1 1515 Heritage Dr., Ste. 102 McKinney, TX (office) Firm Registration No. F PROPERTY EVALUATION AND RESERVE FUND STUDY CROSS OAK RANCH CROSS ROADS, TEXAS Prepared for: CROSS OAK RANCH HOMEOWNERS ASSOCIATION c/o Ms. DeAnna Etheredge Essex HOA Management 1221 IH- 35E, Suite 112 Carrollton, Texas Project Number: C Date of Investigation: April 17, 2014 Investigator: Phillip Nieman, P.E. Review: David H. Dotson, P.E., R.S. May 2014

2 CONTENTS 1.0 SUMMARY PROPERTY PROFILE GENERAL CONDITION PURPOSE & SCOPE PURPOSE SCOPE & METHODOLOGY SOURCES OF INFORMATION STANDARDS OF REFERENCE DESCRIPTION SITE IMPROVEMENTS TOPOGRAPHY STORM DRAINAGE PAVING & CURBING FLATWORK LANDSCAPING & APPURTENANCES CABANAS SUBSTRUCTURE SUPERSTRUCTURE VENTILATION ROOFING SYSTEM FAÇADE ELEMENTS INTERIOR ELEMENTS HVAC ELECTRICAL SYSTEMS PLUMBING SYSTEMS POOLS PLAYGROUND EQUIPMENT MISCELLANEOUS AMENITIES RESERVE FUND PROJECTIONS CONCLUSION LIMITATIONS APPENDIX A RESERVE FUND PROJECTIONS APPENDIX B PHOTOGRAPHS APPENDIX C EXECUTIVE SUMMARY Cross Oak Ranch Cross Roads, Texas

3 1.0 SUMMARY CROSS OAK RANCH HOMEOWNERS ASSOCIATION authorized Criterium Dotson Engineers to conduct a Property Evaluation and Reserve Fund Study for the property located on the west side of FM 720 at Cross Oak Ranch Blvd in Cross Roads, Texas. Studies of this nature are important to ensure a community has sufficient funds for long-term, periodic capital expenditure requirements. Anticipating large expenditures over an extended period of time through a structured analysis and scheduling process assists the Association in meeting financial requirements without increasing the service fees above permitted maximums, borrowing the funds, or levying special financial assessments to the home owners. Typically, a community Association has two broad cash requirements: the general operating reserves and the capital repair and replacement reserves. In this report, we will focus on those items falling under the capital repair and replacement reserve criteria. This report is structured to analyze components of the community for which the Association is responsible and to assess a useful expected life and useful remaining life for those components. The anticipated scheduled repair or replacement of the component and the anticipated expense for the activity are then analyzed in conjunction with the current capital reserves funding program for the community. Funding program recommendations are made with the objective of limiting substantial cash excesses while minimizing financial burdens that can result from significant cash inadequacies. This report is intended to be used as a tool to determine reserve fund allocation requirements for the community, to manage future Association obligations, and to inform the community of future financial needs in general. The report that follows has been prepared from the perspective of what an owner of this property would benefit from knowing. Some items, beyond those of immediate concern, may be discussed. Therefore, the report needs to be read in its entirety in order to fully understand all of the information that has been obtained. This investigation was performed on April 17, 2014 by Phillip Nieman, P.E. of Criterium Dotson Engineers on behalf of CROSS OAK RANCH HOMEOWNERS ASSOCIATION. The report that follows is based on that investigation. 1.1 Property Profile City & State: Cross Roads, TX Location: FM 720 & Cross Oak Ranch Blvd. Lot Size: Varies Area of Building (Cabana): ~ 1,800 SF Number of Stories: Single Number of Tenant Spaces: NA Percent Occupied: NA Year Built: 2004 Building Code: IBC Zoned: Residential Parking 26 spaces (Includes 2 handicap) Amenity Center Structure: Wood Frame Exterior: Stone Veneer / HardiPlank Siding / Wood Trim Roof: Standing Seam Metal Cross Oak Ranch CRITERIUM Dotson Engineers C Cross Roads, Texas May 2014 Page 1

4 Plumbing: City water and sewage service. PVC waste and copper water supply piping. HVAC: NA Electric: 120/240 Volt Service Vertical Transportation: NA Fire Protection: NA ADA Compliance: Generally Compliant Regulatory Compliance: No Issues Noted Budget: $100,137 Balance, $40,000 Annual Contribution 1.2 General Condition The property is in general, in good condition. In this section of the report, we will address those issues that, in our opinion, will require immediate repair or replacement. For a more detailed discussion of all of our findings and any other material deficiencies that will require repair or replacement, refer to the appropriate section of this report. Based on our observations, immediate material include: Pilaster repairs at shade structure Retaining wall repairs at entry pond Paint and repair bus stop and amenity center Replace fountains and pumps Replace wood signs Replace hail damaged lighting There are, of course, anticipated capital expenditures to be expected over the next twenty years. Those items that will require attention and are discussed in detail in this report and can be found in their appropriate sections. 2.0 PURPOSE & SCOPE 2.1 Purpose The purpose of this study is to determine a capital needs plan and a reserve fund analysis. It is intended to be used as a tool for the Homeowner s Association in determining the allocation requirements into the reserve fund in order to meet future anticipated capital expenditures for the community. This report forecasts obligations for the community twenty years into the future. It should be noted that events may occur that could have an effect on the underlying component or system useful life assumptions used in this study. Likewise, inevitable market fluctuations can have an impact on component or system replacement and repair costs. As a result, a study such as this should be updated from time to time, usually on a three to five year cycle, in order to reflect the most accurate needs and obligations of the community. 2.2 Scope & Methodology This study has been performed according to the scope as generally defined by the CROSS OAK RANCH HOMEOWNERS ASSOCIATION. The findings and recommendations are based on interviews with the community s management personnel, a review of available documents; and an investigation of the property and site. The investigation involved, in particular, a visual inspection of the entrance monuments, perimeter fencing, amenity center, pool, lake equipment, walking / jogging trail, Cross Oak Ranch CRITERIUM Dotson Engineers C Cross Roads, Texas May 2014 Page 2

5 utilities, and common amenities. The report contains the following: A description of the overall condition of building components and systems and common areas that are the responsibility of the association, and conditions that may limit the expected useful life of the buildings, facilities, and their components. Information about significant deficiencies, deferred maintenance items, and material code violations based on a visual survey of the buildings, facilities and grounds. A reserve fund analysis including a component inventory, anticipated remaining component useful life, anticipated component repair or replacement costs, and forecasted fund levels as a result of those anticipated costs. The statements in this report are opinions about the present condition of the subject community. They are based on visual evidence available during a diligent investigation of all reasonably accessible areas falling under the responsibility of the association. We did not remove any surface materials, perform any destructive testing, or move any furnishings. This study is not an exhaustive technical evaluation. Such an evaluation would entail a significantly larger scope than this effort. For additional limitations, see Section Sources of Information The following people were interviewed during our study: Ms. DeAnna Etheredge, Essex HOA Management (HOA) The following documents were made available to us and reviewed: Current Reserve Funding & Balance Site Plan 2.4 Standards of Reference For your reference, the following definitions may be helpful: Excellent: Component or system is in "as new" condition, requiring no rehabilitation and should perform in accordance with expected performance. Good: Component or system is sound and performing its function, although it may show signs of normal wear and tear. Some minor rehabilitation work may be required. Fair: Component or system falls into one or more of the following categories: a) Evidence of previous repairs not in compliance with commonly accepted practice, b) Workmanship not in compliance with commonly accepted standards, c) Component or system is obsolete, d) Component or system approaching end of expected performance. Repair or replacement is required to prevent further deterioration or to prolong Cross Oak Ranch CRITERIUM Dotson Engineers C Cross Roads, Texas May 2014 Page 3

6 expected life. Poor: Component or system has either failed or cannot be relied upon to continue performing its original function as a result of having exceeded its expected performance, excessive deferred maintenance, or state of disrepair. Present condition could contribute to or cause the deterioration of other adjoining elements or systems. Repair or replacement is required. Adequate: A component or system is of a capacity that is defined as enough for what is required, sufficient, suitable, and/or conforms to standard construction practices. All ratings are determined by comparison to other buildings of similar age and construction type. Further, some details of workmanship and materials will be examined more closely in higher quality buildings where such details typically become more relevant. All directions (left, right, rear, etc.), when used, are taken from the viewpoint of an observer standing in front of a building and facing it. Repair/Replacement Reserves - Non-routine maintenance items that will require significant expenditure over the life of the buildings. Included are items that will reach the end of their estimated useful life during the course of this forecast, or, in the opinion of the investigator, will require attention during that time. 3.0 DESCRIPTION A Property Evaluation and Reserve Fund Study for CROSS OAK RANCH were authorized by Ms. DeAnna Etheredge of Essex HOA Management for the CROSS OAK RANCH HOMEOWNERS ASSOCIATION. The study that follows is based on that investigation and has been prepared from the perspective of what a homeowner and a community association would benefit from knowing regarding those components of the community that fall under the responsibility of the association. This study needs to be read in its entirety to understand fully all of the information that we have obtained. Weather conditions on the day of the investigation were approximately 60 F with clear skies. The principal subjects of this study are the CROSS OAK RANCH Amenity Center / Recreation Area, including the cabanas, pools, splash park, equipment, shade structures, playground equipment, and concrete parking lot. Also included in the property evaluation were the entrance monuments / features, fencing, lake and equipment, walking / jogging trail, playgrounds, and common areas in the community. Cross Oak Ranch CRITERIUM Dotson Engineers C Cross Roads, Texas May 2014 Page 4

7 The property is served by the following utilities and providers: COMMUNITY UTILITY PROVIDERS Potable Water Municipal Sewer Municipal Storm Sewer Municipal Electricity Texas Choice Gas NA Oil NA Phone Unknown Trash Unknown Table 3: Utility Providers 4.0 SITE IMPROVEMENTS 4.1 Topography Description Topography is generally flat with a slight slope from east to west. There are a couple of drainage channels throughout the property and a lake at the southwest portion of the property. Observations & Comments No issues observed. Our inspection does not include specialized pond maintenance, dredging or erosion control need determination. We are not pond or erosion experts and these components require the services of a specialist in order to determine the current and future needs for erosion control, pond maintenance, and future dredging estimates. We are happy to, and certainly recommend including these anticipated costs into reserve planning. If you have already enlisted a professional to evaluate and address the current and future needs of the pond(s), we can incorporate your estimated costs into this study. If this has not been done, we recommend that you engage a qualified pond/erosion control specialist. We observed at the time of inspection that Pond Medics, Inc. maintains the lake areas in the community which is more than capable of providing this type of work. 4.2 Storm Drainage Description Observations & Comments Drainage in the community is handled over the surface with curb inlets and underground storm drainage at the streets. Drainage at common areas is handled over the surface to drainage channels and catch basins. Storm water drainage is conveyed to municipal system and the lake at the southwest portion of the property. No issues observed. Cross Oak Ranch CRITERIUM Dotson Engineers C Cross Roads, Texas May 2014 Page 5

8 4.3 Paving & Curbing COMMUNITY PAVING & CURBING Type of Paving Type of Curbing Parking Spaces Table 4: Parking Area Concrete Cast-in -place Concrete Cast-in -place 26 spaces (Includes 2 handicap) Description All streets and curbs at the community are cast-in-place concrete. The streets and curbs in the community are owned and maintained by the City. The amenity center has a cast-in-place concrete paved parking lot with twenty-six (26) striped parking spaces, including two (2) accessible spaces for the disabled. Curb side parking is available at the south pool. The main entrances to the property are located at Cross Oak Ranch Blvd. off of FM 720 and at Longhorn Drive off of Martop Road. Observations & Comments Concrete parking lot is in good condition; periodic repairs / replacement will be required. Any cracks in the concrete paving should be sealed to prevent seepage of water below the paving, causing premature failure. Periodic re-striping of the parking lot will be required on an approximate four (4) year cycle. Striping is in good condition at this time. 4.4 Flatwork Description Sidewalks run along the streets throughout the community and at the recreation area. There is an eight (8) foot wide concrete walking / jogging trail that runs along the west side of the community and leads to and around the lake. All flatwork is cast-in-place concrete. Observations & Comments Concrete walkways are in good general condition at this time; they will require periodic repairs and replacement due to the expansive nature of soils in this area. Only common area flatwork is the responsibility of the HOA; concrete walkways along community streets are the responsibility of the City. 4.5 Landscaping & Appurtenances Description The community entrances, recreation areas and common areas are extensively and attractively landscaped. An irrigation system is present at most landscaped areas. Irrigation controllers are located throughout the community. There is a large lake present at the west portion of the community and two (2) ponds at the main entrance to the community off of FM 720 and another pond at the Longhorn Drive Entrance. The larger pond at the Cross Oak Ranch CRITERIUM Dotson Engineers C Cross Roads, Texas May 2014 Page 6

9 north side of the main entrance has a large fountain with controls located at the northwest corner of the pond, and the smaller pond at the main entrance has a fountain with controls located north of the pond. Fountain equipment consists of a 10 hp pump, electronic water leveler system, and a Well-x-trol Water Well System at the larger pond and a fountain pump at the smaller pond. The pump and controls for the Longhorn Drive pond are located in a pump house at the northeast side of the pond. An 8 wide concrete hike/bike trail leads to and around the large lake at the southwest portion of the community from Liberty Blvd. at the west side of the community. A cedar framed arbor structure with a corrugated metal roof and some stone facade is located along the hike/bike trail at the east side of the lake; also located at this area are four (4) park benches, a picnic table, and four (4) wood trash bins. This common area is enclosed by split-rail cedar ranch fencing and some wrought iron fencing at lake side. Custom iron signage is hanging from the arbor structure and at the start of the trail at Liberty Blvd. Wood signs are located along the hike/bike trail in four (4) separate areas. A small light gauge steel framed floating dock is located at the west side of the large lake. Perimeter fencing borders the property at the east side along FM 720 and at the south side along Martop Road. Fencing consists of a combination of board-on-board cedar fencing and wrought iron fencing spaced between stone pilasters. There are larger stone pilasters at the main entrance with heavy iron anchor accents and accent lights. Fencing at the interior of the community consists of ornamental iron fencing spaced between stone pilasters at the median of Cross Oak Ranch Blvd. and split-rail cedar ranch style fencing along Liberty Blvd. Entrance monument at the main entrance consists of large stone pilasters at the median and each side of entry / exit drives with arched steel beams at the top; there is also a small stone monument wall at the median between entry and exit drives with custom iron signage mounted on each side. Monument features at main entry are lit by incandescent and fluorescent accent lights. A large stone monument wall is located at the larger pond north of the main entrance starting at the bank and extending into the pond; custom iron signage is mounted on each side of the monument wall. The stone monument is lit on each side by a high pressure sodium spotlight. There is a small amount of stone retaining walls located throughout the community, at the small pond between the main entrance drives, and at the Longhorn Pond. Both pool areas are enclosed by ornamental iron fencing and have card reader access control systems. Observations & Comments Landscaping is in good condition - Routine maintenance and replacement always required. The lake and ponds appeared to be in good condition and well maintained with no adverse issues observed. Our inspection does not include Cross Oak Ranch CRITERIUM Dotson Engineers C Cross Roads, Texas May 2014 Page 7

10 specialized pond maintenance, dredging or erosion control need determination. We are not pond or erosion experts and these components require the services of a specialist in order to determine the current and future needs for erosion control, pond maintenance, and future dredging estimates. All fountains were in good working order and appeared to be in good condition at the time of inspection with the exception of the Longhorn fountain which was not in operation at the time of inspection. Regular maintenance and periodic replacement of fountain equipment will be required. The water well that provides water for the ponds and the automatic water leveler system appeared to be in good condition at the time of inspection. The well house at the Longhorn Pond was locked and unavailable for inspection. Concrete hike/bike trail will require periodic repairs / sectional replacement due to the expansive nature of the soils in this area. Cedar framed arbor at the hike/bike trail along the large lake was in good condition overall. Staining of cedar framing will be required in approximately four (4) years. Wood trail signs will likely require replacement in approximately two (2) years. The floating dock at the large lake is in good overall condition. No issues were observed. Perimeter board-on-board cedar fencing is in good overall condition; staining and repairs is recommended in approximately four (4) years. Ornamental iron fencing at the east perimeter, the median of Cross Oak Ranch Blvd., and at the pool areas is in good condition overall; however, the fencing at the north is rusting through in isolated areas. We recommend periodic cleaning, priming and painting of all ornamental iron fencing at one time in approximately six (6) years. Entrance monument features are in good overall condition. Iron features at monuments will require periodic cleaning, priming, and painting; stone monument features will require periodic repairs. Stone retaining walls are in good condition overall; however, the wall located at the pond near the north entrance is in poor condition. We recommend immediate repairs to this wall. 5.0 CABANAS 5.1 Substructure It should be noted that access was not provided to the amenity center or south pool area. Description Observations & Comments 5.2 Superstructure Description Observations & Comments The foundations of the cabanas consist of a post-tension reinforced cast-inplace concrete slabs-on-grade. No visible indications of structural problems Wood load bearing walls and conventional wood roof framing. No visible indications of structural problems. Cross Oak Ranch CRITERIUM Dotson Engineers C Cross Roads, Texas May 2014 Page 8

11 5.3 Ventilation Description Observations & Comments 5.4 Roofing System Description Observations & Comments Attic ventilation consists of a small dormer vent and soffit vents. No signs of excess moisture were observed. Amenity center roofing consists of a sloped standing seam metal roof. The roofs at the bus stop and the south cabana are comprised of asphalt composition shingles. Amenity center roofing is in good condition; some small periodic repairs will be required in the form of caulking exposed fasteners and some penetrations as regular maintenance. Standing seam metal roofs generally have an average lifespan of 45 years. The bus stop and south cabana roofs are also in good condition; however, both suffered through a significant hail storm on April Façade Elements Description Amenity center façade consists of stone veneer along with cement fiber lap siding and trim, and the south cabana is clad with stone veneer. Doors to restrooms and storage rooms are hollow core metal doors and doors to the exercise room are insulated metal with glass panes. Amenity center is equipped with aluminum insulated glass windows. Observations & Comments Good condition - no issues noted. Siding and trim materials will require periodic painting and sealing of joints in order to provide full weather protection to the product. Doors and windows are in good condition. 5.6 Interior Elements TYPICAL CLUBHOUSE INTERIOR FINISHES Walls Painted Drywall Floors Concrete Ceilings Painted Drywall Doors Hollow Core metal / Insulated metal with glass panes Table 7: Interior Finish Summary Table Description Floor finish is bare concrete. The restroom walls and ceilings consist of painted drywall. Observations & Comments Generally in good condition. Carpet at the exercise room will likely require replacement in approximately two (2) years. 5.7 HVAC Description The exercise room is heated and cooled by an individual residential-type Cross Oak Ranch CRITERIUM Dotson Engineers C Cross Roads, Texas May 2014 Page 9

12 split-system air conditioner and electric resistance heater. Compressor unit is located on the ground at the south perimeter of the Amenity Center. All air is distributed via ductwork in the ceiling space and wall space. Observations & Comments HVAC system was in good condition at the time of inspection. Split system units typically last 12 to 15 years. 5.8 Electrical Systems CABANA ELECTRICAL SYSTEMS Amperage 225 Amp Voltage/Phase 120 / 240 Service Entrance Underground Branch Wiring Copper Table 6: Electrical System Summary Description Power meters are located at pond equipment north of the main entrance, at an irrigation controller just north of main entrance, and at the Amenity Center of the cabana along with a 225 amp, 125 amp, and 200 amp electrical panels respectively. All power is distributed from this point by copper branch wiring. There is also a 50 kva step down transformer and a phase converter (1 phase to 3 phase) at pond equipment. Observations & Comments 5.9 Plumbing Systems Description The visible portions of the electrical system are generally in good condition. Water and sewer service is provided by the City of Cross Roads. Water distribution piping is copper. Sewage collection piping is PVC. The plumbing fixtures are vitreous china, of commercial quality, with good quality accessories. Observations & Comments 5.10 Pools Description The system and fixtures are generally in good condition. An approximate 8,250 S.F. pool and incorporated splash feature area are gunite pool surfacing with cast-stone coping and tile at the waterline. Pool apron/decking is Kool-Deck surfaced cast-in-place concrete. There is a separate splash park at the Kool-Deck concrete decking at the northeast corner of the pool area with multiple splash features. There are also three (3) slides at the deep end of the pool. Pool equipment consists of two (2) large pumps and two (2) large filters. Furnishings consist of fifteen (15) chairs and forty-five (45) chaise lounges with metal frame and vinyl strapping, and five (5) round top tables with metal frame and plexi-glass tops. Cross Oak Ranch CRITERIUM Dotson Engineers C Cross Roads, Texas May 2014 Page 10

13 There is one (1) shade structure at the pool area with tubular steel frames and polyethylene covers. Observations & Comments Pools and splash park surfacing is in good general condition; resurfacing should be planned for in approximately four (4) years. Splash features and pool slides are in good condition. The pool equipment is generally in good condition. Routine maintenance and replacement of pool equipment can be expected. Decking is in good condition. We recommend sealing of larger cracks to prevent seepage of water below the surface causing premature deterioration. Regular patching/sealing should be anticipated. The decking to coping joint will require periodic resealing (Seal-O-Deck), and will likely be needed in two (2) years. The furnishings are of good quality and should be expected to last approximately three (3) years. Polyethylene covers at shade structures will require replacement on an approximate eight (8) year cycle Playground Equipment Description Observations & Comments Extensive, metal and plastic playground equipment is located at the common area west of the Amenity Center and at the south pool. Additionally, a swing set is located on the property. Playground equipment is of good quality and condition. 6.0 MISCELLANEOUS AMENITIES Description Observations & Comments 7.0 RESERVE FUND PROJECTIONS The amenity center has an exercise room equipped with a treadmill, two (2) stationary bikes, an elliptical trainer, and a universal weight resistance machine. Exercise equipment is of good quality and condition. See Appendix A. 8.0 CONCLUSION In summary, we consider these facilities to be in generally good condition when compared to others of similar age and construction type. While some components will need a regular repair and replacement program, the program can be prioritized and planned in conjunction with reserve strategies. We feel that the reserve financials included with this report outline possible strategies for your community to adopt given the current condition of the facilities as a whole. As time passes, it may become necessary to re-establish financial priorities and capital expenditure schedules given any unforeseen circumstances. We recommend and encourage this activity. Cross Oak Ranch CRITERIUM Dotson Engineers C Cross Roads, Texas May 2014 Page 11

14 9.0 LIMITATIONS The observations described in this study are valid on the date of the investigation and have been made under the conditions noted in the report. We prepared this study for the exclusive use of the CROSS OAK RANCH HOMEOWNERS ASSOCIATION and their successors and assignees. Criterium Dotson Engineers does not intend any other individual or party to rely upon this study without our express written consent. If another individual or party relies on this study, they shall indemnify and hold Criterium Dotson Engineers harmless for any damages, losses, or expenses they may incur as a result of its use. This study is limited to the visual observations made during our inspection. We did not remove surface materials, conduct any destructive or invasive testing, move furnishings or equipment, or undertake any digging or excavation. Accordingly, we cannot comment on the condition of systems that we could not see, such as buried structures and utilities, nor are we responsible for conditions that could not be seen or were not within the scope of our services at the time of the investigation. We did not undertake to completely assess the stability of the buildings or the underlying foundation soil since this effort would require excavation and destructive testing. Likewise, this is not a seismic assessment. We do not render an opinion on uninvestigated portions of the community. We did not perform any computations or other engineering analysis as part of this evaluation, nor did we conduct a comprehensive code compliance investigation. This study is not to be considered a warranty of condition, and no warranty is implied. The appendices are an integral part of this report and must be included in any review. If probable costs are presented, they are probable only. The costs are based on our general knowledge of building systems and the contracting and construction industry. When appropriate, we have relied on standard sources, such as Means Building Construction Cost Data, to develop probable costs. However, for items that we have developed costs (e.g.: structural repairs), no standard guide for developing such costs exists. We have performed no design work as part of this study, nor have we obtained competitive quotations or estimates from contractors as this also is beyond the scope of the project. The actual cost to remedy deficiencies and deferred maintenance items that we have identified may vary significantly from estimates and competitive quotations from contractors. If you have any questions about this study or the reserve fund analysis, please feel free to contact us. Thank-you for the opportunity to be of assistance to you. CRITERIUM-DOTSON ENGINEERS Cross Oak Ranch CRITERIUM Dotson Engineers C Cross Roads, Texas May 2014 Page 12

15 APPENDIX A RESERVE FUND PROJECTIONS Cross Oak Ranch CRITERIUM Dotson Engineers C Cross Roads, Texas May 2014 Page 13

16 INTRODUCTION The following is a projected reserve fund analysis for non-annual items as discussed in the report. This projection takes into consideration a reasonable return on invested moneys and inflation. Please review this thoroughly and let us know of any changes that may be desired. The intent of this reserve fund projection is to help the association develop a reserve fund to provide for anticipated repair or replacements of various system components during the next twenty years. The capital items listed are those that are typically the responsibility of the Association and are derived from a list developed by Criterium- Dotson Engineers. A copy of this list is provided in this Appendix. However, association by-laws vary and, therefore, which components is the responsibility of the individual owners and which is the responsibility of the association can vary. The association should confirm that the items listed should be financed by the association reserve fund. This projection provides the following: An input sheet that defines all the criteria used for the financial alternatives, including the assumed inflation rate and rate of return on deposited reserve funds. A table that lists anticipated replacement and/or repair items complete with estimated remaining life expectancies, projected costs of replacement and/or repair, a frequency in years of when these items require replacement and/or repair, and a projection based on this frequency. A table and graph that represent end of year balances versus capital expenditures based on your current funding program and reserve balances, and alternatives to your current program. The provided graphs illustrate what effects the funding methods will have over the presented twenty-year period versus the anticipated capital expenditures. Care should be taken in analyzing the graphs due to varying graphic scales that occur within each graph and between graphs. Note that based on our developed list of Capital items and taking inflation into account; the current funding level is NOT adequate for the long-term needs of the community over the next twenty (20) years. The association should bear in mind that unanticipated expenditures can always arise and maintenance of a significant reserve fund balance can be viewed as a way to avoid special assessments. Our objective is to maintain positive funding levels over 20 years without Cross Oak Ranch Criterium-Dotson Engineers Capital Reserve Fund Study

17 building up huge reserves. At the end of 20 years, we look to maintain a balance at least equal to the average annual reserve requirement unless we are anticipating additional major expenditures following quickly after 20 years. To achieve this goal we have projected anticipated maintenance/replacement costs, interest earned on investments, an assumed inflation factor and the current fund balance and operating budget to determine that the required level of funding for capital needs. Please remember this does not include any allowance for routine maintenance and operations costs. Only capital costs are included. There are items, such as future community amenities, that are not incorporated into this reserve analysis. A Reserve Study is a working tool and a fluid document over time. In addition to changing conditions, one of the primary reasons that we recommend a reserve study be updated every 4 years is so that items that fall outside the 20-year analysis today will be pulled into the calculations and required reserve funding when they are still 20 years out, thus allowing sufficient time to accumulate funds without placing unnecessary burden on current residents. Our inspection does not include specialized pond maintenance, dredging or erosion control need determination. We are not pond or erosion experts and these components require the services of a specialist in order to determine the current and future needs for erosion control, pond maintenance, and future dredging estimates. We are happy to, and certainly recommend including these anticipated costs into reserve planning. If you have already enlisted a professional to evaluate and address the current and future needs of the pond(s), we can incorporate your estimated costs into this study. If this has not been done, we recommend that you engage a qualified pond/erosion control specialist. EXISTING FUNDING LEVEL; We have assessed current Reserve as the amount funds currently designated as Reserves together with current contribution being made into the Reserve Fund account. Assuming that operating costs offset all revenues collected during the twenty-year planning period, the Associations current Capital Fund Balance is NOT adequate to meet the long-term Association needs. The following Alternatives show required funding levels over the duration based on the current balance. ALTERNATIVE # 1: Alternative 1 proposes generally level funding for Capital reserves over the duration with an increase in the contribution level to reserves and steps in contribution level in three (3) year increments. This alternative creates an adequate fund balance at the end of the period and represents a good, conservative approach. Cross Oak Ranch Criterium-Dotson Engineers Capital Reserve Fund Study

18 ALTERNATIVE # 2: Alternative 2 also proposes an initial increase to the contribution level and small annual escalation in dues for Capital reserves over the duration. This alternative creates an adequate fund balance at the end of the period and also represents a solid approach. ALTERNATIVE # 3: Alternative 3 reviews maintaining minimum level funding at current level over the duration of the funding period. This alternative requires large special assessments at years 5, 11 and year 17 but holds annual dues for capital reserve to a minimum. This alternative is not recommended but shows what the financial impact will be without long-term planning. Please note that the reserve fund study does not include typical annual maintenance items. Our assumption is that you already have an annual operating budget that provides for these typical, repetitive items. This includes miscellaneous repairs, lawn and grounds maintenance, routine minor painting, etc. We have focused on those significant, non-annual items where careful financial planning is important. Finally, please note that the estimates we have developed are based on 2014 dollars. Our reserve fund study does adjust for an estimated annual inflation and a given return on investment assuming that the indicated fund balances are maintained. CRITERIUM-DOTSON ENGINEERS Cross Oak Ranch Criterium-Dotson Engineers Capital Reserve Fund Study

19 Reserve Study Worksheet - Existing Funding Levels General Information: 1 Organization: Cross Oak Ranch Homeowners Association 2 Address: 9016 Cross Oak Ranch Boulevard Crossroads, TX Number of Homes* 1,054 Total/Month Total Annual Per Unit/Month Per Unit/Year Special Assessments 4 Age of Development (in years) 10 Res. Fund Contrib. (First Year)... $3,333 $40,000 $3.16 $37.95 Years Out Total/Year Per Unit 5a Study Period (in years) 20 Res. Fund Contrib. (Remaining Years)... $3,333 $40,000 $3.16 $ b Normal Fiscal Year starts: January 1, c Partial Fiscal Year starts: January 1, d Partial Year Length: 12 months Final Balance Computed... ($816,541) 6 Site Inspection Date April 16, 2014 Average Capital Expenditure per year... $85,967 7 Reserve Funds at start $100,137 8 Rate of Return on invested Reserve Funds (%) 1.0% 9 Inflation Rate (%) 3.0% 10 Yearly Threshold $0 11 Annual Maintenance Budget $0 12 Annual Maintenance Escalation Rate 0.0% 13 Target Funding Percentage 0.0% *1,754 at build-out Fiscal Years: Normal: Jan Partial: Jan 2014 (12 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $100,137 $42,558 $74,937 $82,467 $60,618 ($47,679) ($29,010) ($30,049) ($24,148) $8,334 ($16,461) ($304,410) ($409,852) ($474,937) ($463,647) $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $421 $742 $817 $600 $0 $0 $0 $0 $83 $0 $0 $0 $0 $0 $0 $98,000 $8,364 $33,286 $62,449 $148,297 $21,331 $41,040 $34,098 $7,601 $64,795 $327,949 $145,441 $105,086 $28,710 $95,407 $42,558 $74,937 $82,467 $60,618 ($47,679) ($29,010) ($30,049) ($24,148) $8,334 ($16,461) ($304,410) ($409,852) ($474,937) ($463,647) ($519,054) Ending Reserve Balance: Percent Funded: 10.39% 19.80% 18.87% 12.83% -9.89% -6.96% -6.46% -4.85% 1.55% -2.76% % % % % % Special Assessment Cost per Unit: $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Fiscal Years: Normal: Jan Partial: Jan 2014 (12 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: ($519,054) ($549,162) ($688,777) ($724,023) ($786,646) $40,000 $40,000 $40,000 $40,000 $40,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $70,109 $179,615 $75,246 $102,623 $69,895 ($549,162) ($688,777) ($724,023) ($786,646) ($816,541) Ending Reserve Balance: Percent Funded: % % % % % Special Assessment Cost per Unit: $0 $0 $0 $0 $0 Criterium Engineers Page 1 of 22 6/3/2014

20 Reserve Study Worksheet - Alternative 1, Level Funding with Steps General Information: 1 Organization: Cross Oak Ranch Homeowners Association 2 Address: 9016 Cross Oak Ranch Boulevard Crossroads, TX Number of Homes* 1,054 CURRENT FUNDING Total/Month Total Annual Per Unit/Month Per Unit/Year Special Assessments 4 Age of Development (in years) 10 Res. Fund Contrib. (First Year)... $3,333 $40,000 $3.16 $37.95 Years Out Total/Year Per Unit 5a Study Period (in years) 20 Res. Fund Contrib. (Remaining Years)... $3,333 $40,000 $3.16 $ b Normal Fiscal Year starts: January 1, c Partial Fiscal Year starts: January 1, d Partial Year Length: 12 months Final Balance Computed... ($816,541) 6 Site Inspection Date April 16, 2014 Average Capital Expenditure... $85,967 7 Reserve Funds at start $100,137 8 Rate of Return on invested Reserve Funds (%) 1.0% ALTERNATIVE 1 Total/Month Total Annual Per Unit/Month Per Unit/Year Special Assessments 9 Inflation Rate (%) 3.0% Monthly Amount, (First Year)... $4,831 $57,970 $4.58 $55.00 Years Out Total/Year Per Unit 10 Yearly Threshold $0 Monthly Amount, (Last Year)... $10,101 $121,210 $9.58 $ Annual Maintenance Budget $0 Balance Required Final Year... $85, Annual Maintenance Escalation Rate 0.0% 13 Target Funding Percentage 0.0% Final Balance Computed... $164,230 *1,754 at build-out Average Capital Expenditure... $85,967 Fiscal Years: Normal: Jan Partial: Jan 2014 (12 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $100,137 $60,708 $111,418 $137,463 $144,959 $65,823 $114,133 $153,665 $200,603 $274,772 $302,563 $64,846 $9,084 $4,170 $76,346 $57,970 $57,970 $57,970 $68,510 $68,510 $68,510 $79,050 $79,050 $79,050 $89,590 $89,590 $89,590 $100,130 $100,130 $100,130 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $601 $1,103 $1,361 $1,435 $652 $1,130 $1,521 $1,986 $2,721 $2,996 $642 $90 $41 $756 $811 $98,000 $8,364 $33,286 $62,449 $148,297 $21,331 $41,040 $34,098 $7,601 $64,795 $327,949 $145,441 $105,086 $28,710 $95,407 $60,708 $111,418 $137,463 $144,959 $65,823 $114,133 $153,665 $200,603 $274,772 $302,563 $64,846 $9,084 $4,170 $76,346 $81,880 Ending Reserve Balance: Percent Funded: 14.82% 29.44% 31.45% 30.69% 13.66% 27.37% 33.03% 40.31% 51.21% 50.65% 10.55% 2.06% 1.04% 19.44% 18.61% Special Assessment Cost per Unit: $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Fiscal Years: Normal: Jan Partial: Jan 2014 (12 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $81,880 $123,666 $55,268 $91,599 $111,289 $110,670 $110,670 $110,670 $121,210 $121,210 $0 $0 $0 $0 $0 $1,224 $547 $907 $1,102 $1,626 $70,109 $179,615 $75,246 $102,623 $69,895 $123,666 $55,268 $91,599 $111,289 $164,230 Ending Reserve Balance: Percent Funded: 26.02% 11.14% 17.07% 19.61% 29.19% Special Assessment Cost per Unit: $0 $0 $0 $0 $0 Criterium Engineers Page 2 of 22 6/3/2014

21 Reserve Study Worksheet - Alternative 2, Escalating Funding at 4% per Year General Information: 1 Organization: Cross Oak Ranch Homeowners Association 2 Address: 9016 Cross Oak Ranch Boulevard Crossroads, TX Number of Homes* 1,054 CURRENT FUNDING Total/Month Total Annual Per Unit/Month Per Unit/Year Special Assessments 4 Age of Development (in years) 10 Res. Fund Contrib. (First Year)... $3,333 $40,000 $3.16 $37.95 Years Out Total/Year Per Unit 5a Study Period (in years) 20 Res. Fund Contrib. (Remaining Years)... $3,333 $40,000 $3.16 $ b Normal Fiscal Year starts: January 1, c Partial Fiscal Year starts: January 1, d Partial Year Length: 12 months Final Balance Computed... ($816,541) 6 Site Inspection Date April 16, 2014 Average Capital Expenditure... $85,967 7 Reserve Funds at start $100,137 8 Rate of Return on invested Reserve Funds (%) 1.0% ALTERNATIVE 2 Total/Month Total Annual Per Unit/Month Per Unit/Year Special Assessments 9 Inflation Rate (%) 3.0% Monthly Amount, (First Year)... $4,831 $57,970 $4.58 $55.00 Years Out Total/Year Per Unit 10 Yearly Threshold $0 Monthly Amount, (Last Year)... $10,178 $122,134 $9.66 $ Annual Maintenance Budget $0 Balance Required Final Year... $85, Annual Maintenance Escalation Rate 0.0% Base Escalation % % 13 Target Funding Percentage 0.0% *1,754 at build-out Final Balance Computed... $127,842 Average Capital Expenditure... $85,967 Fiscal Years: Normal: Jan Partial: Jan 2014 (12 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $100,137 $60,708 $113,760 $144,606 $148,839 $69,042 $119,423 $153,251 $197,392 $271,818 $292,428 $50,792 ($5,408) ($17,682) $50,634 $57,970 $60,289 $62,700 $65,208 $67,817 $70,529 $73,351 $76,285 $79,336 $82,509 $85,810 $89,242 $92,812 $96,524 $100,385 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $601 $1,126 $1,432 $1,474 $684 $1,182 $1,517 $1,954 $2,691 $2,895 $503 $0 $0 $501 $556 $98,000 $8,364 $33,286 $62,449 $148,297 $21,331 $41,040 $34,098 $7,601 $64,795 $327,949 $145,441 $105,086 $28,710 $95,407 $60,708 $113,760 $144,606 $148,839 $69,042 $119,423 $153,251 $197,392 $271,818 $292,428 $50,792 ($5,408) ($17,682) $50,634 $56,169 Ending Reserve Balance: Percent Funded: 14.82% 30.06% 33.09% 31.51% 14.32% 28.64% 32.94% 39.67% 50.66% 48.96% 8.27% -1.23% -4.40% 12.89% 12.77% Special Assessment Cost per Unit: $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Fiscal Years: Normal: Jan Partial: Jan 2014 (12 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $56,169 $91,366 $20,531 $58,787 $74,337 $104,401 $108,577 $112,920 $117,437 $122,134 $0 $0 $0 $0 $0 $905 $203 $582 $736 $1,266 $70,109 $179,615 $75,246 $102,623 $69,895 $91,366 $20,531 $58,787 $74,337 $127,842 Ending Reserve Balance: Percent Funded: 19.22% 4.14% 10.96% 13.10% 22.73% Special Assessment Cost per Unit: $0 $0 $0 $0 $0 Criterium Engineers Page 3 of 22 6/3/2014

22 Reserve Study Worksheet - Alternative 3, Escalating Funding with Special Assessments General Information: 1 Organization: Cross Oak Ranch Homeowners Association 2 Address: 9016 Cross Oak Ranch Boulevard Crossroads, TX Number of Homes* 1,054 CURRENT FUNDING Total/Month Total Annual Per Unit/Month Per Unit/Year Special Assessments 4 Age of Development (in years) 10 Res. Fund Contrib. (First Year)... $3,333 $40,000 $3.16 $37.95 Years Out Total/Year Per Unit 5a Study Period (in years) 20 Res. Fund Contrib. (Remaining Years)... $3,333 $40,000 $3.16 $ b Normal Fiscal Year starts: January 1, c Partial Fiscal Year starts: January 1, d Partial Year Length: 12 months Final Balance Computed... ($816,541) 6 Site Inspection Date April 16, 2014 Average Capital Expenditure... $85,967 7 Reserve Funds at start $100,137 8 Rate of Return on invested Reserve Funds (%) 1.0% ALTERNATIVE 3 Total/Month Total Annual Per Unit/Month Per Unit/Year Special Assessments 9 Inflation Rate (%) 3.0% Monthly Amount, (First Year)... $3,333 $39,999 $3.16 $37.95 Years Out Total/Year Per Unit 10 Yearly Threshold $0 Monthly Amount, (Last Year)... $3,333 $39,999 $3.16 $ , Annual Maintenance Budget $0 Balance Required Final Year... $85, , Annual Maintenance Escalation Rate 0.0% Base Escalation % % , Target Funding Percentage 0.0% *1,754 at build-out Final Balance Computed... $74,654 Average Capital Expenditure... $85,967 Fiscal Years: Normal: Jan Partial: Jan 2014 (12 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $100,137 $42,558 $74,935 $82,465 $60,615 $27,591 $46,722 $46,139 $52,560 $85,808 $61,623 $276,410 $172,677 $108,667 $121,156 $39,999 $39,999 $39,999 $39,999 $39,999 $39,999 $39,999 $39,999 $39,999 $39,999 $39,999 $39,999 $39,999 $39,999 $39,999 $0 $0 $0 $0 $75,000 $0 $0 $0 $0 $0 $500,000 $0 $0 $0 $0 $421 $742 $816 $600 $273 $463 $457 $520 $850 $610 $2,737 $1,710 $1,076 $1,200 $657 $98,000 $8,364 $33,286 $62,449 $148,297 $21,331 $41,040 $34,098 $7,601 $64,795 $327,949 $145,441 $105,086 $28,710 $95,407 $42,558 $74,935 $82,465 $60,615 $27,591 $46,722 $46,139 $52,560 $85,808 $61,623 $276,410 $172,677 $108,667 $121,156 $66,406 Ending Reserve Balance: Percent Funded: 10.39% 19.80% 18.87% 12.83% 5.72% 11.21% 9.92% 10.56% 15.99% 10.32% 44.99% 39.25% 27.04% 30.85% 15.10% Special Assessment Cost per Unit: $0 $0 $0 $0 $71 $0 $0 $0 $0 $0 $474 $0 $0 $0 $0 Fiscal Years: Normal: Jan Partial: Jan 2014 (12 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $66,406 $36,659 $199,014 $165,406 $103,810 $39,999 $39,999 $39,999 $39,999 $39,999 $0 $300,000 $0 $0 $0 $363 $1,970 $1,638 $1,028 $739 $70,109 $179,615 $75,246 $102,623 $69,895 $36,659 $199,014 $165,406 $103,810 $74,654 Ending Reserve Balance: Percent Funded: 7.71% 40.12% 30.83% 18.29% 13.27% Special Assessment Cost per Unit: $0 $285 $0 $0 $0 Criterium Engineers Page 4 of 22 6/3/2014

23 Reserve Study Worksheet - Itemized Worksheet Percent Funded Full Capital Item Reserve Beginning Frequency Amount Remaining Reserve Funding Required Funding To Be Replaced Quantity Unit cost Requirement (*) Balance (yrs**) Per Year Life (yrs) Monthly Annual Balance Notes Site Wash & Stain B-O-B Cedar Perimeter Fencing 6,150 lin ft $4.00 $24, $1, $4, $ $5, $4, Replace B-O-B Cedar Perimeter Fencing (50%) 3,075 lin ft $30.00 $92, $11, $4, $ $8, $46, Clean & Paint Ornamental Iron Fence (All Areas)*** 1,415 lin ft $7.00 $9, $ $1, $ $1, $0.00 Replace Ornamental Iron Fence (All Areas)*** 1,415 lin ft $50.00 $70, $10, $1, $ $3, $41, Rusting through at pool Stone Pilaster Repairs (Includes Iron Accents) 174 ea $ $34, $8, $3, $0.00 $0.00 $34, Sun screen pilasters in poor condition Wash & Stain Wood Ranch Fence (Liberty Blvd. & Lake) 1,380 lin ft $2.00 $2, $ $ $54.69 $ $ Replace Wood Ranch Fence (Liberty Blvd. & Lake) 1,380 lin ft $25.00 $34, $3, $1, $ $2, $13, Stone Retaining Wall Repairs (Periodic) 950 lin ft $40.00 $38, $9, $3, $0.00 $0.00 $38, Wall at entry pond in poor condition Irrigation Controller Replacement 8 ea $ $5, $ $ $90.68 $1, $3, Electrical Equipment Replacement 1 lot $7, $7, $1, $ $81.38 $ $4, Entrance Monument Repairs 1 lot $8, $8, $1, $ $ $3, $6, Concrete Hike/Bike Trail Repairs (Periodic) 90,900 sq ft $0.25 $22, $1, $2, $ $3, $6, Replace Hike/Bike Trail Park Benches 10 ea $ $7, $ $ $28.70 $ $2, Replace Hike/Bike Trail Trash Bins 6 ea $ $3, $ $ $18.52 $ $1, Replace Hike/Bike Trail Wood Signs 4 ea $ $1, $ $ $33.52 $ $ Concrete Parking Lot Repairs 7,540 sq ft $0.50 $3, $ $ $47.24 $ $1, Concrete Parking Lot Replacement 7,540 sq ft $6.00 $45, $2, $1, $ $1, $11, Clean, Prime, Paint Ornamental Light Posts 5 ea $ $1, $ $ $34.39 $ $ Site Accent Light Replacement 17 ea $ $3, $ $ $51.47 $ $1, are broken Replace B-O-B Cedar Perimeter Fencing (50%) 3,075 lin ft $30.00 $92, $10, $4, $ $7, $41, Building Exterior Wash & Stain Cedar Arbor/Pergulas 1 lot $1, $1, $ $ $29.72 $ $ Replace Cedar Arbors 1 lot $10, $10, $ $ $49.54 $ $2, Paint & Repair Siding & Trim 2,000 sq ft $1.25 $2, $ $ $0.00 $0.00 $2, Replace Standing Seam Metal Amenity Center 1,200 sq ft $5.00 $6, $ $ $13.51 $ $1, Replace Amenity Center 8 ea $ $2, $ $ $20.48 $ $1, Replace Exterior Doors 9 ea $ $4, $ $ $32.92 $ $2, Replace Exterior Lighting (Accent and Flood) 15 ea $ $3, $ $ $22.28 $ $1, New pool light is hail damaged Replace Asphalt Shingle Roof 1,200 sq ft $2.25 $2, $ $ $19.75 $ $1, Due to hail storm Paint & Repair Bus Stop Siding and Trim 2,400 sq ft $1.25 $3, $ $ $0.00 $0.00 $3, Building Interior Replace Restroom Fixtures 1 lot $5, $5, $ $ $27.57 $ $2, Replace Exercise Equipment 1 lot $8, $8, $1, $ $ $3, $6, Replace Exercise Room 500 sq ft $2.60 $1, $ $ $23.11 $ $ Replace Interior Lighting 1 lot $1, $1, $ $ $11.11 $ $ Mechanical Replace Pond Fountains & Pumps 1 lot $12, $12, $2, $1, $0.00 $0.00 $12, Replace Well-x-Trol Irrigation Well 1 ea $5, $5, $1, $ $ $1, $4, Replace Pool Filters 1 lot $5, $5, $ $ $ $1, $3, Replace Pool Pumps 1 lot $6, $6, $ $ $ $1, $3, Replace Card Reader Access Control 2 ea $3, $7, $1, $ $ $1, $4, Surveillance Camera / Equipment Upgrade 2 ea $2, $5, $ $ $71.45 $ $2, Drinking Fountain Replacement 2 ea. $ $1, $ $ $10.62 $ $ HVAC Replacement 1 ea. $5, $5, $ $ $69.76 $ $3, Amenities Re-Surface Gunite Pools & Splash Park 11,120 sq ft $7.50 $83, $6, $13, $1, $19, $27, Re-seal Coping to Decking Joint (Seal-O-Deck) 575 lin ft $5.00 $2, $ $ $ $1, $1, Kool-Deck Concrete Decking Repairs (Periodic) 12,300 sq ft $0.50 $6, $1, $ $ $1, $4, Replace Splash Park Features 1 lot $25, $25, $4, $1, $ $6, $20, Replace Pool Furniture 1 lot $10, $10, $1, $1, $ $2, $5, Replace Polyethylene Shade Structures 1 lot $2, $2, $ $ $ $2, $2, Rust on frame Replace Playground Equipment 1 lot $55, $55, $3, $1, $ $2, $15, Replace Wood Pergula 360 sq. ft. $14.00 $5, $ $ $27.80 $ $1, Replace Wood Signs at Pool 9 ea $ $2, $ $ $0.00 $0.00 $2, Criterium Engineers Page 5 of 22 6/3/2014

24 Reserve Study Worksheet - Itemized Worksheet Percent Funded Full Capital Item Reserve Beginning Frequency Amount Remaining Reserve Funding Required Funding To Be Replaced Quantity Unit cost Requirement (*) Balance (yrs**) Per Year Life (yrs) Monthly Annual Balance Notes Wash & Stain Wood Equipment Fencing 80 lin ft $4.00 $ $ $ $21.45 $ $ Hail damage at new pool fence Replace Wood Equipment Fencing 80 lin ft $28.00 $2, $ $ $11.10 $ $ Other Reserve Study Updates 1 lot $1, $1, $ $ $20.83 $ $0.00 Contingency 1 lot $5, $5, $1, $5, $0.00 $0.00 $5, Total Over Term $1,270, * Costs are typically 10%± ** Reserve study is based on a 20 year projection of non-annual maintenance *** Includes ornamental iron fencing at pool area, along Cross Oak Ranch Blvd., and at perimeter Totals $808, $100, $66, $7, $92, $409, Criterium Engineers Page 6 of 22 6/3/2014

25 Reserve Study Worksheet - Itemized Graph Categories Totals Site $605,945 Building Exterior $51,000 Building Interior $25,900 Mechanical $104,500 Amenities $379,235 Other $104,000 Total $1,270,580 Reserve Study Worksheet - Itemized Graph Site Building Exterior Building Interior Site, $605,945 Building Exterior, $51,000 Building Interior, $25,900 Mechanical Amenities Other Other, $104,000 Mechanical, $104,500 Amenities, $379,235 Criterium Engineers Page 7 of 22 6/3/2014

26 Reserve Study Worksheet - Itemized Funding Monthly Annual Balance Reserve Reserve Full Reserve Beginning Requiring Funding Funding Funding Percent Categories Requirement Balance Funding Required Required Balance Funded Site $508,150 $64,080 $444,070 $3,442 $41,301 $262,202 Building Exterior $36,000 $3,780 $32,220 $188 $2,258 $15,467 Building Interior $16,600 $2,558 $14,042 $327 $3,927 $10,465 Mechanical $46,500 $8,375 $38,125 $699 $8,382 $34,267 Amenities $195,525 $20,123 $175,402 $3,055 $36,656 $82,337 Other $6,000 $1,222 $4,778 $21 $250 $5,000 Totals $808,775 $100,137 $708,638 $7,731 $92,775 $409, % Criterium Engineers Page 8 of 22 6/3/2014

27 Reserve Study Worksheet - Annual Expense By Year Year: Year Number: Site Wash & Stain B-O-B Cedar Perimeter Fencing , , ,600 Replace B-O-B Cedar Perimeter Fencing (50%) , Clean & Paint Ornamental Iron Fence (All Areas)*** , , Replace Ornamental Iron Fence (All Areas)*** Stone Pilaster Repairs (Includes Iron Accents) 34, , Wash & Stain Wood Ranch Fence (Liberty Blvd. & Lake) , , ,760 Replace Wood Ranch Fence (Liberty Blvd. & Lake) Stone Retaining Wall Repairs (Periodic) 38, , Irrigation Controller Replacement , Electrical Equipment Replacement , Entrance Monument Repairs 0 0 8, , Concrete Hike/Bike Trail Repairs (Periodic) , Replace Hike/Bike Trail Park Benches Replace Hike/Bike Trail Trash Bins , Replace Hike/Bike Trail Wood Signs 0 0 1, , Concrete Parking Lot Repairs , Concrete Parking Lot Replacement Clean, Prime, Paint Ornamental Light Posts 0 0 1, , Site Accent Light Replacement , ,400 0 Replace B-O-B Cedar Perimeter Fencing (50%) , Building Exterior Wash & Stain Cedar Arbor/Pergulas , , ,500 Replace Cedar Arbors Paint & Repair Siding & Trim 2, , , Replace Standing Seam Metal Amenity Center Replace Amenity Center , Replace Exterior Doors , Replace Exterior Lighting (Accent and Flood) , Replace Asphalt Shingle Roof , Paint & Repair Bus Stop Siding and Trim 3, , , Building Interior Replace Restroom Fixtures Replace Exercise Equipment 0 0 8, ,000 Replace Exercise Room , ,300 Replace Interior Lighting , Mechanical Replace Pond Fountains & Pumps 12, , Replace Well-x-Trol Irrigation Well 0 0 5, ,000 Replace Pool Filters , ,000 0 Replace Pool Pumps , , Replace Card Reader Access Control , ,000 Surveillance Camera / Equipment Upgrade , Drinking Fountain Replacement , HVAC Replacement , Amenities Re-Surface Gunite Pools & Splash Park , , Re-seal Coping to Decking Joint (Seal-O-Deck) 0 0 2, , , ,875 Kool-Deck Concrete Decking Repairs (Periodic) , ,150 0 Replace Splash Park Features , Criterium Engineers Page 9 of 22 6/3/2014

28 Reserve Study Worksheet - Annual Expense By Year Year: Year Number: Replace Pool Furniture , , Replace Polyethylene Shade Structures 0 2, , Replace Playground Equipment Replace Wood Pergula ,040 Replace Wood Signs at Pool 2, , Wash & Stain Wood Equipment Fencing Replace Wood Equipment Fencing Other Reserve Study Updates , , , Contingency 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 Total Costs 98,000 8,120 31,375 57, ,760 18,400 34,370 27,725 6,000 49, , ,070 73,705 19,550 63,075 Total Costs Adjusted For 3% Inflation 98,000 8,364 33,286 62, ,297 21,331 41,040 34,098 7,601 64, , , ,086 28,710 95,407 Criterium Engineers Page 10 of 22 6/3/2014

29 Reserve Study Worksheet - Annual Expense By Year Year: Year Number: Site Wash & Stain B-O-B Cedar Perimeter Fencing ,600 Replace B-O-B Cedar Perimeter Fencing (50%) Clean & Paint Ornamental Iron Fence (All Areas)*** ,905 0 Replace Ornamental Iron Fence (All Areas)*** Stone Pilaster Repairs (Includes Iron Accents) Wash & Stain Wood Ranch Fence (Liberty Blvd. & Lake) ,760 Replace Wood Ranch Fence (Liberty Blvd. & Lake) 34, Stone Retaining Wall Repairs (Periodic) Irrigation Controller Replacement 0 5, Electrical Equipment Replacement Entrance Monument Repairs Concrete Hike/Bike Trail Repairs (Periodic) , Replace Hike/Bike Trail Park Benches Replace Hike/Bike Trail Trash Bins Replace Hike/Bike Trail Wood Signs Concrete Parking Lot Repairs 0 3, Concrete Parking Lot Replacement Clean, Prime, Paint Ornamental Light Posts 0 1, Site Accent Light Replacement Replace B-O-B Cedar Perimeter Fencing (50%) Building Exterior Wash & Stain Cedar Arbor/Pergulas ,500 Replace Cedar Arbors 0 10, Paint & Repair Siding & Trim ,500 0 Replace Standing Seam Metal Amenity Center Replace Amenity Center Replace Exterior Doors Replace Exterior Lighting (Accent and Flood) Replace Asphalt Shingle Roof Paint & Repair Bus Stop Siding and Trim ,000 0 Building Interior Replace Restroom Fixtures 5, Replace Exercise Equipment Replace Exercise Room Replace Interior Lighting Mechanical Replace Pond Fountains & Pumps ,000 0 Replace Well-x-Trol Irrigation Well Replace Pool Filters Replace Pool Pumps ,000 Replace Card Reader Access Control Surveillance Camera / Equipment Upgrade 0 0 5, Drinking Fountain Replacement HVAC Replacement Amenities Re-Surface Gunite Pools & Splash Park 0 83, Re-seal Coping to Decking Joint (Seal-O-Deck) ,875 0 Kool-Deck Concrete Decking Repairs (Periodic) Replace Splash Park Features ,000 0 Criterium Engineers Page 11 of 22 6/3/2014

30 Reserve Study Worksheet - Annual Expense By Year Year: Year Number: Replace Pool Furniture , Replace Polyethylene Shade Structures 0 0 2, Replace Playground Equipment Replace Wood Pergula Replace Wood Signs at Pool Wash & Stain Wood Equipment Fencing Replace Wood Equipment Fencing 0 2, Other Reserve Study Updates 0 1, Contingency 5,000 5,000 5,000 5,000 5,000 Total Costs 45, ,930 45,525 60,280 39,860 Total Costs Adjusted For 3% Inflation 70, ,615 75, ,623 69,895 Criterium Engineers Page 12 of 22 6/3/2014

31 Reserve Study Worksheet - Current Funding Levels Beginning Year Reserve Fund Fee Special Investment Total Capital Ending Year Number Balance Revenue Assessments Earnings Revenue Expenditures Balance $100,137 $40,000 $0 $421 $40,421 $98,000 $42, $42,558 $40,000 $0 $742 $40,742 $8,364 $74, $74,937 $40,000 $0 $817 $40,816 $33,286 $82, $82,467 $40,000 $0 $600 $40,600 $62,449 $60, $60,618 $40,000 $0 $0 $40,000 $148,297 ($47,679) ($47,679) $40,000 $0 $0 $40,000 $21,331 ($29,010) ($29,010) $40,000 $0 $0 $40,000 $41,040 ($30,049) ($30,049) $40,000 $0 $0 $40,000 $34,098 ($24,148) ($24,148) $40,000 $0 $83 $40,082 $7,601 $8, $8,334 $40,000 $0 $0 $40,000 $64,795 ($16,461) ($16,461) $40,000 $0 $0 $40,000 $327,949 ($304,410) ($304,410) $40,000 $0 $0 $40,000 $145,441 ($409,852) ($409,852) $40,000 $0 $0 $40,000 $105,086 ($474,937) ($474,937) $40,000 $0 $0 $40,000 $28,710 ($463,647) ($463,647) $40,000 $0 $0 $40,000 $95,407 ($519,054) ($519,054) $40,000 $0 $0 $40,000 $70,109 ($549,162) ($549,162) $40,000 $0 $0 $40,000 $179,615 ($688,777) ($688,777) $40,000 $0 $0 $40,000 $75,246 ($724,023) ($724,023) $40,000 $0 $0 $40,000 $102,623 ($786,646) ($786,646) $40,000 $0 $0 $40,000 $69,895 ($816,541) Criterium Engineers Page 13 of 22 6/3/2014

32 Reserve Study Worksheet - Current Funding Levels Beginning Balance as of start of year beginning Jan 2014: $100,137 CONTRIBUTIONS FIRST YR REM YRS $39, $39, per year $37.95 $37.95 per unit per year $3, $3, per month $3.16 $3.16 per unit per month Threshold: $0.00 Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 42,558 74,937 82,467 60,618 (47,679) (29,010) (30,049) (24,148) 8,334 (16,461) (304,410) (409,852) (474,937) (463,647) (519,054) Capital Expenditures: 98,000 8,364 33,286 62, ,297 21,331 41,040 34,098 7,601 64, , , ,086 28,710 95,407 Special Assessment Total Revenue (all sources) 40,421 40,742 40,816 40,600 40,000 40,000 40,000 40,000 40,082 40,000 40,000 40,000 40,000 40,000 40,000 Target Funding Requirement Year: Year Number: End of Year Reserve Fund Balance (549,162) (688,777) (724,023) (786,646) (816,541) Capital Expenditures: 70, ,615 75, ,623 69,895 Special Assessment Total Revenue (all sources) 40,000 40,000 40,000 40,000 40,000 Target Funding Requirement Reserve Study Worksheet - Current Funding Levels 23,097 (38,336) (99,768) (161,200) (222,632) (284,065) (345,497) Dollars (406,929) (468,361) (529,794) (591,226) (652,658) (714,090) (775,523) (836,955) Funding Years Criterium Engineers Page 14 of 22 6/3/2014

33 Reserve Study Worksheet - Alternative 1, Level Funding with Steps Beginning Year Reserve Fund Fee Special Investment Total Capital Ending Year Number Balance Revenue Assessments Earnings Revenue Expenditures Balance $100,137 $57,970 $0 $601 $58,571 $98,000 $60, $60,708 $57,970 $0 $1,103 $59,073 $8,364 $111, $111,418 $57,970 $0 $1,361 $59,331 $33,286 $137, $137,463 $68,510 $0 $1,435 $69,945 $62,449 $144, $144,959 $68,510 $0 $652 $69,162 $148,297 $65, $65,823 $68,510 $0 $1,130 $69,640 $21,331 $114, $114,133 $79,050 $0 $1,521 $80,571 $41,040 $153, $153,665 $79,050 $0 $1,986 $81,036 $34,098 $200, $200,603 $79,050 $0 $2,721 $81,771 $7,601 $274, $274,772 $89,590 $0 $2,996 $92,586 $64,795 $302, $302,563 $89,590 $0 $642 $90,232 $327,949 $64, $64,846 $89,590 $0 $90 $89,680 $145,441 $9, $9,084 $100,130 $0 $41 $100,171 $105,086 $4, $4,170 $100,130 $0 $756 $100,886 $28,710 $76, $76,346 $100,130 $0 $811 $100,941 $95,407 $81, $81,880 $110,670 $0 $1,224 $111,894 $70,109 $123, $123,666 $110,670 $0 $547 $111,217 $179,615 $55, $55,268 $110,670 $0 $907 $111,577 $75,246 $91, $91,599 $121,210 $0 $1,102 $122,312 $102,623 $111, $111,289 $121,210 $0 $1,626 $122,836 $69,895 $164,230 Criterium Engineers Page 15 of 22 6/3/2014

34 Reserve Study Worksheet - Alternative 1, Level Funding with Steps Beginning Balance as of start of year beginning Jan 2014: $100,137 CONTRIBUTIONS SETTINGS (analyzed by unit/year) FIRST YR LAST YR Starting amount ($): $55.00 $57, $121, per year Increment by ($): $10.00 $55.00 $ per unit per year Every 3 year $4, $10, per month Frequency: 7 time $4.58 $9.58 per unit per month Threshold: $0.00 Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 60, , , ,959 65, , , , , ,563 64,846 9,084 4,170 76,346 81,880 Capital Expenditures: 98,000 8,364 33,286 62, ,297 21,331 41,040 34,098 7,601 64, , , ,086 28,710 95,407 Special Assessment Total Revenue (all sources) 58,571 59,073 59,331 69,945 69,162 69,640 80,571 81,036 81,771 92,586 90,232 89, , , ,941 Target Funding Requirement Year: Year Number: End of Year Reserve Fund Balance 123,666 55,268 91, , ,230 Capital Expenditures: 70, ,615 75, ,623 69,895 Special Assessment Total Revenue (all sources) 111, , , , ,836 Target Funding Requirement Reserve Study Worksheet - Alternative 1, Level Funding with Steps 310, , , , , , , ,299 Dollars 146, , ,086 85,682 65,278 44,873 24,469 4, Funding Years Criterium Engineers Page 16 of 22 6/3/2014

35 Reserve Study Worksheet - Alternative 2, Escalating Funding at 4% per Year Beginning Year Reserve Fund Fee Special Investment Total Capital Ending Year Number Balance Revenue Assessments Earnings Revenue Expenditures Balance $100,137 $57,970 $0 $601 $58,571 $98,000 $60, $60,708 $60,289 $0 $1,126 $61,415 $8,364 $113, $113,760 $62,700 $0 $1,432 $64,132 $33,286 $144, $144,606 $65,208 $0 $1,474 $66,682 $62,449 $148, $148,839 $67,817 $0 $684 $68,500 $148,297 $69, $69,042 $70,529 $0 $1,182 $71,712 $21,331 $119, $119,423 $73,351 $0 $1,517 $74,868 $41,040 $153, $153,251 $76,285 $0 $1,954 $78,239 $34,098 $197, $197,392 $79,336 $0 $2,691 $82,027 $7,601 $271, $271,818 $82,509 $0 $2,895 $85,405 $64,795 $292, $292,428 $85,810 $0 $503 $86,313 $327,949 $50, $50,792 $89,242 $0 $0 $89,242 $145,441 ($5,408) ($5,408) $92,812 $0 $0 $92,812 $105,086 ($17,682) ($17,682) $96,524 $0 $501 $97,026 $28,710 $50, $50,634 $100,385 $0 $556 $100,941 $95,407 $56, $56,169 $104,401 $0 $905 $105,305 $70,109 $91, $91,366 $108,577 $0 $203 $108,780 $179,615 $20, $20,531 $112,920 $0 $582 $113,502 $75,246 $58, $58,787 $117,437 $0 $736 $118,173 $102,623 $74, $74,337 $122,134 $0 $1,266 $123,400 $69,895 $127,842 Criterium Engineers Page 17 of 22 6/3/2014

36 Reserve Study Worksheet - Alternative 2, Escalating Funding at 4% per Year Beginning Balance as of start of year beginning Jan 2014: $100,137 CONTRIBUTIONS SETTINGS (analyzed by unit/year) FIRST YR LAST YR Starting amount ($): $55.00 $57, $122, per year Increment by (%): 4 $55.00 $ per unit per year Step (%): 0 $4, $10, per month Every 1 year $4.58 $9.66 per unit per month Frequency: 20 time Threshold: $0.00 Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 60, , , ,839 69, , , , , ,428 50,792 (5,408) (17,682) 50,634 56,169 Capital Expenditures: 98,000 8,364 33,286 62, ,297 21,331 41,040 34,098 7,601 64, , , ,086 28,710 95,407 Special Assessment Total Revenue (all sources) 58,571 61,415 64,132 66,682 68,500 71,712 74,868 78,239 82,027 85,405 86,313 89,242 92,812 97, ,941 Target Funding Requirement Year: Year Number: End of Year Reserve Fund Balance 91,366 20,531 58,787 74, ,842 Capital Expenditures: 70, ,615 75, ,623 69,895 Special Assessment Total Revenue (all sources) 105, , , , ,400 Target Funding Requirement Reserve Study Worksheet - Alternative 2, Escalating Funding at 4% per Year 299, , , , , , , ,403 Dollars 130, ,021 87,830 66,639 45,449 24,258 3, (18,124) Funding Years Criterium Engineers Page 18 of 22 6/3/2014

37 Reserve Study Worksheet - Alternative 3, Escalating Funding with Special Assessments Beginning Year Reserve Fund Fee Special Investment Total Capital Ending Year Number Balance Revenue Assessments Earnings Revenue Expenditures Balance $100,137 $39,999 $0 $421 $40,421 $98,000 $42, $42,558 $39,999 $0 $742 $40,741 $8,364 $74, $74,935 $39,999 $0 $816 $40,816 $33,286 $82, $82,465 $39,999 $0 $600 $40,599 $62,449 $60, $60,615 $39,999 $75,000 $273 $115,272 $148,297 $27, $27,591 $39,999 $0 $463 $40,462 $21,331 $46, $46,722 $39,999 $0 $457 $40,456 $41,040 $46, $46,139 $39,999 $0 $520 $40,520 $34,098 $52, $52,560 $39,999 $0 $850 $40,849 $7,601 $85, $85,808 $39,999 $0 $610 $40,609 $64,795 $61, $61,623 $39,999 $500,000 $2,737 $542,736 $327,949 $276, $276,410 $39,999 $0 $1,710 $41,709 $145,441 $172, $172,677 $39,999 $0 $1,076 $41,075 $105,086 $108, $108,667 $39,999 $0 $1,200 $41,199 $28,710 $121, $121,156 $39,999 $0 $657 $40,657 $95,407 $66, $66,406 $39,999 $0 $363 $40,362 $70,109 $36, $36,659 $39,999 $300,000 $1,970 $341,970 $179,615 $199, $199,014 $39,999 $0 $1,638 $41,637 $75,246 $165, $165,406 $39,999 $0 $1,028 $41,027 $102,623 $103, $103,810 $39,999 $0 $739 $40,738 $69,895 $74,654 Criterium Engineers Page 19 of 22 6/3/2014

38 Reserve Study Worksheet - Alternative 3, Escalating Funding with Special Assessments Beginning Balance as of start of year beginning Jan 2014: $100,137 CONTRIBUTIONS SETTINGS (analyzed by unit/year) FIRST YR LAST YR Starting amount ($): $37.95 $39, $39, per year Increment by (%): 0 $37.95 $37.95 per unit per year Step (%): 0 $3, $3, per month Every 3 year $3.16 $3.16 per unit per month Frequency: 3 time Threshold: $0.00 Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 42,558 74,935 82,465 60,615 27,591 46,722 46,139 52,560 85,808 61, , , , ,156 66,406 Capital Expenditures: 98,000 8,364 33,286 62, ,297 21,331 41,040 34,098 7,601 64, , , ,086 28,710 95,407 Special Assessment , , Total Revenue (all sources) 40,421 40,741 40,816 40, ,272 40,462 40,456 40,520 40,849 40, ,736 41,709 41,075 41,199 40,657 Target Funding Requirement Year: Year Number: End of Year Reserve Fund Balance 36, , , ,810 74,654 Capital Expenditures: 70, ,615 75, ,623 69,895 Special Assessment - 300, Total Revenue (all sources) 40, ,970 41,637 41,027 40,738 Target Funding Requirement Reserve Study Worksheet - Alternative 3, Escalating Funding with Special Assessments 283, , , , , , , ,658 Dollars 146, , ,374 95,279 78,185 61,090 43,996 26, Funding Years Criterium Engineers Page 20 of 22 6/3/2014

39 Summary of Reserve Ending Balances Year Yearly Year Number Expenditures Current Alt. 1 Alt. 2 Alt $98,000 $42,558 $60,708 $60,708 $42, $8,364 $74,937 $111,418 $113,760 $74, $33,286 $82,467 $137,463 $144,606 $82, $62,449 $60,618 $144,959 $148,839 $60, $148,297 ($47,679) $65,823 $69,042 $27, $21,331 ($29,010) $114,133 $119,423 $46, $41,040 ($30,049) $153,665 $153,251 $46, $34,098 ($24,148) $200,603 $197,392 $52, $7,601 $8,334 $274,772 $271,818 $85, $64,795 ($16,461) $302,563 $292,428 $61, $327,949 ($304,410) $64,846 $50,792 $276, $145,441 ($409,852) $9,084 ($5,408) $172, $105,086 ($474,937) $4,170 ($17,682) $108, $28,710 ($463,647) $76,346 $50,634 $121, $95,407 ($519,054) $81,880 $56,169 $66, $70,109 ($549,162) $123,666 $91,366 $36, $179,615 ($688,777) $55,268 $20,531 $199, $75,246 ($724,023) $91,599 $58,787 $165, $102,623 ($786,646) $111,289 $74,337 $103, $69,895 ($816,541) $164,230 $127,842 $74,654 Summary of Reserve Ending Balances $310,128 $233,656 $157,184 $80,711 $4,239 ($72,233) ($148,705) Dollars ($225,177) ($301,650) ($378,122) ($454,594) ($531,066) ($607,538) ($684,011) ($760,483) ($836,955) Funding Years Current Alt. 1 Alt. 2 Alt. 3 Criterium Engineers Page 21 of 22 6/3/2014

40 Summary of Reserve Percent Funded Year Year Number Current Alt. 1 Alt. 2 Alt % 14.82% 14.82% 10.39% % 29.44% 30.06% 19.80% % 31.45% 33.09% 18.87% % 30.69% 31.51% 12.83% % 13.66% 14.32% 5.72% % 27.37% 28.64% 11.21% % 33.03% 32.94% 9.92% % 40.31% 39.67% 10.56% % 51.21% 50.66% 15.99% % 50.65% 48.96% 10.32% % 10.55% 8.27% 44.99% % 2.06% -1.23% 39.25% % 1.04% -4.40% 27.04% % 19.44% 12.89% 30.85% % 18.61% 12.77% 15.10% % 26.02% 19.22% 7.71% % 11.14% 4.14% 40.12% % 17.07% 10.96% 30.83% % 19.61% 13.10% 18.29% % 29.19% 22.73% 13.27% Summary of Reserve Percent Funded Dollars % % % 40.00% 20.00% 0.00% % % % % % % % % % % Funding Years Current Alt. 1 Alt. 2 Alt. 3 Criterium Engineers Page 22 of 22 6/3/2014

41 APPENDIX B PHOTOGRAPHS Cross Oak Ranch Criterium-Dotson Engineers Capital Reserve Fund Study

42 Location: Photo Taken by: Date: Cross Oak Ranch Phillip Nieman, P.E. April 16, 2014 Crossroads, TX Description: Entrance Monument Photo Number 1 Description: Entrance Monument Photo Number 2

43 Location: Photo Taken by: Date: Cross Oak Ranch Phillip Nieman, P.E. April 16, 2014 Crossroads, TX Description: Wood Perimeter Fencing with Pilasters Photo Number 3 Description: Wood Ranch Fencing Photo Number 4

44 Location: Photo Taken by: Date: Cross Oak Ranch Phillip Nieman, P.E. April 16, 2014 Crossroads, TX Description: Wrought Iron Fencing Photo Number 5 Description: Retaining Wall Photo Number 6

45 Location: Photo Taken by: Date: Cross Oak Ranch Phillip Nieman, P.E. April 16, 2014 Crossroads, TX Description: Fountain Photo Number 7 Description: Hike and Bike Trail Photo Number 8

46 Location: Photo Taken by: Date: Cross Oak Ranch Phillip Nieman, P.E. April 16, 2014 Crossroads, TX Description: Bus Stop Photo Number 9 Description: Irrigation Controller and Electric Panel Photo Number 10

47 Location: Photo Taken by: Date: Cross Oak Ranch Phillip Nieman, P.E. April 16, 2014 Crossroads, TX Description: Parking Area Photo Number 11 Description: Front Elevation Photo Number 12

48 Location: Photo Taken by: Date: Cross Oak Ranch Phillip Nieman, P.E. April 16, 2014 Crossroads, TX Description: Rear Elevation Photo Number 13 Description: Front Elevation Photo Number 14

49 Location: Photo Taken by: Date: Cross Oak Ranch Phillip Nieman, P.E. April 16, 2014 Crossroads, TX Description: Pool Photo Number 15 Description: Pool Photo Number 16

50 Location: Photo Taken by: Date: Cross Oak Ranch Phillip Nieman, P.E. April 16, 2014 Crossroads, TX Description: Pool Equipment Photo Number 17 Description: Water Slide Photo Number 18

51 Location: Photo Taken by: Date: Cross Oak Ranch Phillip Nieman, P.E. April 16, 2014 Crossroads, TX Description: Splash Park Photo Number 19 Description: Shade Structure Photo Number 20

52 Location: Photo Taken by: Date: Cross Oak Ranch Phillip Nieman, P.E. April 16, 2014 Crossroads, TX Description: Arbors Photo Number 21 Description: Playground Equipment Photo Number 22

53 Location: Photo Taken by: Date: Cross Oak Ranch Phillip Nieman, P.E. April 16, 2014 Crossroads, TX Description: Boat Dock Photo Number 23

THE RETREAT AT RIVER PARK PLACE

THE RETREAT AT RIVER PARK PLACE 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY THE RETREAT AT RIVER PARK PLACE FORT WORTH, TEXAS Prepared for:

More information

WYLIE, TX. Date of Investigation: February 6, 2018 Investigator: Phillip Nieman, P.E. Reviewed By: David H. Dotson, P.E., R.S.

WYLIE, TX. Date of Investigation: February 6, 2018 Investigator: Phillip Nieman, P.E. Reviewed By: David H. Dotson, P.E., R.S. 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY RIVERCHASE AT WYLIE WYLIE, TX Prepared for: RIVERCHASE AT WYLIE HOMEOWNERS ASSOCIATION

More information

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST 2016 CONTENTS 1.0 INTRODUCTION...

More information

LOWE S FARM PROPERTY EVALUATION AND RESERVE FUND STUDY MANSFIELD, TEXAS

LOWE S FARM PROPERTY EVALUATION AND RESERVE FUND STUDY MANSFIELD, TEXAS 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY LOWE S FARM MANSFIELD, TEXAS Prepared for: LOWE S FARM HOMEOWNERS

More information

OAK CREEK CONDOMINIUMS

OAK CREEK CONDOMINIUMS 1515 Heritage Dr., Suite 204 McKinney, Texas75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY OAK CREEK CONDOMINIUMS 1700 BAIRD FARM CIRCLE ARLINGTON,

More information

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO RESERVE FUND STUDY NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com NOVEMBER 2013 1.0 INTRODUCTION...1

More information

CONTENTS. Sparger Springs Townhomes Durham, NC

CONTENTS. Sparger Springs Townhomes Durham, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by:

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by: DRAFT FOR BOARD REVIEW FULL RESERVE STUDY SPARGER SPRINGS TOWNHOMES DURHAM, NC Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION DURHAM, NC & ALLENTON MANAGEMENT Prepared by: CRITERIUM GILES ENGINEERS

More information

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST, 2009 1.0 INTRODUCTION... 1

More information

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I QUALCHAN HILLS HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 6 AUGUST 2012 CONTENTS 1.0 INTRODUCTION...

More information

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by:

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by: RESERVE FUND STUDY THE VILLAGE AT HIGHLANDS CROZET, VA 22932 Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA C/O ASSOCIA COMMUNITY GROUP 1828 PAVILION CIRCLE CHARLOTTESVILLE, VA 22911

More information

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111 RESERVE STUDY THE VILLAGE AT HIGHLANDS CHARLOTTESVILLE, VA Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION C/O ASSOCIA COMMUNITY GROUP 1413 SACHEM PLACE, SUITE 2 CHARLOTTESVILLE, VA 22901 Prepared

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for:

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: MEADOWWOOD GLEN HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

Meadowlake Village 7410 Breda Dr. Baytown, TX Prepared for:

Meadowlake Village 7410 Breda Dr. Baytown, TX Prepared for: RESERVE FUND STUDY Meadowlake Village 7410 Breda Dr. Prepared for: Meadowlake Village Homeowners Association c/o Regina Real Real Property Management PO Box 1583 Mont Belvieu, TX 77580 Prepared by: Criterium

More information

CONTENTS. Greens at Lochmere Cary, NC

CONTENTS. Greens at Lochmere Cary, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

CONTENTS. Twisted Creek Townhomes Holly Springs, NC

CONTENTS. Twisted Creek Townhomes Holly Springs, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

DRAFT For Review SETTLERS POINTE LEXINGTON, SC. Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION. Prepared by:

DRAFT For Review SETTLERS POINTE LEXINGTON, SC. Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION. Prepared by: DRAFT For Review FULL RESERVE STUDY SETTLERS POINTE LEXINGTON, SC Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION LEXINGTON, SC Prepared by: CRITERIUM GILES ENGINEERS 7334 CHAPEL HILL ROAD, SUITE

More information

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC.

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC. DRAFT FULL RESERVE STUDY WILLOUGHBY PARK GREENVILLE, NC Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION GREENVILLE, NC & HOA MANAGEMENT COMPANY, LLC Prepared by: CRITERIUM GILES ENGINEERS, INC. 1150

More information

ASHLAND COCKEYSVILLE, MD Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION. Prepared by:

ASHLAND COCKEYSVILLE, MD Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION. Prepared by: RESERVE FUND STUDY ASHLAND COCKEYSVILLE, MD 21030 Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION Prepared by: CRITERIUM-HARBOR ENGINEERS PO BOX 408 STEVENSON, MARYLAND 21153

More information

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by:

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by: FOR BOARD REVIEW RESERVE FUND STUDY FENWAY PARK CARRBORO, NC Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. CARRBORO, NC Prepared by: CRITERIUM GILES ENGINEERS 1150 SE MAYNARD ROAD, SUITE 220 CARY,

More information

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 4 3.1 PURPOSE... 4 3.2 SCOPE... 4 3.3 SOURCES OF INFORMATION... 5 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 7 6.0 RESERVE

More information

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

DRAFT FOR BOARD REVIEW

DRAFT FOR BOARD REVIEW DRAFT FOR BOARD REVIEW FULL RESERVE FUND STUDY OAK HALL COMMUNITY ASSOCIATION HOLLY SPRINGS, NC Prepared for: OAK HALL COMMUNITY ASSOCIATION HOLLY SPRINGS, NC & PPM, INC. Prepared by: CRITERIUM GILES ENGINEERS

More information

CONTENTS. Riverwatch Gloucester, VA

CONTENTS. Riverwatch Gloucester, VA CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

JULIAN POND KERNERSVILLE, NC. Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION & CAS, INC. Prepared by:

JULIAN POND KERNERSVILLE, NC. Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION & CAS, INC. Prepared by: FULL RESERVE STUDY JULIAN POND KERNERSVILLE, NC Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION KERNERSVILLE, NC & CAS, INC. Prepared by: CRITERIUM GILES ENGINEERS 8819 UNIVERSITY EAST DRIVE, SUITE 200

More information

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 4 3.1 PURPOSE... 4 3.2 SCOPE... 4 3.3 SOURCES OF INFORMATION... 5 4.0 DESCRIPTION... 7 5.0 OBSERVATIONS... 7 6.0 RESERVE

More information

SAMPLE. Prepared for: SAMPLE HOMEOWNERS ASSOCIATION. Prepared by:

SAMPLE. Prepared for: SAMPLE HOMEOWNERS ASSOCIATION. Prepared by: SAMPLE FULL RESERVE STUDY Prepared for: SAMPLE HOMEOWNERS ASSOCIATION Prepared by: CRITERIUM GILES ENGINEERS 7334 CHAPEL HILL ROAD, SUITE 200 RALEIGH, NC 27607 (919) 465-3801 NC LIC. NO. C-2871 CONTENTS

More information

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado Reserve Study Project No. 09069 Prepared for 1771 Norwood Lane Fort Collins, Colorado Prepared by Bornengineering 1130 West 124 th Avenue, Suite 100 Westminster, Colorado 80234 January 28, 2010 1130 WEST

More information

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions 1 Organization: Highlands Condominium Association 2 Address: Spokane, WA 3 Number of Units 46

More information

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for: RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: EAGLE RIDGE HOMEOWNER S ASSOCIATION 935 W. BASALT RIDGE DR. SPOKANE, WA 99224 Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: EAGLE RIDGE HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: WANDERMERE ESTATES HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM-PFAFF ENGINEERS 12128 N. DIVISION ST. #200 SPOKANE, WA 99218 (509)

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY CAPITAL RESERVE STUDY FOR THE HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Number: 12-1066 W:\2012\12-1066\CORR\12-1066v1.doc Date: March 29, 2013 Table of Contents Section Page Executive Summary...

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

What are Capital Reserves?

What are Capital Reserves? Capital Reserves What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs Stormwater pond repair, dredging and drainage improvements Fence repair, retaining

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019.

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019. RESERVE STUDY UPDATE for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925) 831-1803

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Seavue Condominiums 130-5 th Avenue South, Edmonds, WA 98020 For: Seavue Homeowners Association c/o Jay Grant Board President (202) 351-9399 Prepared By: Jeff Samdal, PE, RS,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Jason Kozleski Board President 10790-221 st Lane NE Redmond,

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

Agenda Item # 5b Page 1 of 43

Agenda Item # 5b Page 1 of 43 Page 1 of 43 Page 2 of 43 Page 3 of 43 Page 4 of 43 Page 5 of 43 Page 6 of 43 Page 7 of 43 Page 8 of 43 Page 9 of 43 Page 10 of 43 Page 11 of 43 Page 12 of 43 Page 13 of 43 Page 14 of 43 Page 15 of 43

More information

Anson County Early College High

Anson County Early College High NC School District/040 Anson County/High School Anson County Early College High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

RESERVE STUDY Component Analysis and Reserve Fund Plan Annual Review Study 2016/17 For Middlefield Meadows HOA Mountain View, CA Prepared By RESERVE ANALYSIS CONSULTING, LLC 1750 Bridgeway, Suite B106

More information

Urban Heights Condominium

Urban Heights Condominium Condominium Capital 2011 2010, AssociationAnalysis, LLC Condominium Prepared For: Table of Contents Condominium Association, Inc. 1642 Maxwell Road Atlanta, GA 30012 October 19, 2010 INTRODUCTION INTRODUCTION

More information

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844)

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844) GLOBAL Solution Partners, LLC info@globalreservestudies.com - Toll free phone and fax: (844) 477-7883 - www.globalsolutionpartners.com Funding Reserve Analysis for The Bluffs at Ashley River August 2,

More information

RESERVE STUDY UPDATE SUMMARY

RESERVE STUDY UPDATE SUMMARY RESERVE STUDY UPDATE SUMMARY for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925)

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Soda Creek Condominiums Dillon, Colorado Version 2 Monday, August 19, 2013 6860 S. Yosemite Court, Suite 2000 Centennial, CO 80112 Phone (303) 953-2078 Facsimile (303) 953-2157

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cambridge Court 9512-1 st Avenue Northeast, Seattle, WA 98115 For: Cambridge Court Homeowners Association c/o Tim Kammer, Property Manager Condo Managements, Inc. 1661 Harbor

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

Educational & Performing Arts Center: Downriver Campus

Educational & Performing Arts Center: Downriver Campus Educational & Performing Arts Center: Total Estimated Project Construction Cost: $ 18.04 million Groundbreaking: September 2006 Percentage Completed: 100 percent Anticipated Completion Date: Completed

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE 0807 3502 SOUTH FIRST STREET CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.771 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 347,400 LABORATORY BUILDING GROSS SQUARE FEET 16,986

More information

RESERVE STUDY ANNUAL REPORT

RESERVE STUDY ANNUAL REPORT RESERVE STUDY ANNUAL REPORT PINELOCH SUN BEACH CLUB LEVEL III RESERVE STUDY UPDATE WITHOUT SITE VISIT Ronald, WA 98940 Report #50510500R FINANCIAL YEAR 01.2016 12.2016 701 Fifth Ave, Suite 4200, Seattle

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cascara at Redmond Ridge NE 112 th Place & Eastridge Drive NE, Redmond, WA 98052 For: Cascara at Redmond Ridge Homeowners Association c/o Luiza Limona Morris Management 325-118

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112 th Ave NE

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

.USI.COMMERCIAL. (888) Funding Reserve Analysis. for. The Retreat at Gleannloch Farms Homeowners Association Spring, TX

.USI.COMMERCIAL. (888) Funding Reserve Analysis. for. The Retreat at Gleannloch Farms Homeowners Association Spring, TX .USI.COMMERCIAL (888)225-3755 www.usicommercial.com Funding Reserve Analysis for The Retreat at Gleannloch Farms Homeowners Association Spring, TX October 14, 2014 Page 1 of 31 Pages Funding Reserve Analysis

More information

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844)

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844) GLOBAL Solution Partners, LLC info@globalreservestudies.com - Toll free phone and fax: (844) 477-7883 - www.globalsolutionpartners.com Funding Reserve Analysis for Oak Crest Farms November 2, 2016 Page

More information

Reserve Fund Study prepared for The Greens at Pelican Point Homeowners Association February 2013 prepared by

Reserve Fund Study prepared for The Greens at Pelican Point Homeowners Association February 2013 prepared by Reserve Fund Study prepared for The Greens at Pelican Point Homeowners Association February 2013 prepared by Craig Naden and John Carlson Table of Contents TABLE OF CONTENTS Page No. 1.0 EXECUTIVE SUMMARY...

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community

More information

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08 Central Pointe HOA Level I Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10870 Property Type...... Mid-Rise Number of Units............ 83 Fiscal Year End....... December 31

More information

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Calusa Point Association, Inc. Miami, Florida File #

Calusa Point Association, Inc. Miami, Florida File # A FULL RESERVE STUDY FOR Miami, Florida File # 22920-06289 FOR PERIOD: January 1, 2014 December 31, 2014 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM LINDSEY 3300 W. LAKE MARY BLVD. SUITE 350 LAKE

More information

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY:

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY: 2015 Reserve Study Report LOCATED AT: 101 Oasis Drive Pompano Beach, FL 33069 FOR: Oasis at Palm Aire Association, Inc. 101 Oasis Dr., # Office Pompano Beach, FL 33069 AS OF: January 1st, 2015 - December

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Heritage Park 3208-52 nd Place NE, Tacoma, WA 98422 For: Heritage Park Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions 5500 Olympic Drive,

More information

NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017

NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017 NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus

More information

Davie County Early College High

Davie County Early College High NC School District/300 Davie County/High School Davie County Early College High Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112

More information

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Building Events 2004 2005 2006 2007 2008 Total Code Repair Add ventilation to storage room $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

More information

Pleasantdale Elementary

Pleasantdale Elementary DeKalb County School District/Elementary Schools Pleasantdale Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School

More information

Pemberley at Robinsons Grove

Pemberley at Robinsons Grove Pemberley at Robinsons Grove Level I Reserve Study Report Period 1/01/06 12/31/06 Client Reference Number.... 10429 Property Type...... Apartment Style Number of Units............. 160 Fiscal Year End.......

More information

Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149

Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149 Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149 820 Gartshore Street Fergus, Ontario Report Prepared for the Board of Directors

More information

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014 .USI.COMMERCIAL (888)225-3755 www.usicommercial.com Funding Reserve Analysis for The Summerlyn Association of Owners Inc. Lewes, Delaware September 3, 2014 Page 1 of 25 Pages Funding Reserve Analysis for

More information

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION WOODWIND ASSOCIATION REPLACEMENT RESERVE REPORT FY 2010 Community Management by: N & H Enterprises PO Box 5539 Greenville, SC 29607 864-467-1600

More information

Reserve Fund Study My Condominium Plan

Reserve Fund Study My Condominium Plan Reserve Fund Study My Condominium Plan 12 3456 Number of Units 36 Number of Buildings 1 Building Construction 21 Contact Ima Happy Position(s) President Contact Phone 43.555.4321 Report Date August 8,

More information

Paradise Island Condominium Association Final Report of the Reserve Study Review Committee

Paradise Island Condominium Association Final Report of the Reserve Study Review Committee Paradise Island Condominium Association Final Report of the Reserve Study Review Committee March 11, 2014 Chairperson Mary Linak Members Jeff Duppler Chuck Lanius Bill Murphy Paul Pudlas Advisor Mike Ashworth,

More information

Laurel Hill Elementary

Laurel Hill Elementary NC School District/830 Scotland County/Elementary School Laurel Hill Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

R E S E R V E S T U D Y

R E S E R V E S T U D Y SAGUARO CANYON SUBDIVISION HOMEOWNERS ASSOCIATION R E S E R V E S T U D Y Full Study Published - May 27, 2010 B R O W N I N G R E S E R V E G R O U P ~ Emmett, ID 83617 ~ Office (208) 365-0977 Fax (208)

More information

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association 21289 E. Lords Way Queen Creek, AZ 85142 support@azreservestudy.com Tel: (480) 840-7130 Fax: (888) 842-9319 October 27, 2012 Sample Association Regarding: 2013 - Level I Capital Replacement Reserve Study

More information

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number:

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number: CAPITAL RESERVE STUDY DRAFT FOR THE Management Company: Sound Real Estate Services, Contact Name: Josh Parsons Date: August 22, 2016 Table of Contents Section Name Section # Executive Summary... 1 Reserve

More information

RESERVE FUND STUDY. Hill & Associates Ltd. Member APEGNB July 2014

RESERVE FUND STUDY. Hill & Associates Ltd. Member APEGNB July 2014 2014 RESERVE FUND STUDY Hill & Associates Ltd. Member APEGNB July 2014 Reserve Fund Study Prepared for Bobak Place Townhome Condominiums Prepared by Hill & Associates Ltd. Consulting Professional Engineers

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Th

Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Th Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Threshold (Min Balance): $ 10,400,000 Indexed for projected

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Sammamish Landing Condominiums 4214 West Lake Sammamish Parkway NE, Redmond, WA 98052 For: Sammamish Landing Homeowners Association c/o Scott McCue, Property Manager McCue &

More information

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

Pinebrook Elementary

Pinebrook Elementary NC School District/300 Davie County/Elementary School Pinebrook Elementary Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus

More information

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of:

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of: Pebble Shores Drive Naples, FL 34410 A Service of: 5036 Dr. Phillips Blvd, Suite 207, Orlando FL 32819 www.lcamresources.com October 31, 2018 Pebble Shores Condominium Pebble Shores Drive Naples, FL 34410

More information

Quail Ridge THCA W. 17 th Ave Lakewood, CO 80224

Quail Ridge THCA W. 17 th Ave Lakewood, CO 80224 Quail Ridge THCA 11131-11167 W. 17 th Ave Lakewood, CO 80224 Level 1, Limited Reserve Analysis Report Period 5/01/16-4/30/17 Client Reference Number - 8173 Property Type Townhomes Number of Units 112 Fiscal

More information

Scope Criterium Engineers was hired to update a reserve study for the Reston Association. The specific tasks included: Review the previous study perfo

Scope Criterium Engineers was hired to update a reserve study for the Reston Association. The specific tasks included: Review the previous study perfo Scope Criterium Engineers was hired to update a reserve study for the Reston Association. The specific tasks included: Review the previous study performed by others Consult with Reston Association management

More information

Lakewood Ranch CDD 6

Lakewood Ranch CDD 6 Funding Reserve Analysis for Lakewood Ranch CDD 6 May 30, 2017 Florida Reserve Study and Appraisal, Inc. 12407 N. Florida Avenue Tampa, FL 33612 Phone: 813.932.1588 Fax: 813.388.4189 www.reservestudyfl.com

More information

Ronald E. McNair Discovery Learning Academy

Ronald E. McNair Discovery Learning Academy DeKalb County School District/Elementary Schools Ronald E. McNair Discovery Learning Academy Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive

More information

RESERVE STUDY UPDATE SUMMARY. for. Vista Tassajara HOMEOWNERS ASSOCIATION

RESERVE STUDY UPDATE SUMMARY. for. Vista Tassajara HOMEOWNERS ASSOCIATION RESERVE STUDY UPDATE SUMMARY for Vista Tassajara HOMEOWNERS ASSOCIATION Date Prepared: 10/27/2017 for fiscal year 2018 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA

More information