1 3218 Fannin Road Melissa, TX (972) TEL Firm Reg. No F RESERVE FUND STUDY RIVERCHASE AT WYLIE WYLIE, TX Prepared for: RIVERCHASE AT WYLIE HOMEOWNERS ASSOCIATION C/o Ms. Corinn Dandridge Principal Management Group Park Central Drive, Suite 600 Dallas, TX Date of Investigation: February 6, 2018 Investigator: Phillip Nieman, P.E. Reviewed By: David H. Dotson, P.E., R.S. MARCH 2018 (Draft February 2018) Project Number: C

2 CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY PURPOSE & SCOPE PURPOSE SCOPE SOURCES OF INFORMATION STANDARDS OF REFERENCE DESCRIPTION OBSERVATIONS RESERVE FUND ANALYSIS CONCLUSION LIMITATIONS APPENDIX A: RESERVE FUND PROJECTIONS APPENDIX B: PHOTOGRAPHS APPENDIX C: EXECUTIVE SUMMARY Riverchase at Wylie

3 1.0 INTRODUCTION RIVERCHASE AT WYLIE HOMEOWNERS ASSOCIATION through Principal Management Group, authorized Criterium Dotson Engineers to conduct a Property Evaluation and Reserve Fund Study for RIVERCHASE AT WYLIE, located in. Studies of this nature are important to ensure that a community has sufficient funds for long-term, periodic capital expenditure requirements. Anticipating large expenditures over an extended period of time through a structured analysis and scheduling process assists the Association in meeting financial requirements without increasing the service fees above permitted maximums, borrowing the funds, or levying special financial assessments to the Homeowners. Typically, a community association has two broad cash requirements: the general operating reserves and the capital repair and replacement reserves. In this report, we focus on those items falling under the capital repair and replacement reserve criteria. We have projected a capital repair and replacement reserve for thirty years. The first ten years are the most reliable. Such a study should be updated every three to five years. A Reserve Study is a working tool and a fluid document over time. In addition to changing conditions, one of the primary reasons that we recommend a reserve study be updated every 3-5 years is so that items that fall outside the 30-year analysis today will be pulled into the calculations and required reserve funding when they are still about 30 years out, thus allowing sufficient time to accumulate funds without placing unnecessary burden on current residents. This report is structured to analyze components of the community for which the Association is responsible and to assess a useful expected life and useful remaining life to those components. The anticipated scheduled repair or replacement of the component and the anticipated expense for the activity are then analyzed in conjunction with the current capital reserves funding program for the community. Funding program recommendations are made with the objective of limiting substantial cash excesses while minimizing financial burdens that can result from significant cash inadequacies. This report is intended to be used as a tool to determine reserve fund allocation requirements for the community, to manage future Association obligations, and to inform the community of future financial needs in general. The report that follows has been prepared from the perspective of what an owner of this property would benefit from knowing. Some items, beyond those of immediate concern, may be discussed. Therefore, the report should be read in its entirety in order to fully understand all of the information that has been obtained. Riverchase at Wylie Page 1

4 2.0 EXECUTIVE SUMMARY The common property is generally in good condition. Based on our evaluation, the current level of funding of the reserve for this project is inadequate for the short term needs. A more detailed analysis of the reserve fund has been provided in Appendix A. Riverchase at Wylie Page 2 Based on our observations, there are immediate material deficiencies. Those items are as follows: Replace seal between pool deck and coping joint Asphalt trail is due for repairs and replacement Brick perimeter fencing repairs There are, of course, other capital expenditures to be expected over the next thirty years. Those items that will require attention are discussed later in this report. For your convenience, we have prepared the following summary of the condition of the major systems of the property. 3.0 PURPOSE & SCOPE 3.1 Purpose The purpose of this study is to perform a reserve fund analysis and to determine a capital needs plan. It is intended to be used as a tool for the RIVERCHASE AT WYLIE HOMEOWNERS ASSOCIATION in determining the allocation requirements into the reserve fund in order to meet future anticipated capital expenditures for the community. This report forecasts obligations for the community thirty years into the future. It should be noted that events might occur that could have an effect on the underlying component or system useful life assumptions used in this study. Likewise, inevitable market fluctuations can have an impact on component or system replacement and repair costs. Therefore, a study such as this should be updated from time to time, usually on a three to five-year cycle, in order to reflect the most accurate needs and obligations of the community. 3.2 Scope This study has been performed according to the scope as generally defined by RIVERCHASE AT WYLIE HOMEOWNERS ASSOCIATION, Criterium Dotson Engineers, and the standards of the Community Associations Institute. The findings and recommendations are based on a review of available documents; and an investigation of the site components. The guidelines used to determine which physical components within the community are to be included in the component inventory are based on the following general criteria: 1. The component must be a common element, or the responsibility of the Association to replace. 2. The funding for replacement should be from one source only, not funded from another area of the budget or through a maintenance contract. 3. The cost of replacement should be high enough to make it financially unsound to fund it from the operating budget. 4. Components, such as touch-up painting, which are considered deferred maintenance, are most appropriately funded from the

5 Operating Budget instead of Reserves. Our reserve study analysis included evaluating the following association property: Site: Asphalt trail Bridge Entrance monuments Fountain Ornamental lighting Perimeter fencing Retaining walls Cabana Interior: Fixtures Lighting Cabana Exterior: Roof Lighting Mechanical: Electric panels Irrigation controllers Pool filters Pool pumps Amenities: Park benches Pool Pool deck Pool furnishings The above list was obtained by our inspection of the site. No community asset list was provided. This study estimates the funding levels required for maintaining the long term viability of the facility. Our approach involves: 1. Examining association managed equipment, components, and site facilities. 2. Predicting their remaining service life and, approximating how frequently they will require repair or replacement. 3. Estimating repair or replacement costs (in 2018 dollars) for each capital item. 4. Using data developed in Steps 1, 2 and 3 to project Capital Reserve balances for Years 1 through 30. Riverchase at Wylie Page 3 The statements in this report are opinions about the present condition of

6 Riverchase at Wylie Page 4 the subject community. They are based on visual evidence available during a diligent investigation of all reasonably accessible areas falling under the responsibility of the Association. We did not remove any surface materials, perform any destructive testing, or move any furnishings. This study is not an exhaustive technical evaluation. Such an evaluation would entail a significantly larger scope than this effort. For additional limitations, see Section Sources of Information Onsite inspections of the property occurred on the following date: February 6, 2018 The following people were interviewed during our study: Ms. Corinn Dandridge, Principal Management Group The following documents were made available to us and reviewed: Reserve fund amount and funding rate Replacement and repair history We based our cost estimates on some or all of the following: R.S. Means Our data files on similar projects Local contractors 3.4 Standards of Reference For your reference, the following definitions may be helpful: Excellent: Component or system is in "as new" condition, requiring no rehabilitation and should perform in accordance with expected performance. Good: Component or system is sound and performing its function, although it may show signs of normal wear and tear. Some minor rehabilitation work may be required. Adequate: A component or system is of a capacity that is defined as enough for what is required, sufficient, suitable, and/or conforms to standard construction practices. Fair: Component or system falls into one or more of the following categories: a) Evidence of previous repairs not in compliance with commonly accepted practice, b) Workmanship not in compliance with commonly accepted standards, c) Component or system is obsolete, d) Component or system approaching end of expected performance. Repair or replacement is required to prevent further deterioration or to prolong expected life. Poor: Component or system has either failed or cannot be relied upon to continue performing its original function as a result of having exceeded its expected performance, excessive deferred maintenance, or state of

7 disrepair. Present condition could contribute to or cause the deterioration of other adjoining elements or systems. Repair or replacement is required. All ratings are determined by comparison to other components of similar age and construction type. Further, some details of workmanship and materials will be examined more closely in higher quality components where such details typically become more relevant. All directions (left, right, rear, etc.), when used, are taken from the viewpoint of an observer standing in front of a component and facing it. Repair/Replacement Reserves - Non-annual maintenance items that will require significant expenditure over the life of the component. Included are items that will reach the end of their estimated useful life during the course of this forecast, or, in the opinion of the investigator, will require attention during that time. 4.0 DESCRIPTION RIVERCHASE AT WYLIE was reportedly constructed in or around 2000 and consists of 292 single family homes. Topography is generally flat with a slight slope west, southwest. The gated community has three (3) entrances and three (3) exits (6 total) equipped with French, ornamental iron gates that are controlled by two (2) Elite ½ hp, 125 lb max swing arm mechanisms each (12 total). Each entrance is equipped with a DKS touchpad controller with phone system access. Each gated entrance/exit has a regular gate at the fencing with access controlled by an electrical combo lock controller (2 each entry/exit). The main entrance to the property is located at Stonecrest Tr. off of Country Club Rd. (FM 1378). There are two (2) other entrances at Coral Reef Ln. and Schooner Bay Dr. both off of Country Club Rd. (FM 1378). A brick/cast-stone entrance monument is located in the middle of the drives at each of the three (3) entrances to the community. Each monument is equipped with accent lighting. The entrance monument at Stonecrest Tr. contains two (2) ornamental light fixtures mounted on the monument. Perimeter fencing along Country Club Rd. (FM 1378), at the east border of the community, consists of a combination of brick fencing (~975 linear feet) and ornamental iron fencing(~1,470 linear feet). Perimeter fencing is only present at the east community border along Main St and is spaced between brick pilasters. Sidewalks run along the streets throughout the community and at the recreation area. All flatwork is cast-in-place concrete and the responsibility of HOA. Riverchase at Wylie Page 5

8 All streets and curbs at the community are cast-in-place concrete. The streets and curbs in the gated community are owned and maintained by the Homeowner s Association. Streets are typically 24 feet wide with cast-in-place concrete curbing. There is approximately 360,750 square feet of concrete paved streets. The Recreation Center has a cast-in-place concrete paved parking lot with nine (9) striped parking spaces, including one (1) accessible space for the disabled. Drainage in the community is handled over the surface with curb inlets and underground storm drainage at the streets. Most drainage is conveyed to a creek at the middle of the community that flows into the community lake just west of Country Walk Rd. at the west side of the community. The community entrances, recreation areas and common areas are extensively and attractively landscaped. An irrigation system is present at most landscaped areas. Irrigation controllers are located at the following locations: inside a locked fence are with the lake fountain equipment, inside each entry/exit gates (3 total), and at the cabana s west exterior wall with pool equipment. There is a lake present at the west side of the community just west of Country Walk Rd. that is fed by a drainage creek flowing from the east into the lake. The lake is equipped with a fountain and fountain controls are located on the east side of Country Walk Rd. An asphalt walking trail runs along both sides of the creek to the east of the lake, and there are designated picnic areas with tables and grills along the trail. A wood framed bridge connects the asphalt walking trail across the east portion of the creek. The pool area and playground/recreation area are enclosed by ornamental iron fencing. The pool area fencing has controlled access provided by a mechanical combo lock gate. There are approximately 34 ornamental pole-mounted street lights throughout the community. One small building serves as the pool cabana. The building is constructed of concrete masonry units. The walls are load bearing and sit on top of a slab on grade foundation. Roofing consists of a standing seam metal roof (~375 sq. ft.) and a composition shingle roof (~300 sq. ft.). Attic ventilation is provided by roof hawks and soffit vents. Exterior components consists of brick veneer with cedar paneling at the pool side upper half and exposed wood roof framing at the breezeway. Riverchase at Wylie Page 6

9 There is a cedar slat arbor overhang at the pool side of the cabana. The restrooms walls consist of painted CMU and the ceilings are composed of stained cedar paneling. There are not any doors to the men or women s restrooms. Each restroom is naturally ventilated. A power meter is located at the west exterior wall of the cabana along with a 200 Amp electrical panel. All power is distributed from this point by copper wiring. There is also a small electrical panel with meter powering the irrigation controller, gate equipment, and monument lighting at each irrigation controller location. A total of six (6) Wal-pak light fixtures provide light at the front and pool side of the cabana, and there are two (2) ceiling fans at the pool side overhang. The plumbing fixtures are vitreous china, of commercial quality, with good quality accessories. An approximate 2,150 S.F. Pool and wading pool are gunite pool surfacing with cast-stone coping and tile at the waterline. Pool apron/decking is Kool-Deck surfaced cast-in-place concrete. Pool equipment is located in a locked fenced area at the west side of the cabana. Pool equipment consists of three (3), 2 hp pumps, one (1) 1 hp pump and four (4) filters. Approximately 45 linear feet of wood fencing encloses the pool equipment. The pool area is secured by a mechanical combo gate lock at the main entrance to the pool area. Six (6) foot high ornamental iron fencing (~250 lin. ft.) surrounds the perimeter of the pool area and playground/recreation area Extensive, metal and plastic playground equipment is located just southeast of the cabana. There are two (2) heavy metal park benches and trash receptacles located at the playground/recreation area. 5.0 OBSERVATIONS The following key observations were made about the current condition of the common elements of the property. Unless mentioned below, components are in good condition and/or aging normally. Riverchase at Wylie Page 7 Site Accent lights at entrance monuments appear relatively new Parking lot due for striping and joint/crack seal

10 No issues observed with private streets Asphalt trail is in poor condition and repairs and replacement are recommended Brick perimeter fencing repairs due immediately to correct exposed and corroded steel reinforcement Cabana Exterior Exterior stain is in good condition Cabana Interior No issues observed Mechanical All mechanical items appeared to be functioning as intended Amenities Cracks observed at pool deck Deck-o-seal joint is due for immediate replacement Park benches are due for cleaning, priming and painting Riverchase at Wylie Page 8

11 6.0 RESERVE FUND ANALYSIS Using software developed by Criterium Engineers and KPMG Peat Marwick, we have analyzed capital reserves draw-down for the projected capital expenditures to determine the amount needed. The following is a projected reserve fund analysis for non-annual items as discussed in the report. This projection takes into consideration a reasonable return on invested moneys and inflation. Please review this thoroughly and let us know of any changes that may be desired. The intent of this reserve fund projection is to help the Association develop a reserve fund to provide for anticipated repair or replacements of various system components during the next thirty years. The capital items listed are those that are typically the responsibility of the association. However, association by-laws vary, and therefore, which components are the responsibilities of the owner and which are the responsibilities of the Association can vary. The Association should confirm that the items listed should be financed by the reserve fund. This projection provides the following: An input sheet that defines all the criteria used for the financial alternatives, including the assumed inflation rate and rate of return on deposited reserve funds. A table that lists anticipated replacement and/or repair items complete with estimated remaining life expectancies, projected costs of replacement and/or repair, a frequency in years of when these items require replacement and/or repair, and a projection based on this frequency. A table and graph that represent end of year balances versus capital expenditures based on your current funding program and reserve balances, and alternatives to your current program. The provided graphs illustrate what effects the funding methods will have over the thirty-year study period versus the anticipated capital expenditures. Care should be taken in analyzing the graphs due to varying graphic scales that occur within each graph and between graphs. Note that based on our developed list of capital items and taking inflation into account; the current funding is NOT adequate to meet short-term anticipated capital expenses of the community. The Association should bear in mind that unanticipated expenditures can always arise and maintenance of a significant reserve fund balance can be viewed as a way to avoid special assessments. We have included three alternatives to your current funding program and recommend that the board adopt an alternative that best reflects the objectives of the community. In summary they are as follows: Riverchase at Wylie Page 9

12 EXISTING FUNDING LEVEL: We have assessed current Capital Reserve Fund balance and current level of contribution into capital reserves and determined that the Association s current financial status is NOT adequate to meet the Association s short-term or long-term financial needs for the community. ALTERNATIVE # 1: Minimum required funding for capital reserves over the duration without special assessments. This alternative requires an increase in initial funding level combined with increases EVERY year for the first 12 of the study period. This alternative creates an adequate fund balance throughout the study period. ALTERNATIVE # 2 Minimum required contribution together with annual escalation in dues for capital reserves over the duration. This alternative also begins with an increase in funding, together with smaller annual increases for the first 17 years. This alternative creates an adequate fund balance throughout the study period and also represents a solid approach. ALTERNATIVE # 3 Alternative 3 reviews maintaining minimum level funding at current level over the duration of the funding period. This alternative requires a special assessment at years 7, 13, 18, and 25, but holds annual dues for the capital reserve at the level funding level. This alternative is NOT recommended but shows what the financial impact will be without long-term planning. Addendum A lists estimated capital reserves for the next thirty years. Riverchase at Wylie Page 10

13 7.0 CONCLUSION In summary, we consider the property to be in generally good condition when compared to others of similar age and construction type. While some components are in need of a repair and replacement program, the program can be prioritized and planned in conjunction with reserve strategies. We feel that the reserve financials included with this report outline several possible strategies for the community to adopt given the current condition of the project as a whole. As time passes, it may become necessary to reestablish financial priorities and capital expenditure schedules given any unforeseen circumstances. We recommend and encourage this activity. 8.0 LIMITATIONS The observations described in this study are valid on the date of the investigation and have been made under the conditions noted in the report. We prepared this study for the exclusive use of RIVERCHASE AT WYLIE HOMEOWNERS ASSOCIATION and their representatives. Criterium-Dotson Engineers does not intend any other individual or party to rely upon this study without our express written consent. If another individual or party relies on this study, they shall indemnify and hold Criterium-Dotson Engineers harmless for any damages, losses, or expenses they may incur as a result of its use. This study is limited to the visual observations made during our inspection. We did not remove surface materials, conduct any destructive or invasive testing, move furnishings or equipment, or undertake any digging or excavation. Accordingly, we cannot comment on the condition of systems that we could not see, such as buried structures and utilities, nor are we responsible for conditions that could not be seen or were not within the scope of our services at the time of the investigation. We did not undertake to completely assess the stability of structures or the underlying foundation soil since this effort would require excavation and destructive testing. Likewise, this is not a seismic assessment. We did not investigate the following areas: Buried utilities or infrastructure Concealed structural members or systems We do not render an opinion on uninvestigated portions of the community. We did not perform any computations or other engineering analysis as part of this evaluation, nor did we conduct a comprehensive code compliance investigation. This study is not to be considered a warranty of condition, and no warranty is implied. The appendices are an integral part of this report and must be included in any review. In our Reserve Fund Analysis, we have provided estimated costs. These costs are based on our general knowledge of building systems, construction components and the contracting and construction industry. When appropriate, we have relied on standard sources, such as Means Building Construction Cost Data, to develop estimates. However, for Riverchase at Wylie Page 11

14 items that we have developed costs (e.g.: structural repairs), no standard guide for developing such costs exists. Actual costs can vary significantly, based on the availability of qualified contractors to do the work, as well as many other variables. We cannot be responsible for the specific cost estimates provided. We have performed no design work as part of this study, nor have we obtained competitive quotations or estimates from contractors as this also is beyond the scope of the project. The actual cost to remedy deficiencies and deferred maintenance items that we have identified may vary significantly from estimates and competitive quotations from contractors. If you have any questions about this study or the reserve fund analysis, please feel free to contact us. Thank-you for the opportunity to be of assistance to you. Thank you for the opportunity to be of service. CRITERIUM-DOTSON ENGINEERS Riverchase at Wylie Page 12

15 Appendix A: RESERVE FUND PROJECTIONS

16 Reserve Study Worksheet - Existing Funding Levels General Information: 1 Organization: Riverchase of Wylie Homeowners Association 2 Address: 1701 Eastfork Lane Number of Homes 292 Total/Month Total Annual Per Unit/Month Per Unit/Year Special Assessments 4 Age of Development (in years) 18 Res. Fund Contrib. (First Year)... $0 $0 $0.00 $0.00 Years Out Total/Year Per Unit 5a Study Period (in years) 30 Res. Fund Contrib. (Remaining Years)... $0 $0 $0.00 $0.00 5b Normal Fiscal Year starts: January 1, c Partial Fiscal Year starts: January 1, d Partial Year Length: 12 months Final Balance Computed... ($2,196,254) 6 Site Inspection Date February 5, 2018 Average Capital Expenditure per year... $77,795 7 Reserve Funds at start $136,248 8 Rate of Return on invested Reserve Funds (%) 0.5% 9 Inflation Rate (%) 3.0% 10 Yearly Threshold $0 11 Annual Maintenance Budget $0 12 Annual Maintenance Escalation Rate 0.0% 13 Target Funding Percentage 0.0% Fiscal Years: Normal: Jan Partial: Jan 2018 (12 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $136,248 $88,769 $85,549 $32,863 $29,140 $21,591 $12,332 ($80,285) ($298,515) ($373,062) ($377,680) ($410,086) ($414,986) ($485,422) ($504,572) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $442 $426 $163 $145 $107 $61 $0 $0 $0 $0 $0 $0 $0 $0 $0 $47,920 $3,646 $52,849 $3,868 $7,656 $9,321 $92,617 $218,231 $74,546 $4,619 $32,405 $4,900 $70,436 $19,150 $40,560 $88,769 $85,549 $32,863 $29,140 $21,591 $12,332 ($80,285) ($298,515) ($373,062) ($377,680) ($410,086) ($414,986) ($485,422) ($504,572) ($545,132) Ending Reserve Balance: Percent Funded: 35.93% 34.84% 11.40% 10.23% 6.59% 3.36% % % % % % % % % % Special Assessment Cost per Unit: $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Fiscal Years: Normal: Jan Partial: Jan 2018 (12 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: ($545,132) ($570,745) ($702,086) ($1,055,699) ($1,117,395) ($1,123,602) ($1,160,041) ($1,166,626) ($1,293,597) ($1,344,002) ($1,420,938) ($1,437,772) ($1,557,981) ($2,172,348) ($2,187,912) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $25,613 $131,341 $353,613 $61,696 $6,207 $36,438 $6,585 $126,971 $50,405 $76,936 $16,834 $120,208 $614,367 $15,564 $8,342 ($570,745) ($702,086) ($1,055,699) ($1,117,395) ($1,123,602) ($1,160,041) ($1,166,626) ($1,293,597) ($1,344,002) ($1,420,938) ($1,437,772) ($1,557,981) ($2,172,348) ($2,187,912) ($2,196,254) Ending Reserve Balance: Percent Funded: % % % % % % % % % % % % % % % Special Assessment Cost per Unit: $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Criterium Engineers Page 1 of 12 4/16/2018

17 Reserve Study Worksheet - Itemized Worksheet Capital Item Reserve Frequency Remaining To Be Replaced Quantity Unit cost Requirement (*) (yrs**) Life (yrs) Comments Site Asphalt Walking Trail Repairs (Periodic) 3,780 sq. ft. $1.50 $5, Board-On-Board Cedar Pool Area 225 lin. ft. $0.00 $ Operating Budget per HOA Brick Entrance Monument Repairs 3 ea. $ $2, Concrete Perimeter Playground Area 200 lin. ft. $0.00 $ Operating Budget per HOA Concrete Sidewalk Repairs (~114,825 sf - Periodic) 11,482 sq. ft. $0.00 $ Operating Budget per HOA Concrete Street Partial Replacement (~360,750 sf total) 18,037 sq. ft. $9.50 $171, % of total Concrete Street Repairs / Crack Seal 1 lot $45, $45, Electrical Panels 5 ea. $0.00 $ Operating Budget per HOA Irrigation Controllers 5 ea. $0.00 $ Operating Budget per HOA Lake-Partial Dredging/Maintenance of Lake 1 lot $22, $22, Based on 2010 Cost Inflated Ornamental Iron Fencing - Along FM ,470 lin. ft. $62.00 $91, Ornamental Iron Fencing - Pool Area 250 lin. ft. $70.00 $17, Ornamental Street Lights - Clean/Prime/Paint 21 ea. $ $5, Perimeter Brick Fencing Repairs 975 lin. ft. $25.00 $24, Stain Wood Bridge Across Creek 1 lot $0.00 $ Operating Budget per HOA Wash & Stain Board-On-Board Cedar Pool Area 225 lin. ft. $0.00 $ Operating Budget per HOA Wood Bridge Across Creek 1 lot $9, $9, Building Exterior Wash & Stain Cabana Cedar Overhang & Paneling 1 lot $0.00 $ Operating Budget per HOA Composition Shingle Roof 300 sq. ft. $4.25 $1, Standing Seam Metal Roof 375 sq. ft. $7.00 $2, Building Interior Replace Restroom Fixtures 1 lot $0.00 $ Operating Budget per HOA Mechanical Entrance / Exit Gate Controllers 3 ea. $1, $3, Operating Budget per HOA Entrance / Exit Gate Equipment 12 ea. $2, $33, Operating Budget per HOA Lake Fountain & Equipment / Controls 1 lot $8, $8, Operating Budget per HOA Pool Equipment Pumps 1 ea. $1, $1, Operating Budget per HOA Pool Filters 4 ea. $2, $8, Operating Budget per HOA Surveillance Cameras 6 ea. $ $1, Surveillance Equipment Upgrade 1 lot $8, $8, Includes router, server, DVR, power supply Walkway Gate Controllers (Incl. Pool Area) 7 ea. $ $4, Operating Budget per HOA Pool Pump Upgrade 1 ea. $1, $1, Per invoice Baby Pool Pump Upgrade 1 ea. $1, $1, Per invoice Amenities BBQ Replacement 4 ea. $ $1, Concrete Kool-Deck Pool Decking Repairs (Periodic) 2,730 sq. ft. $3.25 $8, Metal Park Benchs & Trash Receptacles 1 lot $1, $1, Park Bench Replacement 2 ea. $ $1, Picnic Common Area Along Creek 5 ea. $ $2, Playground Equipment Replacement 1 lot $35, $35, Pool Furniture 1 lot $0.00 $ Operating Budget per HOA Re-seal Coping To Decking Joint 175 lin. ft. $5.50 $ Re-surface Pool & Wading Pool 2,150 sq. ft. $6.50 $13, Additional Pool Work for lot $1, $1, Per invoice Other Reserve Study Updates 1 ea. $2, $2, Contingency 1 ea. $3, $3, Totals $542, * Costs are typically 10%± ** Reserve study is based on a 30 year projection of non-annual maintenance Total Over Term $1,410, Criterium Engineers Page 2 of 12 4/16/2018

18 Reserve Study Worksheet - Annual Expense By Year Year: Year Number: Site Asphalt Walking Trail Repairs (Periodic) 5, , Board-On-Board Cedar Pool Area Brick Entrance Monument Repairs , Concrete Perimeter Playground Area Concrete Sidewalk Repairs (~114,825 sf - Periodic) Concrete Street Partial Replacement (~360,750 sf total) , Concrete Street Repairs / Crack Seal , Electrical Panels Irrigation Controllers Lake-Partial Dredging/Maintenance of Lake , Ornamental Iron Fencing - Along FM Ornamental Iron Fencing - Pool Area Ornamental Street Lights - Clean/Prime/Paint 0 0 5, , Perimeter Brick Fencing Repairs 24, , Stain Wood Bridge Across Creek Wash & Stain Board-On-Board Cedar Pool Area Wood Bridge Across Creek ,500 0 Building Exterior Wash & Stain Cabana Cedar Overhang & Paneling Composition Shingle Roof 0 0 1, Standing Seam Metal Roof Building Interior Replace Restroom Fixtures Mechanical Entrance / Exit Gate Controllers , ,300 Entrance / Exit Gate Equipment , , Lake Fountain & Equipment / Controls , Pool Equipment Pumps , ,800 Pool Filters Surveillance Cameras 0 0 1, , , ,950 Surveillance Equipment Upgrade , Walkway Gate Controllers (Incl. Pool Area) 0 0 4, Pool Pump Upgrade 1, , , Baby Pool Pump Upgrade 1, , , Amenities BBQ Replacement , Concrete Kool-Deck Pool Decking Repairs (Periodic) 8, , Metal Park Benchs & Trash Receptacles Park Bench Replacement Picnic Common Area Along Creek ,250 Playground Equipment Replacement Pool Furniture Re-seal Coping To Decking Joint Re-surface Pool & Wading Pool , ,975 Additional Pool Work for , , , Other Reserve Study Updates , , , Contingency 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 Total Costs 47,920 3,540 49,815 3,540 6,803 8,040 77, ,442 58,848 3,540 24,113 3,540 49,403 13,040 26,815 Total Costs Adjusted For 3% Inflation 47,920 3,646 52,849 3,868 7,656 9,321 92, ,231 74,546 4,619 32,405 4,900 70,436 19,150 40,560 Criterium Engineers Page 3 of 12 4/16/2018

19 Reserve Study Worksheet - Annual Expense By Year Year: Year Number: Site Asphalt Walking Trail Repairs (Periodic) 0 5, , Board-On-Board Cedar Pool Area Brick Entrance Monument Repairs 0 0 2, , Concrete Perimeter Playground Area Concrete Sidewalk Repairs (~114,825 sf - Periodic) Concrete Street Partial Replacement (~360,750 sf total) , , Concrete Street Repairs / Crack Seal 0 45, , Electrical Panels Irrigation Controllers Lake-Partial Dredging/Maintenance of Lake , Ornamental Iron Fencing - Along FM , Ornamental Iron Fencing - Pool Area , Ornamental Street Lights - Clean/Prime/Paint , , Perimeter Brick Fencing Repairs 0 24, , Stain Wood Bridge Across Creek Wash & Stain Board-On-Board Cedar Pool Area Wood Bridge Across Creek Building Exterior Wash & Stain Cabana Cedar Overhang & Paneling Composition Shingle Roof , Standing Seam Metal Roof , Building Interior Replace Restroom Fixtures Mechanical Entrance / Exit Gate Controllers , Entrance / Exit Gate Equipment , Lake Fountain & Equipment / Controls , Pool Equipment Pumps , Pool Filters 8, Surveillance Cameras , , , Surveillance Equipment Upgrade , Walkway Gate Controllers (Incl. Pool Area) , Pool Pump Upgrade 1, , , Baby Pool Pump Upgrade 1, , , Amenities BBQ Replacement Concrete Kool-Deck Pool Decking Repairs (Periodic) , Metal Park Benchs & Trash Receptacles 0 0 1, Park Bench Replacement , Picnic Common Area Along Creek Playground Equipment Replacement , Pool Furniture Re-seal Coping To Decking Joint Re-surface Pool & Wading Pool , Additional Pool Work for , , , Other Reserve Study Updates 0 2, , , ,300 0 Contingency 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 3,540 Total Costs 16,440 81, ,942 36,240 3,540 20,175 3,540 66,265 25,540 37,848 8,040 55, ,582 6,803 3,540 Total Costs Adjusted For 3% Inflation 25, , ,613 61,696 6,207 36,438 6, ,971 50,405 76,936 16, , ,367 15,564 8,342 Criterium Engineers Page 4 of 12 4/16/2018

20 Reserve Study Worksheet - Current Funding Levels Beginning Year Reserve Fund Fee Special Investment Total Capital Ending Year Number Balance Revenue Assessments Earnings Revenue Expenditures Balance $136,248 $0 $0 $442 $442 $47,920 $88, $88,769 $0 $0 $426 $426 $3,646 $85, $85,549 $0 $0 $163 $163 $52,849 $32, $32,863 $0 $0 $145 $145 $3,868 $29, $29,140 $0 $0 $107 $107 $7,656 $21, $21,591 $0 $0 $61 $61 $9,321 $12, $12,332 $0 $0 $0 $0 $92,617 ($80,285) ($80,285) $0 $0 $0 $0 $218,231 ($298,515) ($298,515) $0 $0 $0 $0 $74,546 ($373,062) ($373,062) $0 $0 $0 $0 $4,619 ($377,680) ($377,680) $0 $0 $0 $0 $32,405 ($410,086) ($410,086) $0 $0 $0 $0 $4,900 ($414,986) ($414,986) $0 $0 $0 $0 $70,436 ($485,422) ($485,422) $0 $0 $0 $0 $19,150 ($504,572) ($504,572) $0 $0 $0 $0 $40,560 ($545,132) ($545,132) $0 $0 $0 $0 $25,613 ($570,745) ($570,745) $0 $0 $0 $0 $131,341 ($702,086) ($702,086) $0 $0 $0 $0 $353,613 ($1,055,699) ($1,055,699) $0 $0 $0 $0 $61,696 ($1,117,395) ($1,117,395) $0 $0 $0 $0 $6,207 ($1,123,602) ($1,123,602) $0 $0 $0 $0 $36,438 ($1,160,041) ($1,160,041) $0 $0 $0 $0 $6,585 ($1,166,626) ($1,166,626) $0 $0 $0 $0 $126,971 ($1,293,597) ($1,293,597) $0 $0 $0 $0 $50,405 ($1,344,002) ($1,344,002) $0 $0 $0 $0 $76,936 ($1,420,938) ($1,420,938) $0 $0 $0 $0 $16,834 ($1,437,772) ($1,437,772) $0 $0 $0 $0 $120,208 ($1,557,981) ($1,557,981) $0 $0 $0 $0 $614,367 ($2,172,348) ($2,172,348) $0 $0 $0 $0 $15,564 ($2,187,912) ($2,187,912) $0 $0 $0 $0 $8,342 ($2,196,254) Criterium Engineers Page 5 of 12 4/16/2018

21 Reserve Study Worksheet - Alternative 1, Level Funding with Step Every Year Beginning Year Reserve Fund Fee Special Investment Total Capital Ending Year Number Balance Revenue Assessments Earnings Revenue Expenditures Balance $136,248 $14,600 $0 $515 $15,115 $47,920 $103, $103,442 $21,900 $0 $608 $22,508 $3,646 $122, $122,304 $29,200 $0 $493 $29,693 $52,849 $99, $99,149 $36,500 $0 $659 $37,159 $3,868 $132, $132,440 $43,800 $0 $843 $44,643 $7,656 $169, $169,426 $51,100 $0 $1,056 $52,156 $9,321 $212, $212,262 $58,400 $0 $890 $59,290 $92,617 $178, $178,935 $65,700 $0 $132 $65,832 $218,231 $26, $26,537 $73,000 $0 $125 $73,125 $74,546 $25, $25,115 $80,300 $0 $504 $80,804 $4,619 $101, $101,300 $87,600 $0 $782 $88,382 $32,405 $157, $157,278 $94,900 $0 $1,236 $96,136 $4,900 $248, $248,514 $94,900 $0 $1,365 $96,265 $70,436 $274, $274,343 $94,900 $0 $1,750 $96,650 $19,150 $351, $351,843 $94,900 $0 $2,031 $96,931 $40,560 $408, $408,214 $94,900 $0 $2,388 $97,288 $25,613 $479, $479,889 $94,900 $0 $2,217 $97,117 $131,341 $445, $445,665 $94,900 $0 $935 $95,835 $353,613 $187, $187,887 $94,900 $0 $1,105 $96,005 $61,696 $222, $222,196 $94,900 $0 $1,554 $96,454 $6,207 $312, $312,443 $94,900 $0 $1,855 $96,755 $36,438 $372, $372,759 $94,900 $0 $2,305 $97,205 $6,585 $463, $463,379 $94,900 $0 $2,157 $97,057 $126,971 $433, $433,465 $94,900 $0 $2,390 $97,290 $50,405 $480, $480,350 $94,900 $0 $2,492 $97,392 $76,936 $500, $500,805 $94,900 $0 $2,894 $97,794 $16,834 $581, $581,765 $94,900 $0 $2,782 $97,682 $120,208 $559, $559,239 $94,900 $0 $199 $95,099 $614,367 $39, $39,971 $94,900 $0 $597 $95,497 $15,564 $119, $119,904 $94,900 $0 $1,032 $95,932 $8,342 $207,494 Criterium Engineers Page 6 of 12 4/16/2018

22 Reserve Study Worksheet - Alternative 1, Level Funding with Step Every Year Beginning Balance as of start of year beginning Jan 2018: $136,248 CONTRIBUTIONS SETTINGS (analyzed by unit/year) FIRST YR LAST YR Starting amount ($): $50.00 $14, $94, per year Increment by ($): $25.00 $50.00 $ per unit per year Every 1 year $1, $7, per month Frequency: 11 time $4.17 $27.08 per unit per month Threshold: $0.00 Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 103, ,304 99, , , , ,935 26,537 25, , , , , , ,214 Capital Expenditures: 47,920 3,646 52,849 3,868 7,656 9,321 92, ,231 74,546 4,619 32,405 4,900 70,436 19,150 40,560 Special Assessment Total Revenue (all sources) 15,115 22,508 29,693 37,159 44,643 52,156 59,290 65,832 73,125 80,804 88,382 96,136 96,265 96,650 96,931 Target Funding Requirement Year: Year Number: End of Year Reserve Fund Balance 479, , , , , , , , , , , ,239 39, , ,494 Capital Expenditures: 25, , ,613 61,696 6,207 36,438 6, ,971 50,405 76,936 16, , ,367 15,564 8,342 Special Assessment Total Revenue (all sources) 97,288 97,117 95,835 96,005 96,454 96,755 97,205 97,057 97,290 97,392 97,794 97,682 95,099 95,497 95,932 Target Funding Requirement Reserve Study Worksheet - Alternative 1, Level Funding with Step Every Year 596, , , , , , , ,459 Dollars 291, , , , , ,730 62,609 24, Funding Years Criterium Engineers Page 7 of 12 4/16/2018

23 Reserve Study Worksheet - Alternative 2, Escalating Funding at 8% per Year Beginning Year Reserve Fund Fee Special Investment Total Capital Ending Year Number Balance Revenue Assessments Earnings Revenue Expenditures Balance $136,248 $30,660 $0 $595 $31,255 $47,920 $119, $119,582 $33,113 $0 $745 $33,858 $3,646 $149, $149,794 $35,762 $0 $664 $36,425 $52,849 $133, $133,371 $38,623 $0 $841 $39,463 $3,868 $168, $168,966 $41,713 $0 $1,015 $42,728 $7,656 $204, $204,038 $45,050 $0 $1,199 $46,248 $9,321 $240, $240,965 $48,654 $0 $985 $49,639 $92,617 $197, $197,987 $52,546 $0 $162 $52,707 $218,231 $32, $32,464 $56,750 $0 $73 $56,823 $74,546 $14, $14,741 $61,289 $0 $357 $61,647 $4,619 $71, $71,768 $66,193 $0 $528 $66,720 $32,405 $106, $106,083 $71,488 $0 $863 $72,351 $4,900 $173, $173,535 $77,207 $0 $902 $78,109 $70,436 $181, $181,207 $83,384 $0 $1,227 $84,611 $19,150 $246, $246,668 $90,054 $0 $1,481 $91,535 $40,560 $297, $297,643 $97,259 $0 $1,846 $99,105 $25,613 $371, $371,136 $105,039 $0 $1,724 $106,764 $131,341 $346, $346,558 $105,039 $0 $490 $105,529 $353,613 $98, $98,475 $105,039 $0 $709 $105,748 $61,696 $142, $142,527 $105,039 $0 $1,207 $106,246 $6,207 $242, $242,566 $105,039 $0 $1,556 $106,595 $36,438 $312, $312,723 $105,039 $0 $2,056 $107,095 $6,585 $413, $413,232 $105,039 $0 $1,957 $106,996 $126,971 $393, $393,258 $105,039 $0 $2,239 $107,279 $50,405 $450, $450,131 $105,039 $0 $2,391 $107,431 $76,936 $480, $480,626 $105,039 $0 $2,844 $107,884 $16,834 $571, $571,675 $105,039 $0 $2,783 $107,822 $120,208 $559, $559,289 $105,039 $0 $250 $105,289 $614,367 $50, $50,211 $105,039 $0 $698 $105,738 $15,564 $140, $140,385 $105,039 $0 $1,185 $106,225 $8,342 $238,267 Criterium Engineers Page 8 of 12 4/16/2018

24 Reserve Study Worksheet - Alternative 2, Escalating Funding at 8% per Year Beginning Balance as of start of year beginning Jan 2018: $136,248 CONTRIBUTIONS SETTINGS (analyzed by unit/year) FIRST YR LAST YR Starting amount ($): $ $30, $105, per year Increment by (%): 8 $ $ per unit per year Step (%): 0 $2, $8, per month Every 1 year $8.75 $29.98 per unit per month Frequency: 16 time Threshold: $0.00 Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 119, , , , , , ,987 32,464 14,741 71, , , , , ,643 Capital Expenditures: 47,920 3,646 52,849 3,868 7,656 9,321 92, ,231 74,546 4,619 32,405 4,900 70,436 19,150 40,560 Special Assessment Total Revenue (all sources) 31,255 33,858 36,425 39,463 42,728 46,248 49,639 52,707 56,823 61,647 66,720 72,351 78,109 84,611 91,535 Target Funding Requirement Year: Year Number: End of Year Reserve Fund Balance 371, ,558 98, , , , , , , , , ,289 50, , ,267 Capital Expenditures: 25, , ,613 61,696 6,207 36,438 6, ,971 50,405 76,936 16, , ,367 15,564 8,342 Special Assessment Total Revenue (all sources) 99, , , , , , , , , , , , , , ,225 Target Funding Requirement Reserve Study Worksheet - Alternative 2, Escalating Funding at 8% per Year 585, , , , , , , ,223 Dollars 281, , , , ,691 90,585 52,478 14, Funding Years Criterium Engineers Page 9 of 12 4/16/2018

25 Reserve Study Worksheet - Alternative 3, Escalating Funding with Special Assessments Beginning Year Reserve Fund Fee Special Investment Total Capital Ending Year Number Balance Revenue Assessments Earnings Revenue Expenditures Balance $136,248 $0 $0 $442 $442 $47,920 $88, $88,769 $0 $0 $426 $426 $3,646 $85, $85,549 $0 $0 $163 $163 $52,849 $32, $32,863 $0 $0 $145 $145 $3,868 $29, $29,140 $0 $0 $107 $107 $7,656 $21, $21,591 $0 $0 $61 $61 $9,321 $12, $12,332 $0 $420,000 $1,699 $421,699 $92,617 $341, $341,414 $0 $0 $616 $616 $218,231 $123, $123,799 $0 $0 $246 $246 $74,546 $49, $49,499 $0 $0 $224 $224 $4,619 $45, $45,105 $0 $0 $63 $63 $32,405 $12, $12,763 $0 $0 $39 $39 $4,900 $7, $7,902 $0 $500,000 $2,187 $502,187 $70,436 $439, $439,653 $0 $0 $2,103 $2,103 $19,150 $422, $422,606 $0 $0 $1,910 $1,910 $40,560 $383, $383,956 $0 $0 $1,792 $1,792 $25,613 $360, $360,135 $0 $0 $1,144 $1,144 $131,341 $229, $229,938 $0 $410,000 $1,432 $411,432 $353,613 $287, $287,757 $0 $0 $1,130 $1,130 $61,696 $227, $227,191 $0 $0 $1,105 $1,105 $6,207 $222, $222,088 $0 $0 $928 $928 $36,438 $186, $186,578 $0 $0 $900 $900 $6,585 $180, $180,893 $0 $0 $270 $270 $126,971 $54, $54,192 $0 $0 $19 $19 $50,405 $3, $3,805 $0 $1,100,000 $5,134 $1,105,134 $76,936 $1,032, $1,032,004 $0 $0 $5,076 $5,076 $16,834 $1,020, $1,020,245 $0 $0 $4,500 $4,500 $120,208 $904, $904,537 $0 $0 $1,451 $1,451 $614,367 $291, $291,621 $0 $0 $1,380 $1,380 $15,564 $277, $277,437 $0 $0 $1,345 $1,345 $8,342 $270,440 Criterium Engineers Page 10 of 12 4/16/2018

26 Reserve Study Worksheet - Alternative 3, Escalating Funding with Special Assessments Beginning Balance as of start of year beginning Jan 2018: $136,248 CONTRIBUTIONS SETTINGS (analyzed by unit/year) FIRST YR LAST YR Starting amount ($): $0.00 $0.00 $0.00 per year Increment by (%): 3 $0.00 $0.00 per unit per year Step (%): 0 $0.00 $0.00 per month Every 3 year $0.00 $0.00 per unit per month Frequency: 3 time Threshold: $0.00 Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 88,769 85,549 32,863 29,140 21,591 12, , ,799 49,499 45,105 12,763 7, , , ,956 Capital Expenditures: 47,920 3,646 52,849 3,868 7,656 9,321 92, ,231 74,546 4,619 32,405 4,900 70,436 19,150 40,560 Special Assessment , , Total Revenue (all sources) , ,187 2,103 1,910 Target Funding Requirement Year: Year Number: End of Year Reserve Fund Balance 360, , , , , , ,893 54,192 3,805 1,032,004 1,020, , , , ,440 Capital Expenditures: 25, , ,613 61,696 6,207 36,438 6, ,971 50,405 76,936 16, , ,367 15,564 8,342 Special Assessment , ,100, Total Revenue (all sources) 1,792 1, ,432 1,130 1, ,105,134 5,076 4,500 1,451 1,380 1,345 Target Funding Requirement Reserve Study Worksheet - Alternative 3, Escalating Funding with Special Assessments 1,057, , , , , , , ,893 Dollars 495, , , , , ,256 73,983 3, Funding Years Criterium Engineers Page 11 of 12 4/16/2018

27 Summary of Reserve Ending Balances Year Yearly Year Number Expenditures Current Alt. 1 Alt. 2 Alt $47,920 $88,769 $103,442 $119,582 $88, $3,646 $85,549 $122,304 $149,794 $85, $52,849 $32,863 $99,149 $133,371 $32, $3,868 $29,140 $132,440 $168,966 $29, $7,656 $21,591 $169,426 $204,038 $21, $9,321 $12,332 $212,262 $240,965 $12, $92,617 ($80,285) $178,935 $197,987 $341, $218,231 ($298,515) $26,537 $32,464 $123, $74,546 ($373,062) $25,115 $14,741 $49, $4,619 ($377,680) $101,300 $71,768 $45, $32,405 ($410,086) $157,278 $106,083 $12, $4,900 ($414,986) $248,514 $173,535 $7, $70,436 ($485,422) $274,343 $181,207 $439, $19,150 ($504,572) $351,843 $246,668 $422, $40,560 ($545,132) $408,214 $297,643 $383, $25,613 ($570,745) $479,889 $371,136 $360, $131,341 ($702,086) $445,665 $346,558 $229, $353,613 ($1,055,699) $187,887 $98,475 $287, $61,696 ($1,117,395) $222,196 $142,527 $227, $6,207 ($1,123,602) $312,443 $242,566 $222, $36,438 ($1,160,041) $372,759 $312,723 $186, $6,585 ($1,166,626) $463,379 $413,232 $180, $126,971 ($1,293,597) $433,465 $393,258 $54, $50,405 ($1,344,002) $480,350 $450,131 $3, $76,936 ($1,420,938) $500,805 $480,626 $1,032, $16,834 ($1,437,772) $581,765 $571,675 $1,020, $120,208 ($1,557,981) $559,239 $559,289 $904, $614,367 ($2,172,348) $39,971 $50,211 $291, $15,564 ($2,187,912) $119,904 $140,385 $277, $8,342 ($2,196,254) $207,494 $238,267 $270,440 Summary of Reserve Ending Balances $1,057,804 $837,206 $616,609 $396,011 $175,413 ($45,184) 1 ($265,782) Dollars ($486,380) ($706,977) ($927,575) ($1,148,173) ($1,368,770) ($1,589,368) ($1,809,966) ($2,030,563) ($2,251,161) Funding Years Current Alt. 1 Alt. 2 Alt. 3 Criterium Engineers Page 12 of 12 4/16/2018

28 Appendix B: PHOTOGRAPHS

29 Location: Photo Taken by: Date: Riverchase Phillip Nieman, P.E. February 6, 2018 Description: Entrance Monument Photo Number 1 Description: Concrete Street Photo Number 2

30 Location: Photo Taken by: Date: Riverchase Phillip Nieman, P.E. February 6, 2018 Description: Concrete Street Photo Number 3 Description: Metal Fencing Photo Number 4

31 Location: Photo Taken by: Date: Riverchase Phillip Nieman, P.E. February 6, 2018 Description: Brick Fencing Photo Number 5 Description: Amenity Center Parking Photo Number 6

32 Location: Photo Taken by: Date: Riverchase Phillip Nieman, P.E. February 6, 2018 Description: Front Elevation Cabana Photo Number 7 Description: Cabana Exterior Photo Number 8

33 Location: Photo Taken by: Date: Riverchase Phillip Nieman, P.E. February 6, 2018 Description: Rear Elevation Cabana Photo Number 9 Description: Gate Controller Photo Number 10

34 Location: Photo Taken by: Date: Riverchase Phillip Nieman, P.E. February 6, 2018 Description: Gates and Motors Photo Number 11 Description: Irrigation Controller Photo Number 12

35 Location: Photo Taken by: Date: Riverchase Phillip Nieman, P.E. February 6, 2018 Description: Pool Equipement Photo Number 13 Description: Pool Fencing Photo Number 14

36 Location: Photo Taken by: Date: Riverchase Phillip Nieman, P.E. February 6, 2018 Description: Pool and Deck Photo Number 15 Description: Pool Furniture Photo Number 16

37 Location: Photo Taken by: Date: Riverchase Phillip Nieman, P.E. February 6, 2018 Description: Playground Equipment Photo Number 17 Description: Walking Trail Photo Number 18

38 Location: Photo Taken by: Date: Riverchase Phillip Nieman, P.E. February 6, 2018 Description: Pond and Fountain Photo Number 19 Description: Wood Bridge Photo Number 20

THE RETREAT AT RIVER PARK PLACE

THE RETREAT AT RIVER PARK PLACE 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY THE RETREAT AT RIVER PARK PLACE FORT WORTH, TEXAS Prepared for:

More information

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO RESERVE FUND STUDY NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com NOVEMBER 2013 1.0 INTRODUCTION...1

More information

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST 2016 CONTENTS 1.0 INTRODUCTION...

More information

OAK CREEK CONDOMINIUMS

OAK CREEK CONDOMINIUMS 1515 Heritage Dr., Suite 204 McKinney, Texas75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY OAK CREEK CONDOMINIUMS 1700 BAIRD FARM CIRCLE ARLINGTON,

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for:

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: MEADOWWOOD GLEN HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

LOWE S FARM PROPERTY EVALUATION AND RESERVE FUND STUDY MANSFIELD, TEXAS

LOWE S FARM PROPERTY EVALUATION AND RESERVE FUND STUDY MANSFIELD, TEXAS 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY LOWE S FARM MANSFIELD, TEXAS Prepared for: LOWE S FARM HOMEOWNERS

More information

CONTENTS. Sparger Springs Townhomes Durham, NC

CONTENTS. Sparger Springs Townhomes Durham, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I QUALCHAN HILLS HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 6 AUGUST 2012 CONTENTS 1.0 INTRODUCTION...

More information

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by:

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by: DRAFT FOR BOARD REVIEW FULL RESERVE STUDY SPARGER SPRINGS TOWNHOMES DURHAM, NC Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION DURHAM, NC & ALLENTON MANAGEMENT Prepared by: CRITERIUM GILES ENGINEERS

More information

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by:

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by: RESERVE FUND STUDY THE VILLAGE AT HIGHLANDS CROZET, VA 22932 Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA C/O ASSOCIA COMMUNITY GROUP 1828 PAVILION CIRCLE CHARLOTTESVILLE, VA 22911

More information

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111 RESERVE STUDY THE VILLAGE AT HIGHLANDS CHARLOTTESVILLE, VA Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION C/O ASSOCIA COMMUNITY GROUP 1413 SACHEM PLACE, SUITE 2 CHARLOTTESVILLE, VA 22901 Prepared

More information

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST, 2009 1.0 INTRODUCTION... 1

More information

1515 Heritage Dr., Ste. 102 McKinney, TX (office) Firm Registration No. F

1515 Heritage Dr., Ste. 102 McKinney, TX (office) Firm Registration No. F 1515 Heritage Dr., Ste. 102 McKinney, TX 75069 972-562-1011 (office) Firm Registration No. F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY CROSS OAK RANCH CROSS ROADS, TEXAS Prepared

More information

CONTENTS. Greens at Lochmere Cary, NC

CONTENTS. Greens at Lochmere Cary, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by:

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by: FOR BOARD REVIEW RESERVE FUND STUDY FENWAY PARK CARRBORO, NC Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. CARRBORO, NC Prepared by: CRITERIUM GILES ENGINEERS 1150 SE MAYNARD ROAD, SUITE 220 CARY,

More information

Meadowlake Village 7410 Breda Dr. Baytown, TX Prepared for:

Meadowlake Village 7410 Breda Dr. Baytown, TX Prepared for: RESERVE FUND STUDY Meadowlake Village 7410 Breda Dr. Prepared for: Meadowlake Village Homeowners Association c/o Regina Real Real Property Management PO Box 1583 Mont Belvieu, TX 77580 Prepared by: Criterium

More information

DRAFT For Review SETTLERS POINTE LEXINGTON, SC. Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION. Prepared by:

DRAFT For Review SETTLERS POINTE LEXINGTON, SC. Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION. Prepared by: DRAFT For Review FULL RESERVE STUDY SETTLERS POINTE LEXINGTON, SC Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION LEXINGTON, SC Prepared by: CRITERIUM GILES ENGINEERS 7334 CHAPEL HILL ROAD, SUITE

More information

CONTENTS. Twisted Creek Townhomes Holly Springs, NC

CONTENTS. Twisted Creek Townhomes Holly Springs, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC.

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC. DRAFT FULL RESERVE STUDY WILLOUGHBY PARK GREENVILLE, NC Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION GREENVILLE, NC & HOA MANAGEMENT COMPANY, LLC Prepared by: CRITERIUM GILES ENGINEERS, INC. 1150

More information

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 4 3.1 PURPOSE... 4 3.2 SCOPE... 4 3.3 SOURCES OF INFORMATION... 5 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 7 6.0 RESERVE

More information

ASHLAND COCKEYSVILLE, MD Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION. Prepared by:

ASHLAND COCKEYSVILLE, MD Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION. Prepared by: RESERVE FUND STUDY ASHLAND COCKEYSVILLE, MD 21030 Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION Prepared by: CRITERIUM-HARBOR ENGINEERS PO BOX 408 STEVENSON, MARYLAND 21153

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: EAGLE RIDGE HOMEOWNER S ASSOCIATION 935 W. BASALT RIDGE DR. SPOKANE, WA 99224 Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: EAGLE RIDGE HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

DRAFT FOR BOARD REVIEW

DRAFT FOR BOARD REVIEW DRAFT FOR BOARD REVIEW FULL RESERVE FUND STUDY OAK HALL COMMUNITY ASSOCIATION HOLLY SPRINGS, NC Prepared for: OAK HALL COMMUNITY ASSOCIATION HOLLY SPRINGS, NC & PPM, INC. Prepared by: CRITERIUM GILES ENGINEERS

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 4 3.1 PURPOSE... 4 3.2 SCOPE... 4 3.3 SOURCES OF INFORMATION... 5 4.0 DESCRIPTION... 7 5.0 OBSERVATIONS... 7 6.0 RESERVE

More information

JULIAN POND KERNERSVILLE, NC. Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION & CAS, INC. Prepared by:

JULIAN POND KERNERSVILLE, NC. Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION & CAS, INC. Prepared by: FULL RESERVE STUDY JULIAN POND KERNERSVILLE, NC Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION KERNERSVILLE, NC & CAS, INC. Prepared by: CRITERIUM GILES ENGINEERS 8819 UNIVERSITY EAST DRIVE, SUITE 200

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: WANDERMERE ESTATES HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM-PFAFF ENGINEERS 12128 N. DIVISION ST. #200 SPOKANE, WA 99218 (509)

More information

CONTENTS. Riverwatch Gloucester, VA

CONTENTS. Riverwatch Gloucester, VA CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado Reserve Study Project No. 09069 Prepared for 1771 Norwood Lane Fort Collins, Colorado Prepared by Bornengineering 1130 West 124 th Avenue, Suite 100 Westminster, Colorado 80234 January 28, 2010 1130 WEST

More information

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for: RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,

More information

SAMPLE. Prepared for: SAMPLE HOMEOWNERS ASSOCIATION. Prepared by:

SAMPLE. Prepared for: SAMPLE HOMEOWNERS ASSOCIATION. Prepared by: SAMPLE FULL RESERVE STUDY Prepared for: SAMPLE HOMEOWNERS ASSOCIATION Prepared by: CRITERIUM GILES ENGINEERS 7334 CHAPEL HILL ROAD, SUITE 200 RALEIGH, NC 27607 (919) 465-3801 NC LIC. NO. C-2871 CONTENTS

More information

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions 1 Organization: Highlands Condominium Association 2 Address: Spokane, WA 3 Number of Units 46

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019.

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019. RESERVE STUDY UPDATE for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925) 831-1803

More information

RESERVE STUDY Component Analysis and Reserve Fund Plan Annual Review Study 2016/17 For Middlefield Meadows HOA Mountain View, CA Prepared By RESERVE ANALYSIS CONSULTING, LLC 1750 Bridgeway, Suite B106

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY:

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY: 2015 Reserve Study Report LOCATED AT: 101 Oasis Drive Pompano Beach, FL 33069 FOR: Oasis at Palm Aire Association, Inc. 101 Oasis Dr., # Office Pompano Beach, FL 33069 AS OF: January 1st, 2015 - December

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION WOODWIND ASSOCIATION REPLACEMENT RESERVE REPORT FY 2010 Community Management by: N & H Enterprises PO Box 5539 Greenville, SC 29607 864-467-1600

More information

Common Component Inventory and Capital Expenditure Planning

Common Component Inventory and Capital Expenditure Planning Common Component Inventory and Capital Expenditure Planning Expected Percent Useful Life Funded Remaining Full Capital Item Quantity CapEx Beginning (or Frequency) Amount Useful Life Reserve Funding Required

More information

RESERVE STUDY ANNUAL REPORT

RESERVE STUDY ANNUAL REPORT RESERVE STUDY ANNUAL REPORT PINELOCH SUN BEACH CLUB LEVEL III RESERVE STUDY UPDATE WITHOUT SITE VISIT Ronald, WA 98940 Report #50510500R FINANCIAL YEAR 01.2016 12.2016 701 Fifth Ave, Suite 4200, Seattle

More information

Sample Community Association

Sample Community Association Level 1 Reserve Study Report Period - 1/1/2018 to 12/31/2018 Client Reference Number 10014 Property Type Condominium Number of Units 150 Fiscal Year End 12/31 Type of Study Full Study Date of Site Visit

More information

.USI.COMMERCIAL. (888) Funding Reserve Analysis. for. The Retreat at Gleannloch Farms Homeowners Association Spring, TX

.USI.COMMERCIAL. (888) Funding Reserve Analysis. for. The Retreat at Gleannloch Farms Homeowners Association Spring, TX .USI.COMMERCIAL (888)225-3755 www.usicommercial.com Funding Reserve Analysis for The Retreat at Gleannloch Farms Homeowners Association Spring, TX October 14, 2014 Page 1 of 31 Pages Funding Reserve Analysis

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT 2008 NEWTON PARISH NEWTON PARISH REPLACEMENT RESERVE REPORT FY 2008 Community Management by: CAS, Inc Mr. Dan Quartermane 1930 N. Salem Street, Suite 101 Apex, NC 27523 919-367-7711

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Heritage Park 3208-52 nd Place NE, Tacoma, WA 98422 For: Heritage Park Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions 5500 Olympic Drive,

More information

Scope Criterium Engineers was hired to update a reserve study for the Reston Association. The specific tasks included: Review the previous study perfo

Scope Criterium Engineers was hired to update a reserve study for the Reston Association. The specific tasks included: Review the previous study perfo Scope Criterium Engineers was hired to update a reserve study for the Reston Association. The specific tasks included: Review the previous study performed by others Consult with Reston Association management

More information

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I Prepared for: OVERLOOK AT QUALCHAN HOMEOWNERS ASSOCIATION SPOKANE, WA Prepared by: CRITERIUM-PFAFF ENGINEERS 12128 N. DIVISION ST. #200 SPOKANE, WA 99218

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844)

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844) GLOBAL Solution Partners, LLC info@globalreservestudies.com - Toll free phone and fax: (844) 477-7883 - www.globalsolutionpartners.com Funding Reserve Analysis for The Bluffs at Ashley River August 2,

More information

RESERVE FUND STUDY. Hill & Associates Ltd. Member APEGNB July 2014

RESERVE FUND STUDY. Hill & Associates Ltd. Member APEGNB July 2014 2014 RESERVE FUND STUDY Hill & Associates Ltd. Member APEGNB July 2014 Reserve Fund Study Prepared for Bobak Place Townhome Condominiums Prepared by Hill & Associates Ltd. Consulting Professional Engineers

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Jason Kozleski Board President 10790-221 st Lane NE Redmond,

More information

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08 The Ranches HOA Level II Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10329 Property Type..... Single Family Homes Number of Units.......... 1,750 Fiscal Year End......... December

More information

What are Capital Reserves?

What are Capital Reserves? Capital Reserves What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs Stormwater pond repair, dredging and drainage improvements Fence repair, retaining

More information

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number:

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number: CAPITAL RESERVE STUDY DRAFT FOR THE Management Company: Sound Real Estate Services, Contact Name: Josh Parsons Date: August 22, 2016 Table of Contents Section Name Section # Executive Summary... 1 Reserve

More information

RESERVE STUDY UPDATE SUMMARY

RESERVE STUDY UPDATE SUMMARY RESERVE STUDY UPDATE SUMMARY for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925)

More information

RESERVE STUDY UPDATE SUMMARY. for. Vista Tassajara HOMEOWNERS ASSOCIATION

RESERVE STUDY UPDATE SUMMARY. for. Vista Tassajara HOMEOWNERS ASSOCIATION RESERVE STUDY UPDATE SUMMARY for Vista Tassajara HOMEOWNERS ASSOCIATION Date Prepared: 10/27/2017 for fiscal year 2018 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY CAPITAL RESERVE STUDY FOR THE HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Number: 12-1066 W:\2012\12-1066\CORR\12-1066v1.doc Date: March 29, 2013 Table of Contents Section Page Executive Summary...

More information

Replacement Reserve Study Report

Replacement Reserve Study Report Replacement Reserve Study Report for Landscaping and Lighting Assessment District (Zone 1: La Vigne) For the Napa County, California August 6, 2012 (Revised March 5, 2014) Page i August 6, 2012 (revised

More information

Calusa Point Association, Inc. Miami, Florida File #

Calusa Point Association, Inc. Miami, Florida File # A FULL RESERVE STUDY FOR Miami, Florida File # 22920-06289 FOR PERIOD: January 1, 2014 December 31, 2014 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM LINDSEY 3300 W. LAKE MARY BLVD. SUITE 350 LAKE

More information

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association 21289 E. Lords Way Queen Creek, AZ 85142 support@azreservestudy.com Tel: (480) 840-7130 Fax: (888) 842-9319 October 27, 2012 Sample Association Regarding: 2013 - Level I Capital Replacement Reserve Study

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: August 15, 215 To: Lorrie Olson, Caughlin Creek HOA From: Browning Reserve Group (BRG) Re: Caughlin Creek HOA; Full Study Attached, please find the reserve study

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community

More information

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA VILLAGE GREEN HOA REPLACEMENT RESERVE REPORT FY 2011 Community Management by: Ravenel Associates, Inc. Chad Hammond, Property Manager 3690 Bohicket

More information

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08 Central Pointe HOA Level I Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10870 Property Type...... Mid-Rise Number of Units............ 83 Fiscal Year End....... December 31

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2 2014 Reserve Study The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee 37862 Report No: 2921 Version 2 For the Period From: January 1, 2014 To: December 31, 2014 TABLE

More information

Pemberley at Robinsons Grove

Pemberley at Robinsons Grove Pemberley at Robinsons Grove Level I Reserve Study Report Period 1/01/06 12/31/06 Client Reference Number.... 10429 Property Type...... Apartment Style Number of Units............. 160 Fiscal Year End.......

More information

The Ford Plantation - POA Revised August 17, THE FORD10 EXECUTIVE SUMMARY

The Ford Plantation - POA Revised August 17, THE FORD10 EXECUTIVE SUMMARY Replacement Reserve Analysis - Page A1 EXECUTIVE SUMMARY The Ford Plantation - POA Replacement Reserve Inventory identifies 77 Projected Replacements for funding from Replacement Reserves, with an estimated

More information

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of:

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of: Pebble Shores Drive Naples, FL 34410 A Service of: 5036 Dr. Phillips Blvd, Suite 207, Orlando FL 32819 www.lcamresources.com October 31, 2018 Pebble Shores Condominium Pebble Shores Drive Naples, FL 34410

More information

Do-It-Yourself Reserve Study

Do-It-Yourself Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Soda Creek Condominiums Dillon, Colorado Version 2 Monday, August 19, 2013 6860 S. Yosemite Court, Suite 2000 Centennial, CO 80112 Phone (303) 953-2078 Facsimile (303) 953-2157

More information

Agenda Item # 5b Page 1 of 43

Agenda Item # 5b Page 1 of 43 Page 1 of 43 Page 2 of 43 Page 3 of 43 Page 4 of 43 Page 5 of 43 Page 6 of 43 Page 7 of 43 Page 8 of 43 Page 9 of 43 Page 10 of 43 Page 11 of 43 Page 12 of 43 Page 13 of 43 Page 14 of 43 Page 15 of 43

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Licorice Fern II Homeowners Association 16880 SE Licorice Way, Renton, WA 98059 For: Licorice Fern II Homeowners Association c/o Ann Hart, Property Manager Pinnacle 2801 Alaskan

More information

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

Full Reserve Study. The Ridge at Rock Creek Marysville, WA 11/13/2012

Full Reserve Study. The Ridge at Rock Creek Marysville, WA 11/13/2012 Full Reserve Study The Ridge at Rock Creek Marysville, WA 11/13/2012 Report # 1100 Phone: 253-241-8151 E-mail: jeremy@reservesolutions.net www.reservesolutions.net The Ridge at Rock Creek Client Info:

More information

Mrs. Casey Davis Houston Community Management Services El Comino Real Houston, Texas 77058

Mrs. Casey Davis Houston Community Management Services El Comino Real Houston, Texas 77058 Mrs. Casey Davis Houston Community Management Services 7049 El Comino Real Houston, Texas 77058 Reference: Detailed Reserve Study Kipcon Dear Mrs. Davis: Attached please find Kipcon s Detailed Reserve

More information

Kayscreek Estates HOA

Kayscreek Estates HOA Kayscreek Estates HOA Level I Reserve Study Report Period 1/01/09 12/31/09 Client Reference Number.... 11004 Property Type........ Single Family Homes Number of Units............. 276 Fiscal Year End.........

More information

FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017

FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017 FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017 This Report contains intellectual property developed by Reserve Advisors, Inc. and cannot be reproduced or distributed

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112 th Ave NE

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association Replacement Reserve Study REPLACEMENT RESERVE STUDY Oakton, Virginia Property Management: Flint Hill Manor Townhouse Association Jamie Critchfield Vice President Email: tommie0200@aol.com Consultant: RICHARD

More information

Anson County Early College High

Anson County Early College High NC School District/040 Anson County/High School Anson County Early College High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC.

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. Woodburn, OR January 1, 2015 December 31, 2015 Project No: OR 11101 0006 5 Prepared By: Carson M. Horton, RS Quality Check By:

More information

Vallarta Community Association

Vallarta Community Association Funding Reserve Analysis Update with Site Visit for Vallarta Community Association December 18, 2012 Page 1 of 59 Pages Funding Reserve Analysis Update with Site Visit for Vallarta Community Association

More information

Ashleigh Commons Condominiums Association, Inc.

Ashleigh Commons Condominiums Association, Inc. RESERVE STUDY Full Study Ashleigh Commons Condominiums Association, Inc. Published - January 14, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE 0807 3502 SOUTH FIRST STREET CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.771 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 347,400 LABORATORY BUILDING GROSS SQUARE FEET 16,986

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014 Shadow Ridge Level 2 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 10160 Property Type Condominium Number of Units 168 Fiscal Year End 12/31 Date of Property Inspection 8/21/2014

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Park Avenue 244 Quari St Denver, CO Level II Study with Site Inspection Fiscal Year End Date: 12/31/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina

Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina Prepared for FY 2016 Report Date: November 27, 2015 Southeast Region 10459 Hunters Creek Court Jacksonville, FL 32256 (904)