1 Asset Management and Condition Assessment Best Practices Jeffrey Sanford 2/28/2013 Joseph Zalla Jeffrey Sanford February 1, 2013
2 Asset Management Definition Effective Asset Management is: An integrated set of processes to minimize the life-cycle costs of owning, operating and maintaining assets, at an acceptable level of risk, while continuously delivering established levels of service Implementing Asset Management A Practical Guide AMWA, NACWA, WEF 2007 Managing Public Infrastructure Assets to Minimize Costs and Maximize Performance AMSA, AMWA, AWWA, WEF 2002
3 Balancing Act. Minimize the life-cycle costs of assets Continuously deliver established levels of service At an acceptable level of risk Service Levels Low Costs RISK
4 Risk is quantified by the classic equation. Risk = (consequence x likelihood) How severe are the consequences of asset failure? How likely is it for the asset to fail?
5 Understanding the risk of asset failure provides The basis prioritizing capital investments for R&R The basis for optimizing O&M The basis for investing in condition assessments A uniform and rigorous manner that results in defensible decisions
6 Risk Based Approach Quantified by using the classic risk equation Risk = (consequence x likelihood) Levels of Service How severe are the consequences of asset failure? H, S implications Financial impact Regulatory compliance Public confidence Service delivery How likely is it for the asset to fail? Condition Reliability O&M Protocols Performance
7 Rio Rancho Consequence of Failure Matrix Consequence by Level of Service Category Rio Rancho LOS Category Wt. Negligible = 1 Low = 4 Moderate = 7 Severe = 10 Safety of public and employees 30% No injuries or adverse health effects No lost-time injuries or medical attention required Lost-time injury or medical attention required Loss of life or widespread outbreak of illness Financial impact 15% Can be repaired within Utility budget (<$2,500) Can be repaired between $2500 and $9,999 Can be repaired between $10,000 to $29,000. Greater than $30,000. Sealed bids and City Council approval required Public confidence 10% No social or economic impact on the community. No reactive media coverage. Any media coverage is a result of proactive announcements by Utility. No complaints. Minor disruption (e.g., traffic, dust, noise,water pressure). No adverse media coverage. Some complaints. Substantial but short-term disruption. Adverse media coverage due to public impact. Localized media coverage. Long-term impact. Areawide disruption. Regional media coverage. Regulatory compliance 25% No State or local permit violations. No SSO's Possible technical violation Probable enforcement action, but fines or surcharge unlikely Enforcement action with fines or surcharge Service Delivery 20% No impact Minor impact to process or out of service less than 24 hours. No SSO's or loss of service Major impact to process, out of service <24 hours. Potential SSO or loss of service Major impact to process, out of service >24 hours, outside services required, SSO' or loss of service
8 Rio Rancho Likelihood Matrix Likelihood Category Likelihood by Category Rio Rancho Wt Negligible = 1 Unlikely = 3 Possible = 5 Likely = 7 Very Likely = 10 Physical Condition 80% Very good. Condition Grade 1. New or nearly new. Only normal maintenance required. Good. Condition Grade 2. Minor wear. Fair. Condition Grade 3. Poor. Condition Grade 4. Major wear impacting level Unable to meet level of of service. service life. Failure imminent. Very poor. Grade 5. Requires complete rehabilitation or replacement. Failed. O&M Protocols (i.e., PMs, SOPs, JSAs)l 5% Complete, up-to-date, written, easily accessible and is being used. Complete, written, up-todate, being used but not easily accessible. Parially developed Written, but out-date and not used. No written protocols. Reliability 15% No corrective work order events within 12 months <2 corrective work order events within 12 months 2-5 corrective work order events within 12 months 6-8 corrective work order events within 12 months >8 corrective work order events within 12 months
9 Use consequence and likelihood scoring matrices to quantify risk of asset failure ASSET Safety of public and employees Financial impact on Utility Public confidence CONSEQUENCE Regulatory compliance Service Delivery Consequence Score Consequence Rank Physical Condition Performance (i.e., capacity, utilization and functionality of asset) LIKELIHOOD O&M Protocols (i.e., SOPs) Planned maintenance as a % of total maintenance Weight-> MILLS ELSWORTH HEACOCK CACTUS & NASON NASON & DRACAEA FREDERICK/ SUNNYMEAD MORENO PERRIS & FIR HEMLOCK ELDER MEDLEY PIGEON PASS ROAD VILLAGE ROAD PERRIS / IRONWOOD HIDDEN SPRINGS STEEPLECHASE / IRONWOOD STEEPLECHASE / KALMIA SUNNYMEAD PKWY PERRIS & KALMIA BOOSTER COVEY REDLANDS / COTTONWOOD Likelihood Score Likelihood Rank Risk Score Risk Rank
10 Use risk levels to prioritize detailed assessments Re-score likelihood of failure based on updated field information Recalculate risk
11 Based on risk assessment, identify areas with unacceptable levels of risk Relative Risk Score of Level 3 Assets Acceptable / Unacceptable Risk Level
12 Benefits from detailed condition assessment Identifies specific deficiencies in equipment assessed Identifies specific maintenance steps that may be taken to increase asset life and reduce likelihood of failure Provides data for the prioritization process Repeatable process that can be continued Repeated assessments of an asset will build a decay curve
13 Condition Assessment is a step-by-step process Gather asset data for the high risk assets identified Develop assessment criteria Upload data into the Asset Condition Evaluation System (ACES) tool Field condition assessment by experienced maintenance personnel Utilize data in prioritization process
14 Asset data gathering Assets and their characteristics are captured Typically, data is obtained from CMMS/GIS Once obtained, data is aligned to hierarchy and asset categories previously developed
15 Development of asset condition criteria Ask and answer predefined questions that relate to the asset condition Questions are grouped by asset type Answers for each question (criteria) are scored from 1 to 5
16 Upload data to the SQL database Pre-populated with risk analysis Condition data gathered is entered into ACES
17 On-site condition assessment
18 Condition assessment data will then be used to: Identify specific deficiencies in equipment assessed Develop condition summary Provide data for the prioritization process Produce multiple reporting options
19 Rio Rancho Water Utility Optimized Asset Management Decision Process
20 Summary Data
21 ATF, 809, 36% System Asset Count Booster Station, 164, 7% Lift Station, 199, 9% Well, 231, 10% Reservoir, 16, 1% WWTP, 825, 37%
22 System Asset Value Booster Station, $1,604,223, 3% ATF, $12,883,032, 29% Lift Station, $2,728,647, 6% Reservoir, $8,914,639, 20% WWTP, $13,349,150, 30% Well, $5,529,642, 12%
23 All Asset Trigger Score Range
24 Replacement Schedules and Costs Water Production Wastewater Treatment Total Capital Plan $ 70,000 $ 63,000 $133,000 Repairs and Maintenance $ 11,600 $ 14,200 $ 25,800 TOTAL $ 81,600 $ 77,200 $158,800
25 Production Repair and Replacement Schedule Based on Equipment Lifespan $8,000,000 $7,000,000 $6,000,000 $5,000,000 $4,000,000 $3,000,000 $2,000,000 $1,000,000 $ Production Production CM
26 Wastewater Repair and Replacement Schedule Based on Equipment Lifespan $6,000,000 $5,000,000 $4,000,000 $3,000,000 $2,000,000 $1,000,000 $ Wastewater Wasterwater CM
27 Combined CM and Replacement Schedule Based on Equipment Lifespan $10,000,000 $9,000,000 $8,000,000 $7,000,000 $6,000,000 $5,000,000 $4,000,000 $3,000,000 $2,000,000 $1,000,000 $
28 10,000,000 Statistical 5 year NPV Plot versus Typical Lifespan Model 9,000,000 8,000,000 7,000,000 6,000,000 5,000,000 4,000,000 3,000,000 2,000,000 1,000,000 0 Year 1 Year 6 Year 11 Year 16 Year 21 Year 26 Simulated Time (Years)
29 10,000,000 Statistical 5 year Pay Back Plot versus Typical Lifespan Model 9,000,000 8,000,000 7,000,000 6,000,000 5,000,000 4,000,000 3,000,000 2,000,000 1,000,000 0 Year 1 Year 6 Year 11 Year 16 Year 21 Year 26 Simulated Time (Years)
30 Optimized versus 5 year NPV Model 5,000,000 4,500,000 4,000,000 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000, ,000 With 5-year payback rule Optimized Replacement Policy Simulated Time (Years)
31 Questions???
Using Tolerable Risk to Drive Asset Management Decision Making
Using Tolerable Risk to Drive Asset Management Decision Making Richmond, Virginia May 12, 2016 1 Principal Asset Management Consultant with GHD and has over 25 years experience in utility management. Nationally
More informationWastewater Asset Management Unique Perspectives from the Engineer & Municipality
Wastewater Asset Management Unique Perspectives from the Engineer & Municipality Alex Mattia GHD Charlie Card GHD Matt Lamb GHD Patrick Fellrath Plymouth Twp. 2018 Boyne Falls Agenda for today Introduction
More information2016 Collection Systems Workshop. Asset Management for Small to Midsized Communities
2016 Collection Systems Workshop FISHBECK, THOMPSON, CARR & HUBER, INC. Asset Management for Small to Midsized Communities Ohio Water Environment Association May 18 2016 An asset management program identifies
More informationPractical Water Utility Asset Management Plans
Kevin Campanella, Utility Planning Leader, Burgess & Niple September, 2016 Practical Water Utility Asset Management Plans Inconsistency Treatment plants One tracked pencils, another didn t track small
More informationPlanning Your Asset Management Journey
Planning Your Asset Management Journey Dale Jutila, CH2M HILL Pacific Northwest Section AWWA May 7, 2009 1 Why Asset Management? Friday, December 5, 2008 The House Transportation and Infrastructure Committee
More informationMONETIZING RISKS A PRIORITIZATION & OPTIMIZATION SOLUTION JASON DE STIGTER, P.E. 13 October 2014
13 October 2014 MONETIZING RISKS A PRIORITIZATION & OPTIMIZATION SOLUTION JASON DE STIGTER, P.E. SENIOR CONSULTANT SOUTHWEST SECTION AWWA ANNUAL CONFERENCE TULSA, OKLAHOMA TOP 5 INDUSTRY ISSUES MIDWEST
More informationENTERPRISE RISK MANAGEMENT (ERM) GOVERNANCE POLICY PEDERNALES ELECTRIC COOPERATIVE, INC.
1. Purpose: 1.1. Pedernales Electric Cooperative ( PEC ) is committed to delivering low-cost, reliable and safe energy solutions for the benefit of our members. In order to improve the likelihood of achieving
More informationCNAM Risk Management for Utility Managers
CNAM 2013 Heather McGinnity PEng. Region of Peel Project Manager Roop Lutchman, PEng. GHD Leader, Business Consulting May 07 th, 2013 Agenda 1. Introduction 2. Risk Management Framework 3. Case Study (Lake
More informationNew Strategies for Prioritizing Old Projects Using Risk and Triple Bottom Line Criteria Presenter: Celine Hyer, PE ARCADIS/Malcolm Pirnie 5/23/2012
New Strategies for Prioritizing Old Projects Using Risk and Triple Bottom Line Criteria Presenter: Celine Hyer, PE ARCADIS/Malcolm Pirnie 5/23/2012 Today s Agenda Overview of Toho Water Authority Risk
More informationNCHRP Consequences of Delayed Maintenance
NCHRP 14-20 Consequences of Delayed Maintenance Recommended Process for Bridges and Pavements prepared for NCHRP prepared by Cambridge Systematics, Inc. with Applied Research Associates, Inc. Spy Pond
More informationProject Risk Management. Prof. Dr. Daning Hu Department of Informatics University of Zurich
Project Risk Management Prof. Dr. Daning Hu Department of Informatics University of Zurich Learning Objectives Understand what risk is and the importance of good project risk management Discuss the elements
More informationFacility Management Triage
5 November, 2010 Facility Management Triage A Risk-Based Approach for Identifying & Prioritizing Maintenance & Repair projects Albert Antelman, Senior Fellow Institute for Responsible Infrastructure Stewardship
More informationTHE DISTRICT OF MUSKOKA ASSET MANAGEMENT PLAN FOR ROADS, BRIDGES, WATER AND WASTEWATER ASSETS
THE DISTRICT OF MUSKOKA ASSET MANAGEMENT PLAN FOR ROADS, BRIDGES, WATER AND WASTEWATER ASSETS MAY 29, 2014 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview 1-1 1.2 Plan Development 1-1
More informationConstruction Mitigation Management
Construction Mitigation Management Construction and the Community A formal construction mitigation effort is a fairly new approach to an old standing problem of proactively managing the Community concerns
More informationEnterprise Risk Management Program
Enterprise Risk Management Program David W Sundvall, Risk Manager 3/2/2016 Page 0 of 12 Table of Contents Introduction... 2 Approach... 2 Risk Appetite... 3 Roles and Responsibilities... 3 Process... 4
More informationCity of Madison 2019 Operating Budget 296
City of Madison 2019 Operating Budget 296 City of Madison 2019 Operating Budget 297 Agency: Sewer Proposed Budget Cost to Continue Proposed Change Revenue -$38,331,199 -$40,684,110 -$2,352,911 Expenditures
More informationCity of Glendale, Arizona Pavement Management Program
City of Glendale, Arizona Pavement Management Program Current Year Plan (FY 2014) and Five-Year Plan (FY 2015-2019) EXECUTIVE SUMMARY REPORT December 2013 TABLE OF CONTENTS TABLE OF CONTENTS I BACKGROUND
More informationFraud Risk Management
Fraud Risk Management Fraud Risk Assessment Part 2 2017 Association of Certified Fraud Examiners, Inc. Fraud Risk Assessment Frameworks Frameworks are helpful for performing, evaluating, and reporting
More information2017 ENTERPRISE ASSET MANAGEMENT PLAN
Corporate Asset Management 2017 ENTERPRISE ASSET MANAGEMENT PLAN Investments in Peel s Infrastructure We are all asset managers! Executive Summary The Region s infrastructure is a public investment with
More informationAs presented at the Institute of Municipal Engineering of South Africa (IMESA) conference 2013
Paper title: OUTCOMES FROM A SEWER MAINTENANCE BACKLOG INVESTIGATION As presented at the Institute of Municipal Engineering of South Africa (IMESA) conference 2013 Morné Pienaar a a Aurecon Port Elizabeth,
More informationperthcounty_amp2_d The Asset Management Plan for the County of Perth October 2016
The Asset Management Plan for the County of Perth October 2016 1 Content Executive Summary... 8 I. Introduction & Context... 9 II. Asset Management...10 III. AMP Objectives and Content...11 IV. Data and
More informationBy Shayne C. Kavanagh and Jennifer Belknap Williamson
Risk-Aware Infrastructure Maintenance By Shayne C. Kavanagh and Jennifer Belknap Williamson This article is part of an ongoing series about financial sustainability, based on GFOA s new financial sustainability
More informationWhat Makes Risk Management Work?
What Makes Risk Management Work? Rick Wells Associate, Risk Management MIRARCO Mining Innovation, Sudbury, Canada w w w. m i r a r c o. o r g Agenda Introduction; Risk Assessment vs Risk Management; Issues
More informationRisk Management Framework
Risk Management Framework Risk Management Framework 1. The University views Risk Management as integral to the successful execution of its Strategy. In order to achieve the aims set out in our strategy,
More informationRISK MANAGEMENT. Co-X/QHS/SOP03
CONVENTION & EXHIBITION (PUTRAJAYA) SDN. BHD. Co-X/QHS/SOP03 Revision No.: 02 Effective Date: 1 st November 2017 PREPARED BY REVIEWED BY APPROVED BY Name: Name: Name: Position: Position: Position: REFERENCE
More informationPACP Based Asset Management
PACP Based Asset Management Objectives of Asset Management Maintain function or level of service as cost effectively as possible Maintain individual components (assets) at lowest life cycle cost possible
More information: The EXAKT Cost Model
1 of 13 11/03/2011 10:48 PM The EXAKT Cost Model By:Murray Wiseman on:sun 21 of Jan., 2007 02:24 MST (346 Reads) The EXAKT Cost Model Return to WikiHome Slide 1 Nature, and therefore humankind, must optimize
More informationThe City of Owen Sound Asset Management Plan
The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to
More informationAMP2016. County of Grey. The 2016 Asset Management Plan for the. w w w. p u b l i c s e c t o r d i g e s t. c o m
AMP2016 w w w. p u b l i c s e c t o r d i g e s t. c o m The 2016 Asset Management Plan for the County of Grey SUBMITTED BY THE PUBLIC SECTOR DIGEST INC. (PSD) WWW.PUBLICSECTORDIGEST.COM JULY 2017 Contents
More informationRisk management procedures
Purpose and scope In accordance with the BizOps Enterprises risk management policy, these procedures describe the organisation s standard process for risk management, including: 1. Risk identification
More informationHighway Engineering-II
Highway Engineering-II Chapter 7 Pavement Management System (PMS) Contents What is Pavement Management System (PMS)? Use of PMS Components of a PMS Economic Analysis of Pavement Project Alternative 2 Learning
More informationSOLID GROUP INC. ENTERPRISE RISK MANAGEMENT POLICY
SOLID GROUP INC. ENTERPRISE RISK MANAGEMENT POLICY SECTION 1. PURPOSE This Policy establishes the standards, processes and accountability structure to identify, assess, prioritize and manage key risk exposures
More informationRisk Assessment Workshop Pam Walaski, CSP, CHMM Director, Health and Safety GAI Consultants, Inc. Pittsburgh, PA
Risk Assessment Workshop Pam Walaski, CSP, CHMM Director, Health and Safety GAI Consultants, Inc. Pittsburgh, PA Today s Plan of Action Benefits of Risk Assessment Risk Assessment Definitions Identifying
More informationAn Update On Association Policies, Health Checks & Guidelines To A Safer Hockey Association. Lauren Woods Member Engagement & Operations
An Update On Association Policies, Health Checks & Guidelines To A Safer Hockey Association Lauren Woods Member Engagement & Operations Association Health Checks Issues arising from the health check: 3/27
More informationEVENT OPERATIONS RISK ASSESSMENT WORKSHEET
EVENT DETAILS Client to complete Event name: Event date: Event no: (ICC Sydney to complete) Stand no: Event location: ASSESSMENT DETAILS Client to complete Description of Event/ Activity Assessed: ID:
More informationRisk Management Strategy. February 2016 February 2019 Risk management, risk Assurance Plan SOP
Corporate Risk Register: Standard Operating Procedure Document Control Summary Status: Version: Author/Title: Owner/Title: Approved by: Ratified: Related Trust Strategy and/or Strategic Aims Implementation
More informationA Holistic Approach to Risk Management. Dono Tong & Jeff Chan
A Holistic Approach to Risk Management Dono Tong & Jeff Chan 1 Agenda Business Today & Tomorrow Evolution of Risk Management Process Risk Management in MTR 2 Business in the 21 st Century Changing Business
More informationAppendices to NCHRP Research Report 903: Geotechnical Asset Management for Transportation Agencies, Volume 2: Implementation Manual
Appendices to NCHRP Research Report 903: Geotechnical Asset Management for Transportation Agencies, Volume 2: Implementation Manual This document contains the following appendices to NCHRP Research Report
More informationFundamentals of Project Risk Management
Fundamentals of Project Risk Management Introduction Change is a reality of projects and their environment. Uncertainty and Risk are two elements of the changing environment and due to their impact on
More informationJob Safety Analysis Preparation And Risk Assessment
Job Safety Analysis Preparation And Risk Assessment Sample Only Reference CPL_PCR_JSA_Risk_Assessment Revision Number SAMPLE ONLY Document Owner Sample Date 2015 File Location Procedure Revision Date Major
More informationLeveraging Infrastructure Management Systems. Andrea Becker, MASc, P.Eng. Doug Manarin, P.Eng. Engineering 1 Services
Leveraging Infrastructure Management Systems Andrea Becker, MASc, P.Eng. Doug Manarin, P.Eng. Engineering 1 Services PRESENTATION AGENDA Engineering s Asset Management Strategy and Framework Integrated
More information1.0 CITY OF HOLLYWOOD, FL
1.0 CITY OF HOLLYWOOD, FL PAVEMENT MANAGEMENT SYSTEM REPORT 1.1 PROJECT INTRODUCTION The nation's highways represent an investment of billions of dollars by local, state and federal governments. For the
More informationTOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN
TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN JUNE 24, 2014 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview 1-1 1.2 Plan Development 1-1 1.3 Maintaining the Asset Management Plan 1-2 1.4
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS Water & Sewer Utilities Optimization City of Wichita Public Works & Utilities May 14, 2015 PROJECT DEFINITION The City of Wichita is seeking proposals for assistance with the risk,
More informationTotal Budget Year 1 - FY Estimated Project Specific Funding. External Deliver Project Contrib Cost Contrib Balance Cost
RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 4 FISCAL YEARS 2017-18 THROUGH 2021-22 Project Number Stg No. Project Title
More informationKidsafe NSW Risk Management Plan. August 2014
Kidsafe NSW Risk Management Plan August 2014 Document Control Document Approval Name & Position Signature Date Document Version Control Version Status Date Prepared By Comments Document Reviewers Name
More informationIntroduction to Risk for Project Controls
Introduction to Risk for Project Controls By Eukeni Urrechaga, PE Quick view at Project Controls Project Controls, like project management, is much an art as it is a science. The secret of good project
More informationDeck Preservation Strategies with a Bridge Management System. Paul Jensen Montana Department of Transportation
Deck Preservation Strategies with a Bridge Management System Paul Jensen Montana Department of Transportation Email : pjensen@mt.gov Development Of A Roadmap Definitions Outcomes Culture Models Performance
More informationOptimal Risk-Based Life-Cycle Cost Scheduling of Water & Sewer Main Replacements
Optimal Risk-Based Life-Cycle Cost Scheduling of Water & Sewer Main Replacements The firefighter who was driving the firetruck when it fell into the Valley Village sinkhole caused by a broken water line
More informationTHE HYBRID PERFORMANCE BASED PAVEMENT MANAGEMENT STRATEGY
THE HYBRID PERFORMANCE BASED PAVEMENT MANAGEMENT STRATEGY Travis Gilbertson, Opus International Consultants Ltd, Christchurch, NZ ABSTRACT Hybrid performance based road management and maintenance contracts
More informationISO/DIS 9001:2015 Risk-Based Thinking
ISO/DIS 9001:2015 Risk-Based Thinking Whittington & Associates, LLC 6175 Hickory Flat Highway, Suite 110-303, Canton, GA 30115 www.whittingtonassociates.com 770-517-7944 Version 1.0: 01/10/15 2015 Whittington
More informationAsset Management Made Easy
Asset Management Made Easy Presented by: Gary Vaughan Date: April 17, 2014 1 My Background Gary Vaughan 40+ years Utility Experience 17 years Government 10 years private utility 13 Consultant WERF Strategic
More informationHazim M Abdulwahid, MSC, MBA Hazim Consulting
Road Map for Establishing Pavement Maintenance Management System on the Strategic Level 13 th International O&M Conference in the Arab Countries,17-19 Nov 2015 Hazim M Abdulwahid, MSC, MBA Hazim Consulting
More informationTransportation Economics and Decision Making. Lecture-11
Transportation Economics and Decision Making Lecture- Multicriteria Decision Making Decision criteria can have multiple dimensions Dollars Number of crashes Acres of land, etc. All criteria are not of
More informationWater Service Asset Management Plan
Water Service Asset Management Plan November 2016 Joel Shaw, P.Eng. 1435 Water Street Kelowna, BC V1Y 1J4 TEL (250) 469-8739 jshaw@kelowna.ca kelowna.ca Document Control Rev No Date Revision Details Author
More informationFinal report May 13, Ontario Ministry of Transportation CVOR effectiveness study
Final report May 13, 2013 Ontario Ministry of Transportation CVOR effectiveness study Table of contents 1 Executive summary... 1 2 CVOR Program background... 4 3 CVOR Effectiveness Study Approach... 6
More informationStep 5 INSTRUCTIONS FOR USING RISK ASSESSMENT TEMPLATE. Step 6. Step 1. Step 2. Step 3. Step 4. Complete Section 3 Emergency Response Plan
INSTRUCTIONS FOR USING RISK ASSESSMENT TEMPLATE When completing a risk management assessment focus your thoughts on three critical areas: 1. People 2. Environment 3. Equipment Step 5 Complete Section 3
More informationDeveloping Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System
Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System M. Arif Beg, PhD Principal Consultant, AgileAssets Inc. Ambarish Banerjee, PhD Consultant, AgileAssets
More informationCowal Gold Project Addendum to the Transport of Hazardous Materials Study
Cowal Gold Project Addendum to the Transport of Hazardous Materials Study On 7 February 2017 the Cowal Gold Project s (the Project) Development Consent (DA 14/98) was modified to reflect approval of the
More informationWHS Risk Assessment and Control Form
WHS Risk Assessment and Control Form Step 1: Who has conducted the Risk Assessment Risk Assessment completed by (name): Staff / Student Number: Signature: Date: Step 4: Documentation and initial approval
More informationCORPORATE AND EMERGENCY SERVICES
CORPORATE AND EMERGENCY SERVICES Asset Management Plan April 19, 2018 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview 1-1 1.2 Plan Development 1-1 1.3 Maintaining the Asset Management
More informationRisk Management & FMEAs. By Jay P. Patel, ASQ Fellow CEO & President QPS Institute
Risk Management & FMEAs By Jay P. Patel, ASQ Fellow CEO & President QPS Institute Learning Objectives Understand Risk management process elements Learn the principles involved in the Risk process Know
More informationclient user GUIDE 2011
client user GUIDE 2011 STEP ACTION Accessing Risk Register 1. Type https://www.scm rms.ca/riskregister/login.aspx 2. Click in the Username field on the Risk Register home page. 3. Type your Username and
More informationAccess the Mobile App: Or Search in your App store: COSC2015. #IATA_CabinSafety
Welcome! Access the Mobile App: http://eventmobi.com/cs2015 Or Search in your App store: COSC2015 #IATA_CabinSafety Risk Assessment: Identifying your safety risks Facilitator: Nancy Rockbrune Assistant
More informationAMP2016. i t r i g e s t. c o w w w. p u b l i c s e c t o r d i g e s t. c o m. The 2016 Asset Management Plan for the Township of Hamilton
AMP2016 i t r i g e s t. c o w w w. p u b l i c s e c t o r d i g e s t. c o m The 2016 Asset Management Plan for the Township of Hamilton SUBMITTED BY THE PUBLIC SECTOR DIGEST INC. (PSD) WWW.PUBLICSECTORDIGEST.COM
More informationMUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES
MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES TO: FROM: Mayor and Members of Council Gerry Wolting, B. Math, CPA, CA General Manager, Corporate Services DATE: January 13, 2014 SUBJECT: 2013 Asset Management
More informationRisk-based Prioritization of Transmission & Distribution Projects in Westchester County
Risk-based Prioritization of Transmission & Distribution Projects in Westchester County NYS AWWA Water Event April 26, 2017 Alberto Quiroz, PE Outline Background Methodology Results SUEZ in North America
More informationRisk Assessment Mitigation Phase Risk Mitigation Plan Lessons Learned (RAMP B) November 30, 2016
Risk Assessment Mitigation Phase Risk Mitigation Plan Lessons Learned (RAMP B) November 30, 2016 #310403 Risk Management Framework Consistent with the historic commitment of Southern California Gas Company
More informationDemonstrating the Use of Pavement Management Tools to Address GASB Statement 34 Requirements
Demonstrating the Use of Pavement Management Tools to Address GASB Statement 34 Requirements Angela S. Wolters and Kathryn A. Zimmerman Applied Pavement Technology, Inc. 3001 Research Road, Suite C Champaign,
More informationSoftware Project Management. Chapter Two Project evaluation and programme management
Software Project Management Chapter Two Project evaluation and programme management 1 Main topics to be covered The business case for a project Project portfolios Project evaluation Cost benefit analysis
More informationHAZARD MANAGEMENT POLICY Page 1 of 7 Reviewed: October 2018
Page 1 of 7 Policy Applies to: The Board of Directors, staff employed by Mercy Hospital, Credentialed Specialists, Allied Health Professionals, contractors, students, volunteers and visitors. Related Standards:
More informationUniversity of Greenwich Risk Management Guide Revised October 2017
University of Greenwich Risk Management Guide Revised October 2017 Purpose of the Guide 1. This document supplements the Risk Management Policy of the University of Greenwich. It explains why risk management
More informationRisk Management Policy Appendix A: Institutional Risk Tolerance Statement
Original Approval Date: September 17, 2005 Most Recent Approval Date: April 23, 2012 Parent Policy: Risk Management Policy Risk Management Policy Appendix A: Institutional Risk Tolerance Statement Office
More informationMulti-Objective Optimization Model using Constraint-Based Genetic Algorithms for Thailand Pavement Management
Multi-Objective Optimization Model using Constraint-Based Genetic Algorithms for Thailand Pavement Management Pannapa HERABAT Assistant Professor School of Civil Engineering Asian Institute of Technology
More informationAsset Management Investment Plan
Asset Management Plan Prepared for the City of Kimberley 304-1353 Ellis Street Kelowna, BC, V1Y 1Z9 T: 250.762.2517 F: 250.763.5266 June 2016 File: 1162.0014.01 A s s e t M a n a g e m e n t I n v e s
More informationCriteria for Establishing Objectives & Targets
Impacts and Hazards Projects Alignment Process Criteria for Establishing Objectives & Targets Legal & Other Requirements Legal & Other Requirements 2 14 Technological Options 1 1 2 1 8 Financial 1 1 1
More informationRisk Management Framework. Metallica Minerals Ltd
Risk Management Framework Metallica Minerals Ltd Risk Management Framework 23 March 2012 Table of Contents Contents 1. Introduction... 3 2. Risk Management Approach... 3 3. Roles and Responsibilities...
More informationInfrastructure Risk Management. Infrastructure Risk Management
Infrastructure Risk Management What is Risk and Uncertainty? Risk and uncertainty are two terms basic to any decision making framework. Risk can be defined as imperfect knowledge where the probabilities
More informationSewer Rate Study July 2016
July 2016 Prepared By The Finance Division TABLE OF CONTENTS SECTION 1: EXECUTIVE SUMMARY... 1 1.1 Background... 1 1.2 Purpose... 1 1.3 Current Sewer Rates... 1 1.4 Five Year Financial Projection... 1
More informationRisk Management Strategy January NHS Education for Scotland RISK MANAGEMENT STRATEGY
NHS Education for Scotland RISK MANAGEMENT STRATEGY January 2016 1 Contents 1. NES STATEMENT ON RISK MANAGEMENT 2 RISK MANAGEMENT STRATEGY 3 RISK MANAGEMENT STRUCTURES 4 RISK MANAGEMENT PROCESSES 5 RISK
More informationBartlett Tree Experts Tree Risk Assessment and Recommendations
Bartlett Tree Experts Tree Risk Assessment and Recommendations Prepared for: Town of Weston Scenic Roadways, Inventory/Assesment Weston, Massachusetts 02493 Assessed by: Andrew Balon The F.A. Bartlett
More informationApplying Risk-based Decision-making Methods/Tools to U.S. Navy Antiterrorism Capabilities
Applying Risk-based Decision-making Methods/Tools to U.S. Navy Antiterrorism Capabilities Mr. Charles Mitchell ABSG Consulting Inc. Alexandria, VA (703) 519-6387 cmitchell@absconsulting.com Commander Chris
More informationRISK REGISTER POLICY AND PROCEDURE
RISK REGISTER POLICY AND PROCEDURE Lead Manager: Head of Clinical Governance Responsible Director: Board Medical Director Approved by: Date Approved: Date for Review: Feb 2012 Replaces Version: 1.0 Page
More informationEconomic Appraisal Objectives
Network Screening HSM Vol. 1 (Part B) Chapters 7 & 8 MODULE 10. ECONOMIC APPRAISAL AND PRIORITIZATION Roadway Safety Management Process Diagnosis and Countermeasure Selection Economic Appraisal and Prioritization
More informationManagement System Effectiveness
Management System Effectiveness Stockholm 14.11.2016 TE.GEN.00409-001 Concept of Effectiveness 2 The ability to be successful and produce the intended results 3 4 5 Inspector competence - Understanding
More informationInformation Technology Project Management, Sixth Edition
Management, Sixth Edition Prepared By: Izzeddin Matar. Note: See the text itself for full citations. Understand what risk is and the importance of good project risk management Discuss the elements involved
More informationReview of the Federal Transit Administration s Transit Economic Requirements Model. Contents
Review of the Federal Transit Administration s Transit Economic Requirements Model Contents Summary Introduction 1 TERM History: Legislative Requirement; Conditions and Performance Reports Committee Activities
More informationPractitioners Guide to Building Resilience into Infrastructure Networks
Practitioners Guide to Building Resilience into Infrastructure Networks David HEILER, Rod CAMERON, New Zealand Key words: SCIRT, resilience, whole of life, wastewater, NPV, option evaluation, levels of
More informationAsset Management Plan 2016 Township of King
Asset Management Plan 206 Township of King GHD Allstate Parkway Suite 30 Markham Ontario L3R 9T8 T 905 752 4300 F 905 752 430 5432 Table of Contents. 2. 3. 4. 5. 6. Executive Summary. Introduction.2 State
More informationQueen s University Belfast. Risk Management. Policy and Procedures
Queen s University Belfast Risk Management Policy and Procedures POLICY SCHEDULE Policy title Policy owner Policy lead contact Approving body Date of approval/review Related Guidelines and Procedures Review
More informationRisk Management Framework
Risk Management Framework Anglican Church, Diocese of Perth November 2015 Final ( Table of Contents Introduction... 1 Risk Management Policy... 2 Purpose... 2 Policy... 2 Definitions (from AS/NZS ISO 31000:2009)...
More informationMunicipal Asset Management Plans
Municipal Asset Management Plans AMCTO Webinar October 12, 2012 Agenda Introduction Municipal Infrastructure Investment Initiative Asset Management Scoping Asset Management Approaches State of Local Infrastructure
More information2.2 For Board Members to approve the five high risks the Trust is facing:
HEREFORD HOSPITALS NHS TRUST PUBLIC BOARD MEETING 28 TH JANUARY 2011 COMPANY SECRETARY S REPORT NICOLA.LICENCE@HHTR.NHS.UK BOARD ASSURANCE FRAMEWORK 1.0 INTRODUCTION 1.1 The attached Board Assurance Framework
More informationHow Can Near Misses be Used to Improve Your Safety Program? We Work Safely
How Can Near Misses be Used to Improve Your Safety Program? Matt Shurtliff, CSP Director of Safety and Environmental Issues J.D. Heiskell & Co. 1 Before We Start If you re unsure of a safe way to do a
More informationHITRUST Third Party Assurance (TPA) Risk Triage Methodology
HITRUST Third Party Assurance (TPA) Risk Triage Methodology A streamlined approach to assessing the inherent risk posed by a third party and selecting an appropriate assurance mechanism leveraging the
More informationRISK MANAGEMENT. Budgeting, d) Timing, e) Risk Categories,(RBS) f) 4. EEF. Definitions of risk probability and impact, g) 5. OPA
RISK MANAGEMENT 11.1 Plan Risk Management: The process of DEFINING HOW to conduct risk management activities for a project. In Plan Risk Management, the remaining FIVE risk management processes are PLANNED
More informationBasel III Reforms. Strategic Initiatives of the Risk Management Implementation in Risk and its Management Profiles
630 Basel III Reforms In order to improve the 's ability to manage risk due to interest rate movements affecting income and capital (interest Rate Risk in Banking Book/IRRBB), Bank Mandiri has made preparations
More informationA Study on Risk Analysis in Construction Project
A Study on Risk Analysis in Construction Project V. Rathna Devi M.E. Student, Department of civil engineering, Velammal Engineering College, Tamil Nadu, India ---------------------------------------------------------------------***--------------------------------------------------------------------
More informationThe Corporation of the Municipality of Central Elgin ORDER OF THE DAY
Page The Corporation of the Municipality of Central Elgin ORDER OF THE DAY FOR THE REGULAR MEETING OF COUNCIL ON MONDAY, DECEMBER 23rd, 2013 @ 1:00 PM IN THE COUNCIL CHAMBERS Roll Call Disclosure of Pecuniary
More informationCHALET ALOUETTE. If the booking is made within 8 weeks of the commencement of the rental period, 100% of the rental price should be paid.
BOOKING FORM & TERMS AND CONDITIONS CHALET ALOUETTE, GRIMENTZ 3961 SWITZERLAND THE FOLLOWING BOOKING FORM AND TERMS AND CONDITIONS, FORM THE BASIS OF THE RENTAL CONTRACT FOR CHALET ALOUETTE. PLEASE READ
More information