1 Review f Urbandale Rapid Transit Prpsal Summary Reprt City f Ottawa Review f Urbandale Rapid Transit Prpsal SUMMARY REPORT Transprtatin Divisin File: RPT-LRTSummary_071101C.dc Nvember 1, 2007

2 Review f Urbandale Rapid Transit Prpsal Summary Reprt Table f Cntents 1. Assignment Cnclusin Prject Backgrund Urbandale Prpsal Recmmendatins Technical Cmparisn Schedule Review Financial Analysis Primary Assumptins... 7 (Separate Dcuments) ANNEX A Exhibits 1-7 & Schedule ANNEX B Urbandale LRT System Prpsal Materials ANNEX C Review f Urbandale Rapid Transit Prpsal Detailed Reprt Transprtatin Divisin File: RPT-LRTSummary_071101C.dc Page: i Nvember 1, 2007

3 Review f Urbandale Rapid Transit Prpsal Summary Reprt 1. Assignment The City f Ottawa retained the MMM Grup t carry ut a technical review f the prpsal An Affrdable Slutin fr Rapid Transit in Ottawa dated August 2007 ( Urbandale prpsal ), t cmpare it with the frmer N-S LRT prject and t review the feasibility f the implementatin f Phase 1 f the Urbandale prpsal, tgether with any suggested imprvements. This is ne f a number f reprts that will supprt the staff respnse t the City Cuncil mtin requesting that staff review the prpsal frm Urbandale and reprt back t a jint meeting f Transprtatin and Transit Cmmittees n: Full Size Versin in Annex a. The apprpriateness f the crridrs; b. Recmmendatins n mdificatins f the crridrs including expansin t Kanata and acrss the Strandherd Bridge t Barrhaven Twn Centre (TC); and c. A timetable t undertake any additinal r mdificatin studies t implement such a netwrk. 2. Cnclusin Based n the analysis in this reprt, it is cncluded that the basic technical cncept within the Urbandale prpsal has sme merit, but detailed studies are required in rder t verify and quantify the engineering elements f the Urbandale prpsal and the preliminary recmmendatins f this reprt. The cnclusins with respect t the assignment are: a. Apprpriateness f Crridrs: Dwntwn Cre Urbandale prpses a tunnel whereas the frmer N-S LRT prject was t have the LRT running n the surface alng Albert and Slater Streets (in a shared reserved transit lane with buses). A tunnel has ptential advantages with respect t imprved reliability f LRT peratin, reduced traffic impact and reduced cnstructin/utility relcatin impacts n existing dwntwn streets. An Envirnmental Assessment is needed t determine the viability f a tunnel and t identify the preferred tunnel alignment, lcatin f prtals and statin lcatins. Acrss LeBretn Flats, the Urbandale prpsal calls fr the LRT t be in a trench, with a majr hub statin at Bayview Statin, lcated at the extreme west end f LeBretn Flats. N prvisin is made fr any ther LRT statin in LeBretn Flats. A statin at LeBretn Flats shuld be maintained t supprt the ntin f transit-riented develpment as envisined by the NCC and the City fr this area. Bayview Statin t the intersectin with Earl Armstrng Rad suthwest f the Maintenance Centre (MC) - The Urbandale Phase 1A alignment is the same as the frmer N-S LRT alignment. Intersectin with Earl Armstrng Rad suthwest f the Maintenance Centre (MC) t River Rad Statin (Riverside Suth) - Urbandale s Phase 1A crridr wuld be lcated alng the centre median f Earl Armstrng Rad. The alignment set ut in the frmer N-S LRT prject tk a rute suth f Earl Armstrng Rad thrugh the planned Twn Centre and higher density sectins f the Riverside Suth cmmunity, where land uses are planned t take advantage f and supprt the LRT. The Urbandale alignment wuld nt be integrated with nr supprt the cmmunity develpment plan, and therefre wuld nt service the needs f the cmmunity as addressed in the Riverside Suth Cmmunity Design Plan. River Rad Statin t Barrhaven Twn Centre The Urbandale Phase 2 alignment is the same as the frmer N-S alignment. b. Mdificatins f Crridrs: The extensin t Barrhaven Twn Centre is identical in bth the Urbandale prpsal and the frmer N-S LRT prject, except that the Urbandale prpsal wuld delay implementatin until a later Phase. The frmer N-S LRT prject included the extensin t Barrhaven TC as part f the initial implementatin. Expansin t Kanata and t Cumberland was nt part f the scpe f the MMM review (it is discussed in a separate reprt prepared by anther cnsulting firm fr the City) Transprtatin Divisin File: RPT-LRTSummary_071101C.dc Page: 1 f 7 Nvember 1, 2007

4 Review f Urbandale Rapid Transit Prpsal Summary Reprt c. Timetable fr studies: Further studies listed belw are required in rder t prepare the business case fr a revised nrth-suth LRT line as a first phase f a cmprehensive citywide LRT system. Mre details are described later within the attachments t this reprt. Undertake simulatin studies f the alternatives presented t ensure that the assumptins are valid; Undertake ridership studies based n the revised set f alternatives; Undertake a detailed cst estimate and value engineering exercise fr the identified alternatives; Undertake analysis t verify that there is sufficient interm capacity n the dwntwn street netwrk t accmmdate bus service during the interim perid f peratin when Bayview is the nrthern terminus pint f the LRT system where LRT riders wuld transfer t/frm buses t g dwntwn. Prepare and cmpare the business case fr each f the alternatives; Crdinate the review exercise with the nging update f the TMP and the Official Plan; Determine the financial and schedule feasibility f a revised prject; and Undertake the Envirnmental Assessment Study fr the Dwntwn Tunnel and affected areas. At a minimum apprximately 6 mnths wuld be required t carry ut mst f these studies, (with the exceptin f the Tunnel EA study which wuld take lnger due t its cmplexity). 3. Backgrund Light Rail Transit (LRT) is an integral part f the City f Ottawa s Transprtatin Master Plan (TMP). Within the Plan, LRT service t dwntwn is fundamental and was prjected t be implemented as part f the first stage f the LRT netwrk. Prviding high quality transit service t the develping suth urban cmmunities was als identified by Cuncil as ne f the first pririties fr implementatin. Subsequent netwrk expansin stages were planned t service the East and West prtins f the City. Many slutins t access the dwntwn cre have been investigated, including tunnels. In the 1980 s, the frmer Reginal Municipality f Ottawa-Carletn cnsidered a bus tunnel acrss the dwntwn cre as part f the then new Transitway facility. At the time, the cst f the bus tunnel was seen t be prhibitive and the prject did nt prceed. During the Envirnmental Assessment fr the frmer N-S LRT prject, a dwntwn tunnel was als investigated. The surface ptin was carried frward, alng with the recmmendatin that prvisin fr a transit tunnel be prtected fr future develpment, if and when apprpriate ridership levels are reached and funds are available. The frmer N-S LRT prject was released t a RFQ issued in April 2005, fllwed by a RFP tender prcess issued in August 2005, fr implementatin thrugh a design, build and maintain (15 year) cntract. This prcess cncluded with Cuncil apprving a cntract award t a Special Purpse Cnsrtium (Ottawa Light Rail Crpratin (OLC)) in July Due t the nn-fulfillment f certain cnditins, the Prject Agreement was terminated in accrdance with its terms in December On August 15, 2007 the City received an unslicited prpsal frm the Urbandale Crpratin fr a recnfigured slutin t LRT fr the City f Ottawa. The intent f the prpsal was t re-initiate an LRT-based rapid transit system due t Urbandale s cmmitment t the transit riented design f Riverside Suth and a cncern fr imprvements t transit in bth the East and in the West. Transprtatin Divisin File: RPT-LRTSummary_071101C.dc Page: 2 f 7 Nvember 1, 2007

5 Review f Urbandale Rapid Transit Prpsal Summary Reprt 4. Urbandale Prpsal The Urbandale prpsal shwn t the right includes the fllwing key elements, which are illustrated in mre detail in Annex A, Exhibits 1-7 appended t this Summary Reprt: Urbandale prpsal Full Size Versin in Annex Phase 1A Cnnect River Rad and Bayview statins (Ex.1); Frm River Rad t east f Msquit Creek, mve the LRT alignment frm within the Twn Centre f the Riverside Suth cmmunity t fllw Earl Armstrng Rad (Ex.2 and 3); Reduce the size f the Maintenance Centre (MC) (Ex.2); Delete Greenbr Statin (Ex.4); Dw s Lake Tunnel t remain as a single track with signal-cntrlled tw-way peratin (Ex.5); and Bayview Statin t be a system hub (Ex.6). Phase 1B Extend acrss LeBretn Flats withut a LeBretn Statin (Ex.7); The LRT t run in a tunnel acrss the dwntwn cre area. The tunnel t extend t suth f the University f Ottawa (Ex.7); Prvide a transfer statin at Hurdman (Ex.7); and Terminate at the VIA Train statin (Ex.7); Phase 2 Extend west t Barrhaven TC when passenger demand increases (Ex.2); and, Extend t the East and t the West. 5. Preliminary Recmmendatins If the decisin is made t cnsider activating an LRT prject, then it is recmmended that studies listed in Clause 2C f the Cnclusin abve, be cmpleted t validate the assumptins made in this reprt; with the bjective f recmmending a phased slutin fr the LRT that allws a first phase t be peratinal as early as pssible, while ther phases such as thse serving the dwntwn and extensins t the East and West cntinue thrugh the planning prcess fr implementatin as quickly as feasible. In rder t assist with budget allcatins the freging fllw-up studies culd present ptins fr the fllwing items based n c-rdinatin with the TMP and an assessment f value fr mney: Determine the suthern terminus pint f the first phase f implementatin. These wuld include Bwesville, River Rad r Barrhaven Twn Centre; Phasing f the link t the Airprt; Secnd tunnel t prvide tw tracks and tw-way peratin at Dw s Lake; and Size f the Maintenance Centre and whether it shuld be included in the riginal capital cst r financed ver the term f the maintenance agreement. Transprtatin Divisin File: RPT-LRTSummary_071101C.dc Page: 3 f 7 Nvember 1, 2007

6 Review f Urbandale Rapid Transit Prpsal Summary Reprt 6. Technical Cmparisn The Alternative set ut in the table belw is a suggested mdificatin based n the frmer N-S LRT prject and the Urbandale prpsal. It is prpsed t be the subject f the further studies recmmended herein. Fr further infrmatin n each ne f these items refer t the Detailed Reprt in Annex C. *** All recmmendatins are subject t review and verificatin by studies and further detailed analysis. Factr Nrth-Suth LRT Prject Urbandale Prpsal Alternative*** East LRT Extensin Nt in scpe f prject Phase 2 Nt in scpe f review*** West LRT Extensin Nt in scpe f prject Phase 2 Nt in scpe f review*** Barrhaven Twn Centre At initial build Phase 2 Timing t be (BTC), LRT Extensin Fleet Size Opening day train frequency and shrt turn LRT n Strandherd- Armstrng Bridge Riverside Suth (River Rad t east f Msquit Creek) Maintenance Centre (MC) Airprt Access Nrth-Suth Crridr 22 Trains fr Barrhaven TC t Ottawa U service Shrt turn at Leitrim statin Nrth f Leitrim 5 minutes (peak) Suth f Leitrim 10 minutes (peak) At initial build Future grade separatin f LRT prtected at River Rad and Prince f Wales Drive Alignment thrugh twn centre (Main Street) suth f Earl Armstrng Rad Initial build larger than near-term expansin requirements Future expansin prtected fr Scheduled bus service t airprt frm nearest statin Prtect fr rail link t airprt fr future Twin track between MC and U f Ottawa Single track with passing sectins between MC and BTC 18 Trains fr River Rad t Bayview service 23 Trains fr River Rad t VIA statin service N shrt turn River Rad t Bayview 5 minutes (peak) Deferred fr LRT until Phase 2 extensin t BTC Grade separatin f LRT nt required Alignment in median f Earl Armstrng frm River Rad t east f Msquit Creek then fllws N-S LRT alignment nrth frm Earl Armstrng Build t requirements Bus shuttle t airprt frm nearest statin N future rail link t airprt Twin track between Bayview and River Rad (except fr Dw s Lake Tunnel) cnsidered*** 16 Trains fr River Rad t Bayview service*** 22 Trains fr River Rad t VIA statin service*** Shrt turn lcatin t be cnfirmed*** Bayview t Shrt turn 5 minutes (peak)*** Shrt turn t Suth 10 minutes (peak)*** Depends n timing f Barrhaven extensin*** Prtect fr grade separatin f LRT at River Rad and Prince f Wales Drive Alignment t remain thrugh Riverside Suth twn centre as per N-S LRT alignment Build nw fr reasnable expansin*** Prtect fr future expansin*** Scheduled bus service t airprt frm nearest statin*** Prtect fr rail link t airprt*** Requires further study*** Greenbr Statin T be implemented Remved T be implemented Dw s Lake tunnel Secnd tunnel N secnd tunnel; single Cnfirm need fr secnd track nly tunnel Bayview Statin Statin lcatin Transfer Hub fr Phase 1A Temprary LeBretn Flats Phase 1B will depend Transprtatin Divisin File: RPT-LRTSummary_071101C.dc Page: 4 f 7 Nvember 1, 2007

7 Review f Urbandale Rapid Transit Prpsal Summary Reprt Factr Nrth-Suth LRT Prject Urbandale Prpsal Alternative*** n dwntwn tunnel study*** LeBretn Statin Dwntwn Statin lcatin Main transfer statin In reserved transit lane shared with buses n surface f Albert and Slater Streets T be cnsidered as part f future EA wrk Defer LRT acrss LeBretn Flats; implement with dwntwn tunnel N statin at LeBretn LRT Tunnel Defer LRT acrss LeBretn Flats; implement with dwntwn tunnel Prvide LeBretn Statin Main transfer statin Undertake dwntwn tunnel study*** Extensin t Hurdman BRT/LRT Transfer Nt in scpe f review*** statin Extensin t VIA Nt part f plan Terminus f Phase 1B Nt in scpe f review*** Transprtatin Divisin File: RPT-LRTSummary_071101C.dc Page: 5 f 7 Nvember 1, 2007

8 Review f Urbandale Rapid Transit Prpsal Summary Reprt 7. Schedule Review The schedule belw is intended t shw an estimate f the time perids required t initiate an LRT prject with a mdified scpe definitin. The schedule fr implementatin wuld be greatly influenced by several factrs, including the slutin chsen, hw sn apprval t prceed is given and the initiatin f varius activities including city staff mbilizatin, cntractr negtiatins, cntractr mbilizatin, NCC apprvals, Federal land use apprvals, Envirnmental Assessment (EA) amendments and apprvals (if required), perating and regulatry apprvals, etc. Mst imprtantly this assumes that the frmer N-S LRT cnfiguratin (technlgy, train system infrastructure, civil wrks) remains valid and it is nt necessary t initiate a cmplete re-tendering prcess. If a new re-terndering prcess is required, it will have a significant impact n the prject schedule. Befre cnstructin can begin, a number f initial activities are required, including: Cmpletin f the apprpriate studies t validate the assumptins; Cuncil review and apprval time fr bth apprval t prceed t negtiatins as well as apprval t prceed with acntract; Negtiatin with funding agencies; Re-applicatin r fllw-up f previus applicatins fr apprval, prperty acquisitins and utility relcatins that were nt pursued after the terminatin f the Prject Agreement fr the Nrth-Suth LRT prject; and Develpment f the apprpriate regulatry regime and apprvals. There are n apparent cst effective methds f keeping the O-Train running nce cnstructin has started. As a result it is expected that the O-Train wuld be de-cmmissined at the beginning f cnstructin and train service wuld resume at the start f LRT service. Review f Urbandale Rapid Transit Prpsal (Schedule Reprt) Full Size Versin in Annex ACTIVITY O N J J J J J J J J J J J J S D J F M A M A S O N D J F M A M A S O N D J F M A M A S O N D J F M A M A S O N D J F M A M A S O N D J F M A M A S O N D Nrth/Suth (Barrhaven Optinal) Cuncil Apprval t Investigate Studies/Business Case* Cuncil Apprval t Negtiate Funding Agency Negtiatin Cntractr Negtiatin Cuncil Apprval t Prceed with Cntract Apprvals Regulatry Apprvals Cntract Clse with Cntractr Design Cnstructin Testing/Cmmissining Nrth/Suth - Start f Operatin Tunnel Envirnmental Assessment Study Cuncil Review/Apprval t Prceed Funding Agency Negtiatin Cntracts Cuncil Review/Apprval Design Cnstructin Start f Operatin East/West (Barrhaven Optinal) Envirnmental Assessment Cuncil Review/Apprval t Prceed Funding Agency Negtiatin Cntracts Cuncil Review/Apprval Design/Cnstructin Start f Operatin 8. Prepatry/Clean-up Activity Full Activity * Assumes nly fr Nrth-Suth LRT Entire Schedule assumes nt having t repeat the prcurment prcess Octber 31, 2007 Transprtatin Divisin File: RPT-LRTSummary_071101C.dc Page: 6 f 7 Nvember 1, 2007

9 Review f Urbandale Rapid Transit Prpsal Summary Reprt Financial Analysis There are sme differences between the City financial numbers and the Urbandale financial numbers, presumably because Urbandale did nt have access t all f the frmer N-S LRT prject dcuments. There are als cst increases that the Urbandale prpsal may r may nt have taken int accunt (such as cst escalatin and twinning the track frm the Maintenance Centre t River Rad). Because f this, and because there was little detail prvided as t hw the values were derived, it was difficult t d a direct analysis f the cst savings prpsed by Urbandale. Hwever by using the frmer N-S LRT prject dcuments t undertake a very high level review f the cncepts f the Urbandale prpsal, it can be reasnably cncluded that: The Urbandale cst prjectins are missing sme elements f cst increases; Subject t the adjustment f the abve, the Urbandale bttm line cst prjectins are within the reasnable range f csts that culd be expected t result frm an apprpriate value-engineering exercise; The Urbandale bttm line cst prjectins are n the lw end f the expected range f csts; and Other csts in additin t the cntract csts need t be cnsidered including prperty acquisitin, utility wrk, and City prject management. As in the case f the technical analysis, this is subject t review and verificatin by the recmmended studies. In particular it is recmmended that a further value-engineering exercise be perfrmed t identify, with the pssibility f remving frm the scpe (and thus deferring the cst f), all items that are nt essential t the successful installatin, peratin and maintenance f the initial LRT system. In additin t the csts presented in the Urbandale prpsal, Urbandale als prpses that the Maintenance Centre shuld be capitalized with the verall prject rather than financed ver the life f the maintenance term. In recgnitin f the ever-changing financial market, it is recmmended that nce the cst f the Maintenance Centre is determined, a financial analysis shuld be undertaken t determine the mst cst effective means t build the facility. 9. Primary Assumptins The review f the Urbandale prpsal was predicated n the fllwing primary assumptins. The frmer 2006 N-S LRT cnfiguratin (technlgy, train system infrastructure, civil wrks) remains valid; This analysis has been dne based n nt entering int a re-tendering prcess. A requirement t enter int a re-tendering prcess wuld have significant impacts t the cnclusins and recmmendatins f this reprt; and N accunt has been made regarding the current litigatin between Ottawa Light Rail Crpratin and the City. Transprtatin Divisin File: RPT-LRTSummary_071101C.dc Page: 7 f 7 Nvember 1, 2007

10 Review f Urbandale Rapid Transit Prpsal Summary Reprt Separate Dcuments (Annex A, B and C) SEPARATE DOCUMENTS ANNEX A Exhibits 1-7 Schedule ANNEX B Urbandale LRT System Prpsal Materials Prpsal Dcument- An Affrdable Slutin fr Rapid Transit in Ottawa N-S LRT Dwntwn Map (Tunnel, Sparks and Nichlas) N-S LRT System Phased Implementatin Map (Map 1) N-S LRT Cst Savings Map (Map 2) Letter t Ms. Vivi Chi Develpment f a Financially Viable LRT System Cst Reductin Estimates frm M.R. Renfrew, September 04, 2007) ANNEX C Detailed Reprt Transprtatin Divisin File: RPT-LRTSummary_071101C.dc Page: SD-1 Nvember 1, 2007

Full Business Case. Installation of MRI at County Hospital

Full Business Case. Installation of MRI at County Hospital Full Business Case Installatin f MRI Scanner at Cunty Hspital April 2015 1 1 Executive Summary 1.1 Intrductin & Backgrund In February 2014 the Secretary f State apprved the Trust Special Administratrs

More information

ADMINISTRATIVE REPORT

ADMINISTRATIVE REPORT LATE DISTRIBUTION FOR COUNCIL JANUARY 20, 2009 RR-2 ADMINISTRATIVE REPORT Reprt Date: January 19, 2009 Cntact: Kenneth Bayne Cntact N.: 604.873.7223 RTS N.: 07877 VanRIMS N.: 08-2000-20 Meeting Date: January

More information

Detailed Summary of Project Justification Criteria Changes in the Final New Starts / Small Starts Rule

Detailed Summary of Project Justification Criteria Changes in the Final New Starts / Small Starts Rule Detailed Summary f Prject Justificatin Criteria Changes in the Final Starts / Small Starts Rule On December 27, 2012, the Federal Transit Administratin published a final rule and prpsed plicy guidance

More information

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council June 5, 2018

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council June 5, 2018 P.O. Bx 1749 Halifax, Nva Sctia B3J 3A5 Canada Item N. 14.1.2 Halifax Reginal Cuncil June 5, 2018 TO: Mayr Savage and Members f Halifax Reginal Cuncil SUBMITTED BY: Brad Anguish, A/Chief Administrative

More information

THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES

THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES TITLE: Capital Budget Applicatin Guidelines PAGE 1 f 11 DATE ISSUED: June 2, 2005 (Prvisinal) REVISION DATE: Octber 2007 This plicy is designed t prvide directin as t general administrative prcess utilized

More information

DATE: December 14, Board of Commissioners. Patrick Quinton, Executive Director

DATE: December 14, Board of Commissioners. Patrick Quinton, Executive Director DATE: December 14, 2011 TO: FROM: Bard f Cmmissiners Patrick Quintn, Executive Directr SUBJECT: Reprt Number 11-71 Authrize the Third Amendment t Dispsitin and Develpment Agreement fr Statin Place Redevelpment

More information

~RLY AGENDA REPORT. Meeting Date: September 10, 2013 Item Number: F 15

~RLY AGENDA REPORT. Meeting Date: September 10, 2013 Item Number: F 15 ~RLY Meeting Date: September 10, 2013 Item Number: F 15 T: Frm: Subject: AGENDA REPORT Hnrable Mayr & City Cuncil Chad Lynn, Directr f Parking Operatins SECOND AMENDMENT TO THE AGREEMENT BETWEEN THE CITY

More information

Academic and Administrative and Other Related Staff Annual Review

Academic and Administrative and Other Related Staff Annual Review Academic and Administrative and Other Related Staff Annual Review Intrductin Heads f Cllege/Budget Centre (r nminated representative) have the pprtunity t cnsider and t make the fllwing recmmendatins fr

More information

The Group met on 17th November 2015 for an update on approved projects progress and to consider further proposals.

The Group met on 17th November 2015 for an update on approved projects progress and to consider further proposals. Item/Min Ref: 10 Title f Reprt: Capital prjects apprval Officer presenting: Lead Finance Officer Authr: Lead Finance Officer 1 Purpse f Reprt/Recmmendatins The purpse f this reprt is fr Members t apprve

More information

Annex 03 - Recommendation #3: Redefining ICANN s Bylaws as Standard Bylaws and Fundamental Bylaws

Annex 03 - Recommendation #3: Redefining ICANN s Bylaws as Standard Bylaws and Fundamental Bylaws Annex 03 - Recmmendatin #3 Annex 03 - Recmmendatin #3: Redefining ICANN s Bylaws as Standard Bylaws and Fundamental Bylaws 1. Summary Currently ICANN nly has ne class f Bylaws. All ICANN Bylaws can be

More information

REQUEST FOR STATEMENT OF INTEREST AND QUALIFICATIONS for PROFESSIONAL REAL ESTATE DEVELOPMENT CONSULTING AND PLANNING SERVICES

REQUEST FOR STATEMENT OF INTEREST AND QUALIFICATIONS for PROFESSIONAL REAL ESTATE DEVELOPMENT CONSULTING AND PLANNING SERVICES Feasibility Study Cmmittee Saint Spyridn Greek Orthdx Church Saint Spyridn Hellenic Fundatin REQUEST FOR STATEMENT OF INTEREST AND QUALIFICATIONS fr PROFESSIONAL REAL ESTATE DEVELOPMENT CONSULTING AND

More information

Guidelines and Recommendations Guidelines on periodic information to be submitted to ESMA by Credit Rating Agencies

Guidelines and Recommendations Guidelines on periodic information to be submitted to ESMA by Credit Rating Agencies Guidelines and Recmmendatins Guidelines n peridic infrmatin t be submitted t ESMA by Credit Rating Agencies 23 June 2015 ESMA/2015/609 Table f Cntents 1 Scpe... 3 2 Definitins... 3 3 Purpse f Guidelines...

More information

Approval Process and Arrangements for University Consultancy Work

Approval Process and Arrangements for University Consultancy Work Apprval Prcess and Arrangements fr University Cnsultancy Wrk 1 Intrductin Cnsultancy activities can be separated int tw types: thse undertaken in City s name (University cnsultancy) and thse undertaken

More information

Queensland Rail's 2012 Draft Access Undertaking. New Hope Corporation submission

Queensland Rail's 2012 Draft Access Undertaking. New Hope Corporation submission New Hpe Grup A Divisin f NEW HOPE CORPORATION LIMITED ABN 38 010 653 844 Cntact Direct Phne: +61 7 3418 0572 Direct Fax: +61 7 34180 372 Email: gclarke@newhpecal.cm.au Website: www.newhpecal.cm.au New

More information

TERMS OF REFERENCE. Audit and Risk Committee (the "Committee") of Wilmcote Holdings Plc (the "Company")

TERMS OF REFERENCE. Audit and Risk Committee (the Committee) of Wilmcote Holdings Plc (the Company) References t the "Bard" shall mean the full Bard f Directrs. MEMBERSHIP - The Bard has reslved t establish a cmmittee f the Bard t be knwn as the Audit and Risk Cmmittee. - The Cmmittee shall cmprise at

More information

Greenfield Project Proposal Template

Greenfield Project Proposal Template PJM 2014 Greenfield Prject Prpsal Template PJM Intercnnectin February 16, 2016 Versin 3 PJM 2016 Greenfield Prject Prpsal Template A. Executive Summary This sectin shall include: Name f prpsing entity

More information

Policy on Requesting Reasonable Accommodations from the Zoning Code

Policy on Requesting Reasonable Accommodations from the Zoning Code Plicy n Requesting Reasnable Accmmdatins frm the Zning Cde Backgrund The Americans with Disabilities Act (ADA), as amended, is a federal anti-discriminatin statute designed t remve barriers that prevent

More information

Audit Follow Up. Citywide Cash Controls Development and Transportation Services (Report #0134, Issued August, 2001) As of March 31, 2002

Audit Follow Up. Citywide Cash Controls Development and Transportation Services (Report #0134, Issued August, 2001) As of March 31, 2002 Audit Fllw Up As f March 31, 2002 Sam M. McCall, CPA, CIA, CGFM City Auditr Citywide Cash Cntrls Develpment and Transprtatin Services (Reprt #0134, Issued August, 2001) Reprt #0231 July 25, 2002 Summary

More information

Central City Line Steering Committee

Central City Line Steering Committee Central City Line Steering Cmmittee Meeting #5 Mnday, 1:00 PM 2:30 PM Spkane Reginal Transprtatin Cuncil Paulsen Building 421 W. Riverside Ave., Spkane, WA 1 Agenda Welcme, Intrductins and Agenda Review

More information

HOC Works Program Requirements

HOC Works Program Requirements HOC Wrks Prgram Requirements Last Revisin: March 2018 INTRODUCTION The Husing Opprtunities Cmmissin f Mntgmery Cunty (HOC) established the HOC Wrks prgram in 2015 in rder t guarantee that HOC emplyment

More information

Engineering IT Application Development Governance Workflow

Engineering IT Application Development Governance Workflow Apprved April 6, 2018 Engineering IT Applicatin Develpment Gvernance Wrkflw This dcument is intended t define the gvernance structure and prcesses t be used in guiding the activities f the Engineering

More information

Audit and Risk Management Committee Charter

Audit and Risk Management Committee Charter Audit and Risk Management Cmmittee Charter Pivtal Systems Crpratin ("Cmpany") 1. Objectives The Audit and Risk Management Cmmittee (Cmmittee) has been established by the bard f directrs (Bard) f the Cmpany.

More information

MOTION NO. M Amended and Restated Construction and Maintenance Agreement with Washington State Department of Transportation

MOTION NO. M Amended and Restated Construction and Maintenance Agreement with Washington State Department of Transportation MOTION NO. M2016-50 Amended and Restated Cnstructin and Maintenance Agreement with Washingtn State Department f Transprtatin MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Cmmittee Bard 06/09/2016

More information

June Dear Chairman Cuttita and Members of the Board of Fire Commissioners:

June Dear Chairman Cuttita and Members of the Board of Fire Commissioners: THOMAS P. DiNAPOLI COMPTROLLER STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 GABRIEL F. DEYO DEPUTY COMPTROLLER DIVISION OF LOCAL GOVERNMENT AND SCHOOL ACCOUNTABILITY

More information

Summary of Outstanding Issues Related to Collective Bargaining Between the Government of the Northwest Territories and Union of Northern Workers

Summary of Outstanding Issues Related to Collective Bargaining Between the Government of the Northwest Territories and Union of Northern Workers Summary f Outstanding Issues Related t Cllective Bargaining Between the Gvernment f the Nrthwest Territries and Unin f Nrthern Wrkers The GNWT is cmmitted t reaching a cllective agreement that meets the

More information

EXECUTIVE SUMMARY INTERNAL AUDIT REPORT. IOM Kingston JM JULY 2017

EXECUTIVE SUMMARY INTERNAL AUDIT REPORT. IOM Kingston JM JULY 2017 EXECUTIVE SUMMARY INTERNAL AUDIT REPORT IOM Kingstn JM201701 17-21 JULY 2017 Issued by the Office f the Inspectr General Page 1 f 9 Reprt n the Audit f IOM Kingstn Executive Summary Audit File N. JM201701

More information

Flood Risk Sequential Test

Flood Risk Sequential Test FLOOD RISK SEQUENTIAL TEST Fld Risk Sequential Test Practice Nte August 2013 i ii FLOOD RISK SEQUENTIAL TEST FLOOD RISK SEQUENTIAL TEST Cntents 1. Intrductin... 1 2. The Sequential Test and Fld Znes...

More information

CONSTRUCTION DIVISION

CONSTRUCTION DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION CONSTRUCTION DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Cntract Change Management NUMBER: SPECIFIC SUBJECT: Change Orders DATE: June 15,

More information

AUDIT, RISK MANAGEMENT AND COMPLIANCE COMMITTEE CHARTER

AUDIT, RISK MANAGEMENT AND COMPLIANCE COMMITTEE CHARTER AUDIT, RISK MANAGEMENT AND COMPLIANCE COMMITTEE CHARTER August 2012 OPUS Grup Limited Audit, Risk Management and Cmpliance Cmmittee 1. GENERAL PURPOSE The primary bjective f the Audit, Risk Management

More information

inemi Statement of Work (SOW) Name TIG Name Project

inemi Statement of Work (SOW) Name TIG Name Project inemi Statement f Wrk (SOW) Name TIG Name Prject Instructins fr use: 1. Save this file as Prject Name Statement f Wrk Draft 1.0 2. All bld headings shuld be left as they are. These will frm the structure

More information

MNCPPC Site Plan No Administration Building/CH1 Site Plan Improvements Project Executive Summary of Information

MNCPPC Site Plan No Administration Building/CH1 Site Plan Improvements Project Executive Summary of Information MNCPPC Site Plan N. 820170120 Administratin Building/CH1 Site Plan Imprvements Prject Executive Summary f Infrmatin I. Frmatin f the Facilities Enhancement Plan In 2010, Leisure Wrld f Maryland thrugh

More information

Attachment 10.2 Regulated Asset Base, Tax Asset Base and Depreciation Access Arrangement Information

Attachment 10.2 Regulated Asset Base, Tax Asset Base and Depreciation Access Arrangement Information Attachment 10.2 Regulated Asset Base, Tax Asset Base and Depreciatin Access Arrangement Infrmatin 2 Octber 2017 Access Arrangement Infrmatin (AAI) fr the perid 1 July 2017 t 30 June 2022 Regulated Asset

More information

Overview of New Starts and Related Provisions in MAP-21

Overview of New Starts and Related Provisions in MAP-21 Overview f New Starts and Related Prvisins in MAP-21 Prgram Huse - HR 7, American Energy and Infrastructure Jbs Act - as reprted by Huse Transprtatin and Infrastructure Cmmittee Senate - S. 1813, Mving

More information

TASSAL GROUP LIMITED ABN Procedures for the Oversight and Management of Material Business Risks. (Approved by the Board 28 May 2015)

TASSAL GROUP LIMITED ABN Procedures for the Oversight and Management of Material Business Risks. (Approved by the Board 28 May 2015) Prcedures fr the Oversight and Management f Material Business Risks TASSAL GROUP LIMITED ABN 15 106 067 270 Prcedures fr the Oversight and Management f Material Business Risks (Apprved by the Bard 28 May

More information

GICIYE 3 HYDROELECTRIC POWER PLANT FEASIBILITY STUDY CALL FOR TENDERS

GICIYE 3 HYDROELECTRIC POWER PLANT FEASIBILITY STUDY CALL FOR TENDERS GICIYE 3 HYDROELECTRIC POWER PLANT FEASIBILITY STUDY CALL FOR TENDERS Intrductin The Gvernment f Rwanda plans t increase very significantly its electricity generatin capacity in the cming years. It is

More information

Request for Proposals # Tulsa Transit CNG Fuel Station Maintenance Amendment# 3 October 9, 2018

Request for Proposals # Tulsa Transit CNG Fuel Station Maintenance Amendment# 3 October 9, 2018 This amendment prvides additinal infrmatin t firms respnding t RFP #19-1902 CNG Fuel Statin Maintenance issued by. Purpse: This amendment answers questins psed by prpsers wh attended the Pre- Prpsal Meeting.

More information

Guidelines for submission to the NSW Population and Health Services Research Ethics Committee. Version June 2015

Guidelines for submission to the NSW Population and Health Services Research Ethics Committee. Version June 2015 Guidelines fr submissin t the NSW Ppulatin and Health Services Research Versin 3.0 18 June 2015 Cntents Sectin 1: Intrductin... 3 Sectin 2: Research Gvernance... 4 Sectin 3: Submissins t the NSW PHSREC...

More information

Wanganui District Council. Waste Minimisation Fund Policy 2014

Wanganui District Council. Waste Minimisation Fund Policy 2014 Wanganui District Cuncil Waste Minimisatin Fund Plicy 2014 Table f Cntents: 1.0 Intrductin 2 2.0 Backgrund 2 3.0 Purpse 3 4.0 Eligibility and Assessment Criteria 4 5.0 Assessing the Applicatin 5 6.0 Funding

More information

BOARD OF AIRPORT COMMISSIONERS

BOARD OF AIRPORT COMMISSIONERS Y.44 Ilf.d1 Angeles Wrld Airprts REPORT TO THE BOARD OF AIRPORT COMMISSIONERS I 4Walk 141 Apprved by.:,':4 f be T -f Airprts Engineer Reviewed by: /1 / I R: ' A. J /n, Deputy Executive Directr / Air A

More information

Nova Scotia Power Integrated Resource Plan Terms of Reference

Nova Scotia Power Integrated Resource Plan Terms of Reference Nva Sctia Pwer Integrated Resurce Plan - 2014 Terms f Reference Objective T develp a lng-term Preferred Resurce Plan that establishes the directin fr NS Pwer t meet custmer demand and energy requirements,

More information

T E M P L A T E. Tenancy Management Requirements. 1. General. a. Compliance obligations

T E M P L A T E. Tenancy Management Requirements. 1. General. a. Compliance obligations age 1 enancy anagement s 1. General a. Cmpliance bligatins b. SD Husing Client System c. enant placement he rvider is t cmply with all aws, each enancy greement and the plicies and prcedures applicable

More information

Community Planning Association of Southwest Idaho FY Strategic Plan Report No Approved by the COMPASS Board, December 16, 2013

Community Planning Association of Southwest Idaho FY Strategic Plan Report No Approved by the COMPASS Board, December 16, 2013 Cmmunity Planning Assciatin f Suthwest Idah FY2015-2017 Strategic Plan Reprt N. 01-2014 Apprved by the COMPASS Bard, December 16, 2013 FINAL COMPASS FY2015 FY2017 Strategic Plan Page 1 Cmmunity Planning

More information

City of Saskatoon Internal Audit

City of Saskatoon Internal Audit City f Saskatn Internal Audit Rad Maintenance Terms f Reference City f Saskatn Fr presentatin t the Public Cmmittee n September 8, 2015 PwC City f Saskatn PwC Internal Audit fr City f Saskatn We are pleased

More information

Niagara District Airport Commission Meeting Minutes

Niagara District Airport Commission Meeting Minutes Niagara District Airprt Cmmissin Meeting Minutes The members f the Niagara District Airprt Cmmissin met n September 29, 2016. PRESENT: Rbin Garrett, Vice-chair Henry Zwlak, Secretary James Detenbeck, Treasurer

More information

SOUND TRANSIT STAFF REPORT MOTION NO. M Contract Amendment for Construction Management Services

SOUND TRANSIT STAFF REPORT MOTION NO. M Contract Amendment for Construction Management Services SOUND TRANSIT STAFF REPORT MOTION NO. M2006-62 Cntract Amendment fr Cnstructin Management Services Meeting: Date: Type f Actin: Staff Cntact: Phne: Finance Cmmittee Bard 8/3/06 8/10/06 Discussin/Pssible

More information

Closing Out Award. The PI will work with ORA in obtaining the applicable resolution. Residuals

Closing Out Award. The PI will work with ORA in obtaining the applicable resolution. Residuals Clseut All spnsred prject awards must be frmally clsed-ut as sn as pssible after the prject end date t ensure that all expenses psted t this prject are allwable, n additinal charges are psted, all payments

More information

D R A F T M E M O R A N D U M

D R A F T M E M O R A N D U M D R A F T M E M O R A N D U M T: Frm: Subject: Je Speaks, CH2M Darin Smith and Matt Lftis Secndary Csts Analysis fr RAB Alternatives Date: August 14, 2017 Wrking n a cnsultant team led by CH2M Hill, Ecnmic

More information

Intervention Report Scheduling out-of-merit-order injections at Iona CPP to avert a threat to system security during Brooklyn Compressor Outage

Intervention Report Scheduling out-of-merit-order injections at Iona CPP to avert a threat to system security during Brooklyn Compressor Outage INTRODUCTION Interventin Reprt Scheduling ut-f-merit-rder injectins at Ina CPP t avert a threat t system security during Brklyn Cmpressr Outage Intrductin AEMO declared a threat t system security in the

More information

EXECUTIVE SUMMARY INTERNAL AUDIT REPORT. IOM Mogadishu SO November 7 December 2018

EXECUTIVE SUMMARY INTERNAL AUDIT REPORT. IOM Mogadishu SO November 7 December 2018 EXECUTIVE SUMMARY INTERNAL AUDIT REPORT IOM Mgadishu SO201701 27 Nvember 7 December 2018 Issued by the Office f the Inspectr General Page 1 f 12 Reprt n the Audit f IOM Mgadishu Executive Summary Audit

More information

16-18Co(17)97 Appendix 2. Panel Consideration Practice Statement. Introduction. This document has been produced to:

16-18Co(17)97 Appendix 2. Panel Consideration Practice Statement. Introduction. This document has been produced to: 16-18C(17)97 Appendix 2 Panel Cnsideratin Practice Statement Intrductin This dcument has been prduced t: Supprt the cnsistent cnsideratin f fitness t teach cnduct cases by Panels in line with the GTCS

More information

Design Council CONSULTANT GUIDELINES

Design Council CONSULTANT GUIDELINES Design Cuncil CONSULTANT GUIDELINES Intrductin: The Design Cuncil s missin is t advise and make recmmendatins t the City Manager and City staff n matters f aesthetic quality related t the built envirnment.

More information

RISK INFORMATION CHURCHES CHURCH RISK MANAGEMENT

RISK INFORMATION CHURCHES CHURCH RISK MANAGEMENT The infrmatin prvided in this paper is intended t assist church staff in develpment f suitable Risk Management prcesses. Intrductin t Risk Management Risk is the expsure t the pssibility f such things

More information

PROJECT CHARTER PLAN VERSION: 1A (DRAFT) <DD-MM-YY> <SECTION NAME>

PROJECT CHARTER PLAN VERSION: 1A (DRAFT) <DD-MM-YY> <SECTION NAME> The fllwing dcument is a sample Wrd template fr the creatin f a prject charter and r prject plan, which will demnstrate hw t apprach any type f prject and manage it effectively. The frmat is very basic

More information

For personal use only

For personal use only 8 March 2017 KABUNI ENTERS INTO A LETTER OF INTENT FOR POTENTIAL SALE OF ITS OPERATING SUBSIDIARIES AND ALSO RESETS STRATEGIC PRIORITIES The Bard f Directrs f Kabuni Ltd. (the Cmpany r Kabuni ) is pleased

More information

APPLICATION FORM FOR ASSISTANCE FROM THE AFRICAN WORLD HERITAGE FUND

APPLICATION FORM FOR ASSISTANCE FROM THE AFRICAN WORLD HERITAGE FUND APPLICATION FORM FOR ASSISTANCE FROM THE AFRICAN WORLD HERITAGE FUND This template is the riginal assistance request frm which when sent shuld cver all the questins asked. It can be adjusted t accmmdate

More information

BBC Trust assessment processes Guidance document

BBC Trust assessment processes Guidance document BBC Trust assessment prcesses Guidance dcument Nvember 2012. Getting the best ut f the BBC fr licence fee payers Cntents Intrductin 1 Purpse f this guidance 1 Activities cvered by the guidance 1 Prcesses

More information

MichaelFarrellOnline.Wordpress.Com

MichaelFarrellOnline.Wordpress.Com MichaelFarrellOnline.Wrdpress.Cm NEW IRISH GAAP BACKGROUND Under the Cmpanies Acts, cmpany directrs must prepare accunts fr the cmpany fr each financial year using either: Cmpanies Act individual accunts

More information

Manual of Administrative Policies and Procedures

Manual of Administrative Policies and Procedures Manual f Administrative Plicies and Prcedures POLICY 1.49 Cntract Management and Signing Authrity Plicy Categry: General Related Prcedures: Prcedures fr Negtiating, Apprving and Signing University Cntracts

More information

PRIMARY GROWTH PARTNERSHIP FINANCIAL MANAGEMENT: ASSURANCE ON BALLANCE S USE OF PGP FUNDING

PRIMARY GROWTH PARTNERSHIP FINANCIAL MANAGEMENT: ASSURANCE ON BALLANCE S USE OF PGP FUNDING Assurance and Evaluatin Office f the Directr-General PRIMARY GROWTH PARTNERSHIP FINANCIAL MANAGEMENT: ASSURANCE ON BALLANCE S USE OF PGP FUNDING Final reprt issued: 19 December 2013 www.mpi.gvt.nz Cntents

More information

Site visit to new property Council members, Park Commission, Prop 5 Committee. March 19 th. March 23 rd

Site visit to new property Council members, Park Commission, Prop 5 Committee. March 19 th. March 23 rd City Cuncil Agenda Item Reprt May 3, 2016 Agenda Item N. Cntact Drew Wells, Directr f Parks and Recreatin dwells@ci.buda.tx.us, 512-295-7170 SUBJECT: Deliberatin and pssible actin regarding amendment t

More information

Independent Director and Audit Committee

Independent Director and Audit Committee Independent Directr and Audit Cmmittee Rules summary The listed cmpany s bard f directrs is representing the sharehlders. They are respnsible fr making decisins n the cmpany s imprtant plicies and strategies.

More information

Summary of revised methodology for setting the allowed revenue for electricity transmission

Summary of revised methodology for setting the allowed revenue for electricity transmission Public Cnsultatin, December 2013 Summary f revised methdlgy fr setting the allwed revenue fr electricity transmissin Summary f revised methdlgy fr setting the allwed revenue fr electricity transmissin

More information

REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR QUALIFICATIONS (RFQ) The University f Tennessee REQUEST FOR QUALIFICATIONS (RFQ) DESIGNER fr STEM Classrm Building SBC N. 540/011-03-2016 UT Martin September 21, 2017 The University f Tennessee (Owner) issues this RFQ t qualified

More information

SCHEDULE OF FEES AND CHARGES FOR GENERATOR CONNECTIONS

SCHEDULE OF FEES AND CHARGES FOR GENERATOR CONNECTIONS SCHEDULE OF FEES AND CHARGES FOR GENERATOR CONNECTIONS PREPARED BY: Netwrk Develpment VERSION: 4.0 RELEASE DATE: 11 September 2017 Versin Release Histry Versin Date Apprved 1.0 14 Dec 11 Transmissin Services

More information

TERMS OF REFERENCE FOR CONSULTANTS

TERMS OF REFERENCE FOR CONSULTANTS A. Backgrund: Develping an Infrmatin System fr Develpment Plicy and Planning (KSTA) MON 51136-001 TERMS OF REFERENCE FOR CONSULTANTS The Asian Develpment Bank (ADB) will engage 82 persn-mnths f cnsulting

More information

ABORIGINAL ECONOMIC PARTNERSHIPS Program Grant Application Guidelines

ABORIGINAL ECONOMIC PARTNERSHIPS Program Grant Application Guidelines ABORIGINAL ECONOMIC PARTNERSHIPS Prgram Grant Applicatin Guidelines Abriginal Ecnmic Partnerships Prgram (AEPP) grant funding supprts Indigenus cmmunities, cmmunity-wned businesses and nt-fr-prfit nn-gvernmental

More information

Standard Operating Procedure Payment Requisition

Standard Operating Procedure Payment Requisition Office f the Cmptrller Accunts Payable Divisin f Finance and Administratin Standard Operating Prcedure Payment Requisitin Effective Date: January 2016 Descriptin: This dcument prvides instructins n hw

More information

NATIONAL IDENTITY THEFT VICTIM ASSISTANCE NETWORK EXPANSION PROGRAM (NITVAN II)

NATIONAL IDENTITY THEFT VICTIM ASSISTANCE NETWORK EXPANSION PROGRAM (NITVAN II) NATIONAL IDENTITY THEFT VICTIM ASSISTANCE NETWORK EXPANSION PROGRAM (NITVAN II) REQUEST FOR PROPOSAL (RFP) RUBRIC 100 POINTS TOTAL 1. Abstract 5 Pints Pssible Prvide a shrt summary, cncisely describing

More information

Overview of Statements of Investment Policies and Procedures (SIPP) Requirements

Overview of Statements of Investment Policies and Procedures (SIPP) Requirements Financial Services Cmmissin f Ontari Cmmissin des services financiers de l Ontari SECTION: INDEX NO.: TITLE: APPROVED BY: PUBLISHED: Investment Guidance Ntes IGN-005 Overview f Statements f Investment

More information

Terms of Reference - Board of Directors (approved by the Board on 12 April 2018)

Terms of Reference - Board of Directors (approved by the Board on 12 April 2018) Terms f Reference - Bard f Directrs (apprved by the Bard n 12 April 2018) 1. Respnsibility and Principal Duties The Bard f Directrs has the verall respnsibility fr the gvernance f the Cmpany and fr supervising

More information

JOB MATCHING PROCEDURE AGAINST NATIONAL (BENCHMARK) JOB EVALUATION PROFILES

JOB MATCHING PROCEDURE AGAINST NATIONAL (BENCHMARK) JOB EVALUATION PROFILES JOB MATCHING PROCEDURE AGAINST NATIONAL (BENCHMARK) JOB EVALUATION PROFILES 1. AIMS The aims f the matching prcedure are: (1) T match as many jbs as pssible t natinal evaluatin prfiles in the mst efficient

More information

Boettcher Foundation Webb-Waring Biomedical Research Awards Frequently Asked Questions (FAQs)

Boettcher Foundation Webb-Waring Biomedical Research Awards Frequently Asked Questions (FAQs) Eligibility: Bettcher Fundatin Webb-Waring Bimedical Research Awards Frequently Asked Questins (FAQs) Q. Which faculty titles are eligible t apply? A. University f Clrad Qualifying Titles: Investigatrs

More information

3. What do you need to do to take holiday or carry forward holiday prevented by sickness absence? 6. Appendix 1 Annual Leave Entitlement 7

3. What do you need to do to take holiday or carry forward holiday prevented by sickness absence? 6. Appendix 1 Annual Leave Entitlement 7 Hliday Plicy 1 Cntents HOLIDAY POLICY 1. What des this plicy cver? 3 2. When des this plicy apply? 3 2.1 What annual hliday are yu entitled t? 3 2.2 Hw is annual leave apprved? 3 2.3 What Public Hlidays

More information

The Wind Down of HAMP

The Wind Down of HAMP Center fr NYC Neighbrhds May 2016 Curina Yulisa The Wind Dwn f HAMP This infrmatin was taken frm a Treasury webinar with Empire Justice Center. Check ut Empire Justice Center s webinar recrding n the MHA

More information

RE: SUBMISSION TO INFRASTRUCTURE VICTORIA S LAYING THE FOUNDATIONS PAPER

RE: SUBMISSION TO INFRASTRUCTURE VICTORIA S LAYING THE FOUNDATIONS PAPER 16 March 2016 Michel Massn Chief Executive Infrastructure Victria Level 34, 121 Exhibitin Street Melburne, VIC 3000 Dear Mr Massn, RE: SUBMISSION TO INFRASTRUCTURE VICTORIA S LAYING THE FOUNDATIONS PAPER

More information

CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF PLURALSIGHT, INC. Adopted May 3, 2018

CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF PLURALSIGHT, INC. Adopted May 3, 2018 CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF PLURALSIGHT, INC. Adpted May 3, 2018 PURPOSE The purpse f the Cmpensatin Cmmittee (the Cmpensatin Cmmittee ) f the Bard f Directrs (the

More information

Click on question below to view answer

Click on question below to view answer Click n questin belw t view answer Q. Hw are yu ging t handle, and hpefully imprve, drp ff/pick up at Westwd Elementary Schl? Q. Why wuldn t yu cnnect the new 5/6 building t the 7/8 building? Q. Why a

More information

The University of Tennessee REQUEST FOR QUALIFICATIONS (RFQ)

The University of Tennessee REQUEST FOR QUALIFICATIONS (RFQ) The University f Tennessee REQUEST FOR QUALIFICATIONS (RFQ) DESIGNER fr Neyland Stadium Suth Renvatins UT Knxville SBC N. 540/009-02-2017 September 15, 2017 The University f Tennessee (Owner) issues this

More information

LBIS FFT: Current Reforestation and Timber Supply Mitigation 5 Year and Annual Operating Plan

LBIS FFT: Current Reforestation and Timber Supply Mitigation 5 Year and Annual Operating Plan LBIS FFT: Current Refrestatin and Timber Supply Mitigatin 5 Year and Annual Operating Plan Purpse The Land Based Investment Strategy (LBIS) was develped in 2010 t ensure that the gvernment gals and pririties

More information

City of Turlock Fiscal Impact Analysis Tool User Manual

City of Turlock Fiscal Impact Analysis Tool User Manual City f Turlck Fiscal Impact Analysis Tl User Manual CONTENTS INTRODUCTION TO FISCAL IMPACT ANALYSIS (FIA) TOOL... 1 1. Purpse f the FIA Tl... 1 2. General Assumptins... 1 3. Cmpnents... 2 STEP 1 DEFINE

More information

ABORIGINAL ECONOMIC PARTNERSHIPS Program Application Guidelines

ABORIGINAL ECONOMIC PARTNERSHIPS Program Application Guidelines ABORIGINAL ECONOMIC PARTNERSHIPS Prgram Applicatin Guidelines The Abriginal Ecnmic Partnerships Prgram (AEPP) supprts Abriginal cmmunities, businesses and rganizatins t increase participatin in ecnmic

More information

Grant Application Guidelines

Grant Application Guidelines Grant Applicatin Guidelines The prgram staff f the Cmmunity Fundatin f Greater New Britain lks frward t wrking with yu. This frm is fr rganizatins that have submitted a Letter f Intent t us and were invited

More information

VILLAGE OF SCHILLER PARK COOK COUNTY, ILLINOIS

VILLAGE OF SCHILLER PARK COOK COUNTY, ILLINOIS VILLAGE OF SCHILLER PARK COOK COUNTY, ILLINOIS Prcedures and Applicatin fr Village f Schiller Park Cnsideratin f Ck Cunty Real Estate 6B Classificatin This applicatin is nly used fr petitin f a standard

More information

CEIOPS Proposals for a Definition of Cross-Border Provision of Service under the Insurance Mediation Directive ("IMD")

CEIOPS Proposals for a Definition of Cross-Border Provision of Service under the Insurance Mediation Directive (IMD) CEIOPS-DOC-15/07 CEIOPS Prpsals fr a Definitin f Crss-Brder Prvisin f Service under the Insurance Mediatin Directive ("IMD") Purpse T respnd t the EIOPC 1 request t present an extensive analysis f different

More information

FUNDING GUIDELINES PREVENTION GRANTS FOR CULTURALLY AND LINGUISTICALLY DIVERSE COMMUNITIES

FUNDING GUIDELINES PREVENTION GRANTS FOR CULTURALLY AND LINGUISTICALLY DIVERSE COMMUNITIES FUNDING GUIDELINES PREVENTION GRANTS FOR CULTURALLY AND LINGUISTICALLY DIVERSE COMMUNITIES CODE FOR APPLICATION COVER: CALD18 ISSUE DATE: 24 Octber 2017 PLACE FOR LODGEMENT: Please ldge yur applicatin

More information

Quick Reference Guide

Quick Reference Guide Quick Reference Guide Accunting Standard Update 2016-01 "Financial Instruments Overall: Recgnitin and Measurement f Financial Assets and Financial Liabilities" Why d I need this Quick Reference Guide?

More information

CUMBERLAND, RHODE ISLAND FIRE DISTRICT. REQUEST FOR PROPOSALS (RFP) FOR PROFESSIONAL AUDITING SERVICES RFP Issuance Date May 3, 2017

CUMBERLAND, RHODE ISLAND FIRE DISTRICT. REQUEST FOR PROPOSALS (RFP) FOR PROFESSIONAL AUDITING SERVICES RFP Issuance Date May 3, 2017 CUMBERLAND, RHODE ISLAND FIRE DISTRICT REQUEST FOR PROPOSALS (RFP) FOR PROFESSIONAL AUDITING SERVICES RFP Issuance Date May 3, 2017 INTRODUCTION The Cumberland Fire District is requesting prpsals frm qualified

More information

KCA Deutag Alpha Limited ( KCA Deutag or the Group ) Results for the three months ended 30 June 2018

KCA Deutag Alpha Limited ( KCA Deutag or the Group ) Results for the three months ended 30 June 2018 Fr immediate release KCA Deutag Alpha Limited ( KCA Deutag r the Grup ) Results fr the three mnths ended 30 June 2018 KCA Deutag, ne f the wrld s leading drilling and engineering cntractrs, is pleased

More information

Emergency Solutions Grant (ESG) Program

Emergency Solutions Grant (ESG) Program Cunty f Santa Barbara Cmmunity Services Department Husing and Cmmunity Develpment Divisin State f Califrnia Emergency Slutins Grant (ESG) Prgram Bidder s Cnference June 22, 2018 Agenda I. Intrductins II.

More information

Emergency Support Function (ESF) 18 Business and Industry

Emergency Support Function (ESF) 18 Business and Industry Emergency Supprt Functin (ESF) 18 Business and Industry Lead Crdinating Agency: Supprt Agencies Pensacla Bay Area Chamber f Cmmerce Better Business Bureau f Nrthwest Flrida Century Chamber f Cmmerce Dwntwn

More information

Appendix G. Wisconsin DOT: Q&A from FTA

Appendix G. Wisconsin DOT: Q&A from FTA Appendix G Wiscnsin DOT: Q&A frm FTA Questins & Answers Elderly Individuals & Individuals with Disabilities (Sectin 5310), JARC & New Freedm Prgrams Last Updated March 25, 2008 All Prgrams: 1. Q. D applicants

More information

PAUL K. RACS BUILDING AND SAFETY ERIC GARCETTI MAYOR TEMPORARY SIGNS ON TEMPORARY CONSTRUCTION SURROUNDING VACANT LOTS; CF

PAUL K. RACS BUILDING AND SAFETY ERIC GARCETTI MAYOR TEMPORARY SIGNS ON TEMPORARY CONSTRUCTION SURROUNDING VACANT LOTS; CF CITY PLANNING City f Ls Angeles CALIFORNIA PUBLIC WORKS VINCENT P. BERTONI, AICP OFFICE OF COMMUNITY BEAUTIFICATION PAUL K. RACS BUILDING AND SAFETY V: FRANK M. BUSH General Manager SUPERINTENDENT OF BUILDING

More information

Workers Pension Trust

Workers Pension Trust Wrkers Pensin Trust YEAR ENDED 31 OCTOBER 2016 CHAIRMAN S ANNUAL STATEMENT REGARDING DC GOVERNANCE This statement is prduced pursuant t Regulatin 17 f the Occupatinal Pensin Schemes (Charges and Gvernance)

More information

STATE OF WASHINGTON HEALTH CARE AUTHORITY 626 8th Avenue, SE P.O. Box Olympia, Washington

STATE OF WASHINGTON HEALTH CARE AUTHORITY 626 8th Avenue, SE P.O. Box Olympia, Washington March 5, 2013 STATE OF WASHINGTON HEALTH CARE AUTHORITY 626 8th Avenue, SE P.O. Bx 45502 Olympia, Washingtn 98504-5502 Dear Health Plans: As yu knw, changes in family incme can result in switching between

More information

County of Riverside OFFICE OF THE AUDITOR-CONTROLLER STANDARD PRACTICE MANUAL

County of Riverside OFFICE OF THE AUDITOR-CONTROLLER STANDARD PRACTICE MANUAL Cunty f Riverside OFFICE OF THE AUDITOR-CONTROLLER STANDARD PRACTICE MANUAL SECTION: 5 POLICY NUMBER: 510 SUBJECT: CATEGORY: CONSTRUCTION-IN-PROGRESS CAPITAL ASSET POLICIES REVISED DATE: 07/01/17 APPROVED

More information

AUDIT & RISK COMMITTEE (ARC)

AUDIT & RISK COMMITTEE (ARC) AUDIT & RISK COMMITTEE (ARC) The Audit and Risk Cmmittee is an independent appraisal bdy appinted by the chapter bard t assist the bard in fulfilling its versight respnsibilities pertaining t the integrity

More information

Formal Procurement Checklist CDE School Nutrition Unit

Formal Procurement Checklist CDE School Nutrition Unit Frmal Prcurement Checklist CDE Schl Nutritin Unit Did the SFA Frecast prduct needs Cycle menus, velcity reprts, and prductin recrds are cmmn tls used t frecast prduct needs Cnduct a cst r price analysis

More information

Request for Proposal

Request for Proposal CITY OF GLENDORA Request fr Prpsal Fr Architectural Services Prject number 1248_ 8/3/2017 Prepared by Cmmunity Services Department 116 E. Fthill Bulevard Glendra, Califrnia 91741 Prpsal Mailing Date August

More information

Attachment #3 To Report No. HC HALTON COMMUNITY HOUSING CORPORATION

Attachment #3 To Report No. HC HALTON COMMUNITY HOUSING CORPORATION Attachment #3 T Reprt N. HC-09-09 HALTON COMMUNITY HOUSING CORPORATION Date f issue: Dcument number: Revisin: 2 PAGE 1 OF 6 Apprval: Title: MANAGER, HOUSING OPERATIONS 1.0 Purpse The purpse f the Plicy

More information

1 This paper seeks agreement to the final Terms of Reference (the Terms) for the Welfare Expert Advisory Group (WEAG). The final Terms are attached.

1 This paper seeks agreement to the final Terms of Reference (the Terms) for the Welfare Expert Advisory Group (WEAG). The final Terms are attached. Office f the Minister fr Scial Develpment Chair Cabinet Scial Wellbeing Cmmittee WELFARE EXPERT ADVISORY GROUP TERMS OF REFERENCE Prpsal 1 This paper seeks agreement t the final Terms f Reference (the

More information