3 1.0 INTRODUCTION The Preston Village Homeowners Association authorized Criterium Giles Engineers to conduct a Reserve Study Update for Preston Village community located in Cary, North Carolina. This is an update of the Reserve Study dated October 22, Studies of this nature are important to ensure a community has sufficient funds for long-term, periodic capital expenditure requirements. Anticipating large expenditures over an extended period of time through a structured analysis and scheduling process assists the Association in meeting financial requirements without increasing the service fees above permitted maximums, borrowing the funds, or levying special financial assessments to the home owners. Typically, a community association has two broad cash requirements: the general operating reserves and the capital repair and replacement reserves. In this report, we will focus on those items falling under the capital repair and replacement reserve criteria. We have projected a capital repair and replacement reserve for twenty (20) years. The first ten years are the most reliable. Such a study should be updated every five years. This report is structured to analyze components of the community for which the Association is responsible and to assess a useful expected life and useful remaining life to those components. The anticipated scheduled repair or replacement of the component and the anticipated expense for the activity are then analyzed in conjunction with the current capital reserves funding program for the community. Funding program recommendations are made with the objective of limiting substantial cash excesses while minimizing financial burdens that can result from significant cash inadequacies. This report is intended to be used as a tool to determine reserve fund allocation requirements for the community, to manage future Association obligations, and to inform the community of future financial needs in general. The report that follows has been prepared from the perspective of what an owner of this property would benefit from knowing. Some items, beyond those of immediate concern, may be discussed. Therefore, the report should be read in its entirety in order to fully understand all of the information that has been obtained. Preston Village Page 1

4 2.0 EXECUTIVE SUMMARY Preston Village is a 711-member association with responsibility for the common area amenities and site improvements. The most significant improvements include the pool facility buildings, swimming pool, parking lots, play ground, gazebos, picnic shelter, storm water retention pond, drainage systems, entrance signage, fencing and landscaping improvements. The buildings, common areas and grounds are generally in good condition. Based on our evaluation, the current level of funding is adequate. Maintaining the current contribution rate is projected to maintain a healthy reserve fund balance over the term. We have provided an alternative for annual reserve contribution schedules that also provides sufficient funding to meet capital expenditure requirements in the next twenty years. A more detailed analysis of the reserve fund has been provided in Appendix A. Some significant expenditures are expected in the next few years. Some of the more notable examples are listed below: Repair and coat pool surfaces Repair/replacement of playground equipment Pond dredging/repairs There are, of course, other capital expenditures to be expected over the next twenty years. Those items that will require attention are discussed later in this report. Preston Village Page 2

5 3.0 PURPOSE & SCOPE 3.1 Purpose The purpose of this study is to update the reserve fund analysis and to determine a capital needs plan. It is intended to be used as a tool for the Preston Village HOA in determining the allocation requirements into the reserve fund in order to meet future anticipated capital expenditures for the community. This report forecasts obligations for the community twenty years into the future. It should be noted that events might occur that could have an effect on the underlying component or system useful life assumptions used in this study. Likewise, inevitable market fluctuations can have an impact on component or system replacement and repair costs. Therefore, a study such as this should be updated from time to time, usually on a three to fiveyear cycle, in order to reflect the most accurate needs and obligations of the community. 3.2 Scope This study has been performed according to the scope as generally defined by Preston Village HOA, Criterium-Giles Engineers Inc., PPM, Inc. and the standards of the Community Associations Institute. The findings and recommendations are based on interviews with the community s management personnel; a review of available documents; and an investigation of the buildings and site. The Cash Flow Method of calculating reserves has been utilized, whereby contributions to the reserve fund are designed to offset the variable annual expenditures. Funding alternates are recommended which are designed to achieve a Baseline Funding goal. The guidelines used to determine which physical components within the community are to be included in the component inventory are based on the following general criteria: 1. The component must be a common element, or otherwise noted to be the responsibility of the Association to replace. 2. The component must have an estimated remaining useful life of twenty years or less. As the site ages, additional components may need to be added. 3. The funding for replacement should be from one source only, not funded from another area of the budget or through a maintenance contract. 4. The cost of replacement should be high enough to make it financially unsound to fund it from the operating budget. Our reserve study analysis included evaluating the following association property: Site and Grounds: The storm water retention pond is the responsibility of the Association and is thereby included in this study. The anodized aluminum fencing around the pool and playground is maintained by the Association. Wood privacy fencing along Davis Preston Village Page 3

6 Preston Village Page 4 Drive, artificial turf within the playground, entrance monument signage and associated lighting and irrigation systems are also the responsibility of the Association and included in this study. Private Parking Lots and Sidewalks: The pool and picnic/playground parking lots are private and asphalt paved. Concrete sidewalks are also provided around the common areas. Buildings: The pool facilities buildings, picnic shelter, and the gazebos are the only common area buildings included in this study. Amenities: Common amenities include a swimming pool and associated equipment, playground equipment, picnic shelter, gazebos, site furniture and interior furnishings in the facility buildings. The above list was obtained from the site inspection and discussions with the management firm prior to the inspection. This study estimates the funding levels required for maintaining the longterm viability of the facility. Our approach involves: 1. Examining association managed equipment, buildings and site facilities. 2. Predicting their remaining service life and, approximating how frequently they will require repair or replacement. 3. Estimating repair or replacement costs (in 2015 dollars) for each capital item. 4. Using data developed in Steps 1, 2 and 3 to project Capital Reserve balances for Years 1 through 20. The statements in this report are opinions about the present condition of the subject community. They are based on visual evidence available during a diligent investigation of all reasonably accessible areas falling under the responsibility of the Association. We did not remove any surface materials, perform any destructive testing, or move any furnishings. This study is not an exhaustive technical evaluation. Such an evaluation would entail a significantly larger scope than this effort. For additional limitations, see Section Sources of Information Onsite inspections of the property occurred on the following date: August 5, 2015 The following people were interviewed during our study: Monica Legere (Community Manager with PPM, Inc.) Board members at meeting on September 8, 2015 The following documents were made available to us and reviewed: Wake county tax records Preston Village Reserve Study dated 10/22/10.

7 Preston Village HOA Income and Budget Statements 07/31/15 We based our cost estimates on some or all of the following: R.S. Means Our data files on similar projects Local contractor estimates For your reference, the following definitions may be helpful: Excellent: Component or system is in "as new" condition, requiring no rehabilitation and should perform in accordance with expected performance. Good: Component or system is sound and performing its function, although it may show signs of normal wear and tear. Some minor rehabilitation work may be required. Fair: Component or system falls into one or more of the following categories: a) Evidence of previous repairs not in compliance with commonly accepted practice, b) Workmanship not in compliance with commonly accepted standards, c) Component or system is obsolete, d) Component or system approaching end of expected performance. Repair or replacement is required to prevent further deterioration or to prolong expected life. Poor: Component or system has either failed or cannot be relied upon to continue performing its original function as a result of having exceeded its expected performance, excessive deferred maintenance, or state of disrepair. Present condition could contribute to or cause the deterioration of other adjoining elements or systems. Repair or replacement is required. Adequate: A component or system is of a capacity that is defined as enough for what is required, sufficient, suitable, and/or conforms to standard construction practices. All ratings are determined by comparison to other buildings of similar age and construction type. Further, some details of workmanship and materials will be examined more closely in higher quality buildings where such details typically become more relevant. All directions (left, right, rear, etc.), when used, are taken from the viewpoint of an observer standing in front of a building and facing it. Repair/Replacement Reserves - Non-annual maintenance items that will require significant expenditure over the life of the buildings. Included are items that will reach the end of their estimated useful life during the course of this forecast, or, in the opinion of the investigator, will require attention during that time. Preston Village Page 5

8 4.0 DESCRIPTION The community is comprised of 711 single-family homes with a swimming pool, large playground, picnic shelter, three gazebos, two parking lots and a storm water retention pond. The swimming pool center located on Preston Village Way, Cary was constructed in The pool center includes a concrete-lined swimming pool and kiddie pool with a concrete deck, a pool facilities building with restrooms, a chemical storage and pool equipment building, and various pieces of patio furniture. An asphalt paved parking area is located in front of the pool. Anodized aluminum fencing encloses the pool area. A large playground with numerous play structures is located on the site. Aluminum fencing surrounds the playground and some areas of the playground utilize an artificial turf ground cover. Adjacent to the playground is a grill area and picnic shelter with restrooms. Parking for the playground and picnic shelter is provided in an asphalt paved parking lot adjacent to the picnic shelter. A large gazebo is located in the center of the neighborhood on Circle On The Green. Two smaller gazebos are located on Frehold Court and on the pond adjacent to the playground. All of the gazebos and the picnic shelter are of wood construction and are roofed with Cedar Shingles. Entrance monument signage and landscaping is incorporated at the community entrances on Davis Drive and Morrisville Parkway. The monument signage is of masonry construction with a brick veneer. Site drainage is provided via landscaped and stone rip rap lined swales and catch basins in the paved and landscaped areas. These systems direct water flow off site and to a large retention pond located on Preston Village Way. 5.0 OBSERVATIONS The following key observations were made about the current condition of the more significant and costly common elements of the property. Site and Grounds The parking lot for the playground, picnic shelter and pool is showing some wear, but is generally in fair condition. It is evident that crack repair and sealcoating were recently completed. We anticipate the asphalt paving to have a remaining useful life of approximately 5 to 8 years. We have allocated funds to resurface the paving in Resurfacing would include minor milling at curbing and transitions and installing a new 1.5 to 2 thick wearing layer of asphalt over the existing paving. We have allocated funds for future crack repairs, resealing and striping the parking areas on a 7 year cycle beginning in 2028 (after resurfacing). Concrete flatwork on the property consists of concrete sidewalks around the pool, playground, gazebos, picnic shelter slab and the concrete pool deck. The concrete flatwork appeared to be in generally good to fair condition. Some limited cracking was observed in the concrete pool deck and the picnic shelter slab. Preston Village Page 6

9 Concrete curb and gutters surround the parking areas. We have allocated funds for periodic replacement of concrete flatwork and curbing as required and have assumed that 5% of the surfaces will require replacement every 8 years. The monument entrance signage appeared to be in good to fair condition. Some deterioration of the concrete signage in the form of cracking and spalling was noted. Previous crack repairs were evident in the masonry work at the entrance at Preston Village Way and Morrisville Parkway. We have allocated funds to repair and re-point the monument signage on a 4 year cycle beginning in Anodized aluminum fencing surrounds the pool and playground areas. The fencing appeared to be generally in good condition. This fencing will likely require minor repairs and painting on a 10 year cycle. We have allocated funds to repair and paint the anodized aluminum fencing around the pool and playground beginning in Portions of the playground utilize an artificial turf as ground cover. The turf appeared to generally be in good condition. We have estimated the artificial turf to have a useful life of ten years. We have allocated funds to replace the artificial turf beginning in Six foot tall wood privacy fencing has been installed along Davis Drive. The fencing was observed to be in good to fair condition. Some areas of warping were observed. To extend the useful life of wood fencing we recommend the application of a water proofing sealant/stain on a 5 year cycle. At this same time, minor repairs to the wood fencing will be required. We have allocated funds to complete minor repairs and to apply sealant/stain beginning in 2019 and on a 5 year cycle. Assuming minor repairs and sealant applications are completed in the interim, we anticipate the fencing to have a remaining life of approximately 15 years. We have allocated funds to replace the wood fencing in The board of directors feels that the repair/stain cycle is adequate to maintain the fencing, however we have provided an allocation of funds for full replacement in the future. Drainage systems in the community include swales, buried stormwater piping and creeks throughout the property. Most of the drainage systems appear to be located on municipal maintained drainage easements. However, sections of drainage systems are located on private sign and landscape easements and on association owned common areas which would be maintained by the association. Numerous catch basins in the paved areas lead storm water via concrete culverts to a large storm water retention pond in the center of the community. The drainage system appeared to generally be in good condition. We have allocated funds for drainage improvements in the association maintained areas on a 5-year cycle beginning in Drainage improvements would include repairing/stabilizing areas of erosion, re-trenching drainage swales, installing stone rip rap armoring/shore protection, repairing pond inlet/outlet structures and other repairs. Preston Village Page 7

10 The association maintains an approximately 3 acre pond located between the pool and picnic shelter. The pond generally appeared to be in good condition, however dredging is planned for the near future. We recommend the association hire a qualified pond maintenance company to perform routine maintenance on the pond including inspections of pond and inlet/outlet, debris removal, trimming vegetation, nuisance pest control, algae control and maintaining pond banks. We recommend the association maintains the pond to meet any applicable regulations and requirements. The association may consider bathymetric/sediment mapping to assist in determining sediment accumulation rates. This would include a baseline mapping in addition to periodic mapping to determine changes in pond depth/volume. This would allow more accurate determination of future dredging costs and frequency. We have allocated funds for sediment mapping on a 3 year cycle beginning in Over time, sediment will accumulate in the pond resulting in a reduction in depth and volume. The sediment will require periodic dredging. We have allocated funds for pond dredging in 2018 and on a 20 year cycle. The association maintains a significant amount of landscaping in common areas, around entrance signs and in medians and roadsides in the community. As requested, we have allocated funds for landscape overhaul projects on a 5 year cycle beginning in Common Building Exteriors The exterior of the pool buildings and picnic shelter are comprised of a brick veneer. The primary trim and soffit materials are wood. The roofs of the pool buildings are of asphaltic fiberglass three tab shingles. The roofs on the picnic buildings and gazebos are comprised of cedar shingles. The exterior doors are comprised of metal skins and were generally in good condition with the exception of the pool pump and chemical room doors. Limited rust and corrosion was observed at the bottom of the metal exterior door at the pool chemical room. This door is prone to corrosion due to frequent exposure to water and pool chemicals. We have allocated funds to replace this door on a 10 year cycle beginning in The remaining doors on the pool building appeared to be in good condition. Assuming the remaining doors are routinely painted and minor repairs to the openers and locksets are completed in the interim, we do not anticipate replacing the doors will be required over the term. Two roll up doors are installed at the snack bar and appeared to be in good condition. We have allocated funds to replace the roll up doors on a 30 year cycle beginning in The windows at the pool building are wood framed with thermal pane glass. The windows appeared to be in good condition and have an expected useful life of approximately 30 years. We have allocated funds to replace the windows beginning in Preston Village Page 8

11 The wood trim materials at the pool building and picnic buildings and gazebos are painted white and in fair to good condition. Areas of wood components at the gazebos and picnic shelter are un-painted pressure treated wood. The various exterior wood components have recently been repaired and the pool building has recently been painted. We have allocated funds on a 7 year cycle to repair and paint the exterior trim and doors on all of the buildings beginning in These repairs would include repairs to wood trim components and siding at the pool buildings. This would also include repairs as needed to the wood railings and trim components at the gazebos and dock. Any areas of deteriorating caulking should also be repaired during each paint cycle. Additionally, we have allocated funds to repair the wood decking and framing at the gazebos and dock on a 15 year cycle beginning in The brick veneer on the buildings appeared to be in good condition. We do not anticipate the need for repointing or significant repairs the brick veneer over the term of this study. The pool buildings roofs are clad with asphaltic fiberglass three-tab shingles, and appeared to be in good condition. Typically, roofing surfaces will last approximately twenty years. We have allocated funds for roofing replacement in 4 years. We strongly recommend that any re-roofing project closely follow procedures outlined by the National Roofing Contractors Association s Roofing and Waterproofing Manual. A re-roofing sequence should include removal of the existing shingle surfacing, replacement of any inadequate roof sheathing, replacement of any damaged flashing, and replacement of drip edge components. Water heater and other vent boot units at the roof surface typically deteriorate more quickly than roof shingles. We anticipate that all vent boots will be replaced at the same time as the next scheduled roof replacement, and that subsequent replacement will be covered within the maintenance budget. The gazebos in the community are of wood construction. The gazebos and the picnic shelter roofs are clad with cedar shingles. The gazebo and picnic shelter roofing appeared to generally be in good to fair condition. The cedar shingles are beginning to show signs of age and some gaps were observed in the picnic shelter. We have allocated funds to replace the gazebo and picnic shelter roofs on a 30 year cycle beginning in In the interim, we have assumed that replacement of individual cedar shingles will be completed as needed and funded from an annual maintenance budget. Replacement and repairs of cedar shingle roofs should be done in accordance with Cedar Shake and Shingle Bureau recommendations. Common Building Interiors The pool center restroom, office and snack bar walls are painted, and appear to be in good condition. We anticipate that the interior rooms will require repainting on a 7-year cycle beginning in Preston Village Page 9

12 The concrete floors in the building interiors appeared to be in relatively good condition and should not require maintenance (except for repainting) for the duration of the study period. Cabinets and countertops are installed in the snack bar room at the pool building and appeared to be in good condition. We have allocated funds to replace the cabinets and countertops on a 15 year cycle beginning in The restrooms at the pool and picnic buildings include commercial style sinks and toilets. The pool restrooms include partition walls. The fixtures and partition walls generally appeared to be in good condition and have an expected useful life of approximately 15 years depending on use. We have allocated funds for replacing the fixtures and partition walls beginning in Mechanical The pool pumps were operating at the time of inspection and appeared to be in good condition. The large pool utilizes a 10 Horsepower pump which was replaced in 2013 and five Aquatech sand filters. The small kiddie pool is serviced by a ½ horsepower pump and a small sand filter. We have provided funds for periodic repair of the pool pump and filtration equipment including replacing individual pieces on a 3 year cycle beginning in An electric water heater was located in the pool house. The water heater is a 40 gallon capacity unit manufactured by A.O. Smith in We have allocated funds to replace the water heater on a 15 year cycle beginning in We have allocated funds to replace the drinking water fountain on a 15 year cycle beginning in The entrance signage along Davis Drive is illuminated by several light fixtures. Approximately 30 community owned and maintained light poles were observed along the median at the entrances, around the pool parking lot and at the Circle On The Green. Exterior lighting was also observed at the monument entrance signs, around the gazebo at the Circle On The Green, the picnic shelter and overhead in the gazebos. We have allocated funds for repair and/or replacement of the pole mounted lights on a 15 year cycle beginning in The buildings include various light fixtures, electrical wiring and plumbing lines. We have allocated funds for electrical/plumbing repairs including fixture replacement on a 15 year cycle beginning in This would include replacing individual light fixtures as needed and repairing electrical and plumbing systems as needed. Most of the common landscaped areas are irrigated through a combination of drip and spray systems. Moisture sensing devices were observed as part of this system. While not functioning at the time of inspection, no problems were reported in conjunction with the irrigation system. We have Preston Village Page 10

13 allocated funds to repair the systems on a 5 year cycle beginning in 2 years. Access to the picnic shelter bathrooms and the pool is provided via an electronic key fob locking system. This system is powered by an emerge Browser Managed Security Platform. An Altronix closed circuit TV security system with several cameras was observed at the picnic shelter. The secured access systems and security camera systems are planned for replacement in late 2015 and we have allocated funds for future replacement on a 10 year cycle. Amenities The pool was operational at the time of inspection and appeared to be in good to fair condition. The surface coating appeared to be in good condition. The pool should be drained, cracks repaired and surface replastered on an approximately twelve year cycle. The cost of this work is calculated based on the surface area of the pool, and funds have been allocated for this beginning in Replacement of the pool furniture (approximately 110 total pieces) is scheduled on an 8-year basis. We noted that the predominately aluminum furniture was generally in good condition with a manufacture date stamp of We have allocated funds to replace the furnishing beginning in A large playground with extensive equipment is located adjacent to the picnic shelter in the center of the community. The main playground structure is approximately 400 feet in circumference and includes approximately 12 slides and dozens of interconnected structures. A smaller play area geared toward younger ages includes 2 slides and a sandbox. Finally, several other structures were observed including 3 swing structures, and several climbing structures. The playground equipment appeared to be in good to fair condition at the time of inspection. Some painted surfaces of the playground equipment are beginning to fade and paint was observed to be flaking in several areas. Additionally, sections of the thermoplastic coating were observed to be significantly worn and chipped. Exposed metal framing components are beginning to rust. Painting of the equipment is planned for late 2015 and we have allocated funds for future painting of the playground equipment on a 10 year cycle. We have allocated funds to repair/replace sections of the equipment on a 4 year cycle beginning in We have assumed approximately 1/5 th of the equipment will require replacement every 4 years. Numerous pieces of furniture were observed throughout the property. This includes picnic tables, benches, trash receptacles and grills. We have allocated funds to replace the site furniture on a five year cycle beginning in Preston Village Page 11

14 6.0 RESERVE FUND ANALYSIS Using software developed by Criterium Engineers and KPMG Peat Marwick, we have analyzed capital reserves draw-down for the projected capital expenditures to determine the amount needed. The following is a projected reserve fund analysis for non-annual items as discussed in the report. This projection takes into consideration a reasonable return on invested moneys and inflation. Please review this thoroughly and let us know of any changes that may be desired. The intent of this reserve fund projection is to help the Association develop a reserve fund to provide for anticipated repair or replacements of various system components during the next twenty years. The capital items listed are those that are typically the responsibility of the Association and are derived from a list provided the Association with several items added as a result of the inspection. However, association bylaws vary, and therefore, which components are the responsibilities of the owner and which are the responsibilities of the Association can vary. The Association should confirm that the items listed should be financed by the reserve fund. This projection provides the following: An input sheet that defines all the criteria used for the financial alternatives, including the assumed inflation rate and rate of return on deposited reserve funds. A table that lists anticipated replacement and/or repair items complete with estimated remaining life expectancies, projected costs of replacement and/or repair, a frequency in years of when these items require replacement and/or repair, and a projection based on this frequency. A table and graph that represent end of year balances versus capital expenditures based on your current funding program and reserve balances, and alternatives to your current program. The provided graphs illustrate what effects the funding methods will have over the presented twenty-year period versus the anticipated capital expenditures. Care should be taken in analyzing the graphs due to varying graphic scales that occur within each graph and between graphs. Note that based on our developed list of capital items and taking inflation into account; the current funding level is adequate. We have provided alternatives below to establish contributions to reserves which will maintain a positive balance through Year 20. The Association should bear in mind that unanticipated expenditures can always arise and maintenance of a significant reserve fund balance can be viewed as a way to avoid special assessments. We have included some alternatives to your current funding program and recommend that the board adopt an alternative that best reflects the Preston Village Page 12

15 Preston Village Page 13 objectives of the community. In summary they are as follows: Current Funding Rate: $64,000 per year ($90.27 per unit per year) Current Reserve Balance: $307,660 (includes adjustment for playground painting and security system capital projects planned for late 2015). Alternative 1: Maintain the current reserve contribution rate of $64,000 per year for the next 20 years. This alternative will maintain a positive balance through Year 20. Alternative 2: Increase the contribution by 1% each year for the next twenty years. This alternative is projected to maintain a positive balance through Year 20. Alternative 3: Not used. No special assessments are anticipated over the next twenty years. 7.0 CONCLUSION Either of the two alternatives provided above are projected to provide sufficient funding to meet estimated capital expenditures during the next twenty years. Further detail of the reserve fund analysis is provided in Appendix A. 8.0 LIMITATIONS The observations described in this study are valid on the date of the investigation and have been made under the conditions noted in the report. We prepared this study for the exclusive use of the Preston Village Homeowners Association. Criterium-Giles Engineers Inc. does not intend any other individual or party to rely upon this study without our express written consent. If another individual or party relies on this study, they shall indemnify and hold Criterium-Giles Engineers Inc. harmless for any damages, losses, or expenses they may incur as a result of its use. This study is limited to the visual observations made during our inspection. We did not remove surface materials, conduct any destructive or invasive testing, move furnishings or equipment, or undertake any digging or excavation. Accordingly, we cannot comment on the condition of systems that we could not see, such as buried structures and utilities, nor are we responsible for conditions that could not be seen or were not within the scope of our services at the time of the investigation. We did not undertake to completely assess the stability of the buildings or the underlying foundation soil since this effort would require excavation and destructive testing. Likewise, this is not a seismic assessment. We did not investigate the following areas: Buried utilities or infrastructure Concealed structural members or systems We do not render an opinion on uninvestigated portions of the community. We did not perform any computations or other engineering analysis as part of this evaluation, nor did we conduct a comprehensive code compliance

16

17 Appendix A: RESERVE FUND PROJECTIONS

18 Itemized Worksheet Capital Item Reserve Frequency Remaining To Be Replaced Quantity Unit cost Requirement (*) (yrs**) Life (yrs) Information Source Site Crack repair, seal, stripe paving 2,200 SY $2.00 $4, Resurface asphalt paving 2,200 SY $11.00 $24, Repair sections of concrete curb and gutter 55 LF $35.00 $1, % every 8 years Repair sections of concrete flatwork pool and sidewalks 175 SY $95.00 $16, % every 8 years Paint/repair aluminum fencing 1,600 LF $10.00 $16, Repair/stain/seal wood privacy fencing 2,500 LF $5.00 $12, Replace wood privacy fencing 2,500 LF $30.00 $75, Drainage improvements 1 LS $8, $8, Pond repair/dredging 1 LS $60, $60, Repair/repoint monument entrance signage 1 LS $3, $3, Allocation for landscape overhaul projects 1 LS $13, $13, Pond sediment mapping 1 LS $2, $2, Building Exterior Roof replacement on pool buildings 60 SQ $ $15, Roof replacement on gazebos and picnic shelter 35 SQ $ $29, Paint/repair exterior wood pool/picnic buildings and gazebos 1 LS $10, $10, Replace pool pump and chemical room doors 2 EA $1, $3, Replace windows at pool building 13 EA $ $5, Decking repairs/replacement at gazebos/dock 1 LS $14, $14, Replace roll up doors at snack bar at pool building 2 EA $3, $7, Building Interior Paint/repair interior surfaces at pool building 1 LS $5, $5, Replace cabinets and refurbish interior of pool bl 1 LS $10, $10, Refurbish restrooms 2 EA $7, $15, Mechanical Repair/replace pool pump and filtration equipment 1 LS $3, $3, Repair landscape irrigation system 1 LS $7, $7, Repair/replace exterior pole mounted light fixture 30 EA $ $22, Replace water heater in pool building 1 LS $1, $1, Replace drinking fountain at picnic shelter 1 LS $1, $1, Repair/upgrade access control/security systems 1 LS $21, $21, Repair/replace plumbing and electrical fixtures 1 LS $7, $7, Amenities Repair/resurface swimming pools 4,600 SF $14.00 $64, Replace pool furniture 110 PCS $ $27, Repair/paint playground equipment 1 LS $22, $22, Replace portions of playground equipment 1 LS $40, $40, Approx. 20% every 4 years Replace artificial turf at playground areas 5,000 SF $10.00 $50, Replace portions of site furnishings 1 LS $7, $7, Other * Costs are typically 10%± ** Reserve study is based on a 20 year projection of non-annual maintenance Totals $631, Total Over Term $1,141, Criterium Engineers Page 1 of 14 9/18/2015

19 Annual Expense By Year Year: Year Number: Site Crack repair, seal, stripe paving , Resurface asphalt paving , Repair sections of concrete curb and gutter , , Repair sections of concrete flatwork pool and sidewalks , , Paint/repair aluminum fencing , ,000 Repair/stain/seal wood privacy fencing , , , Replace wood privacy fencing ,000 Drainage improvements , , ,500 Pond repair/dredging , Repair/repoint monument entrance signage 0 3, , , , Allocation for landscape overhaul projects 13, , , ,500 Pond sediment mapping 0 2, , , , , Building Exterior Roof replacement on pool buildings , Roof replacement on gazebos and picnic shelter , Paint/repair exterior wood pool/picnic buildings and gazebos , , Replace pool pump and chemical room doors 3, , Replace windows at pool building Decking repairs/replacement at gazebos/dock , Replace roll up doors at snack bar at pool building Building Interior Paint/repair interior surfaces at pool building , , Replace cabinets and refurbish interior of pool bl , Refurbish restrooms , Mechanical Repair/replace pool pump and filtration equipment , , , , ,500 Repair landscape irrigation system 0 0 7, , , Repair/replace exterior pole mounted light fixture , Replace water heater in pool building 1, ,200 Replace drinking fountain at picnic shelter , Repair/upgrade access control/security systems , Repair/replace plumbing and electrical fixtures , Amenities Repair/resurface swimming pools , Replace pool furniture , , Repair/paint playground equipment , , Replace portions of playground equipment 40, , , , Replace artificial turf at playground areas , Replace portions of site furnishings 0 7, , , Other Total Costs 57,700 13,500 90,000 17,500 96, ,050 62,200 17, ,650 28,000 42,000 18,000 82,900 74, ,700 Total Costs Adjusted For 3% Inflation 57,700 13,905 95,481 19, , ,967 74,270 21, ,772 36,534 56,444 24, , , ,373 Criterium Engineers Page 2 of 14 9/18/2015

20 Annual Expense By Year Year: Year Number: Site Crack repair, seal, stripe paving Resurface asphalt paving Repair sections of concrete curb and gutter Repair sections of concrete flatwork pool and sidewalks Paint/repair aluminum fencing Repair/stain/seal wood privacy fencing Replace wood privacy fencing Drainage improvements Pond repair/dredging Repair/repoint monument entrance signage Allocation for landscape overhaul projects Pond sediment mapping Building Exterior Roof replacement on pool buildings Roof replacement on gazebos and picnic shelter Paint/repair exterior wood pool/picnic buildings and gazebos Replace pool pump and chemical room doors Replace windows at pool building Decking repairs/replacement at gazebos/dock Replace roll up doors at snack bar at pool building Building Interior Paint/repair interior surfaces at pool building Replace cabinets and refurbish interior of pool bl Refurbish restrooms Mechanical Repair/replace pool pump and filtration equipment Repair landscape irrigation system Repair/replace exterior pole mounted light fixture Replace water heater in pool building Replace drinking fountain at picnic shelter Repair/upgrade access control/security systems Repair/replace plumbing and electrical fixtures Amenities Repair/resurface swimming pools Replace pool furniture Repair/paint playground equipment Replace portions of playground equipment Replace artificial turf at playground areas Replace portions of site furnishings Other , , , , , , , , , , , , , , , Total Costs Total Costs Adjusted For 3% Inflation 50,000 33,500 28,000 40,750 80,235 55,370 47,668 71,455 Criterium Engineers Page 3 of 14 9/18/2015

21 Reserve Study Worksheet General Information: 1 Organization: Preston Village HOA 2 Address: 3 Number of Units Age of Building (in years) 18 5a Study Period (in years) 20 5b Normal Fiscal Year starts: January 1, c Partial Fiscal Year starts: January 1, d Partial Year Length: 12 months 6 Site Inspection Date August 5, Reserve Funds at start $307,660 8 Rate of Return on invested Reserve Funds (%) 1.5% 9 Inflation Rate (%) 3.0% 10 Current Funding Levels Existing Funding Levels Total/Month Total Annual Per Unit/Month Per Unit/Year Reserve Fund Contribution... $5,333 $64,000 $7.52 $90.27 Years Out Total Annual Per Unit Planned Special Assessment... 0 $0 $0 Balance Computed... $159, Alternative Reserve Fund Contribution Alternative 1 Level Funding with Steps Total/Month Total Annual Per Unit/Month Per Unit/Year Monthly Amount, (First Year)... $5,333 $64,000 $7.52 $90.27 Monthly Amount, (Last Year)... $5,333 $64,000 $7.52 $90.27 Balance Required Final Year... $75,209 Special Assessments: Years Out Total/Year Per Unit First Assessment... 0 $0 $0 Second Assessment... 0 $0 $0 Balance Computed... $159,120 Alternative 2 Escalating Funding at 1% per Year Total/Month Total Annual Per Unit/Month Per Unit/Year Monthly Amount, (First Year)... $5,333 $64,000 $7.52 $90.27 Monthly Amount, (Last Year)... $6,443 $77,319 $9.09 $ Balance Required Final Year... $75,209 Base Escalation % % Special Assessments: Years Out Total/Year Per Unit First Assessment... 0 $0 $0 Second Assessment... 0 $0 $0 Balance Computed... $302,638 Alternative 3 Escalating Funding with Special Assessments Total/Month Total Annual Per Unit/Month Per Unit/Year Monthly Amount, (First Year)... $0 $0 $0.00 $0.00 Monthly Amount, (Last Year)... $0 $0 $0.00 $0.00 Balance Required Final Year... $75,209 Base Escalation % % Special Assessments: Years Out Total/Year Per Unit First Assessment... 0 $0 $0 Second Assessment... 0 $0 $0 Balance Computed... ($1,184,619) Criterium Engineers Page 4 of 14 9/18/2015

22 Reserve Fund Worksheet Fiscal Years: Normal: Jan Partial: Jan 2016 (12 months) Existing Funding Levels Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $307,660 $318,669 $374,296 $347,957 $398,727 $359,541 $282,753 $276,570 $323,833 $205,092 $236,047 $247,256 $290,635 $239,986 $198,170 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,709 $5,531 $5,142 $5,893 $5,313 $4,179 $4,087 $4,786 $3,031 $3,488 $3,654 $4,295 $3,547 $2,929 $3,933 $57,700 $13,905 $95,481 $19,123 $108,499 $144,967 $74,270 $21,523 $185,772 $36,534 $56,444 $24,916 $118,196 $108,745 $0 $318,669 $374,296 $347,957 $398,727 $359,541 $282,753 $276,570 $323,833 $205,092 $236,047 $247,256 $290,635 $239,986 $198,170 $266,102 Alternative 1, Level Funding with Steps Average Cap. Expenditure $75,209 Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $307,660 $318,669 $374,296 $347,957 $398,727 $359,541 $282,753 $276,570 $323,833 $205,092 $236,047 $247,256 $290,635 $239,986 $198,170 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $64,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,709 $5,531 $5,142 $5,893 $5,313 $4,179 $4,087 $4,786 $3,031 $3,488 $3,654 $4,295 $3,547 $2,929 $3,933 $57,700 $13,905 $95,481 $19,123 $108,499 $144,967 $74,270 $21,523 $185,772 $36,534 $56,444 $24,916 $118,196 $108,745 $0 $318,669 $374,296 $347,957 $398,727 $359,541 $282,753 $276,570 $323,833 $205,092 $236,047 $247,256 $290,635 $239,986 $198,170 $266,102 Alternative 2, Escalating Funding at 1% per Year Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $307,660 $318,669 $374,945 $349,922 $402,690 $366,201 $292,826 $290,791 $342,953 $229,881 $267,293 $285,768 $337,238 $295,527 $263,514 $64,000 $64,640 $65,286 $65,939 $66,599 $67,265 $67,937 $68,617 $69,303 $69,996 $70,696 $71,403 $72,117 $72,838 $73,566 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,709 $5,541 $5,171 $5,951 $5,412 $4,327 $4,297 $5,068 $3,397 $3,950 $4,223 $4,984 $4,367 $3,894 $5,056 $57,700 $13,905 $95,481 $19,123 $108,499 $144,967 $74,270 $21,523 $185,772 $36,534 $56,444 $24,916 $118,196 $108,745 $0 $318,669 $374,945 $349,922 $402,690 $366,201 $292,826 $290,791 $342,953 $229,881 $267,293 $285,768 $337,238 $295,527 $263,514 $342,137 Alternative 3, Escalating Funding with Special Assessments Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $307,660 $253,709 $243,401 $150,139 $132,982 $24,850 ($120,117) ($194,387) ($215,910) ($401,682) ($438,216) ($494,660) ($519,576) ($637,772) ($746,517) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,749 $3,597 $2,219 $1,965 $367 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $57,700 $13,905 $95,481 $19,123 $108,499 $144,967 $74,270 $21,523 $185,772 $36,534 $56,444 $24,916 $118,196 $108,745 $0 $253,709 $243,401 $150,139 $132,982 $24,850 ($120,117) ($194,387) ($215,910) ($401,682) ($438,216) ($494,660) ($519,576) ($637,772) ($746,517) ($746,517) Criterium Engineers Page 5 of 14 9/18/2015

23 Reserve Fund Worksheet Fiscal Years: Normal: Jan 2016 Partial: Jan 2016 (12 months) Existing Funding Levels Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $266,102 $148,930 $134,686 $145,465 $164,224 $64,000 $64,000 $64,000 $64,000 $64,000 $0 $0 $0 $0 $0 $2,201 $1,990 $2,150 $2,427 $2,352 $183,373 $80,235 $55,370 $47,668 $71,455 $148,930 $134,686 $145,465 $164,224 $159,120 Alternative 1, Level Funding wi Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $266,102 $148,930 $134,686 $145,465 $164,224 $64,000 $64,000 $64,000 $64,000 $64,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,201 $1,990 $2,150 $2,427 $2,352 $183,373 $80,235 $55,370 $47,668 $71,455 $148,930 $134,686 $145,465 $164,224 $159,120 Alternative 2, Escalating Fundin Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $342,137 $236,562 $234,842 $259,097 $292,302 $74,302 $75,045 $75,795 $76,553 $77,319 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,496 $3,471 $3,829 $4,320 $4,472 $183,373 $80,235 $55,370 $47,668 $71,455 $236,562 $234,842 $259,097 $292,302 $302,638 Alternative 3, Escalating Fundin Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: ($746,517) ($929,890) ($1,010,125) ($1,065,495) ($1,113,163) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $183,373 $80,235 $55,370 $47,668 $71,455 ($929,890) ($1,010,125) ($1,065,495) ($1,113,163) ($1,184,619) Criterium Engineers Page 6 of 14 9/18/2015

24 Itemized Graph Categories Totals Site $401,600 Building Exterior $110,500 Building Interior $35,000 Mechanical $150,900 Amenities $443,400 Other $0 Total $1,141,400 Itemized Graph Building Exterior, $110,500 Site Building Exterior Building Interior Other, $0 Site, $401,600 Amenities, $443,400 Mechanical, $150,900 Building Interior, $35,000 Mechanical Amenities Other Criterium Engineers Page 7 of 14 9/18/2015

25 Itemized Funding Monthly Annual Balance Reserve Reserve Full Reserve Beginning Requiring Funding Funding Funding Percent Categories Requirement Balance Funding Required Required Balance Funded Site $401,600 $124,068 $277,532 $1,896 $22,756 $144,497 Building Exterior $110,500 $44,289 $66,211 $482 $5,779 $51,582 Building Interior $35,000 $10,344 $24,656 $225 $2,695 $12,048 Mechanical $150,900 $27,905 $122,995 $728 $8,734 $32,500 Amenities $443,400 $101,053 $342,347 $1,626 $19,511 $117,693 Other $0 $0 $0 $0 $0 $0 Totals $1,141,400 $307,660 $833,740 $4,956 $59,474 $358, % Criterium Engineers Page 8 of 14 9/18/2015

26 Existing Funding Levels Beginning Year Reserve Fund Fee Special Investment Capital Ending Year Number Balance Revenue Assessments Earnings Expenditures Balance $307,660 $64,000 $0 $4,709 $57,700 $318, $318,669 $64,000 $0 $5,531 $13,905 $374, $374,296 $64,000 $0 $5,142 $95,481 $347, $347,957 $64,000 $0 $5,893 $19,123 $398, $398,727 $64,000 $0 $5,313 $108,499 $359, $359,541 $64,000 $0 $4,179 $144,967 $282, $282,753 $64,000 $0 $4,087 $74,270 $276, $276,570 $64,000 $0 $4,786 $21,523 $323, $323,833 $64,000 $0 $3,031 $185,772 $205, $205,092 $64,000 $0 $3,488 $36,534 $236, $236,047 $64,000 $0 $3,654 $56,444 $247, $247,256 $64,000 $0 $4,295 $24,916 $290, $290,635 $64,000 $0 $3,547 $118,196 $239, $239,986 $64,000 $0 $2,929 $108,745 $198, $198,170 $64,000 $0 $3,933 $0 $266, $266,102 $64,000 $0 $2,201 $183,373 $148, $148,930 $64,000 $0 $1,990 $80,235 $134, $134,686 $64,000 $0 $2,150 $55,370 $145, $145,465 $64,000 $0 $2,427 $47,668 $164, $164,224 $64,000 $0 $2,352 $71,455 $159,120 Criterium Engineers Page 9 of 14 9/18/2015

27 Existing Funding Levels Beginning Balance as of start of year beginning Jan 2016: $307,660 CONTRIBUTIONS SPECIAL ASSESSMENTS AMOUNT Totals $64, per year Per Year $0 Per Unit $0 $90.27 per unit per year $5, per month $7.52 per unit per month Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 318, , , , , , , , , , , , , , ,102 Capital Expenditures: 57,700 13,905 95,481 19, , ,967 74,270 21, ,772 36,534 56,444 24, , ,745 - Total Revenue (all sources) 68,709 69,531 69,142 69,893 69,313 68,179 68,087 68,786 67,031 67,488 67,654 68,295 67,547 66,929 67,933 Year: Year Number: End of Year Reserve Fund Balance 148, , , , ,120 Capital Expenditures: 183,373 80,235 55,370 47,668 71,455 Total Revenue (all sources) 66,201 65,990 66,150 66,427 66,352 Existing Funding Levels 450, , , , ,000 Dollars 200, , ,000 50, Funding Years Criterium Engineers Page 10 of 14 9/18/2015

28 Alternative 1: Level Funding with Steps Beginning Year Reserve Fund Fee Special Special Investment Capital Ending Year Number Balance Revenue Assessments 1 Assessments 2 Earnings Expenditures Balance $307,660 $64,000 $0 $0 $4,709 $57,700 $318, $318,669 $64,000 $0 $0 $5,531 $13,905 $374, $374,296 $64,000 $0 $0 $5,142 $95,481 $347, $347,957 $64,000 $0 $0 $5,893 $19,123 $398, $398,727 $64,000 $0 $0 $5,313 $108,499 $359, $359,541 $64,000 $0 $0 $4,179 $144,967 $282, $282,753 $64,000 $0 $0 $4,087 $74,270 $276, $276,570 $64,000 $0 $0 $4,786 $21,523 $323, $323,833 $64,000 $0 $0 $3,031 $185,772 $205, $205,092 $64,000 $0 $0 $3,488 $36,534 $236, $236,047 $64,000 $0 $0 $3,654 $56,444 $247, $247,256 $64,000 $0 $0 $4,295 $24,916 $290, $290,635 $64,000 $0 $0 $3,547 $118,196 $239, $239,986 $64,000 $0 $0 $2,929 $108,745 $198, $198,170 $64,000 $0 $0 $3,933 $0 $266, $266,102 $64,000 $0 $0 $2,201 $183,373 $148, $148,930 $64,000 $0 $0 $1,990 $80,235 $134, $134,686 $64,000 $0 $0 $2,150 $55,370 $145, $145,465 $64,000 $0 $0 $2,427 $47,668 $164, $164,224 $64,000 $0 $0 $2,352 $71,455 $159,120 Criterium Engineers Page 11 of 14 9/18/2015

29 Alternative 1: Level Funding with Steps Beginning Balance as of start of year beginning Jan 2016: $307,660 CONTRIBUTIONS SPECIAL ASSESSMENTS SETTINGS (analyzed by year) FIRST YR LAST YR Totals Starting amount ($): $64, $64, per year First Per Year $0 Per Unit $0 Increment by ($): 0 $90.27 $90.27 per unit per year Second Per Year $0 Per Unit $0 Every 1 year $5, $5, per month Frequency: 1 time $7.52 $7.52 per unit per month Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 318, , , , , , , , , , , , , , ,102 Capital Expenditures: 57,700 13,905 95,481 19, , ,967 74,270 21, ,772 36,534 56,444 24, , ,745 - Total Revenue (all sources) 68,709 69,531 69,142 69,893 69,313 68,179 68,087 68,786 67,031 67,488 67,654 68,295 67,547 66,929 67,933 Year: Year Number: End of Year Reserve Fund Balance 148, , , , ,120 Capital Expenditures: 183,373 80,235 55,370 47,668 71,455 Total Revenue (all sources) 66,201 65,990 66,150 66,427 66,352 Alternative 1: Level Funding with Steps 450, , , ,000 Dollars 250, , , ,000 50, Funding Years Criterium Engineers Page 12 of 14 9/18/2015

30 Alternative 2: Escalating Funding at 1% per Year Beginning Year Reserve Fund Fee Special Special Investment Capital Ending Year Number Balance Revenue Assessments 1 Assessments 2 Earnings Expenditures Balance $307,660 $64,000 $0 $0 $4,709 $57,700 $318, $318,669 $64,640 $0 $0 $5,541 $13,905 $374, $374,945 $65,286 $0 $0 $5,171 $95,481 $349, $349,922 $65,939 $0 $0 $5,951 $19,123 $402, $402,690 $66,599 $0 $0 $5,412 $108,499 $366, $366,201 $67,265 $0 $0 $4,327 $144,967 $292, $292,826 $67,937 $0 $0 $4,297 $74,270 $290, $290,791 $68,617 $0 $0 $5,068 $21,523 $342, $342,953 $69,303 $0 $0 $3,397 $185,772 $229, $229,881 $69,996 $0 $0 $3,950 $36,534 $267, $267,293 $70,696 $0 $0 $4,223 $56,444 $285, $285,768 $71,403 $0 $0 $4,984 $24,916 $337, $337,238 $72,117 $0 $0 $4,367 $118,196 $295, $295,527 $72,838 $0 $0 $3,894 $108,745 $263, $263,514 $73,566 $0 $0 $5,056 $0 $342, $342,137 $74,302 $0 $0 $3,496 $183,373 $236, $236,562 $75,045 $0 $0 $3,471 $80,235 $234, $234,842 $75,795 $0 $0 $3,829 $55,370 $259, $259,097 $76,553 $0 $0 $4,320 $47,668 $292, $292,302 $77,319 $0 $0 $4,472 $71,455 $302,638 Criterium Engineers Page 13 of 14 9/18/2015

31 Alternative 2: Escalating Funding at 1% per Year Beginning Balance as of start of year beginning Jan 2016: $307,660 CONTRIBUTIONS SPECIAL ASSESSMENTS SETTINGS (analyzed by year) FIRST YR LAST YR Totals Starting amount ($): $64, $77, per year First Per Year $0 Per Unit $0 Increment by (%): 1 $90.27 $ per unit per year Second Per Year $0 Per Unit $0 Step (%): $5, $6, per month Every 1 year $7.52 $9.09 per unit per month Frequency: 20 time Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 318, , , , , , , , , , , , , , ,137 Capital Expenditures: 57,700 13,905 95,481 19, , ,967 74,270 21, ,772 36,534 56,444 24, , ,745 - Total Revenue (all sources) 68,709 70,181 70,458 71,890 72,010 71,592 72,235 73,685 72,700 73,946 74,919 76,387 76,484 76,732 78,623 Year: Year Number: End of Year Reserve Fund Balance 236, , , , ,638 Capital Expenditures: 183,373 80,235 55,370 47,668 71,455 Total Revenue (all sources) 77,798 78,516 79,624 80,873 81,791 Alternative 2: Escalating Funding at 1% per Year 450, , , ,000 Dollars 250, , , ,000 50, Funding Years Criterium Engineers Page 14 of 14 9/18/2015

32 Appendix B: PROJECT PHOTOGRAPHS

33 Location: Photo Taken by: Date: Preston Village Kevin R. Giles, RS 08/05/15 Entrance sign. 1 General view of asphalt paving at pool. Recent crack repair and sealcoating completed. 2

34 Location: Photo Taken by: Date: Preston Village Kevin R. Giles, RS 08/05/15 General view of pond and fountain. 3 View of metal fencing around playground area. 4

35 Location: Photo Taken by: Date: Preston Village Kevin R. Giles, RS 08/05/15 View of wood fencing along Davis Drive. 5 View of example of wood warping in limited sections of fencing. 6

36 Location: Photo Taken by: Date: Preston Village Kevin R. Giles, RS 08/05/15 General view of pool building and roof. 7 View of concrete pool deck. 8

37 Location: Photo Taken by: Date: Preston Village Kevin R. Giles, RS 08/05/15 Pool building roof, windows, roll up doors. 9 Gazebo and dock at pond. 10

38 Location: Photo Taken by: Date: Preston Village Kevin R. Giles, RS 08/05/15 Decking at large gazebo at Circle on the Green. 11 Small gazebo. 12

39 Location: Photo Taken by: Date: Preston Village Kevin R. Giles, RS 08/05/15 Picnic shelter building. 13 Rust on pool chemical room door. 14

40 Location: Photo Taken by: Date: Preston Village Kevin R. Giles, RS 08/05/15 Snack bar finishes and furnishings, cabinets and counter tops in pool building. 15 Water heater at pool building. 16

41 Location: Photo Taken by: Date: Preston Village Kevin R. Giles, RS 08/05/15 General view of swimming pool and furnishings. 17 General view of playground equipment. 18

42 Location: Photo Taken by: Date: Preston Village Kevin R. Giles, RS 08/05/15 View of flaking paint on playground equipment. 19 View of thermoplastic coating deterioration, surface rust in framing. 20

43 Location: Photo Taken by: Date: Preston Village Kevin R. Giles, RS 08/05/15 View of damaged slide at playground. 21 General view of equipment and section of astroturf. 22

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST 2016 CONTENTS 1.0 INTRODUCTION...

More information

CONTENTS. Sparger Springs Townhomes Durham, NC

CONTENTS. Sparger Springs Townhomes Durham, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by:

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by: DRAFT FOR BOARD REVIEW FULL RESERVE STUDY SPARGER SPRINGS TOWNHOMES DURHAM, NC Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION DURHAM, NC & ALLENTON MANAGEMENT Prepared by: CRITERIUM GILES ENGINEERS

More information

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO RESERVE FUND STUDY NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com NOVEMBER 2013 1.0 INTRODUCTION...1

More information

CONTENTS. Greens at Lochmere Cary, NC

CONTENTS. Greens at Lochmere Cary, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC.

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC. DRAFT FULL RESERVE STUDY WILLOUGHBY PARK GREENVILLE, NC Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION GREENVILLE, NC & HOA MANAGEMENT COMPANY, LLC Prepared by: CRITERIUM GILES ENGINEERS, INC. 1150

More information

CONTENTS. Twisted Creek Townhomes Holly Springs, NC

CONTENTS. Twisted Creek Townhomes Holly Springs, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by:

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by: FOR BOARD REVIEW RESERVE FUND STUDY FENWAY PARK CARRBORO, NC Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. CARRBORO, NC Prepared by: CRITERIUM GILES ENGINEERS 1150 SE MAYNARD ROAD, SUITE 220 CARY,

More information

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 4 3.1 PURPOSE... 4 3.2 SCOPE... 4 3.3 SOURCES OF INFORMATION... 5 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 7 6.0 RESERVE

More information

CONTENTS. Riverwatch Gloucester, VA

CONTENTS. Riverwatch Gloucester, VA CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

SAMPLE. Prepared for: SAMPLE HOMEOWNERS ASSOCIATION. Prepared by:

SAMPLE. Prepared for: SAMPLE HOMEOWNERS ASSOCIATION. Prepared by: SAMPLE FULL RESERVE STUDY Prepared for: SAMPLE HOMEOWNERS ASSOCIATION Prepared by: CRITERIUM GILES ENGINEERS 7334 CHAPEL HILL ROAD, SUITE 200 RALEIGH, NC 27607 (919) 465-3801 NC LIC. NO. C-2871 CONTENTS

More information

DRAFT For Review SETTLERS POINTE LEXINGTON, SC. Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION. Prepared by:

DRAFT For Review SETTLERS POINTE LEXINGTON, SC. Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION. Prepared by: DRAFT For Review FULL RESERVE STUDY SETTLERS POINTE LEXINGTON, SC Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION LEXINGTON, SC Prepared by: CRITERIUM GILES ENGINEERS 7334 CHAPEL HILL ROAD, SUITE

More information

JULIAN POND KERNERSVILLE, NC. Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION & CAS, INC. Prepared by:

JULIAN POND KERNERSVILLE, NC. Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION & CAS, INC. Prepared by: FULL RESERVE STUDY JULIAN POND KERNERSVILLE, NC Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION KERNERSVILLE, NC & CAS, INC. Prepared by: CRITERIUM GILES ENGINEERS 8819 UNIVERSITY EAST DRIVE, SUITE 200

More information

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST, 2009 1.0 INTRODUCTION... 1

More information

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

DRAFT FOR BOARD REVIEW

DRAFT FOR BOARD REVIEW DRAFT FOR BOARD REVIEW FULL RESERVE FUND STUDY OAK HALL COMMUNITY ASSOCIATION HOLLY SPRINGS, NC Prepared for: OAK HALL COMMUNITY ASSOCIATION HOLLY SPRINGS, NC & PPM, INC. Prepared by: CRITERIUM GILES ENGINEERS

More information

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by:

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by: RESERVE FUND STUDY THE VILLAGE AT HIGHLANDS CROZET, VA 22932 Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA C/O ASSOCIA COMMUNITY GROUP 1828 PAVILION CIRCLE CHARLOTTESVILLE, VA 22911

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for:

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: MEADOWWOOD GLEN HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111 RESERVE STUDY THE VILLAGE AT HIGHLANDS CHARLOTTESVILLE, VA Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION C/O ASSOCIA COMMUNITY GROUP 1413 SACHEM PLACE, SUITE 2 CHARLOTTESVILLE, VA 22901 Prepared

More information

OAK CREEK CONDOMINIUMS

OAK CREEK CONDOMINIUMS 1515 Heritage Dr., Suite 204 McKinney, Texas75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY OAK CREEK CONDOMINIUMS 1700 BAIRD FARM CIRCLE ARLINGTON,

More information

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I QUALCHAN HILLS HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 6 AUGUST 2012 CONTENTS 1.0 INTRODUCTION...

More information

THE RETREAT AT RIVER PARK PLACE

THE RETREAT AT RIVER PARK PLACE 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY THE RETREAT AT RIVER PARK PLACE FORT WORTH, TEXAS Prepared for:

More information

What are Capital Reserves?

What are Capital Reserves? Capital Reserves What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs Stormwater pond repair, dredging and drainage improvements Fence repair, retaining

More information

WYLIE, TX. Date of Investigation: February 6, 2018 Investigator: Phillip Nieman, P.E. Reviewed By: David H. Dotson, P.E., R.S.

WYLIE, TX. Date of Investigation: February 6, 2018 Investigator: Phillip Nieman, P.E. Reviewed By: David H. Dotson, P.E., R.S. 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY RIVERCHASE AT WYLIE WYLIE, TX Prepared for: RIVERCHASE AT WYLIE HOMEOWNERS ASSOCIATION

More information

Meadowlake Village 7410 Breda Dr. Baytown, TX Prepared for:

Meadowlake Village 7410 Breda Dr. Baytown, TX Prepared for: RESERVE FUND STUDY Meadowlake Village 7410 Breda Dr. Prepared for: Meadowlake Village Homeowners Association c/o Regina Real Real Property Management PO Box 1583 Mont Belvieu, TX 77580 Prepared by: Criterium

More information

ASHLAND COCKEYSVILLE, MD Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION. Prepared by:

ASHLAND COCKEYSVILLE, MD Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION. Prepared by: RESERVE FUND STUDY ASHLAND COCKEYSVILLE, MD 21030 Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION Prepared by: CRITERIUM-HARBOR ENGINEERS PO BOX 408 STEVENSON, MARYLAND 21153

More information

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for: RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: EAGLE RIDGE HOMEOWNER S ASSOCIATION 935 W. BASALT RIDGE DR. SPOKANE, WA 99224 Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: EAGLE RIDGE HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

LOWE S FARM PROPERTY EVALUATION AND RESERVE FUND STUDY MANSFIELD, TEXAS

LOWE S FARM PROPERTY EVALUATION AND RESERVE FUND STUDY MANSFIELD, TEXAS 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY LOWE S FARM MANSFIELD, TEXAS Prepared for: LOWE S FARM HOMEOWNERS

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions 1 Organization: Highlands Condominium Association 2 Address: Spokane, WA 3 Number of Units 46

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: WANDERMERE ESTATES HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM-PFAFF ENGINEERS 12128 N. DIVISION ST. #200 SPOKANE, WA 99218 (509)

More information

1515 Heritage Dr., Ste. 102 McKinney, TX (office) Firm Registration No. F

1515 Heritage Dr., Ste. 102 McKinney, TX (office) Firm Registration No. F 1515 Heritage Dr., Ste. 102 McKinney, TX 75069 972-562-1011 (office) Firm Registration No. F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY CROSS OAK RANCH CROSS ROADS, TEXAS Prepared

More information

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado Reserve Study Project No. 09069 Prepared for 1771 Norwood Lane Fort Collins, Colorado Prepared by Bornengineering 1130 West 124 th Avenue, Suite 100 Westminster, Colorado 80234 January 28, 2010 1130 WEST

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION WOODWIND ASSOCIATION REPLACEMENT RESERVE REPORT FY 2010 Community Management by: N & H Enterprises PO Box 5539 Greenville, SC 29607 864-467-1600

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Jason Kozleski Board President 10790-221 st Lane NE Redmond,

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA VILLAGE GREEN HOA REPLACEMENT RESERVE REPORT FY 2011 Community Management by: Ravenel Associates, Inc. Chad Hammond, Property Manager 3690 Bohicket

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT 2008 NEWTON PARISH NEWTON PARISH REPLACEMENT RESERVE REPORT FY 2008 Community Management by: CAS, Inc Mr. Dan Quartermane 1930 N. Salem Street, Suite 101 Apex, NC 27523 919-367-7711

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

Replacement Reserve Study Report

Replacement Reserve Study Report Replacement Reserve Study Report for Landscaping and Lighting Assessment District (Zone 1: La Vigne) For the Napa County, California August 6, 2012 (Revised March 5, 2014) Page i August 6, 2012 (revised

More information

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM WOODBRIDGE CONDOMINIUM REPLACEMENT RESERVE REPORT FY 2015 Community Management by: CHESAPEAKE BAY MANAGEMENT Ms. Kimberly Marston 100 Volvo Parkway,

More information

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844)

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844) GLOBAL Solution Partners, LLC info@globalreservestudies.com - Toll free phone and fax: (844) 477-7883 - www.globalsolutionpartners.com Funding Reserve Analysis for The Bluffs at Ashley River August 2,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cascara at Redmond Ridge NE 112 th Place & Eastridge Drive NE, Redmond, WA 98052 For: Cascara at Redmond Ridge Homeowners Association c/o Luiza Limona Morris Management 325-118

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112 th Ave NE

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND Community Management by: EVANS MILL POND, HOA Evans Mill Road McLean, Virginia 22101 Consultant: 929

More information

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager REPLACEMENT RESERVE REPORT FY 2017 OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 Community Management by: POSTON & COMPANY Melissa Blocker,

More information

The Ford Plantation - POA Revised August 17, THE FORD10 EXECUTIVE SUMMARY

The Ford Plantation - POA Revised August 17, THE FORD10 EXECUTIVE SUMMARY Replacement Reserve Analysis - Page A1 EXECUTIVE SUMMARY The Ford Plantation - POA Replacement Reserve Inventory identifies 77 Projected Replacements for funding from Replacement Reserves, with an estimated

More information

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844)

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844) GLOBAL Solution Partners, LLC info@globalreservestudies.com - Toll free phone and fax: (844) 477-7883 - www.globalsolutionpartners.com Funding Reserve Analysis for Oak Crest Farms November 2, 2016 Page

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

RESERVE STUDY Component Analysis and Reserve Fund Plan Annual Review Study 2016/17 For Middlefield Meadows HOA Mountain View, CA Prepared By RESERVE ANALYSIS CONSULTING, LLC 1750 Bridgeway, Suite B106

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community

More information

REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2018 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of:

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of: Pebble Shores Drive Naples, FL 34410 A Service of: 5036 Dr. Phillips Blvd, Suite 207, Orlando FL 32819 www.lcamresources.com October 31, 2018 Pebble Shores Condominium Pebble Shores Drive Naples, FL 34410

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Heritage Park 3208-52 nd Place NE, Tacoma, WA 98422 For: Heritage Park Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions 5500 Olympic Drive,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Seavue Condominiums 130-5 th Avenue South, Edmonds, WA 98020 For: Seavue Homeowners Association c/o Jay Grant Board President (202) 351-9399 Prepared By: Jeff Samdal, PE, RS,

More information

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC.

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. Woodburn, OR January 1, 2015 December 31, 2015 Project No: OR 11101 0006 5 Prepared By: Carson M. Horton, RS Quality Check By:

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

.USI.COMMERCIAL. (888) Funding Reserve Analysis. for. The Retreat at Gleannloch Farms Homeowners Association Spring, TX

.USI.COMMERCIAL. (888) Funding Reserve Analysis. for. The Retreat at Gleannloch Farms Homeowners Association Spring, TX .USI.COMMERCIAL (888)225-3755 www.usicommercial.com Funding Reserve Analysis for The Retreat at Gleannloch Farms Homeowners Association Spring, TX October 14, 2014 Page 1 of 31 Pages Funding Reserve Analysis

More information

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated

More information

Pemberley at Robinsons Grove

Pemberley at Robinsons Grove Pemberley at Robinsons Grove Level I Reserve Study Report Period 1/01/06 12/31/06 Client Reference Number.... 10429 Property Type...... Apartment Style Number of Units............. 160 Fiscal Year End.......

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

TIMBERLAKE COMMUNITY ASSOCIATION

TIMBERLAKE COMMUNITY ASSOCIATION TIMBERLAKE COMMUNITY ASSOCIATION REPLACEMENT RESERVE REPORT FY 2014 TIMBERLAKE COMMUNITY ASSOCIATION REPLACEMENT RESERVE REPORT FY 2014 Community Management by: Mr. Phil Massa, AMS, PCAM 933 Windsor Oaks

More information

Calusa Point Association, Inc. Miami, Florida File #

Calusa Point Association, Inc. Miami, Florida File # A FULL RESERVE STUDY FOR Miami, Florida File # 22920-06289 FOR PERIOD: January 1, 2014 December 31, 2014 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM LINDSEY 3300 W. LAKE MARY BLVD. SUITE 350 LAKE

More information

F U L L R E S E RV E S T U DY R E P O RT

F U L L R E S E RV E S T U DY R E P O RT Office: (888) 927-7865 Fax: (813) 200-8448 Contact@customreserves.com 5470 E Busch Blvd., Unit 171 Tampa, FL 33617 Hawks Point Community Development District F U L L R E S E RV E S T U DY R E P O RT For

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Soda Creek Condominiums Dillon, Colorado Version 2 Monday, August 19, 2013 6860 S. Yosemite Court, Suite 2000 Centennial, CO 80112 Phone (303) 953-2078 Facsimile (303) 953-2157

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 VILLAS AT PARKWOOD ESTATES VILLAS AT PARKWOOD ESTATES REPLACEMENT RESERVE REPORT FY 2016 Community Management by: Community Management Professionals, LLC Beth Maurer

More information

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I Prepared for: OVERLOOK AT QUALCHAN HOMEOWNERS ASSOCIATION SPOKANE, WA Prepared by: CRITERIUM-PFAFF ENGINEERS 12128 N. DIVISION ST. #200 SPOKANE, WA 99218

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cambridge Court 9512-1 st Avenue Northeast, Seattle, WA 98115 For: Cambridge Court Homeowners Association c/o Tim Kammer, Property Manager Condo Managements, Inc. 1661 Harbor

More information

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019.

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019. RESERVE STUDY UPDATE for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925) 831-1803

More information

Full Reserve Study. Nelson Farms HOA. Fort Collins, CO. Report #: For Period Beginning: May 1, 2016 Expires: April 30, 2017

Full Reserve Study. Nelson Farms HOA. Fort Collins, CO. Report #: For Period Beginning: May 1, 2016 Expires: April 30, 2017 Full Reserve Study Nelson Farms HOA Fort Collins, CO Report #: 19185-0 For Period Beginning: May 1, 2016 Expires: April 30, 2017 Date Revised: January 13, 2016 Hello, and welcome to your Reserve Study!

More information

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES Community Management by: ROCKTOWN REALTY Bernard Hamann 218 Market Street Harrisonburg, VA 22801 40-70-7080

More information

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014 Shadow Ridge Level 2 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 10160 Property Type Condominium Number of Units 168 Fiscal Year End 12/31 Date of Property Inspection 8/21/2014

More information

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2 2014 Reserve Study The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee 37862 Report No: 2921 Version 2 For the Period From: January 1, 2014 To: December 31, 2014 TABLE

More information

GARDEN HOMES AT CHARBONNEAU GREEN TOWNHOME ASSOCIATION MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2012

GARDEN HOMES AT CHARBONNEAU GREEN TOWNHOME ASSOCIATION MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2012 GARDEN HOMES AT CHARBONNEAU GREEN TOWNHOME ASSOCIATION MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2012 www.schwindtco.com (503)227-1165 Page 1 of 49 GARDEN HOMES AT CHARBONNEAU GREEN

More information

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association 21289 E. Lords Way Queen Creek, AZ 85142 support@azreservestudy.com Tel: (480) 840-7130 Fax: (888) 842-9319 October 27, 2012 Sample Association Regarding: 2013 - Level I Capital Replacement Reserve Study

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112

More information

Sun Peak Master Association

Sun Peak Master Association Sun Peak Master Association Level 1 Reserve Study Report Period 01/01/2014 12/31/2014 Client Reference Number Property Type Fiscal Year End 17547 Master 12/31 Date of Property Inspection Prepared By Analysis

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Licorice Fern II Homeowners Association 16880 SE Licorice Way, Renton, WA 98059 For: Licorice Fern II Homeowners Association c/o Ann Hart, Property Manager Pinnacle 2801 Alaskan

More information

Reserve Fund Study prepared for The Greens at Pelican Point Homeowners Association February 2013 prepared by

Reserve Fund Study prepared for The Greens at Pelican Point Homeowners Association February 2013 prepared by Reserve Fund Study prepared for The Greens at Pelican Point Homeowners Association February 2013 prepared by Craig Naden and John Carlson Table of Contents TABLE OF CONTENTS Page No. 1.0 EXECUTIVE SUMMARY...

More information

DUNN LORING VILLAGE SEQUOIA MANAGEMENT COMPANY. Craig Courtney Property Manager. Vienna, Virginia. Property Management: Consultant:

DUNN LORING VILLAGE SEQUOIA MANAGEMENT COMPANY. Craig Courtney Property Manager. Vienna, Virginia. Property Management: Consultant: Replacement Reserve Study DUNN LORING VILLAGE RSTUDY+ REPLACEMENT RESERVE STUDY DUNN LORING VILLAGE Vienna, Virginia Property Management: SEQUOIA MANAGEMENT COMPANY Craig Courtney Property Manager 13998

More information

RESERVE STUDY ANNUAL REPORT

RESERVE STUDY ANNUAL REPORT RESERVE STUDY ANNUAL REPORT PINELOCH SUN BEACH CLUB LEVEL III RESERVE STUDY UPDATE WITHOUT SITE VISIT Ronald, WA 98940 Report #50510500R FINANCIAL YEAR 01.2016 12.2016 701 Fifth Ave, Suite 4200, Seattle

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Sammamish Landing Condominiums 4214 West Lake Sammamish Parkway NE, Redmond, WA 98052 For: Sammamish Landing Homeowners Association c/o Scott McCue, Property Manager McCue &

More information

Quail Ridge THCA W. 17 th Ave Lakewood, CO 80224

Quail Ridge THCA W. 17 th Ave Lakewood, CO 80224 Quail Ridge THCA 11131-11167 W. 17 th Ave Lakewood, CO 80224 Level 1, Limited Reserve Analysis Report Period 5/01/16-4/30/17 Client Reference Number - 8173 Property Type Townhomes Number of Units 112 Fiscal

More information

Park Rise Homeowners Association, Inc. Financial Statements and Supplementary Information. For the Year Ended December 31, 2014

Park Rise Homeowners Association, Inc. Financial Statements and Supplementary Information. For the Year Ended December 31, 2014 Financial Statements and Supplementary Information For the Year Ended December 31, 2014 Table of Contents Independent Auditor s Report..... 1 Financial Statements Balance Sheet.. 3 Statement of Revenues,

More information

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY:

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY: 2015 Reserve Study Report LOCATED AT: 101 Oasis Drive Pompano Beach, FL 33069 FOR: Oasis at Palm Aire Association, Inc. 101 Oasis Dr., # Office Pompano Beach, FL 33069 AS OF: January 1st, 2015 - December

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY CAPITAL RESERVE STUDY FOR THE HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Number: 12-1066 W:\2012\12-1066\CORR\12-1066v1.doc Date: March 29, 2013 Table of Contents Section Page Executive Summary...

More information

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014 .USI.COMMERCIAL (888)225-3755 www.usicommercial.com Funding Reserve Analysis for The Summerlyn Association of Owners Inc. Lewes, Delaware September 3, 2014 Page 1 of 25 Pages Funding Reserve Analysis for

More information

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08 Central Pointe HOA Level I Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10870 Property Type...... Mid-Rise Number of Units............ 83 Fiscal Year End....... December 31

More information

Urban Heights Condominium

Urban Heights Condominium Condominium Capital 2011 2010, AssociationAnalysis, LLC Condominium Prepared For: Table of Contents Condominium Association, Inc. 1642 Maxwell Road Atlanta, GA 30012 October 19, 2010 INTRODUCTION INTRODUCTION

More information

REPLACEMENT RESERVE REPORT FY 2017 TOWNE SQUARE MASTER ASSOCIATION

REPLACEMENT RESERVE REPORT FY 2017 TOWNE SQUARE MASTER ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 TOWNE SQUARE MASTER ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 TOWNE SQUARE MASTER ASSOCIATION Community Management by: PROPERTY MANAGEMENT ASSOCIATES Sharon Grozich

More information