ATTACHMENT C Price Proposal Forms
|
|
- Anissa Berry
- 6 years ago
- Views:
Transcription
1 ATTACHMENT C Price Proposal Forms
2 Price Proposal Form (Base Proposal) services Prices shall include all labor, equipment, materials, 1 Performance / Payment Bonds and Taxes 1 LS $ $ 2 Onsite Preconstruction Meeting 1 LS $ $ 3 Premobilization Submittals 1 LS $ $ 4 Permit Fee Allowance 1 LS $ $ 5 Access Agreements 1 LS $ $ 6 Mobilization 1 LS $ $ 7 Third Party Utility Locator 1 LS $ $ 8 Progress Meetings 1 LS $ $ 9 Contract Administration 1 LS $ $ 10 Regulatory Compliance 1 LS $ $ 11 Financial Compliance 1 LS $ $ 12 Public Information Services 1 LS $ $ 13 Reporting 1 LS $ $ 14 Site Preparation, Equipment Staging and Decontamination Pad(s) 1 LS $ $ 15 Manatee Protection and Monitoring 1 LS $ $ 16 Sediment Removal from OS-1 4,598 CY $ $ 17 Transportation and Disposal a TEQ > 1 µg/kg 902 TONS $ $ 18 Transportation and Disposal a TEQ < 1 µg/kg 5,444 TONS $ $ 19 Dredge Water Treatment GALLON $ $ 20 Drying Reagent TONS $ $ 21 Maintenance of Traffic 1 LS $ $ 22 Turbidity Control and Monitoring 1 LS $ $ 23 Air Quality Management 1 LS $ $ 24 Site Restoration 1 LS $ $ 25 Demobilization 1 LS $ $ Total Estimated Contract Construction Costs (OS-1) $ 26 Sediment Removal from OS-2 5,148 CY $ $ 27 Transportation and Disposal a TEQ > 1 µg/kg 1,684 TONS $ $
3 Price Proposal Form (Base Proposal) services Prices shall include all labor, equipment, materials, 28 Transportation and Disposal a TEQ < 1 µg/kg 5,419 TONS $ $ 29 Dredge Water Treatment GALLON $ $ 30 Drying Reagent TONS $ $ 31 Maintenance of Traffic 1 LS $ $ 32 Turbidity Control and Monitoring 1 LS $ $ 33 Air Quality Management 1 LS $ $ 34 Site Restoration 1 LS $ $ 35 Demobilization 1 LS $ $ Total Estimated Contract Construction Costs (OS-2) $ 36 Sediment Removal from OS-3 4,338 CY $ $ 37 Transportation and Disposal a TEQ > 1 µg/kg 0 TONS $ $ 38 Transportation and Disposal a TEQ < 1 µg/kg 5,986 TONS $ $ 39 Dredge Water Treatment GALLON $ $ 40 Drying Reagent TONS $ $ 41 Maintenance of Traffic 1 LS $ $ 42 Turbidity Control and Monitoring 1 LS $ $ 43 Air Quality Management 1 LS $ $ 44 Site Restoration 1 LS $ $ 45 Demobilization 1 LS $ $ Total Estimated Contract Construction Costs (OS-3) $ 46 Sediment Removal from OS-4 2,094 CY $ $ 47 Transportation and Disposal a TEQ > 1 µg/kg 0 TONS $ $ 48 Transportation and Disposal a TEQ < 1 µg/kg 2,890 TONS $ $ 49 Dredge Water Treatment GALLON $ $ 50 Drying Reagent TONS $ $ 51 Maintenance of Traffic 1 LS $ $ 52 Turbidity Control and Monitoring 1 LS $ $ 53 Air Quality Management 1 LS $ $
4 Price Proposal Form (Base Proposal) services Prices shall include all labor, equipment, materials, 54 Site Restoration 1 LS $ $ 55 Demobilization 1 LS $ $ Total Estimated Contract Construction Costs (OS-4) % 56 Sediment Removal from OS-5 4,339 CY $ $ 57 Transportation and Disposal a TEQ > 1 µg/kg 0 TONS $ $ 58 Transportation and Disposal a TEQ < 1 µg/kg 5,998 TONS $ $ 59 Dredge Water Treatment GALLON $ $ 60 Drying Reagent TONS $ $ 61 Maintenance of Traffic 1 LS $ $ 62 Turbidity Control and Monitoring 1 LS $ $ 63 Air Quality Management 1 LS $ $ 64 Site Restoration 1 LS $ $ 65 Demobilization 1 LS $ $ Total Estimated Contract Construction Costs (OS-5) $ 66 Sediment Removal from OS-6 23,793 CY $ $ 67 Transportation and Disposal a TEQ > 1 µg/kg 0 TONS $ $ 68 Transportation and Disposal a TEQ < 1 µg/kg 32,835 TONS $ $ 69 Dredge Water Treatment GALLON $ $ 70 Drying Reagent TONS $ $ 71 Maintenance of Traffic 1 LS $ $ 72 Turbidity Control and Monitoring 1 LS $ $ 73 Air Quality Management 1 LS $ $ 74 Site Restoration 1 LS $ $ 75 Demobilization 1 LS $ $ Total Estimated Contract Construction Costs (OS-6) $ Total Estimated Contract Construction Costs (OS-1, 2, 3, 4, 5 and 6) $ OPTIONAL ITEM RATE SCHEDULE
5 Price Proposal Form (Base Proposal) services Prices shall include all labor, equipment, materials, Hourly Standby Time HR $ Daily Standby Time DAY $ NOTE: (a) Assumed density of 1.34 tons per cubic yard.
6 Price Proposal Form (ATC Proposal) services Prices shall include all labor, equipment, materials, SUBMITTED PRICING SHALL BE VALID FOR 120 DAYS. 1 Performance / Payment Bonds and Taxes 1 LS $ $ 2 Onsite Preconstruction Meeting 1 LS $ $ 3 Premobilization Submittals 1 LS $ $ 4 Permit Fee Allowance 1 LS $ $ 5 Access Agreements 1 LS $ $ 6 Mobilization 1 LS $ $ 7 Third Party Utility Locator 1 LS $ $ 8 Progress Meetings 1 LS $ $ 9 Contract Administration 1 LS $ $ 10 Regulatory Compliance 1 LS $ $ 11 Financial Compliance 1 LS $ $ 12 Public Information Services 1 LS $ $ 13 Reporting 1 LS $ $ 14 Site Preparation, Equipment Staging and Decontamination Pad(s) 1 LS $ $ 15 Manatee Protection and Monitoring 1 LS $ $ 16 Sediment Removal from OS-1 4,598 CY $ $ 17 Transportation and Disposal a TEQ > 1 µg/kg 902 TONS $ $ 18 Transportation and Disposal a TEQ < 1 µg/kg 5,444 TONS $ $ 19 Dredge Water Treatment GALLON $ $ 20 Drying Reagent TONS $ $ 21 Maintenance of Traffic 1 LS $ $ 22 Turbidity Control and Monitoring 1 LS $ $ 23 Air Quality Management 1 LS $ $ 24 Site Restoration 1 LS $ $ 25 Demobilization 1 LS $ $ Total Estimated Contract Construction Costs (OS-1) $ 26 Sediment Removal from OS-2 5,148 CY $ $
7 Price Proposal Form (ATC Proposal) services Prices shall include all labor, equipment, materials, SUBMITTED PRICING SHALL BE VALID FOR 120 DAYS. 27 Transportation and Disposal a TEQ > 1 µg/kg 1,684 TONS $ $ 28 Transportation and Disposal a TEQ < 1 µg/kg 5,419 TONS $ $ 29 Dredge Water Treatment GALLON $ $ 30 Drying Reagent TONS $ $ 31 Maintenance of Traffic 1 LS $ $ 32 Turbidity Control and Monitoring 1 LS $ $ 33 Air Quality Management 1 LS $ $ 34 Site Restoration 1 LS $ $ 35 Demobilization 1 LS $ $ Total Estimated Contract Construction Costs (OS-2) $ 36 Sediment Removal from OS-3 4,338 CY $ $ 37 Transportation and Disposal a TEQ > 1 µg/kg 0 TONS $ $ 38 Transportation and Disposal a TEQ < 1 µg/kg 5,986 TONS $ $ 39 Dredge Water Treatment GALLON $ $ 40 Drying Reagent TONS $ $ 41 Maintenance of Traffic 1 LS $ $ 42 Turbidity Control and Monitoring 1 LS $ $ 43 Air Quality Management 1 LS $ $ 44 Site Restoration 1 LS $ $ 45 Demobilization 1 LS $ $ Total Estimated Contract Construction Costs (OS-3) $ 46 Sediment Removal from OS-4 2,094 CY $ $ 47 Transportation and Disposal a TEQ > 1 µg/kg 0 TONS $ $ 48 Transportation and Disposal a TEQ < 1 µg/kg 2,890 TONS $ $ 49 Dredge Water Treatment GALLON $ $ 50 Drying Reagent TONS $ $ 51 Maintenance of Traffic 1 LS $ $ 52 Turbidity Control and Monitoring 1 LS $ $
8 Price Proposal Form (ATC Proposal) services Prices shall include all labor, equipment, materials, SUBMITTED PRICING SHALL BE VALID FOR 120 DAYS. 53 Air Quality Management 1 LS $ $ 54 Site Restoration 1 LS $ $ 55 Demobilization 1 LS $ $ Total Estimated Contract Construction Costs (OS-4) % 56 Sediment Removal from OS-5 4,339 CY $ $ 57 Transportation and Disposal a TEQ > 1 µg/kg 0 TONS $ $ 58 Transportation and Disposal a TEQ < 1 µg/kg 5,998 TONS $ $ 59 Dredge Water Treatment GALLON $ $ 60 Drying Reagent TONS $ $ 61 Maintenance of Traffic 1 LS $ $ 62 Turbidity Control and Monitoring 1 LS $ $ 63 Air Quality Management 1 LS $ $ 64 Site Restoration 1 LS $ $ 65 Demobilization 1 LS $ $ Total Estimated Contract Construction Costs (OS-5) $ 66 Sediment Removal from OS-6 23,793 CY $ $ 67 Transportation and Disposal a TEQ > 1 µg/kg 0 TONS $ $ 68 Transportation and Disposal a TEQ < 1 µg/kg 32,835 TONS $ $ 69 Dredge Water Treatment GALLON $ $ 70 Drying Reagent TONS $ $ 71 Maintenance of Traffic 1 LS $ $ 72 Turbidity Control and Monitoring 1 LS $ $ 73 Air Quality Management 1 LS $ $ 74 Site Restoration 1 LS $ $ 75 Demobilization 1 LS $ $ Total Estimated Contract Construction Costs (OS-6) $ Total Estimated Contract Construction Costs (OS-1, 2, 3, 4, 5 and 6) $
9 Price Proposal Form (ATC Proposal) services Prices shall include all labor, equipment, materials, SUBMITTED PRICING SHALL BE VALID FOR 120 DAYS. OPTIONAL ITEM RATE SCHEDULE Hourly Standby Time HR $ Daily Standby Time DAY $ NOTE: (a) Assumed density of 1.34 tons per cubic yard.
ATTACHMENT C Price Proposal Forms
ATTACHMENT C Price Proposal Forms Price Proposal Form (Base Proposal) 1 Performance / Payment Bonds and Taxes 1 LS $ $ 2 Onsite Preconstruction Meeting 1 LS $ $ 3 Premobilization Submittals 1 LS $ $ 4
More informationAlabama State Port Authority
To: Prospective Bidders Date: March 2016 Please procure the following and deliver to the address below: Delivery of Proposal: Alabama State Port Authority Location identified below in Notes #1 Delivery
More informationRates Effective 1/1/18
Page 1 of 6 Residential Residential with Food Waste Cart Collection in year 4 Proposed in Dollars per Container per Month Solid Waste Cart 20 gallon $ 21.37 $ $ 35 gallon $ 24.37 $ $ 65 gallon $ 37.86
More informationCITY OF CLEVELAND DEPARTMENT OF PUBLIC UTILITIES REQUEST FOR PROPOSAL FOR WATER MAINS RENEWAL PROGRAM ADDENDUM No. 1
CITY OF CLEVELAND DEPARTMENT OF PUBLIC UTILITIES REQUEST FOR PROPOSAL FOR WATER MAINS RENEWAL PROGRAM 2018-2019 ADDENDUM No. 1 December 5, 2016, 2016 There were printing errors in the original Attachment
More informationReviax Constracting Corp. DeSantis Construction
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.
More informationPreliminary Budget Cost Estimate-Raft Island RIIA Roads 26952 SY Construction Items Budget Preliminary Temporary Erosion Control/Miscellaneous Work $ 18,500.00 Traffic Control $ 10,000.00 Pulverizing $
More informationSpecifications and Bid Forms for. Riprap at Bridge Berm Structure # rd Street, Yankton South Dakota, Yankton County,
Specifications and Bid Forms for Riprap at Bridge Berm Structure #68-134-120 44138 303 rd Street, Yankton South Dakota, Yankton County, 57078 For Yankton County Highway Department 3302 W City Limits Road
More informationADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL
II. ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL ITEM NO. 1: Page P-1, Proposal DELETE the Proposal (pages P-1 through P-9) in its entirety and REPLACE with the attached Proposal (pages P-1R
More informationMCR Health Services Inc. Request for Qualifications For Construction Manager/General Contractor Services RFQ GC 2015
MCR Health Services Inc. Request for Qualifications For Construction Manager/General Contractor Services RFP GC 2015 Instruction to Proposers Invitation to Propose: MCR Health Services invites your firm
More informationBID FORM. PROJECT: 2017 Water line replacement
Project Town of Georgetown P.O. Box 426 Georgetown, CO 80444 BID FORM PROJECT: 2017 Water line replacement THE UNDERSIGNED BIDDER, having familiarized himself with the Work required by the Contract Documents,
More informationThe following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin
The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin within the Vendor Self Service portal at wvoasis.gov.
More informationTABLE OF CONTENTS. Table of Contents 3 List of Drawings 1. Procurement Requirements Advertisement for Bids 2
TABLE OF CONTENTS General Requirements Total Pages Table of Contents 3 List of Drawings 1 Procurement Requirements Advertisement for Bids 2 Instruction for Procurement Instructions to Bidders 8 Procurement
More informationATTACHMENT "A" PRICING FOR POINTS OF DISTRIBUTION (PODS)
PRICING FOR POINTS OF DISTRIBUTION (PODS) TYPE I POD (8) Hours per day @ (5) Days Each Per Hour Each Per Day Each Per Day RESOURCE TYPE REQUIRED DAY NIGHT DAILY LABOR RATE WEEKLY LABOR RATE OVERTIME RATE
More informationSTRAIGHT STRIPE PAINTING, INC. 22b Remove Pavement Markings with Sand Blasting Per Hour 1 $ $ $ $
PAVEMENT MARKING STRAIGHT STRIPE PAINTING, AMERICAN PAVEMENT MARKING, LLC ITEM UNIT TOTAL UNIT TOTAL NUMBER DESCRIPTION UNIT QUANTITY COST AMOUNT COST AMOUNT 1 Mobilization L.S. 3 $ 400.00 $ 1,200.00 $
More informationCrushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:
Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and
More information2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationBOCA RATON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION
BOCA RATON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION WHEREAS the Department of Environmental Protection, in partnership with the City of Boca Raton. has sponsored a study of the
More informationRequest for Proposals Phase II South Bachelor Island Wetland Reconnection and Habitat Enhancement Project. Proposals are due March 14 th, 2019 by 4pm
818 Commercial Street, Room 203, Astoria, Oregon 97103, Phone: (503) 325-0435, Fax: (503) 325-0459 Email: crest@columbiaestuary.org, Website: www.columbiaestuary.org Request for Proposals Phase II South
More informationPROVIDENCE WATER SUPPLY BOARD TARIFF. RI Public Utilities Commission Docket No TARIFF SCHEDULES. Bulk Sales to Public Authorities for Resale
PROVIDENCE WATER SUPPLY BOARD TARIFF September 1, 2015 RI Public Utilities Commission Docket No. 4571 Schedule TARIFF SCHEDULES A Service Charges Retail B Metered Sales Retail C Bulk Sales to Public Authorities
More informationREQUISITION & PROPOSAL ALABAMA STATE PORT AUTHORITY DATE: June 18, 2008 ENGINEERING DEPARTMENT ORIGINATING DEPT NO.
DATE: June 18, 2008 ENGINEERING DEPARTMENT ORIGINATING DEPT NO. AFE TBD CN: 1743 TO: Prospective Bidders Please procure the following and DELIVER TO: TECHNICAL SERVICES DIVISION This Requisition solicits
More informationBID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements
BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements BETHEL CHURCH ROAD BID Description Unit Qty Unit Price Extended Total Unit Price Extended Total Mobilization LS 1 $ 2,500.00 $
More informationCITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $
RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement
More informationADDENDUM No. 2. ADDENDUM No. 2 ITEMS:
ADDENDUM No. 2 Proposer must acknowledge the receipt of this Addendum in its Proposal. Failure of the Proposer to acknowledge this Addendum may result in LAWA s rejection of the Proposal for non-responsiveness.
More informationAVERAGE OF BID ITEMS ENGINEERS ESTIMATE
ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian
More informationCh. 264a OWNERS AND OPERATORS 25. CHAPTER 264a. OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE AND DISPOSAL FACILITIES
Ch. 264a OWNERS AND OPERATORS 25 CHAPTER 264a. OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE AND DISPOSAL FACILITIES Subchap. A. GENERAL... 264a.1 B. GENERAL FACILITY STANDARDS... 264a.11
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION 1 Civic Center Dr., San Marcos, CA 92069-2918 (760) 744-1050 FAX (760) 591-4135 FEE SCHEDULE FOR GRADING & IMPROVEMENT PLAN
More informationEversource. Removal of Mercury Boilers. at Schiller Station
Eversource Removal of Mercury Boilers at Schiller Station Monthly Status Report September 2017 Date: October 31, 2017 Subject: Schiller Station Units 1 & 2 Mercury Boiler Removal Monthly Status Report
More information33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.
CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler
More informationProject No Paving & Seal Coat of 52 nd Street NE
I. TABLE OF CONTENTS I. TABLE OF CONTENTS II. APPROVAL OF ENGINEER III. INFORMATION TO BIDDERS IV. GENERAL PROVISIONS V. SPECIAL PROVISIONS VI. BIDDER S PROPOSAL Project No. 0077 Paving and Seal Coat of
More informationNorthumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate
Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)
More informationThe bid due date has been changed to 2:50 p.m. May 25, 2018.
May 18, 2018 BL051-18 Addendum #1 Construction and Rehab of Gravity and Sewer Force Mains on an Contract Make the following changes/additions or clarifications to the above referenced bid: The bid due
More informationSolicitation No. B RA 2010 Concrete Placement Work Order Construction Contract Package No. 2 PROPOSAL. PROPOSAL OF, a corporation a
Solicitation No. B-09-071-RA 2010 Concrete Placement Work Order Construction Contract Package No. 2 PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO
More informationINITIAL STUDY APPLICATION
DEPARTMENT OF PUBLIC WORKS AND PLANNING STEVEN E. WHITE, DIRECTOR INITIAL STUDY APPLICATION INSTRUCTIONS Answer all questions completely. An incomplete form may delay processing of your application. Use
More informationITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2
Page 1 of 16 ITB-PW-U-15-02 Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 ISSUE DATE: January 7, 2015 DUE DATE: January 15, 2015 at 2:00 p.m. SUBJECT: Miscellaneous Changes INTENT: This
More informationCITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018
CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00
More informationBid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221
Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00
More informationMEASUREMENT AND PAYMENT MEASUREMENT OF QUANTITIES Unless otherwise specified, the Engineer will measure in accordance with this section.
MEASUREMENT AND PAYMENT 1901 MEASUREMENT OF QUANTITIES Unless otherwise specified, the Engineer will measure in accordance with this section. The Engineer will determine quantities of acceptable Work using
More informationCLAIM SUMMARY / DETERMINATION. Moss Landing Harbor is a tributary to Monterrey Bay, a navigable waterway of the United States.
CLAIM SUMMARY / DETERMINATION Claim Number: 913029-0001 Claimant: Pacific Marine Salvage Inc. Type of Claimant: Corporation Type of Claim: Removal Costs Claim Manager: Amount Requested: $19,781.75 FACTS:
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More informationFY 2016 Proposed Budget Work Session
Department of Environmental Services FY 2016 Proposed Budget Work Session Tuesday, March 24, 2:30 5:00 Agenda Tuesday, March 24, 2015 2:30 5:00 PM Related FAAC Report: DES Department / Topic Book pgs Web
More informationSEATTLE HARBOR NAVIGATION IMPROVEMENT PROJECT
SEATTLE HARBOR NAVIGATION IMPROVEMENT PROJECT APPENDIX E Cost Engineering Final Integrated Feasibility Report and Environmental Assessment Blank page to facilitate duplex printing Doc#: Cost Team-Form-CP-1,
More informationCity of Clovis. Request for Proposals for Recyclable and Organic Material Collection, Processing and Marketing Services
Request for Proposals for Recyclable and Organic Material Collection, Processing and Marketing Services Final RFP for Public Release November 7, 2014 HF&H Consultants, LLC CITY OF CLOVIS REQUEST FOR PROPOSALS
More informationRFB Addendum 3
Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER
More informationHeadquarters Landfill
Headquarters Landfill Headquarters Landfill Project Progress Sale and Purchase Agreement signed to purchase Headquarters Landfill on March 28, 2012. Final Environmental Impact Statement to convert Headquarters
More informationUnder the proposed Fee Schedule, the permit fees would be adjusted as follows:
6.8 Pursuant to California law, if fees are charged by a local agency in connection with permit issuance, the fees may not exceed the estimated reasonable cost of providing the service for which the fee
More informationAddendum to Enbridge s 2013 Corporate Social Responsibility Report (with a focus on 2013 data)
Addendum to Enbridge s 2013 Corporate Social Responsibility Report (with a focus on 2013 data) Spills, Leaks and Releases Performance Data Sheet This performance data sheet relates to the following Global
More informationCITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER
CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS 12835 NEWCASTLE WAY, SUITE 200 DECEMBER 18, 2012 SPECIAL MEETING 12:00 P.M. 1. CALL TO ORDER 2. GENERAL BUSINESS a. AB 12 077 Resolution Authorizing
More informationSunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List
Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More informationCITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST
CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST Applicant shall provide three (3) copies of the following attachments: Geotechnical Report (Soils Report with grading specifications and
More informationCOUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS
COUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS NOTICE IS HEREBY GIVEN, that Sealed bids will be received at the office of the County Manager/Clerk of the Board of Supervisors, Hall of Justice
More informationINSTRUCTIONS TO BIDDERS
1.0 DEFINITIONS. Terms used in these Instructions to Bidders and the Notice Inviting Bids have the meanings assigned to them in the General Conditions, 007000. The term "Bidder" means one who submits a
More informationCh. 265a INTERIM STATUS STANDARDS a.1
Ch. 265a INTERIM STATUS STANDARDS 25 265a.1 CHAPTER 265a. INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE AND DISPOSAL FACILITIES Subchap. Sec. A. GENERAL... 265a.1
More informationSection 109. MEASUREMENT AND PAYMENT
109.01 Section 109. MEASUREMENT AND PAYMENT 109.01. Measurement of Quantities. The Engineer will measure quantities of work completed under the contract according to United States standard measures, unless
More informationRates Effective 1/1/2018 Water Residential and Commercial Charges CPI not applicable to base and consumption rates for Rates Effective 1/1/2017
Water Rates WATER Regular water rates are indexed annually by the treasurer to reflect one hundred percent of any change from the Consumer Price Index for Seattle- Tacoma-Bremerton-All Urban Wage Earners
More informationINTRACOASTAL WATERWAY ST. LUCIE REACH I MAINTENANCE DREDGING; ST. LUCIE COUNTY, FLORIDA
INTRACOASTAL WATERWAY ST. LUCIE REACH I MAINTENANCE DREDGING; ST. LUCIE COUNTY, FLORIDA SPECIFICATIONS AND CONTRACT DOCUMENTS PREPARED FOR THE FLORIDA INLAND NAVIGATION DISTRICT By 10151 Deerwood Park
More informationAudio Sessions. Session 3 PRECONSTRUCTION. Construction Contract Administration Education Program
Audio Sessions Session 3 PRECONSTRUCTION Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 www.csinet.org This presentation is protected by US and International
More information2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationRANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price
2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF
More information69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11
69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to
More informationDavidson County Fire Marshal Office of the Fire Marshal 935 North Main Street Lexington, NC Fees Paid: $ Check No.
FOR OFFICIAL USE ONLY Permit Number: Application Date: / / Approval Date: / / Initials: Expiration Date: / / Denial Date / / Reason for the Denial: Initials: Davidson County Fire Marshal 935 North Main
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationESTIMATED EXPENDITURES NEEDED TO CONVERT CAPITOL LAKE INTO TIDAL MUD FLATS
ESTIMATED EXPENDITURES NEEDED TO CONVERT CAPITOL LAKE INTO TIDAL MUD FLATS CLIPA by Denis Curry June, 2014 This paper is an update of a March, 2012 CLIPA paper The Construction and Maintenance Costs of
More informationSUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION
Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury
More informationFinancial Assurance for Decommissioning
Vermont Yankee Nuclear Power Station Financial Assurance for Decommissioning December 8, 2014 Agenda Background VY Decommissioning Periods & Cost Estimate Financial Assurance Under 10 CFR 50.75 Dry Fuel
More informationPayment shall be made based on the tonnage charge set forth in CONTRACTOR'S proposal.
Construction and Demolition Debris Disposal Addendum 1 October 16, 2018 Modify Part I, Instructions to Bidders, Section 9.00 Delete the following;: Payment shall be made based on the tonnage charge set
More informationDIVISION 1 - GENERAL REQUIREMENTS SECTION APPLICATIONS FOR PAYMENT
DIVISION 1 - GENERAL REQUIREMENTS SECTION 01027 APPLICATIONS FOR PAYMENT I. GENERAL This section specifies administrative and procedural requirements governing Contractor Applications For Payment. II.
More informationPROPOSAL FOR SHEET PILE RETAINING WALL PROJECT AT THE LAGUNA COAST WILDERNESS PARK. Business Address Phone No. City/State Zip Code
PROPOSAL FOR SHEET PILE RETAINING WALL PROJECT AT THE LAGUNA COAST WILDERNESS PARK Name of Bidder Business Address Phone No. City/State Zip Code TO THE BOARD OF SUPERVISORS OF hereinafter referred to as,
More informationEMERGENCY CONTRACT MANUAL
EMERGENCY CONTRACT MANUAL 2012, Commonwealth of Virginia Virginia Department of Transportation February, 2012 TABLE OF CONTENTS Introduction... 3 Requirements... 5 Emergency Authorization Chart... 6 District
More informationREPLACEMENT OF MERCER COUNTY BRIDGE
ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade
More informationAWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET
STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213
More information~_? BOARD OF COUNTY COMMISSIONERS DATE: January 28, 2014 AGENDA ITEM NO. I I. Public Hearing D. Consent Agenda D. County Administrator's Signature:
BOARD OF COUNTY COMMISSIONERS DATE: January 28, 2014 AGENDA ITEM NO. I I Consent Agenda D Public Hearing D County Administrator's Signature: Subject: Amendment No.6 to the Agreement ith the Florida Department
More informationYakima County Code ~ Building and Construction ~ Title FEES
13.24.010 AMENDED FEE TABLES AND FEE SCHEDULES The fee tables and fee schedules contained in the various codes and regulations adopted in this title shall be amended as established herein. *PLAN REVIEW
More informationUNITED STATES ARMY ALASKA DIRECTORATE OF PUBLIC WORKS FORT WAINWRIGHT, ALASKA DONNELLY TRAINING AREA DELTA CREEK IA FUEL BREAK CLEARING
UNITED STATES ARMY ALASKA DIRECTORATE OF PUBLIC WORKS FORT WAINWRIGHT, ALASKA DONNELLY TRAINING AREA 18-1-3 DELTA CREEK IA FUEL BREAK CLEARING SPECIAL CONTRACT REQUIREMENTS Request for Proposal January
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/10/17
-33,427.31 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/10/17 78 CONTRACT ID: 017605175 PROJECT: NH 2014(292) CONTRACT: 12133220 AWARD AMOUNT: $1,316,346.55 PROJECTED AMOUNT: $1,319,346.55 ADJ. PROJECTED
More informationBID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012
Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00
More informationALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL
ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL July 12, 2010 ALABAMA STATE PORT AUTHORITY FACILITIES MOBILE, ALABAMA The Alabama State Port Authority ( ASPA or Port Authority ) is seeking a private
More informationCITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS
1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating
More informationREQUEST FOR QUOTATION
October 11, 2016 REQUEST FOR QUOTATION The Sheboygan Water Utility is accepting quotations for: 23% Hydrofluosilicic Acid H 2SiF 6, % 23-25 Heavy Metals (as Pb), %
More informationFull Cost Accounting and Solid Waste Rate Structuring
September 28, 2016 8:30 AM New Mexico Solid Waste & Recycling Conference Full Cost Accounting and Solid Waste Rate Structuring Presenter: Mr. David S. Yanke Workshop Agenda A. Background B. Full Cost Accounting
More informationCOUNTY OF GREENVILLE PROPRIETARY FUNDS
Fiscal Years 2012 and 169 COUNTY OF GREENVILLE PROPRIETARY FUNDS Proprietary funds are used to account for activities, which are similar to those found in the private sector. The County s proprietary fund
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1102 ACCEPTANCE OF NON-SPECIFICATION MATERIAL ON CONSTRUCTION PROJECTS.
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1102 ACCEPTANCE OF NON-SPECIFICATION MATERIAL ON CONSTRUCTION PROJECTS October 21, 2016 1102.01 General 1102.02 Determining if Non Specification Material
More informationNE WEST KINGSTON ROAD CULVERT REPLACEMENT
NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS
More informationConservation Commission Procedures Standard Flow Chart - NOT
Conservation Commission Procedures Standard Flow Chart - NOT Mark s Rule of Three Rule 1 - Hearings, site visits, acquire information, close the hearing Rule 2 - Paperwork Issue a great Order of Conditions
More informationPractice 5-4. Unit Rates and Slope. Name Class Date
Name Class Date Practice 5-4 Unit Rates and Slope 5-4 Unit Rates and Slope 1. The graph shows the number of centimeters a particular plant grows over time. Given the points (0,0) and (4,6), how many centimeters
More informationFinal Estimates Level 2
Florida Department of TRANSPORTATION Final Estimates Level 2 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 4 1 4-1 Module Content Adjustments in SiteManager Line Item Adjustments Contract Adjustments
More informationQuestions and Answers RFQ for Disaster Debris Removal and Management Services
Questions and Answers RFQ for Disaster Debris Removal and Management Services The following constitutes questions posed by prospective respondents to this RFQ along with the State s answers. To the extent
More informationAtlas Air Worldwide Holdings, Inc. Consolidated Statements of Operations (in thousands, except per share data) (Unaudited)
Consolidated Statements of Operations (in thousands, except per share data) Operating Revenue ACMI $ 189,047 $ 198,141 Charter 220,138 177,373 Dry Leasing 31,919 24,676 Other 3,741 3,173 Total Operating
More informationRegular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact
CITY COUNCIL AGENDA Meeting Date: 09/16/2013 TITLE: Hatley Way Sidewalk Improvements 2013 Bid Award Responsible Staff: Ron Crumley Backup Material: Backup material attached Digital Presentation: Yes Other
More informationLocal Damage Assessment. Pocket Guide
Local Damage Assessment Pocket Guide INTENTIONALLY BLANK The Purpose of the Damage Assessment Guide Damage assessment is the process which determines the impacts of a natural or human-made disaster. Specifically,
More informationCITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE
CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE GENERAL INSTRUCTIONS 1. This pamphlet lists services available or required to process your project and fees or charges for these services. 2. Fees or deposits
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationFees/Privatization/Sponsorship Opportunities
Fees/Privatization/Sponsorship Opportunities Mike Holder, PE, Chief Engineer Joint Transportation Legislative Oversight Committee January 27, 2015 Statutory Requirement Section 34.17 of Budget Bill: Board
More informationREFUSE COLLECTION COST OF SERVICE STUDY CITY COUNCIL MEETING APRIL 25, 2017
REFUSE COLLECTION COST OF SERVICE STUDY CITY COUNCIL MEETING APRIL 25, 2017 Topics Solid Waste Collection Services Budget Analysis Financial Model Staff Recommendations Solid Waste Collection Services
More informationReimbursement Application Minnesota Agricultural Chemical Response and Reimbursement Account (ACRRA)
625 Robert Street North, St. Paul, MN 55155-2538 www.mda.state.mn.us Pesticide & Fertilizer Management Division, Office: 651/201-6138 Fax: 651/201-6112 Reimbursement Application Minnesota Agricultural
More informationPublic Claims and Damages Arising from Environmental Harms to Our Rivers, Bays and Estuaries Bill Jackson
Public Claims and Damages Arising from Environmental Harms to Our Rivers, Bays and Estuaries Bill Jackson bjackson@jgdpc.com Complexity of Rivers, Bays and Sediment Sites Risk Based Cleanup: Human
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More informationTECHNICAL SPECIFICATIONS ELECTRIC GENERAL CONTRACTOR SERVICES
TECHNICAL SPECIFICATIONS 018-19 ELECTRIC GENERAL CONTRACTOR SERVICES 1. SCOPE OF WORK The scope of work includes providing labor and subcontracts necessary for these Technical Specifications, together
More informationBID OPENING: FRIDAY, September 16,2016 County Engineer \...-/
I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, September 16,2016 County Engineer \...-/ GrouR 1 - Ke~ Peninsula Highwa~ 1 LUMP SUM Mobilization
More informationCulinary and Pressure Irrigation Water System. Capital Facilities Plan
Culinary and Pressure Irrigation Water System Capital Facilities Plan September 2009 Prepared By: J-U-B ENGINEERS, Inc. 240 West Center St., Ste. 200 Orem, Utah 84057 (801) 226-0393 SANTAQUIN CITY CULINARY
More information