Period: January 1, 2011 Ending: December 31, 2011 Prepared By: Report Number: 10-003 Site Inspection Date: September 14, 2010 Report Submittal Date: October

More information

SAMPLE Reserve Study FULL. Serving the Nation.

SAMPLE Reserve Study FULL. Serving the Nation. SAMPLE Reserve Study FULL Serving the Nation www.reservestudy.com Welcome to your Reserve Study! A Reserve Study is a valuable tool to help you budget responsibly for your property. This report contains

More information

Sample Do-It-Yourself Reserve Study Sample Association Anywhere, USA

Sample Do-It-Yourself Reserve Study Sample Association Anywhere, USA Sample Do-It-Yourself Reserve Study Sample Association Anywhere, USA Report #: 9999-0 DIY For Period Beginning: January 1, 2014 Ending: December 31, 2014 Date Prepared: October 22, 2013 Hello, and welcome

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Smoky Ridge 19902 E Red Fox Ln Centennial, CO Level I Study with Site Inspection Fiscal Year End Date: 12/31/2017 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

Do-It-Yourself Reserve Study

Do-It-Yourself Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

Sample Reserve Study Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003

Sample Reserve Study Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003 Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003 Reserve Analyst P.O. Box 797 Vernon, AZ 85940 Phone: 800-561-0173 Fax: 928-537-3377 Prepared By Quality Check

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY Arizona Nevada Texas Utah New Mexico CAPITAL RESERVE STUDY prepared for: Midvale Park HOA Date of report: 2/23/2017 www.azreserveanalysts.com BRINGING THE FUTURE INTO THE PRESENT FOREWARD 2/23/2017 Midvale

More information

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. Steven's Cove HOA.

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. Steven's Cove HOA. Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community

More information

RESERVE STUDY UPDATE SUMMARY

RESERVE STUDY UPDATE SUMMARY RESERVE STUDY UPDATE SUMMARY for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925)

More information

RESERVE STUDY ANNUAL REPORT

RESERVE STUDY ANNUAL REPORT RESERVE STUDY ANNUAL REPORT PINELOCH SUN BEACH CLUB LEVEL III RESERVE STUDY UPDATE WITHOUT SITE VISIT Ronald, WA 98940 Report #50510500R FINANCIAL YEAR 01.2016 12.2016 701 Fifth Ave, Suite 4200, Seattle

More information

MILL CREEK CONDOMINIUMS RESERVE STUDY

MILL CREEK CONDOMINIUMS RESERVE STUDY MILL CREEK CONDOMINIUMS RESERVE STUDY Fiscal Year 2016 Prepared by: Eric Harker, Assoc. AIA Alliance Project Engineers and Construction Consultants November 6, 2015 Project Number: OR14-017 MILL CREEK

More information

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019.

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019. RESERVE STUDY UPDATE for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925) 831-1803

More information

Calusa Point Association

Calusa Point Association Full Reserve Study Calusa Point Association Miami, FL REVISION Report #: 29086-0 For Period Beginning: January 1, 2016 Expires: December 31, 2016 Date Prepared: November 11, 2015 Hello, and welcome to

More information

RESERVE STUDY LEVEL I - Full Reserve Study. ABC Condominium Association, Inc.

RESERVE STUDY LEVEL I - Full Reserve Study. ABC Condominium Association, Inc. Insurance Appraisals Reserve Studies Wind Mitigation RESERVE STUDY LEVEL I - Full Reserve Study Prepared for: ABC Condominium Association, Inc. For the period of January 1, 214 - December 31, 214 71 Enterprise

More information

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of:

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of: Pebble Shores Drive Naples, FL 34410 A Service of: 5036 Dr. Phillips Blvd, Suite 207, Orlando FL 32819 www.lcamresources.com October 31, 2018 Pebble Shores Condominium Pebble Shores Drive Naples, FL 34410

More information

Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY December 31, 2017

Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY December 31, 2017 Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY Section Page RESERVE STUDY EXECUTIVE SUMMARY 1-2 ASSESSMENT AND RESERVE FUNDING 3 DISCLOSURE SUMMARY (These 3 pages should be

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Soda Creek Condominiums Dillon, Colorado Version 2 Monday, August 19, 2013 6860 S. Yosemite Court, Suite 2000 Centennial, CO 80112 Phone (303) 953-2078 Facsimile (303) 953-2157

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

Belle Monet. Full Reserve Study Report by HOMECERTS.COM

Belle Monet. Full Reserve Study Report by HOMECERTS.COM Belle Monet Full Reserve Study Report by HOMECERTS.COM 800.683.5528 SUPPORT@HOMECERTS.COM Belle Monet Reserve Study Report as of June 5, 2015 538 South 2200 West Pleasant Grove, UT 84062 168 Units Completed

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

Full Capital Replacement Plan

Full Capital Replacement Plan Full Capital Replacement Plan Sample Church Anywhere, USA Report #: 9999-0 For Period Beginning: January 1, 2015 Expires: December 31, 2015 Date Prepared: July 6, 2015 Hello, and welcome to your Capital

More information

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT?

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? Tom Larson, PE, RS, PRA Facility Engineering Associates, PC What is a Reserve Study? A budget planning tool which identifies the current status of the

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Seavue Condominiums 130-5 th Avenue South, Edmonds, WA 98020 For: Seavue Homeowners Association c/o Jay Grant Board President (202) 351-9399 Prepared By: Jeff Samdal, PE, RS,

More information

Full Reserve Study. Sample Condominium. Anywhere, USA. Report #: For Period Beginning: January 1, 2016 Expires: December 31, 2016

Full Reserve Study. Sample Condominium. Anywhere, USA. Report #: For Period Beginning: January 1, 2016 Expires: December 31, 2016 Full Reserve Study Sample Condominium Anywhere, USA Report #: 25161-0 For Period Beginning: January 1, 2016 Expires: December 31, 2016 Date Prepared: June 19, 2015 Hello, and welcome to your Reserve Study!

More information

November 22, Boca Rio Condominium Homeowners Association Board of Directors Blossom Valley Road El Cajon, CA Attn: Robin Clegg

November 22, Boca Rio Condominium Homeowners Association Board of Directors Blossom Valley Road El Cajon, CA Attn: Robin Clegg Sonnenberg & Company, CPAs 5190 Governor Drive, Suite 201, San Diego, California 92122 Phone: (858) 457-5252 -- (800) 464-4HOA -- Fax: (858) 457-2211 -- (800) 303-4FAX November 22, 2017 Boca Rio Condominium

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Heritage Park 3208-52 nd Place NE, Tacoma, WA 98422 For: Heritage Park Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions 5500 Olympic Drive,

More information

RESERVE STUDY Component Analysis and Reserve Fund Plan Annual Review Study 2016/17 For Middlefield Meadows HOA Mountain View, CA Prepared By RESERVE ANALYSIS CONSULTING, LLC 1750 Bridgeway, Suite B106

More information

"Full" Reserve Study. Makaha Surfside AOAO Waianae, HI

Full Reserve Study. Makaha Surfside AOAO Waianae, HI "Full" Reserve Study Makaha Surfside AOAO Waianae, HI Report #: For Period Beginning: Expires: Date Prepared: 32902-0 January 1, 2018 December 31, 2018 May 9, 2018 T W Hello, and welcome to your Reserve

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Licorice Fern II Homeowners Association 16880 SE Licorice Way, Renton, WA 98059 For: Licorice Fern II Homeowners Association c/o Ann Hart, Property Manager Pinnacle 2801 Alaskan

More information

Update No Site-Visit Reserve Study

Update No Site-Visit Reserve Study Update No Site-Visit Reserve Study Crystal Lakes Road & Recreation Red Feather Lakes, CO Report #: 20978-2 For Period Beginning: June 1, 2016 Expires: May 31, 2017 Date Prepared: November 5, 2016 Hello,

More information

Hyde Park Place Owners' Association, Inc.

Hyde Park Place Owners' Association, Inc. RESERVE STUDY Full Study Hyde Park Place Owners' Association, Inc. Published - February 10, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

GARDEN ESTATES MAINTENANCE ASSOCIATION ("CORPORATION")

GARDEN ESTATES MAINTENANCE ASSOCIATION (CORPORATION) info@src-reservestudy.com 951-693-1721 GARDEN ESTATES MAINTENANCE ASSOCIATION ("CORPORATION") Level 3 Reserve Study Update (No Site-Visit) Prepared For Fiscal Year 2016 1/26 Contents 1 Title Page 2 Table

More information

East Town Village Townhomes

East Town Village Townhomes East Town Village Townhomes CAPITAL RESERVE STUDY Beginning Period: January 1 st, 2017 Ending: December 31 st, 2046 Prepared By: Report Number: 16-04 Site Inspection Date: August 27 th, 2016 Report Submittal

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: August 15, 215 To: Lorrie Olson, Caughlin Creek HOA From: Browning Reserve Group (BRG) Re: Caughlin Creek HOA; Full Study Attached, please find the reserve study

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

Full Reserve Study. Fox Creek Farm HOA. Longmont. Report #: For Period Beginning: January 1, 2012 Expires: December 31, 2012

Full Reserve Study. Fox Creek Farm HOA. Longmont. Report #: For Period Beginning: January 1, 2012 Expires: December 31, 2012 Full Reserve Study Fox Creek Farm HOA Longmont Report #: 20796-0 For Period Beginning: January 1, 2012 Expires: December 31, 2012 Date Prepared: May 14, 2011 Hello, and welcome to your Reserve Study! T

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Depreciation Report Level I

Depreciation Report Level I Depreciation Report Level I Prepared for Strata VIS 2720 s 2013 Fiscal Year Prepared by RBC STRATA CONSULTING LTD. Version 3.1 2014 RBC STRATA CONSULTING LTD. Have questions about this Depreciation Report.

More information

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. North Shore Terrace.

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. North Shore Terrace. Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Your Homeowners Association

Your Homeowners Association 30 Year Report FULL RESERVE STUDY (With On Site Observation) OF: COMMUNITY ASSOCIATION COMMON ELEMENT MAJOR COMPONENTS Completed: Date 00, 0000 Your Homeowners Association Prepared by: Nevada Reserve Studies,

More information

Full Reserve Study. Sample Hawaii AOAO. Kauai, HI. Report #: HI For Period Beginning: January 1, 2007 Ending: December 31, 2007

Full Reserve Study. Sample Hawaii AOAO. Kauai, HI. Report #: HI For Period Beginning: January 1, 2007 Ending: December 31, 2007 Corporate Office P.O. Box 8637 Calabasas, CA 91372 TEL 800/733-1365 FAX 800/733-1581 www.reservestudy.com Local Offices Phoenix, AZ Huntington Beach, CA San Francisco, CA Denver, CO Honolulu, HI Las Vegas,

More information

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA SCT RESERVE CONSULTANTS, INC. P.O. BOX 890129 TEMECULA, CA 92589-0129 PHONE (951) 296-3520 FAX (951) 296-5038 E-MAIL mike.g@sctreserve.com March 24, 2015 Job 2000-003-10 L3 St. Tropez Villas I, Incorporated

More information

RESERVE STUDY PRIVATE CLUBS and RECREATION CENTERS

RESERVE STUDY PRIVATE CLUBS and RECREATION CENTERS RESERVE STUDY PRIVATE CLUBS and RECREATION CENTERS Serving the Nation www.reservestudy.com Welcome to your Reserve Study! A Reserve Study is a valuable tool to help you budget responsibly for your property.

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cambridge Court 9512-1 st Avenue Northeast, Seattle, WA 98115 For: Cambridge Court Homeowners Association c/o Tim Kammer, Property Manager Condo Managements, Inc. 1661 Harbor

More information

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY:

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY: 2015 Reserve Study Report LOCATED AT: 101 Oasis Drive Pompano Beach, FL 33069 FOR: Oasis at Palm Aire Association, Inc. 101 Oasis Dr., # Office Pompano Beach, FL 33069 AS OF: January 1st, 2015 - December

More information

THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION INDEX TO REVIEWED FINANCIAL STATEMENTS December 31, 2017 and 2016

THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION INDEX TO REVIEWED FINANCIAL STATEMENTS December 31, 2017 and 2016 INDEX TO REVIEWED FINANCIAL STATEMENTS December 31, 2017 and 2016 Independent accountant s review report 1 REVIEWED FINANCIAL STATEMENTS Balance sheets 2 Statements of revenues, expenses, and changes in

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

FINANCIAL STATEMENTS and Supplementary Information. For the Years Ended DECEMBER 31, 2013 AND 2012

FINANCIAL STATEMENTS and Supplementary Information. For the Years Ended DECEMBER 31, 2013 AND 2012 THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION FINANCIAL STATEMENTS and Supplementary Information For the Years Ended FINANCIAL STATEMENTS CONTENTS Page Independent accountants review report 1 Financial

More information

THE SUMMIT AT AUTUMN HILLS CAMAS, WA 98607

THE SUMMIT AT AUTUMN HILLS CAMAS, WA 98607 RESERVE STUDY PROPOSAL THE SUMMIT AT AUTUMN HILLS CAMAS, WA 98607 2016 RESERVE STUDY PROPOSAL February 14, 2016 The Summit at Autumn Hills Camas, WA 98607 Dear Mr. Wormser, Thank you for the opportunity

More information

SAMPLE CONDO RESERVE STUDY for fiscal year 2012

SAMPLE CONDO RESERVE STUDY for fiscal year 2012 SAMPLE CONDO RESERVE STUDY for fiscal year 2012 RDA REPORT - UPDATED RESERVE ANALYSIS FOR FISCAL YEAR 2012 RESERVE DATA ANALYSIS, INC MPLS (612) 616-4817 TOLL FREE (866) 780-7943 WWW.RDAMIDWEST.COM UPDATE

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information