FFY 2019 NEPA TIP Highway & Bridge Draft

Size: px
Start display at page:

Download "FFY 2019 NEPA TIP Highway & Bridge Draft"

Transcription

1 Carbon MPMS #:11013 Municipality:Mahoning (Twp) Title:SR 3005 over Mahoning Creek Route:3005 Section:01B A/Q Status:Exempt Improvement Type:Bridge Replacement Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:04/01/2023 Geographic Limits:SR 3005 over Mahoning Creek, Mahoning Township, Carbon County Narrative:This project involves the replacement/rehabilitation of the bridge carrying Country Club Road (State Route 3005) over Mahoning Creek in Mahoning Township, Carbon County. PE BOF $ 0 $ 200 $ 200 $ 0 $ 0 $ 0 PE 185 $ 0 $ 50 $ 50 $ 0 $ 0 $ 0 FD BOF $ 0 $ 0 $ 0 $ 280 $ 0 $ 0 FD 185 $ 0 $ 0 $ 0 $ 70 $ 0 $ 0 UTL BOF $ 0 $ 0 $ 0 $ 0 $ 12 $ 0 UTL 185 $ 0 $ 0 $ 0 $ 0 $ 3 $ 0 ROW BOF $ 0 $ 0 $ 0 $ 28 $ 0 $ 0 ROW 185 $ 0 $ 0 $ 0 $ 7 $ 0 $ 0 CON BOF $ 0 $ 0 $ 0 $ 0 $ 1,200 $ 0 CON 185 $ 0 $ 0 $ 0 $ 0 $ 300 $ 0 $ 0 $ 250 $ 250 $ 385 $ 1,515 $ 0 Total FY Cost $ MPMS #:11140 Municipality:Penn Forest (Twp) Title:T-516 County Bridge #12 Route:7211 Section:B12 A/Q Status:Exempt Improvement Type:Bridge Replacement Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:04/08/2021 Geographic Limits:T-516 (North Old Stage Road) over Mud Run, Penn Forest Township Narrative:This project involves the replacement/rehabilitation of the Carbon County Bridge #12 on North Old State Road (T-516) over Mud Run in Penn Forest Township, Carbon County. 1 / 68

2 11140 Carbon FD BOF $ 0 $ 156 $ 0 $ 0 $ 0 $ 0 FD 183 $ 0 $ 29 $ 0 $ 0 $ 0 $ 0 FD LOC $ 0 $ 10 $ 0 $ 0 $ 0 $ 0 UTL BOF $ 0 $ 0 $ 26 $ 0 $ 0 $ 0 UTL 183 $ 0 $ 0 $ 5 $ 0 $ 0 $ 0 UTL LOC $ 0 $ 0 $ 2 $ 0 $ 0 $ 0 ROW BOF $ 0 $ 78 $ 0 $ 0 $ 0 $ 0 ROW 183 $ 0 $ 15 $ 0 $ 0 $ 0 $ 0 ROW LOC $ 0 $ 5 $ 0 $ 0 $ 0 $ 0 CON BOF $ 0 $ 0 $ 500 $ 540 $ 0 $ 0 CON 183 $ 0 $ 0 $ 30 $ 165 $ 0 $ 0 CON LOC $ 0 $ 0 $ 10 $ 55 $ 0 $ 0 $ 0 $ 293 $ 573 $ 760 $ 0 $ 0 Total FY Cost $ 1, / 68

3 Carbon MPMS #:66296 Municipality:Mahoning (Twp) Title:443 Roadway Route:443 Section:02S A/Q Status:Significant Improvements Improvement Type:Safety Improvement Exempt Code: Est. Let Date:02/13/2020 Geographic Limits:State Route 443 from Carbon Plaza Mall to Thomas J. McCall Memorial Bridge, Borough of Lehighton and Mahoning Townships, Carbon County Narrative:This project involves widening the roadway and installing a center turn lane along East Blakeslee Boulevard (State Route 443) from Ashtown Drive to East Bridge Street (State Route 209) at the McCall Memorial Bridge. The project is located in the Borough of Lehighton and Mahoning Townships, Carbon County. CON CAQ $ 0 $ 0 $ 0 $ 0 $ 1,553 $ 0 CON STP $ 0 $ 3,061 $ 4,557 $ 375 $ 7,207 $ 0 CON STU $ 0 $ 328 $ 328 $ 328 $ 0 $ 0 CON 581 $ 0 $ 2,857 $ 1,977 $ 792 $ 2,311 $ 0 $ 0 $ 6,246 $ 6,862 $ 1,495 $ 11,071 $ 0 Total FY Cost $ 14, MPMS #:70239 Municipality: Title:Urban Line Item Reserve Route: Section: A/Q Status:Exempt Improvement Type:Restoration Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date: Geographic Limits:Carbon, Monroe, Schuylkill Counties Narrative:This National Highway Performance Program based reserve line item is to be utilized for cost overruns on approved highway and bridge projects from past and current Transportation Improvement Programs within Carbon, Monroe, & Schuylkill Counties. CON STU $ 314 $ 0 $ 0 $ 0 $ 0 $ 0 $ 314 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ / 68

4 Carbon MPMS #:75578 Municipality: Title:Safety Line Item Reserve Route: Section: A/Q Status:Exempt Improvement Type:Safety Improvement Exempt Code:Safety improvement program Est. Let Date: Geographic Limits:Pike, Carbon, Monroe & Schuylkill Counties Narrative:Safety reserve line item to be utilized for cost overruns on approved safety projects from past and current Transportation Improvement Programs within the NEPA MPO for projects in Pike, Carbon, Monroe, & Schuylkill Counties. CON HSIP $ 156 $ 6 $ 70 $ 145 $ 1,460 $ 2,069 $ 156 $ 6 $ 70 $ 145 $ 1,460 $ 2,069 Total FY Cost $ MPMS #:82784 Municipality: Title:CMAQ Line Item Reserve Route: Section: A/Q Status:Exempt Improvement Type:Corridor Safety Exempt Code:Safety improvement program Improvement Est. Let Date: Geographic Limits:Carbon, Monroe and Schuylkill Counties Narrative:Reserve funds for Congestion Mitigation and Air Quality (CMAQ) eligible projects in Carbon County. Please note that projects in Monroe and Schuylkill Counties aren't eligible less those projects can demonstrate an air quality benefit in Carbon County. Funds may be used for transportation projects likely to contribute to the attainment or maintenance of a national ambient air quality standard, with a high level of effectiveness in reducing air pollution. Projects have not yet been identified. CON CAQ $ 249 $ 249 $ 249 $ 249 $ 5,655 $ 7,209 $ 249 $ 249 $ 249 $ 249 $ 5,655 $ 7,209 Total FY Cost $ / 68

5 Carbon MPMS #:83085 Municipality:Lansford (Boro) Title:Patterson St Resurface Route:209 Section:11M A/Q Status:Exempt Improvement Type:Resurface Exempt Code:Pavement resurfacing and/or rehabilitation Est. Let Date:08/10/ /10/2017 Geographic Limits:Patterson Street (State Route 209) from the Schuylkill County Line to Lansford ending approximately at East Snyder Avenue in Lansford, Lansford and Summit Hill boroughs, Carbon County Narrative:This project involves highway resurfacing of Patterson Street (State Route 209) from Schuylkill County Line to Lansford ending approximately at East Snyder Avenue in Lansford in Lansford and Summit Hill Boroughs, Carbon County. CON STP $ 50 $ 0 $ 0 $ 0 $ 0 $ 0 CON 581 $ 13 $ 0 $ 0 $ 0 $ 0 $ 0 $ 63 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ MPMS #:83087 Municipality: Title:Delivery_Consult Assist Route: Section:DCA A/Q Status:Exempt Improvement Type:Miscellaneous Exempt Code:Engr to assess effects of actn or alts to the actn Est. Let Date: Geographic Limits:Carbon, Monroe, and Schuylkill Counties Narrative:Consultant assistance in project delivery and construction for Carbon, Monroe, and Schuylkill Counties. Specific projects have not yet been identified. PE 581 $ 234 $ 1,000 $ 1,000 $ 1,000 $ 0 $ 0 $ 234 $ 1,000 $ 1,000 $ 1,000 $ 0 $ 0 Total FY Cost $ 3, / 68

6 Carbon MPMS #:83088 Municipality:Franklin (Twp) Title:Interchange Rd Slope Failure Route:209 Section:12M A/Q Status:Exempt Improvement Type:Resurface Exempt Code:Pavement resurfacing and/or rehabilitation Est. Let Date:02/14/2019 Geographic Limits:Interchange Road (State Route 209) from about Cherry Hill Road to the Monroe County Line, Franklin and Towamensing Townships, Carbon County Narrative:This project involves highway resurfacing on Interchange Road (State Route 209) from about Cherry Hill Road to the Monroe County Line in Franklin and Towamensing Townships, Carbon County. CON NHPP $ 800 $ 0 $ 0 $ 0 $ 0 $ 0 CON 581 $ 200 $ 0 $ 0 $ 0 $ 0 $ 0 $ 1,000 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ 1, MPMS #:89057 Municipality:Jim Thorpe (Boro) Title:Transp Enhance/ Alternative Project Mngmt Route: Section:TEM A/Q Status:Exempt Improvement Type:Miscellaneous Exempt Code:Trns enhnc acts (excpt rehab, opr. of hist. trans) Est. Let Date: Geographic Limits:Carbon, Monroe, and Schuylkill Counties Narrative:Consultant management contract to assist local sponsors in developing approved Transportaion Alternative Projects in Carbon, Monroe and Schuylkill Counties. PE STP $ 25 $ 25 $ 25 $ 25 $ 0 $ 0 PE 581 $ 15 $ 15 $ 15 $ 15 $ 0 $ 0 $ 40 $ 40 $ 40 $ 40 $ 0 $ 0 Total FY Cost $ / 68

7 Carbon MPMS #:89629 Municipality:Mahoning (Twp) Title:Fritz Valley Rd over Normal Creek Route:3001 Section:02B A/Q Status:Exempt Improvement Type:Replace/Rehab Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:10/19/ /19/2017 Geographic Limits:Rehabilitation or Replacement of bridge carrying State Route 3001 (Fritz Valley Road) over Normal Creek, Mahoning Township, Carbon County Narrative:This project involves the replacement/rehabilitation of the bridge carrying Fritz Valley Road (State Route 3001) over Normal Creek in Mahoning Township, Carbon County. CON 185 $ 5 $ 0 $ 0 $ 0 $ 0 $ 0 $ 5 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ MPMS #:91990 Municipality:Summit Hill (Boro) Title:US 209 over NRR Removal Route:209 Section:13B A/Q Status:Exempt Improvement Type:Bridge Removal Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:04/09/2020 Geographic Limits:SR 209 over Lehigh Canal and abandoned Northern Reading Railroad, Summit Hill Borough, Carbon County Narrative:This project involves backfilling the structure on East Patterson Street (State Route 209) over the Lehigh Canal and abandoned Northern Reading Railroad in Summit Hill Borough, Carbon County. The road over the structure will be maintained but the bridge deck will be removed and remaining structure backfilled. ROW 581 $ 50 $ 0 $ 0 $ 0 $ 0 $ 0 CON 581 $ 0 $ 400 $ 0 $ 0 $ 0 $ 0 $ 50 $ 400 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ / 68

8 Carbon MPMS #:95270 Municipality:Kidder (Twp) Title:Tannery Rd RR Crossing Route:1005 Section:02X A/Q Status:Exempt Improvement Type:RR Warning Devices Exempt Code:Railroad/highway crossing warning devices Est. Let Date:03/08/2018 Geographic Limits:SR 1005 (Tannery Road), At-Grade crossing DOT # N, Kidder Township, Carbon County, Narrative:This project involves upgrades to railroad warning devices on State Route 1005 (Tannery Road) in Kidder Township, Carbon County. CON RRX $ 182 $ 0 $ 0 $ 0 $ 0 $ 0 $ 182 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ MPMS #:96435 Municipality:Lansford (Boro) Title:SpringGarden-N Pine Resur Route:902 Section:0 A/Q Status:Exempt Improvement Type:Resurface Exempt Code:Pavement resurfacing and/or rehabilitation Est. Let Date:04/01/2024 Geographic Limits:Spring Garden/North Pine (SR 902), from US 209 to between Lehigh and E. Richard Streets, Carbon County Narrative:This project involves the highway resurfacing of State Route 902 (Spring Garden/North Pine) from US 209 to between Lehigh and East Richard Streets in Lansford and Summit Hill Boroughs in Carbon County. PE 581 $ 0 $ 0 $ 100 $ 0 $ 0 $ 0 FD 581 $ 0 $ 0 $ 0 $ 0 $ 100 $ 0 UTL 581 $ 0 $ 0 $ 0 $ 0 $ 50 $ 0 ROW 581 $ 0 $ 0 $ 0 $ 0 $ 50 $ 0 CON STP $ 0 $ 0 $ 0 $ 0 $ 520 $ 0 CON 581 $ 0 $ 0 $ 0 $ 0 $ 130 $ 0 $ 0 $ 0 $ 100 $ 0 $ 850 $ 0 Total FY Cost $ / 68

9 Carbon MPMS #:96438 Municipality:Palmerton (Boro) Title:Delaware Ave Resurface Route:2002 Section:02M A/Q Status:Exempt Improvement Type:Resurface Exempt Code:Pavement resurfacing and/or rehabilitation Est. Let Date:04/09/2020 Geographic Limits:Delaware Avenue (SR 2002), from Mauch Chunk Road to SR 2001, Lower Towamensing Township & Palmerton Borough, Carbon County Narrative:This project involves the highway resurfacing of Delaware Avenue (State Route 2002) from Mauch Chunk Road to State Route 2001 in Lower Towamensing Township & and Palmerton Borough in Carbon County. PE 581 $ 50 $ 0 $ 0 $ 0 $ 0 $ 0 CON 581 $ 0 $ 150 $ 550 $ 0 $ 0 $ 0 $ 50 $ 150 $ 550 $ 0 $ 0 $ 0 Total FY Cost $ MPMS #:96478 Municipality:Franklin (Twp) Title:PA 248 Rehabilitation Route:248 Section:0 A/Q Status:Exempt Improvement Type:Restoration Exempt Code:Pavement resurfacing and/or rehabilitation Est. Let Date:04/01/2024 Geographic Limits:PA 248, from US 209 to Northampton County Line, Carbon County Narrative:This project involves the rehabilitation of PA 248 from US 209 to the Northampton County Line in East Penn Township, Franklin Township, Lower Towamensing Township, Bowmanstown Borough, Palmerton Borough, Parryville Borough in Carbon County. PE NHPP $ 0 $ 0 $ 200 $ 120 $ 0 $ 0 PE 581 $ 0 $ 0 $ 50 $ 30 $ 0 $ 0 FD 581 $ 0 $ 0 $ 0 $ 0 $ 400 $ 0 CON 581 $ 0 $ 0 $ 0 $ 0 $ 11,941 $ 0 $ 0 $ 0 $ 250 $ 150 $ 12,341 $ 0 Total FY Cost $ / 68

10 Carbon MPMS #:97326 Municipality:Lower Towamensing (Twp) Title:Environmental Impacts Resolution LI Route: Section:EIR A/Q Status:Exempt Improvement Type:Environmental Mitigation Exempt Code:Engr to assess effects of actn or alts to the actn Est. Let Date: Geographic Limits:Various sites within Carbon, Monroe, and Schuylkill Counties Narrative:Regional set-a-side for monitoring, maintenance and repairs of constructed wetlands and MS4 requirements of the EPA (Environmental Protection Agency) on approved highway and bridge projects from past and current Transportation Improvement Programs as well as identifying potential sites for environmental mitigation requirements in Carbon, Monroe and Schuylkill Counties within the Northeastern Pennsylvania Alliance. PE 581 $ 65 $ 25 $ 25 $ 25 $ 0 $ 0 $ 65 $ 25 $ 25 $ 25 $ 0 $ 0 Total FY Cost $ MPMS #:97421 Municipality:Lower Towamensing (Twp) Title:Construction Assistance Route: Section:CAS A/Q Status:Exempt Improvement Type:Miscellaneous Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date: Geographic Limits:Various locations in Carbon, Monroe & Schuylkill Counties Narrative:Consultant assistance for inspection and/or oversight of approved Transportation Improvement Program construction projects eligible for state funding including highway, bridge and transportation alternative projects in Carbon, Monroe, and Schuylkill Counties. Specific projects have not yet been identified. CON 581 $ 100 $ 100 $ 100 $ 0 $ 0 $ 0 $ 100 $ 100 $ 100 $ 0 $ 0 $ 0 Total FY Cost $ / 68

11 Carbon MPMS #:97944 Municipality:Towamensing (Twp) Title:Construction Assistance Route: Section:CAF A/Q Status:Exempt Improvement Type:Resurface Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date: Geographic Limits:Various locations in Carbon, Monroe & Schuylkill Counties Narrative:Consultant assistance for inspection and/or oversight of approved Transportation Improvement Program construction projects eligible for federal funding including highway, bridge and transportation alternative projects in Carbon, Monroe, and Schuylkill Counties. Specific projects have not yet been identified. CON STP $ 100 $ 0 $ 0 $ 0 $ 0 $ 0 $ 100 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ MPMS #: Municipality:Kidder (Twp) Title:NEPA Hwy & Bridge Reserve Route: Section: A/Q Status:Exempt Improvement Type:Restoration Exempt Code:Pavement resurfacing and/or rehabilitation Est. Let Date: Geographic Limits:Pike, Carbon, Monroe, & Schuylkill Counties Narrative:This National Highway Performance Program based reserve line item is to be utilized for cost overruns on approved highway and bridge projects from past and current Transportation Improvement Programs within Pike, Carbon, Monroe, & Schuylkill Counties. Specific projects have not yet been identified. CON BOF $ 6 $ 5 $ 331 $ 0 $ 386 $ 14,190 CON NHPP $ 5 $ 0 $ 293 $ 0 $ 0 $ 232 CON STP $ 0 $ 0 $ 0 $ 0 $ 44 $ 307 CON 185 $ 207 $ 32 $ 0 $ 0 $ 717 $ 28,710 CON 581 $ 158 $ 66 $ 73 $ 0 $ 778 $ 12,466 $ 376 $ 103 $ 697 $ 0 $ 1,925 $ 55,905 Total FY Cost $ 1, / 68

12 Carbon MPMS #: Municipality: Title:NEPA Traffic ReviewAssist Route: Section: A/Q Status:Exempt Improvement Type:Miscellaneous Exempt Code:Engr to assess effects of actn or alts to the actn Est. Let Date: Geographic Limits:Carbon, Monroe, Schuylkill Counties Narrative:The project provides consultant staffing review assistance in the PennDOT District 5-0 traffic unit for Carbon, Monroe and Schuylkill Counties. Reviews may involve but are not limited to the following submissions: guiderail plans, pavement marking plans, signing plans, traffic control plans, pedestrian studies, ITS plans, trail crossing submissions and any submissions subject to the state and federal criteria outlined in Pub 46, Publication 212, 213 and any traffic related publication. Work may also include engineering services typical of previous traffic open ends in the District for design of various small traffic engineering projects. General Survey, design for municipal traffic signals, preparation of traffic control plans, general traffic engineering studies and analysis, transportation. systems management, meetings / coordination and ITS design. PE 581 $ 319 $ 150 $ 150 $ 150 $ 0 $ 0 $ 319 $ 150 $ 150 $ 150 $ 0 $ 0 Total FY Cost $ MPMS #: Municipality:Franklin (Twp) Title:NEPA BR Preserve&Repair 4 Route:209 Section:BRM A/Q Status:Exempt Improvement Type:Bridge Preservation Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Activities Est. Let Date:06/30/ /30/2016 Geographic Limits:Carbon, Monroe and Schuylkill counties Narrative:This project involves design and construction of bridge improvements of various bridges in Carbon, Monroe, and Schuylkill Counties. CON 581 $ 186 $ 0 $ 0 $ 0 $ 0 $ 0 $ 186 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ / 68

13 Carbon MPMS #: Municipality:Packer (Twp) Title:NEPA Brg Preserve & Repair 5 Route:93 Section:BRM A/Q Status:Exempt Improvement Type:Bridge Preservation Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Activities Est. Let Date:06/18/2020 Geographic Limits:Various bridges in Carbon, Monroe, and Schuylkill Counties Narrative:Consultant design and construction of bridge repairs and preservation of various bridges in Carbon, Monroe, and Schuylkill Counties to reduce outstanding priority bridge repair items. CON 185 $ 0 $ 1,700 $ 1,000 $ 377 $ 0 $ 0 $ 0 $ 1,700 $ 1,000 $ 377 $ 0 $ 0 Total FY Cost $ 3, MPMS #: Municipality:Mahoning (Twp) Title:Mansion Hill Rock Slide Mitigation Route:209 Section:RSM A/Q Status:Exempt Improvement Type:Safety Improvement Exempt Code:Hazard elimination program Est. Let Date:07/26/2018 Geographic Limits:SR 209 from Segment 230/Offset 150 to Segment 230/Offset 3000 known as "Mansion House Hill", Mahoning Township, Carbon County Narrative:This is a safety improvement project along the rock face of State Route 209 from approximately Segment 230 Offset 150 to Segment 230 Offset 3000 (Mansion House Hill) in Mahoning Township, Carbon County. CON NHPP $ 2,400 $ 0 $ 0 $ 0 $ 0 $ 0 CON 581 $ 600 $ 0 $ 0 $ 0 $ 0 $ 0 $ 3,000 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ 3, / 68

14 Carbon MPMS #: Municipality:Lower Towamensing (Twp) Title:SR 248 Wall Ground Anchors Route:248 Section:GAR A/Q Status:Exempt Improvement Type:Reconstruct Exempt Code:Hazard elimination program Est. Let Date:12/06/2018 Geographic Limits:660 LF Retaining wall along SR 248 (west of the cantilever) WB in Lower Towamensing Township, Carbon County Narrative:Retaining wall repair by drilling anchors, concrete repairs, and drainage improvements on SR 248 in Lower Towamensing Township, Carbon County. CON 581 $ 766 $ 0 $ 0 $ 0 $ 0 $ 0 $ 766 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ MPMS #: Municipality:Mahoning (Twp) Title:Jim Thorpe Retaining Wall Route:209 Section:RWR A/Q Status:Exempt Improvement Type:Drainage Improvement Exempt Code:Hazard elimination program Est. Let Date:04/09/2020 Geographic Limits:SR 209 (Mauch Chunk St.) seg 230/0000 to seg 240/0000, Jim Thorpe Borough & Lehighton Township, Carbon County Narrative:This is the rehabilitation of a masonry retaining wall supporting State Route 209 (Mauch Chunk Street) in Jim Thorpe Borough and Lehighton Township, Carbon County. FD NHPP $ 120 $ 0 $ 0 $ 0 $ 0 $ 0 FD 581 $ 30 $ 0 $ 0 $ 0 $ 0 $ 0 UTL NHPP $ 0 $ 41 $ 0 $ 0 $ 0 $ 0 UTL 581 $ 0 $ 10 $ 0 $ 0 $ 0 $ 0 ROW NHPP $ 0 $ 41 $ 0 $ 0 $ 0 $ 0 ROW 581 $ 0 $ 10 $ 0 $ 0 $ 0 $ 0 CON NHPP $ 0 $ 1,000 $ 1,000 $ 960 $ 0 $ 0 CON 581 $ 0 $ 250 $ 250 $ 240 $ 0 $ 0 $ 150 $ 1,352 $ 1,250 $ 1,200 $ 0 $ 0 Total FY Cost $ 3, / 68

15 Carbon MPMS #: Municipality:Penn Forest (Twp) Title:903 over Mud Run Route:903 Section:04B A/Q Status:Exempt Improvement Type:Bridge Replacement Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:04/14/2022 Geographic Limits:SR 903 over Mud Run, Penn Forest Township, Carbon County Narrative:This project involves the replacement/rehabilitation of the bridge carrying State Route 903 over Mud Run in Penn Forest Township, Carbon County. PE 185 $ 100 $ 250 $ 0 $ 0 $ 0 $ 0 FD 185 $ 0 $ 0 $ 300 $ 0 $ 0 $ 0 UTL 185 $ 0 $ 0 $ 0 $ 40 $ 0 $ 0 ROW 185 $ 0 $ 0 $ 30 $ 0 $ 0 $ 0 CON 185 $ 0 $ 0 $ 0 $ 976 $ 824 $ 0 $ 100 $ 250 $ 330 $ 1,016 $ 824 $ 0 Total FY Cost $ 1, MPMS #: Municipality:East Side (Boro) Title:NEPA Bridge Overlay Bundle Route:80 Section:09B A/Q Status:Exempt Improvement Type:Bridge Preservation Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Activities Est. Let Date:06/18/2020 Geographic Limits:Various Locations, Carbon, Monroe & Schuylkill Counties Narrative:Bridge overlay bundle of various bridges in Carbon, Monroe, and Schuylkill Counties. CON 185 $ 0 $ 1,400 $ 1,000 $ 783 $ 0 $ 0 $ 0 $ 1,400 $ 1,000 $ 783 $ 0 $ 0 Total FY Cost $ 3, Monroe 15 / 68

16 Monroe MPMS #:11728 Municipality:Hamilton (Twp) Title:County Bridge #8 - Foundry Rd (T-231 ) Route:7205 Section:FRB A/Q Status:Exempt Improvement Type:Replace/Rehab Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:04/14/2022 Geographic Limits:Foundry Road (T-231) over Appenzell Creek, Hamilton Township, Monroe County Narrative:This project involves the replacement or rehabilitation of the bridge carrying Foundry Road (T-231) over Appenzell Creek in Hamilton Township, Monroe County. PE BOF $ 240 $ 0 $ 0 $ 0 $ 0 $ 0 PE 183 $ 45 $ 0 $ 0 $ 0 $ 0 $ 0 PE LOC $ 15 $ 0 $ 0 $ 0 $ 0 $ 0 FD BOF $ 0 $ 0 $ 160 $ 0 $ 0 $ 0 FD 183 $ 0 $ 0 $ 30 $ 0 $ 0 $ 0 FD LOC $ 0 $ 0 $ 10 $ 0 $ 0 $ 0 UTL BOF $ 0 $ 0 $ 0 $ 8 $ 0 $ 0 UTL 183 $ 0 $ 0 $ 0 $ 2 $ 0 $ 0 UTL LOC $ 0 $ 0 $ 0 $ 1 $ 0 $ 0 ROW BOF $ 0 $ 0 $ 12 $ 0 $ 0 $ 0 ROW 183 $ 0 $ 0 $ 2 $ 0 $ 0 $ 0 ROW LOC $ 0 $ 0 $ 1 $ 0 $ 0 $ 0 CON BOF $ 0 $ 0 $ 0 $ 960 $ 0 $ 0 CON 183 $ 0 $ 0 $ 0 $ 180 $ 0 $ 0 CON LOC $ 0 $ 0 $ 0 $ 60 $ 0 $ 0 $ 300 $ 0 $ 215 $ 1,211 $ 0 $ 0 Total FY Cost $ 1, MPMS #:11802 Municipality:Pocono (Twp) Title:SR 4004 Over Pocono Creek Route:4004 Section:01B A/Q Status:Exempt Improvement Type:Bridge Rehabilitation Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:04/25/2019 Geographic Limits:SR 4004 (Old Sullivan Trail), Over Pocono Creek, Pocono Township, Monroe County Narrative:This project involves preservation activities to the bridge carrying State Route 4004 (Old Sullivan Trail) over the Pocono Creek in Pocono Township, Monroe County. 16 / 68

17 11802 Monroe ROW 185 $ 25 $ 0 $ 0 $ 0 $ 0 $ 0 CON BOF $ 320 $ 0 $ 0 $ 0 $ 0 $ 0 CON 185 $ 80 $ 0 $ 0 $ 0 $ 0 $ 0 $ 425 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ / 68

18 Monroe MPMS #:11817 Municipality:Pocono (Twp) Title:Scotrun - Swiftwater Route:611 Section:04S A/Q Status:Significant Improvement Type:Safety Improvement Exempt Code: Est. Let Date:09/15/ /15/2016 Geographic Limits:SR 611 from T-535 to T-537, Pocono Township, Monroe County Narrative:This project is a safety project that will widen the roadway to allow for turning lanes throughout the corridor and a traffic signal at the Brookdale Road intersection with State Route 611 in Pocono Township, Monroe County. CON STP $ 8 $ 0 $ 0 $ 0 $ 0 $ 0 CON 581 $ 2 $ 0 $ 0 $ 0 $ 0 $ 0 $ 10 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ MPMS #:11851 Municipality:Delaware Water Gap (Boro) Title:SR 2030 Ramp Brg over I-80 Route:2030 Section:02B A/Q Status:Exempt Improvement Type:Replace/Rehab Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:12/07/ /07/2017 Geographic Limits:Ramp Bridge carrying State Route 2030 over I-80, Delaware Water Gap, Monroe County Narrative:This project involves the replacement of the Exit 310 off ramp bridge carrying State Route 2030 (Bridge Street) over I-80 in the Delaware Water Gap, Monroe County. CON STP $ 1,762 $ 1,022 $ 0 $ 0 $ 0 $ 0 $ 1,762 $ 1,022 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ 2, / 68

19 Monroe MPMS #:11872 Municipality:Pocono (Twp) Title:Stites Tunnel Bridge Route:191 Section:04B A/Q Status:Exempt Improvement Type:Bridge Replacement Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:08/09/2018 Geographic Limits:Bridge carrying State Route 191 over Paradise Creek, Pocono Township, Monroe County Narrative:This project involves the replacement of the Stites Tunnel Bridge on State Route 191 over Analomink Creek in Pocono Township, Monroe County. CON 185 $ 1,533 $ 0 $ 0 $ 0 $ 0 $ 0 $ 1,533 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ 1, MPMS #:47668 Municipality:Smithfield (Twp) Title:Hollow Road Bridge Route:2023 Section:01B A/Q Status:Exempt Improvement Type:Replace/Rehab Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:06/01/2020 Geographic Limits:Hollow Road (State Route 2023) Bridge over Shawnee Creek, Smithfield Township, Monroe County Narrative:This project involves the replacement or rehabilitation of the bridge that carries Hollow Road (State Route 2023) over Shawnee Creek in Smithfield Township, Monroe County. FD 185 $ 350 $ 0 $ 0 $ 0 $ 0 $ 0 UTL 185 $ 0 $ 100 $ 0 $ 0 $ 0 $ 0 ROW 185 $ 50 $ 0 $ 0 $ 0 $ 0 $ 0 CON 185 $ 0 $ 450 $ 0 $ 0 $ 0 $ 0 $ 400 $ 550 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ / 68

20 Monroe MPMS #:67265 Municipality:East Stroudsburg (Boro) Title:SR 2024 Ridgeway Street Route:2024 Section:01B A/Q Status:Exempt Improvement Type:Replace/Rehab Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:08/22/2019 Geographic Limits:SR 2024 (Ridgeway Street) over Delaware Lackawanna Railroad, Pennsylvania Northeast Regional Railroad Authority, East Stroudsburg Borough, Monroe County Narrative:This project involves the replacement or rehabilitation of the bridge carrying State Route 2024 (Ridgeway Street) over the Delaware-Lackawanna Railroad controlled by the Pennsylvania Northeast Regional Railroad Authority in East Stroudsburg Borough, Monroe County. UTL 581 $ 300 $ 0 $ 0 $ 0 $ 0 $ 0 CON STP $ 2,600 $ 1,800 $ 0 $ 0 $ 0 $ 0 CON 185 $ 650 $ 450 $ 0 $ 0 $ 0 $ 0 $ 3,550 $ 2,250 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ 5, MPMS #:74979 Municipality:Pocono (Twp) Title:611 /715 Improvements Route:611 Section:11M A/Q Status:Significant Improvement Type:Safety Improvement Exempt Code: Est. Let Date:01/28/2021 Geographic Limits:I-80 Exit 298, SR 611, Scotrun and Exit 299, SR 715, Tannersville and Pocono Townships, Monroe County Narrative:This project involves congestion reduction on Interstate 80 at Exit 298, State Route 611, Scot Run, Exit 299 and State Route 715 in Pocono Township, Monroe County. FD SXF $ 800 $ 0 $ 0 $ 0 $ 0 $ 0 FD LOC $ 200 $ 0 $ 0 $ 0 $ 0 $ 0 UTL SXF $ 400 $ 0 $ 0 $ 0 $ 0 $ 0 UTL LOC $ 100 $ 0 $ 0 $ 0 $ 0 $ 0 ROW SXF $ 1,028 $ 0 $ 0 $ 0 $ 0 $ 0 ROW LOC $ 257 $ 0 $ 0 $ 0 $ 0 $ 0 CON SXF $ 0 $ 0 $ 10,640 $ 0 $ 0 $ 0 CON LOC $ 0 $ 0 $ 2,660 $ 0 $ 0 $ 0 $ 2,785 $ 0 $ 13,300 $ 0 $ 0 $ 0 Total FY Cost $ 16, / 68

21 Monroe MPMS #:76369 Municipality:Barrett (Twp) Title:PA 390 over Leavitts Branch Route:390 Section:01B A/Q Status:Exempt Improvement Type:Bridge Rehabilitation Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:06/08/ /08/2017 Geographic Limits:PA 390 bridge over Leavitts Branch Creek, Barrett Township, Monroe County Narrative:This project involves the rehabilitation or replacement of the bridge that carries PA 390 over Leavitts Branch Creek in Barrett Township, Monroe County. CON 185 $ 1 $ 0 $ 0 $ 0 $ 0 $ 0 $ 1 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ MPMS #:76371 Municipality:Smithfield (Twp) Title:I-80 Bridge Ramp to SR 8024 Route:8024 Section:01B A/Q Status:Exempt Improvement Type:Bridge Replacement Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:12/07/ /07/2017 Geographic Limits:I-80 Bridge Ramp to State Route 8024, Smithfield Township, Monroe County Narrative:This project involves a replacement of the Interstate 80 Exit 310 Bridge Ramp (State Route 8024) onto Interstate 80 westbound in Smithfield Township, Monroe County. Also, the project includes replacing the existing signalized intersection where Broad Street, (SR 2028), and T-663 (River Road /Foxtown Hill Road) and the Exit 310 ramps meet in Smithfield Township with a roundabout. CON NHPP $ 657 $ 1,330 $ 513 $ 0 $ 0 $ 0 $ 657 $ 1,330 $ 513 $ 0 $ 0 $ 0 Total FY Cost $ 2, / 68

22 Monroe MPMS #:79160 Municipality:Barrett (Twp) Title:SR 447 over Brodhead Crk. Route:447 Section:05B A/Q Status:Exempt Improvement Type:Bridge Replacement Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:09/14/ /14/2017 Geographic Limits:Bridge carrying State Route 447 over Brodhead Creek, Barrett Township, Monroe County Narrative:This project involves the replacement of the bridge that carries State Route 447 over Brodhead Creek in Barrett Township, Monroe County. CON BOF $ 20 $ 0 $ 0 $ 0 $ 0 $ 0 CON 185 $ 5 $ 0 $ 0 $ 0 $ 0 $ 0 $ 25 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ MPMS #:79163 Municipality:Pocono (Twp) Title:SR 715 over Pocono Creek Route:715 Section:01B A/Q Status:Exempt Improvement Type:Replace/Rehab Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:01/28/2021 Geographic Limits:Bridge carrying State Route 715 over Pocono Creek, Pocono Township, Monroe County Narrative:This project involves the replacement or rehabilitation of the bridge that carries State Route 715 over Pocono Creek in Pocono Township, Monroe County. FD 581 $ 371 $ 0 $ 0 $ 0 $ 0 $ 0 UTL 581 $ 0 $ 27 $ 0 $ 0 $ 0 $ 0 ROW 581 $ 106 $ 0 $ 0 $ 0 $ 0 $ 0 CON 185 $ 0 $ 0 $ 0 $ 2,000 $ 746 $ 0 $ 477 $ 27 $ 0 $ 2,000 $ 746 $ 0 Total FY Cost $ 2, / 68

23 Monroe MPMS #:79171 Municipality:Paradise (Twp) Title:SR 1004 Swiftwater Creek Route:1004 Section:02B A/Q Status:Exempt Improvement Type:Bridge Replacement Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:04/14/2022 Geographic Limits:SR 1004 over Swiftwater Creek, Paradise Township, Monroe County Narrative:This project involves the replacement/rehabilitation of the bridge carrying Lower Swiftwater Road (State Route 1004) over Swiftwater Creek in Paradise Township, Monroe County. PE 581 $ 300 $ 100 $ 0 $ 0 $ 0 $ 0 FD BOF $ 0 $ 0 $ 200 $ 0 $ 0 $ 0 FD 185 $ 0 $ 0 $ 50 $ 0 $ 0 $ 0 UTL BOF $ 0 $ 0 $ 0 $ 0 $ 8 $ 0 UTL 185 $ 0 $ 0 $ 0 $ 0 $ 2 $ 0 ROW BOF $ 0 $ 0 $ 28 $ 0 $ 0 $ 0 ROW 185 $ 0 $ 0 $ 7 $ 0 $ 0 $ 0 CON BOF $ 0 $ 0 $ 0 $ 237 $ 563 $ 0 CON 185 $ 0 $ 0 $ 0 $ 59 $ 141 $ 0 $ 300 $ 100 $ 285 $ 296 $ 714 $ 0 Total FY Cost $ MPMS #:79178 Municipality:Hamilton (Twp) Title:SR 2010 over McMichael's Creek Route:2010 Section:02B A/Q Status:Exempt Improvement Type:Bridge Rehabilitation Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:11/01/2018 Geographic Limits:SR 2010 over McMichaels Creek, Hamilton Township, Monroe County Narrative:This project involves the rehabilitation of the bridge that carries State Route 2010 over McMichaels Creek in Hamilton Township, Monroe County. CON BOF $ 1,150 $ 300 $ 0 $ 0 $ 0 $ 0 $ 1,150 $ 300 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ 1, / 68

24 Monroe MPMS #:79179 Municipality:Stroudsburg (Boro) Title:SR 2012 over Pocono Creek Route:2012 Section:ABB A/Q Status:Exempt Improvement Type:Bridge Rehabilitation Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:11/01/2018 Geographic Limits:SR 2012 (J. Summerfield Staples Bridge) over Pocono Creek, Stroudsburg Borough, Monroe County Narrative:This project involves the restoration of the bridge carrying State Route 2012 (J. Summerfield Staples Bridge) over Pocono Creek in Stroudsburg Borough, Monroe County. CON NHPP $ 850 $ 190 $ 0 $ 0 $ 0 $ 0 CON 581 $ 213 $ 48 $ 0 $ 0 $ 0 $ 0 $ 1,063 $ 238 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ 1, MPMS #:79205 Municipality:Paradise (Twp) Title:Red Rock Road (T565) over Forest Hill Run Route:1006 Section:01B A/Q Status:Exempt Improvement Type:Replace/Rehab Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:04/08/2021 Geographic Limits:Red Rock Road (T565) over Forest Hill Run, Paradise Township, Monroe County Narrative:This project involves the replacement or rehabilitation of the bridge carrying Red Rock Road (T-565) over Forest Hill Run in Paradise Township, Monroe County. FD 581 $ 0 $ 250 $ 0 $ 0 $ 0 $ 0 UTL BOF $ 0 $ 0 $ 20 $ 0 $ 0 $ 0 UTL 185 $ 0 $ 0 $ 5 $ 0 $ 0 $ 0 ROW BOF $ 0 $ 12 $ 0 $ 0 $ 0 $ 0 ROW 185 $ 0 $ 3 $ 0 $ 0 $ 0 $ 0 CON BOF $ 0 $ 0 $ 400 $ 0 $ 0 $ 0 CON 185 $ 0 $ 0 $ 100 $ 0 $ 0 $ 0 $ 0 $ 265 $ 525 $ 0 $ 0 $ 0 Total FY Cost $ / 68

25 Monroe MPMS #:79473 Municipality:Pocono (Twp) Title:SR 715/ 611 Intersection Route:715 Section:03S A/Q Status:Significant Improvement Type:Safety Improvement Exempt Code: Est. Let Date:01/28/2021 Geographic Limits:State Route 715/ 611 Intersection, Pocono Township, Monroe County Narrative:This project will reconfigure the current two offsetting SR 715 approaches along 611 to create a 4-way intersection by adding through and turn lanes and new traffic signal to improve SR 611 corridor safety and traffic operations. Requires right of way acquisitions, tree removal, rock excavation, roadway reconstruction and widening in Pocono Township, Monroe County. FD 581 $ 1,200 $ 0 $ 0 $ 0 $ 0 $ 0 UTL 581 $ 0 $ 570 $ 0 $ 0 $ 0 $ 0 ROW 581 $ 1,800 $ 0 $ 0 $ 0 $ 0 $ 0 CON 581 $ 0 $ 0 $ 0 $ 5,000 $ 9,500 $ 0 $ 3,000 $ 570 $ 0 $ 5,000 $ 9,500 $ 0 Total FY Cost $ 8, MPMS #:85808 Municipality:Hamilton (Twp) Title:SR 2036 over PA 33 Route:2036 Section:0 A/Q Status:Exempt Improvement Type:Replace/Rehab Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:04/01/2024 Geographic Limits:SR 2036, Shiffers Road over PA 33, Hamilton Township, Monroe County Narrative:This project involves the replacement/rehabilitation of bridge carrying Shiffer Road (State Route 2036) over PA 33 in Hamilton Township, Monroe County. PE 185 $ 0 $ 0 $ 500 $ 0 $ 0 $ 0 FD BOF $ 0 $ 0 $ 0 $ 0 $ 400 $ 0 FD 185 $ 0 $ 0 $ 0 $ 0 $ 100 $ 0 UTL BOF $ 0 $ 0 $ 0 $ 0 $ 60 $ 0 UTL 185 $ 0 $ 0 $ 0 $ 0 $ 15 $ 0 ROW BOF $ 0 $ 0 $ 0 $ 0 $ 40 $ 0 ROW 185 $ 0 $ 0 $ 0 $ 0 $ 10 $ 0 CON BOF $ 0 $ 0 $ 0 $ 0 $ 3,040 $ 0 CON 185 $ 0 $ 0 $ 0 $ 0 $ 760 $ 0 $ 0 $ 0 $ 500 $ 0 $ 4,425 $ 0 Total FY Cost $ / 68

26 Monroe MPMS #:85813 Municipality:Eldred (Twp) Title:SR 3003 over Chapple Crk Route:3003 Section:01B A/Q Status:Exempt Improvement Type:Bridge Replacement Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:12/07/ /07/2017 Geographic Limits:Bridge carrying Silver Spring Boulevard (State Route 3003) over Chapple Creek, Eldred Township, Monroe County Narrative:This project involves the replacement of the bridge that carries Silver Spring Boulevard (State Route 3003) over Chapple Creek in Eldred Township, Monroe County. CON 185 $ 5 $ 0 $ 0 $ 0 $ 0 $ 0 $ 5 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ MPMS #:85818 Municipality:Polk (Twp) Title:Mill Pond Road over Pohopoco Crk Route:3010 Section:01B A/Q Status:Exempt Improvement Type:Bridge Rehabilitation Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:07/25/2019 Geographic Limits:Bridge carrying Mill Pond Road (State Route 3010) over Pohopoco Creek, Polk Township, Monroe County Narrative:This project involves the replacement or rehabilitation of the bridge that carries Mill Pond Road (State Route 3010) over Pohopoco Creek in Polk Township, Monroe County. CON 185 $ 1,000 $ 500 $ 0 $ 0 $ 0 $ 0 $ 1,000 $ 500 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ 1, / 68

27 Monroe MPMS #:85846 Municipality:Tunkhannock (Twp) Title:Long Pond Road ov'rtunkhannock Crk Route:4002 Section:03B A/Q Status:Exempt Improvement Type:Replace/Rehab Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:04/14/2022 Geographic Limits:Long Pond Road (SR 4002) over Tunkhannock Creek, Tunkhannock Township, Monroe County Narrative:This project involves the replacement or rehabilitation of the bridge carrying Long Pond Road (State Route 4002) over Tunkhannock Creek in Tunkhannock Township, Monroe County. PE BOF $ 125 $ 350 $ 45 $ 0 $ 0 $ 0 PE 185 $ 31 $ 88 $ 11 $ 0 $ 0 $ 0 FD BOF $ 0 $ 0 $ 280 $ 0 $ 0 $ 0 FD 185 $ 0 $ 0 $ 70 $ 0 $ 0 $ 0 UTL BOF $ 0 $ 0 $ 0 $ 20 $ 0 $ 0 UTL 185 $ 0 $ 0 $ 0 $ 5 $ 0 $ 0 ROW BOF $ 0 $ 0 $ 24 $ 0 $ 0 $ 0 ROW 185 $ 0 $ 0 $ 6 $ 0 $ 0 $ 0 CON BOF $ 0 $ 0 $ 0 $ 589 $ 1,411 $ 0 CON 185 $ 0 $ 0 $ 0 $ 147 $ 353 $ 0 $ 156 $ 438 $ 436 $ 761 $ 1,764 $ 0 Total FY Cost $ 1, MPMS #:85859 Municipality:Barrett (Twp) Title:SR 447 over Goose Pond Run Route:447 Section:06B A/Q Status:Exempt Improvement Type:Replace/Rehab Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:04/23/2020 Geographic Limits:SR 447 over Goose Pond Run, Barrett Township, Monroe County Narrative:This project involves the replacement or rehabilitation of the bridge that carries State Route 447 over Goose Pond Run in Barrett Township, Monroe County. UTL 581 $ 0 $ 109 $ 0 $ 0 $ 0 $ 0 ROW 185 $ 55 $ 0 $ 0 $ 0 $ 0 $ 0 CON STP $ 0 $ 500 $ 460 $ 0 $ 0 $ 0 CON 185 $ 0 $ 125 $ 115 $ 0 $ 0 $ 0 $ 55 $ 734 $ 575 $ 0 $ 0 $ 0 Total FY Cost $ 1, / 68

28 85882 Monroe 28 / 68

29 Monroe MPMS #:85882 Municipality:Hamilton (Twp) Title:209 Bus over Kettle Creek Route:2012 Section:02B A/Q Status:Exempt Improvement Type:Replace/Rehab Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:03/24/2022 Geographic Limits:State Business Route 209 over Kettle Creek, Hamilton Township, Monroe County Narrative:This project involves the replacement or rehabilitation of the bridge that carries State Business Route 209 over Kettle Creek in Hamilton Township, Monroe County. PE 185 $ 500 $ 0 $ 0 $ 0 $ 0 $ 0 FD 185 $ 0 $ 149 $ 0 $ 0 $ 0 $ 0 UTL 185 $ 0 $ 0 $ 13 $ 0 $ 0 $ 0 ROW 185 $ 0 $ 18 $ 0 $ 0 $ 0 $ 0 CON STP $ 0 $ 0 $ 0 $ 782 $ 509 $ 0 CON 581 $ 0 $ 0 $ 0 $ 196 $ 127 $ 0 $ 500 $ 167 $ 13 $ 978 $ 636 $ 0 Total FY Cost $ 1, MPMS #:88935 Municipality:Chestnuthill (Twp) Title:209/115 Int. Imp - Phase2 Route:209 Section:16S A/Q Status:Significant Improvement Type:Intersection Improvement Exempt Code: Est. Let Date:04/25/2019 Geographic Limits:State Route 209 from Brodheadsville to Route 115, Chestnuthill Township, Monroe County Narrative:This project provides improvements to the intersection of SR 209 and SR 115 in Brodheadsville and the corresponding approaches to the intersection. Roundabouts will be constructed at the SR 209 / SR 115 intersection and the SR 209 / Pleasant Valley Lane / Pleasant Valley School District entrance intersection. Pedestrian accomodations will be provided at select locations. CON CAQ $ 1,289 $ 729 $ 1,553 $ 1,553 $ 0 $ 0 CON HSIP $ 0 $ 0 $ 0 $ 855 $ 0 $ 0 CON NHPP $ 200 $ 1,600 $ 400 $ 1,080 $ 0 $ 0 CON 581 $ 372 $ 582 $ 488 $ 872 $ 0 $ 0 $ 1,861 $ 2,911 $ 2,441 $ 4,360 $ 0 $ 0 Total FY Cost $ 11, / 68

30 Monroe MPMS #:91624 Municipality:Tobyhanna (Twp) Title:TOC Operator - NEPA Route:380 Section:TOC A/Q Status:Exempt Improvement Type:Traffic Control Center Exempt Code:Traf contl devc & oper assist - nonsignalization Est. Let Date:03/10/ /10/2011 Geographic Limits:Monroe County - State Route 380 (mm2.5) and State Route 80 (mm 309.2), Carbon County - State Route 80 (mm 277), Schuylkill County - State Route 81 (mm 97 thru 169.8), Luzerne County - State Route 81 (mm 140.6) Narrative:Funding for operator in Traffic Operations Center in District 5-0 for NEPA region for management coverage of CCTV cameras and DMS message boards installed in Monroe, Carbon and Schuylkill Counties. CON NHPP $ 100 $ 0 $ 100 $ 0 $ 0 $ 0 CON STP $ 100 $ 0 $ 50 $ 0 $ 0 $ 0 CON 582 $ 50 $ 0 $ 38 $ 0 $ 0 $ 0 $ 250 $ 0 $ 188 $ 0 $ 0 $ 0 Total FY Cost $ MPMS #:93634 Municipality:Hamilton (Twp) Title:SR 3023 Replacement Route:3023 Section:0 A/Q Status:Exempt Improvement Type:Replace/Rehab Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:04/01/2025 Geographic Limits:SR 3023 over McMichaels Creek, Hamilton Township, Monroe County Narrative:This project involves the replacement/rehabilitation of bridge that carries Middle Easton Belmont Pike (State Route 3023) over McMichaels Creek in Hamilton Township, Monroe County. PE 185 $ 0 $ 0 $ 750 $ 0 $ 0 $ 0 FD 185 $ 0 $ 0 $ 0 $ 0 $ 750 $ 0 UTL 185 $ 0 $ 0 $ 0 $ 0 $ 100 $ 0 ROW 185 $ 0 $ 0 $ 0 $ 0 $ 125 $ 0 CON STP $ 0 $ 0 $ 0 $ 0 $ 1,600 $ 0 CON 185 $ 0 $ 0 $ 0 $ 0 $ 400 $ 0 $ 0 $ 0 $ 750 $ 0 $ 2,975 $ 0 Total FY Cost $ / 68

31 Monroe MPMS #:94363 Municipality:Barrett (Twp) Title:Golf Drive(SR 1017) Buck Hill Branch Br Route:1017 Section:01B A/Q Status:Exempt Improvement Type:Bridge Rehabilitation Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:04/14/2022 Geographic Limits:Golf Drive (SR 1017) over Buck Hill Branch, Barrett Township, Monroe County Narrative:This project involves the replacement or rehabilitation of the bridge carrying Golf Drive (State Route 1017) over Buck Hill Branch in Barrett Township, Monroe County. PE BOF $ 200 $ 160 $ 0 $ 0 $ 0 $ 0 PE 185 $ 50 $ 40 $ 0 $ 0 $ 0 $ 0 FD BOF $ 0 $ 0 $ 200 $ 0 $ 0 $ 0 FD 185 $ 0 $ 0 $ 50 $ 0 $ 0 $ 0 UTL BOF $ 0 $ 0 $ 0 $ 12 $ 0 $ 0 UTL 185 $ 0 $ 0 $ 0 $ 3 $ 0 $ 0 ROW BOF $ 0 $ 0 $ 20 $ 0 $ 0 $ 0 ROW 185 $ 0 $ 0 $ 5 $ 0 $ 0 $ 0 CON 581 $ 0 $ 0 $ 0 $ 1,000 $ 0 $ 0 $ 250 $ 200 $ 275 $ 1,015 $ 0 $ 0 Total FY Cost $ 1, MPMS #:95398 Municipality:Middle Smithfield (Twp) Title:209 Mt Nebo to Municipal Route:209 Section:0 A/Q Status:Exempt Improvement Type:Safety Improvement Exempt Code:Safety improvement program Est. Let Date:09/17/2020 Geographic Limits:State Route 209 from approximately 100 feet south of Holy Cross Road (T-542) to approximately 90' north of Hollow Road (SR 2023), Middle Smithfield Township, Monroe County Narrative:This project involves corridor safety improvements. SR 209 / Holy Cross Rd intersection to be closed. SR 209 / SR 2023 (Hollow Rd) intersection to be relocated perpendicular to SR 209. Relocated intersection at SR 2023 (Hollow Rd) may include widening for turn lanes. If warranted for a new signal, it is expected to be coordinated with the signal located at the Middle Smithfield Elementary school driveway. Project is located in Middle Smithfield Township, Monroe County. 31 / 68

32 95398 Monroe FD 581 $ 350 $ 0 $ 0 $ 0 $ 0 $ 0 UTL HSIP $ 250 $ 0 $ 0 $ 0 $ 0 $ 0 ROW 581 $ 250 $ 0 $ 0 $ 0 $ 0 $ 0 CON CAQ $ 0 $ 600 $ 0 $ 0 $ 0 $ 0 CON HSIP $ 0 $ 600 $ 0 $ 0 $ 0 $ 0 $ 850 $ 1,200 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ 2, / 68

33 Monroe MPMS #:95516 Municipality:Smithfield (Twp) Title:209 BUS (SR 2012) Mt Tom Road to Airport Road Route:2012 Section:04S A/Q Status:Exempt Improvement Type:Safety Improvement Exempt Code:Safety improvement program Est. Let Date:04/01/2023 Geographic Limits:State Route 2012 (Business Route 209) from the Mount Tom Road Intersection (Valhalla Drive) to the Airport Road intersection, Smithfield Township, Monroe County Narrative:This project involves safety improvements such as widening the shoulder, installation of center and edge line rumble strips, addition of curbed islands, evaluation of ingress/egress points and consideration of two way left turn lanes and/or left turn lanes on Milford Road (209 Business - SR 2012) from Mt. Tom Road Intersection (Valhalla Drive) to the Airport Road intersection in Smithfield Township, Monroe County. PE HSIP $ 0 $ 360 $ 0 $ 0 $ 0 $ 0 FD HSIP $ 0 $ 0 $ 500 $ 0 $ 0 $ 0 UTL HSIP $ 0 $ 0 $ 0 $ 250 $ 0 $ 0 ROW HSIP $ 0 $ 0 $ 2,000 $ 0 $ 0 $ 0 CON HSIP $ 0 $ 0 $ 0 $ 0 $ 2,500 $ 0 $ 0 $ 360 $ 2,500 $ 250 $ 2,500 $ 0 Total FY Cost $ 3, MPMS #:95574 Municipality:Hamilton (Twp) Title:Hamilton West Resurface- Sciota Route:209 Section:15M A/Q Status:Exempt Improvement Type:Resurface Exempt Code:Pavement resurfacing and/or rehabilitation Est. Let Date:04/14/2022 Geographic Limits:Hamilton West (State Route 209) from east of Lesh road to PA 33, Monroe County Narrative:This project involves highway resurfacing of Hamilton West (State Route 209) from east of Lesh Road to PA 33 in Hamilton Township, Monroe County. 33 / 68

34 95574 Monroe PE NHPP $ 240 $ 0 $ 0 $ 0 $ 0 $ 0 PE 581 $ 60 $ 0 $ 0 $ 0 $ 0 $ 0 FD NHPP $ 0 $ 0 $ 240 $ 0 $ 0 $ 0 FD 581 $ 0 $ 0 $ 60 $ 0 $ 0 $ 0 UTL NHPP $ 0 $ 0 $ 0 $ 80 $ 0 $ 0 UTL 581 $ 0 $ 0 $ 0 $ 20 $ 0 $ 0 ROW NHPP $ 0 $ 0 $ 80 $ 0 $ 0 $ 0 ROW 581 $ 0 $ 0 $ 20 $ 0 $ 0 $ 0 CON NHPP $ 0 $ 0 $ 0 $ 1,500 $ 3,300 $ 0 CON 581 $ 0 $ 0 $ 0 $ 375 $ 825 $ 0 $ 300 $ 0 $ 400 $ 1,975 $ 4,125 $ 0 Total FY Cost $ 2, / 68

35 Monroe MPMS #:96414 Municipality:Hamilton (Twp) Title:PA 33 Median Barrier SR 115 to SR 2002 Route:33 Section:03S A/Q Status:Exempt Improvement Type:Safety Improvement Exempt Code:Guardrails, median barriers, crash cushions Est. Let Date:04/08/2021 Geographic Limits:PA 33 from SR 115 to SR 2002, Hamilton and Ross Townships, Monroe County Narrative:This project involves the installation of a concrete median barrier along State Route 33 from State Route 115 to State Route 2002 in Hamilton and Ross Townships, Monroe County. FD NHPP $ 336 $ 0 $ 0 $ 0 $ 0 $ 0 ROW NHPP $ 27 $ 0 $ 0 $ 0 $ 0 $ 0 CON HSIP $ 0 $ 0 $ 400 $ 1,720 $ 0 $ 0 CON 581 $ 0 $ 0 $ 1,000 $ 1,489 $ 2,511 $ 0 $ 363 $ 0 $ 1,400 $ 3,209 $ 2,511 $ 0 Total FY Cost $ 4, MPMS #:96442 Municipality:Hamilton (Twp) Title:Hamilton West Resurface 33 to 80 Route:209 Section:28M A/Q Status:Exempt Improvement Type:Resurface Exempt Code:Pavement resurfacing and/or rehabilitation Est. Let Date:04/11/2019 Geographic Limits:Hamilton West (SR 209), from PA 33 to I-80, Monroe County Narrative:This project involves the highway resurfacing of Hamilton West (State Route 209) including guiderail updates from PA 33 to Interstate 80 in Hamilton and Stroud Townships, Monroe County. CON NHPP $ 1,151 $ 1,000 $ 1,500 $ 1,150 $ 0 $ 0 CON 581 $ 288 $ 250 $ 375 $ 287 $ 0 $ 0 $ 1,439 $ 1,250 $ 1,875 $ 1,437 $ 0 $ 0 Total FY Cost $ 6, / 68

36 Monroe MPMS #: Municipality:Chestnuthill (Twp) Title:SR 115 Corridor Imp- Effort Route:115 Section:03S A/Q Status:Exempt Improvement Type:Corridor Safety Exempt Code:Safety improvement program Improvement Est. Let Date:07/23/2020 Geographic Limits:SR 115, Effort, Monroe County Narrative:This project involves safety improvements along State Route 115 in the vicinity of Astolat Road to Sugar Hollow Road including widening shoulders, adding left turning lanes and improving sight distance in Chestnuthill Township, Monroe County. UTL HSIP $ 114 $ 0 $ 0 $ 0 $ 0 $ 0 ROW HSIP $ 56 $ 0 $ 0 $ 0 $ 0 $ 0 CON HSIP $ 831 $ 1,369 $ 0 $ 0 $ 0 $ 0 $ 1,001 $ 1,369 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ 2, MPMS #: Municipality:Coolbaugh (Twp) Title:Tobyhanna Crk Br II Route:4008 Section:01B A/Q Status:Exempt Improvement Type:Bridge Replacement Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:09/28/ /28/2017 Geographic Limits:Bridge carrying Main Street (State Route 4008) over Tobyhanna Creek, Coolbaugh Township, Monroe County Narrative:This project involves the replacement of the bridge carrying Main Street (State Route 4008) over the Tobyhanna Creek in Coolbaugh Township, Monroe County. CON BOF $ 6 $ 0 $ 0 $ 0 $ 0 $ 0 CON 581 $ 2 $ 0 $ 0 $ 0 $ 0 $ 0 $ 8 $ 0 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ / 68

37 Monroe MPMS #: Municipality:Jackson (Twp) Title:715 over McMichael's Crk II Route:715 Section:03B A/Q Status:Exempt Improvement Type:Replace/Rehab Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Est. Let Date:08/22/2019 Geographic Limits:Village of McMichael, JacksonTownship, Monroe County Narrative:This project involves the replacement or rehabilitation of the stone arch bridge carrying State Route 715 over McMichaels Creek in Jackson Township, Monroe County. UTL 185 $ 100 $ 0 $ 0 $ 0 $ 0 $ 0 ROW 185 $ 100 $ 0 $ 0 $ 0 $ 0 $ 0 CON 581 $ 1,000 $ 800 $ 0 $ 0 $ 0 $ 0 $ 1,200 $ 800 $ 0 $ 0 $ 0 $ 0 Total FY Cost $ 2, MPMS #: Municipality:Hamilton (Twp) Title:209 -Schafer School Route:209 Section:17S A/Q Status:Significant House Improvement Type:Safety Improvement Exempt Code: Est. Let Date:01/28/2021 Geographic Limits:SR 209 at Schafer School House (SR 2005) and Beaver Valley Road, Hamilton Township, Monroe County Narrative:This project involves closing the median and removal of the traffic signal at State Route 209 and Schafer School House Road intersection in Hamilton Township, Monroe County. FD HSIP $ 200 $ 250 $ 0 $ 0 $ 0 $ 0 UTL HSIP $ 0 $ 80 $ 0 $ 0 $ 0 $ 0 ROW HSIP $ 0 $ 80 $ 0 $ 0 $ 0 $ 0 CON HSIP $ 0 $ 0 $ 5,380 $ 0 $ 0 $ 0 $ 200 $ 410 $ 5,380 $ 0 $ 0 $ 0 Total FY Cost $ 5, / 68

38 Monroe MPMS #: Municipality: Title:NEPA Brg Preserve & Repair 6 Route: Section: A/Q Status:Exempt Improvement Type:Bridge Preservation Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes) Activities Est. Let Date:04/14/2022 Geographic Limits:Various bridges in Carbon, Monroe, and Schuylkill Counties Narrative:Consultant design and construction of bridge repairs and preservation of various bridges in Carbon, Monroe, and Schuylkill Counties to reduce outstanding priority bridge repair items. PE 185 $ 0 $ 750 $ 0 $ 0 $ 0 $ 0 CON 185 $ 0 $ 0 $ 0 $ 1,402 $ 4,974 $ 0 $ 0 $ 750 $ 0 $ 1,402 $ 4,974 $ 0 Total FY Cost $ 2, MPMS #: Municipality:Coolbaugh (Twp) Title:Summit Avenue RRXing Upgrade Route: Section: A/Q Status:Exempt Improvement Type:RR Warning Devices Exempt Code:Railroad/highway crossing warning devices Est. Let Date: Geographic Limits:Summit Avenue crossing of Delaware & Lackawanna RR tracks, Pocono Summit, Coolbaugh Township, Monroe County Narrative:This project involves upgrading Railroad warning devices by installing new circuitry and a post mounted 12" lights to the Summit Avenue at-grade crossing of Delaware & Lackawanna railroad tracks in Pocono Summit in Coolbaugh Township, Monroe County. CON RRX $ 0 $ 40 $ 200 $ 0 $ 0 $ 0 $ 0 $ 40 $ 200 $ 0 $ 0 $ 0 Total FY Cost $ / 68

FFY 2019 Lehigh Valley TIP Highway & Bridge Draft

FFY 2019 Lehigh Valley TIP Highway & Bridge Draft 11390 MPMS #:11390 Municipality:Lowhill (Twp) Title:Hollenbachs Bridge Route:4009 Section:02B A/Q Status:Exempt Improvement Type:Replace/Rehab Exempt Code:Widen narw. pave. or recon brdgs (No addtl lanes)

More information

FFY 2015 Scranton/W-B TIP Highway & Bridge Draft

FFY 2015 Scranton/W-B TIP Highway & Bridge Draft Lackawanna MPMS #:8040 Municipality:Carbondale (City) Title:6th Ave.Bridge, Carbondale Route:7301 Section:BRG A/Q Status:Exempt Improvement Type:Bridge Replacement Exempt Code:Widen narw. pave. or recon

More information

Northeastern Pennsylvania Alliance Metropolitan Planning Organization Transportation Programming for the Counties of: Carbon Monroe Pike Schuylkill

Northeastern Pennsylvania Alliance Metropolitan Planning Organization Transportation Programming for the Counties of: Carbon Monroe Pike Schuylkill Northeastern Pennsylvania Alliance Metropolitan Planning Organization Transportation Programming for the Counties of: Carbon Monroe Pike Schuylkill September 20, 2016 Technical Planning Committee Meeting

More information

FFY 2019 Interstate TIP Highway & Bridge Draft

FFY 2019 Interstate TIP Highway & Bridge Draft Allegheny 87756 MPMS #:87756 Municipality:Neville (Twp) Title:Neville Island Bridge Route:79 Section:A61 A/Q Status:Exempt Improvement Type:Bridge Preservation Widen narw. pave. or recon brdgs (No addtl

More information

Pioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017

Pioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017 2017-2021 Pioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017 HIGHWAY AMENDMENTS FEDERAL FISCAL YEAR 2017 Part 1A: Federal Aid Target Projects Increase cost of (604033)

More information

NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY

NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 Amendment Conformity Report for August 20, 2008 Amendments (Amendment # 2008-028 thru 2008-030) On August 20, 2008 the Executive Board

More information

Highway & Bridge Original US DOT Approval Date: 10/01/2008 Current Date: 06/30/2010 Cambria MPMS #: 87593

Highway & Bridge Original US DOT Approval Date: 10/01/2008 Current Date: 06/30/2010 Cambria MPMS #: 87593 MPMS #: 87593 Johnstown (City) Title: Jtown Bridge Open End Route: Section: A/Q Status: Improvement Type: Bridge Preservation Activities Est. Let Date: Actual Let Date: Geographic Limits: Various bridges

More information

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION Amendment # 2 FY 2017-2020 Transportation Improvement Program Amendment Summary: The Transportation Improvement Program (TIP)

More information

Approved STIP Formal Amendments for the Period of 11/01/2018-3/15/2019

Approved STIP Formal Amendments for the Period of 11/01/2018-3/15/2019 3116-151 Hwy 169 from Taconite to Pengilly, Safety Improvements 5409-32 Concrete resurface, raise grade at levee's, install lighting, improve drainage and pedestrian accessibility on Hwy 75 in Halstad

More information

Potential Changes to the 2015 to 2018 TIP Highway List. Proposed Administrative Adjustment #3

Potential Changes to the 2015 to 2018 TIP Highway List. Proposed Administrative Adjustment #3 Potential Changes to the 2015 to 2018 TIP Highway List Proposed Administrative Adjustment # PROJECT #60644, WORCESTER CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENTS Move the FY 2015 Statewide Transportation

More information

PUBLIC WORKS - ENGINEERING

PUBLIC WORKS - ENGINEERING PUBLIC WORKS - ENGINEERING 4 DIVISIONS: CAPITAL IMPROVEMENT PROGRAM (CIP) TRAFFIC ENGINEERING DEVELOPMENT ENGINEERING SEWER & STORM DRAIN ENGINEERING 18 FTE s, 2 Hourly s In FY 14/15 Expended approximately

More information

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM TOTAL PROJECT ESTIMATE ($) STATE ALLOCATION CODE (SAC) FUND TYPE ENCUMBERED FROM BEFORE FY 2011 PE/RW PRIOR TO FY 2016 LOCAL MATCH LOCAL LABOR STATE LABOR FED LABOR & TSKF LINE ITEM # ST. LINE ITEM

More information

TRANSPORTATION IMPROVEMENT PROGRAM

TRANSPORTATION IMPROVEMENT PROGRAM L V T S TRANSPORTATION IMPROVEMENT PROGRAM 2019 2022 DRAFT April 4, 2018 Coordinating Committee Voting Members Michael Rebert (Chair), PennDOT District 5 Larry Shifflet, PennDOT Central Office Raymond

More information

MEMORANDUM. Requested Action Provide comments and questions to staff regarding the proposed TIP projects funding scenario.

MEMORANDUM. Requested Action Provide comments and questions to staff regarding the proposed TIP projects funding scenario. MEMORANDUM To: MPO Technical and Citizens Advisory Committees From: Joshua Desmond, AICP BMCMPO Director Date: March 15, 2017 Re: FY 20182021 TIP s Proposal The MPO is developing the s 2018 through 2021

More information

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP) HINDS Project: 480001 Responsible Agency: CITY OF CLINTON Total Project Cost: $6,068,000 Route: PINEHAVEN/NORTHSIDE DR Fund Source: EARMARK Project Length: 1.25 Pinehaven Dr from Northside Dr to 400' N

More information

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade. Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding

More information

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS - COST FEASIBLE PROJECTS TABLE 1 - STATE PROJECTS (STRATEGIC INTERMODAL SYSTEM / FLORIDA'S TURNPIKE / CENTRAL FLORIDA EXPRESSWAY AUTHORITY) Facility From To Project Current Year Cost Estimates M-SIS M-SIS

More information

PENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE

PENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE November 20, 2015 Revised December 18, 2015 to reflect FAST Act PENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE This is a collaborative product jointly developed by the Pennsylvania Planning

More information

Programed Totals $39,761 $35,676 $75,437 $73,111 $2,326 $0 $17,109 $17,109 $17,109 $0 $0 $14,580 $14,580 $14,580 $0

Programed Totals $39,761 $35,676 $75,437 $73,111 $2,326 $0 $17,109 $17,109 $17,109 $0 $0 $14,580 $14,580 $14,580 $0 WCOG Managed WHATCOM COUNCIL OF GOVERNMENTS 2014 Transportation Improvement Program Amendment #1 (1401) MPO Financial Feasibility Summary Anticipated Federal Funding* & Programmed Expenditures (in Thousands)

More information

2016 Boston Region MPO Transportation Improvement Program

2016 Boston Region MPO Transportation Improvement Program Adjustment Type Project ID Project Description Funding District Source Information Section 1A / Federal Aid Target Projects Indicates a change in project cost Indicates removed from TIP (cost not reflected

More information

Summary Narrative of Amendment 3 to the FFY Transportation Improvement Program for the Northern Middlesex Region

Summary Narrative of Amendment 3 to the FFY Transportation Improvement Program for the Northern Middlesex Region Summary Narrative of Amendment 3 to the FFY 2017 2021 Transportation Improvement Program for the Northern Middlesex Region The following summarizes a proposed amendment to Fiscal Year 2017 of the FFY 2017

More information

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION City of Staunton County of Augusta City of Waynesboro 112 MTANLY PLE STAUNTON, VIRGINIA 24401 PHONE (540) 885-5174 FAX (540) 885-2687 July

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT Project Type: GDOT District: Federal Route Number: State Route Number: P.I. Number: County: MPO ID Number: Project Description (provide

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0 UTP November Update - Funding Adjustments Summary (Amounts in millions) District/Division//TMA Fiscal Year Adjusted Amount Post Public Meeting Adjustments Austin 3 SH 130 Concession FY $6,500,000 3 SH

More information

Chapter 7. Future Network and Implementation

Chapter 7. Future Network and Implementation Chapter 7. Future Network and Implementation Background and Overall Approach The previous Range of Alternatives Chapter provides a summary of how the Universe of Projects list was developed, which encompasses

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP)

HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) HSIP GUIDEBOOK & APPLICATION FORM HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) Greater Minnesota Solicitation for District Projects State Fiscal Years 2019, 2020, 2021 and 2022 September 2017 2017 HSIP Solicitation

More information

TEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P

TEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P TEXAS DEPARTMENT OF TRANSPORTATION S T A T E W I D E T R A N S P O R T A T I O N I M P R O V E M E N T P R O G R A M S T I P 2 015201 8 BRYAN DISTRICT 2 0 1 5 2 0 1 8 T I P H I G H W AY I n i t i a l 2015

More information

Region 5 Upcoming Projects for Summer/Fall 2018

Region 5 Upcoming Projects for Summer/Fall 2018 Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The

More information

Annual Listing of Obligated Projects Federal Fiscal Year 2013

Annual Listing of Obligated Projects Federal Fiscal Year 2013 Annual Listing of Obligated Projects Federal Fiscal Year 2013 Nashua Regional Planning Commission 9 Executive Park Drive Suite 201 Merrimack, NH 03054 (603) 424-2240 www.nashuarpc.org A N N U A L L I S

More information

OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY

OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY TABLE OF CONTENTS MPO AND LARGE CITY PROGRAM OVERVIEW.. 3 MPO AND LARGE CITY SFY 2015 STP BUDGET SUMMARY......... 4 MPO AND LARGE CITY SFY 2015

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 SARASOTA COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide

More information

Funding Update. House Transportation Subcommittee on Long-Term Infrastructure Planning September 10, 2015, 9:00 A.M. Capitol Extension E2.

Funding Update. House Transportation Subcommittee on Long-Term Infrastructure Planning September 10, 2015, 9:00 A.M. Capitol Extension E2. Funding Update House Transportation Subcommittee on Long-Term Infrastructure Planning September 10, 2015, 9:00 A.M. Capitol Extension E2.012 Transportation Funding Sources for the FY 2016-2017 Biennium

More information

2012 APC Liaison Meeting February 24, 2012

2012 APC Liaison Meeting February 24, 2012 District 9-0 2012-13 Letting Schedule Update District 9-09 2012 APC Liaison Meeting February 24, 2012 Brad J. Brumbaugh, P.E. Assistant District Executive - Construction District 9-0 2012 Letting Summary

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 SARASOTA COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide

More information

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6 C ITY OF G EORGETOWN, TEXAS C APITAL I MPROVEMENT P LAN S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6 Georgetown Transportation Advisory Board April 10, 2015 Table of Contents Introduction... 1 Transportation

More information

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway

More information

Development of the Cost Feasible Plan

Development of the Cost Feasible Plan March 15, 2012 TPO Board and Advisory Committee Meetings Development of the Cost Feasible Plan Transportation Outlook 2035 LRTP Update Atkins Development of the Cost Feasible Plan P a g e 1 Development

More information

Transportation Improvement Program Page 39

Transportation Improvement Program Page 39 Fiscal Year CSJ Project # Facility From To 1 - Preventive Maintenance 2019 2022 Transportation Improvement Program Page 39 2U - Urban Mobility 3LC - Local Contribution 4 - Congestion, Connectivity, Corridor

More information

TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION CAPITAL PROGRAM TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily

More information

Unified Planning Work Program

Unified Planning Work Program Unified Planning Work Program New Orleans, Mandeville Covington, Slidell, and Tangipahoa Parish Urbanized Areas ADDENDA FY 2016 2 P a g e Unified Planning Work Program Fiscal Year 2016 Urbanized Areas

More information

Bike/Pedestrian Facilities Stellar Trail St Joseph TAP (INDOT) RW $ 346,640 $ 86,660 $ 433,300

Bike/Pedestrian Facilities Stellar Trail St Joseph TAP (INDOT) RW $ 346,640 $ 86,660 $ 433,300 Match 2018 2019 2020 M08-19 Goshen 1900739 Added Travel Lanes College Ave from US 33 to NS Railroad Line (East Entrance of parking lot) STBG PE $ 300,000 $ 75,000 $ 375,000 Add Des to TIP M07-19 MACOG

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 MANATEE COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide

More information

How to Read the Project Modification Listings Roadway Section

How to Read the Project Modification Listings Roadway Section How to Read the Project Modification Listings Roadway Section The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation Improvement

More information

April 24, Subject: Amendments to the FY Transportation Improvement Program

April 24, Subject: Amendments to the FY Transportation Improvement Program CAMPO Capital Area Metropolitan Planning Organization April 24, 2006 Mr. Robert Daigh District Engineer Texas Department of Transportation - Austin District PO Drawer 15426 Austin, TX 78761 Subject: Amendments

More information

Revision Report A5.M Approved Dollars. Scope: S. Bennington Rd over Russell Brook Bridge Rehab or Replacement

Revision Report A5.M Approved Dollars. Scope: S. Bennington Rd over Russell Brook Bridge Rehab or Replacement BENNINGTON (29486) Route/Road/Entity: S BENNINGTON ROAD Scope: S. Bennington Rd over Russell Brook Bridge Rehab or Replacement $1,016,818 PE 2017 $165,000 $0 $0 $165,000 STP-Non Urban Areas Under 5K, Toll

More information

How to Read the Project Modification Listings - Roadway Section

How to Read the Project Modification Listings - Roadway Section How to Read the Project Modification Listings - Roadway Section Sa m pl e The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation

More information

...;..;...;.;;..;.. Additional preservation and safety needs have been identified and recommend to be programmed with funding available in FY2019.

...;..;...;.;;..;.. Additional preservation and safety needs have been identified and recommend to be programmed with funding available in FY2019. DOT-1208 (6/09) (PROGRAM FISCAL YEAR IS OCTOBER 1 - SEPTEMBER 30) REVISION NUMBER: 19-001...;..;...;.;;..;.. J USTI FICA TION: Additional preservation and safety needs have been identified and recommend

More information

ALL Counties. ALL Districts

ALL Counties. ALL Districts TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation

More information

FY February Quarterly Revision. Bryan DISTRICT

FY February Quarterly Revision. Bryan DISTRICT FY 20132016 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM February Quarterly Revision Bryan DISTRICT TRANSIT Administrative Amendment February 2013 BCSMPO, Final FY 20132016 TIP, FY 2013 2016 Transportation

More information

$+ 121 $+ 120 $+ 122 $+ 155 $+ 155 $+ 109 $+ 139 $+ 136 $+ 111 $+ 124 $ MINNEHAHA COUNTY TIP Projects !.!. !.!. Dell Rapids.

$+ 121 $+ 120 $+ 122 $+ 155 $+ 155 $+ 109 $+ 139 $+ 136 $+ 111 $+ 124 $ MINNEHAHA COUNTY TIP Projects !.!. !.!. Dell Rapids. ST AVE TH AVE TH AVE BIG SIOUX RD TH AVE TH AVE TH AVE TH AVE TH AVE 9 9 0 Miles TH AVE $+ 0 $+ 0 TH AVE TH AVE 9 Humboldt TH ST TH AVE $+ 0 0 0-0-00 0 Construction 09 Construction 00 Construction 0 Construction

More information

Chapter 6 Transportation Improvements & Financial Plan

Chapter 6 Transportation Improvements & Financial Plan Chapter 6 Transportation Improvements & Financial Plan Introduction Up to this point, this plan has provided a regional profile (the population, employment, and commuting patterns) of the RTPO and MPO

More information

Overview of Funding Sources

Overview of Funding Sources Overview of Funding Sources 0 Transportation 0 Transportation Sales Tax 0 License Tax 0 G.O. Bonds 0 CIP Sales Tax 0 General Fund 0 Public Safety, Facilities, Buildings 0 G.O. Bonds 0 General Fund 0 Stormwater

More information

2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD

2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD AGENDA ITEM NO. 2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD TO THE HONORABLE MAYOR AND COUNCIL: DATE: June 22, 2009 Subiect: ADOPTING RESOLUTION NO. 09-53, APPROVING THE CITY'S REVISED PROPOSITION

More information

Associated Pennsylvania Constructors 800 North Third Street, Harrisburg PA 17102

Associated Pennsylvania Constructors 800 North Third Street, Harrisburg PA 17102 PLEASE FAX YOUR ORDER FORM TO 717-238-5060 Associated Pennsylvania Constructors 800 North Third Street, Harrisburg PA 17102 Phone: 717-238-2513 - Fax 717-238-5060 Letting Date 10/19/17 Company Name: Date:

More information

PENNSYLVANIA S 2009 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE

PENNSYLVANIA S 2009 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE September 14, 2007 PENNSYLVANIA S 2009 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE This is a collaborative product jointly developed by the Pennsylvania Planning Partners MPOs, RPOs, FHWA, FTA, the State

More information

SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania

SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania January 2013 Table of Contents... 1 Introduction... 2 Project

More information

Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC:

Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC: To: Mayor Lee Gray Members of Council City Manager Bill Vance Memo From: Scott Tourville Project: 2015 CIP Budget Update CC: C. Schornack S. Spencer File Date: November 21, 2014 RE: Updated 2015 CIP Plan

More information

Capital District Transportation Committee March 3, Amendments to the TIP

Capital District Transportation Committee March 3, Amendments to the TIP Capital District Transportation Committee March 3, 2017 Amendments to the 2016-21 TIP At its March 1, 2017 and March 2, 2017 meetings, CDTC made the following amendments to the Transportation Improvement

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One DISTRICT ONE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make project investments in District One. In FY 2017 and FY 2018, current Turnpike projects total over $105 million within Okeechobee

More information

City of Portsmouth Portsmouth, New Hampshire Department of Public Works

City of Portsmouth Portsmouth, New Hampshire Department of Public Works RFP# 10-07 City of Portsmouth Portsmouth, New Hampshire Department of Public Works MARKET STREET BICYCLE AND PEDESTRIAN PATH BETWEEN MICHAEL SUCCI DRIVE AND THE NH PORT AUTHORITY REQUEST FOR PROPOSAL Sealed

More information

HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) Greater Minnesota Solicitation for Local Projects for 2017, 2018, 2019, and 2020.

HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) Greater Minnesota Solicitation for Local Projects for 2017, 2018, 2019, and 2020. HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) Greater Minnesota Solicitation for Local Projects for 2017, 2018, 2019, and 2020 August 2015 GUIDEBOOK & APPLICATION FORM HSIP HSIP Funding Guide Page 1 HSIP Funding

More information

Transportation Trust Fund Overview

Transportation Trust Fund Overview Transportation Trust Fund Overview Created pursuant to New Jersey Transportation Trust Fund Authority Act of 1984 Established to finance the cost of planning, acquisition, engineering, construction, reconstruction,

More information

NASHVILLE AREA MPO. ADJUSTMENT to The Fiscal Years Transportation Improvement Program. Adjustment Number: TIP Number:

NASHVILLE AREA MPO. ADJUSTMENT to The Fiscal Years Transportation Improvement Program. Adjustment Number: TIP Number: NASHVILLE AREA MPO ADJUSTMENT to The Fiscal Years 20082011 Transportation Improvement Program Adjustment Number: 2009019 TIP Number: 200852034 FROM: TIP# 200852034 Jurisdiction: Hendersonville Project:

More information

Columbia Area Metropolitan Planning Organization

Columbia Area Metropolitan Planning Organization Columbia Area Metropolitan Planning Organization FY 2009 Annual Listing of Obligated Projects October 1, 2008 September 30, 2009 Approved by the CMCOG Board June 24, 2010 The preparation of this report

More information

TEXAS DEPARTMENT OF TRANSPORTATION

TEXAS DEPARTMENT OF TRANSPORTATION TEXAS DEPARTMENT OF TRANSPORTATION FY 2013-2016 2016 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HOUSTON DISTRICT AUGUST 2014 Quarterly Revision HIGHWAY August 2014 . HOUSTON-GALVESTON AREA COUNCIL

More information

Projected Funding & Highway Conditions

Projected Funding & Highway Conditions Projected Funding & Highway Conditions Area Commission on Transportation Gary Farnsworth ODOT Interim Region 4 Manager March, 2011 Overview ODOT is facing funding reductions that will require new strategies

More information

NOTICE OF ELECTION 2021 $10,000, $10,000, $10,000, $10,000,000

NOTICE OF ELECTION 2021 $10,000, $10,000, $10,000, $10,000,000 NOTICE OF ELECTION TO THE QUALIFIED VOTERS OF DEKALB COUNTY, GEORGIA NOTICE IS HEREBY GIVEN that on the 7 th day of November, 2017, an election will be held at the regular polling places in all of the

More information

Quarterly Status Report

Quarterly Status Report Capital Projects Quarterly Status Report 2nd Quarter FY2018 : October 01 - December 31, 2017 Report prepared for the March 01, 2018 TA Board Meeting SAN MATEO COUNTY TRANSPORTATION AUTHORITY QUARTERLY

More information

SEDA-COG Metropolitan Planning Organization Long Range Transportation Plan. Regional Performance Measures Report

SEDA-COG Metropolitan Planning Organization Long Range Transportation Plan. Regional Performance Measures Report SEDA-COG Metropolitan Planning Organization Long Range Transportation Plan Regional Performance Measures Report April 2015 INTRODUCTION The SEDA-COG Metropolitan Planning Organization (MPO) adopted the

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six DISTRICT SIX PROJECT OVERVIE Florida s Turnpike Enterprise continues to make project investments in District Six. In FY 2017 and FY 2018, current Turnpike projects total over $109 million within Miami-Dade

More information

Military Highway Continuous Flow Intersection (CFI) Initial Financial Plan

Military Highway Continuous Flow Intersection (CFI) Initial Financial Plan Military Highway Continuous Flow Intersection (CFI) Initial Financial Plan State Project Number(s): 0013-122-V03, 0165-122-V04, 0165-122-181 UPC(s): 9783, 1765, 84243 1 Table of Contents 1. Project Description...

More information

FRESNO COUNTY ROAD IMPROVEMENT PROGRAM INTRODUCTION

FRESNO COUNTY ROAD IMPROVEMENT PROGRAM INTRODUCTION 4 ),! % 1 2 4 8 - - 6 2 4 / 4 ), - 2 ) 4 6-6. 2 7 * 1 + 9 4 5 2 ) 1 / FRESNO COUNTY 2003 2007 ROAD IMPROVEMENT PROGRAM INTRODUCTION The Road Improvement Program (RIP) is a multi-year road maintenance and

More information

FFY 2009 OBLIGATED AND GRANTED PROJECTS LIST

FFY 2009 OBLIGATED AND GRANTED PROJECTS LIST Note: Yellow highlighted entries are bicycle and pedestrian facilities projects. CAPITOL 10 0400-0043 CON FTA SEC 5309RR RECOVERY & REINVESTMENT 10 0426-0049 ACQ FTA SEC 5307C CAPITAL 10 0426-0050 CON

More information

CITY OF SPOKANE VALLEY Request for Council Action

CITY OF SPOKANE VALLEY Request for Council Action CITY OF OKANE VALLEY Request for Council Action Meeting Date: May 23, 2017 Department Director Approval: Check all that apply: consent old business new business public hearing information admin. report

More information

Memphis and Shelby County Division of Planning & Development

Memphis and Shelby County Division of Planning & Development Memphis and Shelby County Division of Planning & Development 125 NORTH MAIN STREET, MEMPHIS, TENNESSEE 38103 Tel: (901) 576 7190 Fax: (901) 576 7272 Mark H. Luttrell, Jr. Mayor, Shelby County A C Wharton,

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: December 21, 2017 TO: FROM ACTION TRANSMITTAL No. 2018-07 Technical Advisory Committee TAC Funding and Programming Committee

More information

OHIO MPO & LARGE CITY CAPITAL PROGRAM SFY 2017 SUMMARY

OHIO MPO & LARGE CITY CAPITAL PROGRAM SFY 2017 SUMMARY OHIO MPO & LARGE CITY CAPITAL PROGRAM SFY 2017 SUMMARY Revised 9/19/2017 TABLE OF CONTENTS MPO AND LARGE CITY PROGRAM OVERVIEW... 3 MPO AND LARGE CITY SFY 2017 STBG BUDGET SUMMARY... 4 MPO AND LARGE CITY

More information

Wednesday, June 6, 2018

Wednesday, June 6, 2018 Wednesday, June 6, 2018 Excellence in Program Administration Award 2018 AASHTO Civil Rights Training Symposium Excellence in Program Administration Award Joanna McFadden EEO/DBE Section Head APRIL 2017-2018

More information

Amendment 6 - OKI 2030 REGIONAL TRANSPORTATION PLAN

Amendment 6 - OKI 2030 REGIONAL TRANSPORTATION PLAN Amendment 6 - OKI 2030 REGIONAL TRANSPORTATION PLAN February, 2011 Prepared by the Ohio-Kentucky-Indiana Regional Council of Governments Acknowledgments Title Amendment 6 - OKI 2030 Regional Transportation

More information

STAFF REPORT. Highway 101 Milpas to Cabrillo/Hot Springs Project. MEETING DATE: January 15, 2009 AGENDA ITEM: 12

STAFF REPORT. Highway 101 Milpas to Cabrillo/Hot Springs Project. MEETING DATE: January 15, 2009 AGENDA ITEM: 12 STAFF REPORT SUBJECT: Highway 101 Milpas to Cabrillo/Hot Springs Project MEETING DATE: January 15, 2009 AGENDA ITEM: 12 STAFF CONTACT: Jim Kemp, Steve VanDenburgh RECOMMENDATION: Authorize the Executive

More information

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016 City of Des Moines Citizen Engagement Capital Improvement Program November 29, 2016 Goals of Citizen Engagement Goal Focus on service levels Department definitions of adequate service and opportunities

More information

INVESTING STRATEGICALLY

INVESTING STRATEGICALLY 11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program

More information

Region XII Planning Affiliation Transportation Improvement Program

Region XII Planning Affiliation Transportation Improvement Program Region XII Planning Affiliation 2018-2021 Transportation Improvement Program Approved July 13, 2017 2018-2021 Transportation Program Executive Summary The Fixing America s Surface Transportation Act or

More information

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Adopted August 22, 2013 This report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, the Florida

More information

4.A.14-2

4.A.14-2 4.A.14-1 4.A.14-2 Administration and Projects Committee STAFF REPORT Meeting Date: June 2, 2016 Subject Summary of Issues FY 2016-17 Proposed Budget for the Contra Costa Transportation Authority and Congestion

More information

MEMORANDUM OF UNDERSTANDING Lehigh Valley Transportation Study's Procedures for TIP M odifications

MEMORANDUM OF UNDERSTANDING Lehigh Valley Transportation Study's Procedures for TIP M odifications MEMORANDUM OF UNDERSTANDING Lehigh Valley Transportation Study's Procedures for 2017-2020 TIP M odifications Purpose This Memorandum of Understanding (MOU) establishes a set of procedures to be used by

More information

Route Route Z Intersection Realignment

Route Route Z Intersection Realignment Route N @ Route Z Intersection Realignment Sponsor County Highway Project No. RB18-000016 Project Type Traffic Flow TOTAL FUNDING Total County Sponsor Federal $3,310,000 $1,776,000 $0 $1,534,000 Project

More information

CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION. Local Option Sales Tax Funds $ 500,000

CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION. Local Option Sales Tax Funds $ 500,000 CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION On-Going Pavement Management Program: In 2009/2010 the city completed the initial 3-year plan

More information

PUBLIC WORKS CIP Quarterly Update Year 17~Volume II

PUBLIC WORKS CIP Quarterly Update Year 17~Volume II Capital Improvement Program Quarterly Report July 2017 2 0 1 7 Department of Public Works PUBLIC WORKS CIP Quarterly Update Year 17~Volume II 1 Introduction The Public Works Department s mission is improvement

More information

City County Building, Suite Main Street Knoxville, Tennessee (865)

City County Building, Suite Main Street Knoxville, Tennessee (865) City County Building, Suite 403 400 Main Street Knoxville, Tennessee 37902 (865) 215-2500 www.knoxtrans.org January 12, 2017 Tennessee Department of Transportation James K. Polk Building, Suite 600 505

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 20172018 AGENCY CONTACT INFORMATION Agency Name: City of Fremont Date: 12/21/2018 Primary Point of Contact Name: Tish Saini

More information

2012 Boston MPO Transportation Improvement Program

2012 Boston MPO Transportation Improvement Program Non- Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates a project moved out to another TIP element

More information

I-64 Capacity Improvements Segment III Initial Financial Plan

I-64 Capacity Improvements Segment III Initial Financial Plan I-64 Capacity Improvements Segment III Initial Financial Plan State Project # 0064-965-229/0064-099-229 P101, R201, C501, B638, B639, B640, B641, B642, B643, D609, D610, D611 Federal # NHPP-064-3(498)/

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates. , Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...

More information