Reserve Study Transmittal Letter

Size: px
Start display at page:

Download "Reserve Study Transmittal Letter"

Transcription

1 Reserve Study Transmittal Letter Date: November 13, 2013 To: Rob Ross, Gateview From: Richard Avelar & Associates (RA&A) Re: Gateview; Update w/ Site Visit Review Attached, please find the reserve study for Gateview. To assist in your understanding of the study, and to highlight key information you may need quickly, we have listed below some of the important information contained in the study. At RA&A our goal is to bring clarity from complexity, so should you have any questions, please do not hesitate to contact us anytime. 1. Where do I find the recommended reserve contribution for next year's budget? This is found in Section III, 30 Year Reserve Funding Plan, Cash Flow Method. $825,693 is the annual amount. Directly under the annual amount is the amount per ownership interest, per month, or other period, as applicable. $ For any other funding related issues, if any, see Section III, 30 Year Reserve Funding Plan, Cash Flow Method. 2. Where do I find the status of the reserve fund, based on the Percent Funded calculation? This is found for the 30-year term of the study in Section IV, 30 Year Reserve Funding Plan, Including Fully Funded Balance and % Funded. For the year for which the study was prepared, 2014, the Association is 24.3% funded. Based on the 30 year cash flow projection, the Association's reserves appear adequately funded as the reserve fund ending balances remain positive throughout the replacement of all major components during the next 30 years. California statute imposes no reserve funding level requirements nor does it address funding level adequacy, and although one or more of the reserve fund percentages expressed in this report may be less than one hundred percent, those percentages do not necessarily indicate that the Association's reserves are inadequately funded. 3. Where do I find the assumptions for interest and inflation factors? While this information is in various places in the study, it can always be found in Section III, 30 Year Reserve Funding Plan, Cash Flow Method. For this study the assumption is 1.00% for the interest rate and 2.50% for the inflation factor. Please be advised these rates estimate the values that will stand the test of time over the 30-year term of the study, not simply only next year. 12usvv Harrison St., #103 / Oakland, CA Office (510) Fax (510) Thess@Ravelar /

2 November 13, Reserve Study Page Two 4. What pages from the reserve study get mailed to the members (homeowners)? Please see the last section of the reserve study, "Member Distribution Materials." These are the last six pages (or more) of the study which can be removed, and copied, for distribution to the membership with the budget packet. This packet includes all state mandated disclosures related to the reserves and the reserve study. This section of the study is a stand-alone packet with it's own cover and table of contents. 5. What are the next steps? This study meets the CA Civil Code Requirements for a site visit study every three years. The next site visit study will be due in three years. For the intervening two years, RA&A proposes doing an Update Without Site Visit Study during the next two years at a nominal cost which will include the preparation of a reserve study and required disclosures including the California Assessment and Reserve Funding Disclosure, which under law, must be presented to the association members each year. Please read the two helpful sections entitled Glossary and Notes to the Auditor. The glossary explains common reserve study terms as well as RA&A specific terminology. The Notes to the Auditor while intended to assist the auditor, has useful information for the casual reader on how year zero, (2013) the current fiscal year is dealt with in the study. Thank you for the opportunity to work with the Gateview on this study. 12usvv4.4.73

3 RESERVE STUDY Update w/ Site Visit Review Gateview Published - November 13, 2013 Richard Avelar & Associates 318 Harrison St., #103 / Oakland, CA Office (510) Fax (510) Thess@Ravelar / Richard Avelar & Associates /13/ usvv :trh. Version 11/13/2013 3:32:58 PM

4 Table of Contents Section Report Page Section I: of Association Reserves 1 Section II: 30 Year Expense Forecast Detailed 5 Section III: 30 Year Reserve Funding Plan Cash Flow Method {c} 19 Section III-a: 30 Year Reserve Funding Plan Cash Flow Method - Ending Balances Chart 20 Section IV: 30 Year Reserve Funding Plan Fully Funded Balance and % Funded 21 Section IV-a: 30 Year Reserve Funding Plan Cash Flow Method - Percent Funded Chart 22 Section V: Reserve Fund Balance Forecast Component Method 23 Section VI: Component Listing Included Components 33 Section VII: Tabular Component Listing Included Components 64 Section VII-a: Expenditures by Year - Next 3 Years 70 Section X: Auditor Notes 74 Section X-a: Supplementary Information for Auditor Component Method Section XI: Glossary Reserve Study Terms 82 Addendum: Homeowner Distribution Materials See Page ii for Details /13/ usvv :trh. Version 11/13/2013 3:32:58 PM Richard Avelar & Associates 2013 TOC - i

5 Homeowner Distribution Materials Section The following Reserve Study sections should be provided to each Homeowner. Report California: Homeowner Assessment and Reserve Funding Disclosure Section III: 30 Year Reserve Funding Plan [Civil Code (b)] Cash Flow Method {c} /13/ usvv :trh. Version 11/13/2013 3:32:58 PM Richard Avelar & Associates 2013 TOC - ii

6 Section I Update w/ Site Visit Review Gateview Published - November 13, 2013 Reserve Study A Reserve Study was conducted of Gateview (the "Association"). An Update With Site- Visit Review is a reserve study update in which the following tasks are performed: development of a reserve component inventory (verification only, not quantification); condition assessment based upon on-site visual observation; life and valuation estimates; fund status; and a funding plan. Gateview is a Planned Development with a total of 487 Units. Physical Inspection Richard Avelar & Associates ("RA&A") conducted a physical inspection of the Association. The inspection encompassed those major components that the Association is required to maintain. For this study components are determined to be major components if: 1. As of the date of the study, they have a remaining useful life of less than 30 years, and a value greater than $1, Such additional components, if any, determined by the Board of Directors. During the inspection, RA&A utilized the services of our own construction cost estimator. In addition, independent contractors were retained to render opinions on selected components as indicated in Section VI, Included Component Listing. Supplemental information to the physical inspection may have been obtained from the following sources: 1. Project plans where available. 2. Maintenance records of the reserve components where available. 3. Association board members, management and staff. of Reserves For the first year of the Reserve Study, the reserve contribution is based upon the existing budget unless otherwise noted in Section III, Reserve Funding Plan. In addition RA&A relied on the Association to provide an accurate Beginning Reserve Balance /13/ usvv :trh. Version 11/13/2013 3:32:58 PM Richard Avelar & Associates Harrison St., #103 / Oakland, CA Office (510) Fax (510) Thess@Ravelar /

7 Reserve Study - Update w/ Site Visit Review Gateview 2 The status of the Association's reserves, as reflected in the following Reserve Study, is as follows: 1. The Expenditure Forecast of the following Reserve Study identifies the major components which the Association is obligated to repair, replace, restore or maintain, as determined in accordance with the criteria specified above, and specifies for each such component: a. Its current estimated replacement cost; b. Its estimated useful life; and c. Its estimated remaining useful life. 2. It is estimated that the total cash reserves necessary to repair, replace, restore or maintain such major components (in the aggregate) during and at the end of their first remaining useful life is $7,394,943. [For purposes of this calculation, necessary is defined as the Fully Funded Balance (FFB) (Component Current Cost X Effective Age / Useful, including a provision for interest and inflation in future years.)] 3. The current amount of accumulated cash reserves actually set aside to repair, replace, restore, or maintain such major components as of the fiscal year ending December 31, 2014 is estimated to be $1,793,602, constituting 24.3% of the total expenditures anticipated for all such major components through their first end of useful life replacement. 4. Based upon the schedule of annual reserve contributions necessary to defray the cost of repairing, replacing, restoring or maintaining such major components in the years such expenditures are estimated to be required, it is estimated that annual reserve contributions in the initial amount of $825,693 [$ per Unit per month (average)] for the fiscal year ending December 31, 2014 (the first full fiscal year following first distribution of this report) will be necessary in order to meet all such reserve expenditures when they are projected to come due. Funding Assessment Based on the 30 year cash flow projection, the Association's reserves appear adequately funded as the reserve fund ending balances remain positive throughout the replacement of all major components during the next 30 years. California statute imposes no reserve funding level requirements nor does it address funding level adequacy, and although one or more of the reserve fund percentages expressed in this report may be less than one hundred percent, those percentages do not necessarily indicate that the Association's reserves are inadequately funded. Percent Funded Status Based on paragraphs 1-3 above, the Association is 24.3% funded. The following scale can be used as a measure to determine the Association s financial picture whereas the lower the percentage, the higher the likelihood of the Association requiring a special assessment, or other large increases to the reserve contribution in the future. Percent Funded Poor % Fair % Strong %

8 Reserve Study - Update w/ Site Visit Review Gateview 3 Methodology The above recommended reserve contribution for the next fiscal year (and future fiscal years as outlined in Section III, Reserve Fund Balance Forecast) was developed using the cash flow method. This is a method of developing a reserve funding plan where the contributions to the reserve fund are designed to offset the variable annual expenditures from the reserve fund. Different reserve funding plans are tested against the anticipated schedule of reserve expenses until the desired funding goal is achieved. Funding Goals The funding goal employed for Gateview is Threshold Funding: Establishing a Reserve funding goal of keeping the Reserve balance above a specified dollar or Percent Funded amount. Depending on the threshold, this may be more or less conservative than Fully Funding. Limitations The intention of the Reserve Study is to forecast the Association's ability to repair or replace major components as they wear out in future years. The Reserve Study is not an engineering report, and no destructive testing was performed. The costs outlined in the study are for budgetary and planning purposes only, and actual bid costs would depend upon the defined scope of work at the time repairs are made. Also, any latent defects are excluded from this report. Statutory Disclosures Compliance The Reserve Study was conducted pursuant to Sections 1365 and (d) of the California Civil Code. Open Meeting California Civil Code Section says (in part): The (Reserve Funding) plan shall be adopted by the board of directors at an open meeting before the membership of the association as described in Section If the board of directors determines that an assessment increase is necessary to fund the reserve funding plan, any increase shall be approved in a separate action of the board that is consistent with the procedure described in Section General: Supplemental Disclosures RA&A has no other involvement(s) with the Association which could result in actual or perceived conflicts of interest.

9 Reserve Study - Update w/ Site Visit Review Gateview 4 Personnel Credentials: RA&A is an Architectural Firm and a licensed general building contractor in California. Ken Kosloff, PRA, RS, Principal, holds the Professional Reserve Analyst designation from The Association of Reserve Analysts along with the Reserve Specialist designation from the Community Associations Institute. Completeness: RA&A has found no material issues which, if not disclosed, would cause a distortion of the Association's situation. Reliance on Client Data: Information provided by the official representative of the Association regarding financial, physical, quantity, or historical issues will be deemed reliable by RA&A. Scope: This Reserve Study is a reflection of information provided to RA&A and assembled for the Association's use, not for the purpose of performing an audit, quality/forensic analysis, health and safety inspection, or background checks of historical records. Reserve Balance: The actual beginning reserve fund balance in this Reserve Study is based upon information provided and was not audited. Reserve Projects: Information provided about reserve projects will be considered reliable. Any on-site inspection should not be considered a project audit, quality inspection, or health and safety review. Component Quantities: The Association warrants the previously developed component quantities are accurate and reliable. Richard Avelar & Associates

10 Section II Gateview 30 Year Expense Forecast - Detailed Current Replacement Useful / Reserve Component Cost Remaining Paint/Caulk/Waterproof/Refinish Waterproofing / Paint 389,787 Sq. Ft. Acrylic Paint Building Exterior[nr:1] Waterproofing / Paint 389,787 Sq. Ft. Elastomeric Paint Bldg Exterior 550, , , Window Re-Caulking 200, , , Waterproofing Plaza Entry Paver & Area Drain Repair Plaza Waterproofing - Leak Detection [nr:1] Plaza Waterproofing - Leak Repairs [nr:1] Building Exterior Paint Removal (strip) [nr:1] Total Paint/Caulk/Waterproof/Refinish Mailboxes Mailboxes D/F Building Mailboxes C/J Building Mailboxes A/B Building 250, ,923 5, ,384 38, ,029 1,076, ,484,506 2,669,967 Total Mailboxes 32, Mechanical Equipment - Domestic Water Valves Main Floor Isolation Valve Boilers Boiler #2 Replace Boilers Boiler #3 Replace Boilers Boiler #1 Replace 768,750 5,384 42, ,923 1,760,208 12, ,361 10, ,801 10, ,801 16, ,971 19,201 21, , , , Boiler Insulation 4, , , Boiler Fencing 3, ,677 40, Booster Pumps Circulation Pumps 4 (50%) 25, ,358 1, ,505 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates to

11 Current Replacement Useful / Gateview 30 Year Expense Forecast - Detailed Reserve Component Cost Remaining Circulation Pumps 4 (50%) Backflow Preventor Plaza Backflow Preventor Pierce Leak Repair/Pipe Replace Interior Building Plumbing Survey/Inspection Report (33%)[nr:1] Total Mechanical Equipment - Domestic Water 1, ,879 20, , ,538 30, ,519 35,661 40,347 5, , , Mechanical Equipment - HVAC / Ventilation Hydronic System Specifications Total Mechanical Equipment - HVAC / Ventilation Mechanical Equipment - Trash Trash Chutes (Repair) Chute/Misc. Door Repair (5%) 5, , Trash Compactor Replace 60, Trash/Recycle Bins 10 Total Mechanical Equipment - Trash 5,519 52,167 93,286 29,863 54,862 62,071 1,879 3, ,904 4,417 4,997 20, ,774 83, Mechanical Equip. - Fire Safety/Alarm System Main Pumps 3 Replace 3,904 4,417 23,774 4,997 37, , Sprinkler System Repair 8, ,272 10,490 11, Miscellaneous System Repair/Retrofit Total Mechanical Equip. - Fire Safety/Alarm System 14, , Mechanical Equipment - Security System Entry Access System [se:2] Surveillance Cameras (18%) Surveillance Cameras (40.9%) Surveillance Cameras (40.9%) 136, ,383 70,092 35, ,000 78, ,462 78, , Backup Batteries 3, ,231 50,282 10,490 11,869 Total Mechanical Equipment - Security System 331, Mechanical Equipment - Garage Ventilation Ventilation Fans 2 Total Mechanical Equipment - Garage Ventilation 106, ,555 82,474 8, ,113 8,938 10,113 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates to

12 Current Replacement Useful / Gateview 30 Year Expense Forecast - Detailed Reserve Component Cost Remaining Mechanical Equip. - Safety System Central Panel 405, , Central Panel 1,014, ,040, Keltron System 36, , Smoke Detectors Consultant Safety/Fire/Comm/Security[nr:1] Consultant Safety/Fire/Comm/Security[nr:1] Total Mechanical Equip. - Safety System 26, ,239 36,148 78, ,971 78, ,945 1,641, Mechanical Equip. - Safety Emergency Syst Generator Replacement Fuel Tank (Generator) Replacement Fire Pump Indicator Panel (Generator) [se:2] Total Mechanical Equip. - Safety Emergency Syst Paving Repairs 6,360 Sq. Ft. Repair/Seal/Re-Stripe Asphalt: Resurface 6,360 Sq. Ft. 50, , , ,817 1,121,109 28,239 49,242 36,148 6, ,338 3,422 3,777 3,871 4,273 4, ,388 Total Paving 32, Concrete (Partial Replacement) 105,575 3,338 3,422 3,777 3,871 4,273 4,380 5, ,265 5,957 6,740 27, ,265 5,957 6, Walkways/Drives 5, ,519 5,798 6,092 6,400 6,724 7,065 7, Pool Deck Re-Coat Total Concrete (Partial Replacement) Waterproofing Planter Areas Repair 3,000 Sq. Ft. Atrium's (5.6%) Garage Slab Leak Inspection [nr:1] Garage Slab Leak Repair [nr:1] 30, ,307 35,384 Total Waterproofing 62, Painting: Interior Common Areas / Stairwells 216,782 Sq. Ft. Total Painting: Interior 200,000 10, , ,688 45, ,125 5,519 38,105 6,092 6,400 6,724 7,065 7,423 53, , , , , , Structural Repairs/Replacement Version 11/13/2013 3:32:58 PM Richard Avelar & Associates to

13 Current Replacement Useful / Gateview 30 Year Expense Forecast - Detailed Reserve Component Cost Remaining Miscellaneous F Building Emergency Exit[nr:1] Roofing Total Structural Repairs/Replacement Roof Deck Replacement AB Plaza Entry 8, ,713 8, Roof Drainage 1, Low Slope: Tar & Gravel A Bldg Low Slope: Tar & Gravel B Bldg Low Slope:Duro-Last C Bldg Low Slope:Duro-Last D Bldg Low Slope: Tar & Gravel E Bldg Low Slope:Duro-Last F Bldg Low Slope:Duro-Last J Bldg Low Slope: Tar & Gravel 2,000 Sq. Ft. Clubhouse 8,713 25, , , , , , , , , , , , , ,840 86, ,473 21, , Roofing: Inspections & Repairs 5, ,388 7,052 7,784 Total Roofing 1,876,810 22,402 6,388 1,046,780 7, , ,656 7,784 36, Re-Model / Upgrade Security Office [nr:1] Laundry Room 2 Total Re-Model / Upgrade 24, Gate Equipment / Entry System Roll-Up Gate 6 Garbage Room/B Dock Pedestrian Gate A dock Auto Gate 3 Driv. Assy Auto Gate 3 G-1, G-2 Res, G-2 Vis 15, ,375 9, ,521 21, ,375 11,521 5, ,241 12, ,438 14,073 15,922 16, , Security Gate 5, , Safety Loops 2 Total Gate Equipment / Entry System Pool Re-plaster 984 Sq. Ft. 8, ,292 68,652 20,730 14,073 19,681 15,922 14,483 30, ,791 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates to

14 Current Replacement Useful / Gateview 30 Year Expense Forecast - Detailed Reserve Component Cost Remaining Equipment Repair Miscellaneous 3, , Filter 1, ,726 2, Chlorinator 3, ,931 4,447 5, Pumps 2 Solar Pumps 1, , Heater 9, , Pool Cover 2, ,951 3, Miscellaneous Skimmer & Lights Spa Repairs Replacement Heater Heater & Pumps Total Pool 57,381 Total Spa 22, Recreation / Fitness Equipment 5, ,560 21, ,589 3,931 1,726 37,742 6,367 6,560 4,291 11,934 5,031 3,508 2, ,280 22,589 1, Sauna: Heaters 1, ,937 2,086 2,247 2,419 2, Sauna: Wood Replacement Fund Interior Miscellaneous Exercise Equipment (10%) Total Recreation / Fitness Equipment Tennis Court 6, ,873 3, ,643 3,923 4,224 4,549 4,899 11,905 5,580 6,009 6,471 7,873 6,968 7, Seal Coat 6, ,461 7,310 8, Resurface 25, Total Tennis Court 31,000 6,461 7,310 8, Landscaping Irrigation North Plaza, Hillside (13.7%) Irrigation Driveway, Pierce St. (28%) Irrigation South Plaza (28%) Irrigation Plaza Lawns 13, ,500 27, ,990 27, ,715 30, , Plants 25, ,000 32, Plants 25, ,266 33,622 Total Landscaping 148,686 38,500 55,256 29,715 33,114 32,002 33, Fencing (Repair/Replace) Version 11/13/2013 3:32:58 PM Richard Avelar & Associates to

15 Current Replacement Useful / Gateview 30 Year Expense Forecast - Detailed Reserve Component Cost Remaining Chain Link 950 Lin. Ft Wrought Iron Pool Fence Wrought Iron All W/I Fencing and Railings Miscellaneous Patio Fence Replacement Fund Miscellaneous 728 Lin. Ft. Tennis court fence Total Fencing (Repair/Replace) 27, , , ,384 5,657 5,943 6,244 6,560 6,893 7,241 7,608 50, , , , Office Equipment / Furnishings Carpet Carpet/Paint 5,384 5,657 5,943 6,244 6,560 6,893 37,976 7,608 6, ,623 8, Furnishings 4, ,978 6, Equipment 5, ,378 6,869 7,397 7,966 Total Office Equipment / Furnishings Misc. Mechanical Equipment Miscellaneous Tomcat 250 Floor Cleaner Total Misc. Mechanical Equipment Elevator Cab Refurbish / Upgrade 7 Traction Elevators (50%) Cab Refurbish / Upgrade 7 Traction Elevators (50%) Cab Refurbish / Upgrade Hydraulic Garage Elevator System Modernization Traction Elevators System Modernization Traction Elevators System Modernization Garage Hydraulic Elevator System Modernization B Dock Freight Elevator 17,123 6,623 4,978 6,378 6,869 7,397 8,478 7,966 6,695 10, ,769 13,785 10,000 Total Elevator 1,626,348 87, ,500 85, ,500 15, , , , Common Area Furnishings / Equipment Miscellaneous Microphones 828, , , , , , , , ,823 10,769 13,785 2, , Lobby 9, , Pool/Patio Furnishings 3, ,436 3,887 4,398 Total Common Area Furnishings / Equipment Electrical 15,236 3,436 3,887 11,302 2,566 4,398 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates to

16 Current Replacement Useful / Gateview 30 Year Expense Forecast - Detailed Reserve Component Cost Remaining Building Exterior Lighting Ext. Bldg including Pierce Street (25%) Corridor Lighting Interior 22, ,456 26,538 30,026 92, , Garage Lighting 100, , , Lighting Plaza Area Lighting East Hillside Lighting Driveway Miscellaneous Atrium Lighting Miscellaneous Lobby Chandeliers Flooring Total Electrical 334, Carpeting 6,150 Sq. Yds. Carpet corridor (50%) Carpeting 6,150 Sq. Yds. Carpet corridor (50%) Tile Bathrooms Miscellaneous Tile & Vinyl Miscellaneous Carpet Lobby Total Flooring 381, Wallcoverings Sheet Metal 3 Garbage Rooms Total Wallcoverings 7, Miscellaneous 60, ,000 19, ,000 30, ,519 3, ,641 6, ,150 79,000 29,606 31, ,689 26, ,972 4,641 30, , , , , , , ,482 5, , ,135 24,494 6, , , ,739 19,135 7, , ,482 24,494 7, , Structural Repairs 678, , Utility Cart 7, , General Renovations (20%) Miscellaneous 2013 Improvements[nr:1] 8,486 36, ,530 39,430 41,426 43,523 45,726 48,041 50,473 90, , Reserve Study (3-Year Update) 4, ,146 4,465 4,808 5,178 5,576 Total Miscellaneous 816,524 Total Expenditures 2.50% 94,146 37,530 51,780 41,426 4,808 43,523 50,904 48, ,004 50,473 1,389,379 3,536, , , ,525 1,464, , , , , , ,061 1,364,877 2,053,939 70,957 Total Current Replacement Cost 11,372,634 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates to

17 30 Year Expense Forecast - Detailed Reserve Component Paint/Caulk/Waterproof/Refinish Waterproofing / Paint 389,787 Sq. Ft. Acrylic Paint Building Exterior[nr:1] Waterproofing / Paint 389,787 Sq. Ft. Elastomeric Paint Bldg Exterior 1,019, Window Re-Caulking 370, Waterproofing Plaza Entry Paver & Area Drain Repair Plaza Waterproofing - Leak Detection [nr:1] Plaza Waterproofing - Leak Repairs [nr:1] Building Exterior Paint Removal (strip) [nr:1] Total Paint/Caulk/Waterproof/Refinish Mailboxes Mailboxes D/F Building Mailboxes C/J Building Mailboxes A/B Building Total Mailboxes 371, , ,126 1,390, , Mechanical Equipment - Domestic Water Valves Main Floor Isolation Valve Boilers Boiler #2 Replace Boilers Boiler #3 Replace Boilers Boiler #1 Replace 258,502 24,579 27,809 31, ,362 46, Boiler Insulation 7, Boiler Fencing 6, , Booster Pumps Circulation Pumps 4 (50%) Circulation Pumps 4 (50%) Backflow Preventor Plaza Backflow Preventor Pierce Leak Repair/Pipe Replace Interior Building 46,468 2,179 33,592 45,649 51,647 58,434 2,722 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates to

18 30 Year Expense Forecast - Detailed Reserve Component Plumbing Survey/Inspection Report (33%)[nr:1] Total Mechanical Equipment - Domestic Water Mechanical Equipment - HVAC / Ventilation Hydronic System Specifications Total Mechanical Equipment - HVAC / Ventilation Mechanical Equipment - Trash Trash Chutes (Repair) Chute/Misc. Door Repair (5%) 5, Trash Compactor Replace 86, Trash/Recycle Bins 10 Total Mechanical Equipment - Trash Mechanical Equip. - Fire Safety/Alarm System Main Pumps 3 Replace 258,502 70, ,014 2,179 33,592 85, ,567 46,468 89,898 2,722 9,162 9,162 6,397 7,237 30,432 38,956 92,552 30,432 6,397 7,237 38, Sprinkler System Repair 13,428 15,193 17, Miscellaneous System Repair/Retrofit Total Mechanical Equip. - Fire Safety/Alarm System Mechanical Equipment - Security System Entry Access System [se:2] Surveillance Cameras (18%) Surveillance Cameras (40.9%) Surveillance Cameras (40.9%) 99, Backup Batteries 4, ,514 29,068 13,428 15,193 46,257 57, , ,143 Total Mechanical Equipment - Security System Mechanical Equipment - Garage Ventilation Ventilation Fans 2 Total Mechanical Equipment - Garage Ventilation Mechanical Equip. - Safety System Central Panel 103, ,514 57, , ,143 12,945 16,571 12,945 16, Central Panel Keltron System Version 11/13/2013 3:32:58 PM Richard Avelar & Associates to

19 30 Year Expense Forecast - Detailed Reserve Component Smoke Detectors Consultant Safety/Fire/Comm/Security[nr:1] Consultant Safety/Fire/Comm/Security[nr:1] Total Mechanical Equip. - Safety System Mechanical Equip. - Safety Emergency Syst Generator Replacement Fuel Tank (Generator) Replacement Fire Pump Indicator Panel (Generator) [se:2] Total Mechanical Equip. - Safety Emergency Syst Paving Repairs 6,360 Sq. Ft. Repair/Seal/Re-Stripe Asphalt: Resurface 6,360 Sq. Ft. Total Paving Concrete (Partial Replacement) 80,913 46,272 46,272 4,835 4,956 5,470 5,607 6,189 6,344 4,835 85,869 5,470 5,607 6,189 6,344 7,626 8,628 9,761 40,670 48,295 8,628 9, Walkways/Drives 7,798 8,193 8,608 9,044 9,501 9,982 10,488 11, Pool Deck Re-Coat Total Concrete (Partial Replacement) Waterproofing Planter Areas Repair 3,000 Sq. Ft. Atrium's (5.6%) Garage Slab Leak Inspection [nr:1] Garage Slab Leak Repair [nr:1] Total Waterproofing Painting: Interior Common Areas / Stairwells 216,782 Sq. Ft. Total Painting: Interior Structural Repairs/Replacement Miscellaneous F Building Emergency Exit[nr:1] Roofing Total Structural Repairs/Replacement Roof Deck Replacement AB Plaza Entry 46,790 7,798 8,193 46,790 8,608 9,044 9,501 9,982 10,488 11,019 15,596 15, , , , ,299 52,596 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates to

20 30 Year Expense Forecast - Detailed Reserve Component Roof Drainage 2, Low Slope: Tar & Gravel A Bldg Low Slope: Tar & Gravel B Bldg Low Slope:Duro-Last C Bldg Low Slope:Duro-Last D Bldg Low Slope: Tar & Gravel E Bldg Low Slope:Duro-Last F Bldg Low Slope:Duro-Last J Bldg Low Slope: Tar & Gravel 2,000 Sq. Ft. Clubhouse 32, Roofing: Inspections & Repairs 8,592 9,484 10,468 11, , , , , , , ,756 Total Roofing Re-Model / Upgrade Security Office [nr:1] Laundry Room 2 Total Re-Model / Upgrade 8,592 32,445 9,484 1,516, ,052 1,035,036 11,555 55,376 16,685 16, Gate Equipment / Entry System Roll-Up Gate 6 Garbage Room/B Dock Pedestrian Gate A dock Auto Gate 3 Driv. Assy Auto Gate 3 G-1, G-2 Res, G-2 Vis 30,414 18,014 20,381 23,060 10,488 25,194 32, Security Gate 10, Safety Loops 2 Total Gate Equipment / Entry System Pool Re-plaster 984 Sq. Ft Equipment Repair Miscellaneous 48,428 25,194 20,381 38,433 20,976 32,250 15,373 44,535 57,009 5,492 7, Filter 2, Chlorinator 5,693 6,441 7, Pumps 2 Solar Pumps 2,458 3,146 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates to

21 30 Year Expense Forecast - Detailed Reserve Component Heater 16, Pool Cover 4,170 4, Miscellaneous Skimmer & Lights Spa Repairs Replacement Heater Heater & Pumps Total Pool Total Spa 8,398 10,750 44,535 8,150 8,398 5,492 4,170 6,441 16,050 2,828 57,009 15,390 10,750 7,031 37,014 1,721 37,014 1, Recreation / Fitness Equipment Sauna: Heaters 2,806 3,021 3,254 3,504 3, Sauna: Wood Replacement Fund Interior Miscellaneous Exercise Equipment (10%) Total Recreation / Fitness Equipment Tennis Court 10,077 12,900 5,276 5,681 6,118 6,588 7,095 8,081 10,077 8,703 9,372 10,092 23, Seal Coat 9,358 10,588 11, Resurface 44,115 Total Tennis Court 9,358 54,703 11, Landscaping Irrigation North Plaza, Hillside (13.7%) Irrigation Driveway, Pierce St. (28%) Irrigation South Plaza (28%) Irrigation Plaza Lawns Plants 40, Plants 43,039 Total Landscaping Fencing (Repair/Replace) Chain Link 950 Lin. Ft Wrought Iron Pool Fence Wrought Iron All W/I Fencing and Railings Miscellaneous Patio Fence Replacement Fund 40,965 43,039 42,389 28,627 7,993 8,398 8,823 9,270 9,739 10,232 10,750 81,210 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates to

22 30 Year Expense Forecast - Detailed Reserve Component Miscellaneous 728 Lin. Ft. Tennis court fence Total Fencing (Repair/Replace) Office Equipment / Furnishings Carpet Carpet/Paint 7,993 42,389 8, ,836 8,823 9,270 9,739 10,232 10, Furnishings 9, Equipment 8,578 9,238 9,948 10,713 11,537 10,852 Total Office Equipment / Furnishings Misc. Mechanical Equipment Miscellaneous Tomcat 250 Floor Cleaner Total Misc. Mechanical Equipment Elevator Cab Refurbish / Upgrade 7 Traction Elevators (50%) Cab Refurbish / Upgrade 7 Traction Elevators (50%) Cab Refurbish / Upgrade Hydraulic Garage Elevator System Modernization Traction Elevators System Modernization Traction Elevators System Modernization Garage Hydraulic Elevator System Modernization B Dock Freight Elevator Total Elevator 8,578 9,238 20,800 10,713 9,004 11,537 17,646 17, , , , , Common Area Furnishings / Equipment Miscellaneous Microphones 3,285 4, Lobby 18, Pool/Patio Furnishings 4,976 5,630 6,369 Total Common Area Furnishings / Equipment Electrical Building Exterior Lighting Ext. Bldg including Pierce Street (25%) Corridor Lighting Interior 4,976 3,285 5,630 6,369 18,520 4,205 33,971 38,435 43, Garage Lighting 176, , Lighting Plaza Area 98,317 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates to

23 30 Year Expense Forecast - Detailed Reserve Component Lighting East Hillside Lighting Driveway Miscellaneous Atrium Lighting Miscellaneous Lobby Chandeliers Total Electrical 31,134 51,647 5,940 7,604 10,077 33,971 5, ,451 48,513 51, ,461 43, ,202 7, Flooring Carpeting 6,150 Sq. Yds. Carpet corridor (50%) Carpeting 6,150 Sq. Yds. Carpet corridor (50%) Tile Bathrooms Miscellaneous Tile & Vinyl Miscellaneous Carpet Lobby Total Flooring Wallcoverings Sheet Metal 3 Garbage Rooms Total Wallcoverings 295, ,717 9,070 31,355 10,120 12,955 19, , ,717 31,355 12,955 13,905 13, Miscellaneous Structural Repairs Utility Cart 10,606 14, General Renovations (20%) Miscellaneous 2013 Improvements[nr:1] 53,028 55,713 58,533 61,497 64,610 67,881 71,317 74, Reserve Study (3-Year Update) 6,005 6,466 6,964 7,499 8,076 Total Miscellaneous Total Expenditures 2.50% 69,639 55,713 6,466 58,533 68,460 64,610 7,499 67,881 93,656 74, , , , , ,275 1,791, , ,124 1,125,410 1,086,615 1,786, , , , ,440 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates to

24 Section III Gateview 30 Year Reserve Funding Plan Cash Flow Method Beginning Balance Inflated 2.5% Reserve Contribution 487 Percentage Increase Special Assessments / Other Interest Pre 1.00% Ending Balance 1) ,863,659 4,472,846 1,793,602 2,194,065 2,679,134 3,456,314 2,934,560 3,497,700 4,207,341 4,743,093 1,389,379 3,536, , , ,525 1,464, , , , , , , , , , , , , , , % 2.5% 2.5% 2.5% 2.5% 1.0% 1.0% 1.0% 1.0% 185, ,450 31,176 19,839 24,245 30,525 31,795 32,001 38,334 44,530 48,106 4,472,846 1,793,602 2,194,065 2,679,134 3,456,314 2,934,560 3,497,700 4,207,341 4,743,093 4,926,167 Additional Funds to be transferred to the Reserve Account. Beginning Balance Inflated 2.5% Reserve Contribution 487 Percentage Increase Special Assessments / Other Interest Pre 1.00% Ending Balance ,926,167 5,556,539 6,230,598 5,903,241 4,889,925 5,869,291 6,575,759 6,774,949 7,610,791 8,563, , ,061 1,364,877 2,053,939 70, , , , , , , , , , ,794 1,001,778 1,006,787 1,011,821 1,016,880 1,021, % 1.0% 1.0% 1.0% 1.0% 0.5% 0.5% 0.5% 0.5% 0.5% ,153 58,642 60,367 53,697 53,528 61,916 66,421 71,571 80,471 86,661 5,556,539 6,230,598 5,903,241 4,889,925 5,869,291 6,575,759 6,774,949 7,610,791 8,563,791 8,855,142 Beginning Balance Inflated 2.5% Reserve Contribution 487 Percentage Increase Special Assessments / Other Interest Pre 1.00% Ending Balance ,855,142 8,175,549 8,675,377 9,121,163 9,129,107 9,181,359 8,536,213 8,895,908 9,578,730 10,251,284 1,791, , ,124 1,125,410 1,086,615 1,786, , , , ,440 1,027,074 1,032,209 1,037,370 1,042,557 1,047,770 1,053,009 1,058,274 1,063,565 1,068,883 1,074, % 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% ,730 83,835 88,540 90,797 91,097 88,147 86,727 91,914 98, ,742 8,175,549 8,675,377 9,121,163 9,129,107 9,181,359 8,536,213 8,895,908 9,578,730 10,251,284 11,203,812 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

25 Fund Balance Section III-a Gateview 30 Year Reserve Funding Plan Cash Flow Method - Ending Balances $12,000,000 $10,000,000 $8,000,000 $6,000,000 $4,000,000 $2,000,000 $ Version 11/13/2013 3:32:58 PM Richard Avelar & Associates Years

26 Section IV Gateview 30 Year Reserve Funding Plan Including Fully Funded Balance and % Funded Year Beginning Balance Fully Funded Balance Percent Funded Inflated 2.50% Reserve Contribution Special Assessments & Other Contributions ,863,659 7,982, % 1,389, , ,461 46,450 4,472, ,472,846 7,394, % 3,536, , ,176 1,793, ,793,602 4,539, % 465, , ,839 2,194, ,194,065 4,774, % 406, , ,245 2,679, ,679,134 5,090, % 142, , ,525 3,456, ,456,314 5,698, % 1,464, , ,795 2,934, ,934,560 4,981, % 389, , ,001 3,497, ,497,700 5,365, % 258, , ,334 4,207, ,207,341 5,910, % 447, , ,530 4,743, ,743,093 6,291, % 813, , ,106 4,926, ,926,167 6,325, % 379, , ,153 5,556, ,556,539 6,822, % 352, , ,642 6,230, ,230,598 7,379, % 1,364, , ,367 5,903, ,903,241 6,931, % 2,053, , ,697 4,889, ,889,925 5,734, % 70, , ,528 5,869, ,869,291 6,620, % 357,225 1,001, ,916 6,575, ,575,759 7,254, % 874,019 1,006, ,421 6,774, ,774,949 7,396, % 247,550 1,011, ,571 7,610, ,610,791 8,205, % 144,350 1,016, ,471 8,563, ,563,791 9,162, % 817,275 1,021, ,661 8,855, ,855,142 9,475, % 1,791,397 1,027, ,730 8,175, ,175,549 8,821, % 616,217 1,032, ,835 8,675, ,675,377 9,379, % 680,124 1,037, ,540 9,121, ,121,163 9,909, % 1,125,410 1,042, ,797 9,129, ,129,107 10,021, % 1,086,615 1,047, ,097 9,181, ,181,359 10,201, % 1,786,302 1,053, ,147 8,536, ,536,213 9,694, % 785,306 1,058, ,727 8,895, ,895,908 10,228, % 472,657 1,063, ,914 9,578, ,578,730 11,123, % 494,986 1,068, ,657 10,251, ,251,284 12,045, % 228,440 1,074, ,742 11,203,812 Interest Ending Balance Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

27 Percent Funded Section IV-a Gateview 30 Year Reserve Funding Plan Cash Flow Method - Percent Funded Years /13/ usvv :trh. Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

28 Section V Gateview Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Remaining Estimated Future Replacement Costs Per Year 2013 Fully Funded Balance 2014 Fully Funded Balance % Per Year Straight Line 2014 Line Item Contribution based on Cash Flow Method Paint/Caulk/Waterproof/Refinish Waterproofing / Paint 389,787 Sq. Ft. Acrylic Paint Building Exterior[nr:1] Waterproofing / Paint 389,787 Sq. Ft. Elastomeric Paint Bldg Exterior 550, ,750 46, , , % 58, , ,019,669 39,218 21,154 22, % 48, Window Re-Caulking 200, ,000 17, , , % 21, Waterproofing Plaza Entry Paver & Area Drain Repair Plaza Waterproofing - Leak Detection [nr:1] Plaza Waterproofing - Leak Repairs [nr:1] Building Exterior Paint Removal (strip) [nr:1] 250, ,923 28, , , % 35,924 5, , ,250 4, % , ,029 2,101 30,461 33, % 2,604 1,076, ,484,506 49, , , % 61,314 Sub-total [ Paint/Caulk/Waterproof/Refinish] 2,669,967 3,610, ,127 1,453,603 1,619, % 228, Mailboxes Mailboxes D/F Building Mailboxes C/J Building Mailboxes A/B Building 12, , ,200 7, % , , ,000 6, % , , ,000 6, % 634 Sub-total [ Mailboxes] 32,000 40,963 1,639 19,200 20, % 2,030 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

29 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Remaining Estimated Future Replacement Costs Per Year 2013 Fully Funded Balance 2014 Fully Funded Balance % Per Year Straight Line 2014 Line Item Contribution based on Cash Flow Method Mechanical Equipment - Domestic Water Valves Main Floor Isolation Valve Boilers Boiler #2 Replace Boilers Boiler #3 Replace Boilers Boiler #1 Replace 16, ,971 3,394 9,692 13, % 4, , ,502 10,340 62,688 71, % 12,812 66, ,362 5,318 3,327 6, % 6,590 29, ,361 2,318 1,450 2, % 2,872 66, ,748 3,587 56,631 61, % 4, Boiler Insulation 4, , % Boiler Fencing 3, , ,150 3, % Booster Pumps Circulation Pumps 4 (50%) Circulation Pumps 4 (50%) Backflow Preventor Plaza Backflow Preventor Pierce Leak Repair/Pipe Replace Interior Building Plumbing Survey/Inspection Report (33%)[nr:1] Sub-total [ Mechanical Equipment - Domestic Water] 25, ,358 1,418 18,798 20, % 1,757 1, , , % 124 1, , % , ,592 1,120 6,000 6, % 1,387 20, , ,000 19, % , ,519 6,304 18,000 24, % 7,811 5, ,519 2,760 2,692 5, % 3, , ,821 38, , , % 47, Mechanical Equipment - HVAC / Ventilation Hydronic System Specifications Mechanical Equipment - Trash Trash Chutes (Repair) Chute/Misc. Door Repair (5%) 5, , % 568 3, , , % Trash Compactor Replace 60, ,898 2,897 30,000 32, % 3, Trash/Recycle Bins 10 20, ,774 2,377 6,000 8, % 2,946 Sub-total [ Mechanical Equipment - Trash] 83, ,575 6,055 39,904 41, % 7,502 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

30 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Remaining Estimated Future Replacement Costs Per Year 2013 Fully Funded Balance 2014 Fully Funded Balance % Per Year Straight Line 2014 Line Item Contribution based on Cash Flow Method Mechanical Equip. - Fire Safety/Alarm System Main Pumps 3 Replace 37, ,010 1,025 33,437 35, % 1, Sprinkler System Repair 8, ,272 1,854 1,680 3, % 2, Miscellaneous System Repair/Retrofit Sub-total [ Mechanical Equip. - Fire Safety/Alarm System] 14, , % 1,201 59,757 79,349 3,849 35,591 39, % 4, Mechanical Equipment - Security System Entry Access System [se:2] Surveillance Cameras (18%) Surveillance Cameras (40.9%) Surveillance Cameras (40.9%) 136, ,475 9, ,206 74, % 11,439 35, , ,000 1, % 1,084 78, ,231 2,012 74,575 80, % 2,492 78, ,237 2,062 70,650 76, % 2, Backup Batteries 3, , , % 267 Sub-total [ Mechanical Equipment - Security System] 331, ,673 14, , , % 17, Mechanical Equipment - Garage Ventilation Ventilation Fans Mechanical Equip. - Safety System 8, ,113 1,011 4,469 5, % 1, Central Panel 405, ,923 6, ,846 13, % 8, Central Panel 1,014, ,082 17, ,968 1,040, % 21, Keltron System 36, ,242 2,462 14,646 16, % 3, Smoke Detectors Consultant Safety/Fire/Comm/Security[nr:1] Consultant Safety/Fire/Comm/Security[nr:1] Sub-total [ Mechanical Equip. - Safety System] 26, ,119 1,412 18,356 21, % 1,749 78, , % 0 78, ,473 8,095 63,177 80, % 10,030 1,641, ,839 36,069 1,561,963 1,173, % 44,692 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

31 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Remaining Estimated Future Replacement Costs Per Year 2013 Fully Funded Balance 2014 Fully Funded Balance % Per Year Straight Line 2014 Line Item Contribution based on Cash Flow Method Mechanical Equip. - Safety Emergency Syst Generator Replacement Fuel Tank (Generator) Replacement Fire Pump Indicator Panel (Generator) [se:2] Sub-total [ Mechanical Equip. - Safety Emergency Syst.] 50, ,913 3,237 12,147 14, % 4, , ,575 3, ,575 3, % 4,361 6, ,760 1,352 1,860 3, % 1, , ,248 8, ,582 21, % 10, Paving Repairs 6,360 Sq. Ft. Repair/Seal/Re-Stripe Asphalt: Resurface 6,360 Sq. Ft. 5, ,265 1,053 4,109 5, % 1,305 27, ,670 1,627 9,863 11, % 2,016 Sub-total [ Paving] 32,533 45,935 2,680 13,972 16, % 3, Concrete (Partial Replacement) Walkways/Drives 5, ,519 2,760 2,692 5, % 3, Pool Deck Re-Coat 30, ,307 2,154 24,000 26, % 2,669 Sub-total [ Concrete (Partial Replacement)] 35,384 37,826 4,913 26,692 32, % 6, Waterproofing Planter Areas Repair 3,000 Sq. Ft. Atrium's (5.6%) Garage Slab Leak Inspection [nr:1] Garage Slab Leak Repair [nr:1] 10, , ,000 1, % 966 7, , ,250 7, % , ,125 1,538 43,500 46, % 1,905 Sub-total [ Waterproofing] 62,500 69,409 2,574 51,750 55, % 3, Painting: Interior Common Areas / Stairwells 216,782 Sq. Ft Structural Repairs/Replacement Miscellaneous F Building Emergency Exit[nr:1] 200, ,000 22, , , % 28,223 8, , ,075 8, % 540 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

32 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Remaining Estimated Future Replacement Costs Per Year 2013 Fully Funded Balance 2014 Fully Funded Balance % Per Year Straight Line 2014 Line Item Contribution based on Cash Flow Method Roofing Roof Deck Replacement AB Plaza Entry 25, ,316 2,421 1,713 3, % 3, Roof Drainage 1, , % Low Slope: Tar & Gravel A Bldg Low Slope: Tar & Gravel B Bldg Low Slope:Duro-Last C Bldg Low Slope:Duro-Last D Bldg Low Slope: Tar & Gravel E Bldg Low Slope:Duro-Last F Bldg Low Slope:Duro-Last J Bldg Low Slope: Tar & Gravel 2,000 Sq. Ft. Clubhouse 308, ,782 25, , , % 31, , ,874 21, , , % 27, , ,733 27, , , % 34, , ,733 27, , , % 34, , ,040 26, , , % 32, , ,840 8,123 71,793 80, % 10,065 86, ,473 6,498 57,435 64, % 8,052 21, ,402 1,493 18,479 20, % 1, Roofing: Inspections & Repairs 5, ,388 1,597 1,483 3, % 1,979 Sub-total [ Roofing] 1,876,810 2,225, ,436 1,019,109 1,173, % 185, Re-Model / Upgrade Security Office [nr:1] Laundry Room 2 15, ,375 1,025 14,000 15, % 1,270 9, , ,000 3, % 952 Sub-total [ Re-Model / Upgrade] 24,000 26,896 1,793 17,000 19, % 2,222 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

33 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Remaining Estimated Future Replacement Costs Per Year 2013 Fully Funded Balance 2014 Fully Funded Balance % Per Year Straight Line 2014 Line Item Contribution based on Cash Flow Method Gate Equipment / Entry System Roll-Up Gate 6 Garbage Room/B Dock Pedestrian Gate A dock Auto Gate 3 Driv. Assy Auto Gate 3 G-1, G-2 Res, G-2 Vis 21, ,414 1,217 8,400 9, % 1,507 5, , ,077 1, % , ,438 2,488 12,438 2, % 3,082 16, ,681 1,968 3,231 4, % 2, Security Gate 5, , ,077 1, % Safety Loops 2 8, , , % 411 Sub-total [ Gate Equipment / Entry System] 68,652 85,309 6,970 34,515 20, % 8, Pool Re-plaster 984 Sq. Ft Equipment Repair Miscellaneous 30, ,791 3,479 12,000 15, % 4,311 3, , % Filter 1, , , % Chlorinator 3, , ,245 3, % Pumps 2 Solar Pumps 1, , % Heater 9, , , % 1, Pool Cover 2, , % Miscellaneous Skimmer & Lights 5, , ,077 1, % 813 Sub-total [ Pool] 57,381 68,104 7,131 18,209 24, % 8, Spa Repairs Replacement Heater Heater & Pumps 21, ,589 1,129 19,350 20, % 1, , % 132 Sub-total [ Spa] 22,475 23,868 1,236 19,431 21, % 1,532 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

34 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Remaining Estimated Future Replacement Costs Per Year 2013 Fully Funded Balance 2014 Fully Funded Balance % Per Year Straight Line 2014 Line Item Contribution based on Cash Flow Method Recreation / Fitness Equipment Sauna: Heaters 1, , ,260 1, % Sauna: Wood Replacement Fund Interior Miscellaneous Exercise Equipment (10%) 6, , ,292 1, % 975 3, ,643 1,214 2,369 3, % 1,504 Sub-total [ Recreation / Fitness Equipment] 11,905 13,452 2,647 4,921 7, % 3, Tennis Court Seal Coat 6, ,461 1,292 2,400 3, % 1, Resurface 25, ,115 1,765 2,000 3, % 2,186 Sub-total [ Tennis Court] 31,000 50,577 3,057 4,400 6, % 3, Landscaping Irrigation North Plaza, Hillside (13.7%) Irrigation Driveway, Pierce St. (28%) Irrigation South Plaza (28%) Irrigation Plaza Lawns 13, , , % , , ,754 27, % , , ,834 26, % , , ,000 27, % Plants 25, ,500 1,250 25,000 2, % 1, Plants 25, ,133 1,313 20,000 23, % 1,627 Sub-total [ Landscaping] 148,686 78,292 4, , , % 5, Fencing (Repair/Replace) Chain Link 950 Lin. Ft Wrought Iron Pool Fence Wrought Iron All W/I Fencing and Railings Miscellaneous Patio Fence Replacement Fund Miscellaneous 728 Lin. Ft. Tennis court fence 27, ,389 2,119 4,179 5, % 2,626 17, ,627 1, , % 1,774 5, ,384 2,692 5,384 2, % 3,336 50, ,210 4,060 2,540 5, % 5,031 22, ,735 1,229 11,884 13, % 1,523 Sub-total [ Fencing (Repair/Replace)] 124, ,344 11,533 24,882 28, % 14,290 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

35 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Remaining Estimated Future Replacement Costs Per Year 2013 Fully Funded Balance 2014 Fully Funded Balance % Per Year Straight Line 2014 Line Item Contribution based on Cash Flow Method Office Equipment / Furnishings Carpet Carpet/Paint 6, , ,815 6, % Furnishings 4, , ,949 4, % Equipment 5, ,378 1,595 1,481 2, % 1,976 Sub-total [ Office Equipment / Furnishings] 17,123 17,979 2,672 11,245 13, % 3, Misc. Mechanical Equipment Miscellaneous Tomcat 250 Floor Cleaner Elevator Cab Refurbish / Upgrade 7 Traction Elevators (50%) Cab Refurbish / Upgrade 7 Traction Elevators (50%) Cab Refurbish / Upgrade Hydraulic Garage Elevator System Modernization Traction Elevators System Modernization Traction Elevators System Modernization Garage Hydraulic Elevator System Modernization B Dock Freight Elevator 10, ,769 1,077 7,000 8, % 1,334 87, ,750 1,750 87,500 3, % 2,168 85, ,750 1,750 81,951 87, % 2,168 15, , ,000 12, % , ,888 5, ,775 12, % 7, , ,712 14, , , % 17, , ,570 2,263 80,000 86, % 2, , ,856 3, , , % 4,206 Sub-total [ Elevator] 1,626, ,012 29,650 1,542,310 1,180, % 36, Common Area Furnishings / Equipment Lobby 9, , ,822 7, % Pool/Patio Furnishings 3, , , % Miscellaneous Microphones Sub-total [ Common Area Furnishings / Equipment] 2, , % ,236 17,304 1,509 10,463 8, % 1,870 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

36 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Remaining Estimated Future Replacement Costs Per Year 2013 Fully Funded Balance 2014 Fully Funded Balance % Per Year Straight Line 2014 Line Item Contribution based on Cash Flow Method Electrical Building Exterior Lighting Ext. Bldg including Pierce Street (25%) Corridor Lighting Interior 22, ,728 2,346 18,307 23, % 2,906 92, ,972 5,499 60,135 66, % 6, Garage Lighting 100, ,689 10,769 70,000 82, % 13, Lighting Plaza Area Lighting East Hillside Lighting Driveway Miscellaneous Atrium Lighting Miscellaneous Lobby Chandeliers 60, ,000 3,000 60,000 3, % 3,717 19, , , % 1,177 30, ,519 1,576 27,000 29, % 1,953 3, , % 575 6, , ,700 6, % 381 Sub-total [ Electrical] 334, ,698 24, , , % 30, Flooring Carpeting 6,150 Sq. Yds. Carpet corridor (50%) Carpeting 6,150 Sq. Yds. Carpet corridor (50%) Tile Bathrooms Miscellaneous Tile & Vinyl Miscellaneous Carpet Lobby 175, ,233 18, , , % 22, , ,739 18, , , % 22,891 5, , % , ,135 1,913 12,438 14, % 2,371 6, , , % 980 Sub-total [ Flooring] 381, ,083 39, , , % 49, Wallcoverings Sheet Metal 3 Garbage Rooms 7, , ,625 6, % 526 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

37 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Remaining Estimated Future Replacement Costs Per Year 2013 Fully Funded Balance 2014 Fully Funded Balance % Per Year Straight Line 2014 Line Item Contribution based on Cash Flow Method Miscellaneous Structural Repairs 678, ,428 30, , , % 37, Utility Cart 7, , ,492 6, % General Renovations (20%) Miscellaneous 2013 Improvements[nr:1] 36, ,530 18,765 18,307 37, % 23,251 90, , % Reserve Study (3-Year Update) 4, ,146 1,382 4,146 1, % 1,712 Sub-total [ Miscellaneous] 816, ,989 51, , , % 63,463 Totals 11,372,634 11,497, ,377 7,982,158 7,394, % 825,693 [A] [EndBal] [A] [B] [EndBal] [B] Percent Funded 56.04% 24.25% Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

38 Section VI Gateview Component Listing Included Components Paint/Caulk/Waterproof/Refinish Waterproofing / Paint 389,787 Sq. Ft. Acrylic Paint Building Exterior 12 Quantity 389,787 Unit of Measure Square Feet Cost /SqFt $ % 1 Total Cost/Study Treatment [nr:1] $550,000 Replacement Year 2014 Future Cost $563, Waterproofing / Paint 389,787 Sq. Ft. Elastomeric Paint Bldg Exterior 12 Quantity 389,787 Unit of Measure Square Feet Cost /SqFt $ % Total Cost/Study $550,000 Replacement Year 2038 Future Cost $1,019,669 This is to paint the entire exterior of the complex and provides for all rigging and access, thorough preparation and one coat of top quality Sherwin Williams duration paint to all exterior painted surfaces, including stairwells. This painting cycle will commence twelve years after the total re-stripping of the building exterior paint included in line item 982 within this category. Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

39 Component Listing Included Components Paint/Caulk/Waterproof/Refinish Window Re-Caulking 12 Quantity 1 Unit of Measure Fund Cost /Fnd $200, % Total Cost/Study $200,000 Replacement Year 2014 Future Cost $205,000 1 This is to recaulk the window perimeters and provides for all rigging and access to remove the existing sealant from the window perimeters and replace it with a top quality urethane sealant Waterproofing Plaza Entry Paver & Area Drain Repair Quantity 1 Unit of Measure Fund 10 Cost /Fnd $250, % Total Cost/Study $250,000 Replacement Year 2019 Future Cost $289, Plaza Waterproofing - Leak Detection 20 Quantity 1 Unit of Measure Fund Cost /Fnd $5, % 3 Total Cost/Study Treatment [nr:1] $5,000 Replacement Year 2016 Future Cost $5, Plaza Waterproofing - Leak Repairs 20 Quantity 1 Unit of Measure Fund Cost /Fnd $38, % 4 Total Cost/Study Treatment [nr:1] $38,076 Replacement Year 2017 Future Cost $42, Building Exterior Paint Removal (strip) 30 Quantity 1 Unit of Measure Fund Cost /Fnd $1,076, % 13 Total Cost/Study Treatment [nr:1] $1,076,891 Replacement Year 2026 Future Cost $1,484,505 This is to completely strip and re-paint the building exterior. Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

40 Component Listing Included Components Mailboxes Mailboxes D/F Building Quantity 1 Unit of Measure Fund 25 Cost /Fnd $12, % Total Cost/Study $12,000 Replacement Year 2023 Future Cost $15, Mailboxes C/J Building Quantity 1 Unit of Measure Fund 25 Cost /Fnd $10, % Total Cost/Study $10,000 Replacement Year 2023 Future Cost $12, Mailboxes A/B Building Quantity 1 Unit of Measure Fund 25 Cost /Fnd $10, % Total Cost/Study $10,000 Replacement Year 2023 Future Cost $12,801 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

41 Component Listing Included Components Valves Mechanical Equipment - Domestic Water Main Quantity 1 Unit of Measure Items 5 Cost /Itm $16, % Total Cost/Study $16,153 Replacement Year 2015 Future Cost $16, Floor Isolation Valve 196 Quantity 196 Unit of Measure Items 25 Cost /Itm $ % Total Cost/Study $174,133 Replacement Year 2029 Future Cost $258, Boilers Boiler #2 Replace Quantity 1 Unit of Measure Items 20 Cost /Itm $66, % Total Cost/Study $66,533 Replacement Year 2032 Future Cost $106,362 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

42 Component Listing Included Components Boilers Mechanical Equipment - Domestic Water Boiler #3 Replace Quantity 1 Unit of Measure Items 20 Cost /Itm $29, % Total Cost/Study $29,000 Replacement Year 2032 Future Cost $46, Boilers Boiler #1 Replace Quantity 1 Unit of Measure Items 20 Cost /Itm $66, % Total Cost/Study $66,625 Replacement Year 2016 Future Cost $71, Boiler Insulation 20 Quantity 1 Unit of Measure Fund Cost /Fnd $4, % Total Cost/Study $4,561 Replacement Year 2032 Future Cost $7,291 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

43 Component Listing Included Components Mechanical Equipment - Domestic Water Boiler Fencing 20 Quantity 1 Unit of Measure Lump Sum Cost /LS $3, % Total Cost/Study $3,500 Replacement Year 2015 Future Cost $3, Booster Pumps 7 Quantity 7 Unit of Measure Items 20 Cost /Itm $3, % Total Cost/Study $25,065 Replacement Year 2018 Future Cost $28, Circulation Pumps 4 (50%) Quantity 4 Unit of Measure Unit 15 Cost /Ut $665 Qty * $/Ut $2, % Total Cost/Study $1,330 Replacement Year 2018 Future Cost $1,505 5 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

44 Component Listing Included Components Mechanical Equipment - Domestic Water Circulation Pumps 4 (50%) Quantity 4 Unit of Measure Unit 15 Cost /Ut $665 Qty * $/Ut $2, % Total Cost/Study $1,330 Replacement Year 2027 Future Cost $1, Backflow Preventor Plaza Quantity 1 Unit of Measure Items 30 Cost /Itm $20, % Total Cost/Study $20,000 Replacement Year 2034 Future Cost $33, Backflow Preventor Pierce Quantity 1 Unit of Measure Items 30 Cost /Itm $20, % Total Cost/Study $20,000 Replacement Year 2016 Future Cost $21,538 This is to bring the 2nd backflow prevention device up to code by moving it from below grade to above grade. 3 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

45 Component Listing Included Components Mechanical Equipment - Domestic Water Leak Repair/Pipe Replace Interior Building Quantity 1 Unit of Measure Fund 5 Cost /Fnd $30, % Total Cost/Study $30,000 Replacement Year 2015 Future Cost $31, Plumbing Survey/Inspection Report (33%) Quantity 1 Unit of Measure Fund 2 Cost /Fnd $16,153 Qty * $/Fnd $16, % 1 Total Cost/Study Treatment [nr:1] $5,384 Replacement Year 2014 Future Cost $5, Mechanical Equipment - HVAC / Ventilation Hydronic System Specifications Quantity 1 Unit of Measure Lump Sum 20 Cost /LS $5, % Total Cost/Study $5,731 Replacement Year 2032 Future Cost $9,162 This is for the work performed by Gregory Booth Engineering in fiscal year 2012 which includes specifications for the circulation pumps, domestic water pressurization system and new boilers. Replacement of these components is not included in this line item Mechanical Equipment - Trash Trash Chutes (Repair) Chute/Misc. Door Repair (5%) Quantity 1 Unit of Measure Lump Sum 5 Cost /LS $78,075 Qty * $/LS $78, % Total Cost/Study $3,904 Replacement Year 2013 Future Cost $3, Trash Compactor Replace 30 Quantity 1 Unit of Measure Items Cost /Itm $60, % Total Cost/Study $60,000 Replacement Year 2028 Future Cost $86,898 This is to replace the existing trash compactor Trash/Recycle Bins 10 Quantity 10 Unit of Measure Items 10 Cost /Itm $2, % Total Cost/Study $20,000 Replacement Year 2020 Future Cost $23,774 7 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

46 Component Listing Included Components Main Pumps Mechanical Equip. - Fire Safety/Alarm System 3 Replace Quantity 3 Unit of Measure Items 40 Cost /Itm $12, % Total Cost/Study $37,153 Replacement Year 2017 Future Cost $41, Sprinkler System Repair 5 Quantity 1 Unit of Measure Fund Cost /Fnd $8, % Total Cost/Study $8,400 Replacement Year 2017 Future Cost $9, Miscellaneous System Repair/Retrofit Quantity 1 Unit of Measure Fund 30 Cost /Fnd $14, % Total Cost/Study $14,204 Replacement Year 2042 Future Cost $29,068 This is for the system repair/retrofit completed by AECO Systems Inc. in Mechanical Equipment - Security System Entry Access System 15 Quantity 1 Unit of Measure Unit Cost /Ut $136, % 0 Total Cost/Study Treatment [se:2] $136,765 Replacement Year 2013 Future Cost $138, Surveillance Cameras (18%) Quantity 1 Unit of Measure Fund 20 Cost /Fnd $192,030 Qty * $/Fnd $192, % Total Cost/Study $35,000 Replacement Year 2013 Future Cost $35,000 0 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

47 Component Listing Included Components Mechanical Equipment - Security System Surveillance Cameras (40.9%) Quantity 1 Unit of Measure Fund 20 Cost /Fnd $192,030 Qty * $/Fnd $192, % Total Cost/Study $78,500 Replacement Year 2014 Future Cost $80, Surveillance Cameras (40.9%) Quantity 1 Unit of Measure Fund 20 Cost /Fnd $192,030 Qty * $/Fnd $192, % Total Cost/Study $78,500 Replacement Year 2015 Future Cost $82, Backup Batteries 15 Quantity 1 Unit of Measure Fund Cost /Fnd $3, % Total Cost/Study $3,231 Replacement Year 2013 Future Cost $3, Mechanical Equipment - Garage Ventilation Ventilation Fans 2 Quantity 2 Unit of Measure Items 10 Cost /Itm $4, % Total Cost/Study $8,938 Replacement Year 2018 Future Cost $10, Mechanical Equip. - Safety System Central Panel 30 Quantity 1 Unit of Measure Fund Cost /Fnd $405, % Total Cost/Study $405,846 Replacement Year 2013 Future Cost $405, Central Panel 30 Quantity 1 Unit of Measure Fund Cost /Fnd $1,014, % Total Cost/Study $1,014,794 Replacement Year 2014 Future Cost $1,040, Keltron System 20 Quantity 1 Unit of Measure Fund Cost /Fnd $36, % Total Cost/Study $36,614 Replacement Year 2025 Future Cost $49,242 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

48 Component Listing Included Components Mechanical Equip. - Safety System Smoke Detectors 487 Quantity 487 Unit of Measure Items 10 Cost /Itm $ % Total Cost/Study $26,222 Replacement Year 2016 Future Cost $28, Consultant Safety/Fire/Comm/Security Quantity 1 Unit of Measure Fund 5 Cost /Fnd $78, % 0 Total Cost/Study Treatment [nr:1] $78,971 Replacement Year 2013 Future Cost $78, Consultant Safety/Fire/Comm/Security Quantity 1 Unit of Measure Fund 5 Cost /Fnd $78, % 1 Total Cost/Study Treatment [nr:1] $78,971 Replacement Year 2014 Future Cost $80, Generator Mechanical Equip. - Safety Emergency Syst. Replacement Quantity 1 Unit of Measure Unit 25 Cost /Ut $50, % Total Cost/Study $50,613 Replacement Year 2032 Future Cost $80,913 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

49 Component Listing Included Components Mechanical Equip. - Safety Emergency Syst Fuel Tank (Generator) Replacement Quantity 1 Unit of Measure Fund Fuel tank - Generator replacement to occur in Cost /Fnd $105, % Total Cost/Study $105,575 Replacement Year 2013 Future Cost $105, Fire Pump Indicator Panel (Generator) 5 Quantity 1 Unit of Measure Unit Cost /Ut $6, % 3 Total Cost/Study Treatment [se:2] $6,200 Replacement Year 2016 Future Cost $6, Paving Repairs 6,360 Sq. Ft. Repair/Seal/Re-Stripe Quantity 6,360 Unit of Measure Square Feet 5 Cost /SqFt $ % Total Cost/Study $5,137 Replacement Year 2014 Future Cost $5, Asphalt: Resurface 6,360 Sq. Ft. Quantity 6,360 Unit of Measure Square Feet 25 Cost /SqFt $ % Total Cost/Study $27,396 Replacement Year 2029 Future Cost $40,670 This is to completely grind the roadway and install new hot asphalt on to the new surface Concrete (Partial Replacement) Walkways/Drives 2 Quantity 1 Unit of Measure Fund Cost /Fnd $5, % Total Cost/Study $5,384 Replacement Year 2014 Future Cost $5,519 1 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

50 Component Listing Included Components Pool Deck Concrete (Partial Replacement) Re-Coat Quantity 1 Unit of Measure Lump Sum 15 Cost /LS $30, % Total Cost/Study $30,000 Replacement Year 2016 Future Cost $32, Waterproofing Planter Areas Repair 3,000 Sq. Ft. Atrium's (5.6%) Quantity 3,000 Unit of Measure Square Feet 20 Cost /SqFt $60.00 Qty * $/SqFt $180, % Total Cost/Study $10,000 Replacement Year 2031 Future Cost $15,596 This is to waterproof the planters located in the atrium areas. This cost includes fees associated with excavation, cleaning, waterproofing and re-planting Garage Slab Leak Inspection 30 Quantity 1 Unit of Measure Fund Cost /Fnd $7, % 1 Total Cost/Study Treatment [nr:1] $7,500 Replacement Year 2014 Future Cost $7,688 This is a one time expense to perform garage slab leak inspections Garage Slab Leak Repair 30 Quantity 1 Unit of Measure Fund Cost /Fnd $45, % 1 Total Cost/Study Treatment [nr:1] $45,000 Replacement Year 2014 Future Cost $46,125 This is a one time expense for the performance of garage slab repairs. Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

51 Component Listing Included Components Painting: Interior Common Areas / Stairwells 216,782 Sq. Ft. Quantity 216,782 Unit of Measure Square Feet 9 Cost /SqFt $ % Total Cost/Study $200,000 Replacement Year 2014 Future Cost $205,000 This is to paint the interior common areas including hallways, ceilings, walls and trim. This cost includes fees associated with the completion of a second coat to walls and ceilings Structural Repairs/Replacement Miscellaneous F Building Emergency Exit Quantity 1 Unit of Measure Lump Sum 20 Cost /LS $8, % 1 Total Cost/Study Treatment [nr:1] $8,500 Replacement Year 2014 Future Cost $8,713 This is to remove/replace the existing wood emergency exit at the F building roof with a walk pad system. Future repair/replacement will be included in the roofing replacement line item. Therefore, this line item is scheduled for 2014 only and will not repeat Roofing Roof Deck Replacement AB Plaza Entry Quantity 1 Unit of Measure Fund 15 Cost /Fnd $25, % Total Cost/Study $25,702 Replacement Year 2027 Future Cost $36,316 This is for the replacement of the roof deck and railings at the AB Plaza Entry Roof Drainage 30 Quantity 1 Unit of Measure Fund Cost /Fnd $1, % Total Cost/Study $1,358 Replacement Year 2042 Future Cost $2,780 This is for the roof drain that was new as of 2012 and installed by Ronald J. Loar. Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

52 Component Listing Included Components Roofing Low Slope: Tar & Gravel A Bldg. Quantity 1 Unit of Measure Building This is to re-roof with a tar & gravel roofing product. 15 Cost /Bldg $308, % Total Cost/Study $308,106 Replacement Year 2022 Future Cost $384, Low Slope: Tar & Gravel B Bldg. Quantity 1 Unit of Measure Building This is to re-roof with a tar & gravel roofing product. 15 Cost /Bldg $264, % Total Cost/Study $264,140 Replacement Year 2022 Future Cost $329, Low Slope:Duro-Last C Bldg. Quantity 1 Unit of Measure Building This is to re-roof with a Duro-last roofing product. 15 Cost /Bldg $365, % Total Cost/Study $365,680 Replacement Year 2018 Future Cost $413, Low Slope:Duro-Last D Bldg. Quantity 1 Unit of Measure Building This is to re-roof with a Duro-last roofing product. 15 Cost /Bldg $365, % Total Cost/Study $365,680 Replacement Year 2018 Future Cost $413, Low Slope: Tar & Gravel E Bldg. Quantity 1 Unit of Measure Building This is to re-roof with a tar & gravel roofing product. Version 11/13/2013 3:32:58 PM 15 Cost /Bldg $325, % Total Cost/Study $325,049 Replacement Year 2021 Future Cost $396,040 Richard Avelar & Associates

53 Component Listing Included Components Roofing Low Slope:Duro-Last F Bldg. Quantity 1 Unit of Measure Building 15 Cost /Bldg $107,689 This is to re-coat the roof with a Duro-last roofing product % Total Cost/Study $107,689 Replacement Year 2018 Future Cost $121, Low Slope:Duro-Last J Bldg. Quantity 1 Unit of Measure Building 15 Cost /Bldg $86,152 This is to re-coat the roof with a Duro-last roofing product % Total Cost/Study $86,152 Replacement Year 2018 Future Cost $97, Low Slope: Tar & Gravel 2,000 Sq. Ft. Clubhouse Quantity 2,000 Unit of Measure Square Feet This is to replace the tar and gravel roofing. 15 Cost /SqFt $ % Total Cost/Study $21,322 Replacement Year 2015 Future Cost $22, Roofing: Inspections & Repairs 4 Quantity 1 Unit of Measure Lump Sum Cost /LS $5, % Total Cost/Study $5,932 Replacement Year 2016 Future Cost $6,388 3 This is to inspect and perform periodic maintenance as needed to the roofing. Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

54 Component Listing Included Components Re-Model / Upgrade Security Office 15 Quantity 1 Unit of Measure Lump Sum Cost /LS $15, % 1 Total Cost/Study Treatment [nr:1] $15,000 Replacement Year 2014 Future Cost $15,375 This is a one time cost for the performance of a general rehab of the security office Laundry Room 2 Quantity 2 Unit of Measure Fund 15 Cost /Fnd $4, % Total Cost/Study $9,000 Replacement Year 2023 Future Cost $11,521 This is for general rehab of the laundry room and includes flooring, painting, countertops, etc Gate Equipment / Entry System Roll-Up Gate 6 Garbage Room/B Dock Quantity 6 Unit of Measure Items This is to replace the roll-up gate 25 Cost /Itm $3, % Total Cost/Study $21,000 Replacement Year 2028 Future Cost $30,414 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

55 Component Listing Included Components Gate Equipment / Entry System Pedestrian Gate A dock Quantity 1 Unit of Measure Fund This is to repair the pedestrian gates. 15 Cost /Fnd $5, % Total Cost/Study $5,384 Replacement Year 2025 Future Cost $7, Auto Gate 3 Driv. Assy Quantity 3 Unit of Measure Items 5 Cost /Itm $4, % Total Cost/Study $12,438 Replacement Year 2013 Future Cost $12, Auto Gate 3 G-1, G-2 Res, G-2 Vis Quantity 3 Unit of Measure Items 10 Cost /Itm $5, % Total Cost/Study $16,153 Replacement Year 2021 Future Cost $19, Security Gate 15 Quantity 1 Unit of Measure Items Cost /Itm $5, % Total Cost/Study $5,384 Replacement Year 2025 Future Cost $7, Safety Loops 2 Quantity 2 Unit of Measure Items 25 Cost /Itm $4, % Total Cost/Study $8,292 Replacement Year 2013 Future Cost $8, Pool Re-plaster 984 Sq. Ft. Quantity 984 Unit of Measure Square Feet This is to resurface the pool. Includes coping. 10 Cost /SqFt $ % Total Cost/Study $30,000 Replacement Year 2019 Future Cost $34,791 6 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

56 Component Listing Included Components Pool Equipment Repair Miscellaneous Quantity 1 Unit of Measure Fund 10 Cost /Fnd $3, % Total Cost/Study $3,436 Replacement Year 2022 Future Cost $4, Filter 10 Quantity 1 Unit of Measure Items Cost /Itm $1, % Total Cost/Study $1,564 Replacement Year 2017 Future Cost $1, Chlorinator 5 Quantity 1 Unit of Measure Items Cost /Itm $3, % Total Cost/Study $3,741 Replacement Year 2015 Future Cost $3, Pumps 2 Solar Pumps Quantity 2 Unit of Measure Items 10 Cost /Itm $ % Total Cost/Study $1,615 Replacement Year 2020 Future Cost $1, Heater 12 Quantity 1 Unit of Measure Items Cost /Itm $9, % Total Cost/Study $9,096 Replacement Year 2024 Future Cost $11,934 This is to replace the pool heater (includes sump pump) Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

57 Component Listing Included Components Pool Pool Cover 7 Quantity 1 Unit of Measure Items Cost /Itm $2, % Total Cost/Study $2,545 Replacement Year 2019 Future Cost $2, Miscellaneous Skimmer & Lights Quantity 1 Unit of Measure Fund 10 Cost /Fnd $5, % Total Cost/Study $5,384 Replacement Year 2021 Future Cost $6, Spa Repairs Replacement Quantity 1 Unit of Measure Items This is for repairs/replacement to the spa. 20 Cost /Itm $21, % Total Cost/Study $21,500 Replacement Year 2015 Future Cost $22, Heater Heater & Pumps Quantity 1 Unit of Measure Fund This is to replace the spa heater and pumps. Cost /Fnd 12 $ % Total Cost/Study $975 Replacement Year 2024 Future Cost $1,280 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

58 Component Listing Included Components Recreation / Fitness Equipment Sauna: Heaters 3 Quantity 1 Unit of Measure Items Cost /Itm $1, % Total Cost/Study $1,890 Replacement Year 2014 Future Cost $1,937 1 This is to replace the sauna heater Sauna: Wood Replacement Fund Interior Quantity 1 Unit of Measure Fund 10 Cost /Fnd $6,461 This is to recover and replace the wood kit in the sauna room % Total Cost/Study $6,461 Replacement Year 2021 Future Cost $7, Miscellaneous Exercise Equipment (10%) Quantity 1 Unit of Measure Fund 3 Cost /Fnd $35,537 Qty * $/Fnd $35, % Total Cost/Study $3,554 Replacement Year 2014 Future Cost $3,643 This line item allows for 10% repair/replacement of the gym equipment every three years Tennis Court Seal Coat 5 Quantity 1 Unit of Measure Lump Sum Cost /LS $6, % Total Cost/Study $6,000 Replacement Year 2016 Future Cost $6,461 3 This is to resurface the tennis courts utilizing a Petromat overlay, color coat and striping. Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

59 Component Listing Included Components Tennis Court Resurface 25 Quantity 1 Unit of Measure Lump Sum Cost /LS $25, % Total Cost/Study $25,000 Replacement Year 2036 Future Cost $44, Irrigation Landscaping North Plaza, Hillside (13.7%) Quantity 1 Unit of Measure Lump Sum 30 Cost /LS $98,372 Qty * $/LS $98, % Total Cost/Study $13,500 Replacement Year 2013 Future Cost $13, Irrigation Driveway, Pierce St. (28%) Quantity 1 Unit of Measure Lump Sum 30 Cost /LS $98,372 Qty * $/LS $98, % Total Cost/Study $27,593 Replacement Year 2015 Future Cost $28, Irrigation South Plaza (28%) Quantity 1 Unit of Measure Lump Sum 30 Cost /LS $98,372 Qty * $/LS $98, % Total Cost/Study $27,593 Replacement Year 2016 Future Cost $29, Irrigation Plaza Lawns Quantity 1 Unit of Measure Lump Sum 30 Cost /LS $30, % Total Cost/Study $30,000 Replacement Year 2017 Future Cost $33,114 4 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

60 Component Listing Included Components Landscaping Plants 10 Quantity 1 Unit of Measure Lump Sum Cost /LS $25, % Total Cost/Study $25,000 Replacement Year 2013 Future Cost $25, Plants 10 Quantity 1 Unit of Measure Lump Sum Cost /LS $25, % Total Cost/Study $25,000 Replacement Year 2015 Future Cost $26,266 2 This is to perform re-planting of the common areas, if needed Chain Link Fencing (Repair/Replace) 950 Lin. Ft. Quantity 950 Unit of Measure Linear Feet This is to replace the chain link fencing. 20 Cost /l.f. $ % Total Cost/Study $27,858 Replacement Year 2030 Future Cost $42, Wrought Iron Pool Fence Quantity 1 Unit of Measure Fund Cost /Fnd 20 $17, % Total Cost/Study $17,907 Replacement Year 2032 Future Cost $28,627 This is to replace the wrought iron fencing. With aggressive paint maintenance, this component s life may be extended. Painting is provided for within another component. Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

61 Component Listing Included Components Fencing (Repair/Replace) Wrought Iron All W/I Fencing and Railings Quantity 1 Unit of Measure Fund 2 Cost /Fnd $5, % Total Cost/Study $5,384 Replacement Year 2013 Future Cost $5, Miscellaneous Patio Fence Replacement Fund Quantity 1 Unit of Measure Fund 20 Cost /Fnd $50, % Total Cost/Study $50,799 Replacement Year 2032 Future Cost $81, Miscellaneous 728 Lin. Ft. Tennis court fence Quantity 728 Unit of Measure Linear Feet 25 Cost /l.f. $ % Total Cost/Study $22,853 Replacement Year 2025 Future Cost $30, Carpet Office Equipment / Furnishings Carpet/Paint Quantity 1 Unit of Measure Fund 10 Cost /Fnd $6, % Total Cost/Study $6,461 Replacement Year 2014 Future Cost $6, Furnishings 12 Quantity 1 Unit of Measure Fund Cost /Fnd $4, % Total Cost/Study $4,738 Replacement Year 2015 Future Cost $4,978 2 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

62 Component Listing Included Components Office Equipment / Furnishings Equipment 3 Quantity 1 Unit of Measure Fund Cost /Fnd $5, % Total Cost/Study $5,923 Replacement Year 2016 Future Cost $6, Misc. Mechanical Equipment Miscellaneous Tomcat 250 Floor Cleaner Quantity 1 Unit of Measure Items 10 Cost /Itm $10, % Total Cost/Study $10,000 Replacement Year 2016 Future Cost $10,769 This is to replace the Tomcat 250 machine used to clean the garage floors Elevator Cab Refurbish / Upgrade 7 Traction Elevators (50%) Quantity 7 Unit of Measure Items 25 Cost /Itm $25,000 Qty * $/Itm $175, % Total Cost/Study $87,500 Replacement Year 2013 Future Cost $87,500 0 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

63 Component Listing Included Components Elevator Cab Refurbish / Upgrade 7 Traction Elevators (50%) Quantity 7 Unit of Measure Unit 25 Cost /Ut $24,390 Qty * $/Ut $170, % Total Cost/Study $85,366 Replacement Year 2014 Future Cost $87, Cab Refurbish / Upgrade Hydraulic Garage Elevator Quantity 1 Unit of Measure Unit 25 Cost /Ut $15, % Total Cost/Study $15,000 Replacement Year 2018 Future Cost $16, System Modernization Traction Elevators Quantity 1 Unit of Measure Fund This is for the modernization of the traction elevators. 30 Cost /Fnd $359, % Total Cost/Study $359,775 Replacement Year 2013 Future Cost $359, System Modernization Traction Elevators Quantity 1 Unit of Measure Fund This is for the modernization of the traction elevators. 30 Cost /Fnd $828, % Total Cost/Study $828,707 Replacement Year 2014 Future Cost $849, System Modernization Garage Hydraulic Elevator Quantity 1 Unit of Measure Fund 25 Cost /Fnd $100, % Total Cost/Study $100,000 Replacement Year 2018 Future Cost $113, System Modernization B Dock Freight Elevator Quantity 1 Unit of Measure Fund 25 Cost /Fnd $150, % Total Cost/Study $150,000 Replacement Year 2018 Future Cost $169, Lobby Common Area Furnishings / Equipment 20 Quantity 1 Unit of Measure Fund Cost /Fnd $9, % Total Cost/Study $9,746 Replacement Year 2019 Future Cost $11,302 6 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

64 Component Listing Included Components Common Area Furnishings / Equipment Pool/Patio Furnishings 5 Quantity 1 Unit of Measure Fund Cost /Fnd $3, % Total Cost/Study $3,436 Replacement Year 2013 Future Cost $3, Common Area Furnishings / Equipment Miscellaneous Microphones Quantity 1 Unit of Measure Lump Sum 10 Cost /LS $2, % Total Cost/Study $2,055 Replacement Year 2022 Future Cost $2, Electrical Building Exterior Lighting Ext. Bldg including Pierce Street (25%) Quantity 1 Unit of Measure Fund 5 Cost /Fnd $91,536 Qty * $/Fnd $91, % Total Cost/Study $22,884 Replacement Year 2014 Future Cost $23, Corridor Lighting Interior Quantity 1 Unit of Measure Fund Cost /Fnd 20 $92, % Total Cost/Study $92,516 Replacement Year 2020 Future Cost $109,972 7 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

65 Component Listing Included Components Electrical Garage Lighting 10 Quantity 1 Unit of Measure Fund Cost /Fnd $100, % Total Cost/Study $100,000 Replacement Year 2016 Future Cost $107, Lighting Plaza Area Quantity 1 Unit of Measure Fund 20 Cost /Fnd $60, % Total Cost/Study $60,000 Replacement Year 2013 Future Cost $60, Lighting East Hillside Quantity 1 Unit of Measure Fund 20 Cost /Fnd $19, % Total Cost/Study $19,000 Replacement Year 2013 Future Cost $19, Lighting Driveway Quantity 1 Unit of Measure Fund 20 Cost /Fnd $30, % Total Cost/Study $30,000 Replacement Year 2015 Future Cost $31, Miscellaneous Atrium Lighting Quantity 1 Unit of Measure Lump Sum 10 Cost /LS $3, % Total Cost/Study $3,716 Replacement Year 2022 Future Cost $4,641 9 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

66 Component Listing Included Components Electrical Miscellaneous Lobby Chandeliers Quantity 1 Unit of Measure Lump Sum 20 Cost /LS $6, % Total Cost/Study $6,000 Replacement Year 2014 Future Cost $6, Flooring Carpeting 6,150 Sq. Yds. Carpet corridor (50%) 10 Quantity 6,150 Unit of Measure Square Yard Cost /SqYd $57.18 Qty * $/SqYd $351, % Total Cost/Study $175,837 Replacement Year 2014 Future Cost $180,233 1 This is to replace the current carpeting in the common area corridors with carpet tiles Carpeting 6,150 Sq. Yds. Carpet corridor (50%) 10 Quantity 6,150 Unit of Measure Square Yard Cost /SqYd $57.18 Qty * $/SqYd $351, % Total Cost/Study $175,837 Replacement Year 2015 Future Cost $184,739 2 This is to replace the current carpeting in the common area corridors with carpet tiles Tile Bathrooms Quantity 1 Unit of Measure Lump Sum This is to replace the bathroom tile. 20 Cost /LS $5, % Total Cost/Study $5,673 Replacement Year 2032 Future Cost $9,070 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

67 Component Listing Included Components Flooring Miscellaneous Tile & Vinyl Quantity 1 Unit of Measure Lump Sum This is to replace the tile flooring. 10 Cost /LS $17, % Total Cost/Study $17,769 Replacement Year 2016 Future Cost $19, Miscellaneous Carpet Lobby Quantity 1 Unit of Measure Lump Sum This is to replace the lobby carpet runners. 10 Cost /LS $6, % Total Cost/Study $6,330 Replacement Year 2022 Future Cost $7, Wallcoverings Sheet Metal 3 Garbage Rooms Quantity 3 Unit of Measure Unit 20 Cost /Ut $2, % Total Cost/Study $7,500 Replacement Year 2018 Future Cost $8,486 This is to repair/replace the sheet metal wall coverings located in the garbage rooms Miscellaneous Structural Repairs 30 Quantity 1 Unit of Measure Lump Sum Cost /LS $678, % Total Cost/Study $678,441 Replacement Year 2025 Future Cost $912, Utility Cart 12 Quantity 1 Unit of Measure Items Cost /Itm $7, % Total Cost/Study $7,323 Replacement Year 2016 Future Cost $7,886 3 Version 11/13/2013 3:32:58 PM Richard Avelar & Associates

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: October 09, 2016 To: Joleen Cline, Cline & Associates From: Browning Reserve Group (BRG) Re: Whitehawk Townhomes Association; Update w/ Site Visit Review Attached,

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: February 1, 215 To: Sonja Bachus, Management Alternative, The From: Browning Reserve Group (BRG) Re: ; Update w/o Site Visit Review Attached, please find the reserve

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: August 15, 215 To: Lorrie Olson, Caughlin Creek HOA From: Browning Reserve Group (BRG) Re: Caughlin Creek HOA; Full Study Attached, please find the reserve study

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

Ashleigh Commons Condominiums Association, Inc.

Ashleigh Commons Condominiums Association, Inc. RESERVE STUDY Full Study Ashleigh Commons Condominiums Association, Inc. Published - January 14, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

Hyde Park Place Owners' Association, Inc.

Hyde Park Place Owners' Association, Inc. RESERVE STUDY Full Study Hyde Park Place Owners' Association, Inc. Published - February 10, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES Miramar Plaza Homeowners' Association Reserve Study Update w/o Visual Inspection July 15, 2014 Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES 2059 Camden Ave. Suite

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

Daniel J. Sullivan CPA, MBA 5389 Kahalakua Street Honolulu, Hawaii

Daniel J. Sullivan CPA, MBA 5389 Kahalakua Street Honolulu, Hawaii Daniel J. Sullivan CPA, MBA 5389 Kahalakua Street Honolulu, Hawaii 96821 res1cfdl@hawaiiantel.net INDEPENDENT AUDITOR'S REPORT Board of Directors of The Association of Apartment Owners of Report on the

More information

Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU

Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU August 18, 2016 Mr. Nicholas Burbulis 420 W. Belmont Ave. Chicago, IL 60657 Reference: The Kipcon Great Lakes Dear Mr. Burbulis: Attached, please find Kipcon Great Lakes, which has been prepared for the.

More information

Calusa Point Association, Inc. Miami, Florida File #

Calusa Point Association, Inc. Miami, Florida File # A FULL RESERVE STUDY FOR Miami, Florida File # 22920-06289 FOR PERIOD: January 1, 2014 December 31, 2014 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM LINDSEY 3300 W. LAKE MARY BLVD. SUITE 350 LAKE

More information

RESERVE STUDY LEVEL I - Full Reserve Study. ABC Condominium Association, Inc.

RESERVE STUDY LEVEL I - Full Reserve Study. ABC Condominium Association, Inc. Insurance Appraisals Reserve Studies Wind Mitigation RESERVE STUDY LEVEL I - Full Reserve Study Prepared for: ABC Condominium Association, Inc. For the period of January 1, 214 - December 31, 214 71 Enterprise

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

Agenda Item # 5b Page 1 of 43

Agenda Item # 5b Page 1 of 43 Page 1 of 43 Page 2 of 43 Page 3 of 43 Page 4 of 43 Page 5 of 43 Page 6 of 43 Page 7 of 43 Page 8 of 43 Page 9 of 43 Page 10 of 43 Page 11 of 43 Page 12 of 43 Page 13 of 43 Page 14 of 43 Page 15 of 43

More information

Pacific Tower Condominium Association

Pacific Tower Condominium Association www.hoacpa.com Pacific Tower Condominium Association Audit Report Financial Statements & Supplementary Information December 31, 2016 Cagianut & Company CERTIFIED PUBLIC ACCOUNTANT www.hoacpa.com Members

More information

RESERVE STUDY Component Analysis and Reserve Fund Plan Annual Review Study 2016/17 For Middlefield Meadows HOA Mountain View, CA Prepared By RESERVE ANALYSIS CONSULTING, LLC 1750 Bridgeway, Suite B106

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Soda Creek Condominiums Dillon, Colorado Version 2 Monday, August 19, 2013 6860 S. Yosemite Court, Suite 2000 Centennial, CO 80112 Phone (303) 953-2078 Facsimile (303) 953-2157

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Seavue Condominiums 130-5 th Avenue South, Edmonds, WA 98020 For: Seavue Homeowners Association c/o Jay Grant Board President (202) 351-9399 Prepared By: Jeff Samdal, PE, RS,

More information

Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File #

Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File # A FULL RESERVE STUDY FOR Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File # 22920-04030 FOR PERIOD: January 1, 2017 December 31, 2017 PREPARED BY GAB ROBINS,

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

RESERVE STUDY UPDATE SUMMARY. for. Vista Tassajara HOMEOWNERS ASSOCIATION

RESERVE STUDY UPDATE SUMMARY. for. Vista Tassajara HOMEOWNERS ASSOCIATION RESERVE STUDY UPDATE SUMMARY for Vista Tassajara HOMEOWNERS ASSOCIATION Date Prepared: 10/27/2017 for fiscal year 2018 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA

More information

Sample Reserve Study Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003

Sample Reserve Study Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003 Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003 Reserve Analyst P.O. Box 797 Vernon, AZ 85940 Phone: 800-561-0173 Fax: 928-537-3377 Prepared By Quality Check

More information

HARBOR POINTE CONDOMINIUM ASSOCIATION INC CONDOMINIUM APPROVED BUDGET YEAR ENDING DECEMBER 31, 2017

HARBOR POINTE CONDOMINIUM ASSOCIATION INC CONDOMINIUM APPROVED BUDGET YEAR ENDING DECEMBER 31, 2017 210 Monthly Condominium Assessment $ 477.00 Condominium Income Assessment Income Condominium 1,202,040.00 Assessment Income: $ 1,202,040.00 Condominium Expenses General / Administrative Management Fee

More information

R E S E R V E S T U D Y

R E S E R V E S T U D Y SAGUARO CANYON SUBDIVISION HOMEOWNERS ASSOCIATION R E S E R V E S T U D Y Full Study Published - May 27, 2010 B R O W N I N G R E S E R V E G R O U P ~ Emmett, ID 83617 ~ Office (208) 365-0977 Fax (208)

More information

Do-It-Yourself Reserve Study

Do-It-Yourself Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample HOA 2663 S Oakland St Los Angeles, CA Level I Study with Site Inspection Fiscal Year End: 11/30/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

ASSOCIATION OF APARTMENT OWNERS OF HALE KAMAOLE

ASSOCIATION OF APARTMENT OWNERS OF HALE KAMAOLE ASSOCIATION OF APARTMENT OWNERS OF HALE KAMAOLE FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2016 and 2015 TABLE OF CONTENTS INDEPENDENT AUDITOR S REPORT... 1 FINANCIAL STATEMENTS: BALANCE SHEET...

More information

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA SCT RESERVE CONSULTANTS, INC. P.O. BOX 890129 TEMECULA, CA 92589-0129 PHONE (951) 296-3520 FAX (951) 296-5038 E-MAIL mike.g@sctreserve.com November 23, 2017 Job 2006-127-12 L3 Sunshine Villas Homeowners

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT?

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? Tom Larson, PE, RS, PRA Facility Engineering Associates, PC What is a Reserve Study? A budget planning tool which identifies the current status of the

More information

BUDGET APPROVED. GENERAL EXPENSES (158 Units)

BUDGET APPROVED. GENERAL EXPENSES (158 Units) TANGLEWOOD HILLS CONDOMINIUM Association name: Tanglewood Hills Condom Association number: 1457 General - Total # of Units 158 Fiscal year end: 12/31 Budget year: 2017 Budget type: M BUDGET APPROVED ACCT.

More information

TANGLEWOOD HILLS CONDOMINIUM

TANGLEWOOD HILLS CONDOMINIUM TANGLEWOOD HILLS CONDOMINIUM Association name: Tanglewood Hills Condom Association number: 1547 General - Total # of Units 158 Fiscal year end: 12/31 Budget year: 2018 Budget type: M BUDGET APPROVED ACCT.

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Update With Site-Visit Reserve Study Park Place HOA Surprise, Arizona Report #: 12568-2 For Period Beginning: January 1, 2017 Expires: December 31, 2017 Date Prepared: October 4, 2016 Hello, and welcome

More information

Reserve Studies Turnover Reports Insurance Appraisals

Reserve Studies Turnover Reports Insurance Appraisals Reserve Studies Turnover Reports Insurance Appraisals Dear Board Members, Managers and Unit Owners, For twenty years we having been serving community associations throughout Florida and the Southeast United

More information

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums.

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums. 1825 W. Ray Road, #1135, Chandler, AZ 85244 support@azreservestudy.com Tel: (480) 620-4757 Fax: (888) 842-9319 April 4, 2013 Summit Park Condominiums HOA Regarding: 2012 - Level I Capital Replacement Reserve

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY Arizona Texas Nevada Utah New Mexico CAPITAL RESERVE STUDY Prepared for: Quail Creek HOA Date of Report: 6/7/2018 Capital Reserve Analysts Bringing the future into the present Capital Reserve Analysts,

More information

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA SCT RESERVE CONSULTANTS, INC. P.O. BOX 890129 TEMECULA, CA 92589-0129 PHONE (951) 296-3520 FAX (951) 296-5038 E-MAIL mike.g@sctreserve.com March 24, 2015 Job 2000-003-10 L3 St. Tropez Villas I, Incorporated

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

UPDATE - With Site Visit

UPDATE - With Site Visit SAMPLE Reserve Study UPDATE - With Site Visit Serving the Nation www.reservestudy.com Welcome to your Reserve Study! A Reserve Study is a valuable tool to help you budget responsibly for your property.

More information

ALAMEDA ISLES PROPOSED BUDGET FACT SHEET

ALAMEDA ISLES PROPOSED BUDGET FACT SHEET ALAMEDA ISLES PROPOSED BUDGET FACT SHEET These sheets outline the proposed 2016/2017 budget in two parts. The first part is the operating budget which shows our income and anticipated expenses with a comparative

More information

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019.

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019. RESERVE STUDY UPDATE for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925) 831-1803

More information

Sun Peak Master Association

Sun Peak Master Association Sun Peak Master Association Level 1 Reserve Study Report Period 01/01/2014 12/31/2014 Client Reference Number Property Type Fiscal Year End 17547 Master 12/31 Date of Property Inspection Prepared By Analysis

More information

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH)

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH) HIP Housing In Peel Subject: Capital Reserve Expenditure Guidelines Date: August 1, 2012 Applicable To The information contained in this document applies to the following: Municipal & Private Non- Federal

More information

Urban Heights Condominium

Urban Heights Condominium Condominium Capital 2011 2010, AssociationAnalysis, LLC Condominium Prepared For: Table of Contents Condominium Association, Inc. 1642 Maxwell Road Atlanta, GA 30012 October 19, 2010 INTRODUCTION INTRODUCTION

More information

RESERVE STUDY FUNDING ANALYSIS

RESERVE STUDY FUNDING ANALYSIS RESERVE STUDY FUNDING ANALYSIS There are two generally accepted means of estimating reserves; the Component Funding Analysis and (he Cash Flow Analysis methodologies. The Component Funding Analysis (or

More information

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association 21289 E. Lords Way Queen Creek, AZ 85142 support@azreservestudy.com Tel: (480) 840-7130 Fax: (888) 842-9319 October 27, 2012 Sample Association Regarding: 2013 - Level I Capital Replacement Reserve Study

More information

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08 Central Pointe HOA Level I Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10870 Property Type...... Mid-Rise Number of Units............ 83 Fiscal Year End....... December 31

More information

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC.

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. Woodburn, OR January 1, 2015 December 31, 2015 Project No: OR 11101 0006 5 Prepared By: Carson M. Horton, RS Quality Check By:

More information

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado Reserve Study Project No. 09069 Prepared for 1771 Norwood Lane Fort Collins, Colorado Prepared by Bornengineering 1130 West 124 th Avenue, Suite 100 Westminster, Colorado 80234 January 28, 2010 1130 WEST

More information

RESERVE STUDY ANNUAL REPORT

RESERVE STUDY ANNUAL REPORT RESERVE STUDY ANNUAL REPORT PINELOCH SUN BEACH CLUB LEVEL III RESERVE STUDY UPDATE WITHOUT SITE VISIT Ronald, WA 98940 Report #50510500R FINANCIAL YEAR 01.2016 12.2016 701 Fifth Ave, Suite 4200, Seattle

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY CAPITAL RESERVE STUDY FOR THE HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Number: 12-1066 W:\2012\12-1066\CORR\12-1066v1.doc Date: March 29, 2013 Table of Contents Section Page Executive Summary...

More information

"Full" Reserve Study. Makaha Surfside AOAO Waianae, HI

Full Reserve Study. Makaha Surfside AOAO Waianae, HI "Full" Reserve Study Makaha Surfside AOAO Waianae, HI Report #: For Period Beginning: Expires: Date Prepared: 32902-0 January 1, 2018 December 31, 2018 May 9, 2018 T W Hello, and welcome to your Reserve

More information

SAMPLE CONDO RESERVE STUDY for fiscal year 2012

SAMPLE CONDO RESERVE STUDY for fiscal year 2012 SAMPLE CONDO RESERVE STUDY for fiscal year 2012 RDA REPORT - UPDATED RESERVE ANALYSIS FOR FISCAL YEAR 2012 RESERVE DATA ANALYSIS, INC MPLS (612) 616-4817 TOLL FREE (866) 780-7943 WWW.RDAMIDWEST.COM UPDATE

More information

Social Housing Administration Directive No

Social Housing Administration Directive No Regional Municipality of Halton Social Housing Administration Directive No. 06-05 Date: August 30, 06 To: Federally-Funded Social Housing Providers subject to Operating Agreements under Section 95 of the

More information

Depreciation Report Level I

Depreciation Report Level I Depreciation Report Level I Prepared for Strata VIS 2720 s 2013 Fiscal Year Prepared by RBC STRATA CONSULTING LTD. Version 3.1 2014 RBC STRATA CONSULTING LTD. Have questions about this Depreciation Report.

More information

Reserve Fund Study My Condominium Plan

Reserve Fund Study My Condominium Plan Reserve Fund Study My Condominium Plan 12 3456 Number of Units 36 Number of Buildings 1 Building Construction 21 Contact Ima Happy Position(s) President Contact Phone 43.555.4321 Report Date August 8,

More information

Seaspray Condominium Association, Inc. Fort Walton Beach, Florida File #

Seaspray Condominium Association, Inc. Fort Walton Beach, Florida File # A FULL RESERVE STUDY FOR Seaspray Condominium Association, Inc. Fort Walton Beach, Florida File # 22920-02604 FOR PERIOD: January 1, 2017 December 31, 2017 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM

More information

Belle Monet. Full Reserve Study Report by HOMECERTS.COM

Belle Monet. Full Reserve Study Report by HOMECERTS.COM Belle Monet Full Reserve Study Report by HOMECERTS.COM 800.683.5528 SUPPORT@HOMECERTS.COM Belle Monet Reserve Study Report as of June 5, 2015 538 South 2200 West Pleasant Grove, UT 84062 168 Units Completed

More information

Arizona Nevada Texas Utah New Mexico

Arizona Nevada Texas Utah New Mexico Arizona Nevada Texas Utah New Mexico 9/12/2016 Summit Park HOA Regarding: Fiscal Year beginning 1/1/2017 Level II Capital Replacement Reserve Study We are pleased to submit this Level II Reserve Study

More information

OAK CREEK CONDOMINIUMS

OAK CREEK CONDOMINIUMS 1515 Heritage Dr., Suite 204 McKinney, Texas75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY OAK CREEK CONDOMINIUMS 1700 BAIRD FARM CIRCLE ARLINGTON,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cambridge Court 9512-1 st Avenue Northeast, Seattle, WA 98115 For: Cambridge Court Homeowners Association c/o Tim Kammer, Property Manager Condo Managements, Inc. 1661 Harbor

More information

RESERVE STUDY UPDATE SUMMARY

RESERVE STUDY UPDATE SUMMARY RESERVE STUDY UPDATE SUMMARY for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925)

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Watermark Tower - Residential Association 1107-1 st Avenue, Seattle, WA 98101 For: Watermark Tower Residential Association c/o Alicia Graham, Property Manager CWD Group, Inc.

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY December 31, 2017

Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY December 31, 2017 Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY Section Page RESERVE STUDY EXECUTIVE SUMMARY 1-2 ASSESSMENT AND RESERVE FUNDING 3 DISCLOSURE SUMMARY (These 3 pages should be

More information

Harbour Isle at Hutchinson Island West, CA, Inc. Ft. Pierce, Florida

Harbour Isle at Hutchinson Island West, CA, Inc. Ft. Pierce, Florida A RESERVE STUDY UPDATE FOR Harbour Isle at Hutchinson Island West, CA, Inc. Ft. Pierce, Florida File # U22920-04030 FOR PERIOD: January 1, 2019 December 31, 2019 PREPARED BY GAB ROBINS, A SEDGWICK COMPANY

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017

FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017 FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017 This Report contains intellectual property developed by Reserve Advisors, Inc. and cannot be reproduced or distributed

More information

SURFSIDE HOMEOWNERS ASSOCIATION RESERVE STUDY LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION 2016

SURFSIDE HOMEOWNERS ASSOCIATION RESERVE STUDY LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION 2016 SURFSIDE HOMEOWNERS ASSOCIATION RESERVE STUDY LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION 2016 www.schwindtco.com 503.227.1165 PAGE 1 of 57 SURFSIDE HOMEOWNERS ASSOCIATION Executive Summary Year of

More information

Reserve Study: Alpenrose Condominium Association

Reserve Study: Alpenrose Condominium Association Reserve Study: Alpenrose Condominium Association The Alpenrose Condominiums 74 Erste Strausse Snoqualmie Pass, Washington 98068 Originally Prepared October 5 th 2009 Updated with inspection November 15

More information

RESERVE STUDY OTHER PROPERTY TYPES. Serving the Nation.

RESERVE STUDY OTHER PROPERTY TYPES. Serving the Nation. RESERVE STUDY OTHER PROPERTY TYPES Serving the Nation www.reservestudy.com Welcome to your Reserve Study! A Reserve Study is a valuable tool to help you budget responsibly for your property. This report

More information

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for: RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Sammamish Landing Condominiums 4214 West Lake Sammamish Parkway NE, Redmond, WA 98052 For: Sammamish Landing Homeowners Association c/o Scott McCue, Property Manager McCue &

More information

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012 Parkwood HOA Level 1 Reserve Study Report Period 1/1/2012 12/31/2012 Client Reference Number Property Type Number of Units Fiscal Year End 12784 Townhouse 8 12/31 Date of Property Inspection Prepared By

More information

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of:

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of: Pebble Shores Drive Naples, FL 34410 A Service of: 5036 Dr. Phillips Blvd, Suite 207, Orlando FL 32819 www.lcamresources.com October 31, 2018 Pebble Shores Condominium Pebble Shores Drive Naples, FL 34410

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Villa Marina 17104 NE 45 th Street, Redmond, WA 98053 For: Villa Marina Association of Apartment Owners c/o Sacha Copeland The Copeland Group, LLC 221 First Ave W, Suite 105

More information

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY:

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY: 2015 Reserve Study Report LOCATED AT: 101 Oasis Drive Pompano Beach, FL 33069 FOR: Oasis at Palm Aire Association, Inc. 101 Oasis Dr., # Office Pompano Beach, FL 33069 AS OF: January 1st, 2015 - December

More information

Reserve Study Executive Summary

Reserve Study Executive Summary Reserve Study Executive Summary Association Name: Location: 8550 Lynx Rd., San Diego, CA Fiscal Year Ending: June 30, 2017 No. of Units: 440 Built: 1975 Level of Study: Level III: Update with no On-Site

More information

November 22, Boca Rio Condominium Homeowners Association Board of Directors Blossom Valley Road El Cajon, CA Attn: Robin Clegg

November 22, Boca Rio Condominium Homeowners Association Board of Directors Blossom Valley Road El Cajon, CA Attn: Robin Clegg Sonnenberg & Company, CPAs 5190 Governor Drive, Suite 201, San Diego, California 92122 Phone: (858) 457-5252 -- (800) 464-4HOA -- Fax: (858) 457-2211 -- (800) 303-4FAX November 22, 2017 Boca Rio Condominium

More information

Do-It-Yourself Reserve Study

Do-It-Yourself Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2 2014 Reserve Study The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee 37862 Report No: 2921 Version 2 For the Period From: January 1, 2014 To: December 31, 2014 TABLE

More information

Anson County Early College High

Anson County Early College High NC School District/040 Anson County/High School Anson County Early College High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

2015 Reserve Study. 530 East Central Condominium Association, Inc. 530 East Central Boulevard Orlando, Florida (Statutory Minimum Schedule)

2015 Reserve Study. 530 East Central Condominium Association, Inc. 530 East Central Boulevard Orlando, Florida (Statutory Minimum Schedule) 2015 Reserve Study (Statutory Minimum Schedule) 530 East Central Condominium Association, Inc. 530 East Central Boulevard Orlando, Florida 32801 January 1, 2015 - December 31, 2015 Table of Contents Introduction

More information

THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION INDEX TO REVIEWED FINANCIAL STATEMENTS December 31, 2017 and 2016

THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION INDEX TO REVIEWED FINANCIAL STATEMENTS December 31, 2017 and 2016 INDEX TO REVIEWED FINANCIAL STATEMENTS December 31, 2017 and 2016 Independent accountant s review report 1 REVIEWED FINANCIAL STATEMENTS Balance sheets 2 Statements of revenues, expenses, and changes in

More information

FINANCIAL STATEMENTS and Supplementary Information. For the Years Ended DECEMBER 31, 2013 AND 2012

FINANCIAL STATEMENTS and Supplementary Information. For the Years Ended DECEMBER 31, 2013 AND 2012 THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION FINANCIAL STATEMENTS and Supplementary Information For the Years Ended FINANCIAL STATEMENTS CONTENTS Page Independent accountants review report 1 Financial

More information

2013 Reserve Study. Sea Havens Homeowners Association, Inc Florida Shores Boulevard Daytona Beach Shores, Florida Report No: 2713 Version 2

2013 Reserve Study. Sea Havens Homeowners Association, Inc Florida Shores Boulevard Daytona Beach Shores, Florida Report No: 2713 Version 2 2013 Reserve Study Sea Havens Homeowners Association, Inc Florida Shores Boulevard Daytona Beach Shores, Florida 32118 Report No: 2713 Version 2 For the Period From: January 1, 2013 To: December 31, 2013

More information

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Treetop Condos West Linn, Oregon Account 2015 On Site Update -- Version 1 October 07, 2014

Treetop Condos West Linn, Oregon Account 2015 On Site Update -- Version 1 October 07, 2014 West Linn, Oregon Account 2015 On Site Update -- Version 1 October 07, 2014 The Management Trust - Northwest P.O. Box 23099 Tigard, OR 97281 Phone: 503-670-8111 Toll Free: 877-852-8100 Fax: 503-670-0775

More information

2535 Foothill Boulevard Suite 101 * Condominium Budgets Preparation, Consulting PROFORMA OPERATING BUDGET FOR. Costa Pacifica Estates

2535 Foothill Boulevard Suite 101 * Condominium Budgets Preparation, Consulting PROFORMA OPERATING BUDGET FOR. Costa Pacifica Estates 2535 Foothill Boulevard Suite 101 * Condominium Budgets Preparation, Consulting La Crescenta, CA 91214 * Reserve Studies for Community Associations * Financial Management, Tax & Accounting P.O. Box 12311

More information

2016 Reserve Study. Riverwood Plantation Homeowners Association, Inc Riverwood Drive Port Orange, Florida

2016 Reserve Study. Riverwood Plantation Homeowners Association, Inc Riverwood Drive Port Orange, Florida 2016 Reserve Study Riverwood Plantation Homeowners Association, Inc. 6200 Riverwood Drive Port Orange, Florida 32127 Report No: 4142 January 1, 2016 - December 31, 2016 Table of Contents Introduction 1-1

More information

RESERVE STUDY & MAINTENANCE PLAN ReserveStudyUpdate.com, LLC P.O. Box Portland, Oregon Phone: Fax:

RESERVE STUDY & MAINTENANCE PLAN ReserveStudyUpdate.com, LLC P.O. Box Portland, Oregon Phone: Fax: 9998 Beach Drive Birkenfeld, Oregon 97016 Account 733 - Version 8 Fiscal Year: October 1, 2015 to September 30, 2016 RESERVE STUDY & MAINTENANCE PLAN ReserveStudyUpdate.com, LLC P.O. Box 66778 Portland,

More information

Sample Only. Maintenance Budget Plan Report - V2. 1 Sample Street, Melbourne VIC 3022 OC4, OC5, OC6, OC7 & OC8 Plan of Subdivision: PS

Sample Only. Maintenance Budget Plan Report - V2. 1 Sample Street, Melbourne VIC 3022 OC4, OC5, OC6, OC7 & OC8 Plan of Subdivision: PS Maintenance Budget Plan Report - V2 1 Sample Street, Melbourne VIC 3022 OC4, OC5, OC6, OC7 & OC8 Plan of Subdivision: PS 123456 30+ Years Experience In Reporting Services Our Quality Reports Make Roscon

More information